PENGADAAN KHS OSP-FO TA NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 1 Material Jasa 1.1345
Paket 2 Material 1.1002
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
8,677
3,003
8,414
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
11,107 15,949 26,956 38,573 66,505 71,216 187,189 336,947 11,742
3,003 3,003 3,003 3,653 3,653 3,647 4,054 4,054 4,183
10,771 15,467 26,141 37,407 64,494 69,063 181,530 326,759 11,387
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
13,950 20,137 30,178 11,681
4,152 4,152 4,152 3,003
13,528 19,529 29,265 11,328
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
16,460 26,648 49,491 15,153
3,003 3,003 3,003 4,152
15,963 25,843 47,995 14,695
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
20,534 31,993 55,863 11,232
4,152 4,152 4,152 3,003
19,914 31,026 54,174 10,892
Page 1 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
45
DC-OF-SM-2A
Paket 1 Material Jasa 13,927 3,003 18,757 3,003 13,478 4,152
Paket 2 Material 13,506 18,190 13,070
17,018 21,224 822,513
4,152 4,152 34,167
16,503 20,583 797,645
929,217 1,060,758 1,474,850 2,609,350 -
34,167 34,167 34,167 34,167 58,753
901,123 1,028,687 1,430,260 2,530,460 -
meter
2,165
2,412
2,099
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
3,029 5,626 7,791 11,097 17,528 28,132 33,109 51,071 97,380 5,173
2,412 2,412 2,412 3,417 3,417 3,417 3,377 3,859 4,824 3,003
2,938 5,456 7,555 10,761 16,998 27,282 32,108 49,527 94,436 5,017
idem 2 core
meter
5,446
3,003
5,281
Page 2 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 5,442 3,003
Paket 2 Material 5,278
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
5,446 5,446
3,036 4,152
5,281 5,281
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
5,707 82,478
4,152 3,036
5,534 79,985
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
5,173 68,268
1,503 3,036
5,017 66,204
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
5,173 79,415
1,503 3,036
5,017 77,014
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
5,173 61,972
1,503 3,036
5,017 60,098
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
5,173 77,146
1,503 3,036
5,017 74,814
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
5,173 59,300
1,503 3,036
5,017 57,507
61
PC-UPC-652-A1
additional per 1 meter
pcs
5,173
1,503
5,017
Page 3 of 104
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Paket 1 Material Jasa 5,632,864 4,175,600
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
14,070,069
5,642,327
13,644,680
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
25,226,742
5,684,905
24,464,047
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
66,630,248
5,640,333
64,615,777
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,327,365
136,669
1,287,234
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,588,300
136,669
1,540,280
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 4 of 104
SATUAN
Paket 2 Material 5,462,562
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 1,054,574 136,669
Paket 2 Material 1,022,691
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,361,400
136,669
1,320,240
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,021,050
136,427
990,180
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,284,382
136,669
1,245,550
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
2,376,514
136,669
2,304,664
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
2,940,034
136,669
2,851,146
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
1,162,802
742,144
1,127,647
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,634,750 3,156,746 5,442,197
1,484,288 2,968,577 5,937,154
1,585,325 3,061,307 5,277,659
Page 5 of 104
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Paket 1 Material Jasa 11,912,250 525,686
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
16,393,570
525,686
15,897,934
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
72,608
61,846
70,413
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
106,643 299,006
125,053 34,000
103,419 289,966
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
396,508 631,826 975,670 692,045
34,000 34,000 34,000 34,247
384,520 612,723 946,172 671,122
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
816,840 1,166,334
34,247 7,421,442 192,875
792,144 1,131,072
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
1,928,650
195,161
1,870,340
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
2,836,250
201,285
2,750,500
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
3,392,155
198,867
3,289,598
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 6 of 104
SATUAN
Paket 2 Material 11,552,100
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 526,175 60,713
Paket 2 Material 510,267
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
33,134
40,413
32,132
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
903,909
408,081
876,581
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
2,722,800
473,085
2,640,480
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
273,437
164,419
265,170
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
246,029
60,975
238,590
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
27,001
4,041
26,185
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
26,680
4,041
25,873
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
340,364
60,620
330,073
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
680,728 1,021,092 64,761
80,827 121,240 60,620
660,148 990,221 62,803
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
129,520 62,619
80,950 60,620
125,604 60,726
Page 7 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 125,930 80,827 340,364 242,481
Paket 2 Material 122,122 330,073
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
680,728 1,361,457 438,484
484,962 969,923 242,481
660,148 1,320,295 425,227
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
876,889 436,783
484,962 242,481
850,378 423,577
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
873,565 1,736,900 152,793
484,962 735,171 38,653
847,154 1,684,387 148,174
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
314,514
46,384
305,005
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
608,773
54,115
590,367
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
517,332
46,384
501,691
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
1,013,774
54,115
983,124
Page 8 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 1,021,092 22,264,326
Paket 2 Material 990,221
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
2,042,185 4,084,369 9,785
33,396,489 44,528,653 1,643
1,980,443 3,960,884 9,489
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
29,355 10,517
2,145 1,643
28,468 10,199
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
21,334 23,257
2,136 1,643
20,689 22,554
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
46,515 14,358
2,136 1,623
45,108 13,924
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
340,364
72,159
330,073
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
680,728 198,538
74,837 37,385
660,148 192,535
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
394,500 -
37,385 37,516
382,573 -
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
Page 9 of 104
-
37,411
-
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 37,516
Paket 2 Material -
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
13,219
37,385 1,564
12,820
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
26,440 22,463
1,892 1,564
25,640 21,784
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
44,926 13,756
1,892 1,564
43,568 13,340
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
27,322 -
1,892 2,021
26,496 -
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
39,762
80,827
38,560
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
1,165,313
727,443
1,130,081
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
282,253
169,737
273,720
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
27,170
475,966
26,349
Page 10 of 104
m3
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 13,862
Paket 2 Material -
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
-
17,594 26,390 31,012 32,987 35,329 37,516
-
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
-
214,660
-
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
58,266
80,827
56,504
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
275,317
158,292
266,993
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
300,687 839,426 702,775 24,728
170,987 188,089 206,898 520
291,596 814,047 681,528 23,980
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
26,029
520
25,242
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
27,461
520
26,630
Page 11 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 5,928 1,861
Paket 2 Material 5,749
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
8,062 12,742 18,073 27,174 37,870 46,271 12,014
2,450 2,805 2,828 3,251 3,785 4,320 2,404
7,818 12,357 17,527 26,353 36,725 44,872 11,651
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
17,163 30,554 44,728 14,198
2,805 3,206 3,696 3,028
16,645 29,631 43,375 13,768
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
20,461 36,666 53,959 14,781
3,473 4,321 4,631 2,730
19,842 35,557 52,327 14,334
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
17,475 24,964 32,328 48,056 61,830 73,644
3,592 4,115 4,147 4,768 5,551 6,335
16,946 24,209 31,351 46,603 59,961 71,417
2 way 4 way 7 way 12 way 19 way 24 way
Page 12 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 1 Material Jasa 24,959 3,527
Paket 2 Material 24,204
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
32,328 57,292 76,388 29,109
4,115 4,702 5,421 4,441
31,351 55,560 74,079 28,229
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
38,069 67,777 90,867 14,316
5,095 6,287 6,792 520
36,918 65,727 88,120 13,883
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
14,316
520
13,883
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
14,316
520
13,883
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
6,580,100
2,714,357
6,381,160
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
4,603,674
2,066,404
4,464,488
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
867,461
183,294
841,235
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
2,836,250
273,403
2,750,500
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
10,755,060
515,884
10,429,896
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
920,846
714,884
893,006
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
Page 13 of 104
-
59,409
-
PENGADAAN KHS OSP-FO TAHUN PENGADAAN 2014-2017 KHS OSP-FO TA NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Jasa
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 3 Material Jasa 1.1731
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
2,948
8,972
3,304
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
2,948 2,948 2,948 3,587 3,587 3,581 3,980 3,980 4,107
11,485 16,491 27,873 39,885 68,768 73,639 193,558 348,411 12,142
3,304 3,304 3,304 4,020 4,020 4,013 4,460 4,460 4,603
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
4,076 4,076 4,076 2,948
14,424 20,823 31,204 12,078
4,568 4,568 4,568 3,304
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
2,948 2,948 2,948 4,076
17,021 27,555 51,175 15,669
3,304 3,304 3,304 4,568
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
4,076 4,076 4,076 2,948
21,233 33,081 57,763 11,614
4,568 4,568 4,568 3,304
