WELENCHITI TOWN WATER SUPPLY AND SANITATION PROJECT
_____
WATER WELL DRILLING FOR THE WATER SUPPLY OF WELENCHITI TOWN & SATELLITE VILLAGE (DENGORO TIYO) WELENCHITI TOWN BOREHOLE NO.2 DRILLING RESULTS REPORT
Client:
Oromia Water, Energy & Mineral Resources Development Bureau Contractor : GTB Engineering in JV with EMU General Importer PLC and TAM Geo-Engineering PLC Supervisor: A Consortium of Salomon and YGRY Consulting Engineers PLC March 2017
TAM GEO-ENGINEERING PLC. Tel. 251-(0)911211792 (0)911517411/12 P.O.Box 4661, e-mail
[email protected] e-mail
[email protected]
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Table of Contents EXECUTI EXE CUTIVE VE SUMMARY SUMMARY .............................................................................................. 1 1
GENERA GEN ERAL L BACKGRO BACKGROUND UND................................................................................... 3
1.1
DESCRIPTION OF THE WORK AREA ........................................................................ 3
GEOLOGY ............................................................................................................ 5 1.2 2 DRILLI DRI LLING NG RESULT RESULTS S ............................................................................................. 6
2.1 DRILLED GEOLOGICAL FORMATION ..................................................................... 6 2.1.1 Well Casings and Screens Screens ............................................................................... 7 2.2 TEST PUMPING ..................................................................................................... 8 2.2.1 Test Pumping Pumping of Welenchiti Welenchiti BH-02.................................................................. 8 2.2.2 Provisional Test Pumping of Welenchiti BH-02 ............. ...... ............. ............ ............ ........... ........... ........... ..... 8 2.2.3 Step Drawdown Drawdown Test of Welenchiti Welenchiti BH-02 ....................................................... 8 2.2.4 Constant Discharge Test of Welenchiti BH-02 ............................................... 11 2.2.5 Recommended pumping rate of Welenchiti BH-01 Alternative ............ ...... ............ ........... ..... 15 2.2.6 Water quality of Welenchiti Welenchiti BH-02 ................................................................17 3
CONCLUSION AND RECOMMENDATION CONCLUSION RECOMMENDATION............ ...... ............ ............. ............. ........... ........... ............ ............ ...... 20 3.1 CONCLUSION ..................................................................................................... 20 3.2 R ECOMMENDATION ECOMMENDATION............................................................................................ 21 List of Tables T ABLE 0:1.SUMMARY OF TEST DRILLING RESULTS ......................................................................................................1 T ABLE 0:2. SUMMARY OF PUMP TEST RESULT ...........................................................................................................1 T ABLE 1:1. LOCATION OF W ELENCHITI ELENCHITI T OWN OWN & DENGORO T IYO IYO S ATELLITE VILLAGE BOREHOLES ..........................................3 T ABLE 2:1. F ORMATIONS ORMATIONS DRILLED AT W ELENCHITI ELENCHITI BH02 ............................................................................................6 T ABLE 2:2. SUMMARY OF W ELL ELL C ONSTRUCTION ONSTRUCTION FOR W ELENCHITI ELENCHITI BH02 .......................................................................7 T ABLE 2:3 W ELENCHITI ELENCHITI BH02 SUMMARY OF STEP TEST RESULT ....................................................................................9 ....................................................................................9 T ABLE 2:4. STEP DRAWDOWN TEST RESULT W ELENCHITI ELENCHITI BH02 ............ ............. ............. ............. ............. ............. .... 10 T ABLE 2:5 S UMMARY OF C ONSTANT ONSTANT T EST EST RESULT OF W ELENCHITI ELENCHITI BH02 ..................................................................... 15 T ABLE 2:6 E XTRAPOLATED PUMPING RATE OF W ELENCHITI ELENCHITI BH02BASED ON STEP TEST RESULT ........................................... ........................................... 16 T ABLE 3:1.SUMMARY OF TEST DRILLING RESULTS AT W ELENCHITI ELENCHITI BH02 ............ ............. ............. ............. ............. ...... 20 T ABLE 3:2. W ELENCHITI BH02 S ELENCHITI UMMARY OF PUMP TEST RESULT ............................................................................... 20
