TCE CONSULTING ENGINEERS LIMITED SHEET i OF i

30421008-3CL00017-P0A

125V DC STATION BATTERY AND BATTERY CHARGER SIZING REPORT

SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA Dammam, Saudi Arabia GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

DESIGN BASIS FOR 125V DC STATION BATTERY & BATTERY CHARGER SIZING

DOCUMENT NO : 30421008-3CL-00017-P0A NOVEMBER 2004

ENGINEERING CONSULTANT TCE CONSULTING ENGINEERS LIMITED 73/1, ST.MARK'S ROAD BANGALORE 560001 INDIA

CONTRACTOR: AL-TOUKHI COMPANY FOR INDUSTRY & TRADING P.O.BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA TEL.00966-1-4633660 : FAX.00966-1-4631150

P0A 05.11.2004

MP

SR

REV NO. DATE

PREPARED BY

CHECKED BY

275176448.xls SECTION :cover sheeet

CLEARED BY

APPROVED BY

SHEET 1 OF 26

REV NO. DATE

275176448.xls SECTION :cover sheeet

PREPARED BY

CHECKED BY

CLEARED BY

APPROVED BY

SHEET 2 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT

DOCUMENT NO. 30421008-3CL-00017-P0A.

SIZING CALCULATION FOR STATION 125V DC SYSTEM

CONTENTS

SECTION

DESCRIPTION

1.0

PURPOSE

2.0

STANDARDS & REFERENCES

3.0

SIZING CRITERIA

4.0

BATTERY LOAD CYCLE.

5.0

CONSIDERATIONS

6.0

DETERMINATION OF NO. OF CELLS

7.0

CORRECTION FACTORS FOR BATTERY SIZING

8.0

DUTY CYCLE (LOAD PROFILE)

9.0

BATTERY AND CHARGER SIZING CALCULATIONS.

10.0

DC LOAD ESTIMATION

11.0

CONCLUSION

275176448.xls SECTION :Index

SHEET 3 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

275176448.xls SECTION :Index

SHEET 4 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) CALCULATION DOCUMENT

DOCUMENT NO. 30421008-3CL-00017-P0A

1.0 PURPOSE: The purpose of this calculation is to determine the sizes of the 125V DC battery and battery charger for the Station DC System of GTG#1 and GTG#2 of RAFHA Central Power Station. 2.0 STANDARDS & REFERENCES 2.1

SCECO Engineering Standard SES-P-103.02 - Revision-3 : Storage Battery selection and capacity determination.

2.2

SCECO Engineering Standard SES-P-103.03 - Revision-3 : Battery Charger sizing.

2.3

IEEE-485 - IEEE Recommended Practice for Sizing of Large Lead Acid Storage Batteries for Generating stations and Sub Stations.

2.4

Key One Line Diagram for Rafha Plant Drawing No:KA-6667481,Rev-P0D SHEET 1 OF 1

3.0 SIZING CRITERIA 3.1

The battery has been sized to meet the Station DC loads, namely the switchgear control supplies and the Lighting load in the event of black out, for a period twelve (12) hours.The DC Loads pertaining to Gas turbine and Generator Auxiliaries are not considered as part of these calculation.Since these loads would be catered by unit DC system.

3.2

The Type of battery selected is Vented Type Lead Acid Battery as per cl no 3.03-26(a), page 42 of 331 of PTS-1024

3.3

The End cell voltage is considered as 1.75V as per SES-P-103.02.

3.4

Design marigin factor of 1.1 has been considered as per cl.no.4.4.2 of SES-P-103.02

3.5

Ageing factor of 1.25 has been considered as per cl.no.4.4.3 of SES-P-103.02

3.6

The Battery room temperature is considered as 25 deg C and the temperature correction factor of 1.19 based on inside room temperature of 10 Deg C in case of power failure is considered as per cl.no 2.2 of SES-P-103.02. Page 17 of 35

3.7

Capacity correction factors and Temperature correction factors are based on SCECO engineering standard SES-P-103.02.

