RFP for Detailed Engineering of Wellhead Development

October 20, 2017 | Author: Hafiz Akhtar | Category: Specification (Technical Standard), Pump, Request For Proposal, Production And Manufacturing, Water
Share Embed Donate


Short Description

RFP for Detailed Engineering of Wellhead Development...

Description

REQUEST FOR PROPOSAL (RFP)

Detailed Engineering of WDW Wellhead Development

A Rev.

31/01/2014 Date

HA Prep.

SAH Checked

NF Approved

Table of Contents

1.0

1

INTRODUCTION

2

SCOPE OF WORK

3

PROJECT DELIVERABLES

4

ENGINEERING DELIVERABLES

5

DOCUMENTATION REQUIREMENT

6

QUALITY ASSURANCE AND QUALITY CONTROL

7

BID DELIVERABLES

8

ATTACHMENTS

INTRODUCTION

1.1

Project description

BHP Petroleum Pakistan Pty Limited (BHP) is currently operating a large gas field in Zamzama (Sindh Province in Pakistan), with gas condensate and water as side streams which are separated during the gas processing phase. The separated water amounts, currently, to approximately 2.500bbl/day, being this value expected to rise 5000 bbl/day in the near future, based on existing reservoir simulations. Presently, the facility produced water is evaporated into the atmosphere in an open evaporation ponds as the last step of the process; however the capacity of the existing evaporation ponds facilities is not enough to handle the future predicted water “production”. Given this situation BHP Billiton has started a detail engineering project to proceed with the erection and installation of surface facilities to implement the first water disposal well (WDW) in the Zamzama Field. WDW project will comprise the following major units; a) Water Treatment Facility b) Treated Water Storage Tank c) Treat water disposal pumps d) Flow line and e) Water Disposal Well In addition to above, several piping tie-ins and E&I integrations have been envisaged during detail engineering with existing plant to integrate the new facility operation together with existing one. 1.2

Process Description

In WDW project a co-mingled stream of produced water from different production separators will be routed to new Produced water treatment facility and stored in treated water storage tank. A disposal Pumps unit (comprised of booster pump and high pressure disposal pump) will transport treated water to disposal well through a disposal pipeline. An effluent will be released in form of sludge from produced water treatment unit and this will be routed to existing Phase 2 evaporation pond through a new dedicated pump and line.

Oxygen scavenger chemical will be injected in to treated water to remove any oxygen presence in to water to avoid corrosion. See the below sketch for concept. 2.0

SCOPE OF WORK BHP wants to engage the services of engineering contractor for the completion of detailed engineering work of the Water Injection wellhead surface facility. Initial working has been done by TECON. The scope of work includes but is not limited to the following: 

Updation & Finalization of Wellhead Plot Plan.



Updation & finalization of Wellhead P & ID as per BHP comments



Updation & Finalization of Piping arrangement & isometrics as per P & ID



Preparation of Mechanical Data Sheets (SP items only)



Choke Valve & PSV sizing and Development of data sheets.



Updation of Valve List



Finalization of Foundation Layout & Support Details for as per final pipe & Cable tray Routing plan



Footing Design of Wellhead Control Panel & Solar Panel



Development of Instrument Loop drawings.



Development of Wellhead Hook up Drawings



Updation of Wellhead Control Narrative



Finalization of C&E Diagram



Conversion of instrument data sheets to editable formats. All the data sheets already been issued with IFC format. No engineering verification is required.



Updation & Finalization of Instrument List



Finalization of I/O list



Finalization of Cable tray routing drawing



SIL study of wellhead facility



Development of fabrication Installation drawings for cable trays.



Updation & Finalization of Earthing & Lightening protection Drawing



MTO extraction & Consolidation of Civil, E &I and piping Works



Construction Specification & BOQ for Civil, E &I and piping Works for engagement of construction contractor.

IFA/IFR versions for the following drawings/documents are available in PDF formats: 

P & ID’s



Wellhead Plot Plan showing Piping arrangement



Piping Isometrics



Wellhead Foundation layout



Pipe & Cable tray support Details



Pipe Support Structural Details



I/O List



Instrument List



Wellhead Control Narrative



C&E Diagram



Earthing & Lightening Protection Drawings



Cable Routing Drawing



SP items List

Procurement for the following major equipment and instruments has been completed:



Wellhead Control Panel



Solar Panel



RTU



Solar Panel for Guard Post



Wellhead Instruments



Wellhead Guard Filter

No procurement support will be required from the engineering contractor. 3.0

PROJECT DELIVERABLES The CONTRACTOR shall be responsible for collecting and verifying field data. A site visit is recommended at the start of the project for the collection and verification of site data. a) The work shall essentially be completed within four (04) weeks of time from the date of issue of Letter of Intent (LOI) or the award of Contract by BHP Billiton. The CONTRACTOR shall submit a detailed schedule in which he shall describe all the activities and delivery of document with planned dates of issue prior to start of work. b) The CONTRACTOR shall be responsible for providing the weekly progress that shall include progress highlights, progress schedule, area of concern, outstanding information, list of deliverables completed and handed over and forward plan. c) CONTRACTOR shall provide editable electronics files of all drawings / documents of all disciplines under this project scope of work. d) CONTRACTOR shall arrange multidiscipline services to perform the study and respond the queries of BHP Billiton during the initial stage of the project. e) CONTRACTOR shall use the equipment tag number as per existing philosophy for modification being suggested.

