  ROGRES REALISASI  R O G R A M EKERJAAN

:

EN I N G K AT A N S AR A N A D AN

:

EMBANGUNAN

LO K A S I

: K OT A T E RN A T E

TA H U N AN G G A R A N

: 2 01 8

OS

EKERJAAN

R A SA R A N A A A R A TU R

OLISI (KAW. BELAKANG BENTENG)

KONTRAK  No

A

U r ai a n

ek eker erja jaan an

ek e r j a a n

V o lu m e S a tu a n

Harga Satuan (Rp.)

er ersi siap apan an

1 Pembersihan Awal dan Akhir

1.00

Ls

1,450,000.00

2 Pemasangan Bouwplank

1.00

Ls

2,000,000.00

3 Papan Nama Proyek

1.00

Ls

600,000.00

4 Pembuatan Direksi Kit Dan Bangsal Kerja

1.00

Ls

4,000,000.00

5 Administrasi, Pelaporan

1.00

Ls

4,500,000.00

1.00

Ls

4,600,000.00

dan Dokumentasi

6 As Build Drawing

 umlah

B

e ke ke rj rj aa aa n T a na na h

1

Pek Galian Tanah Pondasi Menerus

6.30

m3

120,450.00

2

Urugan Tanah Kembali

1.01

m3

86,300.00

3

Timbunan Tanah Bawah Lantai

1.89

m3

386,350.00

4

Pek. Urugan Pasir Bawah Pondasi

0.53

m3

468,780.00

5

Pek. Urugan Pasir Lantai

0.44

m3

468,780.00 umlah

C

e ke ke rj rj aa aa n

a sa sa ng ng an an

1

Pek Batu Kosong

2.10

m3

728,001.90

2

Pek Pondasi Batu Kali, Camp. 1 : 4

4.66

m3

1,294,849.50

3

Pek Pas Dinding Bata Camp 1 : 4

32.96

m2

165,544.10

4

Pek Pas Dinding Bata Pot Bunga Camp 1 : 4

2.29

m2

165,544.10

2

5 6

Pek Plesteran Dinding Camp 1 : 4 Pe Pek Plesteran Dinding Pot Bunga Camp 1 : 4

132.19 3.16

m2 m

100,252.62 100,252.62

7

Pek Plesteran Beton Camp 1 : 2

9.60

m2

106,375.85

8

Pek Plesteran Lisplankg Beton Camp 1 : 2

5.16

m2

106,375.85

9

Pek. Lantai Granit Lantai 60X60 cm

6.66

m2

386,431.00

10

Pek. Keramik Lantai Km/Wc 40x40 cm

1.45

m2

346,436.50

11

Pek. Keramik Dinding Km/ Wc 25x40 cm

11.86

m2

365,884.10

12

Pek. Granit Meja beton 60x60 cm

0.82

m2

386,431.00

14

Pek. Sconing

28.18

m'

97,228.20 umlah

D

e ke ke rj rj aa aa n B e to to n

1

Pe Pek. k. Sloo Sloof f 15x2 15x20 0 - Pek. Beton - Pek. Bekisting

( K 25 250 0 ) 0.47 6.20

m3 m2

1,647,285.98 297,385.60

 

No

U r ai a n

ek e r j a a n

 - Pek. Besi Beton 3

5

Kg

20,967.24

1.08

m3

1,647,285.98

- Pek. Bekisting

21.63

m2

519,837.30

- Pek. Besi Beton

253.12

Kg

20,967.24

- Pek. Beton - Pek. Bekisting

1.44 14.40

m3 m2

1,647,285.98 660,637.30

- Pek. Besi Beton

260.17

Kg

17,031.97

0.57

m3

1,647,285.98

- Pek. Bekisting

10.16

m2

532,437.30

- Pek. Besi Beton

125.10

Kg

20,967.24

0.45

m3

1,418,721.97

Peke Pekerja rjaan an Kolom Kolom 20 x 20

Pe Pek k Plat Plat Atap Atap

( K 250 250 )

Pe Pek k Ring Ring Balo Balok k

( K 25 250 0 )

8 x 20

- Pek. Beton

6

Harga Satuan (Rp.)

98.25

- Pek. Beton

4

V o lu m e S a tu a n

Pek. Rabat lantai

t = 5 cm

( K 25 250 0 )

 

No 7

U r ai a n

ek e r j a a n

Pek Me Pek Meja ja Pi Pike ket t

V o lu m e S a tu a n

Harga Satuan (Rp.)

( K 25 250 0 ) 0.08

m3

1,647,285.98

- Pek. Bekisting

0.79

m2

660,637.30

- Pek. Besi Beton

10.14

Kg

17,031.97

 - Pek. Beton

umlah

E

eker ekerja jaan an Kunc Kunci i da dan n Alum Alumun uniu ium m

1 2

Pek Kusen Alumunium Pek Daun Pintu Alumunium Kaca 5 mm Pe

13.63 1.58

m m2

213,908.03 1,146,478.67

3

Pek Pintu Km/ Wc Aluminium strip

0.92

m2

880,306.18

5

Pek Daun Jendela Alumunium

0.95

m2

1,146,478.67

6

Pek. Kunci Pintu

1.00

Bh

184,751.00

7

Pek. Kait Angin Jendela

2.00

Bh

108,150.50

8

Pek. Grendel Jendela

2.00

Bh

52,427.00

9

Pek. Rangka Plafon Besi Holow

15.99

m2

159,032.47

10

Pek. Plafon Gypsum 9 mm

15.99

m2

70,496.70

11

Pek. Lis Profil

25.00

m'

38,001.50 umlah

F 1

ek eker erja jaan an Fi Fini nish shin ing g Pengecatan Dinding + Beton

150.10

m2

44,958.83

2

Pek Pengacian Dinding

135.34

m2

58,512.00

3

Pek Pengacian Beton

14.76

m2

58,512.00

4

Pengecatan Plafon

15.99

m2

41,354.43

4

Papan Nama/ (Huruf) Stainless

1.00

Ls

6,500,000.00 umlah

G

ek eker erja jaan an Sa Sani nita tasi si

1

Penyambungan PDAM

1.00

Ls

2,500,000.00

2

Pek Septictank

1.00

Ls

5,000,000.00

3

Pek Kran Air

2.00

Bh

117,090.00

4

Pek Floor Drain

1.00

Bh

38,907.00

5 6

Pek Kloset Jongkok Pipa PVC 3"

1.00 4.00

Bh M'

985,997.00 126,004.95

7

Pek Pipa 1/2"

4.00

M'

28,452.20

8

Pek Pipa 4"

4.00

M'

170,179.95 umlah

H

e ke ke rj rj aa aa n L i st st ri ri k

1

Pek. Titik Lampu

7.00

Bh

308,330.00

2

Pek Kabel NYM 3x2,5 mm

15.00

M'

31,210.00

3

Pek Kabel NYM 2x2,5 mm

15.00

M'

28,710.00

4

Pek. Lampu LED Downlight 10 Watt

3.00

Bh

127,310.00

5

Pek. Saklar Ganda

1.00

Bh

42,610.00

6

Pek. Saklar Tunggal

1.00

Bh

42,610.00

7

Pek. Stop Kontak

2.00

Bh

42,610.00

 

No 8

U r ai a n Ac 1/2 PK

ek e r j a a n

V o lu m e S a tu a n 1.00

Bh

Harga Satuan (Rp.) 3,000,000.00 umlah

JUMLAH PPN 10 % JUMLAH TOTAL DIBULATKAN

A + B

 

REALISASI LAP LAPANGAN ANGAN Jumlah Harga (Rp.)

V o l u me S a tu a n

Harga Satuan (Rp.)

J u ml a h H ar g a ( R p. )

BOBOT

1,450,000.00

1.00

Ls

1,450,000.00

1,450,000.00

0.91

2,000,000.00

1.00

Ls

2,000,000.00

2,000,000.00

1.26

600,000.00

1.00

Ls

600,000.00

600,000.00

0.38

4,000,000.00

Ls

4,000,000.00

0.00

-

4,500,000.00

Ls

4,500,000.00

0.00

-

4,600,000.00

Ls

4,600,000.00

0.00

-

17,150,000.00

 umlah

4,050,000.00

758,835.00

6.30

m3

120,450.00

758,835.00

0.48

87,496.12

1.01

m3

86,300.00

87,496.12

0.06

729,525.39

1.89

m3

386,350.00

729,525.39

0.46

246,109.50

0.53

m3

468,780.00

246,109.50

0.15

208,154.73

0.44

m3

468,780.00

208,154.73

0.13

2,030,120.73

 umlah

2,030,120.73

1,528,803.99

2.10

m3

728,001.90

1,528,803.99

0.96

6,035,293.52

4.66

m3

1,294,849.50

6,035,293.52

3.79

5,455,936.23

m2

165,544.10

0.00

-

378,781.46

m2

165,544.10

0.00

-

2

13,252,153.23 316,397.27

m2 m

100,252.62 100,252.62

0.00 0.00

-

1,021,208.18

m2

106,375.85

0.00

-

548,899.40

m2

106,375.85

0.00

-

2,573,746.39

m2

386,431.00

0.00

-

500,808.60

m2

346,436.50

0.00

-

4,340,190.37

m2

365,884.10

0.00

-

316,873.42

m2

386,431.00

0.00

-

2,739,890.68

m'

97,228.20

0.00

-

39,008,982.73

765,987.98 1,843,790.72

 umlah

0.47 6.20

m3 m2

1,647,285.98 297,385.60

7,564,097.51

765,987.98 1,843,790.72

0.48 1.16

 

Jumlah Harga (Rp.) 2,060,059.81

V o l u me S a tu a n 98.25

Kg

Harga Satuan (Rp.) 20,967.24

J u ml a h H ar g a ( R p. ) 2,060,059.81

BOBOT 1.30 -

1,781,704.52

1.08

m3

1,647,285.98

1,781,704.52

1.12

11,245,120.47

21.63

m2

519,837.30

11,245,120.47

7.07

5,307,188.61 253.12

Kg

20,967.24

5,307,188.61

3.34 -

2,371,268.17 9,509,873.93

14.40

4,431,193.41

m3 m2

1,647,285.98 660,637.30

0.00 9,509,873.93

Kg

17,031.97

0.00

5.98 -

m3

1,647,285.98

0.00

m2

532,437.30

5,411,692.72

2,622,984.82

Kg

20,967.24

0.00

-

639,226.47

m3

1,418,721.97

0.00

-

931,046.04 5,411,692.72

10.16

3.40

 

Jumlah Harga (Rp.)

V o l u me S a tu a n

Harga Satuan (Rp.)

BOBOT

J u ml a h H ar g a ( R p. )  

-

136,395.28

m3

1,647,285.98

0.00

-

519,657.30

m2

660,637.30

0.00

-

172,728.45

Kg

17,031.97

0.00

-

49,749,918.70

 umlah

37,925,418.76

2,915,566.45

m

213,908.03

0.00

-

1,811,436.30

m2

1,146,478.67

0.00

-

809,881.69

m2

880,306.18

0.00

-

1,089,154.74

m2

1,146,478.67

0.00

-

184,751.00

Bh

184,751.00

0.00

-

216,301.00

Bh

108,150.50

0.00

-

104,854.00

Bh

52,427.00

0.00

-

2,542,356.61

m2

159,032.47

0.00

-

1,126,988.44

m2

70,496.70

0.00

-

950,037.50

m'

38,001.50

0.00

-

11,751,327.72

 umlah

0.00

6,748,482.23

m2

44,958.83

0.00

-

7,919,224.72

m2

58,512.00

0.00

-

863,637.12

m2

58,512.00

0.00

-

661,108.46

m2

41,354.43

0.00

-

6,500,000.00

Ls

6,500,000.00

0.00

-

22,692,452.54

 umlah

2,500,000.00

0.00

Ls

2,500,000.00

0.00

Ls

5,000,000.00

2,500,000.00

234,180.00

Bh

117,090.00

0.00

-

38,907.00

Bh

38,907.00

0.00

-

985,997.00 504,019.80

Bh M'

985,997.00 126,004.95

0.00 0.00

-

113,808.80

M'

28,452.20

0.00

-

680,719.80

M'

170,179.95

0.00

-

5,000,000.00

0.50

10,057,632.40

 umlah

1.57

2,500,000.00

2,158,310.00

Bh

308,330.00

0.00

-

468,150.00

M'

31,210.00

0.00

-

430,650.00

M'

28,710.00

0.00

-

381,930.00

Bh

127,310.00

0.00

-

42,610.00

Bh

42,610.00

0.00

-

42,610.00

Bh

42,610.00

0.00

-

85,220.00

Bh

42,610.00

0.00

-

 

Jumlah Harga (Rp.) 3,000,000.00 6,609,480.00  

V o l u me S a tu a n Bh

Harga Satuan (Rp.) 3,000,000.00  umlah

J u ml a h H ar g a ( R p. ) 0.00

BOBOT -

0.00

159,049,914.82

54,069,637.01

15,904,991.48

5,406,963.70

174,954,906.31

59,476,600.71

174,900,000.00

59,400,000.00

34.00

 

  ROGRES REALISASI   ROGR AM EKERJAAN

:

E NIN GKA TAN SAR ANA DAN

:

EMBANGUNAN

L OKAS I

: KO TA TER NATE

T AHUN A AN N GGA RAN

: 2 20 0 18

OS

EKERJAAN

R ASA RAN A A ARA TUR

OLISI (KAW. BELAKANG BENTENG)

KONTRAK No

A

Ura ian

eke ekerja rjaan an

e kerj aan

REALISASI LAP

Vol ume Sat uan

Harga Satuan (Rp.)

Ju mla h Ha rga (R p.)

V olu me S atu an

Harga Satuan (Rp.)

ers ersiap iapan an

1 Pembersihan Awal dan Akhir

1.00

Ls

1,450,000.00

1,450,000.00

1.00

Ls

1,450,000.00

2 Pemasangan Bouwplank

1.00

Ls

2,000,000.00

2,000,000.00

1.00

Ls

2,000,000.00

1.00

3 Papan Nama Proyek

1.00

Ls

600,000.00

600,000.00

Ls

600,000.00

4 Pembuatan Direksi Kit Dan Bangsal Kerja

1.00

Ls

4,000,000.00

4,000,000.00

Ls

4,000,000.00

5 Administrasi, Pelaporan

1.00

Ls

4,500,000.00

4,500,000.00

Ls

4,500,000.00

1.00

Ls

4,600,000.00

Ls

d da an Dokumentasi

6 As Build Drawing

4,600,000.00   umlah

B

17,150,000.00

4,600,000.00   umlah

ek ke er rj ja aa an Ta an na ah h

1

Pek Galian Tanah Pondasi Menerus

6.30

m3

120,450.00

758,835.00

6.30

m3

120,450.00

2

Urugan Tanah Kembali

1.01

m

3

86,300.00

87,496.12

1.01

m

3

86,300.00

3

Timbunan Tanah Bawah Lantai

1.89

m

3

386,350.00

729,525.39

1.89

m

3

386,350.00

4

Pek. Urugan Pasir Bawah Pondasi

0.53

m3

468,780.00

246,109.50

0.53

m3

468,780.00

5

Pek. Urugan Pasir Lantai

0.44

m

468,780.00

208,154.73

0.44

m

3

umlah

C

ek ke er rj ja aa an

3

2,030,120.73

468,780.00   umlah

as as a an ng ga an

 

No

U r ai a n

e ek ke r j aa n

V o lu m e S at u a n

arga Satuan (Rp.)

J u ml a h H a rg a ( R p .)

Vo l u me Sa t ua n

Harga Satuan (Rp.)

1

Pek Batu Kosong

2.10

m3

728,001.90

1,528,803.99

2.10

m3

728,001.90

2

Pek Pondasi Batu Kali, Camp. 1 : 4

4.66

m3

1,294,849.50

6,035,293.52

4.66

m3

1,294,849.50

3

Pek Pas Dinding Bata Camp 1 : 4

32.96

m2

165,544.10

5,455,936.23

32.96

m2

165,544.10

2.29

2

2.29

2

165,544.10

2

m m2

100,252.62 100,252.62

9.60

m2

106,375.85

2

106,375.85

4

Pek Pas Dinding Bata Pot Bunga Camp 1 : 4 Pe

5 6

Pek Plesteran Dinding Camp 1 : 4 Pek Plesteran Dinding Pot Bunga Camp 1 : 4

7

Pek Plesteran Beton Camp 1 : 2

m

165,544.10

132.19 3.16

2

m m2

100,252.62 100,252.62

9.60

m2

106,375.85

2

378,781.46

13,252,153.23 132.19 316,397.27 3.16 1,021,208.18

m

8

Pek Plesteran Lisplankg Beton Camp 1 : 2

5.16

m

106,375.85

548,899.40

5.16

m

2

9

Pek. Lantai Granit Lantai 60X60 cm

6.66

m

386,431.00

2,573,746.39

6.66

m

386,431.00

10

Pek. Keramik Lantai Km/Wc 40x40 cm

1.45

m2

346,436.50

500,808.60

1.45

m2

346,436.50

11

Pek. Keramik Dinding Km/ Wc 25x40 cm

11.86

m2

365,884.10

4,340,190.37

11.86

m2

365,884.10

12

Pek. Granit Meja beton 60x60 cm

0.82

m2

386,431.00

316,873.42

0.82

m2

386,431.00

14

Pek. Sconing

28.18

m'

97,228.20

2,739,890.68

28.18

m'

97,228.20

umlah

D 1

Pek. Pek. Sloof Sloof 15x20 15x20

 u m l a h

( K 250 250 ) 0.47

m3

6.20

2

m

297,385.60

98.25

Kg

1.08

- Pek. Bekisting - Pek. Besi Beton

- Pek. Bekisting - Pek. Besi Beton Pekerjaa Pekerjaan n Kolom Kolom 20 x 20

Pek Plat Plat Atap Atap

1,647,285.98

76 765,987.98

0.47

m3

1,647,285.98

1,843,790.72

6.20

2

m

297,385.60

20,967.24

2,060,059.81

98.25

Kg

20,967.24

m3

1,647,285.98

1,781,704.52

1.08

m3

1,647,285.98

21.63

m2

519,837.30

11,245,120.47

21.63

m2

519,837.30

253.12

Kg

20,967.24

5,307,188.61 253.12

Kg

20,967.24

( K 250 )

- Pek. Beton

4

39,008,982.73

eker ekerja jaan an Beto Beton n - Pek. Beton

3

2

( K 250 250 )

 

No

U ra i an

e ek k er j aa n

 - Pek. Beton - Pek. Bekisting - Pek. Besi Beton 5

Pek Ring Ring Balok Balok - Pek. Beton

8 x 20

V ol u me Sa t ua n 1.44

m3

arga Satuan (Rp.)

