Engineering Standard SAES-H-002V 13 December 2011 Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings Document Responsibility: Paints and Coatings Standards Committee

Saudi Aramco DeskTop Standards Table of Contents 1

Canusa - Approved Materials......................... 2

2

Kansai - Approved Materials.......................... 7

3

Hempel's - Approved Materials.................... 10

4

International Paint - Approved Materials...... 17

5

Oasis Ameron Ltd. - Approved Materials..… 20

6

Sigma Paint - Approved Materials................ 23

7

SIPCO - Approved Materials........................ 26

8

STOPAQ - Approved Materials..…………… 29

Previous Issue: 30 May 2009 Next Planned Update: 13 December 2016 Revised paragraphs are indicated in the right margin Primary contact: Khashram, Maher Saud on 966-3-8809561 Copyright©Saudi Aramco 2011. All rights reserved.

Page 1 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

1

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Canusa - Approved Materials

APCS-113C

Canusa-CPS Wrapid Bond™ System

Visco-Elastic Coating System

Page 2 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113C Type of Coating

:

Visco-Elastic Coating System

Manufacturer

:

Canusa-CPS

Product Name

:

Wrapid Bond™ System

SAMS S/N [SAP]

:

09-000-444 [1000600012] (Wrapid Bond FST); TM 09-000-436/438/442 [1000600006/07/11] (Wrapid Bond ); TM 09-000-439/440 [1000600006/07/08/09/11] (Wrapid Coat ); TM 09-000-441 [1000600010] (Wrapid Coat XL/UV).

TM

Application Procedure 1.

Scope 1.1

1.2

2.

3.

Wrapid Bond™ system is a wraparound corrosion protective Visco-Elastic (VE) coating system for new construction or rehabilitation of existing pipeline coatings. The system may be used for below grade and subsea steel pipelines operating at temperatures up to 75°C. The Wrapid Bond™ system consists of 2 major components: st

a)

The 1 layer (inner), Wrapid Bond™, is a modified and reinforced Visco-Elastic adhesive applied onto a polyethylene carrier film that facilitates wrapping directly to substrate thus creating an impermeable barrier to water and air.

b)

The 2 layer (outer), Wrapid Coat™ or Wrapid Coat™XL range, is a tough PVC or FRP tape designed as an outer wrap for the VE inner wrap for mechanical protection.

nd

This document shall be a general guideline for the installation of Wrapid Bond™ system over pipelines with various applications and conditions. For variant specific applications, Canusa-CPS should be consulted for best practice.

Condition of Steel Pipe Prior to Surface Preparation 2.1

Pipe should have acceptable integrity, be properly patched and leak free. particles on the weld areas shall be removed mechanically.

Any slag and loose

2.2

Any moisture or liquid contaminations on the surface of the pipe is not allowed and shall be properly removed if present.

Surface Preparation Requirements 3.1

Prior to installation, steel surfaces shall be inspected and pre-cleaned according to SSPC SP2 / SIS St2 to remove mill scale and surface rust and subsequently wiped to remove dust, dirt, debris and any oil or grease present.

3.2

Clean surface to minimum SSPC SP2 / SIS St2 or St3 wire brush for small areas (less then 1 m ) or SSPC SP6 / SIS Sa2 medium abrasive blast cleanliness level for larger area.

3.3

Prepared surfaces shall be protected from conditions of high humidity, rainfall, or surface moisture before application of the products.

2

Page 3 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016 3.4 4.

5.

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Make sure the substrate temperature is at least 5°F above the dew point temperature.

Application of Wrapid Bond™ on Girth Weld 4.1

Wrapid Bond™ of 200 mm width shall be pre-cut to the desired length equal to the circumference of the pipe plus 100 to 150 mm for overlapping. Transport to site and storage shall be in a cooled or shaded truck/tente during high temperature season.

4.2

Depending on the cut back width, a number of adjacent Wrapid Bond™ wraps can be applied - either 2, 3 or more wraps of Wrapid Bond™ 200 mm wide or in combination with 100 mm wide product.

4.3

Overlapping of adjacent circumferential wraps shall be minimim 50 mm if 2 wraps, or 25 mm if 3 wraps or more when using Wrapid Bond™ FST weld bead tape of 50 mm width on the weld; overlapping of Wrapid Bond™ wraps on FBE or PP, PE mainline coating shall be kept min 100 mm in all cases.