275176448.xls SECTION :Writeup

SHEET 5 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) CALCULATION DOCUMENT 4.0 4.0.1

DOCUMENT NO. 30421008-3CL-00017-P0A.

BATTERY LOAD CYCLE Prior to blackout the following plant configurations are considered: As a worst case,Incomer & Feeder Breakers of 33 kV switchgear,4.16kV Switchgear, Unit LV Switchgear and Station LV Switchgear are considered as closed. On loss of power in the plant, all the above referred circuit breakers will trip.This load is considered as 1 minute load at starting of duty cycle.

4.0.2

On return of normal power supply, simultaneous closing of one incomer & one outgoing feeder, tripping of one breaker if fault persists, starting of one spring charging motor and running of one spring charging motor are considered as per c.l.no.2.3(b) of SES-P-103.02. page no 18 of 35. This load is considered as 1 minute load prior to end of duty cycle.

4.0.3

Starting current of spring charging motor is taken as 5 times the normal current as per cl.no 2.4 SES-P103.02.

4.0.4

Continuous loads corresponding to remote control/annunciation panels, OLTC panels of Generator Transformer, Station Transformers,indications on switchgear for a period of 12 hours.

4.0.5

DC Emergency lighting load for 3 hours which will be switched on within 3 hours of power failure in accordance with cl.no. 2.6 of SES-P-103.03

5.0 5.1.1

CONSIDERATIONS The following types of indication lamps and transducers have been condsidered for the MV breakers (a) Indication Lamps for i) Breaker -ON ii) R phase -ON iii)Y phase -ON iv) B phase -ON v) Trip circuit healthy -ON

5.1.2

(b) Transducers for i) Voltage(V) Transducer ii) Ammeter(A) Transducer iii) Watt (W) Transducer iv) Power Factor(PF) Transducer v) VAR Transducer

The following type of Indication Lamps & Annunciations have been condsidered for Remote control/ Annunciation Panel. (a) Indication Lamps for i) Breaker -ON ii) R phase -ON iii)Y phase -ON iv) B phase -ON v) Trip circuit healthy -ON

275176448.xls SECTION :Notes for Sizing

(b) Annunciations for i) Transformer Winding Temperature high ii) Transformer Winding Temperature very high. iii)Transformer oil temperarue high iv) Transformer oil temperature very high v) Buchholz relay for transformer and OLTC vi) Pressure relief valve vii) DC supply supervision relay viii) Trip circuit supervision relay ix) O/C & E/F protection x) REF protection xi) Differential protection xii) Overall Differential protection xiii) Lockout relay xiv) Under Voltage Relay xv) AC trip coil healthy xvi) Motor Protection Relay

SHEET 6 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

275176448.xls SECTION :Notes for Sizing

SHEET 7 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) CALCULATION DOCUMENT

6.0

DOCUMENT NO.30421008-3CL-00017-P0A

DETERMINATION OF NUMBER OF CELLS Nominal cell voltage

:

2 volts

Nominal battery voltage

:

125 volts

as per cl.no 2.0 of SES-P-103.02

Float voltage

:

2.2 volts

as per cl.no 2.0 of SES-P-103.02

End cell voltage

:

1.75 volts

Minimum permitted Voltage

:

101.5 volts

as per cl.no 2.0 of SES-P-103.02

Maximum Permitted Voltage

:

136.3 volts

as per cl.no 2.0 of SES-P-103.02

as per cl.no 4.1.2(d) of SES-P-103.02

Number of cells required considering the minimum system voltage and end cell voltage = 101.5/1.75

=

58.00

……..(i)

Number of cells required considering the maximum system voltage and float voltage = 136.3/2.2

=

61.95

……..(ii)

Number of cells chosen is lower of the above 2 values =

58.00

Maximum system voltage considering 58cells and float voltage of 2.2 volts is 58 * 2.2 = <

127.6 136.3

volts volts

Hence the maximum voltage developed during float charging is less than the maximum permissible system voltage. Hence, selection of 58 cells is justified. 7.0

CORRECTION FACTORS FOR BATTERY SIZING For arriving at the battery Amp-Hr. capacity, the following correction factors have been considered: a) Temperature derating factor, Tt (as per SES-P-103.02) b) Capacity Factor (KT) as per SES-P-103.02

