PENGADAAN KHS OSP-FO TA NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 1 Material Jasa 1.1345

Paket 2 Material 1.1002

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

8,677

3,003

8,414

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

11,107 15,949 26,956 38,573 66,505 71,216 187,189 336,947 11,742

3,003 3,003 3,003 3,653 3,653 3,647 4,054 4,054 4,183

10,771 15,467 26,141 37,407 64,494 69,063 181,530 326,759 11,387

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

13,950 20,137 30,178 11,681

4,152 4,152 4,152 3,003

13,528 19,529 29,265 11,328

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

16,460 26,648 49,491 15,153

3,003 3,003 3,003 4,152

15,963 25,843 47,995 14,695

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

20,534 31,993 55,863 11,232

4,152 4,152 4,152 3,003

19,914 31,026 54,174 10,892

Page 1 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

45

DC-OF-SM-2A

Paket 1 Material Jasa 13,927 3,003 18,757 3,003 13,478 4,152

Paket 2 Material 13,506 18,190 13,070

17,018 21,224 822,513

4,152 4,152 34,167

16,503 20,583 797,645

929,217 1,060,758 1,474,850 2,609,350 -

34,167 34,167 34,167 34,167 58,753

901,123 1,028,687 1,430,260 2,530,460 -

meter

2,165

2,412

2,099

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

3,029 5,626 7,791 11,097 17,528 28,132 33,109 51,071 97,380 5,173

2,412 2,412 2,412 3,417 3,417 3,417 3,377 3,859 4,824 3,003

2,938 5,456 7,555 10,761 16,998 27,282 32,108 49,527 94,436 5,017

idem 2 core

meter

5,446

3,003

5,281

Page 2 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 5,442 3,003

Paket 2 Material 5,278

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

5,446 5,446

3,036 4,152

5,281 5,281

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

5,707 82,478

4,152 3,036

5,534 79,985

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

5,173 68,268

1,503 3,036

5,017 66,204

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

5,173 79,415

1,503 3,036

5,017 77,014

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

5,173 61,972

1,503 3,036

5,017 60,098

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

5,173 77,146

1,503 3,036

5,017 74,814

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

5,173 59,300

1,503 3,036

5,017 57,507

61

PC-UPC-652-A1

additional per 1 meter

pcs

5,173

1,503

5,017

Page 3 of 104

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Paket 1 Material Jasa 5,632,864 4,175,600

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

14,070,069

5,642,327

13,644,680

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

25,226,742

5,684,905

24,464,047

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

66,630,248

5,640,333

64,615,777

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,327,365

136,669

1,287,234

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,588,300

136,669

1,540,280

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 4 of 104

SATUAN

Paket 2 Material 5,462,562

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 1,054,574 136,669

Paket 2 Material 1,022,691

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,361,400

136,669

1,320,240

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,021,050

136,427

990,180

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,284,382

136,669

1,245,550

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

2,376,514

136,669

2,304,664

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

2,940,034

136,669

2,851,146

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

1,162,802

742,144

1,127,647

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,634,750 3,156,746 5,442,197

1,484,288 2,968,577 5,937,154

1,585,325 3,061,307 5,277,659

Page 5 of 104

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Paket 1 Material Jasa 11,912,250 525,686

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

16,393,570

525,686

15,897,934

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

72,608

61,846

70,413

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

106,643 299,006

125,053 34,000

103,419 289,966

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

396,508 631,826 975,670 692,045

34,000 34,000 34,000 34,247

384,520 612,723 946,172 671,122

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

816,840 1,166,334

34,247 7,421,442 192,875

792,144 1,131,072

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

1,928,650

195,161

1,870,340

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

2,836,250

201,285

2,750,500

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

3,392,155

198,867

3,289,598

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 6 of 104

SATUAN

Paket 2 Material 11,552,100

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 526,175 60,713

Paket 2 Material 510,267

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

33,134

40,413

32,132

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

903,909

408,081

876,581

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

2,722,800

473,085

2,640,480

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

273,437

164,419

265,170

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

246,029

60,975

238,590

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

27,001

4,041

26,185

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

26,680

4,041

25,873

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

340,364

60,620

330,073

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

680,728 1,021,092 64,761

80,827 121,240 60,620

660,148 990,221 62,803

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

129,520 62,619

80,950 60,620

125,604 60,726

Page 7 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 125,930 80,827 340,364 242,481

Paket 2 Material 122,122 330,073

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

680,728 1,361,457 438,484

484,962 969,923 242,481

660,148 1,320,295 425,227

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

876,889 436,783

484,962 242,481

850,378 423,577

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

873,565 1,736,900 152,793

484,962 735,171 38,653

847,154 1,684,387 148,174

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

314,514

46,384

305,005

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

608,773

54,115

590,367

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

517,332

46,384

501,691

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

1,013,774

54,115

983,124

Page 8 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 1,021,092 22,264,326

Paket 2 Material 990,221

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

2,042,185 4,084,369 9,785

33,396,489 44,528,653 1,643

1,980,443 3,960,884 9,489

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

29,355 10,517

2,145 1,643

28,468 10,199

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

21,334 23,257

2,136 1,643

20,689 22,554

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

46,515 14,358

2,136 1,623

45,108 13,924

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

340,364

72,159

330,073

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

680,728 198,538

74,837 37,385

660,148 192,535

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

394,500 -

37,385 37,516

382,573 -

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

Page 9 of 104

-

37,411

-

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 37,516

Paket 2 Material -

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

13,219

37,385 1,564

12,820

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

26,440 22,463

1,892 1,564

25,640 21,784

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

44,926 13,756

1,892 1,564

43,568 13,340

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

27,322 -

1,892 2,021

26,496 -

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

39,762

80,827

38,560

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

1,165,313

727,443

1,130,081

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

282,253

169,737

273,720

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

27,170

475,966

26,349

Page 10 of 104

m3

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 13,862

Paket 2 Material -

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

-

17,594 26,390 31,012 32,987 35,329 37,516

-

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

-

214,660

-

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

58,266

80,827

56,504

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

275,317

158,292

266,993

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

300,687 839,426 702,775 24,728

170,987 188,089 206,898 520

291,596 814,047 681,528 23,980

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

26,029

520

25,242

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

27,461

520

26,630

Page 11 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 5,928 1,861

Paket 2 Material 5,749

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

8,062 12,742 18,073 27,174 37,870 46,271 12,014

2,450 2,805 2,828 3,251 3,785 4,320 2,404

7,818 12,357 17,527 26,353 36,725 44,872 11,651

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

17,163 30,554 44,728 14,198

2,805 3,206 3,696 3,028

16,645 29,631 43,375 13,768

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

20,461 36,666 53,959 14,781

3,473 4,321 4,631 2,730

19,842 35,557 52,327 14,334

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

17,475 24,964 32,328 48,056 61,830 73,644

3,592 4,115 4,147 4,768 5,551 6,335

16,946 24,209 31,351 46,603 59,961 71,417

2 way 4 way 7 way 12 way 19 way 24 way

Page 12 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 1 Material Jasa 24,959 3,527

Paket 2 Material 24,204

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

32,328 57,292 76,388 29,109

4,115 4,702 5,421 4,441

31,351 55,560 74,079 28,229

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

38,069 67,777 90,867 14,316

5,095 6,287 6,792 520

36,918 65,727 88,120 13,883

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

14,316

520

13,883

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

14,316

520

13,883

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

6,580,100

2,714,357

6,381,160

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

4,603,674

2,066,404

4,464,488

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

867,461

183,294

841,235

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

2,836,250

273,403

2,750,500

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

10,755,060

515,884

10,429,896

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

920,846

714,884

893,006

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

Page 13 of 104

-

59,409

-

PENGADAAN KHS OSP-FO TAHUN PENGADAAN 2014-2017 KHS OSP-FO TA NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Jasa

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 3 Material Jasa 1.1731

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

2,948

8,972

3,304

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

2,948 2,948 2,948 3,587 3,587 3,581 3,980 3,980 4,107

11,485 16,491 27,873 39,885 68,768 73,639 193,558 348,411 12,142

3,304 3,304 3,304 4,020 4,020 4,013 4,460 4,460 4,603

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

4,076 4,076 4,076 2,948

14,424 20,823 31,204 12,078

4,568 4,568 4,568 3,304

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

2,948 2,948 2,948 4,076

17,021 27,555 51,175 15,669

3,304 3,304 3,304 4,568

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

4,076 4,076 4,076 2,948

21,233 33,081 57,763 11,614

4,568 4,568 4,568 3,304

Page 14 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 14,401 3,304 19,395 3,304 13,936 4,568