Page 14 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 14,401 3,304 19,395 3,304 13,936 4,568
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
Jasa 2,948 2,948 4,076
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
4,076 4,076 33,543
17,597 21,946 850,498
4,568 4,568 37,593
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
33,543 33,543 33,543 33,543 57,680
960,832 1,096,849 1,525,030 2,698,130 -
37,593 37,593 37,593 37,593 64,643
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
meter
2,368
2,238
2,653
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
2,368 2,368 2,368 3,354 3,354 3,354 3,315 3,789 4,736 2,948
3,132 5,817 8,056 11,474 18,124 29,089 34,236 52,808 100,693 5,349
2,653 2,653 2,653 3,759 3,759 3,759 3,715 4,246 5,308 3,304
45
DC-OF-SM-2A
idem 2 core
meter
2,948
5,631
3,304
Page 15 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 5,627 3,304
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
Jasa 2,948
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
2,981 4,076
5,631 5,631
3,341 4,568
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
4,076 2,981
5,901 85,284
4,568 3,341
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
1,476 2,981
5,349 70,591
1,654 3,341
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
1,476 2,981
5,349 82,117
1,654 3,341
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
1,476 2,981
5,349 64,081
1,654 3,341
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
1,476 2,981
5,349 79,771
1,654 3,341
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
1,476 2,981
5,349 61,318
1,654 3,341
61
PC-UPC-652-A1
additional per 1 meter
pcs
1,476
5,349
1,654
Page 16 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 5,824,515 4,594,232
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Jasa 4,099,340
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
5,539,281
14,548,786
6,208,009
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
5,581,081
26,085,052
6,254,855
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
5,537,323
68,897,262
6,205,815
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
134,173
1,372,527
150,371
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
134,173
1,642,340
150,371
Page 17 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 1,090,455 150,371
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
Jasa 134,173
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
134,173
1,407,720
150,371
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
133,936
1,055,790
150,105
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
134,173
1,328,081
150,371
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
134,173
2,457,372
150,371
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
134,173
3,040,065
150,371
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
728,590
1,202,365
816,549
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,457,181 2,914,361 5,828,723
1,690,370 3,264,151 5,627,361
1,633,098 3,266,197 6,532,394
Page 18 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 12,317,550 578,389
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Jasa 516,085
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
516,085
16,951,342
578,389
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
60,716
75,078
68,046
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
122,769 33,379
110,271 309,180
137,591 37,409
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
33,379 33,379 33,379 33,621
409,998 653,323 1,008,866 715,591
37,409 37,409 37,409 37,680
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
33,621 7,285,904 185,053
844,632 1,206,017
37,680 8,165,492 206,859
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
187,298
1,994,270
209,375
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
193,310
2,932,750
216,113
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
190,936
3,507,569
213,452
Page 19 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 544,078 66,799
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
Jasa 59,604
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
39,675
34,262
44,465
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
400,628
934,664
448,994
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
464,445
2,815,440
520,515
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
161,416
282,741
180,903
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
59,862
254,400
67,089
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
3,967
27,920
4,446
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
3,967
27,588
4,446
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
59,513
351,944
66,698
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
79,351 119,026 59,513
703,889 1,055,833 66,964
88,931 133,395 66,698
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
79,472 59,513
133,927 64,749
89,066 66,698
Page 20 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 130,214 88,931 351,944 266,792
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
Jasa 79,351 238,053
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
476,105 952,209 238,053
703,889 1,407,779 453,403
533,582 1,067,164 266,792
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
476,105 238,053
906,724 451,644
533,582 266,792
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
476,105 721,744 37,947
903,287 1,795,996 157,992
533,582 808,877 42,528
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
45,537
325,215
51,035
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
53,126
629,485
59,540
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
45,537
534,934
51,035
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
53,126
1,048,267
59,540
Page 21 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 1,055,833 24,496,477
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
Jasa 21,857,711
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
32,786,566 43,715,421 1,613
2,111,668 4,223,335 10,118
36,744,715 48,992,954 1,808
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
2,105 1,613
30,354 10,875
2,360 1,808
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
2,097 1,613
22,060 24,049
2,350 1,808
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
2,097 1,594
48,097 14,847
2,350 1,786
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
69,122
351,944
77,253
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
71,751 34,982
703,889 205,293
80,199 38,991
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
34,982 35,111
407,922 -
38,991 39,136
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
35,008
Page 22 of 104
-
39,020
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 39,136
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
Jasa 35,111
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
34,982 1,536
13,669
38,991 1,721
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
1,858 1,536
27,339 23,227
2,082 1,721
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
1,858 1,536
46,455 14,224
2,082 1,721
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
1,858 1,984
28,252 -
2,082 2,223
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
79,351
41,115
88,931
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
m3
714,157
1,204,961
800,374
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
166,637
291,857
186,754
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
467,273
28,095
523,684
Page 23 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 13,110
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
Jasa 11,889
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
15,553 24,188 28,726 30,665 32,964 35,111
-
17,217 26,895 31,980 34,153 36,730 39,136
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
209,020
-
234,040
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
79,351
60,248
88,931
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
155,401
284,684
174,162
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
167,864 184,654 203,119 511
310,917 867,986 726,686 25,569
188,129 206,946 227,641 573
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
511
26,914
573
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
511
28,395
573
Page 24 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 6,130 2,047
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 1,827
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
2,405 2,754 2,776 3,191 3,716 4,241 2,360
8,336 13,175 18,688 28,099 39,158 47,845 12,423
2,695 3,086 3,112 3,577 4,164 4,753 2,645
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
2,754 3,148 3,629 2,972
17,747 31,594 46,250 14,681
3,086 3,528 4,067 3,331
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
3,410 4,242 4,546 2,680
21,157 37,913 55,794 15,284
3,822 4,754 5,095 3,004
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
3,527 4,040 4,072 4,681 5,449 6,219
18,069 25,813 33,428 49,691 63,934 76,149
3,952 4,527 4,563 5,246 6,107 6,970
2 way 4 way 7 way 12 way 19 way 24 way
Page 25 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 2 SATUAN
Paket 3 Material Jasa 25,808 3,881
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 3,463
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
4,040 4,617 5,322 4,360
33,428 59,242 78,987 30,100
4,527 5,174 5,964 4,886
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
5,002 6,172 6,668 511
39,364 70,083 93,959 14,803
5,605 6,917 7,473 573
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
511
14,803
573
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
511
14,803
573
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
2,664,784
6,803,980
2,986,490
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
2,028,665
4,760,308
2,273,575
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
179,947
896,976
201,671
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
268,410
2,932,750
300,814
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
506,463
11,120,988
567,605
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
701,828
952,177
786,556
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
58,324
Page 26 of 104
-
65,365
PENGADAAN KHS OSP-FO TAHUN 2014-2017 NO
DESIGNATOR
URAIAN PEKERJAAN
PENGADAAN KHS OSP-FO TA SATUAN
Paket 4 Material Jasa
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 5 Material 1.0337
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
7,648
2,856
7,906
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
9,790 14,058 23,760 34,000 58,621 62,773 164,997 297,000 10,350
2,856 2,856 2,856 3,475 3,475 3,469 3,856 3,856 3,979
10,120 14,532 24,561 35,146 60,596 64,889 170,557 307,009 10,699
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
12,296 17,750 26,600 10,296
3,949 3,949 3,949 2,856
12,710 18,348 27,496 10,643
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
14,509 23,489 43,624 13,357
2,856 2,856 2,856 3,949
14,998 24,281 45,094 13,807
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
18,100 28,200 49,240 9,900
3,949 3,949 3,949 2,856
18,710 29,150 50,899 10,234
Page 27 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
45
DC-OF-SM-2A
Paket 4 Material Jasa 12,276 2,856 16,533 2,856 11,880 3,949
Paket 5 Material 12,690 17,090 12,280
15,000 18,708 725,000
3,949 3,949 32,500
15,506 19,338 749,433
819,054 935,000 1,300,000 2,300,000 -
32,500 32,500 32,500 32,500 55,886
846,656 966,510 1,343,810 2,377,510 -
meter
1,908
2,294
1,972
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
