Rd 279596
April 18, 2017 | Author: S.h. Fahad Fiaz | Category: N/A
Short Description
Download Rd 279596...
Description
DATE:
BY:
CONTROL NUMBER
EDSD VERIFICATION
B
A
REV NO.
23-O6-04
May-08
DATE
10-00578-0001
10-00578-0001
JO/EWO
ISSUED FOR PROPOSAL (M1)
ISSUED FOR PROPOSAL (D1)
DESCRIPTION
KACC
DF
GL
ENG'G CERT.
CONTENTS
SECTION
HP FLARE DRAIN DRUM
KHURSANIYAH
DESCRIPTION
1
MECHANICAL DATA SHEET
K80-D-0411
Page No.
HP FLARE DRAIN DRUM K80-D-0411
DWG.TYPE
NON ASSOCIATED GAS PROCESSING FACILITIES
DAT
SAUDI ARABIA
JO/EWO-
3-4
DISCIPLINE ENGINEER
DATE PROJECT ENGINEER
DATE
CERTIFIED
DATE CONSTRUCTION AGENCY
DATE
OPERATIONS
DATE
PLANT NO.
INDEX
DRAWING NO.
K80
D
RD-279596
10-00578-0001
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
THIS INDICATES THAT REV NO. B OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENT, BY DRAWING COMPLETION CERTIFICATE (DCC) NO.
REVISION CERTIFICATION PMT
OPRNS
Saudi Aramco 2616-ENG(03/99)
SAUDI ARABIAN OIL COMPANY
SHT. NO.
OF
2
4
REV.NO.
B
Saudi Aramco SDS-ME-9527 (05/2005) SHEET UNITS ENGLISH
METRIC
NOZZLE & MANWAY SCHEDULE MARK
SIZE
SERVICE
N1
3"
INLET
ASME CLASS MARK 150
N2
2"
GAS IN/OUT
150
N3
3"
WATER OUTLET
150
N4
2"
VENT
150
N5
2"
DRAIN
150
N6
2"
PT
300
N7A/B
2"
LT/LG
300
N8 A/B
2"
LT
300
N9
2"
STEAM OUT
150
MH1
SIZE
SERVICE
ASME CLASS
20"
MAN WAY
150
ALL OTHER INFORMATION ON THIS SHEET TO BE DEDICATED TO YOUR EQUIPMENT.
VESSEL OUTLINE OPERATING CONDITIONS INTERNAL PRESSURE:
MATERIALS OF CONSTRUCTION
NORMAL:
EXTERNAL PRESSURE:
5
psi(g)
MAXIMUM:
113
psi(g)
NORMAL:
ATM
psi
- BASE MATERIAL
MAXIMUM:
N/A
psi
- CLADDING OR OVERLAY
SERVICE
OTHER
If other (Specify)
NORMAL:
AMBIENT
Deg. F
363
Deg. F
MAXIMUM
SPECIFIC GRAVITY OF LIQUID:
1.02
SHELL:
DATA SHEET TO BE COMPLETED IN ACCORDANCE WITH SAES-D-001.
316L (Note4)
SHIPPING: (2:1 S.E)
- TYPE
SA-516 70N(HIC)
SA-333Gr.6
EXTERNAL ATTACHMENT CLIPS:
SA-516 70N
STUD BOLTS:
SA-193 B7 M
EXTERNAL PRESSURE:
NOTE 5
psi
415
Deg.F
INTERNALS:
-26
Deg. F
SUPPORTS:
M.D.M.T
REINFORCING PAD
WIND SPEED
94 (3 SEC GUST) ZONE:
mph
316 L
NUTS:
(EXTERNAL)
(EXTERNAL)
- SKIRT
SA-285 Gr.3 N/A
OTHER (SPECIFY):
Av: CORROSION ALLOWANCE:
0.236 (6 mm) (UNCLAD) / NIL (CLAD)
RADIOGRAPHY IMPACT TESTING (IT):
YES
NO
PWHT:
YES
NO
I. T. TEMPERATURE
in
10 % ( SPOT)
CODE CODE
SERVICE
- PACKING (BY OTHERS)
N/A
- TRAY (BY OTHERS)
N/A
N3 Vortex Breaker
316L
STUD BOLTS: NUTS:
DESIGN CERTIFICATION 12,000
lbs
12,000
lbs
24,500
lbs
TEST:
26,700
lbs
(INTERNALS)
(INTERNALS)
I. T. ENERGY AVE./MIN:
It is the responsbility of the contractor to ensure filling of this data sheet in compliance to the detailed company standard and material specifications
N/A N/A
REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) ENGG./DATE
OTHER
REQUIRED (SAUDI ARAMCO)
CERTIFIED BY/DATE CONST.AGENCY/DATE
OPERATION/DATE
REV.NO.
