OWNER REFERENCE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

1 / 12

CONTRACTOR REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

PROJECT SPECIFICATION

PROCEDURE FOR INSTRUMENT SYSTEMS SAT

OWNER Approval:

PETRONAS

Name: Date (DD-MMM-YY): Signature:

Document Class:

X

Pages modified under this revision:

   E _    3    0    0    0      R    O    F      1    0    0    0      R    7    8    9    0    6

3,6,9

Patrice Merlet 2013.04.05 Bernard Caussanel 2013.04.0410:39:59 +02'00'

11:01:32

Jean-Marc Maurice

+08'00'

+02'00'

2013.04.05 08:56:48

0

04-Apr-13

IFD  – Issued approved For Design

B.CAUSSANEL

P.MERLET

JM. MAURICE

 A

13-Feb-13

IFR  – Issued For Review

B.CAUSSANEL

P.MERLET

JM. MAURICE

REV.

DATE DD-MMM-YY

STATUS  – REVISION MEMO

WRITTEN BY (name & visa)

CHECKED BY (name & visa)

 APPROVED BY BY (name & visa)

Sections changed in last revision are identified by a vertical line in the margin.

Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording recording or otherwise) otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without without authorization Electronic Filename: RAPID-FE1-TPX-CMM-SPN-0001-0927_0.docx

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

2 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

CONTENTS

1.

PURPOSE ............................................................................................................................................................................ 3

2.

REFERENCE DOCUMENTS ....................................................... ............................................................... ..................... 3

3.

ACRONYMS AND DEFINITIONS ......................................................... ............................................................... .......... 3

4.

CODES AND STANDARDS .......................................................... ............................................................... ..................... 5

4.1 4.2 5.

SCOPE OF WORK FOR INSTRUMENT SYSTEMS SAT ........................................................... ................................ 6

5.1 5.2 6.

APPLICABLE CODES & STANDARDS ................................................................ .............................................................. 5 ORDER OF PRECEDENCE ................................................................................................................................................ 6

GENERAL ...................................................................................................................................................................... 6 I NSTRUMENT SYSTEM SITE ACCEPTANCE TEST (SAT) ACTIVITIES .............................................................................. 6

DETAILS FOR IMPLEMENTATION ............................................................... ............................................................ 10

6.1 6.2 6.3 6.4 6.5 6.6

SAT ORGANIZATION................................................................................................................................................... 10 I NSTRUMENT SYSTEM SAT WORK FLOW ................................................................................................................... 10 PREPARATION PRIOR TO SAT ............................................................... ............................................................... ........ 11 SAT EXECUTION ............................................................. .............................................................. .............................. 11 SAT PUNCH ................................................................................................................................................................ 11 SAT APPLICATION / CERTIFICATE FORMAT ............................................................... ................................................. 12

Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

3 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

1.

PURPOSE

PETRONAS intends to build a grassroots Refinery and a Petrochemical Complex by developing the Project RAPID (Refinery and Petrochemical Integrated Development) to meet both domestic and regional demands. The refinery shall process 300 000 BPSD of Basrah Light crude. This Project Specification covers the overall requirements for t he execution of the Site Acceptance Testing of Instrument Systems (called SAT in this document) which is part of Instrument Site activities. Instrument System SATs will be performed for all Instrument Control and Safety Systems installed for the PROJECT (including packaged equipment and advanced control system). These requirements shall be used as a base statement for SAT activities which will be performed during PRE-COMMISSIONING phase and shall be followed and adopted by all concerned parties (CONTRACTORS and OWNER) during engineering phase (detailed SAT procedure preparation  by VENDORS and CONTRACTORS) and during the execution phase. 2.

REFERENCE DOCUMENTS

RAPID-FE1-TPX-INC-DES-0001-0002 (60987R-0001-JSD-1510-0001), Project Specification  –  Instrument Design Basis RAPID-FE1-TPX-INC-DES-0001-9002 (60987R-0001-JSD-1500-9003), “Inspection & Functional Testing of Instruments” Supplement to PETRONAS Technical Standards (PTS 62.10.08.11 dated  Nov 2009) RAPID-FE1-TPX-CMM-SPN-0001-0927 (60987R-0001-JSS-9000-0927), Project Specification –  Loop Checking Procedure RAPID-FE1-TPX-CMM-PRC-0001-0901: Pre-commissioning & Commissioning Execution Plan RAPID-FE1-TPX-CMM-PRC-0001-0902: Commissioning & and Responsibilities Matrix 3.