List of Figures F IGURE IGURE 1. LOCATION OF W ELENCHITI ELENCHITI & DENGORO T IYO IYO BOREHOLES .............................................................................4 F IGURE IGURE 2. W ELENCHITI ELENCHITI BH02 STEP DRAWDOWN TEST RESULT .....................................................................................9 3 ) ........................ ............ ............. ........... 10 F IGURE -DOWN ( M ) VERSUS DISCHARGE ( M / DAY DAY IGURE 3. W ELENCHITI ELENCHITI BH02 DRAW -D F IGURE IGURE 4. W ELENCHITI ELENCHITI BH02 H ANTUSH-BIERSCHENK W ELL ELL LOSS .............................................................................. 11 F IGURE IGURE 5. W ELENCHITI ELENCHITI BH02 SEMI-LOGARITHMIC TIME DRAWDOWN PLOT OF CONSTANT DISCHARGE TEST ............ ............ ............. .. 12 F IGURE IGURE 6. W ELENCHITI ELENCHITI BH02 LOGARITHMIC TIME DRAWDOWN PLOT OF CONSTANT DISCHARGE TEST ............... ............. ...... 12 F IGURE IGURE 7. W ELENCHITI ELENCHITI BH02 SEMI-LOGARITHMIC TIME -RECOVERY PLOT OF CONSTANT DISCHARGE TEST ............. ............. ............. .... 13 F IGURE IGURE 8. W ELENCHITI ELENCHITI BH02 RESULTS FROM C OOPER OOPER J ACOB T IME IME DRAWDOWN METHOD ................................................ 14 F IGURE IGURE 9. W ELENCHITI ELENCHITI BH02 RESULTS FROM T HEIS HEIS RECOVERY ANALYSIS METHOD ............. ............. ............. ............. ............. ...... 14 F IGURE IGURE 10. W ELENCHITI ELENCHITI BH02 W ELL ELL DEPTH V S PUMPING RATE . DEPTH TO W ATER LEVEL FOR DIFFERENT PUMPING RATES ....... 16 IGURE 11. EC CHANGE CHANGE WITH PUMP TEST TIME FOR THE GROUNDWATER OF W ELENCHITI ELENCHITI BH02 .............. .............. ............ 17 F IGURE Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | i
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
F IGURE IGURE 12. PH & TEMPERATURE CHANGES WITH PUMP TEST TIME FOR THE GROUNDWATER OF W ELENCHITI ELENCHITI BH02 ... ............. 18 18 F IGURE IGURE 11. PIPER DIAGRAM FOR THE GROUNDWATER OF W ELENCHITI ELENCHITI BH02 ............. ............. ............ .............. ............ 19 F IGURE IGURE 14. SCHOELLER DIAGRAM FOR THE GROUNDWATER OF W ELENCHITI ELENCHITI BH02.......................................................... 19
APPENDICES APPENDIX A – – PROFILE PROFILE OF WELLS COMPLETED WITH CASING APPENDIX B – – TEST TEST PUMPING DATA APPENDIX
C – WATER
QUALITY
ANALYSIS
LABORATORY
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | ii
RESULT
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
EXECUTIVE SUMMARY
The Welenchiti Town Water Supply and Sanitation Project included drilling and test pumping of o f four boreholes, for Welenchiti Town (three boreholes) & Dengoro Tiy T iyo o (one Borehole) in Oromia Regional State in the Federal Democratic Republic of Ethiopia. Welenchiti BH01 Alternative was drilled as part of o f this program. Welenchiti BH01 Alternative the drilling commenced on January 14 th 2017 and th
completed at a depth of 252m on March 18 2017. The borehole is drilled to a depth of 252 m. The well was drilled with a diameter of 17 ½ inches for surface casing and 14 ¼ inches diameter for the main drilling. Steel surface casing of 14 inches diameter installed to a depth of 6 m and the annular space is grouted with cement. In this well production casings of mild steel casings and screens with 7mm wall thickness with inner diameter 203mm are installed. The annular space has been packed with gravel from 145m up to 252 and the top part filled with clay and grouted with cement. Table 0:1.Summary of test drilling Results BH No
Drilled Depth (m)
Casing Depth (m)
Inner Casing Dia. (mm)
BH02
252
252
203
Screen position st
nd
rd
1
2
3
4th
169m 169m – – 175.14m
180.86m 180.86m – – 186.64m
215.3m – 215.3m – 209.52m
232.46m - 249.8m
The aquifer used for production in this well is mainly the fractured and weathered basalts and sand deposits. The test pumping result shows that the wells has good yield. BH02 is pumped with discharge rate of 11.0 l/s for 72 hours and the resulting drawdown was 10.85m. The 2
aquifer has Transmissivity Transmissivity values of about 174 17 4 m /day. Table 0:2. Summary of pump test result
BH No
Constant test (l/s)
Test Duration (hrs)
SWL (m)
DWL (m)
BH01
11.0
72
103.6
114.45
Draw Down (m) 10.85
Specific capacity (m2/day) 87
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 1
Transmissivity (m2/day) 174
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
The fluoride content (2.76 mg/l) of the groundwater from this well is higher than the maximum allowable limit (1.5mg/l). All other analyzed chemicals are within the allowable limits of the WHO and the Ethiopian Standard Agency Age ncy guidelines. The fluoride concentration in the water supply can be reduced by mixing proportionally the groundwater from this well with the nearby wells. Based on the pumping test analysis result and the well construction this well can be pumped up to 15 l/s with pump position between 160m and 165m. However, the pumping rate from this well depends on the pumping from the t he nearby wells to reduce the concentration of the fluoride content. co ntent. The temperature of the water is less than 38 oC, thus cold-water submersible pumps with operating temperature range of up to 40 oC recommended.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 2
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
1
Water well Drilling Results Report
GENERAL BACKGROUND
Wlenchiti Town Water Supply and Sanitation Project included drilling of 4 boreholes (three boreholes for Welenchiti Town and one borehole for Dengoro Tiyo Satellite village). The major scope of work included drilling with 17 ½ inch diameter for installation of 14 inches surface casing, drilling with 12 ¼ inch diameter and installation of 8 inches uPVC casings & screens, gravel packing, development and testing in accordance to the specification. However, as a result of difficulties encountered in installation of uPVC casing in 12 ¼ inch diameter, 8 inches mild steel casing was installed for Welenchiti BH02. This report includes the drilling results for Welenchiti th