DATE
ORIGINATOR
REVISION DESCRIPTION
A
May-08
DF
ISSUED FOR PROPOSAL (D1)
B
23/04/08
KACC
SEE SHEET 4 OF 4
BY/DATE
ISSUED FOR PROPOSAL (M1) THIS DRAWING IS NOT TO BE USED FOR
JOB ORDER/EWO NO.
CONSTRUCTION UNTIL CERTIFIED AND DATED
10-00578-0001
SAUDI ARABIAN OIL COMPANY MECHANICAL DATA SHEET HP FLARE DRAIN DRUM
316L
- LUGS:
IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
N/A
EMPTY:
NOTES:
B
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO:
N/A
SA-194 2H M
SEE NOTE 22
SOIL COEFF:
REVISION VALIDATION THIS REVISION NO
OPERATING:
SA350-LF2
130
REINFORCEMENT
316L (Note4)
VENDOR:
YES
ESTIMATED VESSEL WEIGHTS:
HEADS:
REQUISITION NO:
SEE NOTE 12
(SAPCS NO):
INTERNAL PRESSURE: TEMPERATURE:
SHOP PRIME & PAINT (SAPCS NO):
N/A
PIPE:
psi(g)
NOTE 25
N/A
INTERNAL ATTACHMENT CLIPS:
ASME VIII DIV. 1 2007 ED (U STAMP)
FIREPROOFING THICKNESS:
- CLADDING OR OVERLAY
- CLADDING OR OVERLAY
DESIGN CONDITIONS
N/A
- BASE MATERIAL
FLANGES:
AND APPLICABLE ADDENDUM.
EARTHQUAKE:
SA-516 70N(HIC)
INSULATION FIREPROOFING & PAINTING INSULATION THICKNESS:
FIELD PRIME & PAINT
- BASE MATERIAL
VESSELS TO BE MANUFACTURED IN ACCORDANCE WITH 32-SAMSS-004
ASME DESIGN CODE & EDITION:
ASME NO:
BOOT:
HYDROCARBON +WET SOUR, NON CYCLIC & NON-LETHAL
TEMPERATURE:
COMPONENT
DRAWING TYPE
DAT
K80-D-0411
SAUDI ARABIA PLANT NO
INDEX
DRAWING NUMBER
SHT. NO.
REV. NO.
K80
D
RD-279596
3 OF 4
B
Saudi Aramco SDS-ME-9527 (05/2005)
NOTES: 1 DIAMETER AND LENGTH OF THE VESSEL ARE PRELIMINARY. THE FINAL SIZE SHALL BE
SPECIFICATIONS AND STANDARDS
CONFIRMED DURING DETAILED ENGINEERING. 2 CONTRACTOR TO CONFIRM VESSEL SIZE, NOZZLE REQUIREMENTS AND CORRESPONDING LIQUID LEVELS DURING DETAILED ENGINEERING. 3 SUPPLIER TO CONFIRM THICKNESS AND WEIGHTS. SUPPLIER IS RESPONSIBLE FOR
01-SAMSS-016
QUALIFICATION OF PIPELINE,IN-PLANT PIPING &PRESSURE VESSEL STEELS FOR RESISTANCE TO HYDROGEN INDUCED CRACKING
RE-462624
MINIMUM NOZZLE LOADS
01-SAMSS-005
MARKING OF METAL PODUCTS
RE-459296
BASIC ENGINEERING DESIGN DATA (BEDD)
12-SAMSS-007
FABRICATION OF STRUCTURAL AND MISCELLANEOUS STEEL
THE MECHANICAL DESIGN.
32-SAMSS-004
MANUFACTURING OF PRESSURE VESSELS
LOWER SECTION OF VESSEL & NOZZLES SHALL BE CLAD WITH 3MM THICK 316L ST/ST.
32-SAMSS-031
MANUFACTURING OF CLAD VESSELS AND HEAT EXCHANGERS.
VESSEL SHALL BE DESIGNED FOR STEAM OUT CONDITIONS: 7.3 PSIA AT 300 °F.
SAES-A-004
GENERAL REQUIREMENTS FOR PRESSURE TESTING
UNDER NORMAL CONDITIONSTHE VESSEL IS NOT SUBJECT TO EXTERNAL PRESSURE.
SAES-A-007
HYDROSTATIC TESTING FLUIDS AND LAY-UP PROCEDURES
MATERIALS OF CONSTRUCTION SHALL BE BASED ON SOUR SERVICE
SAES-A-206
POSITIVE MATERIAL IDENTIFICATION.