Start-Up

Roles

and

ACRONYMS AND DEFINITIONS

The following terms used in this document have the meaning defined below: CONTRACT

The Form of Agreement together with the documents in order of  priority, including the exhibits, drawings, specifications and documents referred to and in the order of precedence listed in the Form of Agreement.

CONTRACTOR

The person or persons, company, join venture or consortium whose  proposal has been accepted by OWNER for Engineering, Procurement, Construction and Commissioning Contract for the PROJECT including its personnel, representatives, successors and  permitted assignee.

OWNER

Petroliam Nasional Berhad (PETRONAS) which includes its representative, successors, nominees and permitted assigns and shall where the context so admits and requires, also include its employees, agents and designated representative.

PROJECT

Refinery And Petrochemicals Integrated Development (RAPID) Project in the State of Johor, Malaysia.

Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

4 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

SCOPE OF WORK

The scope of work to be performed and services to be rendered by CONTRACTOR under the CONTRACT in relation to the realization of the PROJECT.

SUBCONTRACTOR

Any third party Subcontractor engaged by CONTRACTOR in connection with the WORK.

WORK

Works, tasks and WORK to be performed by CONTRACTOR as specified in or to be inferred from the CONTRACT, more specially set out in the SCOPE OF WORK which may be modified by CHANGE ORDER.

VENDOR

Means any and all persons, firms, partnership, companies, bodies, entities or a combination thereof including Sub-Suppliers, who are  providing Equipment and Material specified by CONTRACTOR.

The acronyms used in this document have the meaning defined below: -

ACMS

Automated Corrosion Monitoring System

-

ADAS

ADvanced Analyser System

-

AMADAS

Analyser Management And Data Acquisition System

-

APC

Advanced Process Control

-

ASC

Anti Surge Control

-

BCS

Blending Control System

-

CCR

Central Control Room

-

CEMS

Continuous Emission Monitoring System

-

CMMS

Computerized Maintenance Management System

-

CPMS

Controller Performance Monitoring System

-

CSN

Control System Network

-

CTR

Central Technical Room

-

DCS

Distributed Control System

-

ENMCS

Electrical Network Monitoring & Control System

-

ESD

Emergency Shut Down System

-

EWS

Engineering Workstation

-

FAR

Field Auxiliary Room

-

FAT

Factory Acceptance Test

-

FAP

Fire Alarm Panel

-

FEED

Front-End Engineering Design

-

FGS

Fire & Gas System

-

GCS

GPS (Global Positioning System) Clock System

-

HART

Highway Addressable Remote Transducer

-

HIPPS

High Integrity Pressure Protection System

-

HMI

Human Machine Interface

-

HVAC

Heating, Ventilation and Air Conditioning

-

IAMS

Instrument Asset Management System

-

IER

Instrument Engineering Room

-

IMCS

Integrated Motor Control System

Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

5 / 12

CONTRACTOR REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT -

JB

Junction Box

-

LAN

Local Area Network

-

LBB

Laboratory Building

-

LIMS

Laboratory Information Management System

-

LP

Local Panel

-

MAC

Main Automation Contractor

-

MCB

Main Control Building

-

MCC

Motor Control Centre

-

MCS

Metering Control System

-

MMS

Machine Monitoring System

-

OLE

Object Linking and Embedding

-

OMS

Oil Movement System

-

OPC

OLE for Process Control

-

OSB

Operational Shelter Building

-

OTS

Operator Training Simulator

-

OWS

Operator Workstation

-

P&ID

Piping and Instrumentation Diagram

-

PIMS

Plant Information Management System

-

PM&S

Product Movement & Storage System

-

PAGA

Public Address General Alarm

-

PCN

Process Control Network

-

PCP

Pengerang Cogeneration Plant

-

PDWT

Pengerang Deep Water Terminal

-

PIN

Plant Information Network

-

PLC

Programmable Logic Controller

-

PSN

Plant Security Network

-

PTS

PETRONAS Technical Standard

-

RAPID

Refinery And Petrochemicals Integrated Development

-

RIO

Remote Input / Output

-

SPWMS

Solid Product Warehouse Management System

-

TGS

Tank Gauging System

-

TTLR

Tanker Truck Loading Rack System

-

UPS

Uninterruptible Power Supply

4.