2,670 4,959 6,867 9,781 15,450 24,797 29,184 45,016 85,835 4,560
2,294 2,294 2,294 3,250 3,250 3,250 3,212 3,671 4,589 2,856
2,760 5,126 7,098 10,111 15,971 25,633 30,168 46,533 88,728 4,714
idem 2 core
meter
4,800
2,856
4,962
Page 28 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 4,797 2,856
Paket 5 Material 4,959
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
4,800 4,800
2,888 3,949
4,962 4,962
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
5,030 72,700
3,949 2,888
5,200 75,150
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
4,560 60,175
1,430 2,888
4,714 62,203
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
4,560 70,000
1,430 2,888
4,714 72,359
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
4,560 54,625
1,430 2,888
4,714 56,466
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
4,560 68,000
1,430 2,888
4,714 70,292
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
4,560 52,270
1,430 2,888
4,714 54,031
61
PC-UPC-652-A1
additional per 1 meter
pcs
4,560
1,430
4,714
Page 29 of 104
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Paket 4 Material Jasa 4,965,063 3,971,844
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
12,402,000
5,367,000
12,819,947
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
22,236,000
5,407,500
22,985,353
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
58,730,937
5,365,103
60,710,170
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,170,000
130,000
1,209,429
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,400,000
130,000
1,447,180
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 30 of 104
SATUAN
Paket 5 Material 5,132,386
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 929,550 130,000
Paket 5 Material 960,876
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,200,000
130,000
1,240,440
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
900,000
129,770
930,330
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,132,113
130,000
1,170,265
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
2,094,768
130,000
2,165,362
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
2,591,480
130,000
2,678,813
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
1,024,947
705,930
1,059,488
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,440,943 2,782,500 4,797,000
1,411,860 2,823,720 5,647,440
1,489,502 2,876,270 4,958,659
Page 31 of 104
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Paket 4 Material Jasa 10,500,000 500,034
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
14,450,040
500,034
14,937,006
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
64,000
58,828
66,157
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
94,000 263,558
118,951 32,341
97,168 272,440
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
349,500 556,920 860,000 610,000
32,341 32,341 32,341 32,575
361,278 575,688 888,982 630,557
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
720,000 1,028,060
32,575 7,059,300 198,000
744,264 1,062,706
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
1,700,000
200,175
1,757,290
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
2,500,000
206,000
2,584,250
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
2,990,000
203,700
3,090,763
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 32 of 104
SATUAN
Paket 5 Material 10,853,850
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 463,795 57,750
Paket 5 Material 479,425
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
29,206
38,441
30,190
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
796,747
388,168
823,597
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
2,400,000
450,000
2,480,880
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
241,020
156,396
249,142
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
216,861
58,000
224,169
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
23,800
3,844
24,602
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
23,517
3,844
24,310
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
300,012
57,662
310,122
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
600,025 900,037 57,083
76,883 115,324 57,662
620,246 930,368 59,007
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
114,165 55,195
77,000 57,662
118,012 57,055
Page 33 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 111,000 76,883 300,012 230,649
Paket 5 Material 114,741 310,122
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
600,025 1,200,050 386,500
461,297 922,594 230,649
620,246 1,240,492 399,525
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
772,930 385,000
461,297 230,649
798,978 397,975
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
770,000 1,530,983 134,679
461,297 699,297 36,767
795,949 1,582,577 139,218
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
277,227
44,121
286,570
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
536,600
51,474
554,683
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
456,000
44,121
471,367
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
893,587
51,474
923,701
Page 34 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 900,037 21,177,900
Paket 5 Material 930,368
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
1,800,075 3,600,149 8,625
31,766,850 42,355,800 1,563
1,860,738 3,721,474 8,916
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
25,875 9,270
2,040 1,563
26,747 9,582
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
18,805 20,500
2,032 1,563
19,439 21,191
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
41,000 12,656
2,032 1,544
42,382 13,083
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
300,012
74,453
310,122
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
600,025 175,000
77,000 41,375
620,246 180,898
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
347,730 -
41,375 41,500
359,449 -
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
Page 35 of 104
-
41,400
-
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 41,500
Paket 5 Material -
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
11,652
41,375 1,488
12,045
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
23,305 19,800
1,800 1,488
24,090 20,467
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
39,600 12,125
1,800 1,488
40,935 12,534
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
24,083 -
1,800 1,922
24,895 -
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
35,048
76,883
36,229
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
1,027,160
691,946
1,061,775
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
248,791
161,454
257,175
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
23,949
452,740
24,756
Page 36 of 104
m3
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 19,000
Paket 5 Material -
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
-
22,550 30,917 35,313 37,192 39,420 41,500
-
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
-
210,000
-
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
51,358
76,883
53,089
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
242,677
150,568
250,855
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
265,039 739,908 619,458 21,796
162,643 178,911 196,802 495
273,971 764,843 640,334 22,531
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
22,943
495
23,716
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
24,205
495
25,021
Page 37 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 5,225 1,770
Paket 5 Material 5,402
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
7,106 11,231 15,930 23,953 33,380 40,785 10,590
2,330 2,668 2,690 3,092 3,600 4,109 2,287
7,346 11,610 16,467 24,760 34,505 42,159 10,947
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
15,129 26,932 39,425 12,514
2,668 3,050 3,516 2,880
15,638 27,840 40,754 12,936
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
18,035 32,319 47,562 13,028
3,304 4,110 4,405 2,597
18,643 33,408 49,164 13,468
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
15,403 22,004 28,496 42,359 54,500 64,913
3,417 3,914 3,945 4,535 5,280 6,026
15,922 22,746 29,456 43,786 56,337 67,100
2 way 4 way 7 way 12 way 19 way 24 way
Page 38 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 4 Material Jasa 22,000 3,355
Paket 5 Material 22,741
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
28,496 50,500 67,332 25,658
3,914 4,473 5,156 4,224
29,456 52,202 69,601 26,523
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
33,556 59,741 80,094 12,619
4,846 5,980 6,461 495
34,687 61,755 82,794 13,044
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
12,619
495
13,044
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
12,619
495
13,044
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
5,800,000
2,581,905
5,995,460
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
4,057,888
1,965,570
4,194,639
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
764,620
174,350
790,388
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
2,500,000
260,062
2,584,250
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
9,480,000
490,711
9,799,476
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
811,676
680,000
839,029
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
Page 39 of 104
-
56,510
-
S OSP-FO TAHUN 2014-2017 NO
DESIGNATOR
PENGADAAN KHS OSP-FO TA URAIAN PEKERJAAN
Paket 5 SATUAN
Jasa
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 6 Material Jasa 1.2369
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
2,700
9,460
3,376
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
2,700 2,700 2,700 3,285 3,285 3,280 3,645 3,645 3,762
12,109 17,388 29,389 42,055 72,508 77,644 204,085 367,359 12,802
3,376 3,376 3,376 4,108 4,108 4,102 4,559 4,559 4,704
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
3,733 3,733 3,733 2,700
15,209 21,955 32,902 12,735
4,669 4,669 4,669 3,376
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
2,700 2,700 2,700 3,733
17,946 29,054 53,959 16,521
3,376 3,376 3,376 4,669
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
3,733 3,733 3,733 2,700
22,388 34,881 60,905 12,245
4,669 4,669 4,669 3,376
Page 40 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 15,184 3,376 20,450 3,376 14,694 4,669
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
Jasa 2,700 2,700 3,733
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
3,733 3,733 30,726
18,554 23,140 896,753
4,669 4,669 38,422
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
30,726 30,726 30,726 30,726 52,835
1,013,088 1,156,502 1,607,970 2,844,870 -
38,422 38,422 38,422 38,422 66,068
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
meter
2,169
2,360
2,712
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
2,169 2,169 2,169 3,073 3,073 3,073 3,037 3,471 4,338 2,700
3,303 6,134 8,494 12,098 19,110 30,671 36,098 55,680 106,169 5,640
2,712 2,712 2,712 3,842 3,842 3,842 3,797 4,340 5,425 3,376
45
DC-OF-SM-2A
idem 2 core
meter
2,700
5,937
3,376
Page 41 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 5,933 3,376
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
Jasa 2,700
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
2,730 3,733
5,937 5,937
3,414 4,669
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
3,733 2,730
6,222 89,923
4,669 3,414
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
1,352 2,730
5,640 74,430
1,691 3,414
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