BH02. At this borehole the drilling commenced on January 14 2017 and completed at a th
depth of 252m on March 18 2017. 1.1
Description of the work area
The drilling sites are situated in Oromia Region East Shewa Zone around Welenchiti Town. Welenchiti Town is located at about 120km from Addis Ababa, whereas the drilling sites are situated 5 km south west (before) Welenchiti town by the right side of the main highway. The area is situated within the Awash River catchment within the Main Ethiopian Rift Valley. The location of the boreholes is shown on the following table and the map in figure 1. Table 1:1. Location of Welenchiti Town & Dengoro Tiyo Satellite village Boreholes BH No Coordinate (WGS84) Altitude (m) Wlenchiti BH01 Alternative 1459 (WTBH-01Alt) 545884 955018 Wlenchiti BH02 (WTBH-02) Wlenchiti New BH02 (WTBH-02New) Wlenchiti BH03 Dengoro Tiyo BH04a Dengoro Tiyo BH04b (DTBH-04b)
546255 544997
954669 955055
1460 1459
Not Drilled
546115 545930 544227
954121 953650 954143
1462 14 62 1464 1461
Not drilled Drilled but not used
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 3
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 1. Location of Welenchiti Welenchiti & Dengoro Tiyo B Boreholes oreholes
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 4
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
1.2
Water well Drilling Results Report
Geology
Welenchiti is situated in the Main Ethiopian Rift Valley on an alluvial plain with basalt flows and spatter cones bounded from the east by Dino Formation Volcanics and from the west by the Nazareth Series. The alluvial sediment is of quaternary to recent in age and composed of alluvial and lacustrine deposits, sands, silts and clays. Dino Formation is Pleistocene in age composed of Ignimbrites, tuffs, coarse pumice, water lain pyroclastic deposits and with rare intercalations of lacustrine deposits. depo sits. Nazareth Series is mainly composed of mildly alkaline basalts with subordinate alkaline and peralkaline silicics. Quaternary Rhyolite volcanic centres with obsidian, pumice, ignimbrite and trachyte flows also occur in plains. The drilling for the groundwater of Welenchiti and Dengoro Tiyo has targeted the
alluvial and lacustrine deposits for lower values of fluoride content as it was observed from the result of the test well. At Welenchiti BH02, the drilling encountered the alluvial and lacustrine sediment at the top 162m and followed by volcanic deposits and layers of alluvial and lacustrine deposits.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 5
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
2
Water well Drilling Results Report
DRILLING RESULTS
The borehole was drilled to a depth of 252 m below ground surface. The top 6m was drilled with 17 ½ inches for installation of 14 inches surface casing. The remaining depth was drilled with 12 ¼ inches diameter. The drilling method was mud circulation throughout the depth. 2.1
Drilled Geological Formation
The major geological formations penetrated are volcanic rocks mainly alluvial and lacustrine deposits, basalt and pyroclastic deposits. There was no drilling problem, except slow drilling in the basalt formation and the loss of o f circulation below 236m depth. Upon completion of the drilling, electrical logging was done using Terrameter SAS-300C
in order to complement the lithological logs. The electrical logging result shows distinct difference in the resistivity of the sediments and fractured volcanic rocks. The following table shows the lithological logging result based on recovered samples and electrical logging. Table 2:1. Formations drilled at Welenchiti BH02 B H02 Geologic Log Depth (m) From
To
0m
2m
2m
4m
4m
6m
6m
12 m
12 m
20 m
Geology
Geologic Descriptio Description n Clay:- Black in colour
Sediment
Clay:- black sandy clay Clay:- brownish clay Pumice:- pumice deposit Trachyte:-
Volcanic
20 m
22 m
22 m
32 m
Trachyte:-
32 m
60 m
Clay:-
60 m
100 m
Clay:- Sandy clay
100 m
126 m
126 m
144 m
Sand:-
144 m
162 m
Clay:- Brownish clay
162 m
178 m
178 m
180 m
180 m
184 m
184 m
210 m
Sediment
Volcanic
Clay:-
Clay:- Brownish clay
Basalt:- fractured basalt Clay:- Reddish clay
Sediment
Sand:- coarse grained Clay:- black clay
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 6
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Geologic Log Depth (m)
Geology
Geologic Descriptio Description n
From
To
210 m
214 m
Basalt:- fractured trachy basalt
214 m
222 m
Clay:- light brown clay
222 m
230 m
230 m
232 m
Clay:- light brown clay
232 m
234 m
Basalt:- highly weathered
234 m
252 m
Sand:-
2.1.1 2.1. 1
Volcanic
Pumice:- weathered
Well Casings and Screens
The well was drilled 252 m depth. The up to 252 m it is lined with steel casings and screens with nominal diameter of 8 inches. The screens are slotted with 2-mm slot size. The casing has 217mm outside and 203mm inner diameter with wall thickness of 7mm.