4.4

The 1 wrap shall start at the 2 o’clock position and wrapped clockwise while removing the release liner. The adjacent wrap shall start at the 10 o’clock position and wrapped counter clockwise and so forth. Self overlap (wrap ends) shall be minimum 100 mm.

4.5

Alternatively, Wrapid Bond™ can be supplied of the same joint width to be applied in combination with the weld bead tape as a single wrap using Canusa wrapping machine.

4.6

Ensure the wrapping is well pressed onto the pipe surfaces, especially at the coating transition areas and over the weld bead location.

st

Application of Wrapid BondTM as a Rehabilation Coating TM

5.1

Spiral, longitudinal, and circumferential welds shall be wrapped by Wrapid Bond tape 50 mm wide.

FST weld bead

5.2

Start wrapping circumferentially around the pipe at a 90° angle, overlapping the adjacent sound st coating by a minimum of 100 mm for the 1 total circumference which shall overlap itself vertically by minimum 200 mm.

5.3

Incline the tape and start wrapping spirally while removing the release liner and ensure that a minimum edge overlap of 10% the tape width (or as otherwise specified) is maintained. Press or roll on lightly over the entire coated area. Continue application with light to moderate tension.

5.4

Special attention shall be made to the bottom part of the pipe to make sure the material adheres well with no air pockets at 6 o’clock position.

5.5

Finish with a circumferential wrap applied at 90° to the pipe length, overlapping the coating to be tied into by a minimum of 100mm.

5.6

Transition from one roll to another with a 100 mm overlap onto the end of the previous with the overlap always facing down. Any creases or folds can be pressed flat or cut out and repaired with another piece of Wrapid Bond™ which must overlap the damage by 100 mm in vertical direction and 20 mm in horizontal direction.

5.7

Ensure the wrapping is well pressed onto the pipe surfaces, especially at weld beads and the coating transition area.

Page 4 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016 6.

7.

8.

9.

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Wrapid Bond™ FST (VE paste) on fittings and irregularities 6.1

Apply the VE filler bars or tube on irregularities and fittings such as bolts, cavities, flanges, etc., by moulding the VE paste by hands to the right place creating a completely sealed body.

6.2

VE filler shall take the compacted shape with inclination so that Wrapid Bond™ 50 or 100 mm (depending on the fitting size) can be wrapped around spirally on the whole fitting detail with 10 mm overlap.

6.3

If pipe surface has irregularities like voids or sharp corners, VE fillers shall be used to fill them before applying the inner wrap.

Application of Wrapid Coat™ (outer wrap) 7.1

Apply the first circumference wrap on overlapping the mainline coating by minimum of 50mm around the pipe at a 90° angle with double wrap at start and end, self overlap with minimum 200mm then incline the direction of wrapping from vertical to overcoat the Wrapid Bond™.

7.2

Continue application spirally with a 50% overlap at moderate tension.

7.3

Roll end shall cover the new roll lead by minimum of 200 mm and shall be further inclined toward the wrapping direction for better closure.

7.4

Overlap of Wrapid Coat™ on the sound mainline coating shall be at least 50 mm and it shall end by a full circumferential wrap as well.

7.5

When the pipe is subject to mechanical abuse or impacts, such as in thrust boring, directional drilling applications, and high turbulence soil/subkha, Wrapid Coat™ XL range shall be used as a protection to the VE adhesive and a mechanical barrier. Check with the local representive for any specific application.

Repair 8.1

Wrapid Bond™ system can be repaired by its own components.

8.2

Any damage to the coating shall be cut in window shape only as small as the damage in diameter size; loose materials shall be removed.

8.3

If surface of the steel developed corrosion products prior to repair, they shall be cleaned and prepared as per Section 3 above or by wire brush.

8.4

Patches of Wrapid Bond™ (inner) shall be sized to open window scale with 50 mm addition (overlap) on all sides and shall be pressed in to ensure good adhesion to the substrate.

8.5

A full circumferential wrapping application with Wrapid Coat™ (outer) shall be done the same way described in Section 7 above.

Testing and Inspection 9.1

Holiday testing Holiday detection test shall be performed to determine any defect in the coating after application. Following are the major recommendations for this test: a)

Use a high-voltage, "spark" holiday detector at a voltage ranging from 10,000 to 15,000 volts with a full-circle coiled spring electrode.

Page 5 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

9.2

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

b)

make sure not to touch the mainline coating with the electrode.

c)

Move the probing electrode over the pipe surface in one direction at a rate approximately 0.3 m/second. Mark defective areas.

d)

Marked areas should be repaired as per Section 9 above.

Dew Point

9.3

a)

Control of dew point is important to prevent moisture condensation on the steel pipe substrate during the application of this coating system.

b)

The substrate temperature shall be 5°F higher than the dew point.

Relative Humidity Relative humidity shall not exceed 85% to ensure that no condensate is forming on the substrate during application.

9.4

Chloride Contamination The performance of Wrapid Bond™ coating is not affected with the presence of chloride salts higher than the permissible (40 mg/cm²). Water wash for decontamination is not required.

10.

Materials Handling 11.1

Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying product name, manufacturer, batch or lot number, and date of manufacture.

11.2

Protect individual components to prevent adherence to other components, packing material, and containers.

11.3

Store materials in accordance with manufacturer's instructions.

11.4

Keep containers sealed in original packaging and avoid exposure to direct sunlight, rain, snow, dirt, and dust until ready for use.

11.5

Do not store at temperatures above 35°C (95°F) for a prolonged period of time.

11.6

Protect materials during handling and installation to prevent damage or contamination.

11.7

Disposal: Dispose of waste material in accordance with local requirements.

Approval Date: Replaces:

January 22, 2011 New

Page 6 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

2

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Kansai - Approved Materials

APCS-113B

Kansai Barrier SA

100% Solids Epoxy

Page 7 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113B Type of Coating

:

High Solids Epoxy (Putty)

Manufacturer

:

Kansai Paint Co. Ltd.

Product Name

:

Kansai Barrier SA

SAP M/N (SAMS S/N)

:

09-697-835

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

2 years

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

2.35 to 1.00 by volume

2.3

Thinner

:

Do not thin

SAMS S/N

:

2.4

Thinning Requirements

:

N/A

2.5

Induction Time

:

Nil

2.6

Pot Life

:

2 hours at 25°C 0.7 hour at 40°C 0.4 hour at 50°C

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

100°C

3.2

Typical Wet Film Thickness Per Coat

:

1000-7000 micrometers

3.3

Typical Dry Film Thickness Per Coat

:

1000-7000 micrometers

3.4

Theoretical Coverage at 25 Micrometers

:

1.44 kg/m²/1000 micrometers

3.5

Minimum Number of Coats

:

1

Page 8 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113B - Kansai Barrier SA (Cont'd) 3.6

Drying Time

Substrate Temperature

To Handle

10°C

5 Hours

24 Hours

7 Days

Immediately

24 Hours

30°C

5 Hours

24 Hours

7 Days

Immediately

24 Hours

50°C

1 Hour

6 Hours

5 Days

Immediately

5 Hours

3.7

Recoat Interval Minimum Maximum

To Immersion Water Buried

Recommended Equipment Airless Spray:

Hi-Vis Coater/Graco Monarch

Roller or Brush:

Application: sponge type made of synthetic fiber resistant to solvent. Smoothing: short synthetic fibers resistant to solvent. Wet sponge with solvent, this is intended to ensure a smooth surface and eliminate holidays. If temperature is greater than 70°C, use brush slightly wet with solvent.

4.

Technical Properties 4.1

Volume Solids (ASTM D2697)

:

4.2

Product Weight (ASTM D1475)

:

4.3

Viscosity (ASTM D562)

:

N/A

4.4

Flash Point (ASTM D93 or D56)

:

N/A

Approval Date: Replaces:

100%

September 3, 1997 April 25, 1987

Page 9 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

3

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Hempel's - Approved Materials

APCS-113A ---- do ---APCS-113D

Hempadur XP 87550 Hempadur 87540 Nap-Gard 7-0055 or Hempadur 8553

Very High Volume Solids Epoxy 100% Volume Solids Epoxy High Volume Solids Epoxy

Page 10 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A Type of Coating

:

Very High Volume Solids, Amine Adduct-Cured Epoxy

Manufacturer

:

Hempel's Marine Paints Saudi Arabia Ltd.

Product Name

:

Hempadur XP 87550

SAP M/N (SAMS S/N)

:

1000686070 (09-000-497)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

2 years

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

2 to 1 by volume

2.3

Thinner

:

Hempel Thinner 08450

2.4

Thinning Requirements

:

Up to 2%

2.5

Induction Time

:

Nil

2.6

Pot Life

:

1.5 hours at 20 °C

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

90°C

3.2

Typical Wet Film Thickness Per Coat

:

675 microns

3.3

Typical Dry Film Thickness Per Coat

:

600 microns

3.4

Theoretical Coverage at 25 Micrometers

:

36 M²/L

3.5

Minimum Number of Coats (Spray Application)

:

1

Page 11 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A - Hempadur XP 87550 (Cont'd) 3.6

Drying Time

Substrate Temperature

3.7

4.