1,352 2,730
5,640 86,583
1,691 3,414
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
1,352 2,730
5,640 67,566
1,691 3,414
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
1,352 2,730
5,640 84,109
1,691 3,414
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
1,352 2,730
5,640 64,653
1,691 3,414
61
PC-UPC-652-A1
additional per 1 meter
pcs
1,352
5,640
1,691
Page 42 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 6,141,286 4,695,514
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Jasa 3,754,981
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
5,073,962
15,340,034
6,344,867
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
5,112,251
27,503,708
6,392,747
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
5,072,168
72,644,296
6,342,625
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
122,902
1,447,173
153,686
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
122,902
1,731,660
153,686
Page 43 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 1,149,760 153,686
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
Jasa 122,902
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
122,902
1,484,280
153,686
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
122,685
1,113,210
153,414
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
122,902
1,400,310
153,686
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
122,902
2,591,019
153,686
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
122,902
3,205,402
153,686
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
667,386
1,267,757
834,550
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,334,772 2,669,545 5,339,090
1,782,302 3,441,674 5,933,409
1,669,101 3,338,202 6,676,404
Page 44 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 12,987,450 591,140
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Jasa 472,732
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
472,732
17,873,254
591,140
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
55,616
79,162
69,546
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
112,456 30,575
116,269 325,995
140,624 38,234
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
30,575 30,575 30,575 30,797
432,297 688,854 1,063,734 754,509
38,234 38,234 38,234 38,511
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
30,797 6,673,862 172,387
890,568 1,271,607
38,511 8,345,504 210,771
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
174,443
2,102,730
213,342
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
179,950
3,092,250
220,228
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
177,775
3,698,331
217,509
Page 45 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 573,668 68,272
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
Jasa 54,597
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
36,342
36,125
45,445
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
366,974
985,496
458,892
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
425,430
2,968,560
531,990
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
147,857
298,118
184,891
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
54,833
268,235
68,568
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
3,634
29,438
4,544
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
3,634
29,088
4,544
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
54,514
371,085
68,168
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
72,685 109,027 54,514
742,171 1,113,256 70,606
90,891 136,336 68,168
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
72,796 54,514
141,211 68,271
91,029 68,168
Page 46 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 137,296 90,891 371,085 272,673
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
Jasa 72,685 218,056
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
436,110 872,220 218,056
742,171 1,484,342 478,062
545,345 1,090,691 272,673
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
436,110 218,056
956,037 476,207
545,345 272,673
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
436,110 661,115 34,760
952,413 1,893,673 166,584
545,345 826,709 43,466
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
41,712
342,902
52,160
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
48,664
663,721
60,853
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
41,712
564,026
52,160
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
48,664
1,105,278
60,853
Page 47 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 1,113,256 25,036,513
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
Jasa 20,021,587
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
30,032,380 40,043,173 1,478
2,226,513 4,453,024 10,668
37,554,770 50,073,027 1,848
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
1,929 1,478
32,005 11,466
2,412 1,848
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
1,921 1,478
23,260 25,356
2,402 1,848
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
1,921 1,460
50,713 15,654
2,402 1,825
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
64,467
371,085
78,696
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
66,875 33,195
742,171 216,458
81,707 39,592
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
33,195 33,313
430,107 -
39,592 39,739
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
33,219
Page 48 of 104
-
39,621
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 39,739
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
Jasa 33,313
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
33,195 1,407
14,412
39,592 1,759
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
1,702 1,407
28,826 24,491
2,128 1,759
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
1,702 1,407
48,981 14,997
2,128 1,759
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
1,702 1,817
29,788 -
2,128 2,272
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
72,685
43,351
90,891
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
m3
654,166
1,270,494
818,019
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
152,639
307,730
190,871
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
428,020
29,623
535,229
Page 49 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 13,140
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
Jasa 12,042
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
15,398 23,308 27,464 29,240 31,347 33,313
-
17,337 27,228 32,426 34,646 37,280 39,739
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
192,613
-
238,940
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
72,685
63,525
90,891
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
142,347
300,167
178,001
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
153,763 169,142 186,057 468
327,827 915,192 766,208 26,959
192,277 211,509 232,659 585
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
468
28,378
585
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
468
29,939
585
Page 50 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 6,463 2,092
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 1,673
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
2,203 2,522 2,543 2,923 3,403 3,885 2,162
8,790 13,892 19,704 29,627 41,288 50,447 13,098
2,755 3,154 3,180 3,655 4,256 4,858 2,704
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
2,522 2,883 3,324 2,723
18,713 33,312 48,765 15,479
3,154 3,606 4,157 3,405
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
3,124 3,886 4,164 2,455
22,308 39,975 58,829 16,115
3,906 4,859 5,208 3,070
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
3,230 3,700 3,730 4,287 4,992 5,697
19,052 27,217 35,246 52,393 67,411 80,291
4,040 4,627 4,664 5,361 6,242 7,124
2 way 4 way 7 way 12 way 19 way 24 way
Page 51 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 5 SATUAN
Paket 6 Material Jasa 27,212 3,966
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 3,172
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
3,700 4,229 4,874 3,993
35,246 62,464 83,283 31,737
4,627 5,288 6,095 4,994
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
4,581 5,653 6,108 468
41,505 73,894 99,069 15,608
5,729 7,070 7,638 585
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
468
15,608
585
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
468
15,608
585
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
2,440,933
7,174,020
3,052,328
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
1,858,250
5,019,202
2,323,697
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
164,830
945,758
206,117
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
245,863
3,092,250
307,445
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
463,918
11,725,812
580,119
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
642,872
1,003,962
803,896
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
53,425
Page 52 of 104
-
66,806
PENGADAAN KHS OSP-FO TA NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 7 Material Jasa 1.1503
Paket 8 Material 1.3097
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
8,797
3,205
10,017
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
11,261 16,171 27,331 39,110 67,431 72,208 189,796 341,639 11,906
3,205 3,205 3,205 3,900 3,900 3,894 4,328 4,328 4,466
12,822 18,412 31,118 44,530 76,775 82,214 216,097 388,981 13,555
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
14,144 20,418 30,598 11,843
4,432 4,432 4,432 3,205
16,104 23,247 34,838 13,485
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
16,690 27,020 50,181 15,364
3,205 3,205 3,205 4,432
19,002 30,764 57,134 17,494
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
20,820 32,438 56,641 11,388
4,432 4,432 4,432 3,205
23,706 36,934 64,490 12,966
Page 53 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
45
DC-OF-SM-2A
Paket 7 Material Jasa 14,121 3,205 19,018 3,205 13,666 4,432
Paket 8 Material 16,078 21,653 15,559
17,255 21,520 833,968
4,432 4,432 36,475
19,646 24,502 949,533
942,158 1,075,531 1,495,390 2,645,690 -
36,475 36,475 36,475 36,475 62,721
1,072,715 1,224,570 1,702,610 3,012,310 -
meter
2,195
2,575
2,499
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
3,071 5,704 7,899 11,251 17,772 28,524 33,570 51,782 98,736 5,245
2,575 2,575 2,575 3,647 3,647 3,647 3,605 4,120 5,150 3,205
3,497 6,495 8,994 12,810 20,235 32,477 38,222 58,957 112,418 5,972
idem 2 core
meter
5,521
3,205
6,287
Page 54 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 5,518 3,205
Paket 8 Material 6,283
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
5,521 5,521
3,241 4,432
6,287 6,287
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
5,786 83,627
4,432 3,241
6,588 95,215
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
5,245 69,219
1,605 3,241
5,972 78,811
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
5,245 80,521
1,605 3,241
5,972 91,679
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
5,245 62,835
1,605 3,241
5,972 71,542
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
5,245 78,220
1,605 3,241
5,972 89,060
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
5,245 60,126
1,605 3,241
5,972 68,458
61
PC-UPC-652-A1
additional per 1 meter
pcs
5,245
1,605
5,972
Page 55 of 104
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Paket 7 Material Jasa 5,711,312 4,457,601
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
14,266,021
6,023,384
16,242,899
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
25,578,071
6,068,837
29,122,489