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

Jasa 2,948 2,948 4,076

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

4,076 4,076 33,543

17,597 21,946 850,498

4,568 4,568 37,593

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

33,543 33,543 33,543 33,543 57,680

960,832 1,096,849 1,525,030 2,698,130 -

37,593 37,593 37,593 37,593 64,643

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

meter

2,368

2,238

2,653

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

2,368 2,368 2,368 3,354 3,354 3,354 3,315 3,789 4,736 2,948

3,132 5,817 8,056 11,474 18,124 29,089 34,236 52,808 100,693 5,349

2,653 2,653 2,653 3,759 3,759 3,759 3,715 4,246 5,308 3,304

45

DC-OF-SM-2A

idem 2 core

meter

2,948

5,631

3,304

Page 15 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 5,627 3,304

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

Jasa 2,948

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

2,981 4,076

5,631 5,631

3,341 4,568

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

4,076 2,981

5,901 85,284

4,568 3,341

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

1,476 2,981

5,349 70,591

1,654 3,341

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

1,476 2,981

5,349 82,117

1,654 3,341

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

1,476 2,981

5,349 64,081

1,654 3,341

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

1,476 2,981

5,349 79,771

1,654 3,341

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

1,476 2,981

5,349 61,318

1,654 3,341

61

PC-UPC-652-A1

additional per 1 meter

pcs

1,476

5,349

1,654

Page 16 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 5,824,515 4,594,232

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Jasa 4,099,340

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

5,539,281

14,548,786

6,208,009

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

5,581,081

26,085,052

6,254,855

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

5,537,323

68,897,262

6,205,815

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

134,173

1,372,527

150,371

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

134,173

1,642,340

150,371

Page 17 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 1,090,455 150,371

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

Jasa 134,173

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

134,173

1,407,720

150,371

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

133,936

1,055,790

150,105

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

134,173

1,328,081

150,371

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

134,173

2,457,372

150,371

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

134,173

3,040,065

150,371

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

728,590

1,202,365

816,549

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,457,181 2,914,361 5,828,723

1,690,370 3,264,151 5,627,361

1,633,098 3,266,197 6,532,394

Page 18 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 12,317,550 578,389

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Jasa 516,085

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

516,085

16,951,342

578,389

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

60,716

75,078

68,046

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

122,769 33,379

110,271 309,180

137,591 37,409

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

33,379 33,379 33,379 33,621

409,998 653,323 1,008,866 715,591

37,409 37,409 37,409 37,680

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

33,621 7,285,904 185,053

844,632 1,206,017

37,680 8,165,492 206,859

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

187,298

1,994,270

209,375

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

193,310

2,932,750

216,113

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

190,936

3,507,569

213,452

Page 19 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 544,078 66,799

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

Jasa 59,604

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

39,675

34,262

44,465

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

400,628

934,664

448,994

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

464,445

2,815,440

520,515

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

161,416

282,741

180,903

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

59,862

254,400

67,089

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

3,967

27,920

4,446

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

3,967

27,588

4,446

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

59,513

351,944

66,698

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

79,351 119,026 59,513

703,889 1,055,833 66,964

88,931 133,395 66,698

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

79,472 59,513

133,927 64,749

89,066 66,698

Page 20 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 130,214 88,931 351,944 266,792

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

Jasa 79,351 238,053

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

476,105 952,209 238,053

703,889 1,407,779 453,403

533,582 1,067,164 266,792

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

476,105 238,053

906,724 451,644

533,582 266,792

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

476,105 721,744 37,947

903,287 1,795,996 157,992

533,582 808,877 42,528

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

45,537

325,215

51,035

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

53,126

629,485

59,540

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

45,537

534,934

51,035

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

53,126

1,048,267

59,540

Page 21 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 1,055,833 24,496,477

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

Jasa 21,857,711

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

32,786,566 43,715,421 1,613

2,111,668 4,223,335 10,118

36,744,715 48,992,954 1,808

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

2,105 1,613

30,354 10,875

2,360 1,808

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

2,097 1,613

22,060 24,049

2,350 1,808

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

2,097 1,594

48,097 14,847

2,350 1,786

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

69,122

351,944

77,253

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

71,751 34,982

703,889 205,293

80,199 38,991

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

34,982 35,111

407,922 -

38,991 39,136

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

35,008

Page 22 of 104

-

39,020

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 39,136

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

Jasa 35,111

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

34,982 1,536

13,669

38,991 1,721

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

1,858 1,536

27,339 23,227

2,082 1,721

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

1,858 1,536

46,455 14,224

2,082 1,721

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

1,858 1,984

28,252 -

2,082 2,223

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

79,351

41,115

88,931

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

m3

714,157

1,204,961

800,374

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

166,637

291,857

186,754

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

467,273

28,095

523,684

Page 23 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 13,110

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

Jasa 11,889

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

15,553 24,188 28,726 30,665 32,964 35,111

-

17,217 26,895 31,980 34,153 36,730 39,136

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

209,020

-

234,040

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

79,351

60,248

88,931

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

155,401

284,684

174,162

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

167,864 184,654 203,119 511

310,917 867,986 726,686 25,569

188,129 206,946 227,641 573

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

511

26,914

573

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

511

28,395

573

Page 24 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 6,130 2,047

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 1,827

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

2,405 2,754 2,776 3,191 3,716 4,241 2,360

8,336 13,175 18,688 28,099 39,158 47,845 12,423

2,695 3,086 3,112 3,577 4,164 4,753 2,645

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

2,754 3,148 3,629 2,972

17,747 31,594 46,250 14,681

3,086 3,528 4,067 3,331

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

3,410 4,242 4,546 2,680

21,157 37,913 55,794 15,284

3,822 4,754 5,095 3,004

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

3,527 4,040 4,072 4,681 5,449 6,219

18,069 25,813 33,428 49,691 63,934 76,149

3,952 4,527 4,563 5,246 6,107 6,970

2 way 4 way 7 way 12 way 19 way 24 way

Page 25 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 2 SATUAN

Paket 3 Material Jasa 25,808 3,881

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 3,463

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

4,040 4,617 5,322 4,360

33,428 59,242 78,987 30,100

4,527 5,174 5,964 4,886

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

5,002 6,172 6,668 511

39,364 70,083 93,959 14,803

5,605 6,917 7,473 573

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

511

14,803

573

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

511

14,803

573

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

2,664,784

6,803,980

2,986,490

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

2,028,665

4,760,308

2,273,575

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

179,947

896,976

201,671

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

268,410

2,932,750

300,814

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

506,463

11,120,988

567,605

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

701,828

952,177

786,556

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

58,324

Page 26 of 104

-

65,365

PENGADAAN KHS OSP-FO TAHUN 2014-2017 NO

DESIGNATOR

URAIAN PEKERJAAN

PENGADAAN KHS OSP-FO TA SATUAN

Paket 4 Material Jasa

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 5 Material 1.0337

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

7,648

2,856

7,906

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

9,790 14,058 23,760 34,000 58,621 62,773 164,997 297,000 10,350

2,856 2,856 2,856 3,475 3,475 3,469 3,856 3,856 3,979

10,120 14,532 24,561 35,146 60,596 64,889 170,557 307,009 10,699

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

12,296 17,750 26,600 10,296

3,949 3,949 3,949 2,856

12,710 18,348 27,496 10,643

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

14,509 23,489 43,624 13,357

2,856 2,856 2,856 3,949

14,998 24,281 45,094 13,807

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

18,100 28,200 49,240 9,900

3,949 3,949 3,949 2,856

18,710 29,150 50,899 10,234

Page 27 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

45

DC-OF-SM-2A

Paket 4 Material Jasa 12,276 2,856 16,533 2,856 11,880 3,949

Paket 5 Material 12,690 17,090 12,280

15,000 18,708 725,000

3,949 3,949 32,500

15,506 19,338 749,433

819,054 935,000 1,300,000 2,300,000 -

32,500 32,500 32,500 32,500 55,886

846,656 966,510 1,343,810 2,377,510 -

meter

1,908

2,294

1,972

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

2,670 4,959 6,867 9,781 15,450 24,797 29,184 45,016 85,835 4,560

2,294 2,294 2,294 3,250 3,250 3,250 3,212 3,671 4,589 2,856

2,760 5,126 7,098 10,111 15,971 25,633 30,168 46,533 88,728 4,714

idem 2 core

meter

4,800

2,856

4,962

Page 28 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 4,797 2,856

Paket 5 Material 4,959

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

4,800 4,800

2,888 3,949

4,962 4,962

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

5,030 72,700

3,949 2,888

5,200 75,150

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

4,560 60,175

1,430 2,888

4,714 62,203

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

4,560 70,000

1,430 2,888

4,714 72,359

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

4,560 54,625

1,430 2,888

4,714 56,466

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

4,560 68,000

1,430 2,888

4,714 70,292

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

4,560 52,270

1,430 2,888

4,714 54,031

61

PC-UPC-652-A1

additional per 1 meter

pcs

4,560

1,430

4,714

Page 29 of 104

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Paket 4 Material Jasa 4,965,063 3,971,844