CODES AND STANDARDS

4.1

Applicable Codes & Standards

Refer to RAPID-FE1-TPX-INC-DES-0001-9002 (60987R-0001-JSD-1500-9003), “Inspection & Functional Testing of Instruments”, Supplement to PETRONAS Technical Standards (PTS 62.10.08.11 dated Nov 2009) Unless otherwise specified, the latest applicable revision of codes and standards shall be considered. Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

6 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

4.2

Order of precedence

In case of conflict between Laws, Project Specifications and Codes & Standards, the following order of precedence shall be considered: - 1.

Malaysian Laws and applicable regulatory requirements,

- 2.

Project Specifications and supplemented PTS,

- 3.

Applicable Malaysian Codes and Standards,

- 4.

Applicable International Codes and Standards.

If a Lower Level requirement is more stringent than an upper one in the above documents, a request shall be raised to OWNER for written decision before proceeding with the Design, Manufacture or Construction.

5.

SCOPE OF WORK FOR INSTRUMENT SYSTEMS SAT

5.1

General

Site Testing of Instrument systems is done in 4 Steps: 

Step I: Stand-alone Check of Each Control and Safety System (including package PLC and advance Control system)



Step II: Communication Test Between Sub-Systems and DCS (Serial Links, OPC links)



Step III: Loop Checking (Input / Output)



Step IV: Functional Test (Complex Loops, Sequences)

Step I and II are covered by this Project Specification. Steps III and IV are covered by dedicated specifications as listed in paragraph 2. 5.1.1

Step I: Stand-alone Check of each Control and Safety System Step I will ensure that each stand-alone system of the PROJECT, that is powered-up but isolated from the field instrumentation, is free of basic software errors and built software wise and hardware wise as per specifications. The main purpose is to ensure the integrity of the main components of the system after site installation. Software Configuration understood as software implementation of  parameters specific to each Input / output loop and the logic associated will only be checked during Steps III and IV. For the DCS and each control system, completion of Step I will be recorded on dedicated check sheets to be developed by CONTRACTOR with the support of related Instruments Systems Suppliers or check sheets developed by VENDOR’Ss such for MAC.

5.1.2

Step II: Communication Test between Sub-Systems and DCS Step II will check all physical connections, test the communication protocols (serial link) and redundancy between the DCS and each sub-system and check the consistency of communication tables at both sides. The full check of the exchange tables in not done at this stage but during Loop Checking. Completion of Step II for each sub-system will be recorded on dedicated check sheets to be developed by CONTRACTOR with the support of related Instruments Systems Suppliers.

5.2

Instrument System Site Acceptance Test (SAT) Activities

Step I and Step II described above are part of the Site Acceptance Test (SAT). Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

7 / 12

CONTRACTOR REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

The following test activities are the minimum required for the SAT. However CONTRACTOR is responsible for carrying out all tests required to fully demonstrate the satisfactory performance of the equipment and additional tests may be required, which shall be described in the SAT  procedures to be issued by CONTRACTOR during Engineering Phase. All Instrument Control system installed on RAPID Project shall be subjected to a SAT. Prior to kick-off of SAT, CONTRACTOR and respective SUPPLIERS shall develop document and identify all temporary vs. final hardware/software implementations for SAT, e.g. temporary workstations, server, software forces and overrides, etc. A formal kick-off shall be held between all parties to define scope of test, identify key participants and review schedule. The SAT will be performed in various steps detailed hereafter 





Cold Test (Before Energize) 1)

Installation Check

2)

Wiring Check –  Power Cables, Earth Cables, Internal System Cables

3)

FAT remaining Punch lists clearance (Hardware)

Hot Test (Energize, After Energisation) 4)

Power up

5)

System Boot up and Software Loading

6)

System Network and Diagnostic Check and Performance Test (both System and  Network)

7)

Sample I/O Check

8)

FAT remaining Punch list clearance (Software) and associated re-test per agreed guidelines

Communication checks 9)

5.2.1

Serial Communication (Modbus and OPC) Check (Protocol, redundancy, sample serial I/O check)

Installation Check Instrument System equipment installed in the building/control room shall be checked visually and the following points shall be verified against respective drawings and bill of material:

5.2.2

a) Installation

: Equipment is installed and fixed properly and no equipment is missing.

 b) Damage

: There is no damage visually outside/inside of the equipment

c) Indication

: Equipment Name Plate is properly installed.