J u ml a h H ar g a ( R p. )

V o lu m e S at u an

Harga Satuan (Rp.)

1,647,285.98

2,371,268.17

1.44

m3

1,647,285.98

14.40

2

m

660,637.30

9,509,873.93

14.40

m2

660,637.30

260.17

Kg

17,031.97

4,431,193.41 260.17

Kg

17,031.97

0.57

m3

1,647,285.98

m3

1,647,285.98

( K 250 250 ) 9 93 31,046.04

0.57

6

- Pek. Bekisting

10.16

m2

532,437.30

- Pek. Besi Beton

125.10

Kg

20,967.24

0.45

3

Pek. Rabat lantai

t = 5 cm

m

1,418,721.97

10.16

m2

532,437.30

2,622,984.82 125.10

Kg

20,967.24

3

1,418,721.97

5,411,692.72 639,226.47

0.45

m

 

No 7

Ur a ia n

ek ek e rj a an

Pek Mej Meja a Pik Piket et

V o lu m e Sa t ua n

arga Satuan (Rp.)

V ol u me S a tu a n

Harga Satuan (Rp.)

( K 25 250 0 ) 0.08

m3

- Pek. Bekisting

0.79

2

m

660,637.30

- Pek. Besi Beton

10.14

Kg

17,031.97

 - Pek. Beton

1,647,285.98

umlah

E

J um l ah H a rg a ( R p. )

0.08

m3

1,647,285.98

519,657.30

0.79

2

m

660,637.30

172,728.45

10.14

Kg

17,031.97

136,395.28

49,749,918.70

 u m l a h

eke ekerja rjaan an Kunci Kunci dan Alumun Alumunium ium

1 2

Pek Kusen Alumunium Pek Daun Pintu Alumunium Kaca 5 mm

13.63 1.58

m m2

213,908.03 1,146,478.67

2,915,566.45 1,811,436.30

m m2

213,908.03 1,146,478.67

3

Pek Pintu Km/ Wc Aluminium strip

0.92

m2

880,306.18

809,881.69

m2

880,306.18

5

Pek Daun Jendela Alumunium

0.95

m

1,146,478.67

1,089,154.74

2

m

2

1,146,478.67

6

Pek. Kunci Pintu

1.00

Bh

184,751.00

184,751.00

Bh

184,751.00

7

Pek. Kait Angin Jendela

2.00

Bh

108,150.50

216,301.00

Bh

108,150.50

8

Pek. Grendel Jendela

2.00

Bh

52,427.00

104,854.00

9

Pek. Rangka Plafon Besi Holow

15.99

m2

159,032.47

2,542,356.61

10

Pek. Plafon Gypsum 9 mm

15.99

m2

70,496.70

11

Pek. Lis Profil

25.00

m'

38,001.50 umlah

F

Bh

52,427.00

m2

159,032.47

1,126,988.44

m2

70,496.70

950,037.50

m'

15.99

11,751,327.72

38,001.50  u m l a h

eke ekerja rjaan an Finish Finishing ing

1

Pengecatan Dinding + Beton

150.10

m2

44,958.83

6,748,482.23

m2

44,958.83

2

Pek Pengacian Dinding

135.34

m

58,512.00

7,919,224.72 135.34

m

58,512.00

2

2

2

2

3

Pek Pengacian Beton

14.76

m

58,512.00

863,637.12

m

58,512.00

4

Pengecatan Plafon

15.99

m2

41,354.43

661,108.46

m2

41,354.43

4

Papan Nama/ (Huruf) Stainless

1.00

Ls

6,500,000.00

6,500,000.00

Ls

6,500,000.00

umlah

14.76

22,692,452.54

 u m l a h

 

No G

Ura ia n

ek er ja an

V ol um e S at uan

arga Satuan

Ju mla h Ha rg a ( Rp .)

Vo lu me Sa tua n

(Rp.)

eke ekerja rjaan an Sanita Sanitasi si

Harga Satuan (Rp.)

1

Penyambungan PDAM

1.00

Ls

2,500,000.00

2 2, ,500,000.00

1.00

Ls

2,500,000.00

2

Pek Septictank

1.00

Ls

5,000,000.00

5,000,000.00

1.00

Ls

5,000,000.00

3

Pek Kran Air

2.00

Bh

117,090.00

234,180.00

2.00

Bh

117,090.00

4

Pek Floor Drain

1.00

Bh

38,907.00

38,907.00

1.00

Bh

38,907.00

5

Pek Kloset Jongkok

1.00

Bh

985,997.00

985,997.00

1.00

Bh

985,997.00

6

Pipa PVC 3"

4.00

M'

126,004.95

504,019.80

4.00

M'

126,004.95

7

Pek Pipa 1/2"

4.00

M'

28,452.20

113,808.80

4.00

M'

28,452.20

8

Pek Pipa 4"

4.00

M'

170,179.95

680,719.80

4.00

M'

170,179.95

umlah

H

10,057,632.40

 u m l a h

eker ekerja jaan an List Listri rik k

1

Pek. Titik Lampu

7.00

Bh

308,330.00

2,158,310.00

Bh

308,330.00

2

Pek Kabel NYM 3x2,5 mm

15.00

M'

31,210.00

468,150.00

M'

31,210.00

3

Pek Kabel NYM 2x2,5 mm

15.00

M'

28,710.00

430,650.00

M'

28,710.00

4

Pek. Lampu LED Downlight 10 Watt

3.00

Bh

127,310.00

381,930.00

Bh

127,310.00

5

Pek. Saklar Ganda

1.00

Bh

42,610.00

42,610.00

Bh

42,610.00

6 7

Pek. Saklar Tunggal Pek. Stop Kontak

1.00 2.00

Bh Bh

42,610.00 42,610.00

42,610.00 85,220.00

Bh Bh

42,610.00 42,610.00

8

Ac 1/2 PK

1.00

Bh

3,000,000.00

3, 3,000,000.00

Bh

3,000,000.00

6,609,480.00

umlah

 

JUMLAH

 

PPN 10 % JUMLAH TOTAL

 u m l a h

159,049,914.82 15,904,991.48 174,954,906.31

A + B

 

No

Ur ai an

ek er jaa n

Vol um e Sat ua n

arga Satuan (Rp.)

Jum la h Ha rg a ( Rp .)  

DIBULATKAN

174,900,000.00

Disetujui

Diperiksa

  T TK K

DIR EK SI

IK RA M M. A HM AD, S T

FA LE RI G IS KA

NIP: 19760806 200903 1 001

 

NGAN Jumlah Harga (Rp.)

BOBOT

1,450,000.00 1,450, 000.00

0.91

2,000,000.00 2,000, 000.00

1.26

600,000.00 600,00 0.00

0.38

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

4,050,000.00 758,835.00 758,83 5.00

0.48

87,496.12 87,496 .12 729,525.39 729,525.39

0.06 0.46

246,109.50 246,10 9.50

0.15

208,154.73 208,15 4.73

0.13

2,030,120.73

Vo lu me Sa tu an

Harga Satuan (Rp.)

 

BOBOT

Jumlah Harga (Rp.) 1,528,803.99 1,528, 803.99

0.96

6,035,293.52 6,035, 293.52

3.79

5,455,936.23 5,455, 936.23

3.43

378,781.46 378,78 1.46

0.24

13,252,153.2 13,252 ,153.23 3

8.33

316,397.27 316,39 7.27

0.20

1,021,208.18 1,021, 208.18

0.64

548,899.40 548,89 9.40

0.35

2,573,746.39 2,573, 746.39

1.62

500,808.60 500,80 8.60

0.31

4,340,190.37 4,340, 190.37

2.73

316,873.42 316,87 3.42 2,739,890.68 2,739,890.68

0.20 1.72

39,008,982.73

765,987.98 765,98 7.98

0.48

1,843,790.72 1,843, 790.72

1.16

2,060,059.81 2,060, 059.81

1.30 -

1,781,704.52 1,781, 704.52

1.12

11,245,120.4 11,245 ,120.47 7

7.07

5,307,188.61 5,307, 188.61

3.34 -

 

BOBOT

Jumlah Harga (Rp.) 2,371,268.17 2,371, 268.17

1.49

9,509,873.93 9,509, 873.93

5.98

4,431,193.41 4,431, 193.41

2.79 -

931,046.04 931,04 6.04 5,411,692.72 5,411,692.72

0.59 3.40

2,622,984.82 2,622, 984.82

1.65

639,226.47 639,22 6.47

0.40

 

BOBOT

Jumlah Harga (Rp.)  

-

136,395.28 136,39 5.28

0.09

519,657.30 519,65 7.30

0.33

172,728.45 172,72 8.45

0.11

49,749,918.70

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00 2,542,356.61 2,542, 356.61

1.60

0. 0.00 00

-

0. 0.00 00

-

2,542,356.61 0. 0.00 00

-

7,919,224.72 7,919, 224.72

4.98

863,637.12 863,63 7.12

0.54

0. 0.00 00

-

0. 0.00 00

-

8,782,861.84

 

Jumlah Harga (Rp.)

BOBOT

2,500,000.00 2,500, 000.00

1.57

5,000,000.00 5,000, 000.00

3.14

234,180.00 234,18 0.00

0.15

38,907.00 38,907 .00

0.02

985,997.00 985,99 7.00

0.62

504,019.80 504,01 9.80

0.32

113,808.80 113,80 8.80

0.07

680,719.80 680,71 9.80

0.43

10,057,632.40 0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0. 0.00 00

-

0.00  

116,221,873.0 1

73.07

11,622,187.30 127,844,060.31

 

Jumlah Harga (Rp.)  

127,800,000.00

Ternate, 7 OKTOBER 2018 Dibuat  ELAKSANA CV. DHIAHI KARYA

IRWAN THAMRIN Direktur

BOBOT

 

  ROGRES REALISASI  R O G R A M EKERJAAN

:

EN I N G K AT A N S AR A N A D AN

:

EMBANGUNAN

LO K A S I

: K OT A T E RN A T E

TA H U N AN G G A R A N

: 2 01 8

OS

EKERJAAN

R A SA R A N A A A R A TU R

OLISI (KAW. BELAKANG BENTENG)

KONTRAK  No

A

U r ai a n

ek eker erja jaan an

ek e r j a a n

V o lu m e S a tu a n

Harga Satuan (Rp.)

er ersi siap apan an

1 Pembersihan Awal dan Akhir

1.00

Ls

1,450,000.00

2 Pemasangan Bouwplank

1.00

Ls

2,000,000.00

3 Papan Nama Proyek

1.00

Ls

600,000.00

4 Pembuatan Direksi Kit Dan Bangsal Kerja

1.00

Ls

4,000,000.00

5 Administrasi, Pelaporan

1.00

Ls

4,500,000.00

1.00

Ls

4,600,000.00

dan Dokumentasi

6 As Build Drawing B

 umlah

e ke ke rj rj aa aa n T a na na h

1

Pek Galian Tanah Pondasi Menerus

6.30

m3

120,450.00

2

Urugan Tanah Kembali

1.01

m3

86,300.00

3

Timbunan Tanah Bawah Lantai

1.89

m3

386,350.00

4

Pek. Urugan Pasir Bawah Pondasi

0.53

m3

468,780.00

5

Pek. Urugan Pasir Lantai

0.44

m3

468,780.00 umlah

C

e ke ke rj rj aa aa n

a sa sa ng ng an an

1

Pek Batu Kosong

2.10

m3

728,001.90

2

Pek Pondasi Batu Kali, Camp. 1 : 4

4.66

m3

1,294,849.50

3

Pek Pas Dinding Bata Camp 1 : 4

32.96

m2

165,544.10

4

Pek Pas Dinding Bata Pot Bunga Camp 1 : 4

2.29

m2

165,544.10

5

Pek Plesteran Dinding Camp 1 : 4 Pe

132.19

m2

100,252.62

6

Pek Plesteran Dinding Pot Bunga Camp 1 : 4

3.16

m2

100,252.62

7

Pek Plesteran Beton Camp 1 : 2

9.60

m2

106,375.85

8

Pek Plesteran Lisplankg Beton Camp 1 : 2

5.16

m2

106,375.85

9

Pek. Lantai Granit Lantai 60X60 cm

6.66

m2

386,431.00

10

Pek. Keramik Lantai Km/Wc 40x40 cm

1.45

m2

346,436.50

11

Pek. Keramik Dinding Km/ Wc 25x40 cm

11.86

m2

365,884.10

12

Pek. Granit Meja beton 60x60 cm

0.82

m2

386,431.00

14

Pek. Sconing

28.18

m'

97,228.20 umlah

D 1

e ke ke rj rj aa aa n B e to to n Pe Pek. k. Sloo Sloof f 15x2 15x20 0

( K 25 250 0 )

- Pek. Beton

0.47

m3

1,647,285.98

- Pek. Bekisting

6.20

m2

297,385.60

 

No

U r ai a n

ek e r j a a n

 - Pek. Besi Beton 3

Kg

20,967.24

1.08

m3

1,647,285.98

21.63

m2

519,837.30

253.12

Kg

20,967.24

1.44

m3

1,647,285.98

- Pek. Bekisting

14.40

m2

660,637.30

- Pek. Besi Beton

260.17

Kg

17,031.97

0.57

m3

1,647,285.98

- Pek. Bekisting

10.16

m2

532,437.30

- Pek. Besi Beton

125.10

Kg

20,967.24

0.45

m3

1,418,721.97

Peke Pekerja rjaan an Kolom Kolom 20 x 20

( K 250 250 )

- Pek. Bekisting - Pek. Besi Beton Pe Pek k Plat Plat Atap Atap

( K 25 250 0 )

- Pek. Beton

5

Pe Pek k Ring Ring Balo Balok k

8 x 20

- Pek. Beton

6

Harga Satuan (Rp.)

98.25

- Pek. Beton

4

V o lu m e S a tu a n

Pek. Rabat lantai

t = 5 cm

( K 25 250 0 )

 

No 7

U r ai a n

ek e r j a a n

Pek Me Pek Meja ja Pi Pike ket t

Harga Satuan (Rp.)

( K 25 250 0 )

 - Pek. Beton

E

V o lu m e S a tu a n

0.08

m3

1,647,285.98

- Pek. Bekisting

0.79

m2

660,637.30

- Pek. Besi Beton

10.14

Kg

17,031.97 umlah

eker ekerja jaan an Kunc Kunci i da dan n Alum Alumun uniu ium m

1

Pek Kusen Alumunium

13.63

m

213,908.03

2

Pek Daun Pintu Alumunium Kaca 5 mm Pe

1.58

m2

1,146,478.67

3

Pek Pintu Km/ Wc Aluminium strip

0.92

m2

880,306.18

5

Pek Daun Jendela Alumunium

0.95

m2

1,146,478.67

6

Pek. Kunci Pintu

1.00

Bh

184,751.00

7

Pek. Kait Angin Jendela

2.00

Bh

108,150.50

8

Pek. Grendel Jendela

2.00

Bh

52,427.00

9

Pek. Rangka Plafon Besi Holow

15.99

m2

159,032.47

10

Pek. Plafon Gypsum 9 mm

15.99

m2

70,496.70

11

Pek. Lis Profil

25.00

m'

38,001.50 umlah

F

ek eker erja jaan an Fi Fini nish shin ing g

1

Pengecatan Dinding + Beton

150.10

m2

44,958.83

2

Pek Pengacian Dinding

135.34

m2

58,512.00

3

Pek Pengacian Beton

14.76

m2

58,512.00

4

Pengecatan Plafon

15.99

m2

41,354.43

4

Papan Nama/ (Huruf) Stainless

1.00

Ls

6,500,000.00 umlah

G

ek eker erja jaan an Sa Sani nita tasi si

1

Penyambungan PDAM

1.00

Ls

2,500,000.00

2

Pek Septictank

1.00

Ls

5,000,000.00

3 4

Pek Kran Air Pek Floor Drain

2.00 1.00

Bh Bh

117,090.00 38,907.00

5

Pek Kloset Jongkok

1.00

Bh

985,997.00

6

Pipa PVC 3"

4.00

M'

126,004.95

7

Pek Pipa 1/2"

4.00

M'

28,452.20

8

Pek Pipa 4"

4.00

M'

170,179.95 umlah

H

e ke ke rj rj aa aa n L i st st ri ri k

1

Pek. Titik Lampu

7.00

Bh

308,330.00

2

Pek Kabel NYM 3x2,5 mm

15.00

M'

31,210.00

3

Pek Kabel NYM 2x2,5 mm

15.00

M'

28,710.00

4

Pek. Lampu LED Downlight 10 Watt

3.00

Bh

127,310.00

5 6

Pek. Saklar Ganda Pek. Saklar Tunggal

1.00 1.00

Bh Bh

42,610.00 42,610.00

7

Pek. Stop Kontak

2.00

Bh

42,610.00

 

No 8

U r ai a n

ek e r j a a n

Ac 1/2 PK

V o lu m e S a tu a n 1.00

Bh

Harga Satuan (Rp.) 3,000,000.00 umlah

I 1

e k . T a m b a ha n Pe Pek. k. Lisp Lispla lank nk Beto Beton n

( k 250 250 ) 3

 - Pek. Beton - Pek. Bekisting

0.39 16.53

m3 m

 - Pek. Besi Beton umlah

JUMLAH PPN 10 % JUMLAH TOTAL DIBULATKAN

A + B

 

REALISASI LAP LAPANGAN ANGAN Jumlah Harga (Rp.)