275176448.xls SECTION :Cell Number

SHEET 8 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) CALCULATION DOCUMENT 8.0

DOCUMENT NO30421008-3CL-00017-P0A

D U TY CYC LE ( D C L OAD PR O F I LE )

L O A D I N A5 A M P S

A1 A3

A4

A2 0

1

180

360

719

720

MINUTES SKETCH (Not to Scale)

NOTE: Refer CL.No: 10.0: DC Load Estimation for calculation of load currents A1 to A5

275176448.xls SECTION :DUTY CYCLE

SHEET 9 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

275176448.xls SECTION :DUTY CYCLE

SHEET 10 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) DOCUMENT NO30421008-3CL-00017-P0A

CALCULATION DOCUMENT 9.0

BATTERY & CHARGER SIZING CALCULATION End Cell Voltage 1.75 volts Minimum Site Temperature : (-5) Deg. Cent. Battery Room Temp - 25 deg C 1

2

Period

Load

3 Change in Load

4

Battery Nominal Voltage: 125 V Total Duration: 720 Min. Load in Amps A1= A4= 5

Duration Of Period

Time End of Section

Nominal cell voltage = 2.0volts per cell A2= A5= 6

A3= 7

8

Capacity Temperatur Factor at t e Derating Min. rate ( KT) Factor for t Min.( Tt)

Reqd. Section Size)

Pos. Values Section 1: First Period Only - if A2 is greater than A1, go to Section 2 1 A1 A1= A1-0= M1=1

t=M1=1

0.7700

(3)*(6)*(7) = Rated Amp. Hrs.

Neg. Values

1.19

Section 1

0.19

0.00 AH

Section 2: First Two Periods Only- If A3 is greater than A2, go to Section 3 1 A1

A1=

A1-0=

M1= 1

t= M1 + M2 =180

3.7000

1.19

2 A2

A2=

A2-A1=

M2 = 179

t= M2 = 179

3.6800

1.19

Section 2

Sub. Total Total

0.00 0.00 AH

0.00

Sub. Total

0.00

0.00

Total

0.00 AH

Section 3 : First Three Periods Only - if A4 is greater than A3, go to Section 4 1 A1

A1=

A1-0=

M1 = 1

t= M1 + M2 + M3 = 360

6.2900

1.19

2 A2

A2=

A2-A1=

M2=179

t=M2 + M3 = 359

6.2700

1.19

3 A3

A3=

A3-A2=

M3=180

t = M3 = 180

3.7000

1.19

Section 3

275176448.xls SECTION :Battery&ChargerSizing

SHEET 11 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) DOCUMENT NO30421008-3CL-00017-P0A

CALCULATION DOCUMENT Section 4 : First Four Periods Only - if A5 is greater than A4, go to Section 5 1 A1

A1=

A1-0=

M1 = 1

t= M1 + M2 + M3+M4 = 719

10.7400

1.19

2 A2

A2=

A2-A1=

M2=179

t=M2 + M3+M4 = 718

10.7200

1.19

3 A3

A3=

A3-A2=

M3=180

t = M3+M4 = 539

7.7100

1.19

4 A4

A4=

A4-A3=

M4=359

t = M4 = 359

6.2700

1.19

Section 4

Sub. Total

0.00

Total

0.00 AH

0.00

Section 5 : First Five Periods Only - if A6 is greater than A5, go to Section 6 1 A1

A1=

A1-0=

M1 = 1

t= M1 + M2 + M3 + M4+M5= 720

10.7600

1.19

2 A2

A2=

A2-A1=

M2=179

t= M2 + M3 + M4+M5= 719

10.7400

1.19

3 A3

A3=

A3-A2=

M3=180

t= M3 + M4+M5= 540

7.7300

1.19

3 A4

A4=

A4-A3=

M3=359

t= M4+M5= 360

6.2900

1.19

3 A5

A5=

A5-A4=

M3=1

t = M3 = 1

0.7700

1.19

Section 5 Uncorrected Cell Size = Maximum Section Size Design Margin = Aging Factor = Cell Size =