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

12,402,000

5,367,000

12,819,947

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

22,236,000

5,407,500

22,985,353

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

58,730,937

5,365,103

60,710,170

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,170,000

130,000

1,209,429

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,400,000

130,000

1,447,180

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 30 of 104

SATUAN

Paket 5 Material 5,132,386

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 929,550 130,000

Paket 5 Material 960,876

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,200,000

130,000

1,240,440

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

900,000

129,770

930,330

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,132,113

130,000

1,170,265

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

2,094,768

130,000

2,165,362

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

2,591,480

130,000

2,678,813

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

1,024,947

705,930

1,059,488

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,440,943 2,782,500 4,797,000

1,411,860 2,823,720 5,647,440

1,489,502 2,876,270 4,958,659

Page 31 of 104

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Paket 4 Material Jasa 10,500,000 500,034

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

14,450,040

500,034

14,937,006

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

64,000

58,828

66,157

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

94,000 263,558

118,951 32,341

97,168 272,440

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

349,500 556,920 860,000 610,000

32,341 32,341 32,341 32,575

361,278 575,688 888,982 630,557

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

720,000 1,028,060

32,575 7,059,300 198,000

744,264 1,062,706

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

1,700,000

200,175

1,757,290

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

2,500,000

206,000

2,584,250

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

2,990,000

203,700

3,090,763

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 32 of 104

SATUAN

Paket 5 Material 10,853,850

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 463,795 57,750

Paket 5 Material 479,425

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

29,206

38,441

30,190

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

796,747

388,168

823,597

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

2,400,000

450,000

2,480,880

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

241,020

156,396

249,142

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

216,861

58,000

224,169

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

23,800

3,844

24,602

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

23,517

3,844

24,310

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

300,012

57,662

310,122

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

600,025 900,037 57,083

76,883 115,324 57,662

620,246 930,368 59,007

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

114,165 55,195

77,000 57,662

118,012 57,055

Page 33 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 111,000 76,883 300,012 230,649

Paket 5 Material 114,741 310,122

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

600,025 1,200,050 386,500

461,297 922,594 230,649

620,246 1,240,492 399,525

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

772,930 385,000

461,297 230,649

798,978 397,975

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

770,000 1,530,983 134,679

461,297 699,297 36,767

795,949 1,582,577 139,218

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

277,227

44,121

286,570

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

536,600

51,474

554,683

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

456,000

44,121

471,367

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

893,587

51,474

923,701

Page 34 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 900,037 21,177,900

Paket 5 Material 930,368

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

1,800,075 3,600,149 8,625

31,766,850 42,355,800 1,563

1,860,738 3,721,474 8,916

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

25,875 9,270

2,040 1,563

26,747 9,582

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

18,805 20,500

2,032 1,563

19,439 21,191

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

41,000 12,656

2,032 1,544

42,382 13,083

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

300,012

74,453

310,122

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

600,025 175,000

77,000 41,375

620,246 180,898

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

347,730 -

41,375 41,500

359,449 -

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

Page 35 of 104

-

41,400

-

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 41,500

Paket 5 Material -

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

11,652

41,375 1,488

12,045

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

23,305 19,800

1,800 1,488

24,090 20,467

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

39,600 12,125

1,800 1,488

40,935 12,534

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

24,083 -

1,800 1,922

24,895 -

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

35,048

76,883

36,229

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

1,027,160

691,946

1,061,775

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

248,791

161,454

257,175

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

23,949

452,740

24,756

Page 36 of 104

m3

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 19,000

Paket 5 Material -

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

-

22,550 30,917 35,313 37,192 39,420 41,500

-

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

-

210,000

-

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

51,358

76,883

53,089

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

242,677

150,568

250,855

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

265,039 739,908 619,458 21,796

162,643 178,911 196,802 495

273,971 764,843 640,334 22,531

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

22,943

495

23,716

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

24,205

495

25,021

Page 37 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 5,225 1,770

Paket 5 Material 5,402

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

7,106 11,231 15,930 23,953 33,380 40,785 10,590

2,330 2,668 2,690 3,092 3,600 4,109 2,287

7,346 11,610 16,467 24,760 34,505 42,159 10,947

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

15,129 26,932 39,425 12,514

2,668 3,050 3,516 2,880

15,638 27,840 40,754 12,936

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

18,035 32,319 47,562 13,028

3,304 4,110 4,405 2,597

18,643 33,408 49,164 13,468

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

15,403 22,004 28,496 42,359 54,500 64,913

3,417 3,914 3,945 4,535 5,280 6,026

15,922 22,746 29,456 43,786 56,337 67,100

2 way 4 way 7 way 12 way 19 way 24 way

Page 38 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 4 Material Jasa 22,000 3,355

Paket 5 Material 22,741

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

28,496 50,500 67,332 25,658

3,914 4,473 5,156 4,224

29,456 52,202 69,601 26,523

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

33,556 59,741 80,094 12,619

4,846 5,980 6,461 495

34,687 61,755 82,794 13,044

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

12,619

495

13,044

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

12,619

495

13,044

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

5,800,000

2,581,905

5,995,460

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

4,057,888

1,965,570

4,194,639

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

764,620

174,350

790,388

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

2,500,000

260,062

2,584,250

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

9,480,000

490,711

9,799,476

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

811,676

680,000

839,029

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

Page 39 of 104

-

56,510

-

S OSP-FO TAHUN 2014-2017 NO

DESIGNATOR

PENGADAAN KHS OSP-FO TA URAIAN PEKERJAAN

Paket 5 SATUAN

Jasa

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 6 Material Jasa 1.2369

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

2,700

9,460

3,376

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

2,700 2,700 2,700 3,285 3,285 3,280 3,645 3,645 3,762

12,109 17,388 29,389 42,055 72,508 77,644 204,085 367,359 12,802

3,376 3,376 3,376 4,108 4,108 4,102 4,559 4,559 4,704

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

3,733 3,733 3,733 2,700

15,209 21,955 32,902 12,735

4,669 4,669 4,669 3,376

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

2,700 2,700 2,700 3,733

17,946 29,054 53,959 16,521

3,376 3,376 3,376 4,669

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

3,733 3,733 3,733 2,700

22,388 34,881 60,905 12,245

4,669 4,669 4,669 3,376

Page 40 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 15,184 3,376 20,450 3,376 14,694 4,669

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

Jasa 2,700 2,700 3,733

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

3,733 3,733 30,726

18,554 23,140 896,753

4,669 4,669 38,422

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

30,726 30,726 30,726 30,726 52,835

1,013,088 1,156,502 1,607,970 2,844,870 -

38,422 38,422 38,422 38,422 66,068

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

meter

2,169

2,360

2,712

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

2,169 2,169 2,169 3,073 3,073 3,073 3,037 3,471 4,338 2,700

3,303 6,134 8,494 12,098 19,110 30,671 36,098 55,680 106,169 5,640

2,712 2,712 2,712 3,842 3,842 3,842 3,797 4,340 5,425 3,376

45

DC-OF-SM-2A

idem 2 core

meter

2,700

5,937

3,376

Page 41 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 5,933 3,376

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

Jasa 2,700

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

2,730 3,733

5,937 5,937

3,414 4,669

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

3,733 2,730

6,222 89,923

4,669 3,414

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

1,352 2,730

5,640 74,430

1,691 3,414

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

1,352 2,730

5,640 86,583

1,691 3,414

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

1,352 2,730

5,640 67,566

1,691 3,414

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

1,352 2,730

5,640 84,109

1,691 3,414

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

1,352 2,730

5,640 64,653

1,691 3,414

61

PC-UPC-652-A1

additional per 1 meter

pcs

1,352

5,640

1,691

Page 42 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 6,141,286 4,695,514

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Jasa 3,754,981

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

5,073,962

15,340,034

6,344,867

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

5,112,251

27,503,708

6,392,747

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

5,072,168

72,644,296

6,342,625

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

122,902

1,447,173

153,686

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

122,902

1,731,660

153,686

Page 43 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 1,149,760 153,686

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

Jasa 122,902

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

122,902

1,484,280

153,686

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

122,685

1,113,210

153,414

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

122,902

1,400,310

153,686

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

122,902

2,591,019

153,686

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

122,902

3,205,402

153,686

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

667,386

1,267,757

834,550

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,334,772 2,669,545 5,339,090