V o l u me S a tu a n

Harga Satuan (Rp.)

J u ml a h H ar g a ( R p. )

BOBOT

1,450,000.00

1.00

Ls

1,450,000.00

1,450,000.00

0.91

2,000,000.00

1.00

Ls

2,000,000.00

2,000,000.00

1.26

600,000.00

1.00

Ls

600,000.00

600,000.00

0.38

4,000,000.00

Ls

4,000,000.00

0.00

-

4,500,000.00

Ls

4,500,000.00

0.00

-

4,600,000.00

Ls

4,600,000.00

0.00

-

17,150,000.00

 umlah

4,050,000.00

758,835.00

12.60

m3

120,450.00 120,450 .00

1,517,670.00 1,517,670.00

0.95

87,496.12

2.03

m3

86,300.00 86,300. 00

174,992. 174,992.24 24

0.11

729,525.39

3.78

m3

386,350.00 386,350 .00

1,459,050.78 1,459,050.78

0.92

246,109.50

1.05

m3

468,780.00 468,780 .00

492,219.00 492,219.00

0.31

208,154.73

0.89

m3

468,780.00 468,780 .00

416,309.45 416,309.45

0.26

2,030,120.73

 umlah

4,060,241.47

1,528,803.99

4.20

m3

728,001.90 728,001 .90

3,057,607.98 3,057,607.98

1.92

6,035,293.52

9.32

m3

1,294,849.50 1,294,84 9.50

12,070,587.04 12,070,587.04

7.59

5,455,936.23

32.96

m2

165,544.10

5,455,936.23

3.43

m2

165,544.10

0.00

m2

100,252.62

13,252,153.23

m2

100,252.62

0.00

m2

106,375.85

1,021,208.18

548,899.40

m2

106,375.85

0.00

-

2,573,746.39

m2

386,431.00

0.00

-

500,808.60

m2

346,436.50

0.00

-

4,340,190.37

m2

365,884.10

0.00

-

316,873.42

m2

386,431.00

0.00

-

2,739,890.68

m'

97,228.20

0.00

-

378,781.46 13,252,153.23 132.19 316,397.27 1,021,208.18

39,008,982.73

9.60

 umlah

34,857,492.66

8.33 0.64

765,987.98

0.93

m3

1,647,285.98 1,647,28 5.98

1,531,9 1,531,975.97 75.97

0.96

1,843,790.72

12.40

m2

297,385.60 297,385 .60

3,687,581.44 3,687,581.44

2.32

 

Jumlah Harga (Rp.)

V o l u me S a tu a n

2,060,059.81 196.50

Kg

Harga Satuan (Rp.) 20,967.24

J u ml a h H ar g a ( R p. ) 4,120,119.62

BOBOT 2.59 -

1,781,704.52

2.16

m3

1,647,285.98 1,647,28 5.98

3,563,4 3,563,409.04 09.04

2.24

11,245,120.47

43.26

m2

519,837.30 519,837 .30

22,490,240.95 22,490,240.95

14.14

5,307,188.61 506.24

Kg

20,967.24

10,614,377.21

6.67 -

2,371,268.17

1.44

m3

1,647,285.98

2,371,268.17

1.49

9,509,873.93

14.40

m2

660,637.30

9,509,873.93

5.98

4,431,193.41 260.17

Kg

17,031.97

4,431,193.41

2.79 -

931,046.04

0.57

m3

1,647,285.98

931,046.04

0.59

5,411,692.72

10.16

m2

532,437.30

5,411,692.72

3.40

2,622,984.82 125.10

Kg

20,967.24

2,622,984.82

1.65

m3

1,418,721.97

0.00

639,226.47

-

 

Jumlah Harga (Rp.)

V o l u me S a tu a n

Harga Satuan (Rp.)

BOBOT

J u ml a h H ar g a ( R p. )  

-

136,395.28

m3

1,647,285.98

0.00

-

519,657.30

m2

660,637.30

0.00

-

172,728.45

Kg

17,031.97

0.00

-

49,749,918.70

 umlah

71,285,763.32

2,915,566.45

m

213,908.03

0.00

-

1,811,436.30

m2

1,146,478.67

0.00

-

809,881.69

m2

880,306.18

0.00

-

1,089,154.74

m2

1,146,478.67

0.00

-

184,751.00

Bh

184,751.00

0.00

-

216,301.00

Bh

108,150.50

0.00

-

104,854.00

Bh

52,427.00

0.00

-

2,542,356.61

m2

159,032.47

0.00

-

1,126,988.44

m2

70,496.70

0.00

-

950,037.50

m'

38,001.50

0.00

-

11,751,327.72

 umlah

0.00

6,748,482.23

m2

44,958.83

0.00

-

7,919,224.72

m2

58,512.00

0.00

-

863,637.12

m2

58,512.00

0.00

-

661,108.46

m2

41,354.43

0.00

-

6,500,000.00

Ls

6,500,000.00

0.00

-

22,692,452.54

 umlah

0.00

2,500,000.00

Ls

2,500,000.00

0.00

-

5,000,000.00

Ls

5,000,000.00

0.00

-

234,180.00 38,907.00

Bh Bh

117,090.00 38,907.00

0.00 0.00

-

985,997.00

Bh

985,997.00

0.00

-

504,019.80

M'

126,004.95

0.00

-

113,808.80

M'

28,452.20

0.00

-

680,719.80

M'

170,179.95

0.00

-

10,057,632.40

 umlah

0.00

2,158,310.00

Bh

308,330.00

0.00

-

468,150.00

M'

31,210.00

0.00

-

430,650.00

M'

28,710.00

0.00

-

381,930.00

Bh

127,310.00

0.00

-

42,610.00

Bh

42,610.00

0.00

-

42,610.00

Bh

42,610.00

0.00

-

85,220.00

Bh

42,610.00

0.00

-

 

Jumlah Harga (Rp.)

V o l u me S a tu a n

3,000,000.00

Bh

6,609,480.00 0.00

Harga Satuan (Rp.) 3,000,000.00  umlah

0.00

m3

J u ml a h H ar g a ( R p. ) 0.00

BOBOT -

0.00

120,450 120 ,450.00 .00

0.00

86,300. 86,3 00.00 00 386,350.00 386,350.00

67,572.9 67,572.90 0 12,772,731.00 12,772,731.00

-

3

0.00 0.00 0.00  

0.78 33.06

m m3

 umlah

0.04 8.03

12,840,303.90

159,049,914.82

127,093,801.35

15,904,991.48

12,709,380.13

174,954,906.31

139,803,181.48

174,900,000.00

139,800,000.00

79.91

 

No

URAIAN PEKERJAAN Lebar 1

 A

Lebar 2

lebar Rata2

PEKERJAAN TANAH

1 Pek. Galian Tanah Pondasi 2 Pek. Urugan Tanah Kembali 3 Timbunan Tanah Bawah lantai 4 Pek. Urugan Pasir Bawah Pondasi

 

0.60

 

0.60

 

0.60

 

0.30

 

0.20

5 Pek. Urugan Pasir Bawah Lantai B PEKERJAAN PASANGAN PASANGAN 1 Pek. Pasangan Batu Kosong 2 Pek. Pondasi Menerus 3 Pek. Pasangan Dinding Bata 1:5 4 pek. Pasangan dinding teras 1:5 Jumlah = 5 pek. Pasangan Bata Pot Bunga 1:5 C  PEKERJAAN PLESTERAN 1 Pek. Plesteran Dinding 1:5 Teras Jumlah = 2 pek. Plesteran Pot Bunga 1:5 3 Pek. Plesteran Lisplank 4 Pek. Plesteran Kolom Kolom 20 x 20 cm

 

0.60

0.45

Rumus

D

PEK, BETON

1 Pek,. Sloof 15/20 - Pek. Pembesian Sloof

Besi Utama Besi Beugel Jumlah =

- Pek. Bekisng Sloof  - Pek. Sloof 1:5 2 Pek,. Kolom 20/20 - Pek. Pembesian Kolom

 

   

0.89 0.39

   

0.89 0.39

   

0.89 0.39

   

0.62 0.62

   

0.62 0.62

 

0.62

0.15

Besi Utama Besi Beugel Jumlah =

- Pek. Bekisng Kolom Pek. Kolom 20 x 20 cm 3 Pek,. Ring Balok 12/20 - Pek. Pembesian Ring Balok

 

0.80

 

0.20

Besi Utama Besi Beugel Jumlah =

- Pek. Bekisng Ring Balok - Pek. Beton Ring Balok 1:5 4 Pek,. Plat Atap Beton - Pek. Pe Pembesian Pl Plat A Attap Be Beton

 

0.12

Besi Me Memanjang Besi Melintang Jumlah =

- Pek. Bekisng Plat Atap Beton

a

0.45

b

0.45

c

0.45

d

1.35

e

0.85

Jumlah = - Pek. Plat Atap Beton 5 Pek. Plat Meja Beton - Pek. Pembesian Plat Meja Beton

Besi Memanjang Besi Melintang Jumlah =

- Pek. Bekisng Plat Meja Beton

a

0.47

b Jumlah = - Pek. Plat Meja Beton 6 Pek. Lisplang Beton

 

0.60

- Pek. Pembesian Lisplang Beton - Pek. Bekisng Lisplang Beton - Pek. Lisplang Beton 8 Pek. Balok Praks

 

9 Pek. Rabat lantai

 

10 Skoning Lisplang 11 Skoning pot Bunga 11 Skoning Teras Jumlah = 12 Pek. Granit Lantai 60x60

0.05

13 Pek. Lantai Keramik KM/WC 30x30 14 Pek. Keramik Dinding 25x40 15 Pek. Granit Meja Beton 60x60 16 Kusen PJ 17 Kusen P 18 Kusen J Daun Pintu Daun jendela Depan Daun jendela Samping

Plafond Pos Jaga

Ruang Jaga KM/ WC Teras

1 Pengeceta Pengecetan n Dinding Dinding 2 Pengecetan Kolom 20x20 cm 3 Pengeceta Pengecetan n Lisplank Lisplank 4 Pengecetan Pot Bunga 5

Jumlah =

 

 

1.22

 

PERHITUNGAN Tinggi 1

 

Tinggi 2

Tinggi Rata2

Banyak 1

Luasan

Panjang 1 P Pa anjang 2

0.60

Jumlah Volume 1 Panjang

17.50 0.03

32.60

0.42

4.55

0.05

17.50

0.05

8.88

0.20

17.50

0.60

17.50

4.73

2.80

12.60

35.28

0.90

1.04

1.30

1.13

0.29

1.92

2

12.60

2.10

1.30

0.40

1.13 7.89

0.30 3.00

1.17 7.89

2.80

 

Panjang Rata2

17.20 8

1.20

0.20

70.56 2.50

 

4

18.38

123.00 0.20

0.68

2

15.50

0.20

15.50 222.72

3.38 3.38

180

0.78

8 8

0.20

4

24.66

164

0.58

0.22

46.20

0.20

23.55 36

 

5.73

51

 

4.23

4

0.45

4

1.85

2

2.35

2

1.85

2

1.85

0.10 15

 

0.65

5

 

1.34 1.38

0.10

1.38

0.10

1.38  

3

17.40

0.68 0.40

17.60 17.20 1

0.05

1.37 9.01

 

 

17.60 7.70 2.88

6.66 1.45 2.59

4.58 0.82 6.71

4.66 2.26 1.18 0.48 0.49

4.50 1.67 17.67 132.19 9.60 5.16 3.16

 

PEK LISPLANK

17.4 x

0.05 x

0.45 =

PEK BEKESTING

17.4 X

0.95 =

16.53 M2

116 X

39

BESI

 

 

2.38

0.88 1.37

 

 jumlah Total

Volume 2

 

0.06 4.67

1.18

6.30 1.01 1.89 0.53 0.44

m3 m3 m3 m3 m3

2.10 4.66 30.61 2.35 32.96

m3 m3

2.29  

9.34

Satuan

122.45

m2 m2

2.37

9.74

132.19

m2

3.16 5.16 9.60

m2 m2 m2

 

 

 

65.25

17.50

33.00

0.12

98.25 6.20

Kg m2

0.47

m3

197.72 55.40

253.12 21.63 1.08

Kg m2 m3

87.57 37.53

125.10 10.16 0.57

Kg m2 m3

127.17 133.00

260.17 0.81 3.33 2.12 5.00 3.15 14.40 1.44

Kg

m2 m3

6.01 4.13

10.14 0.65 0.14 0.79

0.08 32.18 11.97 0.34 1.37 0.45

Kg

m2 m3 Kg m2 m3 m m3

0.88 0.17

18.38

 

 

17.60

m

7.70

m

2.88

m Kg

28.18 6.66 1.45 11.86

m2 m2

0.82

m2

6.71 4.66

m2

2.26  

0.84 0.32 0.33

 

13.63 0.34 0.16 0.16

m3

0.66

m2

4.50 1.67

7.86

9.81

15.99

150.10

m2

 

0.3915 0.3 915 M3

 

HITUNGAN VOLUME PEKERJAAN GALIAN Pek. Galian Tanah Pondasi PEK. Urugan Tanah Kembali Timbunan Tanah Bawah lantai Pek. Urugan Pasir Bawah Pondasi PEKERJAAN PASANGAN Pek. Pondasi Menerus Pek. Pasangan Dinding Bata 1:5 pek. Pasangan dinding teras 1:5

Pek. Plesteran Dinding 1:5 PEK PLESTERAN BETON Pek. Plesteran Sloof 1:5 Pek. Plesteran Kolom  

1.82

Pek. Granit Lantai 60/60 Pek. Granit Meja Piket 60/60 pek. Keramik Lantai Km/wc 30/30 Pek. Keramik Dinding Km/Wc 30/30

1.85

 

Kusen

6.75

x

1

Bh

=

6.75

Jendela

0.55

x

1

Bh Bh

=

0.55

Pintu Kaca

1.30

x

1

bh

=

1.30

Luas

1.30

x

1

Bh

=

1.30

Kusen

3.10

x

1

Bh

=

3.10

Jendela

0.55

x

1

Bh Bh

=

0.55

0

x

1

bh

=

0

0.55

x

1

Bh Bh

=

0.55

Pintu Kaca Luas

VOLUME KUSEN

=

VOLUME PINTU

=

DAUN JENDELA

=

VOLUME JENDELA

=

Pekerjaan Rangka Plafond

=

Pekerjaan Plafond Gipsum 0.9 mm

=

Pek. Kunci Pintu Kwalitas Baik Pek. Kait Angin Jendela

= =

Pek. Grendel Jendela

=

Pek. Grendel Pintu

=

PEKERJAAN BETON Pek. Sloof 15/20

 

Pek. Beton

Pek. Bekesng Pek Besi Beton Pek. Kolom Praks 8/15 Pek. Beton Pek. Bekesng Pek. Besi Beton Pek. Kolom Teras 15/15 Pek. Beton Pek. Bekesng Pek. Besi Beton Pek. Ring Balok 8/20 Pek. Beton Pek. Bekesng Pek Besi Beton Pek. Rabat Lantai T = 5cm Pek. Meja Piket Pek. Beton Pek. Bekesng Pek. Besi Beton Pek. Lisplank Pek. Beton Pek. Bekesng Pek. Besi Beton Pek. Plat Atap Pek. Beton Pek. Bekesng Pek. Besi Beton

PEKERJAAN FHINISING Pengecatan Dinding Pengecatan Beton

2= =

77.86 1.80

=

8.42

Pek. Kran Air

=

2

Pek. Floor Drain

=

1

Pek. Klosed Duduk

=

1

Pek. Pipa 2,5"

= 4M

Pek. Pipa 1/2"

= 4M

Pek. Pipa 4"

= 4M

Pengecatan Plafond

38.93

X

PEKERJAAN SANITASI Pek. Sapktank

 