To Handle

Recoat Interval Minimum Maximum

To Immersion Water Buried

10°C

14 Hours

32 Hours

10 Days

3-1/2 Days

42 Hours

30°C

3-1/2 Hours

8 Hours

2-1/2 Days

14 Hours

10 Hours

50°C

45 Minutes

2 Hours

15 Hours

5 Hours

3 Hours

Recommended Equipment Airless Spray

:

Tip Size 0.023 to 0.025 inch Fluid Pressure 3,600 psi

Conventional Spray

:

N/A

Brush

:

(For Touch-up)

Technical Properties 4.1

Volume Solids

(ASTM D2697)

:

88 to 92%

4.2

Product Weight

(ASTM D1475)

:

1.62 to 1.68 Kg/L

4.3

Viscosity

(ASTM D562)

:

125 to 135 KU

4.4

Flash Point

(ASTM D93 or D56)

:

14°C

Approval Date: Replaces:

October 11, 2006 New

Page 12 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A Type of Coating

:

100% Solids Epoxy

Manufacturer

:

Hempel's Marine Paints Saudi Arabia Ltd.

Product Name

:

Hempadur 87540

SAP M/N (SAMS S/N)

:

1000686070 (09-000-497)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

2 years

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

2 to 1 by volume

2.3

Thinner

:

N/A

2.4

Thinning Requirements

:

N/A

2.5

Induction Time

:

N/A

2.6

Pot Life

:

N/A. For dual feed spray equipment.

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

90°C

3.2

Typical Wet Film Thickness Per Coat

:

500 to 625 microns

3.3

Typical Dry Film Thickness Per Coat

:

500 to 625 microns

3.4

Theoretical Coverage at 25 Micrometers

:

40 M²/L

3.5

Minimum Number of Coats (Spray Application)

:

1

Page 13 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A - Hempadur 87540 (Cont'd) 3.6

Drying Time

Substrate Temperature

To Handle

10°C

4 Hours

8 Hours

3 Days

6 Days

3 Days

30°C

1 Hour

3 Hours

2 Days

2 Days

1 Day

50°C

20 Minutes

2 Hours

2 Days

8 Hours

4 Hours

60°C

10 Minutes

1 Hour

2 Days

4 Hour

2 Hours

3.7

Recoat Interval Minimum Maximum

Recommended Equipment Dual- Feed Airless Spray

4.

To Immersion Water Buried

:

Tip Size 0.025 inch Fluid Pressure 2,500 psi

Technical Properties 4.1

Volume Solids

(ASTM D2697)

:

100%

4.2

Product Weight

(ASTM D1475)

:

1.8 Kg/L

4.3

Viscosity

(ASTM D562)

:

4.4

Flash Point

(ASTM D93 or D56)

:

Approval Date: Replaces:

121°C

September 30, 1997 New

Page 14 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113D Type of Coating

:

High Volume Solids Epoxy

Manufacturer

:

Hempel's Marine Paints Saudi Arabia Ltd.

Product Name

:

Nap-Gard 7-0055 or Hempadur 8553

SAP M/N (SAMS S/N)

:

1000197749 (09-697-831), 20-L kit 1000197771 (09-697-833), 0.5-L kit 1000197777 (09-697-837, 5-L kit) 1000197800 (09-697-839, 10-L kit)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

2 years

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

4 to 1 by volume

2.3

Thinner

:

Hempel's 0845

2.4

Thinning Requirements

:

5% maximum

2.5

Induction Time

:

Nil

2.6

Pot Life

:

3 hours at 25°C 1 hour at 40°C

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

90°C

3.2

Typical Wet Film Thickness Per Coat

:

625 microns

3.3

Typical Dry Film Thickness Per Coat

:

500 microns

3.4

Theoretical Coverage at 25 Micrometers

:

32 M²/L

3.5

Minimum Number of Coats (Spray Application)

:

1

Page 15 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113D - Nap-Gard 7-0055 or Hempadur 8553 (Cont'd) 3.6

Drying Time

Substrate Temperature

3.7

4.