1,782,302 3,441,674 5,933,409

1,669,101 3,338,202 6,676,404

Page 44 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 12,987,450 591,140

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Jasa 472,732

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

472,732

17,873,254

591,140

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

55,616

79,162

69,546

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

112,456 30,575

116,269 325,995

140,624 38,234

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

30,575 30,575 30,575 30,797

432,297 688,854 1,063,734 754,509

38,234 38,234 38,234 38,511

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

30,797 6,673,862 172,387

890,568 1,271,607

38,511 8,345,504 210,771

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

174,443

2,102,730

213,342

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

179,950

3,092,250

220,228

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

177,775

3,698,331

217,509

Page 45 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 573,668 68,272

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

Jasa 54,597

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

36,342

36,125

45,445

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

366,974

985,496

458,892

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

425,430

2,968,560

531,990

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

147,857

298,118

184,891

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

54,833

268,235

68,568

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

3,634

29,438

4,544

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

3,634

29,088

4,544

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

54,514

371,085

68,168

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

72,685 109,027 54,514

742,171 1,113,256 70,606

90,891 136,336 68,168

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

72,796 54,514

141,211 68,271

91,029 68,168

Page 46 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 137,296 90,891 371,085 272,673

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

Jasa 72,685 218,056

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

436,110 872,220 218,056

742,171 1,484,342 478,062

545,345 1,090,691 272,673

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

436,110 218,056

956,037 476,207

545,345 272,673

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

436,110 661,115 34,760

952,413 1,893,673 166,584

545,345 826,709 43,466

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

41,712

342,902

52,160

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

48,664

663,721

60,853

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

41,712

564,026

52,160

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

48,664

1,105,278

60,853

Page 47 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 1,113,256 25,036,513

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

Jasa 20,021,587

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

30,032,380 40,043,173 1,478

2,226,513 4,453,024 10,668

37,554,770 50,073,027 1,848

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

1,929 1,478

32,005 11,466

2,412 1,848

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

1,921 1,478

23,260 25,356

2,402 1,848

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

1,921 1,460

50,713 15,654

2,402 1,825

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

64,467

371,085

78,696

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

66,875 33,195

742,171 216,458

81,707 39,592

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

33,195 33,313

430,107 -

39,592 39,739

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

33,219

Page 48 of 104

-

39,621

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 39,739

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

Jasa 33,313

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

33,195 1,407

14,412

39,592 1,759

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

1,702 1,407

28,826 24,491

2,128 1,759

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

1,702 1,407

48,981 14,997

2,128 1,759

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

1,702 1,817

29,788 -

2,128 2,272

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

72,685

43,351

90,891

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

m3

654,166

1,270,494

818,019

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

152,639

307,730

190,871

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

428,020

29,623

535,229

Page 49 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 13,140

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

Jasa 12,042

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

15,398 23,308 27,464 29,240 31,347 33,313

-

17,337 27,228 32,426 34,646 37,280 39,739

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

192,613

-

238,940

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

72,685

63,525

90,891

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

142,347

300,167

178,001

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

153,763 169,142 186,057 468

327,827 915,192 766,208 26,959

192,277 211,509 232,659 585

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

468

28,378

585

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

468

29,939

585

Page 50 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 6,463 2,092

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 1,673

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

2,203 2,522 2,543 2,923 3,403 3,885 2,162

8,790 13,892 19,704 29,627 41,288 50,447 13,098

2,755 3,154 3,180 3,655 4,256 4,858 2,704

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

2,522 2,883 3,324 2,723

18,713 33,312 48,765 15,479

3,154 3,606 4,157 3,405

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

3,124 3,886 4,164 2,455

22,308 39,975 58,829 16,115

3,906 4,859 5,208 3,070

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

3,230 3,700 3,730 4,287 4,992 5,697

19,052 27,217 35,246 52,393 67,411 80,291

4,040 4,627 4,664 5,361 6,242 7,124

2 way 4 way 7 way 12 way 19 way 24 way

Page 51 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 5 SATUAN

Paket 6 Material Jasa 27,212 3,966

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 3,172

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

3,700 4,229 4,874 3,993

35,246 62,464 83,283 31,737

4,627 5,288 6,095 4,994

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

4,581 5,653 6,108 468

41,505 73,894 99,069 15,608

5,729 7,070 7,638 585

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

468

15,608

585

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

468

15,608

585

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

2,440,933

7,174,020

3,052,328

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

1,858,250

5,019,202

2,323,697

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

164,830

945,758

206,117

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

245,863

3,092,250

307,445

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

463,918

11,725,812

580,119

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

642,872

1,003,962

803,896

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

53,425

Page 52 of 104

-

66,806

PENGADAAN KHS OSP-FO TA NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 7 Material Jasa 1.1503

Paket 8 Material 1.3097

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

8,797

3,205

10,017

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

11,261 16,171 27,331 39,110 67,431 72,208 189,796 341,639 11,906

3,205 3,205 3,205 3,900 3,900 3,894 4,328 4,328 4,466

12,822 18,412 31,118 44,530 76,775 82,214 216,097 388,981 13,555

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

14,144 20,418 30,598 11,843

4,432 4,432 4,432 3,205

16,104 23,247 34,838 13,485

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

16,690 27,020 50,181 15,364

3,205 3,205 3,205 4,432

19,002 30,764 57,134 17,494

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

20,820 32,438 56,641 11,388

4,432 4,432 4,432 3,205

23,706 36,934 64,490 12,966

Page 53 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

45

DC-OF-SM-2A

Paket 7 Material Jasa 14,121 3,205 19,018 3,205 13,666 4,432

Paket 8 Material 16,078 21,653 15,559

17,255 21,520 833,968

4,432 4,432 36,475

19,646 24,502 949,533

942,158 1,075,531 1,495,390 2,645,690 -

36,475 36,475 36,475 36,475 62,721

1,072,715 1,224,570 1,702,610 3,012,310 -

meter

2,195

2,575

2,499

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

3,071 5,704 7,899 11,251 17,772 28,524 33,570 51,782 98,736 5,245

2,575 2,575 2,575 3,647 3,647 3,647 3,605 4,120 5,150 3,205

3,497 6,495 8,994 12,810 20,235 32,477 38,222 58,957 112,418 5,972

idem 2 core

meter

5,521

3,205

6,287

Page 54 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 5,518 3,205

Paket 8 Material 6,283

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

5,521 5,521

3,241 4,432

6,287 6,287

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

5,786 83,627

4,432 3,241

6,588 95,215

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

5,245 69,219

1,605 3,241

5,972 78,811

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

5,245 80,521

1,605 3,241

5,972 91,679

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

5,245 62,835

1,605 3,241

5,972 71,542

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

5,245 78,220

1,605 3,241

5,972 89,060

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

5,245 60,126

1,605 3,241

5,972 68,458

61

PC-UPC-652-A1

additional per 1 meter

pcs

5,245

1,605

5,972

Page 55 of 104

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Paket 7 Material Jasa 5,711,312 4,457,601

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

14,266,021

6,023,384

16,242,899

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

25,578,071

6,068,837

29,122,489

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

67,558,197

6,021,255

76,919,908

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,345,851

145,899

1,532,349

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,610,420

145,899

1,833,580

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 56 of 104

SATUAN

Paket 8 Material 6,502,743

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 1,069,261 145,899

Paket 8 Material 1,217,432

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,380,360

145,899

1,571,640

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,035,270

145,641

1,178,730

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,302,269

145,899

1,482,728

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

2,409,612

145,899

2,743,518

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

2,980,979

145,899

3,394,061

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

1,178,997

792,265

1,342,373

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,657,516 3,200,710 5,517,989

1,584,530 3,169,061 6,338,122

1,887,203 3,644,240 6,282,631

Page 57 of 104

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Paket 7 Material Jasa 12,078,150 561,188

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

16,621,881

561,188

18,925,217

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

73,619

66,023

83,821

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

108,128 303,171

133,499 36,296

123,112 345,182

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

402,030 640,625 989,258 701,683

36,296 36,296 36,296 36,559

457,740 729,398 1,126,342 798,917

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

828,216 1,182,577

36,559 7,922,652 198,908

942,984 1,346,450

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

1,955,510

201,349

2,226,490

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

2,875,750

207,886

3,274,250

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

3,439,397

205,305

3,916,003

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 58 of 104

SATUAN

Paket 8 Material 13,751,850

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 533,503 64,813

Paket 8 Material 607,432

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

33,596

43,142

38,251

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

916,498

435,641

1,043,500

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

2,760,720

505,035

3,143,280

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

277,245

175,523

315,664

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

249,455

65,093

284,023

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

27,377

4,314

31,171

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

27,052

4,314

30,800

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

345,104

64,714

392,926

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

690,209 1,035,313 65,663

86,286 129,428 64,714

785,853 1,178,778 74,762

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

131,324 63,491

86,417 64,714

149,522 72,289

Page 59 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 127,683 86,286 345,104 258,857

Paket 8 Material 145,377 392,926

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

690,209 1,380,418 444,591

517,714 1,035,427 258,857

785,853 1,571,705 506,199

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

889,101 442,866

517,714 258,857

1,012,306 504,235

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

885,731 1,761,090 154,921

517,714 784,821 41,264

1,008,469 2,005,128 176,389

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

318,894

49,517

363,084

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

617,251

57,769

702,785

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

524,537

49,517

597,223

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

1,027,893

57,769

1,170,331

Page 60 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 1,035,313 23,767,957