PEKERJAAN LISTRIK Pek. Tik Lampu

=

Pek. Kabel NYM 3x2,5 mm

=

10

Pek. Kabel NYM 2x2,5 mm

=

10

Pek. Lampu Fled Dunlaigh

=

3

Pek. Saklar Ganda

=

2

Pek. Saklar Tunggal

=

1

Pek. Stop Kontak

=

1

Pek. Meteran

=

1

 

 

0.60 x

0.60 x

 

0.25 x

6.30

17.50 =

6.30

M3

=

1.58

M3

  6.97 x 0.05 x

0.2 0.6 x

= 17.5 =

1.39 0.525

M3 M3

0.4 x

0.6 x

17.50 =

4.20

M3

12.98 x

2.6

=

33.748

M2

2.57 x

1

=

2.57

M2

=

36.32

M2

Jumlah 0

-

38.93

=

38.93

M2

0.2

x

17.5

=

3.50

M2

0.6

x

3

=

1.80

M2

Jumlah =

5.30

M2

= =

6.85 0.9

M2 M2

=

1.57

M2

=

8.1

m2

1.5

x

5.4

 

Luas

 

9.85 M1

 

1.30 M2

 

1.10 M2

 

1.10 M2

 

8.42 8.42

1 Bh 4 Bh 2 Bh 1 Bh

(K225)

 

17.5 =

0.53 M3

17.5

=

7.00 M2

x

70

=

0.08

x

0.15 x

 

0.24

X

 

0.62

x

0.15

x

 

0.60

x

 

0.62

x

12

0.08

x

0.2 x

0.4

x

0.62

 

0.15

x

0.4

x

0.62

0.2 x

69.90 Kg

(K225) 2.80 x

7=

2.8 X

7.00 =

78.40

=

(K225) 0.15 x

2.80 x 2.8

1= = =

(K225) 17.5 =

0.28 M3

17.5

=

7.00 M2

x

70.00

=

0.05

X

8.42

=

0.42 M3

0.05

x

0.9

=

0.05 M3

0.6

x

1.5

=

0.9 M3

0.37

x

12

=

0.07

x

0.35 x

 

0.70

X

 

0.37

x

3.62

x

5.12 x

3.62

X

  0. 0 .62

x

 

64.37 Kg

(K225)

(K225)

 

4.44 Kg

21.5 =

0.53 M3

21.5

=

15.05 M2

86.00

=

48.42 Kg

(K225)

M2 M2 M2

0.08 =

1.48 M3

5.12

=

18.53 M3

327.69

=

202.08 Kg

Bh Bh Bh

 

M1 M1 Bh Bh Bh bH Bh

 

  3.74

 

1.19

2.04

 

-

M3

 

-

M2

  50.17  

- M3

 

- M2

  10.44

Kg

Kg

 

-

 

  3.74

1.19

2.04

 

  1.30

x

1

Bh

=

1.30

 

 

0.24

M3

 

4.70

M2

  50.17  

0.06 M3

 

1.68 M2

  10.44

Kg

Kg

 

-

 

R E K A   R O G RA M E K E RJ A A N L O K A SI T A H U N A N G G A RA N

: EN I N G K AT A N S AR A N A D AN R A SA R A N A A A R A TU R : EM B A N G UN A N OS O L I SI ( K A W. B E L AK A N G BE N T E N G ) : K OT A T E RN A T E : 2 01 8 URAIAN

NO

I T U L A S I

E K E R JA A N

A

e k e rj a a n

B

ekerjaan Tanah

C

ekerjaan

D

e k e rj a a n Be t o n

5 0, 6 3 0 , 6 32 . 6 9

E

e ke ke rj rj aa aa n K u nc nc i d a n A lu lu m un un iu iu m

1 1, 1, 91 91 8, 8, 91 91 1 .3 .3 9

F

e k e rj a a n Fi n i s h in g

2 1, 1 8 1 , 6 81 . 9 9

G

e k e rj a a n Sa n i t a si

1 0, 2 0 6 , 7 34 . 3 0

H

e k e rj a a n Li s t r i k

6, 7 0 6 , 0 93 . 5 0

A

JU M L A H

B

e r s i a pa n

J U M L AH H A R GA ( R p .)

asangan

JUMLAH TOTAL

D

D I B U L AT K A N

2,378,335.84

41,841,417.34

1 6 2, 0 1 3 , 8 07 . 0 4

N 10 %

C

1 7, 1 5 0 , 0 00 . 0 0

1 6, 2 0 1 , 3 80 . 7 0 A + B

1 7 8, 2 1 5 , 1 87 . 7 5 1 7 8, 2 0 0 , 0 00 . 0 0

Ternate, 21 JUNI 2018 PENAWAR CV. DHIAHI KARYA

Irwan Thamrin

 

Direktur

 

  -

175,000,000.0 3,200,000.00 174,900,000

 

RENCANA ANGGARAN BIAYA (RAB)   R O GR A M EKERJAAN

:

E N IN G K A T AN S A R A NA D A N

:

EMBANGUNAN

L O K AS I

: K O T A T E R N AT E

T A H UN A N G GA R A N

: 2018

No A

U r a i an ek eker erja jaan an

OS

R A S A RA N A A AR A T U R

OLISI (KAW. BELAKANG BENTENG)

e k e rj a a n

V o l u m e S a t ua n

Harga Satuan (Rp.)

er ersi siap apan an

1 Pembersihan Awal dan Akhir

1.00

Ls

1,450,000.00

2 Pemasangan Bouwplank

1.00

Ls

2,000,000.00

3 Papan Nama Proyek

1.00

Ls

600,000.00

4 Pembuatan Direksi Kit Dan Bangsal Kerja

1.00

Ls

4,000,000.00

5 Administrasi, Pelaporan

1.00

Ls

4,500,000.00

1.00

Ls

4,600,000.00

dan Dokumentasi

6 As Build Drawing

 umlah

B

e ke ke rj rj aa aa n T an an ah ah 3

1 2

Pek Galian Tanah Pondasi Menerus Urugan Tanah Kembali

6.30 1.01

m m3

124,817.50 89,435.00

3

Timbunan Tanah Bawah Lantai

1.89

m3

493,997.50

4

Pek. Urugan Pasir Bawah Pondasi

0.53

m3

586,687.00

5

Pek. Urugan Pasir Lantai

0.44

m3

586,687.00 umlah

C

e ke ke rj rj aa aa n

a sa sa n ga ga n

1

Pek Batu Kosong

2.10

m3

932,219.70

2

P ek Pondasi Batu Kali, Camp. 1 : 4 Pe

4.66

m3

1,507,078.50

3

Pek Pas Dinding Bata Camp 1 : 4

32.96

m2

173,385.75

4

Pek Pas Dinding Bata Pot Bunga Camp 1 : 4

2.29

m2

173,385.75

5

Pek Plesteran Dinding Camp 1 : 4

132.19

m2

105,182.58

6

Pek Plesteran Dinding Pot Bunga Camp 1 : 4

3.16

m2

105,182.58

7

Pek Plesteran Beton Camp 1 : 2

9.60

m2

110,682.31

8

Pek Plesteran Lisplankg Beton Camp 1 : 2

5.16

m2

110,682.31

9

Pek. Lantai Granit Lantai 60X60 cm

6.66

m2

398,849.50

10

Pek. Keramik Lantai Km/Wc 40x40 cm

1.45

m2

359,144.00

11

Pek. Keramik Dinding Km/ Wc 25x40 cm

11.86

m2

379,732.10

12

Pek. Granit Meja beton 60x60 cm

0.82

m2

398,849.50

14

Pek. Sconing

28.18

m'

101,900.30 umlah

D

e ke ke rj rj aa aa n B et et on on

1

Pek. Pek. Sloo Sloof f 15x2 15x20 0

( K 250 250 ) 3

- Pek. Beton - Pek. Bekisting

0.47 6.20

m2 m

1,637,592.38 303,632.40

- Pek. Besi Beton

98.25

Kg

21,224.35

 

No 3

U r a i an

e k e rj a a n

Peker Pekerja jaan an Kolom Kolom 20 x 20

5

1.08

m3

1,637,592.38

- Pek. Bekisting

21.63

m2

534,971.70

- Pek. Besi Beton

253.12

Kg

21,224.35

- Pek. Beton - Pek. Bekisting

1.44 14.40

m3 m2

1,637,592.38 675,771.70

- Pek. Besi Beton

260.17

Kg

17,143.53

0.57

m3

1,637,592.38

- Pek. Bekisting

10.16

m2

548,996.70

- Pek. Besi Beton

125.10

Kg

21,224.35

0.45

m3

1,416,700.37

Pe Pek k Pl Plat at At Atap ap

Pek Pek Ring Ring Balo Balok k

( K 25 250 0 )

8 x 20

- Pek. Beton

6

Harga Satuan (Rp.)

( K 250 250 )

- Pek. Beton

4

V o l u m e S a t ua n

Pek. Rabat lantai

t = 5 cm

( K 250 250 )

 

No 7

U r a i an

e k e rj a a n

Pek Me Pek Meja ja Pi Pike ket t

V o l u m e S a t ua n

Harga Satuan (Rp.)

( K 25 250 0 ) 0.08

m3

1,637,592.38

- Pek. Bekisting

0.79

m2

675,771.70

- Pek. Besi Beton

10.14

Kg

17,143.53

 - Pek. Beton

umlah

E 1

eker ekerja jaan an Ku Kunc nci i da dan n Al Alum umun uniu ium m Pek Kusen Alumunium

2

13.63

m

214,477.23

Pek Daun Pintu Alumunium Kaca 5 mm Pe

1.58

m2

1,155,001.40

3

Pek Pintu Km/ Wc Aluminium strip

0.92

m2

881,431.67

5

Pek Daun Jendela Alumunium

0.95

m2

1,155,001.40

6

Pek. Kunci Pintu

1.00

Bh

188,495.50

7

Pek. Kait Angin Jendela

2.00

Bh

108,150.50

8

Pek. Grendel Jendela

2.00

Bh

52,427.00

9

Pek. Rangka Plafon Besi Holow

15.99

m2

163,671.57

10

Pek. Plafon Gypsum 9 mm

15.99

m2

73,166.50

11

Pek. Lis Profil

25.00

m'

38,667.10 umlah

F

ek eker erja jaan an Fi Fini nish shin ing g

1

Pengecatan Dinding + Beton

150.10

m2

34,168.26

2

Pek Pengacian Dinding

135.34

m2

60,248.00

3

Pek Pengacian Beton

14.76

m2

60,248.00

4

Pengecatan Plafon

15.99

m2

31,868.43

4

Papan Nama/ (Huruf) Stainless

1.00

Ls

6,500,000.00 umlah

G

ek eker erja jaan an Sa Sani nita tasi si

1

Penyambungan PDAM

1.00

Ls

2,500,000.00

2

Pek Septictank

1.00

Ls

5,000,000.00

3

Pek Kran Air

2.00

Bh

121,403.50

4 5

Pek Floor Drain Pek Kloset Jongkok

1.00 1.00

Bh Bh

39,727.50 1,111,299.00

6

Pipa PVC 3"

4.00

M'

127,472.20

7

Pek Pipa 1/2"

4.00

M'

29,105.80

8

Pek Pipa 4"

4.00

M'

171,647.20 umlah

H

e ke ke rj rj aa aa n L is is tr tr ik ik

1

Pek. Titik Lampu

7.00

Bh

318,757.00

2

Pek Kabel NYM 3x2,5 mm

15.00

M'

31,848.50

3

Pek Kabel NYM 2x2,5 mm

15.00

M'

29,348.50

4

Pek. Lampu LED Downlight 10 Watt

3.00

Bh

127,948.50

5

Pek. Saklar Ganda

1.00

Bh

43,248.50

6

Pek. Saklar Tunggal

1.00

Bh

43,248.50

7

Pek. Stop Kontak

2.00

Bh

43,248.50

 

No 8

U r a i an Ac 1/2 PK

e k e rj a a n

V o l u m e S a t ua n 1.00

Bh

Harga Satuan (Rp.) 3,000,000.00 umlah

 

Jumlah Harga (Rp.)

1,450,000.00 2,000,000.00 600,000.00 4,000,000.00 4,500,000.00 4,600,000.00 17,150,000.00

786,350.25 90,674.57 932,790.78 308,010.68 260,509.56 2,378,335.84 1,957,661.37 7,024,492.89 5,714,378.19 396,723.93 13,903,832.81 331,956.22 1,062,550.16 571,120.71 2,656,457.32 519,178.57 4,504,458.12 327,056.59 2,871,550.45 41,841,417.34

761,480.46 1,882,520.88 2,085,321.22

 

Jumlah Harga (Rp.)

1,771,219.92 11,572,507.81 5,372,267.81

2,357,314.24 9,727,733.62 4,460,217.89 925,567.22 5,580,002.46 2,655,149.07 638,315.60

 

Jumlah Harga (Rp.)

135,592.65 531,562.02 173,859.82 50,630,632.69 2,923,324.64 1,824,902.22 810,917.14 1,097,251.33 188,495.50 216,301.00 104,854.00 2,616,519.11 1,169,668.94 966,677.50 11,918,911.39 5,128,778.83 8,154,181.21 889,260.48 509,461.47 6,500,000.00 21,181,681.99 2,500,000.00 5,000,000.00 242,807.00 39,727.50 1,111,299.00 509,888.80 116,423.20 686,588.80 10,206,734.30 2,231,299.00 477,727.50 440,227.50 383,845.50 43,248.50 43,248.50 86,497.00

 

Jumlah Harga (Rp.) 3,000,000.00 6,706,093.50

 

TABEL HAR HARGA GA AN ANALIS ALISA A PEK PEKERJ ERJAAN AAN S SESU ESUAI AI PERMEN PERMEN PUPR N NO O 28 TH 20 NO 1

KELOMPOK PEKERJAAN Pek eker erja jaan an Per ersi siap apan an

JENIS PEKERJAAN Pembuatan Pembuat an 1 m2 pagar sementara dari seng gelombang nggi 2 meter  Pengukuran dan pemasangan 1 m' Bouwplank Pembuatan 1 m2 Kantor sementara lantai plesteran Pembuatan 1 m2 rumah jaga (konstruksi kayu) Pembuatan 1 m2 gudang semen dan peralatan Pembuatan 1 m2 bedeng pekerja Pembersihan 1 m2 lapangan dan perataan Pembuatan 1 m2 steger/perancah dari bambu Pembuatan 1 bh kotak adukan ukuran ukuran 40cm x 50cm x 25cm Pembongkaran Pembongkar an 1 m3 beton bertulang Pembongkaran Pembongkar an 1 m3 dinding tembok bata Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm Pemasangan 1 m2 panel beton pracetak 5 x 50 x 240 cm Untuk Pagar. Pagar.

2

Pekerjaan Tanah

Penggalian 1 m3 tanah biasa sedalam 1 m  Penggalian 1 m3 tanah biasa sedalam 2 m Penggalian 1 m3 tanah biasa sedalam 3 m Penggalian 1 m3 tanah keras sedalam 1 m Penggalian 1 m3 tanah cadas sedalam 1 m Penggalian 1 m3 tanah lumpur sedalam 1 m Pengerjaan stripping 1 m2 tanah tebing senggi 1 m Pembuangan 1 m3 tanah sejauh 30 m Pengurugan kembali 1 m3 galian tanah Pemadatan tanah 1 m3 tanah (per 20 cm) Pengurugan 1 m3 dengan pasir urug Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan Pengurugan 1 m3 sirtu padat Pengurugan 1 m3 tanah urug

3

Pekerjaan Pondasi

Pemasangan 1 m3 pondasi batu belah 1sp : 3pp Pemasangan 1 m3 pondasi batu belah 1sp : 4pp

 

 Pemasangan 1 m3 pondasi batu belah 1sp : 5pp Pemasangan 1 m3 pondasi batu belah 1sp : 6pp Pemasangan 1 m3 pondasi batu belah 1sp : 8pp Pemasangan 1 m3 batu kosong (anstamping)

 

 

Pekerjaan Beton

Untuk Pembesian Plat (100 Kg) Untuk Pembesian Kolom, Balok, Ringbalk dan Sloof (100 Kg) Membuat 1 m3 beton mutu f'c = 7,4 mpa (K 100), slump (12-2) cm, w/c = 0,87 Membuat 1 m3 beton mutu f'c = 9,8 mpa (K 125), slump (12-2) cm, w/c = 0,78 Membuat 1 m3 beton mutu f'c = 12,2 mpa (K 150), slump (12-2) cm, w/c = 0,72

Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 mpa (K 100), slump (3-6) cm, w/c = 0,87 Membuat 1 m3 beton mutu f'c = 14,5 mpa (K 175), slump (12-2) cm, w/c = 0,66 Membuat 1 m3 beton mutu f'c = 16,9 mpa (K 200), slump (12-2) cm, w/c = 0,61 Membuat 1 m3 beton mutu f'c = 19,3 mpa (K 225), slump (12-2) cm, w/c = 0,58 Membuat 1 m3 beton mutu f'c = 21,7 mpa (K 250), slump (12-2) cm, w/c = 0,56 Membuat 1 m3 beton mutu f'c = 24,0 mpa (K 275), slump (12-2) cm, w/c = 0,53 Membuat 1 m3 beton mutu f'c = 26,4 mpa (K 300), slump (12-2) cm, w/c = 0,52 Membuat 1 m3 beton mutu f'c = 28,8 mpa (K 325), slump (12-2) cm, w/c = 0,49 Membuat 1 m3 beton mutu f'c = 31,2 mpa (K 350), slump (12-2) cm, w/c = 0,48  Pemasangan 10 Kg jaring kawat baja (wiremesh) Pemasangan 1 Kg jaring kawat baja (wiremesh) Pemasangan 1 m2 bekisng untuk pondasi Pemasangan 1 m2 bekisng untuk sloof Pemasangan 1 m2 bekisng untuk kolom Pemasangan 1 m2 bekisng untuk balok Pemasangan 1 m2 bekisng untuk lantai Pemasangan 1 m2 bekisng untuk dinding Pemasangan 1 m2 bekisng untuk tangga Pemasangan 1 m2 jembatan untuk pengecoran beton 1 M' Kolom Praks Beton Bertulang (11x11) cm 1 M' Ring Balok Beton Bertulang (10 x 15 cm)

