HPCL-VRMP -VISAKHAPATNAM  

SURFACE PREPARATION AND PAINTING INSPECTION REPORT

Unit :

Report No:

Date:

AREA/LOCATION: 

ITEM:

PIPE,PI PIPE,PIPE PE SPOOLS,STR UCTURE,TANK PLATE/TANK 

 Surface Preparation Method  

Shot Blasting/

 

Power brush cleaning  

Humidity

Brush Coating

Paint Specication

0

Temperature :

Wire Brush cleaning/

Grit Blasting

Coating Method :

Surface prole required : C

Hygrometer SI No. :

: %

Calib Due Date:

Calib Due Date:

DFTgauge SI No.:  Airless Spray

Roller

Batch No.

microns

 

Mfg.date & Shelf life

Conventional Spray (Air Spray)

I

DFT required

Primer paint Primer paint Intermediate coat Finish coat Primer coat Sl.No.

Drg. No./ Line No./Spool No. /Eqp. No./ Str. Mark No.

Intermediate coat

Final Coat

Surface prole Shop

Quantity µ

Field

1st c  co oat

2nd c  co oat

1st c  co oat

2nd c

Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ )

  E   L   P   M

A

 

REMARKS: Adhersion test (if applicable) :

Acceptable,

Not acceptable

Based on visual check, DFT readings, proper color coding & ID mark; painting of above items is accepted.

DESCRIPTION Inspector’s name Signature Date Format No:

Sub-Contractor

EIL/TPIA

 

 

MIR No.

Remarks   oat Checked