Observation pipe of ¾ inches GS pipe installed up to the depth of 200 m. A steel surface casing of 6 m length and 14 inches diameter installed in the well. Rounded river gravel of basaltic origin has been emplaced in annular space up to 145m below ground. A total of 7 m3 gravel has been used. After the emplacement of gravel, the well has been developed with compressed air for 12 hours using Ingersoll-Rand (IR) compressor of capacity 25 bar mounted on the rig. The annular space has been grouted for 12m below the ground surface and above the gravel level. Finally a wellhead of 1 m by 1 m by 0.75 m is constructed around the 14 inches surface casing. The details of casing and screen positions are provided in the following table. Table 2:2. Summary of Well Construction for Welenchiti BH02 Item
From (m)
1. Drilling
0 6
2. Steel Surface Casing 3. 8 inches steel 7mm thick Casing installed with outer diameter of 217mm and inner diameter 203mm
To (m)
6 252
+0.8 Blind 6 From (m) To (m)
Total (m)
Diameter in inch
6 246
17 ½ 12 ¼
6.8(m) Total
16 Diameter in inch
169.36
170.06
8
175
180.86
5.86
8
186.64
209.52
22.88
8
215.3
232.46
17.16
8
249.8
252.8
3
+0.7
Total blind Casing
8
218.96 218.9 6
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 7
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
4. uPVC heavy duty 13mm thick screens installed in stalled
Total Screen Casing 5. Observation pipe
2.2 2.2.1 2.2. 1
Screen From (m) To (m)
Water well Drilling Results Report
Total (m)
Diameter in inches
169
175.14
6.14
8
180.86
186.64
5.78
8
215.3
209.52
5.78
8
249.8
232.46
17.34
8
35.04
+0.7
200
¾
Test Pumping Test Pumping of Welenchiti BH-02
The test pumping was conducted between 10/03/2017 and 14/03/2017. It was done o
using 200 KVA generator, 55 KW submersible pumps, 4 inches riser pipe, 90 weir
(V-notch), stopwatch and water level measuring tape (deep-meter). (deep -meter). 2.2.2 2.2. 2
Provisional Test Pumping of Welenchiti BH-02
Before starting the proper pumping test, provisional test was conducted on the well to estimate the well yield, to check the draw down, and to decide on the pump position and the type of pumping test to be conducted. This test was carried out with 11 l/s for one hour with the pump intake situated at 140 m depth below the top of casing, which was 0.5m above ground level. The static water
level at the beginning of the test has been measured 103.8 m from the same reference point. At the end of the test the pumping level reached 113.27 m. 2.2.3 2.2. 3
Step Drawdown Test of Welenchiti BH-02
Based on the result obtained from provisional pumping test, Step drawdown test was carried out to determine some characteristics of the well such as well performance, well efficiency, specific capacity of the well, to calculate aquifer and well loss and to determine a suitable discharge rate for the constant discharge test. The test was conducted for a total of four hours and consisted of four steps, where each step lasted for one hour. The well was pumped successively with 6.5 l/s, 8.0l/s, 9.5 l/s and 11.0 l/s by positioning the pump at a depth of o f 140 m below the reference point. The total t otal draw down of the step-wise test was 6.14 m, 7.44 m, 9.08 m and 9.34 m respectively. With the increase of discharge from 6.5 l/s to 9.34 l/s the specific capacity of the well did Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 8
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
not show any significant decline and rather it increased at 11 l/s. Summary of the step test result is shown on the following table and figure. Table 2:3 Welenchiti BH02 summary summary of step test result result l/s
m3/day
DD
l/s/m
m2/day
SC %
6.5
5 61.6 561.6
6.14
1.06
91.47
100%
8
691.2
7.44
1.08
92.90
102%
9.5
820.8
9.08
1.05
90.40
99%
11
950.4
9.34
1.18
101.76
111%
7.2
m3/day 622.08
DD 3.25
l/s/m 2.22
m2/day 191.41
SC % 100%
8.7
751.68
4.11
2.12
182.89
96%
10.2
881.28
4.92
2.07
179.12
94%
l/s
11.7
1010.88
5.06
2.31
199.78
104%
Figure 2. Welenchiti BH02 Step Drawdown test result
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 9
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 3. Welenchiti BH02 Draw-D Draw-Down own (m) versus d discharge ischarge (m3 /day)
The step test result is analysed using the following conventional method; s = BQ + CQ2 Where s Where s = = Drawdown 2 B B = = Aquifer loss (d/m ( d/m ) C = = Well loss coefficient Q = Discharge (m3/d) Well efficiency = 100*BQ / (BQ+CQ2) The result shows that the major drawdown in the well is as a result of the aquifer loss. The results of the step test are shown in the t he following tables and figures. Table 2:4. Step Drawdown test result Welenchiti BH02 Specific Capacity 2 (m /d)
Qn (l/s)
Qn (m /d)
DD, Sw (m)
6.5
561.60
6.14
91.47
8
691.20
7.44
9.5
820.80
11
950.40
3
Specific Draw down 2 Sw/Qn (d/m )
2
2
2
100*BQn / (BQ+CQn2)
B*Qn
CQn
Swn = B *Qn + CQn
2.64E-06
5.13
0.83
5.96
86.03
9.13E-03
2.64E-06
6.31
1.26
7.57
83.34
0.011
9.13E-03
2.64E-06
7.49
1.78
9.27
80.82
0.010
9.13E-03
2.64E-06
8.68
2.38
11.06
78.44
B (d/m )
C
0.011
9.13E-03
92.90
0.011
9.08
90.40
9.34
101.76
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 10
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 4. Welenchiti BH02 Hantush-Biersc Hantush-Bierschenk henk Well Well Loss
2.2.4 2.2. 4
Constant Discharge Test of Welenchiti BH-02
72 hours constant rate test was carried out at the same pumping position and discharge
rate of 11 11 l/s. The water level at the beginning of the test was 104.19 m. During the pumping period the maximum drawdown attained was 10.26 m. The recovery of the well was fast and 91% recovered within 4 hours duration. The aquifers are situated within the volcanic rock formation such as basalt and sediments mainly sand (probably reworked volcano-clastic deposit). The timedrawdown curve shows semi-confined aquifer characteristic with gradual increase in drawdown.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 11
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 5. Welenchiti BH02 Semi-Logarithmic time drawdown plot of constant discharge test
Figure 6. Welenchiti BH02 Logarithmic time drawdown drawdown plot of constant constant discharge discharge test
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 12
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 7. Welenchiti BH02 Semi-Logarithmic time-recovery plot of constant discharge test 2
2
The specific capacity of the well is about 186m /day. The transmissivity (m /day) of the aquifer has been calculated using Cooper-Jacob time-drawdown method and the Theis recovery methods; where, T = 0.183*Q/Δs -------------------- (for Drawdown) T = 0.183*Q/Δs’ ------------------ (for Recovery) 2
