Rev.1_ITP for Cable Pulling,Termination,Jointing and Conduit
April 27, 2017 | Author: Utku Can Kılıç | Category: N/A
Short Description
Rev.1_ITP for Cable Pulling,Termination,Jointing and Conduit...
Description
Inspection and Test Plan for Cable Pulling,Termination,Jointing and Conduit
ITP No.
KP-00+++-CQ712-G0012
Rev. No.
1
Page
1 of 2
Inspection Status No.
1
1.1
1.2
2
2.1
3
Item Name
Review of Technical Documents (Drawings, Specs, Method statements etc.)
Material Inspection
Application Document/Code/Spec. No.
Document Submittal Subcon tractor
GAMA
3rd Party POSCO /AI E&C
Document Review
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev 0_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing) KP-00+++-CY712G0014Rev A_Method Statement for Electrical Works ( Conduit Works (Embedded or Surface Type))
P
R
R
R
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
Material Certification Review and Visual&Dimension Inspection
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev 0_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing) KP-00+++-CY712G0014Rev A_Method Statement for Electrical Works ( Conduit Works (Embedded or Surface Type))
P
W
W
V
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
Visual Inspection
Visual Inspection
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev 0_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing) KP-00+++-CY712G0014Rev A_Method Statement for Electrical Works ( Conduit Works (Embedded or Surface Type))
P
W
W
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
Visual Inspection
Visual Inspection
P
W
W
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
Visual and Dimensional Inspection
Visual inspection
P
W
W
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
P
W
W
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
Remarks
Owner
Document Review
Visual&Dimension Inspection
Material Certificate Submission
Cable Conduit Installation
Cable conduit route and box installation check for later cable pulling works
Power and Control Cable Installation
Cable route readiness check for cable installation
3.2
Cable installation check
4.1
Inspection & Test Description
GENERAL
3.1
4
Inspection & Test Activity
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev A_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing)
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev A_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing)
Cable Tests
Insulation resistance checks
Controlling Test Results
Controlling Test Results
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev A_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing) Cable Manufacturer Technical Documentations
Test Report Submission
Inspection and Test Plan for Cable Pulling,Termination,Jointing and Conduit
ITP No.
KP-00+++-CQ712-G0012
Rev. No.
1
Page
1 of 2
Inspection Status No.
4.2
Item Name
Point to point and Continuity check
Inspection & Test Activity
Controlling Test Results
Inspection & Test Description
Controlling Test Results
4.3
High pot test
Controlling Test Results
Controlling Test Results
4.4
Termination Point Bolt Torque Test
Controlling Test Results
Controlling Test Results
Application Document/Code/Spec. No.
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev A_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing)
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev A_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing) Cable Manufacturer Technical Documentations
KP-00B__-EE432-G6018Rev 01 MV Cable List KP-00+++-CY712-G0014Rev A_Method Statement for Electrical Works (Cable Pulling,Termination and Jointing) Cable Manufacturer Technical Documentations
Document Submittal Subcon tractor
GAMA
3rd Party POSCO /AI E&C
P
W
W
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
P
W
H
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
P
W
H
S
KP-00+++-CQ712-G0012_F01 Electrical Works (Cable Pulling,Termination,Jointing and Conduit) Inspection Checklist 12-3-4
Notes) #1
P
Legend
Doc. No: KP-00+++-CQ712-G0012 , Rev.1
Remarks
Owner
Test Report Submission
Perform
H
Hold Point
W
Witness Point
S
Spot Witness
V
Surveillance
R
Report Review