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
67,558,197
6,021,255
76,919,908
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,345,851
145,899
1,532,349
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,610,420
145,899
1,833,580
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 56 of 104
SATUAN
Paket 8 Material 6,502,743
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 1,069,261 145,899
Paket 8 Material 1,217,432
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,380,360
145,899
1,571,640
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,035,270
145,641
1,178,730
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,302,269
145,899
1,482,728
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
2,409,612
145,899
2,743,518
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
2,980,979
145,899
3,394,061
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
1,178,997
792,265
1,342,373
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,657,516 3,200,710 5,517,989
1,584,530 3,169,061 6,338,122
1,887,203 3,644,240 6,282,631
Page 57 of 104
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Paket 7 Material Jasa 12,078,150 561,188
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
16,621,881
561,188
18,925,217
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
73,619
66,023
83,821
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
108,128 303,171
133,499 36,296
123,112 345,182
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
402,030 640,625 989,258 701,683
36,296 36,296 36,296 36,559
457,740 729,398 1,126,342 798,917
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
828,216 1,182,577
36,559 7,922,652 198,908
942,984 1,346,450
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
1,955,510
201,349
2,226,490
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
2,875,750
207,886
3,274,250
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
3,439,397
205,305
3,916,003
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 58 of 104
SATUAN
Paket 8 Material 13,751,850
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 533,503 64,813
Paket 8 Material 607,432
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
33,596
43,142
38,251
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
916,498
435,641
1,043,500
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
2,760,720
505,035
3,143,280
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
277,245
175,523
315,664
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
249,455
65,093
284,023
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
27,377
4,314
31,171
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
27,052
4,314
30,800
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
345,104
64,714
392,926
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
690,209 1,035,313 65,663
86,286 129,428 64,714
785,853 1,178,778 74,762
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
131,324 63,491
86,417 64,714
149,522 72,289
Page 59 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 127,683 86,286 345,104 258,857
Paket 8 Material 145,377 392,926
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
690,209 1,380,418 444,591
517,714 1,035,427 258,857
785,853 1,571,705 506,199
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
889,101 442,866
517,714 258,857
1,012,306 504,235
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
885,731 1,761,090 154,921
517,714 784,821 41,264
1,008,469 2,005,128 176,389
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
318,894
49,517
363,084
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
617,251
57,769
702,785
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
524,537
49,517
597,223
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
1,027,893
57,769
1,170,331
Page 60 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 1,035,313 23,767,957
Paket 8 Material 1,178,778
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
2,070,626 4,141,251 9,921
35,651,936 47,535,914 1,754
2,357,558 4,715,115 11,296
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
29,764 10,663
2,289 1,754
33,888 12,141
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
21,631 23,581
2,281 1,754
24,629 26,849
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
47,162 14,558
2,281 1,733
53,698 16,576
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
345,104
74,236
392,926
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
690,209 201,303
77,094 37,112
785,853 229,198
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
399,994 -
37,112 37,252
455,422 -
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
Page 61 of 104
-
37,140
-
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 37,252
Paket 8 Material -
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
13,403
37,112 1,670
15,261
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
26,808 22,776
2,020 1,670
30,523 25,932
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
45,552 13,947
2,020 1,670
51,864 15,880
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
27,703 -
2,020 2,157
31,542 -
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
40,316
86,286
45,902
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
1,181,542
776,571
1,345,271
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
286,184
181,200
325,842
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
27,549
508,110
31,366
Page 62 of 104
m3
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 12,001
Paket 8 Material -
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
-
15,985 25,375 30,309 32,418 34,918 37,252
-
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
-
226,360
-
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
59,077
86,286
67,264
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
279,151
168,982
317,834
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
304,874 851,116 712,563 25,072
182,534 200,792 220,871 556
347,122 969,058 811,304 28,546
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
26,391
556
30,048
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
27,843
556
31,701
Page 63 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 6,011 1,986
Paket 8 Material 6,844
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
8,174 12,919 18,325 27,553 38,397 46,915 12,181
2,615 2,994 3,019 3,470 4,040 4,612 2,567
9,307 14,710 20,864 31,371 43,718 53,416 13,869
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
17,402 30,980 45,351 14,395
2,994 3,423 3,946 3,232
19,814 35,273 51,635 16,390
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
20,746 37,176 54,710 14,987
3,708 4,613 4,944 2,915
23,621 42,328 62,291 17,063
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
17,718 25,312 32,779 48,725 62,691 74,669
3,835 4,393 4,427 5,090 5,926 6,763
20,173 28,819 37,321 55,477 71,379 85,016
2 way 4 way 7 way 12 way 19 way 24 way
Page 64 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 7 Material Jasa 25,307 3,765
Paket 8 Material 28,813
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
32,779 58,090 77,452 29,515
4,393 5,020 5,787 4,741
37,321 66,140 88,185 33,604
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
38,599 68,721 92,133 14,516
5,439 6,711 7,251 556
43,948 78,243 104,900 16,527
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
14,516
556
16,527
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
14,516
556
16,527
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
6,671,740
2,897,672
7,596,260
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
4,667,789
2,205,959
5,314,616
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
879,542
195,673
1,001,423
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
2,875,750
291,868
3,274,250
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
10,904,844
550,725
12,415,956
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
933,671
763,164
1,063,052
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
Page 65 of 104
-
63,421
-
PENGADAAN KHS OSP-FO TA NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Jasa
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 9 Material Jasa 1.3045
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
3,331
9,977
3,180
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
3,331 3,331 3,331 4,053 4,053 4,046 4,497 4,497 4,641
12,771 18,339 30,995 44,353 76,471 81,888 215,239 387,437 13,502
3,180 3,180 3,180 3,869 3,869 3,863 4,293 4,293 4,430
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
4,606 4,606 4,606 3,331
16,040 23,155 34,700 13,431
4,397 4,397 4,397 3,180
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
3,331 3,331 3,331 4,606
18,927 30,642 56,908 17,424
3,180 3,180 3,180 4,397
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
4,606 4,606 4,606 3,331
23,611 36,787 64,234 12,915
4,397 4,397 4,397 3,180
Page 66 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 16,014 3,180 21,567 3,180 15,497 4,397
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
Jasa 3,331 3,331 4,606
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
4,606 4,606 37,905
19,568 24,405 945,763
4,397 4,397 36,186
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
37,905 37,905 37,905 37,905 65,180
1,068,456 1,219,708 1,695,850 3,000,350 -
36,186 36,186 36,186 36,186 62,223
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
meter
2,675
2,489
2,554
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
2,675 2,675 2,675 3,790 3,790 3,790 3,746 4,281 5,352 3,331
3,483 6,469 8,958 12,759 20,155 32,348 38,071 58,723 111,972 5,949
2,554 2,554 2,554 3,619 3,619 3,619 3,576 4,087 5,109 3,180
45
DC-OF-SM-2A
idem 2 core
meter
3,331
6,262
3,180
Page 67 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 6,258 3,180
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
Jasa 3,331
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
3,368 4,606
6,262 6,262
3,215 4,397
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
4,606 3,368
6,562 94,837
4,397 3,215
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
1,668 3,368
5,949 78,498
1,592 3,215
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
1,668 3,368
5,949 91,315
1,592 3,215
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
1,668 3,368
5,949 71,258
1,592 3,215
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
1,668 3,368
5,949 88,706
1,592 3,215
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
1,668 3,368
5,949 68,186
1,592 3,215
61
PC-UPC-652-A1
additional per 1 meter
pcs
1,668
5,949
1,592
Page 68 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 6,476,925 4,422,251
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Jasa 4,632,362
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
6,259,532
16,178,409
5,975,618
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
6,306,767
29,006,862
6,020,711
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
6,257,320
76,614,507
5,973,506
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
151,619
1,526,265
144,742
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
151,619
1,826,300
144,742
Page 69 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 1,212,598 144,742
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
Jasa 151,619
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
151,619
1,565,400
144,742
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
151,351
1,174,050
144,486
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
151,619