Wiring Check Verify that internal Cables within the Building/Control Room are properly connected: a) Power Cables : Visually check that power cables from Power Distribution board to equipment are properly connected.  b) Earth Cables : Visually check that earth cables between Earth Cabinet and equipment are connected properly. Visually check that Main Earth Cables between Earth Cabinet and Building Earth bar is connected properly. Confirm the construction test record is signed off Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

8 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

c) System Cables : Visually check that System cables and Ethernet Cable provided by System VENDOR are connected properly. d) Others : Visually check special cables, such as Fiber Optic cables / patch cords, and Serial Communication cables are properly connected. Within the equipment, all terminals for power supply lines, which are not only main power but also internal power supply, shall be checked and tightened before power up to ensure no loose connection for power supply lines. Signal cables from field may not be necessarily 100 % connected / tested for the SAT since they will be checked during Instrument Loop Test. 5.2.3

FAT Remaining Punch Clear (Hardware) If there are some FAT remaining punches for Hardware which have to be completed before system is energized, they shall be completed and checked. VENDOR ’s FAT report shall be referred to, as well as any FAT punches, all known outstanding items should also completed. In order to track efficiently all the FAT outstanding items, they shall be transferred into the site Master Punch List database so as to be tracked and cleared in due time.

5.2.4

Power Up Once the above cold tests are completed, equipment is ready to energize. Prior to power up, VENDOR, CONTRACTOR and OWNER must confirm that all installation and inspection records have been signed and accepted and that the equipment is ready for energisation. Proper Electrical Lock out/Tag out procedure should be followed for circuit not utilized (e.g. spare circuits and equipment not ready for energisation). Energisation shall be performed as per VENDOR procedure, if any. At first, main power for equipment shall be powered up one by one from Instrument Power Distribution Board. Supply power voltage shall be measured and documented before power up to check correct power supply is available. After main power is energised, subsequent power supply within the cabinet shall be switched on one by one.

5.2.5

System Boot-up and Software Loading Once the system is energised, it will be boot up simultaneously. After boot up the system, it shall  be checked via its diagnostics and confirm its healthiness. If necessary, the latest software/configuration shall be loaded depending on the equipment.

5.2.6

System Network and Diagnostic Check and Performance Test Once all associated system equipment is started, available system equipment diagnostics shall be checked and verified for healthiness. System network, including peer to peer communication and redundancy, shall also be checked and verified. System networks are categorized as following for this project: a) Process Control Network (PCN)  b) Control System Networks (CSN) c) Plant Information Network (PIN) d) Plant Security Network (PSN) –   For Telecommunication Systems only e) Electrical Control Network (ECN) –  For Electrical Systems only Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

9 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

Following major dedicated system networks are provided as minimum, but not limited to: a) DCS PCN and CSN  b) ESD CSN (Safety Network and ESD EWS Network) c) FGS CSN (Safety Network and FGS EWS Network) d) RIO link for DCS, ESD, FGS e) PLC CSN f) IAMS CSN g) ASC CSN h) MCS CSN i) TGS CSN  j) MMS CSN k) TTLR CSN l) PIN for following systems: PIMS, ACMS, CMMS, AMADAS, LIMS, OMS, BCS, SPWM etc. m) Communication links with other systems / sub systems (Modbus and OPC) n) External Interfaces communication links (OPC) with other plants (SUMMER, PCP, RGT2, PDWT, etc.) When some error is found during SAT, System VENDOR shall verify the root cause and solve such error under his responsibility. If it is caused by construction work, System VENDOR shall identify the cause and report to CONTRACTOR. However, overall responsibility and coordination remains with CONTRACTOR. 5.2.7

Sample I/O Check Once system healthiness is confirmed, sample I/O check shall be carried out randomly. One of the  purposes to do this I/O check is to verify the system cable connection between the Field Termination Assembly and the I/O modules are correct. a) Conventional Signals

: At least one signal per each system cable connection

 b) Diagnostic Alarms tested

: All hardwired diagnostic alarms within the same building shall be

c) Modbus and OPC Signals: Address and Signal checks for each communication link (Refer to section 5.2.9 below.) 5.2.8

FAT Remaining Punch list clearance (Software) If there are some remaining FAT punches related to software which have to be confirmed after system is energized, they shall be implemented and checked. VENDOR ’s FAT report shall be referred to. Re-testing required as part of FAT punches should be supported and documented via the agreed to test sheets.