To Handle

Recoat Interval Minimum Maximum

To Immersion Water Buried

10°C

24 Hours

24 Hours

21 Days

3 Days

1.5 Days

30°C

12 Hours

12 Hours

7 Days

18 Hours

14 Hours

50°C

3 Hours

3 Hours

5 Days

6 Hours

4 Hours

Recommended Equipment Airless Spray

:

Tip Size: 0.021 to 0.023 inch Fluid Pressure: 2,900 psi

Conventional Spray

:

Tip Needle: 0.070; Air Cap; High Volume.

Roller

:

Use synthetic ½ inch NAP or greater.

Brush

:

May be applied by brush; however, additional coats will be required to obtain dry film thickness.

Technical Properties 4.1

Volume Solids (ASTM D2697)

:

78 to 82%

4.2

Product Weight (ASTM D1475)

:

1.67 to 1.73 Kg/L

4.3

Viscosity (ASTM D562)

:

80 to 90 KU

4.4

Flash Point (ASTM D93 or D56)

:

29°C

Note:

Approval Date: Replaces:

When marketed from the United States, the product is designated Nap-Gard 7-0055. When locally manufactured, the product is called Hempadur 8553.

September 3, 1997 August 23, 1995

Page 16 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

4

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

International Paint - Approved Materials

APCS-113A

Interzone 485

99% Solids Epoxy

Page 17 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A Type of Coating

:

Ultra High Volume Solids Epoxy

Manufacturer

:

International Paint Saudi Arabia Ltd.

Product Name

:

Interzone 485

SAP M/N (SAMS S/N)

:

1000686070 (09-000-497)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

12 months

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

4 PARTS EAA485: 1 PART EAA486

2.3

Thinner

:

GTA203

SAP M/N (SAMS S/N)

:

09-000-498

2.4

Thinning Requirements

:

Up to 3%

2.5

Induction Time

:

N/A

2.6

Pot Life

:

45 minutes at 25°C 30 minutes at 40°C

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

100°C

3.2

Typical Wet Film Thickness Per Coat

:

600 - 1000 micrometers

3.3

Typical Dry Film Thickness Per Coat

:

600 - 1000 micrometers

3.4

Theoretical Coverage at 25 Micrometers Dry Film Thickness

:

39.6 M²/L

3.5

Minimum Number of Coats

:

1

Page 18 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A – Interzone 485 (Cont'd) 3.6

Drying Time

Substrate Temperature

To Handle

Recoat Interval Minimum Maximum*

Water

Burial Dry Soil

10°C

72 Hours

72 Hours

21 Days

2 days

2 days

25°C

24 Hours

24 Hours

10 Days

1 day

1 day

40°C

12 Hours

12 Hours

7 Days

1 day

1 day

* Before overcoating after exposure in a contaminated environment, clean thoroughly by high pressure fresh water hosing and allow to dry. 3.7

4.

Recommended Equipment Airless spray

:

0.030 in. tip; Remove all filters 45:1 ratio pump preferred 4,000 psi

Conventional spray

:

Not recommended

Brush and Roller

:

Not recommended

Technical Properties 4.1

Volume Solids

(ASTM D2697)

:

99%

4.2

Product Weight

(ASTM D1475)

:

1.10 Kg/L

4.3

Viscosity

(ASTM D562)

:

40-50 poise (BRT)

4.4

Flash Point

(ASTM D93 or D56)

:

63°C (base)

Approval Date: Replaces:

March 31, 2004 New

Page 19 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

5

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Oasis Ameron Ltd. - Approved Materials

APCS-113D

Amercoat 4151

High Volume Solids Epoxy

Page 20 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113D Type of Coating

:

High Volume Solids Epoxy

Manufacturer

:

Oasis Ameron Ltd.

Product Name

:

Amercoat 4151

SAP M/N (SAMS S/N)

:

1000197749 (09-697-831), 20-L kit 1000197771 (09-697-833), 0.5-L kit 1000197777 (09-697-837, 5-L kit) 1000197800 (09-697-839, 10-L kit)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

2 years

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

4:1 by volume

2.3

Thinner

:

Amercoat T-10

SAP M/N (SAMS S/N)

:

09-000-498

2.4

Thinning Requirements

:

Up to 10%

2.5

Induction Time

:

15 minutes at 20 °C

2.6

Pot Life

:

4 hours at at 20 °C

100°C

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

3.2

Typical Wet Film Thickness Per Coat

:

micrometers

3.3

Typical Dry Film Thickness Per Coat

:

micrometers

3.4

Theoretical Coverage at 25 Micrometers Dry Film Thickness

:

28 M²/L

3.5

Minimum Number of Coats

:

1

Page 21 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113D – Amercoat 4151 (Cont'd) 3.6

Drying Time

Substrate Temperature

To Handle

Recoat Interval Minimum Maximum*

Burial

10°C

24 Hours

24 Hours

6 Days

14 days

24 days

30°C

7 Hours

7 Hours

4 Days

6 day

4 day

50°C

5 Hours

5 Hours

3 Days

2 day

3 day

Water

Dry Soil

* Before overcoating after exposure in a contaminated environment, clean thoroughly by high pressure fresh water hosing and allow to dry. 3.7

4.