Paket 8 Material 1,178,778

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

2,070,626 4,141,251 9,921

35,651,936 47,535,914 1,754

2,357,558 4,715,115 11,296

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

29,764 10,663

2,289 1,754

33,888 12,141

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

21,631 23,581

2,281 1,754

24,629 26,849

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

47,162 14,558

2,281 1,733

53,698 16,576

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

345,104

74,236

392,926

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

690,209 201,303

77,094 37,112

785,853 229,198

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

399,994 -

37,112 37,252

455,422 -

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

Page 61 of 104

-

37,140

-

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 37,252

Paket 8 Material -

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

13,403

37,112 1,670

15,261

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

26,808 22,776

2,020 1,670

30,523 25,932

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

45,552 13,947

2,020 1,670

51,864 15,880

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

27,703 -

2,020 2,157

31,542 -

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

40,316

86,286

45,902

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

1,181,542

776,571

1,345,271

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

286,184

181,200

325,842

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

27,549

508,110

31,366

Page 62 of 104

m3

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 12,001

Paket 8 Material -

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

-

15,985 25,375 30,309 32,418 34,918 37,252

-

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

-

226,360

-

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

59,077

86,286

67,264

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

279,151

168,982

317,834

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

304,874 851,116 712,563 25,072

182,534 200,792 220,871 556

347,122 969,058 811,304 28,546

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

26,391

556

30,048

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

27,843

556

31,701

Page 63 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 6,011 1,986

Paket 8 Material 6,844

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

8,174 12,919 18,325 27,553 38,397 46,915 12,181

2,615 2,994 3,019 3,470 4,040 4,612 2,567

9,307 14,710 20,864 31,371 43,718 53,416 13,869

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

17,402 30,980 45,351 14,395

2,994 3,423 3,946 3,232

19,814 35,273 51,635 16,390

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

20,746 37,176 54,710 14,987

3,708 4,613 4,944 2,915

23,621 42,328 62,291 17,063

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

17,718 25,312 32,779 48,725 62,691 74,669

3,835 4,393 4,427 5,090 5,926 6,763

20,173 28,819 37,321 55,477 71,379 85,016

2 way 4 way 7 way 12 way 19 way 24 way

Page 64 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 7 Material Jasa 25,307 3,765

Paket 8 Material 28,813

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

32,779 58,090 77,452 29,515

4,393 5,020 5,787 4,741

37,321 66,140 88,185 33,604

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

38,599 68,721 92,133 14,516

5,439 6,711 7,251 556

43,948 78,243 104,900 16,527

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

14,516

556

16,527

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

14,516

556

16,527

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

6,671,740

2,897,672

7,596,260

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

4,667,789

2,205,959

5,314,616

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

879,542

195,673

1,001,423

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

2,875,750

291,868

3,274,250

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

10,904,844

550,725

12,415,956

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

933,671

763,164

1,063,052

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

Page 65 of 104

-

63,421

-

PENGADAAN KHS OSP-FO TA NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Jasa

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 9 Material Jasa 1.3045

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

3,331

9,977

3,180

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

3,331 3,331 3,331 4,053 4,053 4,046 4,497 4,497 4,641

12,771 18,339 30,995 44,353 76,471 81,888 215,239 387,437 13,502

3,180 3,180 3,180 3,869 3,869 3,863 4,293 4,293 4,430

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

4,606 4,606 4,606 3,331

16,040 23,155 34,700 13,431

4,397 4,397 4,397 3,180

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

3,331 3,331 3,331 4,606

18,927 30,642 56,908 17,424

3,180 3,180 3,180 4,397

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

4,606 4,606 4,606 3,331

23,611 36,787 64,234 12,915

4,397 4,397 4,397 3,180

Page 66 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 16,014 3,180 21,567 3,180 15,497 4,397

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

Jasa 3,331 3,331 4,606

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

4,606 4,606 37,905

19,568 24,405 945,763

4,397 4,397 36,186

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

37,905 37,905 37,905 37,905 65,180

1,068,456 1,219,708 1,695,850 3,000,350 -

36,186 36,186 36,186 36,186 62,223

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

meter

2,675

2,489

2,554

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

2,675 2,675 2,675 3,790 3,790 3,790 3,746 4,281 5,352 3,331

3,483 6,469 8,958 12,759 20,155 32,348 38,071 58,723 111,972 5,949

2,554 2,554 2,554 3,619 3,619 3,619 3,576 4,087 5,109 3,180

45

DC-OF-SM-2A

idem 2 core

meter

3,331

6,262

3,180

Page 67 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 6,258 3,180

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

Jasa 3,331

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

3,368 4,606

6,262 6,262

3,215 4,397

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

4,606 3,368

6,562 94,837

4,397 3,215

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

1,668 3,368

5,949 78,498

1,592 3,215

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

1,668 3,368

5,949 91,315

1,592 3,215

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

1,668 3,368

5,949 71,258

1,592 3,215

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

1,668 3,368

5,949 88,706

1,592 3,215

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

1,668 3,368

5,949 68,186

1,592 3,215

61

PC-UPC-652-A1

additional per 1 meter

pcs

1,668

5,949

1,592

Page 68 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 6,476,925 4,422,251

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Jasa 4,632,362

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

6,259,532

16,178,409

5,975,618

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

6,306,767

29,006,862

6,020,711

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

6,257,320

76,614,507

5,973,506

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

151,619

1,526,265

144,742

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

151,619

1,826,300

144,742

Page 69 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 1,212,598 144,742

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

Jasa 151,619

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

151,619

1,565,400

144,742

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

151,351

1,174,050

144,486

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

151,619

1,476,841

144,742

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

151,619

2,732,625

144,742

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

151,619

3,380,586

144,742

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

823,326

1,337,043

785,982

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,646,652 3,293,305 6,586,609

1,879,710 3,629,771 6,257,687

1,571,965 3,143,930 6,287,860

Page 70 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 13,697,250 556,738

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Jasa 583,190

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

583,190

18,850,077

556,738

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

68,611

83,488

65,499

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

138,733 37,719

122,623 343,811

132,440 36,008

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

37,719 37,719 37,719 37,993

455,923 726,502 1,121,870 795,745

36,008 36,008 36,008 36,269

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

37,993 8,233,262 209,270

939,240 1,341,104

36,269 7,859,825 198,618

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

211,807

2,217,650

201,040

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

218,600

3,261,250

207,525

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

215,918

3,900,455

204,965

Page 71 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 605,021 64,299

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

Jasa 67,354

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

44,834

38,099

42,800

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

452,720

1,039,356

432,186

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

524,835

3,130,800

501,030

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

182,405

314,411

174,131

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

67,645

282,895

64,577

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

4,483

31,047

4,280

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

4,483

30,678

4,280

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

67,251

391,366

64,201

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

89,669 134,502 67,251

782,733 1,174,098 74,465

85,602 128,402 64,201

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

89,805 67,251

148,928 72,002

85,732 64,201

Page 72 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 144,800 85,602 391,366 256,805

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

Jasa 89,669 269,006

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

538,011 1,076,021 269,006

782,733 1,565,465 504,189

513,608 1,027,216 256,805

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

538,011 269,006

1,008,287 502,233

513,608 256,805

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

538,011 815,590 42,881

1,004,465 1,997,167 175,689

513,608 778,597 40,936

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

51,458

361,643

49,124

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

60,034

699,995

57,311

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

51,458

594,852

49,124

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

60,034

1,165,684

57,311

Page 73 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 1,174,098 23,579,474