1,476,841
144,742
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
151,619
2,732,625
144,742
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
151,619
3,380,586
144,742
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
823,326
1,337,043
785,982
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,646,652 3,293,305 6,586,609
1,879,710 3,629,771 6,257,687
1,571,965 3,143,930 6,287,860
Page 70 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 13,697,250 556,738
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Jasa 583,190
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
583,190
18,850,077
556,738
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
68,611
83,488
65,499
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
138,733 37,719
122,623 343,811
132,440 36,008
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
37,719 37,719 37,719 37,993
455,923 726,502 1,121,870 795,745
36,008 36,008 36,008 36,269
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
37,993 8,233,262 209,270
939,240 1,341,104
36,269 7,859,825 198,618
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
211,807
2,217,650
201,040
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
218,600
3,261,250
207,525
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
215,918
3,900,455
204,965
Page 71 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 605,021 64,299
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
Jasa 67,354
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
44,834
38,099
42,800
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
452,720
1,039,356
432,186
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
524,835
3,130,800
501,030
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
182,405
314,411
174,131
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
67,645
282,895
64,577
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
4,483
31,047
4,280
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
4,483
30,678
4,280
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
67,251
391,366
64,201
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
89,669 134,502 67,251
782,733 1,174,098 74,465
85,602 128,402 64,201
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
89,805 67,251
148,928 72,002
85,732 64,201
Page 72 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 144,800 85,602 391,366 256,805
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
Jasa 89,669 269,006
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
538,011 1,076,021 269,006
782,733 1,565,465 504,189
513,608 1,027,216 256,805
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
538,011 269,006
1,008,287 502,233
513,608 256,805
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
538,011 815,590 42,881
1,004,465 1,997,167 175,689
513,608 778,597 40,936
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
51,458
361,643
49,124
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
60,034
699,995
57,311
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
51,458
594,852
49,124
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
60,034
1,165,684
57,311
Page 73 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 1,174,098 23,579,474
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
Jasa 24,699,785
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
37,049,677 49,399,570 1,823
2,348,198 4,696,394 11,251
35,369,211 47,158,948 1,740
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
2,379 1,823
33,754 12,093
2,271 1,740
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
2,370 1,823
24,531 26,742
2,262 1,740
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
2,370 1,801
53,485 16,510
2,262 1,719
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
78,172
391,366
74,162
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
81,142 39,593
782,733 228,288
76,998 37,333
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
39,593 39,738
453,614 -
37,333 37,472
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
39,622
Page 74 of 104
-
37,361
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 37,472
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
Jasa 39,738
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
39,593 1,735
15,200
37,333 1,657
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
2,099 1,735
30,401 25,829
2,004 1,657
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
2,099 1,735
51,658 15,817
2,004 1,657
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
2,099 2,242
31,416 -
2,004 2,140
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
89,669
45,720
85,602
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
m3
807,017
1,339,930
770,413
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
188,304
324,548
179,763
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
528,031
31,241
504,081
Page 75 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 12,421
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
Jasa 13,497
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
17,637 27,395 32,523 34,714 37,313 39,738
-
16,373 25,689 30,584 32,676 35,156 37,472
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
236,260
-
225,080
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
89,669
66,997
85,602
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
175,607
316,572
167,642
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
189,691 208,664 229,530 577
345,743 965,210 808,083 28,433
181,087 199,200 219,119 551
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
577
29,929
551
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
577
31,575
551
Page 76 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 6,817 1,971
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 2,064
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
2,717 3,112 3,137 3,606 4,199 4,792 2,667
9,270 14,651 20,781 31,246 43,544 53,204 13,814
2,594 2,971 2,995 3,443 4,008 4,575 2,546
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
3,112 3,557 4,101 3,359
19,735 35,133 51,430 16,325
2,971 3,396 3,915 3,207
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
3,853 4,793 5,138 3,029
23,527 42,160 62,044 16,996
3,679 4,576 4,905 2,891
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
3,985 4,565 4,601 5,289 6,158 7,028
20,093 28,705 37,173 55,257 71,095 84,679
3,804 4,358 4,392 5,049 5,879 6,709
2 way 4 way 7 way 12 way 19 way 24 way
Page 77 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 8 SATUAN
Paket 9 Material Jasa 28,699 3,735
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 3,913
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
4,565 5,217 6,013 4,926
37,173 65,878 87,835 33,471
4,358 4,980 5,741 4,703
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
5,652 6,974 7,535 577
43,774 77,933 104,483 16,461
5,396 6,658 7,194 551
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
577
16,461
551
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
577
16,461
551
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
3,011,276
7,566,100
2,874,693
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
2,292,444
5,293,515
2,188,466
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
203,344
997,447
194,121
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
303,310
3,261,250
289,553
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
572,316
12,366,660
546,358
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
793,084
1,058,831
757,112
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
65,908
Page 78 of 104
-
62,918
PENGADAAN KHS OSP-FO TA NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 10 Material Jasa 1.1549
Paket 11 Material 1.3587
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
8,833
2,897
10,391
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
11,306 16,236 27,440 39,267 67,701 72,497 190,555 343,005 11,953
2,897 2,897 2,897 3,525 3,525 3,520 3,912 3,912 4,037
13,302 19,101 32,283 46,196 79,648 85,290 224,181 403,534 14,063
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
14,200 20,499 30,720 11,891
4,006 4,006 4,006 2,897
16,706 24,117 36,141 13,989
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
16,756 27,128 50,381 15,426
2,897 2,897 2,897 4,006
19,713 31,915 59,272 18,148
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
20,904 32,568 56,867 11,434
4,006 4,006 4,006 2,897
24,592 38,315 66,902 13,451
Page 79 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
45
DC-OF-SM-2A
Paket 10 Material Jasa 14,178 2,897 19,094 2,897 13,720 4,006
Paket 11 Material 16,679 22,463 16,141
17,324 21,606 837,303
4,006 4,006 32,971
20,381 25,419 985,058
945,925 1,079,832 1,501,370 2,656,270 -
32,971 32,971 32,971 32,971 56,696
1,112,849 1,270,385 1,766,310 3,125,010 -
meter
2,204
2,327
2,592
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
3,084 5,727 7,931 11,296 17,843 28,638 33,705 51,989 99,131 5,266
2,327 2,327 2,327 3,297 3,297 3,297 3,259 3,724 4,656 2,897
3,628 6,738 9,330 13,289 20,992 33,692 39,652 61,163 116,624 6,196
idem 2 core
meter
5,544
2,897
6,522
Page 80 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 5,540 2,897
Paket 11 Material 6,518
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
5,544 5,544
2,930 4,006
6,522 6,522
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
5,809 83,961
4,006 2,930
6,834 98,777
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
5,266 69,496
1,451 2,930
6,196 81,760
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
5,266 80,843
1,451 2,930
6,196 95,109
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
5,266 63,086
1,451 2,930
6,196 74,219
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
5,266 78,533
1,451 2,930
6,196 92,392
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
5,266 60,367
1,451 2,930
6,196 71,019
61
PC-UPC-652-A1
additional per 1 meter
pcs
5,266
1,451
6,196
Page 81 of 104
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Paket 10 Material Jasa 5,734,151 4,029,436
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
14,323,070
5,444,822
16,850,597
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
25,680,356
5,485,909
30,212,053
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
67,828,359
5,442,897
79,797,724
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,351,233
131,885
1,589,679
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,616,860
131,885
1,902,180
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 82 of 104
SATUAN
Paket 11 Material 6,746,031
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 1,073,537 131,885
Paket 11 Material 1,262,980
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,385,880
131,885
1,630,440
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,039,410
131,652
1,222,830
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
1,307,477
131,885
1,538,201
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
2,419,248
131,885
2,846,161
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
2,992,900
131,885
3,521,044
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
1,183,711
716,166
1,392,595
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,664,145 3,213,509 5,540,055
1,432,332 2,864,664 5,729,328
1,957,809 3,780,583 6,517,684
Page 83 of 104
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Paket 10 Material Jasa 12,126,450 507,284
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
16,688,351
507,284
19,633,269
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