Recommended Equipment Airless spray

:

0.021 in. tip 28:1 ratio pump preferred 2,800 psi

Conventional spray

:

Not recommended

Brush and Roller

:

Recommended on small areas only.

Technical Properties 4.1

Volume Solids

(ASTM D2697)

:

70%

4.2

Product Weight

(ASTM D1475)

:

1.39 Kg/L (Mixture)

4.3

Viscosity

(ASTM D562)

:

4.4

Flash Point

(ASTM D93 or D56)

:

Approval Date: Replaces:

28 °C

October 15, 2008 New

Page 22 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

6

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Sigma's - Approved Materials

APCS-113A

Sigmaline 2000

100% Solids Epoxy

Page 23 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A Type of Coating

:

100% Solids Phenolic Epoxy

Manufacturer

:

Sigma Paints Saudi Arabia Ltd.

Product Name

:

Sigmaline 2000 (Formerly named Sigmarite EPH 7497)

SAP M/N (SAMS S/N)

:

1000686070 (09-000-497)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage at 35°C maximum

:

1 year

2.1

No. of Components

:

2

2.2

Mixing Ratio

:

78:22 by volume; base: hardener

2.3

Thinner

:

None

2.4

Thinning Requirements

:

N/A

2.5

Induction Time

:

Nil

2.6

Pot Life

:

50 minutes at 25°C 20 minutes at 40°C

Mixing

Application 3.1

Maximum Allowable Substrate Temperature

:

70°C

3.2

Typical Wet Film Thickness Per Coat

:

600 microns

3.3

Typical Dry Film Thickness Per Coat

:

550 microns

3.4

Theoretical Coverage at 25 Micrometers

:

40 M²/L

3.5

Minimum Number of Coats (Spray Application)

:

1

Page 24 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A - Sigmaline 2000 (Cont'd) 3.6

Substrate Temperature

To Handle

Recoat Interval Minimum Maximum

10°C

30 Hours

1-½ Days

90 Days

1 Day

1 Day

30°C

10 Hours

16 Hours

30 Days

12 Hours

7 Hours

50°C

4 Hours

4 Hours

10 Days

6 Hours

4 Hours

3.7

4.

Drying Time To Immersion Water Buried

Recommended Equipment Airless Spray

:

Tip Size: 0.021 inch Fluid Pressure: 3,000 psi

Conventional Spray

:

N/A

Brush

:

Suitable for touch-up, repairs, and stripe coating

Technical Properties 4.1

Volume Solids (ASTM D2697)

:

100%

4.2

Product Weight (ASTM D1475)

:

1.28 to 1.32 Kg/L

4.3

Viscosity (ASTM D562)

:

35 to 40 poise **

4.4

Flash Point (ASTM D93 or D56)

:

65°C

** - Conversion to KU not available.

Approval Date: Replaces:

October 23, 1998 New

Page 25 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

7

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

SIPCO - Approved Materials

APCS-113A

Solvent free Amine Cured Epoxy Coating

100% Solids Epoxy

Page 26 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A Type of Coating

:

Solvent free Amine Cured Epoxy Coating

Manufacturer

:

Saudi Industrial Paint Co. (SIPCO)

Product Name

:

Sipoxy Shield 656

SAP M/N (SAMS S/N)

:

09-000-497 (09-000-497)

1.

Storage 1.1

2.

3.

