Sales & Distribution-APO-ATP Check
Short Description
Download Sales & Distribution-APO-ATP Check...
Description
Sales & Distribution - Available to Promise (ATP)
2009
Table of Contents Available to Promise (ATP)................................................................................................ 2 Dates:- ............................................................................................................................. 2 Order Date .................................................................................................................. 2 Material Availability Date .......................................................................................... 2 Transportation Planning Date ..................................................................................... 2 Loading Date ............................................................................................................... 2 Goods Issue Date ........................................................................................................ 2 Delivery Date .............................................................................................................. 2 Times:- ............................................................................................................................ 3 Pick/Pack Time ........................................................................................................... 3 Transportation Lead Time........................................................................................... 3 Loading Time .............................................................................................................. 3 Transit Time ................................................................................................................ 3 How do we View Availability Situation? ....................................................................... 3 When is Availability Check Triggered? ......................................................................... 4 How we arrive at a Confirmed Delivery Date? .............................................................. 5 Below is the logic the system uses to check availability: ........................................... 5 Backwards Scheduling ................................................................................................ 6 Control of Availability Check ..................................................................................... 7 Forward Scheduling .................................................................................................... 8 Result of Availability Check: Some Sample Scenarios .............................................. 9 One-time delivery ..................................................................................................... 10 Complete dlv. ............................................................................................................ 10 Delivery proposal ...................................................................................................... 10 Continue .................................................................................................................... 10 Case: Confirmation on Requested Delivery Date ..................................................... 11 Case: Confirmation after Requested Delivery Date (Complete Delivery) ...... 12 Case: Confirmation after Requested Delivery Date (Partial Delivery) .................... 13 See the screens below corresponding to this situation. ................................................. 14 Case: Confirmation after Requested Delivery Date (Replenishment Lead Time) ... 16 What Configuration & Data do we need? ..................................................................... 21 Controlling Elements:- .............................................................................................. 21 Material Master Data:- .............................................................................................. 22 Scheduling Data:-...................................................................................................... 22
1
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Available to Promise (ATP) Dates:Order Date Date on which the sales order is entered. System proposes the current date by default.
Material Availability Date The date on which the material must be available. On the material availability date, the vendor must start the activities relevant for delivery, such as picking and packing the goods. The material availability date must be sufficiently early enough so that the goods are prepared by the loading date.
Transportation Planning Date We must arrange transportation by this date, so that the delivery can be sent to the customer. The date from which the organization of goods transport must begin. The transportation planning date must be selected early enough so that the transport is available on the loading date to load the goods.
Loading Date Picking and packing must be completed by this date so that the goods are ready for loading.
Goods Issue Date Goods must physically leave the shipping point by this date. The date on which the goods must leave the company to arrive at the customer location in time.
Delivery Date Customer should receive delivery of the goods by this date. The date on which goods are to arrive at the customer's premises. Example: The delivery date can be the delivery date requested by the customer (desired delivery date) or the date confirmed in the vendor's order acknowledgment or shipping confirmation (confirmed or acknowledged delivery date).
2
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Times:Pick/Pack Time Difference between the material availability date and loading date.
Transportation Lead Time Number of days required for organizing a shipment for an item to be delivered.
Loading Time Difference between loading date and goods issue date.
Transit Time Number of days required for delivering an item from your company to the customer via a certain route.
How do we View Availability Situation? Run Transaction: CO09
Enter Plant & Checking Rule, against which the Availability is to be checked. For Sales Order Checking Rule = A, Delivery = B, Back Order = BO
3
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
In this screen, we can see: • • • •
• •
Availability Checking Group (Avail Check): 02 Check Rule : A End Lead Time Refers to the end of Replenishment Lead Time. If that is not included in the Configuration, then this field is not visible. Totals Display:** Receipts = Sum of all +ve Quantities in Rec./Reqd qty Column (Leave out the last row, MRP Element 001, since it is a total) These are all the Planned Incoming Movements Issues = Sum of all -ve Quantities in Rec./Reqd qty Column These are all the Planned Outgoing Movements Confirmed issues = Sum of all (+ve) Quantities in Confirmed Column These are the confirmations against ATP.