RE-462621 RE-462622 RE-462623 RE-462625 RE-462626 RE-462627
GUIDANCE FOR THE DESIGN OF ANCHOR BOLT TEMPLATES GUIDANCE FOR THE DESIGN OF SHIPPING SADDLES FOR VESSELS SUPPORT SKIRT DETAIL LIFTING LUGS PLATFORM BRACKETS VERTICAL VESSELS LADDER CONNECTIONS TO VERTICAL VESSELS
ALL DIMENSIONS ARE FROM BOTTOM TAN LINE DATUM UNLESS OTHERWISE INDICATED.
SAES-A-301
MATERIALS RESISTANT TO SULFIDE STRESS CORROSION CRACKING
BOLT HOLES SHALL STRADDLE CENTRELINES UNLESS OTHERWISE INDICATED.
SAES-H-001
COATING SELECTION & APPLICATION REQUIREMENTS FOR INDUSTRIAL PLANTS & EQUIPMENT.
WITH CARBON STEEL OUTER CENTERING CONF0RMING TO ASME B16.20. THE MATERIALS SHALL BE IN ACCORDING WITH 32-SAMSS-004.
SAES-H-100
COATING MATERIALS & APPLICATION REQUIREMENTS FOR INDUSTRIAL FACILITIES.
CONTRACTOR SHALL RECOMMEND CONTROL AND SAFETY INSRUMENTATION DURING
SAES-H-101
APPROVED PROTECTIVE COATINGS SYSTEMS
DETAILED ENGINEERING TO ENSURE STABLE AND SAFE OPERATION .
SAES-H-101V
APPROVED SAUDI ARAMCO DATA SHEETS - PAINTS AND COATINGS
PAINTING REQUIREMENTS: IN ACCORDANCE WITH SAES-H-001. SUPPLIER IS RESPONSIBLE FOR EXTERNAL COATING APPLICATION WITH FULL TIME INSPECTION PER ARAMCO SPECIFICATION SAES-H-100 AND 175-091900 INSPECTION REQUIREMENTS. CLIENT SHALL BE GIVEN 2 WEEK NOTICE PRIOR TO ANY COATING.
SAES-W-010
WELDING REQUIREMENTS FOR PRESSURE VESSELS
SAES-W-014
WELD OVERLAYS AND WELDING OF CLAD MATERIALS
4 5 6 7 8 9
10 11 12
GASKETS SHALL BE 304 SS OR 316 SS SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED
PROJECT SPECIFICATIONS AND STANDARDS
STANDARD DRAWINGS
13 THE FOLLOWING VESSEL ATTACHMENTS ARE REQUIRED AS A MINIMUM: AA-036322
ANCHOR BOLT DETAIL, INCHES AND METRIC SIZES
AB-036367
JOINT PREP AND WELDING DETAIL-ALLOY AND CLAD PRESSURE VESSELS AN`D HEAT EXCHANGERS
· PIPE SUPPORTS / GUIDES
AB-036386
HARDNESS TESTING FOR WELDING PROCEDURE QUALIFICATIONS
· GROUNDING LUG X 2
AE 036451
PREHEAT LEVELS FOR WELDING CARBON STEELS
· PLATFORMS & LADDER SUPPORT CLIPS
AE-036625
ENGINEERING DRAWING FORMS LAYOUT
EXTERNAL ATTACHMENTS: · NAMEPLATE · LIFTING LUGS,TAILING LUG
· PLATFORMS & LADDER (HOLD) INTERNAL ATTACHMENTS: · VORTEX BREAKER - N3 NOZZLE 316L St/St
INSPECTION & TESTING REQUIREMENTS
· INTERNAL LADDERS RUNGS AND GRAB HANDLES AT MANWAY. REQUISITION NO:
175-000003 175-022501
INSPECTION AND EXPLANATION FOR INSPECTION INSPECTION AND TESTING REQUIREMENTS FOR FLANGES
16 DESIGN OF LIFTING ATTACHMENTS SHALL BE BY SUPPLIER. LIFTING ATTACHMENTS AND VESSEL SHALL BE DESIGNED FOR THE ERECTION WEIGHT OF THE VESSEL TIMES A SHOCK FACTOR OF 1.5.
175-060100
GASKETS
175-091900
COATING : SHOP APPLIED
175-100100
FASTENERS
THIS REVISION NO
17 SKIRT THICKNESS & ANCHOR BOLT REQUIREMENTS SHALL BE CONFIRMED BY SUPPLIER
175-120100
INSPECTION REQUIREMENTS FOR STRUCTURAL STEEL
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO:
18 ALL COMPONENTS SUBJECT TO COLD FORMING DURING MANUFACTURE SHALL BE HEAT TREATED AT 620 Deg C FOR 1 HOUR PER 25mm OF THICKNESS, 1 HOUR MINIMUM, AFTER FORMING IRRESPECTIVE OF THE FIBRE STRAIN INDUCED.
175-320300
POSITIVE MATERIAL IDENTIFICATION
175-321900
PRESSURE VESSELS
175-022500
FLANGES,SPECTACLE PLATES, SPACERS AND BLINDS
19 SHELL(HIC) PLATE SHALL BE COVERED WITH WELD OVERLAY 100MM LONG WHERE
175-010600
PIPE:CARBON STEEL OR LONGITUDINAL SUBMERGED ARC WEDED
WELDED TO SHELL CLAD PLATE 20 VESSEL COMPONENTS SHALL BE FURNISHED IN ACCORDANCE WITH REFERENCED
175-010700 175-010701
PIPE: BEVELLED END,SEAMLESS OR SUBMERGED ARC WEDED. PIPE:BEVELLED END, SEAMLESS CARBON STEEL < 6"
REV NO
DATE
ORIGINATOR
REVISION DESCRIPTION
175-026100
FITTINGS
A
May-08
DF
ISSUED FOR PROPOSAL(D1)
175-010200
INSPECTION AND TESTING, HIC TESTING
B
23/06/08
KACC
14 MINIMUM NOZZLE PROJECTIONS SHALL BE AS PER 32-SAMSS-004 PARA 8.1.2. 15 LEVEL INSTRUMENT NOZZLES SHALL NOT BE PLACED IN THE 6 O'CLOCK POSITION
21 22
23 24 25
SPECIFICATIONS AND STANDARDS WIND AND SEISMIC LOADS ARE TO BE DETERMINED FROM ASCE 7-02. SEISMIC DATA AS DETAILED IN BEDD, RE-459296. NOZZLE N3 SHALL BE INTERNALLY EXTENDED TYPE WITH ANTI-VORTEX BAFFLE INTERNAL ATTACHMENT MATERIALS TO MEET THE REQUIREMENTS OF SECTION 8.3 OF 32- SAMSS-031 VESSEL SKIRT TO BE FIREPROOFED IN ACCORDANCE WITH SAES-B-006. TYPE AND THICKNESS TO BE CONFIRMED BY CONTRACTOR. CLAD PLATES SHALL MEET THE REQUIREMENTS OF ASME SA-264 AS A MINIMUM.
26 27 STEELS SHALL MEET THE TESTING REQUIREMENTS OF 01-SAMSS-016 FOR HIC RESISTANT STEEL. NON HIC PLATE CAN BE USED UNDER FULLY CLAD VESSEL SECTIONS 28 ANY NOZZLE/MANWAY IN CLAD SECTION SHALL BE CLAD/WELD OVERLAYED WITH 316L ST/ST. 29 316L CLADDING IS TO EXTEND UP TO 500MM ABOVE HIGH LEVEL LIQUID LINE, TO BE CONFIRMED DURING DETAILED ENGINEERING. 30 ALL REMOVABLE INTERNALS SHALL PASS THROUGH VESSEL MANWAYS
VENDOR:
REVISION VALIDATION IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
B
DESIGN CERTIFICATION
REVIEW FOR KEY DRAWINGS
(DESIGN AGENCY) ENGG./DATE
CERTIFIED BY/DATE CONST.AGENCY/DATE
OPERATION/DATE
BY/DATE
ISSUED FOR PROPOSAL (M1) THIS DRAWING IS NOT TO BE USED FOR
JOB ORDER/EWO NO.
CONSTRUCTION UNTIL CERTIFIED AND DATED
10-00578-0001
PROCESS INDUSTRY PRACTICES
OTHER
REQUIRED (SAUDI ARAMCO)
SAUDI ARABIAN OIL COMPANY VEFV1100
VESSEL / S&T HEAT EXCHANGER STANDARD DETAILS
STF O5501
FIXED LADDERS AND CAGES
STF05535
VESSEL CIRCULAR PLATFORM DETAILS
MECHANICAL DATA SHEET HP FLARE DRAIN DRUM
DRAWING TYPE
DAT
K80-D-0411
SAUDI ARABIA PLANT NO
INDEX
DRAWING NUMBER
SHT. NO.
REV. NO.
K80
D
RD-279596
4 OF 4
B
View more...
Comments