Shelf life, sheltered storage @ 35°C maximum

:

1 year

Mixing 2.1

No. of Components

:

2

2.2

Mixing Ratio

:

2.5 Base: 1 hard. by volume

2.3

Thinner : * for cleaning equipment use Thinner 741/Thinner 780

N/A*

SAMS S/N

:

2.4

Thinning Requirements

:

N/A

2.5

Induction Time

:

N/A

2.6

Pot Life (mixture)

:

65 min @ 25°C 40 min @ 40°C 5 min @ 60°C

Application 3.1

Maximum Allowable Substrate Temperature

:

90°C

3.2

Typical Wet Film Thickness Per Coat

:

600-1000 microns

3.3

Typical Dry Film Thickness Per Coat

:

600-1000 microns

3.4

Theoretical Coverage @ 25 Micrometers

:

40 M²/L Dry Film Thickness

3.5

Minimum Number of Coats (spray application)

:

1

Page 27 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113A - SIPOXYSHIELD 656 (Cont'd) 3.6

3.7

4.

Drying Time Substrate Temperature

To Handle

Recoat Interval Minimum Maximum

To Immersion Water Buried

10°C

36 Hours

36 Hours

30 Days

84 Hours

60 Hours

30°C

10 Hours

10 Hours

9 Days

36 Hours

24 Hours

50°C

3 Hours

3 Hours

5 Days

8 Hours

5 Hours

60°C

90 Minutes

90 Minutes

3 Days

4.5 Hour

3 Hour

Recommended Equipment Airless Spray(min 60:1 pump)

:

Tip size: 0.021 to 0.029 inch Nozzle Pressure: 3,200-4,100 psi

Twin Feed Application with inline heater

:

for details contact SIPCO TSD

Conventional Spray

:

Not recommended

Brush/Roller

:

For touch-up only

Technical Properties 4.1

Volume Solids

(ASTM D2697)

:

100 %

4.2

Product Weight

(ASTM D1475)

:

1.35 Kg/L

4.3

Viscosity

(ASTM D562)

:

85 – 105 Ku (mixed)

4.4

Flash Point

(ASTM D93 or D56)

:

121°C

Approval Date: Replaces

May 31, 2004 New

Page 28 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

8

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

STOPAQ - Approved Materials

APCS-113C

Visco-Elastic Coating System

Page 29 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Manufacturer - Approved Saudi Aramco Data Sheet APCS-113C Type of Coating

:

Visco-Elastic Coating System

Manufacturer

:

STOPAQ

Product Name

:

STOPAQ

SAP M/N (SAMS S/N)

:

09-000-444 (CZH Paste); 09-000-436/438/442 (Wrapping-band CZH), 09-000-439/440 (Outer Wrap); and 09-000-441 (Fiber CZ)

Application Procedure 1.

2.

3.

4.

Scope 1.1

This specification covers the surface preparation and application/installation procedure for the ® STOPAQ coating system on pipelines and piping, that are buried below ground.

1.2

The STOPAQ system consists of the following:

®

a)

Wrapping-band CZ H.

b)

Polyvinyl Chloride (PVC) or PP Outer Wrap.

Condition of Steel Pipe Prior to Surface Preparation 2.1

Remove all weld spatters and slag.

2.2

Remove loose coating and/or heavy layers of rust.

2.3

Moisture condensation on the steel substrate is not allowed.

Surface Preparation Requirements 3.1

Blast cleaning is recommended if the pipe length is more than one meter. Surface profile is not critical but if blast cleaning is employed, commercial blasting to achieve a profile Sa-2 is acceptable.

3.2

The type and particle size of the abrasive material are not critical. Recycled abrasive can be used.

3.3

For a pipe length of less than one meter, tool cleaning (wire brushing) according to SSPC SP 2 is acceptable.

3.4

Any sharp metal protrusions exceeding 0.8 mm in height should be ground to prevent the possibility of the polyethylene layer being torn.

Application of the STOPAQ® System 4.1

The steel pipe temperature should not exceed 70ºC during the application.

4.2

The steel pipe should not be wet or moist during the application. If it is wet, the pipe should be dried with a dry rag.

4.3

The STOPAQ® system can be applied over an existing coating that is bonded strongly to the steel pipe, risers or isolated valves.

Page 30 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016 4.4

4.5

4.6

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Before starting the wrapping of the wrapping-band CZ H, the following items should be ensured. a)

Allow proper accessibility to the pipeline from all directions for free movement of labor during the application.

b)

In "Subkha" areas, the bell hole should be drained properly and continuously for a dry working condition during the application.

c)

Use CZ H paste in areas of significant transition in the pipeline such as the welds on metal sleeves. This paste will enable a gradual transition from the higher edge of the metal sleeve to the original pipe body.

d)

Apply the wrapping-band CZ H over the CZ H paste immediately after the adhesive application.