When is Availability Check Triggered? While creating a Sales Order, Production Order, Delivery, etc. Below is a screen from Sales Order. At the bottom is a button for Check Material Availability. Also while creating the order, if the Availability situation cannot meet the requested delivery date, the system goes to Availability screen automatically. (Discussed later) Run Transaction: VA01
4
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
How we arrive at a Confirmed Delivery Date? Below is the logic the system uses to check availability: •
•
• •
Using the Scheduling data from Delivery & Transportation Scheduling, the system does the backward calculation from the Requested Delivery Date. This is used to arrive at Material Availability Date. On the Material Availability Date, system checks the Available Qty, as seen in CO09 in column Cum. ATP Qty. If the Available Qty is > than Required Qty, Requested Delivery Date is confirmed. Otherwise, System moves into the future till it finds the required Available Qty. The new date is then the new Material Availability Date. On getting the confirmed Material Availability Date, system does the Forward Scheduling to arrive at a Confirmed Delivery date.
5
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Backwards Scheduling
6
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Control of Availability Check
7
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Forward Scheduling
8
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Result of Availability Check: Some Sample Scenarios
Above is the Availability Screen as seen in Sales Order. It has following Buttons:
9
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
One-time delivery In the results of Availability, we have 3 options to choose from. This is Case 1, when we can confirm the Customer's Requested delivery Date. The details of this are visible in the first sub screen below.
Complete dlv. This is Case 2, when we can confirm the Customer's Requested complete delivery at a future Date. The details of this are visible in the second sub screen below.
Delivery proposal This is Case 3, when we can confirm the Customer's Requested delivery in partial quantities at future dates. The details of this are visible in the third sub screen below.
Continue If we select one of the above options, the same gets saved in the ATP results. Otherwise, we can select this button. In that case, system leaves the ATP screen without saving the ATP results.
10
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Case: Confirmation on Requested Delivery Date
11
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Case: Confirmation after Requested Delivery Date (Complete Delivery)
12
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Case: Confirmation after Requested Delivery Date (Partial Delivery)
13
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
See the screens below corresponding to this situation. The first screen shows the Availability (CO09) Overview. We have an incoming PO on 19 Jan. !image034.jpg!In the second screen We have created a SO (VA01) on 09 Feb, with requested Delivery date for 09 Feb.
Now we change the Availability situation, by changing the PO Date to 12 Feb. See the screens below corresponding to this situation. The first screen shows the Availability (CO09) Overview. We have an incoming PO on 12 Feb. See the new Cum ATP qty. date wise accordingly. !image038.jpg!In the second screen We have created a SO on 09 Feb, with requested Delivery date for 09 Feb. See that the Delivery got staggered according to the new Availability situation.
14
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
15
Posted by: Sudipta Sanyal on Aug 2009
2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Case: Confirmation after Requested Delivery Date (Replenishment Lead Time)
In the screens below, we have simulated the RLT. In the first scenario RLT is not activated, see below: 'Check without RLT'. The system considers only the confirmed inward movements. So out of 500 only 21 is confirmed. See IMG Guide > SD > BF > AC & TOR > AC > AC with ATP > Control of Availability Check
16
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
See VA01
In the second scenario RLT is activated, but corresponding data in material master is not st maintained. Material is procured In-House (E), but In-house Production time (1 screenshot) & nd RLT (2 screenshot) are not maintained. The system assumes both these times as Zero. So, complete 500 are confirmed immediately. See MM01
17
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
18
Posted by: Sudipta Sanyal on Aug 2009
2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
In the third scenario RLT is activated, corresponding data in material master is maintained. Material is procured In-House (E), In-house Production time (10 days) & RLT (not maintained). The system confirms 21 on basis of incoming material. Rest 479 is confirmed after 14 days. This is because 10 working days for in-house production + 4 holidays (Sat-Sun).
19
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
In the fourth scenario RLT is activated, corresponding data in material master is maintained. Material is procured In-House (E), In-house Production time (10 days) & RLT (20 days). The system confirms 21 on basis of incoming material. Rest 479 is confirmed after 14 days. This is because 20 working days for in-house production + 8 holidays (Sat-Sun).
20
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
What Configuration & Data do we need? Controlling Elements:Requirements Type Requirements Class Schedule Line Category Delivery Item Category Checking Group Checking Rule Scope of Check Strategy Group Partial Delivery Agreement Replenishment Lead Time
21
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
Sales & Distribution - Available to Promise (ATP)
2009
Material Master Data:MRP 1 > MRP Group MRP 2 > Planned Delivery Time MRP 2 > GR Processing Time MRP 3 > Checking Group for Availability Check MRP 3 > Strategy Group MRP 3 > Total Replenishment Lead Time
Scheduling Data:Transit Time Loading Time Pick/Pack Time Transportation Planning Lead Time
22
Posted by: Sudipta Sanyal on Aug 2009
@sdn.sap.som
View more...
Comments