 

5

Pekerjaan Besi Beton

Untuk Pembesian Plat (100 Kg) Untuk Pembesian Plat (1 Kg) Untuk Pembesian Kolom, Balok, Ringbalk dan Sloof (100 Kg) Untuk Pembesian Kolom, Balok, Ringbalk dan Sloof (100 Kg)

 

6

Pekerjaan Besi dan Aluminium

Pemasangan 1 Kg besi prol Pemasangan 1 Kg rangka kuda-kuda baja IWF Pengerjaan 10 Kg pekerjaan perakitan Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja Pembuatan siku Pengerjaan 10 cm pengelasan dengan las listrik Pemasangan 1 m2 rolling door alumunium Pemasangan 1 m kusen pintu alumunium Pemasangan 1 m2 pintu alumunium strip lebar 8 cm cm Pemasangan 1 m2 pintu/jendela kaca rangka alumunium Pemasangan 1 m' talang dasar/jurai seng bjls 30 lebar 90 cm Pemasangan 1 m' talang 1/2 lingkaran lingkaran D-15 cm, seng bjls 30 lebar 45 cm Pemasangan 1 m2 rangka besi hollow 1x40.40.3mm, modul 60x120cm, dinding parsi Pemasangan 1 m2 rangka besi hollow 1x40.40.3mm, modul 60x60cm, plafon Pemasangan 1 m2 rangka Atap Baja Ringan

 

7

Peker ekerja jaan an Din Dindi ding ng Bat Bata a Pres Presss

Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1sp : 2pp Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1sp : 3pp Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1sp : 4pp Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1sp : 5pp Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1sp : 6pp Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp. 1sp : 8pp Pemasangan 1 m2 dinding terawang (rooster) (rooster) 12x11x24 camp. 1sp : 3pp Pemasangan 1 m2 dinding terawang (rooster) (rooster) 12x11x24 camp. 1sp : 4pp  Pemasangan 1 m2 dinding bata berongga 12x11x24 camp. 1sp : 3pp Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

8

Pekerjaan Plesteran

Pemasangan 1 m2 plesteran 1sp : 1pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 2pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 3pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 4pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 5pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 6pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 7pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 8pp tebal 15 mm Pemasangan 1 m2 plesteran 1sp : 1pp tebal 20 mm

Pemasangan 1 m2 plesteran 1sp : 3pp tebal 20 mm Pemasangan 1 m2 plesteran 1sp : 4pp tebal 20 mm Pemasangan 1 m2 plesteran 1sp : 5pp tebal 20 mm Pemasangan 1 m2 plesteran 1sp : 6pp tebal 20 mm

 

 Pemasangan 1 m' plesteran skoning 1sp : 3pp lebar 10 1 0 cm Pemasangan 1 m2 plesteran granit 1sp : 2 granit tebal 1 cm Pemasangan 1 m2 plesteran traso 1sp : 2 traso tebal 1 cm Pemasangan 1 m2 plesteran ciprat 1sp : 2pp Pemasangan 1 m2 nishing siar pasangan bata merah Pemasangan 1 m2 nishing siar pasangan conblock ekspose Pemasangan 1 m2 nishing siar pasangan batu kali camp. 1sp : 2pp Pemasangan 1 m2 acian

 

9

Pekerjaan Penutup Lantai

Pemasangan 1 m2 lantai keramik arsk ukuran 10cm x 20cm Pemasangan 1 m2 lantai keramik ukuran ukuran 30cm x 30cm Pemasangan 1 m2 lantai keramik ukuran ukuran 20cm x 20cm Pemasangan 1 m2 lantai ker keramik amik mozaik ukuran 30cm x 30cm Pemasangan 1 m' plint keramik ukuran ukuran 10cm x 20cm Pemasangan 1 m' plint keramik ukuran ukuran 5cm x 20cm Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm Pemasangan 1 m2 lantai karpet Pemasangan 1 m2 underlayer (pelapis bawah karpet) Pemasangan 1 m2 lantai parquet kayu Pemasangan 1 m2 dinding keramik arsk ukuran 10cm x 20cm Pemasangan 1 m2 dinding keramik arsk ukuran 5cm x 20cm Pemasangan 1 m2 dinding keramik ukuran ukuran 20cm x 20cm Pemasangan 1 m2 dinding marmer ukuran 100cm x 100cm Pemasangan 1 m2 dinding batu tempel hitam Pemasangan 1 m2 Paving Blok Natural T = 6 cm cm Pemasangan 1 m2 lantai keramik ukuran ukuran 40cm x 40cm Pemasangan 1 m2 lantai Granit ukuran 60cm x 60cm Pemasangan 1 m2 dinding keramik ukuran ukuran 25cm x 40cm

10

Peke Pekerja rjaan an Penut Penutup up Langit Langit - LLang angit it

Pemas Pemasang angan an 1 m m2 2 lang langit it-la -langi ngitt tr tripl ipleks eks ukur ukuran an (12 (120 0 x 240) 240) cm cm,, teba teball Pemasangan 1 m2 langit-langit lambrisering kayu tebal 9 mm Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) cm Pemasangan 1 m' list langit-langit kayu prol Pemasangan 1 m2 rangka langit-langit besi hollow 40.40.3 Pemasangan 1 m' list langit-langit Gypsum 10 cm

11

Pekerjaan Penutup Atap

Pemasangan 1 m2 roof light breglass 90x180 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai Pemasangan 1 m' nok genteng metal Pemasangan 1 m2 atap seng gelombang Pemasangan 1 m' nok atap seng

 

 Pemasangan 1 m2 alumunium foil/sisalaon foil/sisalaon Pemasangan 1 m2 atap spandek

 

12

Pek eker erja jaan an Kayu

Pembuatan Pembuat an dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Pembuatan Pembuat an dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II  Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I Pembuatan Pembuat an dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas Pembuatan II Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kls II tertutup (lbr sampai 90 cm) Pembuatan 1 m2 daun pintu plywood rangkap, rangka expose kayu kls

II Pemasangan 1 m2 jalusi kusen, kayu kelas II Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kls I Pemasangan 1 m3 kons konstruksi truksi kuda-kuda expose, kayu kls I Pemasangan 1 m3 kons konstruksi truksi gordeng, kayu kls II Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kls II Pemasangan 1 m2 rangka langit-langit (60x60) cm, kayu kls II Pemasangan 1 m' lisplank ukuran (3x20)cm, kayu kls II Pemasangan 1 m' lisplank ukuran (3x30)cm, kayu kls II Pemasangan 1 m2 rangka dinding pemisah (60x120)cm, kayu kls II Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kls II Pemasangan 1 m2 dinding lambrisering dari papan kayu kls I Pemasangan 1 m2 dinding lambrisering dari plywood uk. (120x240) cm 13

Pekerjaan Kunci dan Kaca

Pemasangan 1 bh kunci tanam kualitas baik Pemasangan 1 bh kunci tanam biasa Pemasangan 1 bh kunci kamar mandi Pemasangan 1 bh kunci silinder Pemasangan 1 bh engsel pintu Pemasangan 1 bh engsel jendela Pemasangan 1 bh kait angin Pemasangan 1 bh door closer Pemasangan 1 bh door holder

 

 Pemasangan 1 bh door stop Pemasangan 1 bh rel pintu sorong Pemasangan 1 m2 kaca tebal 3 mm Pemasangan 1 m2 kaca tebal 5 mm Pemasangan 1 m2 kaca tebal 10 mm Pemasangan 1 m2 kaca buram tebal 12 mm Pemasangan 1 m2 kaca cermin tebal 5 mm Pemasangan 1 m2 kaca cermin tebal 8 mm

 

14

Pekerjaan Pengecatan

1 m2 Pengikisan/pengerokan permukaan cat lama 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 1 m2 Pengerokan karat pada permukaan baja cara manual 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) 1 m2 Pelaburan bidang kayu dengan vernis 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 1 m2 Pengecatan tembok lama (1 lapis cat dasar dasar,, 2 lapis cat penutup) 1 m2 Pemasangan wallpaper 1 m2 Pengecatan permukaan baja dengan meni besi 1 m2 Pengecatan permukaan baja dengan meni besi dengan perancah 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

15

Pekerjaan Sanitasi

Pemasangan 1 bh closet duduk Pemasangan 1 bh closet jongkok Pemasangan 1 bh urinoir Pemasangan 1 bh wastafel

Pemasangan 1 bh bathcuip porselen Pemasangan 1 bh bak breglass vol 1 m3 Pemasangan 1 bh bak cuci piring stainlessteel stainlessteel Pemasangan 1 bh oor drain Pemasangan 1 M' pipa galvanis dia. 1/2" Pemasangan 1 bh kran dia. 1/2" atau 3/4" Pemasangan 1 M' pipa galvanis dia. 3/4" Pemasangan 1 M' pipa galvanis dia. 1"

 

 Pemasangan 1 M' pipa galvanis dia. 1 1/2" Pemasangan 1 M' pipa galvanis dia. 3" Pemasangan 1 M' pipa galvanis dia. 4" Pemasangan 1 M' pipa PVC pe AW dia. 1/2" Pemasangan 1 M' pipa PVC pe AW dia. 3/4" Pemasangan 1 M' pipa PVC pe AW dia. 1" Pemasangan 1 M' pipa PVC pe AW dia. 1 1/2" Pemasangan 1 M' pipa PVC pe AW dia. 2" Pemasangan 1 M' pipa PVC pe AW dia. 2 1/2" Pemasangan 1 M' pipa PVC pe AW dia. 3" Pemasangan 1 M' pipa PVC pe AW dia. 4"

 

16

Pekerjaan Elektrikal

Memasang Tik Instalasi Memasang 1 Bh Stop Kontak Memasang 1 Bh Saklar Ganda Memasang 1 Bh Lampu LED Downlight 10 Wa Memasang 1 Bh Feng Lampu Memasang 1 M' Kabel NYM Uk. 3x2,5 mm Memasang 1 M' Kabel NYM Uk. 2x2,5 mm Memasang 1 Bh Feng Downlight Memasang 1 Bh MCB

17

Pekerjaan TAMBAHAN

Penggelontoran (m') apapun namanya

 

 

16 ( T A 2018 )  HARGA  Rp

644,786.00

Rp

117,523.50

KET

#NAME?  Rp

2,017,195.00

Rp

1,839,775.00

Rp

1,864,925.00

Rp

25,355.00

Rp

679,368.80

Rp

250,338.00

Rp

2,260,449.00

Rp

1,130,224.50 #NAME?

 Rp

310,642.40

Rp

124,817.50

Rp

152,581.50

Rp

180,718.90

Rp

166,174.40

Rp

251,502.00

Rp

200,641.50

Rp

8,943.50

Rp

54,733.00

Rp

89,435.00

Rp

89,435.00

Rp

586,687.00

Rp

2,026,630.50

Rp

560,357.50

Rp

493,997.50

Rp

1,563,034.00

Rp

1,507,078.50

 Rp

1,468,222.50

Rp

1,440,936.00

Rp

1,403,462.50

Rp

932,219.70

 

`

 

 Rp

17,143.53

Rp

21,224.35

Rp

1,416,700.37

Rp

1,463,970.39

Rp

1,500,678.19

Rp

1,308,319.20

Rp

1,544,409.79

Rp

1,585,768.11

Rp

1,617,493.22

Rp

1,637,592.38

Rp

1,672,423.00

Rp

1,683,076.76

Rp

1,815,142.91

Rp

1,829,238.84 Err:509 Err:509

 Rp

286,632.40

Rp

303,632.40

Rp

534,971.70

Rp

548,996.70

Rp

675,771.70 Err:509

 Rp

499,569.20

Rp

157,319.60

Rp

121,443.30

Rp

159,713.00

 

 Rp Rp Rp Rp

1,714,353.00 Rp

17,143.53

17,143.53 2,122,435.00 Rp 21,224.35

21,224.35

 

Err:509  Rp

52,762.30 Err:509

 Rp

1,178,614.99 Err:509

 Rp

836,255.00

Rp

214,477.23

Rp

881,431.67

Rp

1,155,001.40

Rp

206,512.20

Rp

107,834.65

Rp

123,169.17

Rp

163,671.57

Rp

268,760.10

 

 Rp

179,159.70

Rp

175,336.52

Rp

173,385.75

Rp

172,173.53

Rp

171,905.97

Rp

170,439.00

Rp

109,697.00

Rp

71,052.50

Rp

81,148.50

Rp

370,390.10 Err:509

 Rp

118,634.07

Rp

110,682.31

Rp

107,579.19

Rp

105,182.58

Rp

104,203.63

Rp

103,260.07

Rp

102,861.41

Rp

102,462.75

Rp

148,119.64

Rp

119,873.86

Rp

140,616.84

Rp

139,481.40

Rp

138,053.50

 

 Rp

101,900.30 Err:509 Err:509

 Rp

82,282.94

Rp

46,657.04

Rp

22,164.30

Rp

101,470.58

Rp

60,248.00

 

Err:509  Rp

346,124.00

Rp

316,640.80

Rp

1,663,585.20

Rp

75,357.88

Rp

73,191.19

Rp

245,718.68

Rp

397,287.70

Rp

158,121.60

Rp

543,406.39 Err:509 Err:509

 Rp

394,460.10

Rp

492,215.68 Err:509

 Rp

330,142.71

Rp

359,144.00

Rp

398,849.50

Rp

379,732.10

Rp

66,836.50

Rp

408,436.00

Rp

73,166.50

Rp

25,688.10

Rp

163,671.57

Rp

38,667.10

Rp

71,788.00

Rp

141,698.70

Rp

187,198.70 Err:509

 Rp

94,607.40

Rp

44,897.27

 Rp

39,084.60

Rp

85,859.40

 

 

 Rp

13,841,360.00

Rp

10,316,065.00

Rp

434,341.60

Rp

1,083,505.00

Rp

724,582.00

Rp

1,046,225.00

Rp

771,696.00

Rp

851,651.00

Rp

819,853.50

Rp

928,147.64

Rp

14,590,388.11

Rp

10,550,748.11

Rp

175,383.50

Rp

176,660.50

Rp

103,386.50

Rp

103,000.00

Rp

250,872.60

Rp

402,119.20 Err:509

 Rp

66,639.80

Rp

366,124.10

Rp

188,495.50

Rp

185,321.10 Err:509

 Rp

91,840.36

Rp

59,887.35

Rp

47,484.60

Rp

806,630.10 Err:509

 

 Rp

61,667.50

Rp

375,524.10

Rp

169,125.80

Rp Rp

235,681.02 550,418.77

Rp

1,469,745.71

Rp

1,088,754.60 Err:509

 

Err:509  Rp

25,340.10

Rp

26,273.60

Rp

60,036.20

Rp

83,153.40

Rp

72,034.30

Rp

34,168.26

Rp

28,262.34

Rp

106,226.75

Rp

51,276.75

Rp

103,818.25

Rp

45,072.50

Rp

255,002.00

Rp

230,402.00

Rp

4,619,450.00

Rp

1,111,299.00 Err:509

 Rp

1,646,144.00

Rp

4,426,055.10

Rp

701,948.50

Rp

2,995,682.50

Rp

39,727.50

Rp

89,369.50

Rp

121,403.50

Rp

105,799.50

D D D D D D D D D D

Rp

146,719.50

 Rp

218,570.70

Rp

429,315.00

 

Err:509

 

 Rp

29,105.80

Rp

35,460.80

Rp

39,645.80

 Rp

Err:509 71,403.70

Rp

104,687.20

Rp

127,472.20

Rp

171,647.20

 Rp

318,757.00

Rp

43,248.50

Rp

43,248.50

Rp

127,948.50

Rp

36,948.50

Rp

31,848.50

Rp

29,348.50

Rp

227,948.50

Rp

77,948.50

b Rp

1,111,299.00

 

Analisa Harga Satuan No. 1

Uraian

ekerjaan Tanah Harga Satuan (Rp.)

Jumlah Harga (Rp.)

