Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
RM
Site Acceptance Test Report ENERGY METER
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI REVISION PAGE 0 1
SUMMARY 1
PURPOSE OF TESTS
2
X
2
REFERENCE DOCUMENT
2
X
3
SCOPE
2
X
4
METER TERMINLOGY
3
X
5
TEST EQUIPMENT
3
X
6
PRE-REQUISTES
3
X
7
TEST PROCEDURES
4
X
8
RECORD TEST SHEET
5
X
8.1 METER INFORMATION
X
8.2 PROGRAMMED METER SETTINGS 8.3 DISPLAY CHECK
X
8.4 FINAL CHECK
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV- 1
Page 1 of 7
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I Site Acceptance Test Report ENERGY METER
RM
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI
1 PURPOSE OF TESTS The purpose of the tests is to check the full functionality of the energy meter. This procedure must be used with the complete Diameter Test Procedure, which provides the list of all panel wiring tests. This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures. 2 REFERENCE DOCUMENTS DOCUMENT
DOCUMENT REFERENCE
VERSION/ DATE
REMARKS
Protection Line Diagram Schematic Drawing Service Manual Operation Manual 3 SCOPE Substation Name :Diameter: Bay : Panel Number : Meter Denomination in Scheme (RM) Scheme to be Checked
Meter Functionality Test.
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV- 1
Page 2 of 7
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI
Site Acceptance Test Report ENERGY METER
RM 4 TERMINOLOGY Code ( ANSI) MAIN, CHECK
Terminology ENERGY METER
5 TEST EQUIPMENT USED Sl No 1.
Description
2.
Secondary Injection Kit Multimeter
3.
Laptop
Make
Equipment Sl No.
Calibration date
Calibration due date
NA
6. PRE - REQUISITES PRE-REQUISITES
REMARKS
All Safety Condition Are Ok All Competent Personnel Available For The Test Ac & Dc Supply Availability And Security PPE Safety Available. All Other Relevant Safety Instructions Been Followed Coordination With Other Parties ( GIS, Transformer, Etc..)
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV- 1
Page 3 of 7
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I Site Acceptance Test Report ENERGY METER
RM
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI
7. TEST PROCEDURES The following procedures are written for demonstrating the main functions of the energy meters using an Omicron test set or similar. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual. 7.1. Operational tests: 7.1.1 Meter Display (Instant Readings) Program the meter with correct ratio of Current Transformer and Voltage transformer.
Apply rated voltage and check the meter readings and record the different readings such as Phase to phase voltage and Phase to neutral voltage.
Now apply rated current and check the readings and record.
Apply rated voltage and current with phase angle 0° and check the Power Factor and note the readings.
Similarly, apply rated voltage and current with different phase angle and note down the readings.
7.1.2 Meter Display (Accumulated Readings) Apply rated voltage and rated current with Unity power factor for 30 Minutes and check the initial readings and final readings. Similarly, apply rated voltage and current with different power factor and noted the readings.
AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV- 1
Page 4 of 7
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I Site Acceptance Test Report ENERGY METER
RM
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI
8. RECORD TEST SHEET 8.1 METER INFORMATION Designation: Type No.: Model No : Serial Number : Rated Voltage (V) Rated Current (A) Frequency (HZ) Auxiliary Power (V) 8.2 PROGRAMMED METER SETTINGS CT Ratio: VT Ratio: Multiply by Constant: Primary Watt Hour Constant: 8.3 DISPLAY CHECK (a) VOLTAGE Phase
Voltage Applied (V)
Expected Reading (kV)
Meter Display Reading (kV)
Remarks
R-N Y-N B-N R-Y Y-B B-R (b) CURRENT AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV- 1
Page 5 of 7
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I Site Acceptance Test Report ENERGY METER
RM Phase
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI
Injected Current (A)
Expected Reading (kA)
Meter Display Reading (kA)
Remarks
Angle (between V&I)
Expected Reading
Meter Display Reading
Remarks
R-N Y-N B-N (c) POWER FACTOR Phase R-N Y-N B-N RYB (d) ACTIVE POWER Voltage Phase Applied (V)
Current Injected (A)
Angle (between V&I)
Expected Reading
Current Injected (A)
Angle (between V&I)
Expected Reading
Meter Display Reading
Remarks
Meter Display Reading
Remarks
R-N Y-N B-N RYB (e) REACTIVE POWER Voltage Phase Applied (V) R-N Y-N B-N RYB (f) APPRAENT POWER AREVA T&D
GCCIA / SNCL
Signature
Signature
Name Date Doc. No.
Name Date REV- 1
Page 6 of 7
Gulf Cooperation Council Interconnection Authority GCCIA Engineer
GCC Interconnection Project - Phase I
TRANSMISSION & DISTRIBUTION Bay Ref: RM Substation: 400kV AL FADHILI
Site Acceptance Test Report ENERGY METER
RM
Voltage Applied (V)
Phase
Current Injected (A)
Angle (between V&I)
Expected Reading
Voltage Applied (V)
Current Injected (A)
Angle (between V&I)
Time Applied
Expected Reading
Voltage Applied (V)
Current Injected (A)
Angle (between V&I)
Time Applied
Expected Reading
Meter Display Reading
Remarks
R-N Y-N B-N RYB (g) WATT HOUR Phase
Meter Display Reading
RYB (g) VAR HOUR Phase
Meter Display Reading
RYB 8.4 FINAL CHECKS Item Description
Result
1
All test equipment, leads, shorts and test block removed safely?
2
Disturbed customer wiring re-checked?
3
Alarms reset?
4
Secondary front cover replaced? (If applicable)
REMARKS ……………………………………………………………………………………………………………… ……………………………………………………………………………………………………………… ……………………………………………………………………………………………………… END OF REPORT AREVA T&D
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.