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

Jasa 24,699,785

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

37,049,677 49,399,570 1,823

2,348,198 4,696,394 11,251

35,369,211 47,158,948 1,740

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

2,379 1,823

33,754 12,093

2,271 1,740

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

2,370 1,823

24,531 26,742

2,262 1,740

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

2,370 1,801

53,485 16,510

2,262 1,719

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

78,172

391,366

74,162

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

81,142 39,593

782,733 228,288

76,998 37,333

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

39,593 39,738

453,614 -

37,333 37,472

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

39,622

Page 74 of 104

-

37,361

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 37,472

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

Jasa 39,738

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

39,593 1,735

15,200

37,333 1,657

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

2,099 1,735

30,401 25,829

2,004 1,657

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

2,099 1,735

51,658 15,817

2,004 1,657

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

2,099 2,242

31,416 -

2,004 2,140

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

89,669

45,720

85,602

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

m3

807,017

1,339,930

770,413

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

188,304

324,548

179,763

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

528,031

31,241

504,081

Page 75 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 12,421

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

Jasa 13,497

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

17,637 27,395 32,523 34,714 37,313 39,738

-

16,373 25,689 30,584 32,676 35,156 37,472

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

236,260

-

225,080

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

89,669

66,997

85,602

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

175,607

316,572

167,642

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

189,691 208,664 229,530 577

345,743 965,210 808,083 28,433

181,087 199,200 219,119 551

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

577

29,929

551

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

577

31,575

551

Page 76 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 6,817 1,971

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 2,064

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

2,717 3,112 3,137 3,606 4,199 4,792 2,667

9,270 14,651 20,781 31,246 43,544 53,204 13,814

2,594 2,971 2,995 3,443 4,008 4,575 2,546

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

3,112 3,557 4,101 3,359

19,735 35,133 51,430 16,325

2,971 3,396 3,915 3,207

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

3,853 4,793 5,138 3,029

23,527 42,160 62,044 16,996

3,679 4,576 4,905 2,891

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

3,985 4,565 4,601 5,289 6,158 7,028

20,093 28,705 37,173 55,257 71,095 84,679

3,804 4,358 4,392 5,049 5,879 6,709

2 way 4 way 7 way 12 way 19 way 24 way

Page 77 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 8 SATUAN

Paket 9 Material Jasa 28,699 3,735

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 3,913

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

4,565 5,217 6,013 4,926

37,173 65,878 87,835 33,471

4,358 4,980 5,741 4,703

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

5,652 6,974 7,535 577

43,774 77,933 104,483 16,461

5,396 6,658 7,194 551

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

577

16,461

551

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

577

16,461

551

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

3,011,276

7,566,100

2,874,693

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

2,292,444

5,293,515

2,188,466

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

203,344

997,447

194,121

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

303,310

3,261,250

289,553

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

572,316

12,366,660

546,358

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

793,084

1,058,831

757,112

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

65,908

Page 78 of 104

-

62,918

PENGADAAN KHS OSP-FO TA NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 10 Material Jasa 1.1549

Paket 11 Material 1.3587

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

8,833

2,897

10,391

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

11,306 16,236 27,440 39,267 67,701 72,497 190,555 343,005 11,953

2,897 2,897 2,897 3,525 3,525 3,520 3,912 3,912 4,037

13,302 19,101 32,283 46,196 79,648 85,290 224,181 403,534 14,063

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

14,200 20,499 30,720 11,891

4,006 4,006 4,006 2,897

16,706 24,117 36,141 13,989

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

16,756 27,128 50,381 15,426

2,897 2,897 2,897 4,006

19,713 31,915 59,272 18,148

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

20,904 32,568 56,867 11,434

4,006 4,006 4,006 2,897

24,592 38,315 66,902 13,451

Page 79 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

45

DC-OF-SM-2A

Paket 10 Material Jasa 14,178 2,897 19,094 2,897 13,720 4,006

Paket 11 Material 16,679 22,463 16,141

17,324 21,606 837,303

4,006 4,006 32,971

20,381 25,419 985,058

945,925 1,079,832 1,501,370 2,656,270 -

32,971 32,971 32,971 32,971 56,696

1,112,849 1,270,385 1,766,310 3,125,010 -

meter

2,204

2,327

2,592

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

3,084 5,727 7,931 11,296 17,843 28,638 33,705 51,989 99,131 5,266

2,327 2,327 2,327 3,297 3,297 3,297 3,259 3,724 4,656 2,897

3,628 6,738 9,330 13,289 20,992 33,692 39,652 61,163 116,624 6,196

idem 2 core

meter

5,544

2,897

6,522

Page 80 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 5,540 2,897

Paket 11 Material 6,518

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

5,544 5,544

2,930 4,006

6,522 6,522

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

5,809 83,961

4,006 2,930

6,834 98,777

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

5,266 69,496

1,451 2,930

6,196 81,760

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

5,266 80,843

1,451 2,930

6,196 95,109

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

5,266 63,086

1,451 2,930

6,196 74,219

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

5,266 78,533

1,451 2,930

6,196 92,392

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

5,266 60,367

1,451 2,930

6,196 71,019

61

PC-UPC-652-A1

additional per 1 meter

pcs

5,266

1,451

6,196

Page 81 of 104

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Paket 10 Material Jasa 5,734,151 4,029,436

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

14,323,070

5,444,822

16,850,597

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

25,680,356

5,485,909

30,212,053

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

67,828,359

5,442,897

79,797,724

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,351,233

131,885

1,589,679

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,616,860

131,885

1,902,180

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 82 of 104

SATUAN

Paket 11 Material 6,746,031

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 1,073,537 131,885

Paket 11 Material 1,262,980

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,385,880

131,885

1,630,440

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,039,410

131,652

1,222,830

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

1,307,477

131,885

1,538,201

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

2,419,248

131,885

2,846,161

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

2,992,900

131,885

3,521,044

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

1,183,711

716,166

1,392,595

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,664,145 3,213,509 5,540,055

1,432,332 2,864,664 5,729,328

1,957,809 3,780,583 6,517,684

Page 83 of 104

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Paket 10 Material Jasa 12,126,450 507,284

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

16,688,351

507,284

19,633,269

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

73,914

59,681

86,957

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

108,561 304,383

120,676 32,810

127,718 358,096

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

403,638 643,187 993,214 704,489

32,810 32,810 32,810 33,048

474,866 756,687 1,168,482 828,807

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

831,528 1,187,306

33,048 7,161,660 187,009

978,264 1,396,825

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

1,963,330

189,215

2,309,790

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

2,887,250

195,125

3,396,750

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

3,453,151

192,791

4,062,513

NO

DESIGNATOR

URAIAN PEKERJAAN

Page 84 of 104

SATUAN

Paket 11 Material 14,266,350

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 535,637 58,587

Paket 11 Material 630,158

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

33,730

38,998

39,682

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

920,163

393,796

1,082,540

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

2,771,760

456,525

3,260,880

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

278,354

158,664

327,474

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

250,453

58,841

294,649

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

27,487

3,900

32,337

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

27,160

3,900

31,953

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

346,484

58,498

407,626

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

692,969 1,039,453 65,925

77,998 116,996 58,498

815,254 1,222,880 77,559

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

131,849 63,745

78,117 58,498

155,116 74,993

Page 85 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 128,194 77,998 346,484 233,993

Paket 11 Material 150,816 407,626

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

692,969 1,385,938 446,369

467,986 935,972 233,993

815,254 1,630,508 525,138

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

892,657 444,637

467,986 233,993

1,050,180 523,100

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

889,273 1,768,132 155,541

467,986 709,437 37,300

1,046,199 2,080,147 182,988

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

320,169

44,761

376,668

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

619,719

52,220

729,078

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

526,634

44,761

619,567

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

1,032,004

52,220

1,214,117

Page 86 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 1,039,453 21,484,980

Paket 11 Material 1,222,880

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

2,078,907 4,157,812 9,961

32,227,469 42,969,959 1,586

2,445,762 4,891,522 11,719

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

29,883 10,706

2,070 1,586

35,156 12,595

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

21,718 23,675

2,061 1,586

25,550 27,853

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

47,351 14,616

2,061 1,566

55,707 17,196

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

346,484

69,988

407,626

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

692,969 202,108

72,572 36,430

815,254 237,773

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

401,593 -

36,430 36,557

472,461 -

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

Page 87 of 104

-

36,455

-

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 36,557

Paket 11 Material -

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

13,457

36,430 1,510

15,832

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

26,915 22,867

1,826 1,510

31,665 26,902

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

45,734 14,003

1,826 1,510

53,805 16,474

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

27,813 -

1,826 1,950

32,722 -

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

40,477

77,998

47,620

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

1,186,267

701,979

1,395,602

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

287,329

163,795

338,032

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

27,659

459,305

32,540

Page 88 of 104

m3

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 13,731

Paket 11 Material -

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

-

17,332 25,820 30,280 32,186 34,447 36,557

-

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

-

207,500

-

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

59,313

77,998

69,780

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

280,268

152,751

329,725

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

306,094 854,520 715,412 25,172

165,001 181,505 199,656 502

360,108 1,005,313 841,658 29,614

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

26,497

502

31,173

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

27,954

502

32,887

Page 89 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 6,035 1,796

Paket 11 Material 7,100

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

8,207 12,971 18,398 27,663 38,551 47,103 12,230

2,364 2,707 2,729 3,137 3,652 4,169 2,320

9,655 15,260 21,645 32,544 45,353 55,415 14,388

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

17,472 31,104 45,532 14,453

2,707 3,094 3,567 2,922

20,555 36,593 53,567 17,003

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

20,829 37,325 54,929 15,047

3,352 4,170 4,469 2,635

24,505 43,911 64,622 17,702

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

17,789 25,413 32,910 48,920 62,942 74,968

3,467 3,971 4,002 4,601 5,357 6,113

20,928 29,897 38,717 57,553 74,049 88,197

2 way 4 way 7 way 12 way 19 way 24 way

Page 90 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

SATUAN

Paket 10 Material Jasa 25,408 3,404

Paket 11 Material 29,891

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

32,910 58,323 77,762 29,633

3,971 4,538 5,231 4,285

38,717 68,615 91,484 34,862

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

38,754 68,995 92,501 14,574

4,916 6,067 6,555 502

45,592 81,171 108,824 17,145

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

14,574

502

17,145

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

14,574

502

17,145

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

6,698,420

2,619,343

7,880,460

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

4,686,455

1,994,071

5,513,452

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

883,060

176,878

1,038,889

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

2,887,250

263,833

3,396,750

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

10,948,452

497,826

12,880,476

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

937,405

689,860

1,102,824

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

Page 91 of 104

-

57,329

-

PENGADAAN KHS OSP-FO TA NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Jasa