73,914
59,681
86,957
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
108,561 304,383
120,676 32,810
127,718 358,096
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
403,638 643,187 993,214 704,489
32,810 32,810 32,810 33,048
474,866 756,687 1,168,482 828,807
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
831,528 1,187,306
33,048 7,161,660 187,009
978,264 1,396,825
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
1,963,330
189,215
2,309,790
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
2,887,250
195,125
3,396,750
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
3,453,151
192,791
4,062,513
NO
DESIGNATOR
URAIAN PEKERJAAN
Page 84 of 104
SATUAN
Paket 11 Material 14,266,350
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 535,637 58,587
Paket 11 Material 630,158
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
33,730
38,998
39,682
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
920,163
393,796
1,082,540
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
2,771,760
456,525
3,260,880
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
278,354
158,664
327,474
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
250,453
58,841
294,649
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
27,487
3,900
32,337
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
27,160
3,900
31,953
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
346,484
58,498
407,626
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
692,969 1,039,453 65,925
77,998 116,996 58,498
815,254 1,222,880 77,559
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
131,849 63,745
78,117 58,498
155,116 74,993
Page 85 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 128,194 77,998 346,484 233,993
Paket 11 Material 150,816 407,626
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
692,969 1,385,938 446,369
467,986 935,972 233,993
815,254 1,630,508 525,138
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
892,657 444,637
467,986 233,993
1,050,180 523,100
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
889,273 1,768,132 155,541
467,986 709,437 37,300
1,046,199 2,080,147 182,988
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
320,169
44,761
376,668
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
619,719
52,220
729,078
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
526,634
44,761
619,567
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
1,032,004
52,220
1,214,117
Page 86 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 1,039,453 21,484,980
Paket 11 Material 1,222,880
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
2,078,907 4,157,812 9,961
32,227,469 42,969,959 1,586
2,445,762 4,891,522 11,719
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
29,883 10,706
2,070 1,586
35,156 12,595
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
21,718 23,675
2,061 1,586
25,550 27,853
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
47,351 14,616
2,061 1,566
55,707 17,196
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
346,484
69,988
407,626
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
692,969 202,108
72,572 36,430
815,254 237,773
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
401,593 -
36,430 36,557
472,461 -
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
Page 87 of 104
-
36,455
-
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 36,557
Paket 11 Material -
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
13,457
36,430 1,510
15,832
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
26,915 22,867
1,826 1,510
31,665 26,902
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
45,734 14,003
1,826 1,510
53,805 16,474
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
27,813 -
1,826 1,950
32,722 -
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
40,477
77,998
47,620
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
1,186,267
701,979
1,395,602
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
287,329
163,795
338,032
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
27,659
459,305
32,540
Page 88 of 104
m3
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 13,731
Paket 11 Material -
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
-
17,332 25,820 30,280 32,186 34,447 36,557
-
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
-
207,500
-
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
59,313
77,998
69,780
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
280,268
152,751
329,725
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
306,094 854,520 715,412 25,172
165,001 181,505 199,656 502
360,108 1,005,313 841,658 29,614
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
26,497
502
31,173
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
27,954
502
32,887
Page 89 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 6,035 1,796
Paket 11 Material 7,100
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
8,207 12,971 18,398 27,663 38,551 47,103 12,230
2,364 2,707 2,729 3,137 3,652 4,169 2,320
9,655 15,260 21,645 32,544 45,353 55,415 14,388
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
17,472 31,104 45,532 14,453
2,707 3,094 3,567 2,922
20,555 36,593 53,567 17,003
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
20,829 37,325 54,929 15,047
3,352 4,170 4,469 2,635
24,505 43,911 64,622 17,702
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
17,789 25,413 32,910 48,920 62,942 74,968
3,467 3,971 4,002 4,601 5,357 6,113
20,928 29,897 38,717 57,553 74,049 88,197
2 way 4 way 7 way 12 way 19 way 24 way
Page 90 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
SATUAN
Paket 10 Material Jasa 25,408 3,404
Paket 11 Material 29,891
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
32,910 58,323 77,762 29,633
3,971 4,538 5,231 4,285
38,717 68,615 91,484 34,862
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
38,754 68,995 92,501 14,574
4,916 6,067 6,555 502
45,592 81,171 108,824 17,145
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
14,574
502
17,145
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
14,574
502
17,145
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
6,698,420
2,619,343
7,880,460
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
4,686,455
1,994,071
5,513,452
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
883,060
176,878
1,038,889
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
2,887,250
263,833
3,396,750
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
10,948,452
497,826
12,880,476
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
937,405
689,860
1,102,824
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
Page 91 of 104
-
57,329
-
PENGADAAN KHS OSP-FO TA NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Jasa
Kabel, Penyambungan dan Pekerjaan Sipil
Paket 12 Material Jasa 1.4263
A 0 1
DC-OF-SM-12D
Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D
meter
3,525
10,908
4,257
2 3 4 5 6 7 8 9 10
DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D
Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D
meter meter meter meter meter meter meter meter meter
3,525 3,525 3,525 4,290 4,290 4,283 4,760 4,760 4,912
13,963 20,051 33,889 48,494 83,611 89,533 235,335 423,611 14,762
4,257 4,257 4,257 5,180 5,180 5,171 5,748 5,748 5,931
11 12 13 14
AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
4,875 4,875 4,875 3,525
17,537 25,317 37,940 14,685
5,886 5,886 5,886 4,257
15 16 17 18
DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C
meter meter meter meter
3,525 3,525 3,525 4,875
20,694 33,503 62,221 19,051
4,257 4,257 4,257 5,886
19 20 21 22
AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC
Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter meter
4,875 4,875 4,875 3,525
25,816 40,222 70,231 14,120
5,886 5,886 5,886 4,257
Page 92 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 17,509 4,257 23,581 4,257 16,944 5,886
23 24 25
DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"
meter meter meter
Jasa 3,525 3,525 4,875
26 27 28
AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24
Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core
meter meter pcs
4,875 4,875 40,118
21,395 26,683 1,034,068
5,886 5,886 48,445
29 30 31 32 33
SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1
Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice
pcs pcs pcs pcs core
40,118 40,118 40,118 40,118 68,986
1,168,217 1,333,591 1,854,190 3,280,490 -
48,445 48,445 48,445 48,445 83,304
34
AB-OF-SM-2D
Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D
meter
2,832
2,721
3,419
35 36 37 38 39 40 41 42 43 44
AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A
Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)
meter meter meter meter meter meter meter meter meter meter
2,832 2,832 2,832 4,012 4,012 4,012 3,965 4,531 5,665 3,525
3,808 7,073 9,794 13,951 22,036 35,368 41,625 64,206 122,426 6,504
3,419 3,419 3,419 4,844 4,844 4,844 4,788 5,472 6,840 4,257
45
DC-OF-SM-2A
idem 2 core
meter
3,525
6,846
4,257
Page 93 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 6,842 4,257
46
DC-OF-SM-1B
Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)
meter
Jasa 3,525
47 48
DC-OF-SM-2B AC-OF-SM-1B
idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)
meter meter
3,565 4,875
6,846 6,846
4,305 5,886
49 50
AC-OF-SM-2B PC-APC-657-2
idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657
meter pcs
4,875 3,565
7,174 103,692
5,886 4,305
51 52
PC-APC-657-A1 PC-UPC-657-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657
pcs pcs
1,765 3,565
6,504 85,827
2,132 4,305
53 54
PC-UPC-657-A1 PC-APC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C
pcs pcs
1,765 3,565
6,504 99,841
2,132 4,305
55 56
PC-APC-655-A1 PC-UPC-655-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C
pcs pcs
1,765 3,565
6,504 77,912
2,132 4,305
57 58
PC-UPC-655-A1 PC-APC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D
pcs pcs
1,765 3,565
6,504 96,988
2,132 4,305
59 60
PC-APC-652-A1 PC-UPC-652-2
additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D
pcs pcs
1,765 3,565
6,504 74,553
2,132 4,305
61
PC-UPC-652-A1
additional per 1 meter
pcs
1,765
6,504
2,132
Page 94 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 7,081,669 5,920,431
62
ODC-C-48
Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan
pcs
Jasa 4,902,844
63
ODC-C-144
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
6,625,025
17,688,973
8,000,050
64
ODC-C-288
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
6,675,018
31,715,207
8,060,420
65
ODC-C-576
Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan
pcs
6,622,683
83,767,935
7,997,223
66
ODP-CA-8
Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
160,472
1,668,771
193,778
67
ODP-CA-16
Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
160,472
1,996,820
193,778
Page 95 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 1,325,817 193,778
68
ODP-A-8
Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
Jasa 160,472
69
ODP-A-16
Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
160,472
1,711,560
193,778
70
ODP-PB-8
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
160,188
1,283,670
193,435
71
ODP-PB-16
Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan
pcs
160,472
1,614,732
193,778
72
ODP-PL-8
Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.
pcs
160,472
2,987,768
193,778
73
ODP-PL-16
Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.