f) BHP Billiton intent is to have one complete engineering package comprising engineering drawings, data sheets, MTOs, BOQ, ordering specifications as a minimum to perform all procurement and site construction activities. 4.0

ENGINEERING DELIVERABLES Following documents are foreseen as a minimum (but not limited) to be delivered: 4.1

Process

1. P&ID (To be redrawn on CAD and incorporate BHP comments on last revision) 2. Safety Valves sizing Calculation & data sheets 3. Choke Valve sizing Calculation & Data sheet 4. HAZOP Close out Report. Note: List of documents to be reviewed, redrawn & finalized are mentioned in Annexure-1 4.2

Piping/Mechanical

1. Mechanical Data sheets (SP items only) 2. Plot plan (To be redrawn on CAD and updated) 3. Piping GA drawings 4. Piping isometrics (To be redrawn on CAD and updated) 5. Piping MTO 6. Piping BOQ for Construction 7. Valve List (Updation as per P & ID) 8. Construction Specification for Piping & Mechanical 9. SP Item List (Conversion to editable format and updation) Note: List of documents to be reviewed, redrawn & finalized are mentioned in Annexure-1

4.3

E&I

1. Instrument list 2. Instrument Data editable version)

Sheets

(Conversion

from

pdf

to

3. Process Control narratives (Wellhead as stated earlier) 4. C&E diagram (shall be aligned with WDW project) 5. Loop drawings 6. Cable & Cable tray Routing Drawing with BOM 7. MTO for cables & Cable Schedule 8. MTO for Instrument Hook-up material 9. E&I BOQ for Construction 10.

Instrument Plot Plan

11.

Instrument & Lightening Protection Drawings

12.

Cable Tray Fabrication & Installation Drawings

13.

Single Line Diagram

14.

SIL study of Wellhead Facility

15.

Construction Specification for E & I

Note: List of documents to be reviewed, redrawn & finalized are mentioned in Annexure-1 4.4

Civil

1.

Detail foundation layout

2.

Structural Support Details

3.

Foundation Details

4.

Foundation Design Calculations

5.

Civil BOQ for Construction

6.

MTO for Steel Structure

7.

Construction Specification for Civil

Note: List of documents to be reviewed, redrawn & finalized are mentioned in Annexure-1 4.5

Project Management

1. Project schedule & Weekly progress report 2. Weekly LOD Status 3. ITT for Construction 5.0

DOCUMENTATION REQUIREMENT 5.1

The design format of the drawings shall be the same as of existing drawings of the units. The format will be mutually agreed on after the kick off. The CONTRACTOR shall provide 3 sets of all drawings/documents on paper sizes as per existing plant philosophy: 1. A4 Size: Documents like Data Sheets, Specifications, Basis of design, Scope of work. 2. A3 Size: Drawings like PFD’s, P&ID’s, ISO’s, Instrument hook ups 3. A1 Size: Drawings like Plot plans, Alignment sheets, Cable routing BHP requires its CONTRACTOR to deliver all documents / drawings in digital editable format. The delivery medium should be two sets of compact discs (CD’s) for all the documents. CONTRACTOR shall provide soft files in original software format. CONTRACTOR shall also provide AutoCAD and MS Office compatible soft files. All revisions have to be provided as and when they are finalized, on a weekly or daily basis or based on the number of documents / drawings being generated.

5.2

Engineering Contractor shall be responsible for the generation of As-built drawings on the basis of red lined drawings provided by BHP.

6.0

7.0

QUALITY ASSURANCE AND QUALITY CONTROL 6.1

The CONTRACTOR shall be responsible for all quality control/ assurance activities necessary to ensure that the work meet the requirements specified in the Purchase Order.

6.2

Engineering Contractor shall be responsible for completeness, accuracy and adequacy of engineering documents and Bill of materials. Errors, omissions and inaccuracies shall be made good by the contractor without any additional charges.

BID DELIVERABLES CONTRACTOR shall submit following along with bid: 1. Organogram 2. CV’s of key personnel 3. Methodology of work 4. Payment schedule 5. Project Schedule 6. List of Deliverables 7. Statement of Compliance to BHP indication of deviations & exclusions

8.0

ITT

with

clear

ATTACHMENTS Following documents attached with this RFP are being made to the Engineering Contractor for a better understanding of the project Scope:

9.0



Wellhead P & IDs

(00ZP-D10-5507)



Wellhead Plot Plan

(00ZP-D11-5505)



Process Description

(00ZP-R10-5503)



Basis of Design

(00ZP-S10-5501)

ANNEXURES Annexure-1

List of documents to be reviewed & finalized

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF