MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (5100-A-502 )
OWNER Approval: Name: Date (DD-MMM-YY): Signature:
Document Class:
X
Pages modified under this revision: 3,5,6,7,9,10
Ravi Ranjan Singh 2015.07.20 12:42:46 +05'30'
0
20-Jul-15
Nihar Kumar Mohanty 2015.07.20 12:43:11 +05'30'
Nihar Kumar Mohanty 2015.07.20 12:43:24 +05'30'
IFD - Issued for Design
Ravi S.
Nihar M.
Nihar M.
B
19-Jun-15
IFR - Issued for Review
Saurabh P.
Nihar M.
Nihar M.
A
20-May-15
IFR - Issued for Review
Ravi S.
Nihar M.
Nihar M.
REV.
DATE DD-MMM-YY
STATUS - REVISION MEMO
WRITTEN BY
CHECKED BY
APPROVED BY
Sections changed in last revision are identified by a vertical line in the margin. This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand.
MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (5100-A-502 ) (REFINERY TANK FARM)
HOLD n°
REF. §
1
Page 7 of 10
DESCRIPTION Dimensions and Pit filling flow rate of AOC Collection Basin 2-5100-T502 will be confirmed by civil.
ACTIONS To be confirmed by Civil.
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand. Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0
Document Number Project
Package
Originator
Discipline
Doc. Type
Unit n°
Serial n°
Rev.
Page
RAPID
P0022
PUNJ
MEC
TDS
5100
0004
0
3/10
MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (5100-A-502 ) (REFINERY TANK FARM)
2
CONTENT Description AMENDMENTS / COMPLEMENTS TO RAPID-FE1-TPX-MEC-SPN-0001-0200 PROJECT SPECIFICATION - GENERAL TECHNICAL REQUIREMENTS FOR PACKAGES REFERENCE DOCUMENTS/SPECIFICATIONS
3
DESIGN REQUIREMENTS AND PACKAGE PERFORMANCES
4
DETAILED TECHNICAL REQUIREMENT OF EQUIPMENT
Sl. No. 1
Page No. 4 5 6 7-8
5
DETAILED TECHNICAL REQUIREMENT - OTHERS
9
6
NOTES
10
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand. Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0
Document Number Project
Package
Originator
Discipline
Doc. Type
Unit n°
Serial n°
RAPID
P0022
PUNJ
MEC
TDS
5100
0004
Rev
Page
0
4/10
MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (REFINERY TANK FARM) 1
AMENDMENTS TO RAPID-FE1-TPX-MEC-SPN-0001-0200 - Project Specification - General Technical Requirements for Packages
NOTES Unless otherwise stated in this Data Sheet, RAPID-FE1-TPX-MEC-SPN-0001-0200 - Project Specification - General Technical Requirements for Packages is fully applicable to the Package. Bidder shall provide with his tender a list of deviation (if any) to above requirements and to other specification as per procedure transmitted with the call of tender. If no such list is provided, Bidder tender is assumed to be fully compliant.
38 39 40 This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand. Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0
Document Number Project
Package
Originator
Discipline
Doc. Type
Unit n°
Serial n°
Rev.
Page
RAPID
P0022
PUNJ
MEC
TDS
5100
0004
0
5/10
MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (REFINERY TANK FARM) REFERENCE DOCUMENTS/SPECIFICATIONS/STANDRADS Process Data Sheet - AOC Slop Oil RAPID-P0022-PUNJ-PRO-TDS-5100Skimming and Transfer Package 0008 (5100-A-502)
P&ID for Refinery Storage AOC Collection Basin 1
RAPID-P0022-PUNJ-PRO-PID5100-0010
Design Basis for Package Equipment
RAPID-P0022-PUNJ-MEC-DES-51000001
Project Specification - Welding of Metals
RAPID-FE1-TPX-MCI-SPN-00010101
Project Specification-General Requirements for Packages
RAPID-FE1-TPX-MEC-SPN-0001-0200 Project Specification-Design of Pressure Vessels
Project Specification Pressure Vessel-( Based on ASME Section VIII)
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand. Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0007_0
Document Number Project Package RAPID
P0022
Originator
Discipline
Doc. Type
Unit n°
Serial n°
PUNJ
MEC
TDS
5100
0004
Rev
Page
0
6/10
MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (REFINERY TANK FARM) DESIGN REQUIREMENTS AND PACKAGE PERFORMANCES
1
DESIGN DATA
2 3 4
Ref. Process Datasheet Doc. No. RAPID-P0022-PUNJ-PRO-TDS-5100-0009 and P&ID No. P0022-PUNJPRO-PID-5100-0010.
Package design
6
Package scope of supply
7
Site conditions
8
Design life
9
Installation
10
Package construction
11
Criticality Rating
Bidder proposal
Note 4
General requirements
5
Requirement
RAPID-P0022-PUNJ-MEC-SPN5100-0002 Note 8 Refer to RAPID-FE1-TPX-MEC-SPN-00010200 years
20 outdoor RAPID-P0022-PUNJ-MEC-SPN5100-0002 3
12
UTILITY DATA Requirement
13 14
Electrical supply for main consumers
400V/ 50Hz
15
Others utility needed for Package operation (for available utilities, refer to RAPID-FE1-TPX-PRO-DES-00010001 - Design Basis - Utilities Conditions)
Bidder proposal
Note 5 by Bidder
16 PERFORMANCE GUARANTEES
17 18
Requirement
19
Utilities consumption rates
Vendor to Advice (VTA), if any
20
Electrical power consumption (absorbed power @ normal / rated conditions)
21
Bidder proposal
Vendor to Advice (VTA), if any ≤ 85 (PTS 31.10.00.31 , RAPIDFE1-TPX-MEC-DES-0001-0001, dB(A) RAPID-FE1-TPX-MEC-DES-00010002 &RAPID-FE1-TPX-MECTDS-0001-0001 )
Noise level @ rated conditions
22 LIMITS OF SUPPLY
23 24
Electrical
Requirement
Bidder proposal
Terminal strips in junction boxes at edge of package. - Earthing lugs provided on skid (As per RAPID-P0022-PUNJ-ELEDES-5100-0007 (Electrical Specification for Package unit) & PTS 33.64.10.10)
25
26 27 28 29 30 31 32 33 34
NOTES
35
Right column shall be filled-in (with compliance statement or value by Bidder) and sent with Tender.
36 37 38 39 40
This document is exclusive property of PUNJ LLOYD GROUP. It is to be used only for the purpose which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject to return on demand. Electronic File Name: RAPID-P0022-PUNJ-MEC-TDS-5100-0004_0
Document Number Project
Package
Originator
Discipline
Doc. Type
Unit n°
Serial n°
RAPID
P0022
PUNJ
MEC
TDS
5100
0004
Rev
Page
0
7/ 10
MECHANICAL DATA SHEET FOR AOC SLOP OIL SKIMMING AND TRANSFER PACKAGE (REFINERY TANK FARM) DETAILED TECHNICAL REQUIREMENT OF EQUIPMENT
1 2
Requirement
3 4
Package requirements:
5
Overall package dimensions
6
Overall package weight (empty / in operation / full of water for hydrotest)
m xm xm kg
Approx.(3x2x3) (Note 2) By Bidder Zone 2, Gas Group IIA, Temp. Class T3 (Note 16)
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.