Where T = = Transmissivity (m /day) 3
Q = Pumping rate (m /day) Δs = Δs = Drawdown difference per log cycle (m) time-drawdown graph Δs’’ = Drawdown difference per log cycle (m) of recovery graph Δs In addition the Theis’s analysis method for time-drawdown was used, 2where both have given equivalent results. The transmissivity of the aquifer is about 174m /day. The results are shown on the following figures. The summary of the test result is shown in the following table.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 13
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 8. Welenchiti BH02 results from Cooper Jacob Time drawdown method
Figure 9. Welenchiti BH02 results from Theis Recovery analysis method
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 14
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Table 2:5 Summary Su mmary of Constant Test Result of Welenchiti BH02 Pumping rate (m3/day) Pumping test length (hrs) Static Water Level Below ground (m) Pumping water level (m) Drawdown (m) Specific Capacity (M3/day/m) Transmissivity Transmissivi ty from time drawdown plot (m /d) Transmissivity from 2 recovery (m /d)
constant
rate
163.00
pumping 185.00
Transmissivity Transmissivi ty from step test recovery (m /d) Average transmissivi Average transmissivity ty of aquifer (m /d) Hydraulic Conductivity divided by screen length)
950.4 72 103.6 114.45 10.85 87.59
m/d
174.00
(Transmissivity 5.02
2.2.5 2.2. 5
Recommended pumping rate of Welenchiti BH-01 Alternative
The well was test pumped for 72 hours at 11.0 l/s and has 10.65 m of drawdown. The static water level before commencement of test was at 103.8 m and dynamic water level for 11.0 l/s pumping was at 114.45m. The screen in this well is deep below 169m depth. Taking into account the pump position at about 160m, there will be an available drawdown of about 56m. Taking into account the step test result along with constant test result and by extrapolating this well can be pumped 15 l/s without any problem. At 15 l/s the estimated drawdown is below 20m, which means, the dynamic water level will be below 124m depth. Thus, from the pumping test analysis it is recommended to pump this well up to 15 l/s with pump position at about 160 and 165m. o
o
The temperature of the water measured at the site range between 32 C and 38 C. The o
normal operating range of cold owater pumps range up to 40 C, thus cold water pump with temperature range up to 40 C is recommended.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 15
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Table 2:6 Extrapolated pumping rate of Welenchiti BH02based on step test result
Qn (l/s)
Qn (m3/d)
B (d/m2)
C
S (Drawdown)
CQn2
BQn
8.00
691.2
9.13E-03
2.64E-06
6.31
1.26
7.57
9.00
777.6
9.13E-03
2.64E-06
7.10
1.60
8.70
10.00
864
9.13E-03
2.64E-06
7.89
1.97
9.86
11.00
950.4
9.13E-03
2.64E-06
8.68
2.38
11.06
12.00
1036.8
9.13E-03
2.64E-06
9.47
2.84
12.30
13.00
1123.2
9.13E-03
2.64E-06
10.25
3.33
13.59
14.00
1209.6
9.13E-03
2.64E-06
11.04
3.86
14.91
15.00
1296
9.13E-03
2.64E-06
11.83
4.43
16.27
Figure 10. Welenchiti BH02 Well depth Vs pumping rate. Depth to Water level for different pumping rates rates
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 16
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
2.2.6 2.2. 6
Water well Drilling Results Report
Water quality of Welenchiti BH-02
For the purpose of checking changes in water quality characteristic the electrical conductivity (EC), pH and temperature and fluoride has been monitored throughout the pumping test. The EC value range between 960 μS/cm and 506 μS/cm and the o
o
temperature between 38 C and 32 C. The EC value has shown three different ranges within the 72 hours test. The first is up to 18 hours pumping in which the EC value was between 960 μS/cm and 825 825 μS/cm. After 18 hours of pumping, between 18 hrs and 46 hrs the EC and temperature have shown significant decline. The EC value dec declined lined within the ranges of 675μS/cm and 670 μS/cm and the temperature between 32.2 oC and 33 oC. The third is from 47 hrs up to 72 hours. In this period the EC value declined, but the temperature have shown rising trend. The EC value ranges 506μS/cm and 632 μS/cm
and the temperature between 32. oC and 37 oC. This indicates the presence of aquifers having cold and warm water with different EC values. The pH varies within small range between pH values of 7. and 7.3.
Figure 11. EC EC change with with pump test test time for for the grou groundwate ndwaterr of Welenchiti BH02
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 17
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 12. pH & temperature changes with with pump test time time for the groundwate groundwaterr of Welenchiti BH02
At the end of the test pumping water sample was collected and submitted to the Water Works Design & Supervision Enterprise Laboratory for analysis. The groundwater analysed from BH02 is Na-HCO3 type. Except for fluoride, all the analysed parameters are within the allowable limits of the guideline set by the WHO and the Ethiopian Standard Agency. Agency.
The groundwater has low low TDS (380mg/l), (380mg/l), pH of 7.42 and and low low
hardness (64mg/l). The analysis result of Aluminium, Chromium and boron have values less than 0.1 mg/l. The analysis result has shown that the fluoride content is about 2.76mg/l which is higher than the allowable maximum value of 1.5 mg/l. Thus this water has to be blended with water from the nearby wells with lower fluoride content in order to reduce the fluoride concentration in the water to be supplied.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 18
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Figure 13. Piper Piper diagram for the groundwate groundwaterr of Welenchiti BH02
Figure 14. Schoeller Schoeller diagram diagram for the the groundwater groundwater of Welenchiti BH02
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 19
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
3
3.1
Water well Drilling Results Report
CONCLUSION AND RECOMMENDATION Conclusion
The depth of the well below ground where casing is installed is 252m. The well has been drilled with a diameter 17 ½ inches (444.5mm) diameter for surface casing and 12 ¼ inches (311.15mm) diameter for the well casing. Well casings and screens are made of mild steel with nominal diameter of 8 inches and wall thickness of 7mm. After installation of casing the annular space has been packed with gravel up to 145 m below ground. The remaining part is filled with clay and the top 12 m grouted with cement. Table 3:1.Summary of test drilling Results at Welenchiti BH02 BH No
Drilled Depth (m)
Casing Depth (m)
Inner Casing Dia.
