Project work phase is not clearly defined or understood
Type of Risk
Poor project management
Category of Risk
Probability Rating
Impact Rating
6
3
4
Risk Ri Risk sk Mi Miti tiga gati tion on Factor
12
Share/Reduce
Co Cont ntro roll Measu Measure res s
1.2
Lack of communication, causing lack of clarity and confusion.
Project having a lot of uncertainty
5
3
4
12
Share/Reduce
1.3
1.4
Lack of acceptance by client Increase in costs due to toward design proposal the suspension of work
6
Too optimistic assessment of employee workload
5
Unrealistic deadline for individual work
2
3
6
Share/Reduce
2
2
4
Accept
1.5
Poor cost estimation
2. 2.0 0
SITE SITE IN INVE VEST STIG IGAT ATIO ION/ N/PR PREP EPAR ARAT ATIO ION N
2.1
Scope of investigation is not in properly order
2.2
Repeting ng work for site leveling
Poor cost management
1
3
4
12
Share/Reduce
Insufficient site location data
6
2
4
8
Share/Reduce
Inaccuracy in levelling survey
3
3
4
12
Share/Reduce
Attend Project scheduling workshop
Residual Risk Risk Mitigation Factor
Probability Rating
Impact Rating
1
4
4
Accept
2
4
8
Share/Reduce
2
3
6
Share/Reduce
1
2
2
Accept
2
4
8
Share/Reduce
1
4
4
Accept
1
4
4
Accept
Check previous project, for actual work and cost Scheduled project monitoring
Write a communication plan which includes frequency, goal, and audience of each communication Identify stakeholders early and make sure they are considered in the communication plan Market observation Alternative design solutions Proposing extension of time to complete Build design team to dividing task Revise on previous project and other consultant expert in financial experiences
Define the scope in detail via design workshops with input from subject matter experts Extra point of levelling survey for nearest reference height
2.3
Site located near to explosive plant
Fire and explosive accident
6
4
4
16
Transfer
2.4
2.5
Inexperienced and unqualified personnel involvement
Can cause injury or equipment damages
Design is not in line with states planning in term of social and environmental
Project delay due to amendement
3.0
EART HWORK
3.1
Extensive land disturbance involving the removal of vegetation and reshaping of topography
3.2
8
1
2
2
Accept
3
3
4
12
Share/Reduce
Land Degradation and cause mud floods and flash floods
4
2
4
8
Share/Reduce
Additional soil for filling process caused by short term soil settlement
Cost overrun
1
3
4
12
Share/Reduce
3.3
Construction site generate excessive dust during cut and fill
Dust emission
4
3
2
6
Share/Reduce
4.0
STRUCTURE
4.1
Insufficient material for construction
Project delay
9
4
4
16
Transfer
Assessment 5 km radius from site location
1
4
4
Accept
1
2
2
Accept
2
4
8
Share/Reduce
Proper planning and design in construction drainage
1
4
4
Accept
Proper estimating total fill using most accurate method
1
4
4
Accept
Water spray and minimization of exposed soil surface
1
2
2
Accept
Proper contingency plan of material supply management
1
4
4
Accept
Installing barrier such as metal cladding, concrete wall at specific safe height Safety and health training Occupational certificate check Refer states planning requirement Input social and environmental at design phase
Input settlement factor in ground level design
Material transfer from other site depending the most to be prioritize
4.2
4.3
Lifting of Material
Uneven ground, access and egress from plant and vehicles
Falling objects and Swinging objects
7
Trips, slip and fall
7
3
4
12
Share/Reduce
2
4
8
Share/Reduce
4.4
Concreting work follow correct procedure
4.5
Over design of structural component
Structure failure due worksmanship
7
2
5
10
Share/Reduce
High cost project
6
2
4
8
Share/Reduce
5.0
GEOTE CH CHNICAL
5.1
Underground soil layer type is not accurately classify
5.2
effectiveness of foundation
6
4
4
16
Transfer
Piling machinery produce noise disturbance to surrounding
Noise during piling operation
8
4
2
8
Share/Reduce
5.3
Selection of foundation not applicable for certainis soil type
Building structure subsidence
6
3
4
12
Share/Reduce
5.4
Obstruction to excavation due to buried cables, services and telecomunication
Additional cost for repair work
8
2
4
8
Share/Reduce
Inspection of equipment
2
4
8
Share/Reduce
1
4
4
Accept
1
5
5
Accept
1
4
4
Accept
1
4
4
Accept
2
2
4
Accept
Selection of foundation pile is adequate for soft using soil and closed foundation point
2
4
8
Share/Reduce
Initial checking of existing underground services
1
4
4
Accept
Minimise required access to height PPE, especially appropriate footwear DOSH Inspection Parameter barricade at void location Monitoring and supervision under by engineer Revise and recheck design to be economical Require design specification endorsement from all parties
Increase number of borehole with refered to standard guideline Using integrated machine for piling work Apply noise control at transmission path
Prepare proper excavation plan location
6. 0
R OA OAD AN D T RA RAF FI FI C
6.1
Degradation of traffic and transport infrastructure
6.2
High traffic conflict between commercial and residential area
6.3
Road traffic slower from main road to turn at residential acces junction
7.0
DRAINAGE
7.1
Improper design of storm water drainage
damage to infrastructure
8
4
3
12
Share/Reduce
Traffic congested
6
4
2
8
Share/Reduce
Traffic congested at commercial and residential access
6
4
3
12
Share/Reduce
6
4
2
8
Share/Reduce
Remediation or repair to damaged infrastructure
1
3
3
Accept
Smoother road circulation in design phase
1
2
2
Accept
Design left-turn slip lane
2
3
6
Share/Reduce
Early investigartion and analysis of climate pattern
2
2
4
Accept
3
3
9
Share/Reduce
Install drainage cover for precaution
1
3
3
Accept
Design adequate water pressure for the furthest and highest point
2
4
8
Share/Reduce
Checking road circulation design with expert
junction
Occurrence of Flash flood
7.2
Water from drainage system
road structure and
penetrate to underground soil structure
subgrade damage
7
2
3
6
Share/Reduce
Open drainage is deep and unnoticeable
8 ..0 0
WA AT TE ER R S SU UP PP PL LY YA AN N D SEW SEWA AG GE E
8.1
Pump station located far from residential area
Slip,fall and accident
Low pressure of water supply
Design and construction refer to standard guideline
7.3
Study and refer existing surrounding drainage design
7
4
3
12
Share/Reduce
6
1
4
4
Accept
Investigation of groundwater table
8.2
Destruction due to excessive loading above ground
Water supply pipe burst
Leakage of sewage pipeline will discharge gas from underground to ambient air
9 ..0 0
SO OL L IID DW WA AS T TE E MA AN NA AG GE EM ME EN NT
9.1
Construction waste is not properly manage and abandoned
Improper construction management
Schedule of waste collection is not match to total population waste
Poor management of solid waste
produce
2
4
8
Share/Reduce
8.3
9.2
8
Harmful gas emission such as hydrogen sulide and methane
4
1
4
4
Accept
8
4
1
4
Accept
8
2
3
6
Share/Reduce
Use of good material for piping work
1
4
4
Accept
Fixed location of sewage pipeline at far from above ground/underground activities
1
4
4
Accept
Construction waste management workshop
1
1
1
Accept
1
3
3
Accept
Design of pipe line is not at potential excessive loading location
Provide waste container at construction site Survey and estimating total maximum population at residential and commercial area for parameter in solid waste management