Kabel, Penyambungan dan Pekerjaan Sipil

Paket 12 Material Jasa 1.4263

A 0 1

DC-OF-SM-12D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

meter

3,525

10,908

4,257

2 3 4 5 6 7 8 9 10

DC-OF-SM-24D DC-OF-SM-48D DC-OF-SM-96D DC-OF-SM-144D DC-OF-SM-264D DC-OF-SM-288D DC-OF-SM-432D DC-OF-SM-960D AC-OF-SM-12D

Idem 24 core Idem 48 core Idem 96 core Idem 144 core Idem 264 core Idem 288 core Idem 432 core Idem 960 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

meter meter meter meter meter meter meter meter meter

3,525 3,525 3,525 4,290 4,290 4,283 4,760 4,760 4,912

13,963 20,051 33,889 48,494 83,611 89,533 235,335 423,611 14,762

4,257 4,257 4,257 5,180 5,180 5,171 5,748 5,748 5,931

11 12 13 14

AC-OF-SM-24D AC-OF-SM-48D AC-OF-SM-96D DC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

4,875 4,875 4,875 3,525

17,537 25,317 37,940 14,685

5,886 5,886 5,886 4,257

15 16 17 18

DC-OF-SM-24C DC-OF-SM-48C DC-OF-SM-96C AC-OF-SM-12C

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

meter meter meter meter

3,525 3,525 3,525 4,875

20,694 33,503 62,221 19,051

4,257 4,257 4,257 5,886

19 20 21 22

AC-OF-SM-24C AC-OF-SM-48C AC-OF-SM-96C DC-OF-SM-8-SC

Idem 24 core Idem 48 core Idem 96 core Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter meter

4,875 4,875 4,875 3,525

25,816 40,222 70,231 14,120

5,886 5,886 5,886 4,257

Page 92 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 17,509 4,257 23,581 4,257 16,944 5,886

23 24 25

DC-OF-SM-12-SC DC-OF-SM-24-SC AC-OF-SM-8-SC

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

meter meter meter

Jasa 3,525 3,525 4,875

26 27 28

AC-OF-SM-12-SC AC-OF-SM-24-SC SC-OF-SM-24

Idem 12 Core Idem 24 Core Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

meter meter pcs

4,875 4,875 40,118

21,395 26,683 1,034,068

5,886 5,886 48,445

29 30 31 32 33

SC-OF-SM-48 SC-OF-SM-96 SC-OF-SM-144 SC-OF-SM-288 OS-SM-1

Idem 12 - 48 core Idem 12 - 96 core Idem 12 - 144 core Idem 12 - 288 core Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

pcs pcs pcs pcs core

40,118 40,118 40,118 40,118 68,986

1,168,217 1,333,591 1,854,190 3,280,490 -

48,445 48,445 48,445 48,445 83,304

34

AB-OF-SM-2D

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

meter

2,832

2,721

3,419

35 36 37 38 39 40 41 42 43 44

AB-OF-SM-4D AB-OF-SM-8D AB-OF-SM-12D AB-OF-SM-24D AB-OF-SM-48D AB-OF-SM-72D AB-OF-SM-96D AB-OF-SM-144D AB-OF-SM-288D DC-OF-SM-1A

Idem 4 core Idem 8 core Idem 12 core Idem 24 core Idem 48 core Idem 72 core Idem 96 core Idem 144 core Idem 288 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

meter meter meter meter meter meter meter meter meter meter

2,832 2,832 2,832 4,012 4,012 4,012 3,965 4,531 5,665 3,525

3,808 7,073 9,794 13,951 22,036 35,368 41,625 64,206 122,426 6,504

3,419 3,419 3,419 4,844 4,844 4,844 4,788 5,472 6,840 4,257

45

DC-OF-SM-2A

idem 2 core

meter

3,525

6,846

4,257

Page 93 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 6,842 4,257

46

DC-OF-SM-1B

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

meter

Jasa 3,525

47 48

DC-OF-SM-2B AC-OF-SM-1B

idem 2 core Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

meter meter

3,565 4,875

6,846 6,846

4,305 5,886

49 50

AC-OF-SM-2B PC-APC-657-2

idem 2 core Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

meter pcs

4,875 3,565

7,174 103,692

5,886 4,305

51 52

PC-APC-657-A1 PC-UPC-657-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

pcs pcs

1,765 3,565

6,504 85,827

2,132 4,305

53 54

PC-UPC-657-A1 PC-APC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

pcs pcs

1,765 3,565

6,504 99,841

2,132 4,305

55 56

PC-APC-655-A1 PC-UPC-655-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

pcs pcs

1,765 3,565

6,504 77,912

2,132 4,305

57 58

PC-UPC-655-A1 PC-APC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

pcs pcs

1,765 3,565

6,504 96,988

2,132 4,305

59 60

PC-APC-652-A1 PC-UPC-652-2

additional per 1 meter Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

pcs pcs

1,765 3,565

6,504 74,553

2,132 4,305

61

PC-UPC-652-A1

additional per 1 meter

pcs

1,765

6,504

2,132

Page 94 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 7,081,669 5,920,431

62

ODC-C-48

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

pcs

Jasa 4,902,844

63

ODC-C-144

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

6,625,025

17,688,973

8,000,050

64

ODC-C-288

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

6,675,018

31,715,207

8,060,420

65

ODC-C-576

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

pcs

6,622,683

83,767,935

7,997,223

66

ODP-CA-8

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

160,472

1,668,771

193,778

67

ODP-CA-16

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

160,472

1,996,820

193,778

Page 95 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 1,325,817 193,778

68

ODP-A-8

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

Jasa 160,472

69

ODP-A-16

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

160,472

1,711,560

193,778

70

ODP-PB-8

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

160,188

1,283,670

193,435

71

ODP-PB-16

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

pcs

160,472

1,614,732

193,778

72

ODP-PL-8

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

pcs

160,472

2,987,768

193,778

73

ODP-PL-16

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

pcs

160,472

3,696,228

193,778

74

TC-SM-12

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

pcs

871,400

1,461,882

1,052,259

75 76 77

TC-SM-24 TC-SM-48 TC-SM-96

Idem 24 core Idem 48 core Idem 96 core

pcs pcs pcs

1,742,800 3,485,600 6,971,200

2,055,217 3,968,680 6,841,961

2,104,519 4,209,037 8,418,074

Page 96 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 14,976,150 745,351

78

FTB-SM-144SA

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

pcs

Jasa 617,242

79

TR-FTM-HIGH CAP

Pengadaan dan Pemasangan Close Rack FTM High Capacity

pcs

617,242

20,610,092

745,351

80

RS-IN-SC-1P

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

pcs

72,617

91,283

87,689

81 82

RS-IN-SC-2P PS-1-2-ODC

idem 2 port Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs

146,833 39,922

134,072 375,912

177,308 48,207

83 84 85 86

PS-1-4-ODC PS-1-8-ODP PS-1-16-ODP PS-2-2-ODC

Idem, 1 : 4 Idem, 1 : 8 Idem, 1 : 16 Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

pcs pcs pcs pcs

39,922 39,922 39,922 40,211

498,492 794,335 1,226,618 870,043

48,207 48,207 48,207 48,557

87 88 89

PS-2-4-ODC SITAC PU-S7.0-140

Idem, 2 : 4 Akuisisi Lahan SITAC ODC Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

pcs Node pcs

40,211 8,714,000 219,301

1,026,936 1,466,322

48,557 10,522,593 283,124

90

PU-S9.0-140

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

pcs

221,986

2,424,710

286,366

91

PU-C7.0-250

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

pcs

229,176

3,565,750

295,049

92

PU-C9.0-300

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

pcs

226,337

4,264,637

291,620

Page 97 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 661,511 86,082

93

GU-G

Pengadaan dan Pemasangan Temberang Tarik

pcs

Jasa 71,287

94

PU-AS

Pengadaan dan Pemasangan Asesoris tiang eksisting

set

47,452

41,657

57,300

95

GB-G1

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

pcs

479,155

1,136,400

578,603

96

GB-G3

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

pcs

555,480

3,423,120

670,770

97

GB-G-INTG

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

pcs

193,055

343,767

233,124

98

TC-02-ODC

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

pcs

71,595

309,309

86,455

99

PP-OF-IN

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

meter

4,745

33,946

5,730

PP-OF-OUT

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

meter

4,745

33,542

5,730

100

101

DD-S3-1

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

meter

71,178

427,907

85,951

102 103 104

DD-S3-2 DD-S3-3 DD-V4-1

idem, 2 pipa idem, 3 pipa Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

meter meter meter

94,904 142,356 71,178

855,816 1,283,723 81,417

114,602 171,902 85,951

105 106

DD-V4-2 DD-V5-1

Idem, 2 pipa Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

meter meter

95,049 71,178

162,834 78,725

114,776 85,951

Page 98 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 158,319 114,602 427,907 343,805