Screen position 1st
2nd
3rd
4th
BH02
(m)
(m)
252
252
(mm)
203
169m 169m – – 175.14m
180.86m 180.86m – – 186.64m
215.3m – 215.3m – 209.52m
232.46m - 249.8m
The aquifer used for production in this well is mainly the fractured and weathered basalts & and sand deposit. The aquifers in the volcanic ash and trachyte are sealed with clay and blind casing as a result of their higher values of fluoride content. The aquifer situated below 160m is used for production with screen position position indicted in the above table. The test pumping result shows that the wells has good yield. BH02 is pumped with discharge rate of 11.0 l/s for 72 hours and the resulting drawdown was 10.85m. The 2
aquifer has Transmissivity values of about 174 m /day. The following table shows the summary of test pumping result. Table 3:2. Welenchiti BH02 Summary of pump test result
BH No
Constant test (l/s)
Test Duration (hrs)
SWL (m)
DWL (m)
BH01
11.0
72
103.6
114.45
Draw Down (m)
Specific capacity (m2/day)
10.85
Transmissivity (m2/day)
87
174
The chemical quality of the groundwater for the analysed parameters except its high fluoride content (2.76 mg/l) is within the allowable limits of the WHO and the Ethiopian Standard Agency guidelines.
The groundwater is is Na-HCO3 type.
It has low TDS
(380mg/l), pH of 7.42 and low hardness (64mg/l). The analysis result for Aluminium, Chromium and boron shows that they have values less than 0.1 mg/l. Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 20
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
3.2
Water well Drilling Results Report
Recommendation
The screen in this well is deep below 169m depth. Taking into account the pump position at about 160m, there will be an available drawdown of about 56m. Combining the constant and the step test results show at 15 l/s the drawdown in this well does not exceed 20m with with dynamic water level of 124m. Thus, from the pumping test analysis analysis it is recommended to pump this well up to 15 l/s with pump position between 160m and 165m. However, the pumping rate has to be decided based on the pumping rates of the nearby wells to be used to reduce the fluoride concentration. o o The temperature of the water from this well ranges between 32 C and 38 C. Thus cold o
water pumps with operational temperature range of over 38 C are recommended.
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 21
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
References 1. Mengesha Tefera, Tadiwos Chernet and Workineh Haro; The Geological Map of
Ethiopia, 2nd edition. Geological Survey of Ethiopia, 1990 2. Mengesha Tefera, Tadiwos Chernet and Workineh Haro; Explanation of the
Geological Map of Ethiopia, 2 edition. Geological Survey of Ethiopia, 1996 nd
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 22
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
APPENDICES
Water well Drilling Results Report
– PROFILE PROFILE OF WELLS COMPLETED WITH CASING APPENDIX A – TEST PUMPING DATA APPENDIX B – – TEST APPENDIX C – – WATER WATER QUALITY ANALYSIS LABORATORY RESULT
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 23
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
– PROFILE PROFILE OF WELLS COMPLETED WITH CASING APPENDIX A. –
Tel. 251-(0)911211792 251-(0)911517411-(0)911517412, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 24
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 25
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
– PUMPING PUMPING TEST DATA APPENDIX B –
Water well Drilling Results Report
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 26
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Project Name: Welenchiti Town Water Supply and Sanitation Project Client:Oromiya Mineral, Water and Energy Bureau Date of Start:- 10/03/2017 Date of Completion:14/03/2017 Site Name: New BH-02 REFERENCES Known Benchmark Data:- X=___________ Y=__________ Z=__________ Top of observation pipe 0.5m above ground GPS Reading:X= ___________ Y=___________ Z=__________ Step Drawdown Test st n r t 1 2 3 4 Discharge L/s 6.5 Discharge L/s 8 Discharge L/s 9.5 Discharge L/s 11 Water Draw Water Draw Water Draw Water Draw Time Level down Time Level Down Time Level down Time Level Down (Min) 0 0.5 1
(m) 103.6 105.25 105.6
(m)
0.00 1.65 2.00