pcs
160,472
3,696,228
193,778
74
TC-SM-12
Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box
pcs
871,400
1,461,882
1,052,259
75 76 77
TC-SM-24 TC-SM-48 TC-SM-96
Idem 24 core Idem 48 core Idem 96 core
pcs pcs pcs
1,742,800 3,485,600 6,971,200
2,055,217 3,968,680 6,841,961
2,104,519 4,209,037 8,418,074
Page 96 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 14,976,150 745,351
78
FTB-SM-144SA
Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core
pcs
Jasa 617,242
79
TR-FTM-HIGH CAP
Pengadaan dan Pemasangan Close Rack FTM High Capacity
pcs
617,242
20,610,092
745,351
80
RS-IN-SC-1P
Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail
pcs
72,617
91,283
87,689
81 82
RS-IN-SC-2P PS-1-2-ODC
idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs
146,833 39,922
134,072 375,912
177,308 48,207
83 84 85 86
PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC
Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail
pcs pcs pcs pcs
39,922 39,922 39,922 40,211
498,492 794,335 1,226,618 870,043
48,207 48,207 48,207 48,557
87 88 89
PS-2-4-ODC SITAC PU-S7.0-140
Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg
pcs Node pcs
40,211 8,714,000 219,301
1,026,936 1,466,322
48,557 10,522,593 283,124
90
PU-S9.0-140
Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg
pcs
221,986
2,424,710
286,366
91
PU-C7.0-250
Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg
pcs
229,176
3,565,750
295,049
92
PU-C9.0-300
Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg
pcs
226,337
4,264,637
291,620
Page 97 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 661,511 86,082
93
GU-G
Pengadaan dan Pemasangan Temberang Tarik
pcs
Jasa 71,287
94
PU-AS
Pengadaan dan Pemasangan Asesoris tiang eksisting
set
47,452
41,657
57,300
95
GB-G1
Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm
pcs
479,155
1,136,400
578,603
96
GB-G3
Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm
pcs
555,480
3,423,120
670,770
97
GB-G-INTG
Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi
pcs
193,055
343,767
233,124
98
TC-02-ODC
Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter
pcs
71,595
309,309
86,455
99
PP-OF-IN
Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm
meter
4,745
33,946
5,730
PP-OF-OUT
Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm
meter
4,745
33,542
5,730
100
101
DD-S3-1
Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter
meter
71,178
427,907
85,951
102 103 104
DD-S3-2 DD-S3-3 DD-V4-1
idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran
meter meter meter
94,904 142,356 71,178
855,816 1,283,723 81,417
114,602 171,902 85,951
105 106
DD-V4-2 DD-V5-1
Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )
meter meter
95,049 71,178
162,834 78,725
114,776 85,951
Page 98 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 158,319 114,602 427,907 343,805
107 108
DD-V5-2 DD-DA-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa
meter meter
Jasa 94,904 284,713
109 110 111
DD-DA-S2 DD-DA-S4 DD-BSS-S1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter
meter meter meter
569,425 1,138,850 284,713
855,816 1,711,631 551,265
687,609 1,375,219 343,805
112 113
DD-BSS-S2 DD-BTS-S1
Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter
meter meter
569,425 284,713
1,102,430 549,126
687,609 343,805
114 115 116
DD-BTS-S2 DD-BTS-S4 HB-PS-1
idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter
meter meter meter
569,425 863,212 45,385
1,098,251 2,183,641 192,093
687,609 1,042,372 54,805
117
HB-PS-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter
meter
54,463
395,409
65,767
118
HB-PS-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter
meter
63,540
765,353
76,727
119
HB-PC-2
Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter
meter
54,463
650,393
65,767
120
HB-PC-4
Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter
meter
63,540
1,274,523
76,727
Page 99 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 1,283,723 31,567,778
121
DD-BMR-1
Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm
track
Jasa 26,142,000
122 123 124
DD-BMR-2 DD-BMR-4 DC-SD-28-1
idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct
track track meter
39,213,000 52,284,000 1,929
2,567,447 5,134,893 12,302
47,351,667 63,135,555 2,330
125 126
DC-SD-28-3 DC-SD-33-1
idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct
meter meter
2,518 1,929
36,906 13,222
3,041 2,330
127 128
DC-SD-33-2 DC-SD-43-1
idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct
meter meter
2,508 1,929
26,822 29,239
3,029 2,330
129 130
DC-SD-43-2 DCD-PVC-1
idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa
meter meter
2,508 1,906
58,478 18,051
3,029 2,301
131
DD-BM-100-1
Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter
81,861
427,907
106,174
132 133
DD-BM-100-2 DD-BM-50-1
Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm
meter meter
85,005 41,029
855,816 249,603
109,970 56,868
134 135
DD-BM-50-2 DD-BM-HDPE-40-1
Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
41,029 41,184
495,967 -
56,868 57,054
136
DD-BM-HDPE-40-2
Idem, 2 pipa
meter
41,060
Page 100 of 104
-
56,905
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 57,054
137
DD-BM-HDPE-50-1
Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter
Jasa 41,184
138 139
DD-BM-HDPE-50-2 DD-HDPE-40-1
Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
41,029 1,837
16,619
56,868 2,218
140 141
DD-HDPE-40-2 DD-HDPE-50-1
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter
meter meter
2,222 1,837
33,240 28,241
2,683 2,218
142 143
DD-HDPE-50-2 DD-HDPE-40-1C
Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting
meter meter
2,222 1,837
56,481 17,294
2,683 2,218
144 145
DD-HDPE-40-2C DD-ROD
idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.
meter meter
2,222 2,373
34,350 -
2,683 2,865
146
DD-RV-1
Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.
meter
94,904
49,989
114,602
147
DD-RV-CONCRETE
Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali
m3
854,138
1,465,038
1,031,415
148
DD-DS-S1
Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa
meter
199,299
354,851
240,663
149
DD-DS-COD1-M
Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa
meter
558,862
34,158
674,854
Page 101 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 23,515
150
BC-TR-0.4
Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter
meter
Jasa 13,410
151 152 153 154 155 156
BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5
idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter
meter meter meter meter meter meter
17,792 28,120 33,547 35,866 38,616 41,184
-
28,807 41,279 47,832 50,632 53,953 57,054
157
BCTR-ROCK
Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post
meter
249,180
-
308,220
158
BD-SK
Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel
Titik
94,904
73,252
114,602
159
SMD-ABS-2A
Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).
pcs
185,861
346,130
224,437
160 161 162 163
SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5
idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm
pcs pcs pcs pcs
200,767 220,848 242,932 611
378,025 1,055,331 883,533 31,088
242,436 266,685 293,353 738
164
DD-MDSC-10/8
Pengadaan dan Pemasangan Straight Connector 10/8 mm
pcs
611
32,724
738
165
DD-MDSC-12/10
Pengadaan dan Pemasangan Straight Connector 12/10 mm
pcs
611
34,524
738
Page 102 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 7,453 2,638
166
DD-MDDI-1A
Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 2,185
167 168 169 170 171 172 173
DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B
Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter meter meter meter
2,876 3,293 3,321 3,817 4,444 5,072 2,823
10,136 16,019 22,721 34,164 47,610 58,172 15,104
3,473 3,977 4,010 4,609 5,366 6,125 3,409
174 175 176 177
DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
3,293 3,765 4,340 3,555
21,578 38,413 56,232 17,849
3,977 4,546 5,241 4,293
178 179 180 181
DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
4,078 5,073 5,438 3,206
25,724 46,096 67,837 18,582
4,925 6,126 6,566 3,871
182 183 184 185 186 187
DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A
Idem Idem Idem Idem Idem Idem
meter meter meter meter meter meter
4,218 4,831 4,870 5,598 6,518 7,438
21,969 31,385 40,643 60,416 77,733 92,585
5,093 5,834 5,880 6,760 7,870 8,982
2 way 4 way 7 way 12 way 19 way 24 way
Page 103 of 104
NO
DESIGNATOR
URAIAN PEKERJAAN
Paket 11 SATUAN
Paket 12 Material Jasa 31,379 5,001
188
DD-MDDB-1B
Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter
Jasa 4,141
189 190 191 192
DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector
meter meter meter meter
4,831 5,521 6,365 5,214
40,643 72,028 96,036 36,596
5,834 6,667 7,686 6,296
193 194 195 196
DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5
Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm
meter meter meter pcs
5,982 7,382 7,975 611
47,861 85,209 114,239 17,998
7,223 8,914 9,631 738
197
DD-MDEC-10/8
Pengadaan dan Pemasangan End Cap 10/8 mm
pcs
611
17,998
738
198
DD-MDEC-12/10
Pengadaan dan Pemasangan End Cap 12/10 mm
pcs
611
17,998
738
B 199
Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3
pcs
3,187,104
8,272,540
3,848,588
200
MH-HH2
Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3
pcs
2,426,300
5,787,766
2,929,879
201
HH-PIT-P-HA
Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya
pcs
215,218
1,090,578
259,886
202
HH-PIT-P-ODP
Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya
pcs
321,021
3,565,750
387,648
203
HH-PIT-P-ODC
Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya
pcs
605,734
13,521,324
731,454
204
MH-CA
Pekerjaan Peninggian Tutup Manhole/Handhole
pcs
839,392
1,157,693
1,013,608
205
CO-OF
Pekerjaan Cut Over Kabel Serat Optik
core
69,756
Page 104 of 104
-