154,600 186,700 Jumlah Overhead & Profit Harga Satuan Pekerjaan

115,950 4,668 120,618 120,618

Satuan Koefisien

en engg ggal alia ian n 1 m3 ta tana nah h bi bias asa a se seda dala lam m 1 m  Pekerja OH Mandor OH

0.750 0.025

2

3

4

5

en engu guru ruga gan n ke kemb mbal ali i 1 m3 ga gali lian an ta tana nah h Pekerja OH Mandor OH

em emad adat atan an ta tana nah h 1 m3 ta tana nah h (p (per er 20 cm cm) ) Pekerja OH Mandor OH

en engu guru ruga gan n 1 m3 de deng ngan an pa pasi sir r ur urug ug Pekerja Mandor Pasir urug

engurugan 1 m3 tanah urug Pekerja Mandor Tanah Urug

Analisa Harga Satuan 1

ekerjaan

OH OH m3

OH OH m3

0.500 0.050

154,600 180,000 Jumlah Overhead & Profit Harga Satuan Pekerjaan

77,300 9,000 86,300 86,300

0.500 0.050

77,300 9,000 86,300 86,300

154,600 180,000 Jumlah Overhead & Profit Harga Satuan Pekerjaan

0.300 0.010 1.200

154,600 180,000 350,500

46,380 1,800 420,600

Jumlah Overhead & Profit Harga Satuan Pekerjaan

468,780 468,780

0.250 0.025 1.200

154,600 180,000 286,000 Jumlah Overhead & Profit Harga Satuan Pekerjaan

ondasi

em emas asan anga gan n 1 m3 ba batu tu ko koso song ng (a (ans nsta tamp mpin ing) g) Pekerja OH

0.780

154,600

120,588

Tukang batu Kepala tukang Mandor Batu belah Uk. >15 Cm Pasir urug

0.390 0.039 0.039 1.200 0.432

173,600 210,100 180,000 310,900 350,500

67,704 8,194 7,020 373,080 151,416 728,002 728,002

OH OH OH M3 M3

Jumlah Overhead & Pro   

Harga Satuan Pe   2

38,650 4,500 343,200 386,350 386,350

emas emasan anga gan n 1 m3 po pond ndasi asi ba batu tu belah belah 1sp 1sp : 4pp 4pp Pekerja OH 1.500 Tukang batu OH 0.750 Kepala tukang OH 0.075 Mandor OH 0.075 Batu belah Uk. >15 Cm M3 1.200

154,600 173,600 210,100 180,000 310,900

231,900 130,200 15,758 13,500 373,080

1,948 409,400

317,524 212,888 1,294,850 1,294,850

 

 Semen Portland Pasir pasang

Kg M3

163.000 0.520 Jumlah

Overhead & Pro   

Harga Satuan Pe  

Analisa Harga Satuan 1

U nt nt uk uk e mb mb es es ia ia n  Pekerja Tukang Besi

ekerjaan

l at at ( 10 10 0 K g) g)

embesian Beton OH OH

0.700 0.700

154,600 173,600

108,220 121,520

Kepala tukang Mandor Besi Beton (Polos/Ulir) Kawat Ikat

OH OH Kg Kg

0.070 0.070 105.000 1.500

210,100 180,000 13,400 26,100 Jumlah

Overhead & Profit

Harga Satuan Pekerjaan (100 Kg) Harga Satuan Pekerjaan/Kg 2

Un Untu tuk k em embes besia ian n Kol Kolom, om, Ba Balo lok, k, Ringb Ringbal alk k dan dan Sloo Sloof f ( (100 100 Kg) Kg) Pekerja OH 2.100 154,600 Tukang Besi OH 1.400 173,600 Kepala tukang OH 0.140 210,100 Mandor OH 0.210 180,000 Besi Beton (Polos/Ulir) Kg 105.000 13,400 Kawat Ikat Kg 2.100 26,100 Jumlah Harga Satuan Pekerjaan (100 Kg)

324,660 243,040 29,414 37,800 1,407,000 54,810 2,096,724 2,096,724

Harga Satuan Pekerjaan/Kg

20,967.24

Overhead & Profit

Analisa Harga Satuan

14,707 12,600 1,407,000 39,150 1,703,197 1,703,197 17,031.97

ekerjaan Beton

1

Membuat Membuat 1 m3 beto beton n mutu mutu f'c f'c = 7,4 7,4 mpa mpa (K 100), 100), sl slump ump ( (1212-2) 2) c cm, m, w/ w/c c = 0 0,87 ,87  Pekerja OH 1.650 154,600 255,090 Tukang batu OH 0.275 173,600 47,740 Kepala tukang OH 0.028 210,100 5,883 Mandor OH 0.083 180,000 14,940 Semen Portland Kg 247.000 1,948 481,156 Pasir beton Kg 869.000 293.701 255,226 Koral beton Kg 999.000 341.829 341,487 Air Ltr 215.000 80.00 17,200 Jumlah 1,418,722 Overhead & Profit Harga Satuan Pekerjaan 1,418,722

2

Mem Membua buat t 1 m3 beton beton mutu mutu f'c f'c = 21,7 mpa (K 25 250), 0), slum slump p (1 (12-2 2-2) ) cm, w/c = 0,5 0,56 6 Pekerja OH 1.650 154,600 255,090 Tukang batu OH 0.275 173,600 47,740 Kepala tukang OH 0.028 210,100 5,883 Mandor OH 0.083 180,000 14,940 Semen Portland Kg 384.000 1,948 748,032 Pasir beton Kg 692.000 293.701 203,241 Koral Kora l beton beton Kg ### 341.829 341.829 355,160 355,160 Air Ltr 215.000 80 17,200 Jumlah 1,647,286 Overhead & Profit Harga Satuan Pekerjaan 1,647,286

3

em emas asan anga gan n 1 m2 be beki kist stin ing g un untu tuk k ba balo lok k

 

 Pekerja Tukang kayu Kepala tukang Mandor Kayu klas III Paku 5 - 12 cm Minyak bekisting Kayu 5/7

OH OH OH OH M3 Kg Ltr M3

0.660 0.330 0.033 0.033 0.040 0.400 0.200 0.018

154,600 173,600 210,100 180,000 3,400,000 19,700 2 28,050 8,050 4,200,000

102,036 57,288 6,933 5,940 136,000 7,880 5,610 75,600

 

 Plywood tebal 10 mm Dolken Kayu 5/5 400 cm

Lbr Btng

0.350 2.000

185,000 35,200 Jumlah

Overhead & Profit

Harga Satuan Pekerjaan 4

em emas asan anga gan n 1 m2 be beki kist stin ing g un untu tuk k la lant ntai ai Pekerja OH Tukang kayu OH Kepala tukang OH

0.660 0.330 0.033

154,600 173,600 210,100

64,750 70,400 532,437 532,437

102,036 57,288 6,933

Mandor Kayu klas III Paku 5 - 12 cm Minyak bekisting

OH M3 Kg Ltr

0.033 0.040 0.400 0.200

180,000 3,400,000 19,700 2 28,050 8,050

5,940 136,000 7,880 5,610

Kayu 5/7 Plywood tebal 10 mm Dolken Kayu 5/5 400 cm

M3 Lbr Btng

0.015 0.350 6.000

4,200,000 185,000 35,200 Jumlah

63,000 64,750 211,200 660,637 660,637

Overhead & Profit

Harga Satuan Pekerjaan 5

em emas asan anga gan n 1 m2 be beki kist stin ing g un untu tuk k di dind ndin ing g Pekerja OH Tukang kayu OH Kepala tukang OH Mandor OH Kayu klas III M3 Paku 5 - 12 cm Kg Minyak bekisting Ltr

0.660 0.330 0.033 0.033 0.030 0.400 0.200

154,600 173,600 210,100 180,000 3,400,000 19,700 2 28,050 8,050

102,036 57,288 6,933 5,940 102,000 7,880 5,610

Kayu 5/7tebal 10 mm Plywood Dolken Kayu 5/5 400 cm Penjaga jarak bekisting/spacer bekisting/spacer

0.020 0.350 3.000 4.000

4,200,000 185,000 35,200 Jumlah

84,000 64,750 105,600 542,037 542,037

M3 Lbr Btng Bh

Overhead & Profit

Harga Satuan Pekerjaan

Analisa Harga Satuan  

1

ekerjaan Besi dan Alumunium

emasangan 1 m kusen pintu alumunium Pekerja OH Tukang almunium OH Kepala tukang OH Mandor OH Profil alumunium M' Skrup fixer Bh Sealant Tube

0.043 0.043 0.004 0.002 1.100 2.000 0.060

154,600 173,600 210,100 180,000 177,700 400 37,400 Jumlah

Overhead & Profit

Harga Satuan Pekerjaan 2

emasangan 1 m2 pintu alumunium strip lebar 8 cm Pekerja OH 0.085 Tukang almunium OH 0.085 Kepala tukang OH 0.0085 Mandor OH 0.0042 Profil alumunium M' 4.400 Almunium strip M' 14.600

154,600 173,600 210,100 180,000 177,700 4,657 Jumlah

6,648 7,465 903 378 195,470 800 2,244 213,908 213,908

Overhead & Profit

13,141 14,756 1,786 756 781,880 67,987 880,306 -

 Harga Satuan Pekerjaan

880,306

 

 

 

3

emasangan 1 m2 pintu/jendela kaca rangka alumunium Pekerja OH 0.085 Tukang almunium OH 0.085 Kepala tukang OH 0.009 Mandor OH 0.005 Profil Alumunium M' 4.400 Profil Alumunium T M' 4.500 Profil kaca 5 mm M2 1.000 Sealant Tube 0.270

154,600 173,600 210,100 180,000 177,700 175,313 37,400 Jumlah

13,141 14,756 1,891 900 781,880 175,313 10,098 997,979

Overhead & Profit

Harga Satuan Pekerjaan

4

emasangan 1 m2 rangka besi hollow 1x40.40.3mm, modul 60x60cm, plafon Pekerja OH 0.350 154,600 Tukang besi OH 0.350 173,600 Kepala tukang OH 0.035 210,100 Mandor OH 0.018 180,000 Rangka metal hollow 40.40.3 mm M' 4.000 6,714 Assesoris (perkuatan, las, dll)

Ls

 100% harga rangka

6,714

Jumlah

159,032 159,032

Harga Satuan Pekerjaan

 

1

ekerjaan

54,110 60,760 7,354 3,240 26,855

6,714

Overhead & Profit

Analisa Harga Satuan

997,979

asangan Dinding

emasangan 1 m2 dinding bata press (8x12x24) cm tebal 1/2 batu camp. 1sp : 4pp

Pekerja Tukang batu Kepala tukang Mandor Bata Press Semen Portland Pasir pasang

Analisa Harga Satuan

OH OH OH OH Bh Kg M3

ekerjaan

0.300 0.100 0.010 0.015 35.000 5.750 0.022

154,600 173,600 210,100 180,000 2,200 1,948 409,400 Jumlah Overhead & Profit Harga Satuan Pekerjaan

46,380 17,360 2,101 2,700 77,000 11,201 8,802 165,544 165,544

lesteran

1 emasangan 1 m2 plesteran 1sp : 2pp tebal 15 mm Pekerja

OH

0.3

154,600

46,380

Tukang batu

OH

0.15

173,600

26,040

Kepala tukang

OH

0.015

210,100

3,152

Mandor

OH

0.015

180,000

2 2, ,700

Semen Portland

Kg

10.224

1,948

19,916

Pasir pasang

M3

0.02

409,400

8,188

Jumlah Juml ah Overhead & Profit  

Harga Satuan Pekerjaan   2 emasangan 1 m2 plesteran 1sp : 4pp tebal 15 mm Pekerja OH 0.3 Tukang batu OH 0.15 Kepala tukang OH 0.015 Mandor OH 0.015

154,600 173,600 210,100 180,000

106,376 106,376 106,376

46,380 26,040 3,152 2 2, ,700

 

Semen Portland Pasir pasang

Kg M3

6.24 0.024

1,948 409,400 Jumlah Juml ah

Overhead & Profit  

Harga Satuan Pekerjaan  

12,156 9,826 100,253 100,253 100,253

 

3 emasangan 1 m' plesteran skoning 1sp : 3pp lebar 10 cm Pekerja OH 0.08 Tukang batu OH 0.4 Kepala tukang OH 0.04 Mandor OH 0.004 Semen Portland Kg 0.5 Pasir pasang M3 0.013

154,600 173,600 210,100 180,000 1,948 409,400 Jumlah Juml ah

Overhead & Profit  

Harga Satuan Pekerjaan  

12,368 69,440 8,404 720 974 5,322 97,228 97,228 97,228

4 emasangan emasangan 1 m2 acian acian Pekerja Tukang batu Kepala tukang Mandor Semen Portland

OH OH

0.2 0.1

154,600 173,600

30,920 17,360

OH OH Kg

0.01 0.01 3.25

210,100 180,000 1,948 Jumlah Juml ah

2,101 1,800 6,331 58,512 58,512 58,512

Overhead & Profit  

Harga Satuan Pekerjaan  

Analisa Harga Satuan

ekerjaan

enutup Lantai dan

1 emasangan 1 m2 lantai keramik ukuran 40cm x 40cm Pekerja OH 0.7 Tukang batu OH 0.35 Kepala tukang OH 0.035 Mandor OH 0.035 Ubin keramik 40 x 40 Dos 1.05 Semen Portland Kg 10 Pasir pasang Semen warna

M3 Kg

0.045 0.5

enutup Dinding 154,600 173,600 210,100 180,000 109,000 1,948

108,220 60,760 7,354 6 6, ,300 114,450 19,480

409,400 22,900 Jumlah Juml ah

18,423 11,450 346,437 346,437 346,437

Overhead & Profit  

Harga Satuan Pekerjaan   2 emasangan 1 m2 lantai Granit ukuran 60cm x 60cm Pekerja OH 0.24 Tukang batu OH 0.12 Kepala tukang OH 0.012 Mandor OH 0.012 Granit Bh 3.10 Semen Portland Kg 9.6 Semen warna Kg 1.5 Pasir pasang M3 0.045

154,600 173,600 210,100 180,000 81,400 1,948 22,900 409,400 Jumlah Juml ah

Overhead & Profit  

Harga Satuan Pekerjaan   3 emasangan 1 m2 dinding keramik ukuran 25cm x 40cm Pekerja OH 0.9 Tukang batu OH 0.45 Kepala tukang OH 0.045 Mandor OH 0.045 Keramik Bh 10.0 Semen Portland Kg 9.3 Pasir pasang M3 0.018 Semen warna Kg 0.96

154,600 173,600 210,100 180,000 8,360 1,948 409,400 22,900 Jumlah Juml ah

Overhead & Profit  

37,104 20,832 2,521 2 2, ,160 252,340 18,701 34,350 18,423 386,431 386,431 386,431

139,140 78,120 9,455 8 8, ,100 83,600 18,116 7,369 21,984 365,884 365,884 -

 

Harga Satuan Pekerjaan  

365,884

 

Analisa Harga Satuan

ekerjaan Langit - Langit ( lafond)

1 emasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) cm, tebal 9 mm Pekerja OH 0.1 154,600 15,460 Tukang kayu OH 0.05 173,600 8,680 Kepala tukang OH 0.005 210,100 1,051 Mandor OH 0.005 180,000 900 Gypsum board Lbr 0.364 110,300 40,149 Paku skrup Kg 0.11 38,700 4,257 Jumlah Juml ah 70,497 70,497 Overhead & Profit  

Harga Satuan Pekerjaan   2 emasangan 1 m' list langit-langit Gypsum 10 cm Pekerja OH 0.05 Tukang kayu OH 0.05 Kepala tukang OH 0.005 Mandor OH 0.003 Profil Gipsum   1.050 M' Paku Gypsum   0.150 Kg

154,600 173,600 210,100 180,000 13,520 38,700 Jumlah Juml ah

Overhead & Profit  

Harga Satuan Pekerjaan  

Analisa Harga Satuan

70,497

7 7, ,730 8,680 1,051 540 14,196 5,805 38,002 38,002 38,002

ekerjaan Kunci dan Kaca

1 emasangan emasangan 1 bh kunci tanam biasa biasa Pekerja Tukang kayu Kepala tukang Mandor Kunci tanam biasa

OH OH OH OH Bh

0.01 0.5 0.05 0.005 1

154,600 173,600 210,100 180,000 85,000 Jumlah Juml ah

Overhead & Profit  

Harga Satuan Pekerjaan 2 1 m2 emasangan emasangan 1 Bh Bh kait kait angin (Stopper) (Stopper) Pekerja OH Tukang kayu OH Kepala tukang OH Mandor OH Kait angin Aluminium Bh

0.015 0.150 0.015 0.008 1.000

154,600 173,600 210,100 180,000 75,200 Jumlah Juml ah

Overhead & Profit  

Harga Satuan Pekerjaan   3 1 m2 emasangan 1 Bh grendel jendela (Ram buncis) Pekerja OH 0.010 Tukang kayu OH 0.100 Kepala tukang OH 0.010

1 1, ,546 86,800 10,505 900 85,000 184,751 184,751 184,751

2 2, ,319 26,040 3,152 1 1, ,440 75,200 108,151 108,151 108,151

154,600 173,600 210,100

1 1, ,546 17,360 2,101

180,000 31,240 Jumlah Juml ah

180 31,240 52,427 52,427 52,427

 

Mandor Kait angin Aluminium

OH Bh

0.001 1.000

Overhead & Profit  

Harga Satuan Pekerjaan  

Analisa Harga Satuan

ekerjaan

engecatan

1 1 m2 engecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penut Pekerja OH 0.02 154,600 3 3, ,092 Tukang cat OH 0.063 173,600 10,937

Kepala tukang Mandor Plamir Cat Tembok Cat Tembok

OH OH Kg Kg Kg

0.0063 0.003 0.1 0.1 0.26

210,100 180,000 80,740 80,740 Jumlah Juml ah

Harga Satuan Pekerjaan  

1,324 540 8,074 20,992 44,959 44,959 44,959

lafon baru (1 lapis cat dasar, 2 lapis cat penutup) OH 0.02 154,600 OH 0.063 173,600 OH 0.0063 210,100 OH 0.003 180,000 Kg 0.1 80,740 Kg 0.2 80,740 Jumlah Juml ah Overhead & Profit  

3 3, ,092 10,937 1,324 540 8,074 16,148 40,114 40,114 -

Harga Satuan Pekerjaan  

40,114

Overhead & Profit  

2 1 m2 engecatan Pekerja Tukang cat Kepala tukang Mandor Cat Tembok Cat Tembok

 

DAFTAR HARGA SATUAN U AH, ALAMI DAN BAHAN No.