(Uncorrected Cell Size) * (Design Margin) * (Aging Factor)

Cell Size selected is

275176448.xls SECTION :Battery&ChargerSizing

Sub. Total

0.00

Total

0.00 AH

0.00

10% 1.25 AH

AH

SHEET 12 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) DOCUMENT NO30421008-3CL-00017-P0A

CALCULATION DOCUMENT

Battery Charger rating BIF X AHR Battery charger rating =

SF X L +

RT

Where, SF

= Service Factor

L

= continuous DC load

BIF

= Battery Inefficiency Factor

=

1.1

=

1.1

AHR =

Ampere Hours removed from the battery

=

RT

Recharging time

=

=

275176448.xls SECTION :Battery&ChargerSizing

as per cl.no 2.0 of SES-P-103.03 of page 3 of 6

as per cl.no 2.0 of SES-P-103.03 AH

16

Hrs

as per cl.no 4.3 of SES-P-103.02

SHEET 13 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

A. 1

33kV Switchgear Indication lamps

C

45

2

Protective Relays

C

9

3

Auxiliary relays

C

45

4

Transducers

C

45

5 6

Multifunction Meter Tripping coil

C M

9 20

7

Closing coil

M

4

One. incomer and one feeder breakers will be closed on return of normal power from each bus section.

8

Spring Charging Motor starting

M

2

One no. breaker spring will be charged on closing of breaker and the starting current is taken 5 times the normal current. From each bus section.

9

Spring Charging Motor running

M

2

One no of spring charge motor on running from each bus section.

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Unit Loads for Protective relays are assumed values. 5 nos of Aux Relays are considered for each breaker.

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Unit Loads for Protective relays are assumed values. 5 nos of Aux Relays are considered for each breaker. Transducers are considered for VX, AX, WX, PFX,VARX 10 nos of Breakers trip on loss of normal power and One no breaker will be tripped on restoration period from each bus section.

Sub Total Load : in Watts B. 1

4.16kV Switchgear Indication lamps

C

35

2

Protective Relays

C

7

3

Auxiliary relays

C

35

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 14 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts) Transducers are considered for VX, AX, WX, PFX,VARX

4

Transducers

C

35

5 6

Multifunction Meter Tripping coil

C M

7 14

7

Closing coil

M

4

One. incomer and one feeder breakers will be closed on return of normal power from each bus section

8

Spring Charging Motor staring

M

2

One no. breaker spring will be charged on closing of breaker and the starting current is taken 5 times the normal current from each bus section.

9

Spring Charging Motor running

M

2

One no of spring charge motor on running from each bus section.

Seven no. Breakers trip on loss of normal power and One no breaker will be tripped on restoration period from each bus section.

Sub Total Load : in Watts

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 15 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

C. 1

480V Station Switchgear Indication lamps

C

50

2

Protective Relays

C

10

3

Auxiliary relays

C

50

4

Transducers

C

50

5 6

Multifunction Meter Tripping coil

C M

10 10

7

Closing coil

M

4

8

Spring Charging Motor starting

M

2

9

Spring Charging Motor running

M

2

One no of spring charge motor on running

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Unit Loads for Protective relays are assumed values. 5 nos of Aux Relays are considered for each breaker. Transducers are considered for VX, AX, WX, PFX,VARX

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Unit Loads for Protective relays are assumed values. 5 nos of Aux Relays are considered for each breaker. Transducers are considered for VX, AX, WX, PFX,VARX 10 nos of incomer Breakers trip on loss of normal power and one no of breaker will be tripped on restoration period One. incomer breaker will be closed on return of normal power One no. breaker spring will be charged on closing of breaker and the satrting current is taken 5 times the normal current.

Sub Total Load : in Watts D. 1

480V Unit Switchgear-1 Indication lamps

C

15

2

Protective Relays

C

3

3

Auxiliary relays

C

15

4

Transducers

C

15

5

Multifunction Meter

C

3

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 16 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

6

Tripping coil

M

4

4 nos of Breakers trip on loss of normal power and one breaker will be tripped on restoration period

7

Closing coil

M

2

One. Incomer and one feeder breaker will be closed on return of normal power

8

Spring Charging Motor starting

M

1

One no. breaker spring will be charged on closing of breaker and the starting current is taken as 5 times the normal current.