107 108

DD-V5-2 DD-DA-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

meter meter

Jasa 94,904 284,713

109 110 111

DD-DA-S2 DD-DA-S4 DD-BSS-S1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 12 meter

meter meter meter

569,425 1,138,850 284,713

855,816 1,711,631 551,265

687,609 1,375,219 343,805

112 113

DD-BSS-S2 DD-BTS-S1

Idem, 2 pipa Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

meter meter

569,425 284,713

1,102,430 549,126

687,609 343,805

114 115 116

DD-BTS-S2 DD-BTS-S4 HB-PS-1

idem, 2 pipa idem, 4 pipa Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

meter meter meter

569,425 863,212 45,385

1,098,251 2,183,641 192,093

687,609 1,042,372 54,805

117

HB-PS-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

meter

54,463

395,409

65,767

118

HB-PS-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

meter

63,540

765,353

76,727

119

HB-PC-2

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

meter

54,463

650,393

65,767

120

HB-PC-4

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

meter

63,540

1,274,523

76,727

Page 99 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 1,283,723 31,567,778

121

DD-BMR-1

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

track

Jasa 26,142,000

122 123 124

DD-BMR-2 DD-BMR-4 DC-SD-28-1

idem, 2 pipa idem, 4 pipa Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

track track meter

39,213,000 52,284,000 1,929

2,567,447 5,134,893 12,302

47,351,667 63,135,555 2,330

125 126

DC-SD-28-3 DC-SD-33-1

idem, 3 pipa Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

meter meter

2,518 1,929

36,906 13,222

3,041 2,330

127 128

DC-SD-33-2 DC-SD-43-1

idem, 2 pipa Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

meter meter

2,508 1,929

26,822 29,239

3,029 2,330

129 130

DC-SD-43-2 DCD-PVC-1

idem, 2 pipa Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

meter meter

2,508 1,906

58,478 18,051

3,029 2,301

131

DD-BM-100-1

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter

81,861

427,907

106,174

132 133

DD-BM-100-2 DD-BM-50-1

Idem, 2 pipa Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

meter meter

85,005 41,029

855,816 249,603

109,970 56,868

134 135

DD-BM-50-2 DD-BM-HDPE-40-1

Idem, 2 pipa Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

41,029 41,184

495,967 -

56,868 57,054

136

DD-BM-HDPE-40-2

Idem, 2 pipa

meter

41,060

Page 100 of 104

-

56,905

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 57,054

137

DD-BM-HDPE-50-1

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter

Jasa 41,184

138 139

DD-BM-HDPE-50-2 DD-HDPE-40-1

Idem, 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

41,029 1,837

16,619

56,868 2,218

140 141

DD-HDPE-40-2 DD-HDPE-50-1

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

meter meter

2,222 1,837

33,240 28,241

2,683 2,218

142 143

DD-HDPE-50-2 DD-HDPE-40-1C

Idem 2 pipa Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

meter meter

2,222 1,837

56,481 17,294

2,683 2,218

144 145

DD-HDPE-40-2C DD-ROD

idem, 2 pipa Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

meter meter

2,222 2,373

34,350 -

2,683 2,865

146

DD-RV-1

Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa.

meter

94,904

49,989

114,602

147

DD-RV-CONCRETE

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

m3

854,138

1,465,038

1,031,415

148

DD-DS-S1

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

meter

199,299

354,851

240,663

149

DD-DS-COD1-M

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

meter

558,862

34,158

674,854

Page 101 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 23,515

150

BC-TR-0.4

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

meter

Jasa 13,410

151 152 153 154 155 156

BC-TR-0.6 BC-TR-1 BC-TR-2 BC-TR-3 BC-TR-4 BC-TR-5

idem, kedalaman 0,6 meter idem, kedalaman 1 meter idem, kedalaman 1,2 meter idem, kedalaman 1,3 meter idem, kedalaman 1,4 meter Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

meter meter meter meter meter meter

17,792 28,120 33,547 35,866 38,616 41,184

-

28,807 41,279 47,832 50,632 53,953 57,054

157

BCTR-ROCK

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

meter

249,180

-

308,220

158

BD-SK

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Titik

94,904

73,252

114,602

159

SMD-ABS-2A

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

pcs

185,861

346,130

224,437

160 161 162 163

SMD-ABS-3A SMD-ABS-4A SMD-ABS-6A DD-MDSC-5/3.5

idem 3 cabang idem 4 cabang idem 6 cabang Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

pcs pcs pcs pcs

200,767 220,848 242,932 611

378,025 1,055,331 883,533 31,088

242,436 266,685 293,353 738

164

DD-MDSC-10/8

Pengadaan dan Pemasangan Straight Connector 10/8 mm

pcs

611

32,724

738

165

DD-MDSC-12/10

Pengadaan dan Pemasangan Straight Connector 12/10 mm

pcs

611

34,524

738

Page 102 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 7,453 2,638

166

DD-MDDI-1A

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 2,185

167 168 169 170 171 172 173

DD-MDDI-2A DD-MDDI-4A DD-MDDI-7A DD-MDDI-12A DD-MDDI-19A DD-MDDI-24A DD-MDDI-1B

Idem 2 way Idem 4 way Idem 7 way Idem 12 way Idem 19 way Idem 24 way Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter meter meter meter

2,876 3,293 3,321 3,817 4,444 5,072 2,823

10,136 16,019 22,721 34,164 47,610 58,172 15,104

3,473 3,977 4,010 4,609 5,366 6,125 3,409

174 175 176 177

DD-MDDI-2B DD-MDDI-4B DD-MDDI-7B DD-MDDI-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

3,293 3,765 4,340 3,555

21,578 38,413 56,232 17,849

3,977 4,546 5,241 4,293

178 179 180 181

DD-MDDI-2C DD-MDDI-4C DD-MDDI-7C DD-MDDB-1A

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

4,078 5,073 5,438 3,206

25,724 46,096 67,837 18,582

4,925 6,126 6,566 3,871

182 183 184 185 186 187

DD-MDDB-2A DD-MDDB-4A DD-MDDB-7A DD-MDDB-12A DD-MDDB-19A DD-MDDB-24A

Idem Idem Idem Idem Idem Idem

meter meter meter meter meter meter

4,218 4,831 4,870 5,598 6,518 7,438

21,969 31,385 40,643 60,416 77,733 92,585

5,093 5,834 5,880 6,760 7,870 8,982

2 way 4 way 7 way 12 way 19 way 24 way

Page 103 of 104

NO

DESIGNATOR

URAIAN PEKERJAAN

Paket 11 SATUAN

Paket 12 Material Jasa 31,379 5,001

188

DD-MDDB-1B

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter

Jasa 4,141

189 190 191 192

DD-MDDB-2B DD-MDDB-4B DD-MDDB-7B DD-MDDB-1C

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

meter meter meter meter

4,831 5,521 6,365 5,214

40,643 72,028 96,036 36,596

5,834 6,667 7,686 6,296

193 194 195 196

DD-MDDB-2C DD-MDDB-4C DD-MDDB-7C DD-MDEC-5/3.5

Idem 2 way Idem 4 way Idem 7 way Pengadaan dan Pemasangan End Cap 5/3,5 mm

meter meter meter pcs

5,982 7,382 7,975 611

47,861 85,209 114,239 17,998

7,223 8,914 9,631 738

197

DD-MDEC-10/8

Pengadaan dan Pemasangan End Cap 10/8 mm

pcs

611

17,998

738

198

DD-MDEC-12/10

Pengadaan dan Pemasangan End Cap 12/10 mm

pcs

611

17,998

738

B 199

Manhole, Perbaikan dan Modifikasi MH-HH1 Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

pcs

3,187,104

8,272,540

3,848,588

200

MH-HH2

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

pcs

2,426,300

5,787,766

2,929,879

201

HH-PIT-P-HA

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

pcs

215,218

1,090,578

259,886

202

HH-PIT-P-ODP

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

pcs

321,021

3,565,750

387,648

203

HH-PIT-P-ODC

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

pcs

605,734

13,521,324

731,454

204

MH-CA

Pekerjaan Peninggian Tutup Manhole/Handhole

pcs

839,392

1,157,693

1,013,608

205

CO-OF

Pekerjaan Cut Over Kabel Serat Optik

core

69,756

Page 104 of 104

-

84,234