(min) 60.5 61 61.5
(m) 109.82 109.9 109.95
(m)
6.22 6.30 6.35
(min) 120.5 121 121.5
(m) 111.14 111.23 111.27
(m)
7.54 7.63 7.67
(min) 180.5 181 181.5
(m)
112.69 112.69 112.70
(m)
9.09 9.09 9.10
7 8 9 10 12 14 16 18 20 25 30 35 40 45
105.7 105.9 106 106.07 106.25 106.32 106.54 106.63 106.8 107 107.27 108.4 108.72 108.95 109 109.03 109.15 109.2 109.3 109.42 109.45 109.56 109.56
50 55 60
109.63 109.65 109.74
1.5 2 2.5 3 3.5 4 4.5 5 6
2.10 2.30 2.40 2.47 2.65 2.72 2.94 3.03 3.20 3.40 3.67 4.80 5.12 5.35 5.40 5.43 5.55 5.60 5.70 5.82 5.85 5.96 5.96 6.03 6.05 6.14
62 62.5 63 63.5 64 64.5 65 66 67 68 69 70 72 74 76 78 80 85 90 95 100 105 110
109.99 110.02 110.1 110.13 110.18 110.21 110.27 110.35 110.43 110.5 110.57 110.62 110.63 110.65 110.66 110.7 110.7 110.74 110.8 110.8 110.86 110.89 110.98
115 120
111.02 111.04
6.39 6.42 6.50 6.53 6.58 6.61 6.67 6.75 6.83 6.90 6.97 7.02 7.03 7.05 7.06 7.10 7.10 7.14 7.20 7.20 7.26 7.29 7.38 7.42 7.44
122 122.5 123 123.5 124 124.5 125 126 127 128 129 130 132 134 136 138 140 145 150 155 160 165 170
111.29 111.3 111.35 111.47 111.54 111.6 111.65 111.72 111.81 111.9 111.98 112.06 112.2 112.31 112.4 112.4 112.42 112.47 112.5 112.52 112.55 112.64 112.68
175 180
112.68 112.68
7.69 7.70 7.75 7.88 7.94 8.00 8.05 8.12 8.21 8.30 8.38 8.46 8.60 8.71 8.80 8.80 8.82 8.87 8.90 8.92 8.95 9.04 9.08 9.08 9.08
182 182.5 183 183.5 184 184.5 185 186 187 188 189 190 192 194 196 198 200 205 210 215 220 225 230 235 240
112.71 112.71 112.71 112.72 112.72 112.73 112.74 112.74 112.74
9.11 9.11 9.11 9.12 9.12 9.13 9.14 9.14 9.14
112.75 112.75 112.75 112.76 112.76 112.76 112.78 112.79 112.80 112.85 112.85 112.87 112.89 112.92 112.92 112.94
9.15 9.15 9.15 9.16 9.16 9.16 9.18 9.19 9.20 9.25 9.25 9.27 9.29 9.32 9.32 9.34
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 27
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Project Name: Welenchiti Town Water Supply and Sanitation Project Client:Oromiya Mineral, Water and Energy Bureau Date of Start:- 10/03/2017 Date of Completion:14/03/2017 Site Name: New BH-02 REFERENCES Known Benchmark Data:- X=___________ Y=__________ Z=__________ Top of observation pipe 0.5m
GPS Reading:-
X= ___________ Y=___________ Z=____________
SWL 104.19 (m) Time Water Level (m) Hour Min
Draw down (m)
Constant Discharge Test Discharge 11.0 (l/s) Time Water Draw Level (m) down (m) Hour Min
Pump Position 140 (m) Time Water Draw Level (m) down Hour Min (m)
0 0.5
104.19 109.80
0.00
35
112.17
7.98
600
113.60
9.41
5.61
40
112.20
8.01
660
113.74
9.55
1
110.40
6.21
45
112.22
8.03
720
113.86
9. 9.67 67
1.5
110.70
6.51
50
112.35
8.16
780
113.86
9.67
2
110.87
6.68
55
112.37
8.18
840
113.86
9. 9.67 67
2.5
111.00
6.81
60
112.44
8.25
900
113.90
9.71
3
111.10
6.91
960
113.93
9. 9.74 74
111.20
7.01
112.47 112.47
8.28
3.5
70 80
8.28
1020
113.93
9.74
4
111.29
7.10
90
112.50
8.31
1080
113.94
9.75
4.5
111.37
7.18
100
112.58
8.39
1140
113.94
9.75
5
111.45
7.26
120
112.65
8.46
1200
113.95
9.76
6 7
111.50 111.59
7.31 7.40
140 160
112.80 112.85
8.61 8.66
1260 1320
114.05 114.05
9.86 9.86
8
111.64
7.45
180
112.93
8.74
1380
114.06
9.87
9
111.69
7.50
210
113.05
8.86
1440
114.08
9.89
10
111.70
7.51
240
113.08
8.89
1500
114.10
9.91
12
111.73
7.54
270
113.10
8.91
1560
114.22
10.03
14
111.79
7.60
300
113.23
9.04
1620
114.22
10.03
16
111.81
7.62
330
113.28
9.09
1680
114.23
10.04
18
111.85
7.66
360
113.33
9.14
1740
114.27
10.08
20
111.90
7.71
420
113.33
9.14
1800
114.31
10.12
25
111.98
7.79
480
113.40
9.21
1860
114.37
10.18
30
112.06
7.87
540
113.54
9.35
1920
114.39
10.20
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 28
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
SWL 104.19 (m) Time Water Level (m) Hour Min
Draw down (m)
Constant Discharge Test Discharge 11.0 (l/s) Time Water Level (m) Hour Min
Water well Drilling Results Report
Draw down (m)
1980
114.43
10.24
3300
114.40
10.21
2040
114.45
10.26
3360
114.44
10.25
2100
114.46
10.27
3420
114.43
10.24
2160
114.49
10.30
3480
114.47
10.28
2220
114.49
10.30
3540
114.48
10.29
2280
114.49
10.30
3600
114.52
10.33
2340
114.49
10.30
3660
114.51
10.32
2400
114.49
10.30
3720
114.51
10.32
2460
114.49
10.30
3780
114.52
10.33
2520
114.50
10.31
3840
114.51
10.32
Pump Position 140 (m) Time Water Draw Level down Hour Min (m) (m)
2580
114.50