9

Spring Charging Motor running

M

1

One no of spring charge motor on running

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Unit Loads for Protective relays are assumed values. 5 nos of Aux Relays are considered for each breaker. Transducers are considered for VX, AX, WX, PFX,VARX

Sub Total Load : in Watts E. 1

480V Unit Switchgear-2 Indication lamps

C

15

2

Protective Relays

C

3

3

Auxiliary relays

C

15

4

Transducers

C

15

5 6

Multifunction Meter Tripping coil

C M

3 4

7

Closing coil

M

2

One. Incomer and one feeder breaker will be closed on return of normal power

8

Spring Charging Motor starting

M

1

One no. breaker spring will be charged on closing of breaker and the starting current is taken as 5 times the normal current.

9

Spring Charging Motor running

M

1

One no of spring charge motor on running

275176448.xls SECTION :DC LOAD ESTIMATION

4 nos of Breakers trip on loss of normal power and one breaker will be tripped on restoration period

SHEET 17 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

Sub Total Load : in Watts F. 1

480V Unit Switchgear(future) Indication lamps

C

15

2

Protective Relays

C

3

3

Auxiliary relays

C

15

4

Transducers

C

15

5 6

Multifunction Meter Tripping coil

C M

3 4

7

Closing coil

M

2

One. Incomer and one feeder breaker will be closed on return of normal power

8

Spring Charging Motor starting

M

1

One no. breaker spring will be charged on closing of breaker and the starting current is taken as 5 times the normal current.

9

Spring Charging Motor running

M

1

One no of spring charge motor on running

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Unit Loads for Protective relays are assumed values. 5 nos of Aux Relays are considered for each breaker. Transducers are considered for VX, AX, WX, PFX,VARX 4 nos of Breakers trip on loss of normal power and one breaker will be tripped on restoration period

Sub Total Load : in Watts G.

Relay Panel for Generator Transformer of GTG#1(SET-1 Protections)

1

Transformer Relay Panel

Sub Total Load : in Watts H

Relay Panel for Generator Transformer of GTG#1(SET-2 Protections)

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 18 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

1

Load Description

Transformer Relay Panel

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

Sub Total Load : in Watts

I

Relay Panel for Generator Transformer of GTG#2 (SET-1 Protections)

1

Transformer Relay Panel

Sub Total Load : in Watts J

Relay Panel for Generator Transformer of GTG#2 (SET-2 Protections)

1

Transformer Relay Panel

K

Sub Total Load : in Watts Relay Panel for Generator Transformer of Future GTG(SET-1 Protections)

1

Transformer Relay Panel

Sub Total Load : in Watts L

Relay Panel for Generator Transformer of Future GTG(SET-2 Protections)

1

Transformer Relay Panel

Sub Total Load : in Watts

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 19 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

M

Relay Panel for Interbus Transformer T601(SET-1 & SET-2 Protections)

1

InterbusTransformer Relay Panel

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

Sub Total Load : in Watts N

Relay Panel for Interbus Transformer T602(SET-1 & SET-2 Protections)

1

InterbusTransformer Relay Panel

Sub Total Load : in Watts O

Relay Panel for Interbus Transformer T603(SET-1 & SET-2 Protections)

1

InterbusTransformer Relay Panel

Sub Total Load : in Watts P

Relay Panel for Interbus Transformer spare feeder (SET-1 & SET-2 Protections)

1

InterbusTransformer Relay Panel

Sub Total Load : in Watts Q

Relay Panel for Station Transformer T401(SET-1 & SET-2 Protections)

1

Station Transformer Relay Panel

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 20 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

Sub Total Load : in Watts R

Relay Panel for Station Transformer T402(SET-1 & SET-2 Protections)

1

Station Transformer Relay Panel

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for Relay panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for OLTC panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for OLTC panel unit loads