The Wrapping-band shall be applied onto the steel pipe without tension. a)

The first wraparound of the wrapping-band is done without advancing the roll. One complete circumferential wrapping around the pipe is made before starting the next wrapping.

b)

After the first wraparound is finished, successive wraps should be performed with a minimum overlap of 10 mm or larger regardless of the width of the roll.

c)

When a roll of the wrapping-band is finished, the next roll should be used starting at a distance of at least 100 mm before the end of the finished roll.

d)

After the pipe is completely wrapped, another circumferential wrap is done at the pipe end. This acts as a "seal" to ensure that the end of the wrapping-band will not be removed.

e)

Any areas of blisters or slackening of the wrapping-band shall be pressed or "massaged" by hand to improve the wrapping.

The outer wrap over the wrapping-band shall be applied with tension. a)

The wrapping of the outer wrap shall start 5 mm from the start of the wrapping of the wrappingband. This will enable a 5 mm of the wrapping-band to remain exposed.

b)

The first wrap of the outer wrap over the wrapping-band CZ H is done without advancing the roll.

c)

Subsequent wraps with 50% longitudinal overlap should be maintained regardless of the width of the roll.

d)

If a roll of outer wrap is finished, the succeeding roll should be initiated at a distance of at least 25 cm before the end of the finished outer wrap roll.

e)

When the entire length of visco-elastic coated pipe has been over-wrapped with an outer wrap, a final wrapping similar to the first wrap as in (4.6.b, c, and d) must be repeated.

f)

Any areas showing blisters or irregularities as a result of entrapped air should be removed with by using roller. The rolling action should be done longitudinally along the pipe, starting from the blister toward the edge of the outer wrap.

g)

Backfilling can be performed immediately after the applied coating system has been checked, inspected, and approved by the inspector.

Page 31 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016 5

Patch Repair 5.1

6.

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Patch repair is done when the coating is removed for “window” inspection or if it is damaged by heavy earth moving equipment. The patch repair procedure shall be as follows: a)

Cut out the damaged area using a sharp blade cutter. Chamfer the surrounding coating.

b)

Use new patch of wrapping band to cover the area where the coating is removed. Do not overlap the patch on the sound coating. Use several strips of the wrapping and if necessary to b applied next to each another (minimum 10 mm overlap with one another).

c)

Install the outer wrap over the Wrapping band patch on the whole pipe circumference.

d)

Make several wraparounds over the new patch of wrapping band until it is completely covered, and the outer wrap is at least 100 mm away from the edges of the Wrapping-band.

Testing Methods and Equipment 6.1

Holiday Detection Holiday detection test is not normally recommended, but if required the following procedure is followed to determine inadequately coated areas.

6.2

6.3

a)

Use a high-voltage, "spark" holiday detector at a voltage ranging from 10,000 to 15,000 volts. Use a full-circle coiled spring electrode.

b)

Move the probing electrode over the pipe surface in one direction at a rate approximately 0.3 m/second. Mark defective areas.

c)

Marked areas should be repaired as per paragraph 5.

Dew Point a)

Control of dew point is important to prevent moisture condensation on the steel pipe substrate during the application of this coating system.

b)

The substrate temperature shall be 5°F higher than the dew point. Do not apply the coating when the pipeline temperature is less than 5ºF above the dew point.

Relative Humidity Relative humidity shall not exceed 85% to ensure that no condensate is forming on the substrate during application.

6.4

Chloride Contamination The performance of Visco-Elastic coating is not affected with the presence of chloride salts higher than the permissible (40 mg/cm²) Water wash for decontamination is not required.

7.

Materials Handling Visco-Elastic coating system is a durable in a broad range of field storage conditions. For achieving best results, the product shall be stored as follows: 7.1

Long Term Storage All Vicso-Elastic coating system components shall be stored in a proper closed warehouse at storage temperature not exceed 30ºC.

Page 32 of 33

Document Responsibility: Paints and Coatings Standards Committee Issue Date: 13 December 2011 Next Planned Update: 13 December 2016 7.2

SAES-H-002V Approved Saudi Aramco Data Sheets for the Pipeline and Piping Coatings

Short Term or On-Site Storage All Visco-Elastic coating system components are not recommended to be stored directly under sunlight for more than eight (8) hours. However, they can be stored under shaded areas for a few months.

Approval Date: Replaces

May 5, 2009

13 December 2011

Revision Summary Revised the "Next Planned Update." Reaffirmed the content of the document, and reissued with minor changes.

Page 33 of 33