Proper PPE to be used (safety goggles, dust mask, car plug)
L
Supervisor
-
Trial pits made to establish services lines Cable detector Use of updated underground facility layout Mark cable / piping routes -
-
06/06/2012
Use of Hand Tools
TASK DESCRIPTION
EXACAVATION FOR CABLE LAYING
PROJECT LOCATION
S.No
Activity
2
Cable Installation
Hazards Involved
Consequences
-
Unauthorised work.Electrocut ion, fire.
-
Electric Fire.
shock.
Electric shockfrom livecircuit,shorting sparkswrong connections,wrong item.
Electric shock. Property damage. Damage to test equipment
TRANSCO LDC
DATE REF NO
06/06/2012 TRA 03
Probaility
Risk Rating
Control Measures
Environment / Property Damage
M
H
Use proper Personal Protective Equipment when using electric power tools e.g face shields, rubber soled shoes
Property Damage
M
H
Property, and Personnel, depth
M
M
M
M
Injury to personnel Property, and Personnel, death
Residual risk
L
Reasponsible Person
Supervisor
Always switch off power and pull out the plug before changing parts on the tool or making some adjustments.
L
Supervisor
Check with voltmeter that power is off. Switch off power on earth leakage.
L
Supervisor
Encourage electric hazard spotting among employees such as cracked plug etc and get them to report fault for remedial action.
L
Supervisor
TASK DESCRIPTION
EXACAVATION FOR CABLE LAYING
PROJECT LOCATION
S.No
3
Activity
Backfilling Using Hand tools
Hazards Involved
Consequences
Employees working too close to each other with hand tools
TRANSCO LDC
DATE REF NO
06/06/2012 TRA 03
Probaility
Risk Rating
Control Measures
Residual risk
Reasponsible Person
Environment / Property Damage
M
H
employees will be informed through Tool box talks to work too close to each other and working task to be identified for each
L
Supervisor
Dust and heat Environmental Condition
Property Damage
M
H
Proper PPE to be used and Welfare facilities, cold water, shaded area, adequate rest period regularly Stand by vehicle should be available at site all time
L
Employees working too close to each other with hand tools
Property, and Personnel
M
M
Employees should not work not too close to each other and working task to be identified for each
L
Improper tools
Injury to personnel
M
M
Use the right tools for the right job
L
use
of
Hand tools should check and provide proper sticker to ensure the safety of the workers Foreman to check if back fill procedure is being complied
Supervisor
Supervisor
Supervisor
TASK DESCRIPTION PROJECT LOCATION
EXACAVATION FOR CABLE LAYING TRANSCO LDC
LIKELIHOOD
DATE
06/06/2012
REF NO
TRA 03
CONSEQUENCES Insignificant
Minor
Moderate (Significant
Major (operations
Catastrophic
(Minor Problem Easily Handled by Normal Day to Day Processes)
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.