Sub Total Load : in Watts S

33kV switchgear Tie feeder Relay panel

1

33kV Switchgear Relay Panel

Sub Total Load : in Watts T 1

33kV switchgear Buscoupler feeder Relay panel 33kV Switchgear Relay Panel

Sub Total Load : in Watts U

OLTC Remote Tap Changer Panel for Genrator Transformer of GTG#1

1

Transformer OLTC Panel

Sub Total Load : in Watts

V

OLTC Remote Tap Changer Panel for Genrator Transformer of GTG#2

1

Transformer OLTC Panel

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 21 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

Sub Total Load : in Watts W

OLTC Remote Tap Changer Panel for Genrator Transformer of future GTG

1

Transformer OLTC Panel

C

1

Refer SES-P-103.02 page 20 of 35 for OLTC panel unit loads

Sub Total Load : in Watts

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 22 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

Load Description

X

OLTC Remote Tap Changer Panel for Station Transformer-1

1

Transformer OLTC Panel

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

C

1

Refer SES-P-103.02 page 20 of 35 for OLTC panel unit loads

C

1

Refer SES-P-103.02 page 20 of 35 for OLTC panel unit loads

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Refer Cl.no. 5.1.3

Sub Total Load : in Watts Y

OLTC Remote Tap Changer Panel for Station Transformer-2

1

Transformer OLTC Panel

Sub Total Load : in Watts

Z

Remote Control & Annunciation PANEL for 33kV SWGR

1

Remote Controls

C

15

2

Annunciation

C

48

Sub Total Load : in Watts AA

Remote Control & Annunciation PANEL for 4.16kV SWGR

1

Remote Control

C

15

2

Annunciation

C

48

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Refer Cl.no. 5.1.3

Sub Total Load : in Watts 275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 23 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

BB

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

Remote Control & Annunciation PANEL for 480V Station SWGR

1

Remote Control Indication lamps

C

15

2

Annunciation

C

48

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Refer Cl.no. 5.1.3

Sub Total Load : in Watts

CC

Remote Control & Annunciation PANEL for 480V Unit Switchgear-1

1

Remote Control Indication lamps

C

15

2

Annunciation

C

48

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Refer Cl.no. 5.1.3

Sub Total Load : in Watts DD

Remote Control & Annunciation PANEL for 480V Unit Switchgear-2

1

Remote Control Indication lamps

C

15

2

Annunciation

C

48

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Refer Cl.no. 5.1.3

Sub Total Load : in Watts

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 24 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00)

CALCULATION DOCUMENT 10.0 DC LOAD ESTIMATION

SL. No.

EE

Load Description

DOCUMENT NO30421008-3CL-00017-P0A

A1 A2 Qty 0-1 minute 1-180 minute Type Unit of Load load load Load (Watts) (watts) (watts)

A3 A4 A5 180-360 360-719 719-720 minute load minute load minute (watts) (watts) load(watts)

Continuous Remarks Load on Charger (watts)

Remote Control & Annunciation PANEL for 480V Unit Switchgear future

1

Remote Control Indication lamps

C

15

2

Annunciation

C

48

Indication lamps considered for 1) Breaker- ON , 2) 'R' Phase-ON, 3) 'Y' Phase-ON, 4) 'B' Phase ON, 5)Trip Circuit Healthy-ON Refer Cl.no. 5.1.3

Sub Total Load : in Watts FF

DC Lighting Sub Total Load : in Watts

Lot

TOTAL LOAD IN WATTS TOTAL LOAD IN AMPS

275176448.xls SECTION :DC LOAD ESTIMATION

SHEET 25 OF 26

GENERATION EXPANSION OF RAFHA POWER PLANT (CONTRACT NO : 30421008/00) CALCULATION DOCUMENT

DOCUMENT NO. 30421008-3CL-00017-P0A.

11.0 CONCLUSION (a) Recommended minimum battery size for the station DC system of GTG#1 and GTG#2 including one future GTG of RAFHA Power station on 12 hours duration basis would be calculated as per the above procedure.

(b) A battery charger rating would be provided as per the above procedure.