Uraian

A.

H ar g a S a t u a n Up a h

1 2 3

Pekerja Tukang kayu Tukang batu

Satuan

OH OH OH

Harga Satuan (Rp.)

160,200 180,100 180,100

4 5 6 7

Tukang Tukang Tukang Tukang

besi cat pipa vibrator

8 9 10 11 12 13 14 15 16 17 18

Tukang erection Tukang las Tukang almunium Tukang Listrik Kepala tukang Mandor Ahli alat berat (mekanik) Operator alat berat Pembantu Operator alat berat Supir truk Kenek truk

B.

H ar g a S a t u a n ma t e r i a l A l a m i

OH OH OH OH

180,100 180,100 180,100 180,100

OH OH OH OH OH OH OH OH OH OH OH

180,100 180,100 180,100 180,100 218,200 186,700 218,200 218,200 173,500 175,100 162,800

1 2

Air Batu belah Uk. >15 cm

Ltr M3

80 440,000

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Batu Pecah Uk. 10-15 cm Koral beton Koral beton Pasir beton Pasir beton Pasir pasang Pasir Halus Pasir urug Sirtu Tanah Urug Kayu 5/10 (Kls II) Kayu balok kls. I Kayu Balok kls II Kayu list 2/4 Kayu papan Kls I

M3 M3 Kg M3 Kg M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

440,000 660,000 342 545,800 294 509,500 693,900 447,300 429,700 374,400 4,675,000 7,600,000 4,675,000 4,000,000 7,400,000

18 19

Kayu klas III Kayu papan kls II

M3 M3

3,400,000 4,042,500

C.

H ar g a S a t u a n Ba h a n

1 2 3 4 5 6 7 8 9 10 11

Almunium strip Alumunium foil Ampelas Bahan bakar Baja strip (0,2 x 2) cm Bak cuci piring Bak fibreglass Bata Semen Press Bata Merah Bathcuip Besi Baja IWF

M' M2 Lbr Ltr Kg Unit Unit Bh Bh Unit Kg

4,657 3,300 11,300 13,000 31,400 2,912,800 500,200 2,300 2,100 3,551,700 26,500

12 13 14 15 16 17

Besi Besi Besi Besi Besi Besi

Kg Staf Staf Staf Staf Staf

13,400 89,700 133,200 228,500 282,700 415,500

 

beton Beton Beton Beton Beton Beton

Dia. Dia. Dia. Dia. Dia.

10,5 mm 12,3 mm 14 mm 16 mm 19 mm

 

18 19 20 21 22 23 24 25 26

Besi Beton Dia. 25 mm Besi Beton Dia. 6,7 mm Besi Beton Dia. 8,5 mm Besi hollow 40.40.3 (galvalum) Besi plat baja Besi siku L 30.30.3 Besi strip Besi strip tebal 6mm Cat kayu/besi

Staf Staf Staf M' Kg Kg Kg Kg Kg

546,400 50,800 74,500 6,714 20,450 7,806 31,400 9,471 69,600

27 28 29 30

Cat menie Cat Tembok Closet duduk Closet jongkok

Kg Kg Unit Unit

49,800 49,120 3,642,100 601,900

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

Casemnet Jendela Dempul Dolken Kayu 5-5 /400 cm Door closer Door stop Engsel Casement Engsel jendela kupu-kupu Engsel pintu Floor drain Genteng metal Gypsum board Ijuk Kaca buram tebal 12 mm Kaca cermin tebal 5 mm Kaca tebal 3 mm Kaca tebal 5 mm Kaca tebal 10 mm Kait angin Kapur padam Karpet Kaso-kaso 5x7 cm Kawat beton Kawat dia. 4 mm Kawat jaring Kawat las Kawat las listrik Kawat nyamuk Keramik Kran air Kuas Kunci slot

M' Kg Btng Bh Bh Bh Bh Bh Unit Bh Lbr M3 M2 M2 M2 M2 M2 Bh M3 M2 M3 Kg Kg M' Kg Kg M' Bh Bh Bh Bh

208,000 49,800 35,200 697,100 38,940 217,300 38,000 59,000 17,000 65,000 115,000 333,300 1,284,000 958,700 122,196 182,701 464,166 13,300 50,000 310,000 4,200,000 27,200 32,500 32,400 16,500 16,500 33,300 7,664 33,100 2 23 3,200 66,100

62 63 64 65 66 67 68 69 70 71 72 73 74 75 76

Kunci tanam Kunci tanam antik Kunci tanam biasa Kunci tanam KM Lem Wallpaper Lem Karpet Lem kayu List kayu profil List gypsum profil Main truss Meni besi Minyak bekisting Minyak pelumas Nok standar 40x18 Oli

Bh Bh Bh Bh Kg Kg Kg M' M' staff Ltr Ltr Ltr Lbr Ltr

1,651,600 234,800 85,000 83,000 24,420 24,420 24,420 6,500 13,520 115,000 69,900 28,050 56,100 29,600 43,500

77 78 79 80 81

Paku Paku Paku Paku Paku

 

10cm 12cm 1cm - 2,5cm 5 - 10 cm

Kg Kg Bh Kg Kg

1 19 9,700 23,900 23,900 23,900 23,900

 

82 83 84 85 86 87 88 89 90

Paku Paku Paku Paku Paku Paku Paku Paku Paku

5 - 12 cm 5 cm 5-7 cm 7 - 10 cm biasa 1/2"-1" biasa 2" - 5" seng (1 - 2,5) cm skrup skrup 3,5"

Kg Kg Kg Kg Kg Kg Kg Kg Bh

23,900 23,900 23,900 23,900 23,900 23,900 70,100 38,700 1,300

91 92 93 94

Paku tripleks Parquet Paving Pengencer

Kg M2 M2 Ltr

27,200 323,246 160,000 36,400

95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140

Pintu Alumunium Pipa galvanis 1 1/2" Pipa galvanis 1" Pipa galvanis 1/2" Pipa galvanis 3" Pipa galvanis 3/4" Pipa PVC 1" Pipa PVC 1/2" Pipa PVC 2 1/2" Pipa PVC 2" Pipa PVC 3" Pipa PVC 3/4" Pipa PVC 4" Pipa PVC Ø 110 mm Pipa PVC Ø 150 mm Pipa PVC 200 mm Ø Pipa PVC Ø 250 mm Pipa PVC Ø 300 mm Pipa PVC Ø 400 mm Pipa PVC Ø 450 mm Pipa PVC Ø 63 mm Pipa PVC Ø 90 mm Plamir Plint internal cove Plint keramik Plint ubin granit Plint ubin PC Plint ubin teralux kerang Plint ubin teralux marmer Plint ubin teraso Plint ubin warna Plywood 4mm Plywood tebal 10 mm Profil allumunium "T" Profil alumunium Ram Buncis Rel pintu sorong Reng Kayu 2 x 3 cm Reng U Residu Rolling door alumunium Rooflight 90x180 Sabun Sealant Sealtape Semen grout

M' M M M M M M M M M M M M M M M M M M M M M Kg Bh Bh Bh Bh Bh Bh Bh Bh Lbr Lbr M' M' Bh Bh M3 Staf Ltr M2 Lbr Kg Tube Bh Kg

1,729,000 105,800 74,100 37,100 232,800 47,700 13,800 7,000 41,100 28,400 55,800 11,100 84,300 81,200 168,500 267,600 412,100 653,500 1,055,600 1,055,600 27,600 54,500 12,400 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 115,000 185,000 33,000 177,700 31,240 244,200 4,200,000 60,000 5,500 464,800 55,440 15,000 37,400 5,000 4,123

141 142 143 144 145

Semen merah Semen portland Semen warna Seng gelombang 0.25 mm Seng gelombang 0.30 mm

Kg Kg Kg Lbr Lbr

1,260 1,892 27,000 88,100 94,100

 

 

146 147 148 149 150 151 152 153 154

Seng plat bjls 30 lbr 90 Seng plat bjls 30 lbr 45 Seng Spandek 0,25 mm Seng Spandek 0,3 mm Skrup fixer  Screw 12-14x20  Screw 10-16x16 Skrup Spandek Solar

Lbr Lbr Lbr Lbr Bh Bh Bh Bh Ltr

65,000 15,522 258,000 302,000 400 400 600 600 12,200

155 156 157 158

Stopper Jendela Teakwood T=3mm Uk.(120x244)cm Tripleks 3 mm Granit 60x60

M' Lbr Lbr Bh

80,740 190,900 77,000 81,400

159 160 161 162 163 164 165 166 167 168 169 170

Ubin keramik Ubin keramik Ubin keramik Ubin keramik Ubin keramik Ubin Keramik Underlayer Vernis Wallpaper uk Wallpaper Wastafel Waterdrain

Dos bh Dos Dos Bh Bh M2 Ltr Roll M Unit Bh

67,800 2,712 96,600 109,000 115,720 8,360 100,000 66,100 716,100 47,740 892,700 14,700

20 x 20 20 x 20 30 x 30 40 x 40 Mozaik 30 x 30 25x40

1,07 x 15 m

 

 DAFTAR HARGA SATUAN BAHAN UNTUK T.A 2018

 JENIS BAHAN BAHAN

NO. I

fabrikasi ijuk

SAT.

H

besi profl kawat las

Kg

sealant

tube

aluminium strip

sta

Kaca Polos 3 mm 122 x 152

Lmbr

Kaca Polos 5 mm 122 x 152

Lmbr

Kaca Polos 10 mm 122 x 152

Lmbr

Lem Kayu

 

Kg

Besi Strip 5x5x6

Sta

Aluminium Foil Single

Roll

Keramik Mozaik 30x30

Lmbr

Lem Kayu/Karpet

 

Kg

Parquet 19x120x7 bh

Dos

Granit

Dos

Keramik 25x40

Dos

Paku Skrup

Kg

Besi Hollow Galvalum (Plaond)

Sta  

Rooight 90x180

Lmbr

door closer door stop

bh bh

Rel Pintu Sorong (P 1,5m)

Set

Kaca Bening 3 mm (122x152)

Lmbr

Kaca Bening 5 mm (122x152)

Lmbr

Kaca Bening 10 mm (122x152)

Lmbr

Seng Plat 30 mm 90x180

Lmbr

Seng Plat 30 mm 45x180

Lmbr

Wallpaper lbr 1 m

Roll

Casement jendela 2 sisitem

M'

Stopper

M'

Ram Buncis

Bh

Engsel Casement

Bh

 

NO.

 JENIS BAHAN BAHAN

SAT.

Pagar Besi Hollow 4x4 kombinasi 4x4 (Tipis)(Model Lurus)

M2

Pagar Besi Hollow 4x4 kombinasi 4x4 (Sedang)(Model Lurus)

M2

H

 

Pagar Besi Hollow 4x4 kombinasi 4x4 (Tebal)(Model Lurus)

M2

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tipis)(Model Lurus)

M2

Pagar Besi Hollow 4x4 kombinasi 2x4 (Sedang)(Model Lurus)

M2

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tebal)(Model Lurus)

M2

Pagar Besi Stainless Kotak 4x4 kombinasi 4x4 (Biasa)(Model Lurus)

M2

Pagar Be Besi St Stainless Ko Kotak 4x 4x4 ko kombinasi 4x 4x4 (A (Anti Ka Karat)(Model Lu Lurus)

M2

Pagar Besi Stainless Kotak 4x4 kombinasi 2x4 (Biasa)(Model Lurus)

M2

Pagar Be Besi St Stainless Ko Kotak 4x 4x4 ko kombinasi 2x 2x4 (A (Anti Ka Karat)(Model Lu Lurus)

M2

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tipis)(Model Silang) Pagar Besi Hollow 4x4 kombinasi 2x4 (Sedang)(Model Silang)

M2 M2

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tebal)(Model Silang)

M2

Pagar Besi Stainless Kotak 4x4 kombinasi 2x4 (Biasa)(Model Silang)

M2

Pagar gar Bes esii Sta tain inle less ss Kot ota ak 4x4 kombin mbina asi 2x4 2x4 (A (An nti Kar ara at) t)(M (Mo odel del Sil Silang) ang)

M2

Dulux Eksterior

Kg

Screw Baja Ringan

Pc

Dinabolt

Pc

Rangka Atap Baja Ringan untuk Atap Spandek (Termasuk Pemasangan)

M2

Rangk Ra ngka a Atap Atap Baja Baja Ring Ringan an untu untuk k Atap Atap Multir Multiroo oo Licin Licin (T (Termasu ermasuk k Pema Pemasan sangan gan))

M2

Rangk Ra ngka a Atap Atap Baja Baja Ring Ringan an untu untuk k Atap Atap Multir Multiroo oo Pasir asir (Termasu ermasuk k Pema Pemasan sangan gan))

M2

Rangka At Atap Ba Baja Ri Ringan un untuk At Atap On Onduline (T (Termasuk Pe Pemasangan)

M2

Keramik 60x60

Dos

Main Truss Baja Ringan

Btg

 

RGA PASARAN TERNATE

Ongkos Angkut

R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R

 

RGA PASARAN TERNATE

Ongkos Angkut R R R

R R R

R R

R R

R R R

R R

R

R R

R R R R

R R

 

 DAFTAR HARGA SATUAN BAHAN UNTUK T.A 2017

JENIS BAHAN

 NO.

I

SAT.

HARGA PASARAN TERNATE

  Ongkos Angkut

Galian C

KEUN

fabrikasi

ijuk

Rp.

besi profil

Rp.

kawat las sealant

Kg

14,600.00

400.00

Rp.

tube

33,000.00

1,000.00

Rp.

25,000.00

40 4 00.00

Rp.

170,000.00

8,000.00

aluminium sgg

staf

Kaca Polos 3 mm 122 x 152

Lmbr

Kaca Polos 5 mm 122 x 152

Lmbr

Kaca Polos 10 mm 122 x 152

Lmbr

Lem Kayu

Rp. Rp.

22,000.00

400.00

Staff

100,000.00

1,000.00

Rp.

Aluminium Foil Single

Roll

215,000.00

1,000.00

Rp.

Keramik Mozaik 30x30

Lmbr

105,000.00

200.00

Rp.

22,000.00

2 20 00.00

Rp.

Besi Strip 5x5x6

Lem Kayu/Karpet

Kg

Rp.

Kg

Rp.

Parquet 19x120x7 bh

Dos

468,000.00

1,000.00

Rp.

Granit

Dos

318,000.00

1,000.00

Rp.

Keramik 25x40

Dos

75,000.00

1,000.00

Rp.

Kg

45,400.00

400.00

Rp.

Paku Skrup Besi Hollow Galvalum (Plafond) Rooflight 90x180

Staff

35,000.00

400.00

Rp.

Lmbr

50,000.00

400.00

Rp.

door closer

bh

400,000.00

400.00

Rp.

door stop

bh

35,000.00

400.00

Rp.

Rel Pintu Sorong (P 1,5m)

Set

221,000.00

1,000.00

Rp.

Kaca Bening 3 mm (122x152)

Lmbr

125,000.00

1,000.00

Rp.

Kaca Bening 5 mm (122x152)

Lmbr

170,000.00

1,000.00

Rp.

Kaca Bening 10 mm (122x152)

Lmbr

780,000.00

2,500.00

Rp.

Seng Plat 30 mm 90x180

Lmbr

67,500.00

400.00

Rp.

Seng Plat 30 mm 45x180

Lmbr

25,000.00

400.00

Rp.

Wallpaper lbr 1 m

Roll

650,000.00

1,000.00

Rp.

Rp.

 

Casement jendela 2 sisitem

M'

164,000.00

1,000.00

Stopper

M'

73,000.00

400.00

Rp.

Ram Buncis

Bh

28,000.00

400.00

Rp.

Engsel Casement

Bh

103,000.00

4 40 00.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 4x4 (Tipis)(Model Lurus)

M2

775,000.00

400.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 4x4 (Sedang)(Model Lurus)

M2

950,000.00

400.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 4x4 (Tebal)(Model Lurus)

M2

1,075,000.00

400.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tipis)(Model Lurus)

M2

625,000.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 2x4 (Sedang)(Model Lurus)

M2

750,000.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tebal)(Model Lurus)

M2

850,000.00

Rp.

Pagar Besi Stainless Kotak 4x4 kombinasi 4x4 (Biasa)(Model Lur

M2

1,175,000.00

Rp.

Pagar Besi Stainless Kotak 4x4 kombinasi 4x4 (Anti Karat)(Mode

M2

1,375,000.00

Rp.

Pagar Besi Stainless Kotak 4x4 kombinasi 2x4 (Biasa)(Model Lur

M2

1,025,000.00

Rp.

Pagar Besi Stainless Kotak 4x4 kombinasi 2x4 (Anti Karat)(Mode

M2

1,200,000.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tipis)(Model Silang)

M2

650,000.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 2x4 (Sedang)(Model Silang)

M2

750,000.00

Rp.