10.31
3900
114.53
10.34
2640
114.52
10.33
3960
114.52
10.33
2700
114.52
10.33
4020
114.48
10.29
2760
114.52
10.33
4080
114.50
10.31
2820
114.47
10.28
4140
114.49
10.30
2880
114.43
10.24
4200
114.45
10.26
2940
114.55
10.36
4260
114.44
10.25
3000
114.55
10.36
4320
114.45
10.26
3060
114.25
10.06
3120
114.26
10.07
3180
114.30
10.11
3240
114.36
10.17
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 29
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Project Name: Welenchiti Town Water Supply and Sanitation Project Client:Oromiya Mineral, Water and Energy Bureau Date of Start:- 10/03/2017 Date of Completion:14/03/2017 Site Name: New BH-02 REFERENCES Known Benchmark Data:- X=___________ Y=__________ Z=__________ Top of observation pipe 0.5m
GPS Reading:-
X= ___________ Y=___________ Z=____________
SWL 104.19 (m) Time Time Since since Pumping pumping Stopped (t’) (min) Hour Min
Time Ratio (t/t’)
Constant Discharge Test Recovery Discharge 11.0 (l/s) Time Time Since Water Residual since Pumping Level Drawdo pumping Stopped (t’) (s) wn (s’)
Pump Position 140 (m) Time Water Residual Ratio Level Drawdown (t/t’) (s) (m) (s’) (m)
started (t) (min)
(m)
(m)
0
4320
114.45
57.21
35
4355.0
124
106.71
2.52
0.5
4320.5
111.6
51.10
40
4360.0
109
106.63
2.44
8641
(min) Hour Min
started (t) (min)
1
4321.0
4321
111.1
48.40
45
4365.0
97
105.9
1.71
1.5
4321.5
2881
110.4
47.25
50
4370.0
87
105.85
1.66
2
4322.0
2161
110.39
47.62
55
4375.0
80
105.8
1.61
2.5
4322.5
1729
110.3
47.80
60
4380.0
73
105.76
1.57
3
4323.0
1441
109.59
47.70
70
4390.0
63
105.71
1.52
3.5
4323.5
1235
109.49
47.51
80
4400.0
55
105.62
1.43
4
4324.0
1081
108.55
47.37
90
4410.0
49
105.6
1.41
4.5
4324.5
961
107.67
47.24
100
4420.0
44
105.54
1.35
5
4325.0
865
107.55
47.13
120
4440.0
37
105.43
1.24
6
4326.0
721
107.52
47.00
140
4460.0
32
105.33
1.14
7
4327.0
618
107.59
46.75
160
4480.0
28
105.33
1.14
8
4328.0
541
107.44
46.53
180
4500.0
25
105.29
1.10
9
4329.0
481
107.4
46.32
200
4520.0
23
105.22
1.03
10
4 330.0 4330.0
433
107.37
46.16
220
4540.0
21
105.1
0.91
12
4 332.0 4332.0
361
107.31
45.67
14
4 334.0 4334.0
310
107.25
45.50
16
4336.0
271
107.2
45.16
18
4 338.0 4338.0
241
107.21
44.84
20
4 340.0 4340.0
217
107.17
44.48
25
4345.0
174
107.1
44.08
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 30
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
– WATER WATER QUALITY ANALYSIS LABORATORY RESULT APPENDIX C –
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 31
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
EC, pH and Temperature Te mperature result during test pumping Elapsed Time, [t] (hour)
(min)
EC
pH
(µS/m)
Temp. (℃)
1
797
7.1
37
2
856
7.2
38
3 4
825 960
7.1 7.1
37.1 37.4
5
953
7.2
37.4
6
950
7.1
37.4
7
949
7.1
37.3
8
952
7.2
37.2
9
948
7.1
37.2
Water well Drilling Results Report
10
945
7
37
11
920
7.1
37.1
12
911
7.1
37.2
13
902
7.1
37.2
14
896
7.1
37.1
15
890
7.1
37.2
16
895
7.2
37.4
17
886
7.1
37.1
18 19
879 670
7.3 7.2
37 32.5
20
670
7.1
32.4
21
675
7.2
32.4
22
672
7.1
32.4
23
675
7.2
32.4
24
670
7.2
32.3
25
673
7.1
32.2
26
674
7.2
32.4
27
671
7.3
32.3
28
674
7.2
32.3
29
675
7.1
32.3
30
673
7.2
32.2
31
670
7.1
32.3
32
673
7.2
32.3
33
672
7.2
32.4
34
672
7.3
32.3
35
671
7.2
32.3
36
672
7.4
32.3
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 32
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Elapsed Time, [t] (hour)
(min)
EC
pH
(µS/m)
Temp. (℃)
37
668
7.3
32.4
38
674
7.3
32.4
39
665
7.2
33
40
664
7.2
32.8
41
663
7.2
32.4
42
665
7.2
32.4
43
660
7.3
32.2
44 45
649 652
7.2 7.3
32.5 32.4
46
698
7.2
32.4
47
506
7.2
32
Water well Drilling Results Report
48
516
7.1
32.2
49
523
7.1
32.2
50
525
7.1
33
51
530
7.2
32.4
52
531
7.1
32.4
53
531
7.1
32.4
54
530
7
32.3
55
542
7.1
32.3
56
556
7
32.1
57
550
7
32.1
58
554
7
32.3
59
560
7.1
32.3
60
580
7.1
32.5
61
590
7.2
32.5
62
600
7.2
33.1
63
618
7.2
33.6
64
620
7.3
33.9
65
615
7.3
34.1
66
623
7.3
34.9
67 68
626 608
7.2 7.2
36.9 36.8
69
614
7.1
36.5
70
620
7.1
36.6
71
625
7.2
35.9
72
632
7.1
36.3
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 33
Welenchiti Town & Satellite Village Water Supply and Sanitation Project
Water well Drilling Results Report
Tel. 251-(0)11-6181521/499/518, 0911211792 Fax (0)11-6181520, P.O.Box 4661, e-mail 4661, e-mail
[email protected]
P a g e | 34