5.2.9

Serial Communication Check (Modbus and OPC) If there is serial communication between the different systems, communication healthiness shall be checked during SAT. This test is not the individual I/O (address) test, i.e. complete address check is  part of Loop Checking scope. For the serial communication test, both systems shall be available. If one of the systems is not available for this test, it shall be logged as an outstanding item in the SAT report and recorded in the Punch List. It will be checked when both system is ready to test. Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

10 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

6.

DETAILS FOR IMPLEMENTATION

6.1

SAT Organization

Instrument system SAT will be carried out with several parties including System VENDOR. General SAT organization is provided in Figure 4.1 as below.

CONTRACTOR

OWNER

MAC VENDOR

Package or Subsystem VENDOR

Sub-Vendors

Figure 4.1: SAT Organization

6.2

Instrument System SAT Work Flow

MAC or other System VENDOR shall provide the system SAT procedure in which the requirements described in this specification shall be included as minimum. OWNER and CONTRACTOR will review and comment the SAT procedure prior to the commencement of SAT. When construction is completed and status is confirmed as ready for SAT, CONTRACTOR will  provide the SAT notification with SAT planned date. After completion of SAT, CONTRACTOR will provide the SAT completion certificate (SAT Check sheet), which shall be signed off by all parties, with system VENDOR ’s SAT report.

Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

11 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

6.3

Preparation prior to SAT

6.3.1

Condition of the Instrumentation building Following building conditions shall be satisfied before start SAT: a) Each building shall be air conditioned and dust free.  b) CONTRACTOR shall demonstrate that the air conditioning provided is adequate to ensure conditions within the Vendor’s maximum temperature and humidity requirements for the equipment following energisation and a comfortable working environment for personnel working in the building.

6.3.2

Construction Construction activity listed below shall be completed before start SAT: a) Equipment Installation (Cabinet, Cable Tray, etc)  b) Power Cable Installation and Test c) Earth Cable Installation and Test d) System Cable Installation e) Heat calculations for temporary HVAC (if applicable) f) Dust control and cabinet internals thoroughly cleaned g) Permanent workstations, consoles, printers installed h) Temporary equipment installed to be documented i) Either permanent or temporary flooring erected around respective equipment

6.3.3

Fiber Optic Cable Network between Buildings SAT for each building can be executed without Fiber Optic Cables between each building and MCB. SAT items related to fiber optic network between MCBs and each FAR building shall be included in the SAT of the systems in MCB, which may be in the scope of other CONTRACTOR. SAT items related to fiber optic network between 2 buildings in the scope of the CONTRACTOR (e.g. FAR and Substation) shall be performed by the CONTRACTOR.

6.3.4

UPS Power UPS power supplies shall be available prior to SAT start.

6.3.5

Instrument System SAT Application Instrument System SAT notification shall be submitted to OWNER prior to the date of SAT per system and building/control room wise.

6.4

SAT Execution

Individual System SAT Procedure, in which the detail of SAT activities and acceptance criteria are  provided by System Vendor, shall be referred and SAT will be carried out as per approved VENDOR ’s SAT Procedure. 6.5

SAT Punch list

If there are some comments and/or punch items during SAT, they shall be listed in the SAT punch list. SAT punch list will be attached to the SAT Certificate and included in the Site Master Punch list in the relevant Sub-system. Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization

OWNER REFERENCE

PETRONAS RAPID PROJECT FEED PHASE

Project

Package

RAPID

FE1

Originator

Discipline

Doc. Type

Unit n°

Serial n°

TPX

CMM

SPN

0001

0927

Rev.

Page

0

12 / 12

CONTRACTOR REFERENCE

Project

Unit n°

Doc. Type

Doc. Code

Sequent. n°

60987R

0001

JSS

9000

0927

Project Specification  – Procedure for Instrument Systems SAT

6.6

SAT Application / Certificate Format

When SAT is ready to start, SAT Application shall be provided to OWNER in advance. When test is completed, SAT certificate shall also be provided as a record with this format including all attachments such as detail SAT report and punch list.  Note that detail SAT report will be provided by each System VENDOR and his test report shall be attached as part of this SAT completion certificate.

Subject to the provision of Article 13 of the CONTRACT, TECHNIP hereby grant PETRONAS the copyright of this document. No part of this document may be reproduced, stored in a retrieval system or t ransmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner. CONFIDENTIAL  – Not to disclose without authorization