Pagar Besi Hollow 4x4 kombinasi 2x4 (Tebal)(Model Silang)

M2

850,000.00

Rp.

Pagar Besi Stainless Kotak 4x4 kombinasi 2x4 (Biasa)(Model Sil

M2

6.00

Rp.

Pagar Besi Stainless Kotak 4x4 kombinasi 2x4 (Anti Karat)(Mode

M2

1,650,000.00

Rp.

Dulux Eksterior

Kg

283,000.00

4 40 00.00

Rp.

Screw Baja Ringan

Pc

500.00

80.00

Rp.

Dinabolt

Pc

1,800.00

80.00

Rp.

Rangka Atap Baja Ringan untuk Atap Spandek (Termasuk Pemasanga

M2

275,000.00

0.00

Rp.

Rangka Atap Baja Ringan untuk Atap Multiroof Licin (Termasuk P

M2

290,000.00

0.00

Rp.

Rangka Atap Baja Ringan untuk Atap Multiroof Pasir (Termasuk P

M2

325,000.00

0.00

Rp.

Rangka Atap Baja Ringan untuk Atap Onduline (Termasuk Pemasang

M2

325,000.00

0.00

Rp.

Keramik 60x60

Dos

175,000.00

1,000.00

Rp.

Main Truss Baja Ringan

Btg

84,000.00

400.00

Rp.

150,000.00

 

batu 1-2 cm

M3

334,000.00

batu 1-2 cm

M3

370,000.00

48,800.00

Rp. Rp.

reng

45,000.00

10,000.00

Rp.

kanal C 75 x 75

95,000.00

10,000.00

Rp.

kanal C 70 x 75

90,000.00

10,000.00

Rp.

kanal C 65 x 75

85,000.00

10,000.00

Rp.

spandek 0.25 mm

225,000.00

10,000.00

Rp.

spandek 0.3 mm

265,000.00

10,000.00

Rp.

 

LM TERMASUK KEUNTUNGAN PIHAK KETUNGAN PIHAK KEIII (10 %) III

HARGA SATUAN

0.00

Rp.

0.00

Rp.

0.00

Rp.

0.00

Rp.

0.00 0.00

15,000.00

Rp.

1,500.00

Rp.

16,500.00

34,000.00

Rp.

3,400.00

Rp.

37,400.00

25,400.00

Rp.

2,540.00

Rp.

27,940.00

0.00

Rp.

0.00

Rp.

0.00

178,000.00

R Rp p.

17,800.00

Rp.

195,800.00

0.00

Rp.

0.00

Rp.

0.00

22,400.00

Rp.

2,240.00

Rp.

24,640.00

101,000.00

R Rp p.

10,100.00

Rp.

111,100.00

216,000.00

R Rp p.

21,600.00

Rp.

237,600.00

105,200.00

R Rp p.

10,520.00

Rp.

115,720.00

22,200.00

Rp.

2,220.00

Rp.

24,420.00

469,000.00

R Rp p.

46,900.00

Rp.

515,900.00

319,000.00

R Rp p.

31,900.00

Rp.

350,900.00

76,000.00

Rp.

7,600.00

Rp.

83,600.00

45,800.00

Rp.

4,580.00

Rp.

50,380.00

35,400.00

Rp.

3,540.00

Rp.

38,940.00

50,400.00

Rp.

5,040.00

Rp.

55,440.00

400,400.00 35,400.00

R Rp p. Rp.

40,040.00 3,540.00

Rp. Rp.

440,440.00 38,940.00

222,000.00

R Rp p.

22,200.00

Rp.

244,200.00

126,000.00

R Rp p.

12,600.00

Rp.

138,600.00

171,000.00

R Rp p.

17,100.00

Rp.

188,100.00

782,500.00

R Rp p.

78,250.00

Rp.

860,750.00

67,900.00

Rp.

6,790.00

Rp.

74,690.00

25,400.00

Rp.

2,540.00

Rp.

27,940.00

651,000.00

R Rp p.

65,100.00

Rp.

716,100.00

165,000.00

Rp.

16,500.00

Rp.

181,500.00

73,400.00

Rp.

7,340.00

Rp.

80,740.00

28,400.00

Rp.

2,840.00

Rp.

31,240.00

103,400.00 775,400.00

Rp. Rp.

10,340.00 77,540.00

Rp. Rp.

113,740.00 852,940.00

 

950,400.00

Rp R p.

95,040.00

Rp.

1,045,440.00

1,075,400.00

Rp Rp.

107,540.00

Rp.

1,182,940.00

625,000.00

Rp.

62,500.00

Rp.

687,500.00

750,000.00

Rp.

75,000.00

Rp.

825,000.00

850,000.00

Rp.

85,000.00

Rp.

935,000.00

1,175,000.00

Rp Rp.

117,500.00

Rp.

1,292,500.00

1,375,000.00

Rp Rp.

137,500.00

Rp.

1,512,500.00

1,025,000.00

Rp Rp.

102,500.00

Rp.

1,127,500.00

1,200,000.00

Rp Rp.

120,000.00

Rp.

1,320,000.00

650,000.00

Rp.

65,000.00

Rp.

715,000.00

750,000.00

Rp.

75,000.00

Rp.

825,000.00

850,000.00

Rp.

85,000.00

Rp.

935,000.00

6.00

Rp.

0.60

Rp.

6.60

1,650,000.00

Rp Rp.

165,000.00

Rp.

1,815,000.00

283,400.00

Rp.

28,340.00

Rp.

311,740.00

580.00

Rp.

58.00

Rp.

638.00

1,880.00

Rp.

188.00

Rp.

2,068.00

275,000.00

Rp.

27,500.00

Rp.

302,500.00

290,000.00

Rp.

29,000.00

Rp.

319,000.00

325,000.00

Rp.

32,500.00

Rp.

357,500.00

325,000.00

Rp.

32,500.00

Rp.

357,500.00

176,000.00

Rp.

17,600.00

Rp.

193,600.00

84,400.00

R Rp p.

8,440.00

Rp.

92,840.00

 

532,800.00

Rp.

53,280.00

Rp.

586,080.00

2,051,280.00

370,000.00

Rp.

37,000.00

Rp.

407,000.00

1,424,500.00

55,000.00

R Rp p.

5,500.00

Rp.

60,500.00

105,000.00

Rp.

10,500.00

Rp.

115,500.00

100,000.00

Rp.

10,000.00

Rp.

110,000.00

95,000.00

Rp.

9,500.00

Rp.

104,500.00

235,000.00

Rp.

23,500.00

Rp.

258,500.00

1,650,000.00

275,000.00

Rp.

27,500.00

Rp.

302,500.00

314,000.00

1,336,000.00

78,500.00

 

2.2. 2.2.1 1

An Anal alis isa a Ha Harg rga a Sa Satu tuan an P Pek eker erja jaan an P Per ersi siap apan an

No.

Uraian

Satuan

1

2

3

 2.2.1.2

2.2.1.4

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

Pembuatan 1 m2 pagar sementara dari seng gelombang nggi 2 meter Pekerja

OH

0.200

160,200

32,040

Tukang Tuk ang Kayu

OH

0.400

180,100

72,040

Kepala Tukang

OH

0.020

218,200

4,364

Mandor

OH

0.020

186,700

3,734

Dolken Kayu 8-10 /400 cm

Btng

1.250

35,200

44,000

Semen Portland

Kg

2.500

1,892

4,730

Seng gelombang

Lbr

1.200

88,100

105,720

Pasir beton

M3

0.005

545,800

2,729

Koral beton Kayu 5/7

M3 M3

0.009 0.072

660,000 4,675,000

5,940 336,600

Paku biasa 2" - 5"

Kg

0.060

23,900

1,434

Meni besi

Ltr

0.450

69,900

31,455

Jumlah

644,786

Overhead & Proft

-

Harga Satuan Pekerjaan

644,786

Pengukuran Pengukur an dan pemasangan 1 m' Bouwplank  Pekerja

OH

0.100

160,200

16,020

Tukang Tuk ang Kayu

OH

0.100

180,100

18,010

2.2.1.5

Kepala Tukang

OH

0.010

218,200

2,182

Mandor

OH

0.005

186,700

934

Kayu 5/7 Paku biasa 2" - 5"

M3 Kg

0.012 0.020

4,675,000 23,900

56,100 478

Kayu papan 3/20

M3

0.007

3,400,000

23,800

Jumlah

117,524

Overhead & Proft

-

Harga Satuan Pekerjaan

117,524

Pembuatan 1 m2 Kantor sementara lantai plesteran Pekerja

OH

2.000

160,200

320,400

Tukang Tuk ang Kayu

OH

2.000

180,100

360,200

Tukang Tuk ang Batu

OH

1.000

180,100

180,100

Kepala Tukang

OH

0.300

218,200

65,460

Mandor

OH

0.050

186,700

9,335

Dolken Kayu 8-10 /400 cm

Btng

1.250

35,200

44,000

Kayu 5/7

M3

0.180

4,675,000

841,500

 Paku biasa 2" - 5"

Kg

0.080

23,900

1,912

Besi strip

Kg

1.100

31,400

34,540

Semen Portland

Kg

35.000

1,892

66,220

Pasir pasang

M3

0.150

509,500

76,425

Pasir beton

M3

0.100

545,800

54,580

Koral beton Bata merah

M3 Bh

0.150 30.000

660,000 2,300

99,000 69,000

Seng plat

Lbr

0.250

65,000

16,250

Jendela naco

Bh

0.200

#NAME?

#NAME?

 Kaca polos

M2

0.080

182,701

14,616

Kunci tanam

Bh

0.150

1,651,600

247,740

Plywood 4mm

Lbr

0.060

115,000

6,900

 

Jumlah  Overhead & Proft

Harga Satuan Pekerjaan  2.2.1.6

2.2.1.7

#NAME? -

#NAME?

Pembuatan 1 m2 rumah jaga (konstruksi kayu) Pekerja

OH

1.000

160,200

160,200

Tukang Tuk ang Kayu

OH

1.500

180,100

270,150

Kepala Tukang Mandor

OH OH

0.150 0.050

218,200 186,700

32,730 9,335

Dolken Kayu 8-10 /400 cm

Btng

3.000

35,200

105,600

Kayu 5/7

M3

0.276

4,675,000

1,290,300

Paku biasa 2" - 5"

Kg

0.700

23,900

16,730

Seng gelombang

Lbr

1.500

88,100

132,150

Jumlah

2,017,195

Overhead & Proft

-

Harga Satuan Pekerjaan

2,017,195

Pembuatan 1 m2 gudang semen dan peralatan Pekerja

OH

1.000

160,200

160,200

Tukang Tuk ang Kayu

OH

2.000

180,100

360,200

Kepala Tukang

OH

0.200

218,200

43,640

Mandor Dolken Kayu 8-10 /400 cm

OH Btng

0.050 1.700

186,700 35,200

9,335 59,840

Kayu 5/7

M3

0.210

4,675,000

981,750

Paku biasa 2" - 5"

Kg

0.300

23,900

7,170

Semen Portland

Kg

10.500

1,892

19,866

Pasir beton

M3

0.030

545,800

16,374

Koral beton

M3

0.050

660,000

33,000

Seng gelombang

Lbr

1.500

88,100

132,150

Seng plat

Lbr

0.250

65,000

16,250

Jumlah

1,839,775

Overhead & Proft

-

Harga Satuan Pekerjaan

1,839,775

 

 2.2.1.8

2.2.1.9

2.2.1.10

2.2.1.11

Pembuatan 1 m2 bedeng pekerja Pekerja

OH

1.000

160,200

160,200

Tukang Tuk ang Kayu

OH

2.000

180,100

360,200

Kepala Tukang

OH

0.200

218,200

43,640

Mandor

OH

0.050

186,700

9,335

Dolken Kayu 8-10 /400 cm

Btng

1.250

35,200

44,000

Kayu 5/7 Paku biasa 2" - 5"

M3 Kg

0.186 0.300

4,675,000 23,900

869,550 7,170

Semen Portland

Kg

18.000

1,892

34,056

Pasir beton

M3

0.030

545,800

16,374

Koral beton

M3

0.050

660,000

33,000

Seng gelombang

Lbr

1.500

88,100

132,150

Plywood 4mm

Lbr

1.350

115,000

155,250

Jumlah

1,864,925

Overhead & Proft

-

Harga Satuan Pekerjaan

1,864,925

Pembersihan 1 m2 lapangan dan perataan Pekerja

OH

0.100

160,200

16,020

Mandor

OH

0.050

186,700

9,335

Jumlah Overhead & Proft

25,355 -

Harga Satuan Pekerjaan

25,355

Pembuatan 1 m2 steger/perancah dari bambu Pekerja

OH

1.000

160,200

160,200

Tukang Tuk ang Kayu

OH

2.000

180,100

360,200

Kepala Tukang

OH

0.200

218,200

43,640

Mandor

OH

0.050

186,700

9,335

Dolken Kayu 8-10 /400 cm

Btng

1.250

35,200

44,000

Ijuk

M3

0.186

333,300

61,994

Jumlah

679,369

Overhead & Proft

-

Harga Satuan Pekerjaan

679,369

Pembuatan 1 bh kotak adukan ukuran 40cm x 50cm x 25cm Tukang Tuk ang Kayu

OH

0.300

180,100

54,030

Kepala Tukang

OH

0.030

218,200

6,546

Kayu papan 3/20

M3

0.036

3,400,000

122,400

Kayu 5/7

M3

0.014

4,675,000

65,450

Paku biasa 2" - 5"

Kg

0.080

23,900

1,912

Jumlah

250,338

Overhead & Proft

-

Harga Satuan Pekerjaan

250,338

 

 2.2.1.13

2.2.1.14

2.2.1.15

 2.2.1.16

Pembongkaran Pembongkaran 1 m3 beton bertulang Pekerja

OH

13.334

160,200

2,136,107

Mandor

OH

0.666

186,700

124,342

Jumlah

2,260,449

Overhead & Proft

-

Harga Satuan Pekerjaan

2,260,449

Pembongkaran Pembongkaran 1 m3 dinding tembok bata Pekerja OH

6.667

160,200

1,068,053

Mandor

0.333

186,700

62,171

Jumlah

1,130,225

Overhead & Proft

-

Harga Satuan Pekerjaan

1,130,225

OH

Pemasangan 1 m2 pagar kawat jaring g galvanis alvanis panjang 240 cm Pekerja

OH

0.042

160,200

6,728

Tukang Tuk ang batu

OH

0.004

180,100 180 ,100

720

Kepala tukang

OH

0.002

218,200

436

Mandor

OH

0.042

186,700

7,841

Kawat jaring

Lbr

0.143

#NAME?

#NAME?

 Jumlah

#NAME?

 Overhead & Proft Harga Satuan Pekerjaan

#NAME?

Pemasangan 1 m2 panel beton pracetak pracetak 5 x 50 x 240 cm Untuk Pagar. Pagar. Pekerja

OH

0.375

160,200

60,075

Tukang Tuk ang batu

OH

0.125

180,100

22,513

Kepala tukang

OH

0.012

218,200

2,618

Mandor

OH

0.019

186,700

3,547

Panel beton pracetak

Lbr

0.986

-

-

Kolom beton pracetak

Btng

0.525

-

-

Semen Portland

Kg

45.000

1,892

85,140

Pasir beton Koral beton

M3 M3

0.074 0.146

545,800 660,000

40,389 96,360

Jumlah

310,642

Overhead & Proft

-

Harga Satuan Pekerjaan

310,642

 

1536400

700 1537100

153710

1,691,000

GO TO  

 

 

2.3. 2.3.1 1

An Anal alis isa aH Har arg ga Sa Satu tuan an Pek Pekerja erjaan an T Tan anah ah

No.

Uraian

Satuan

1

2

3

2.3. 2.3.1. 1.1 1

2.3.1.9

2.3.1.11

2.3.1

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

Peng Pengga gali lian an 1 m m3 3 tana tanah h bi bias asa a seda sedala lam m1m  Pekerja OH

0.750

160,200

120,150

Mandor

0.025

186,700

4,668

Jumlah

124,818

Overhead & Proft

-

Harga Satuan Pekerjaan

124,818

OH

Pengurugan kembali 1 m3 galian tanah Pekerja OH Mandor OH

Pengurugan Pengurugan 1 m3 dengan pasir urug Pekerja OH Mandor OH Pasir urug m3

Pengurugan 1 m3 tanah urug Pekerja Mandor Tanah Urug

0.500

160,200

80,100

0.050

186,700 Jumlah

9,335 89,435

Overhead & Proft

-

Harga Satuan Pekerjaan

89,435

0.300

160,200

48,060

0.010

186,700

1,867

1.200

447,300

536,760

Jumlah

586,687

Overhead & Proft

-

Harga Satuan Pekerjaan

586,687

OH

0.250

160,200

40,050

OH

0.025

186,700

4,668

m3

1.200

374,400

449,280

Jumlah Overhead & Proft

493,998 -

Harga Satuan Pekerjaan

493,998

 

Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koef. koef. Pek. Galian

GO TO RE

 

AP

 

3.2. 3.2.1 1

An Anal alis isa aH Har arg ga Sa Satu tuan an Pek Pekerja erjaan an P Pon onda dasi si

No.

Uraian

Satuan

1

2

3

 3.2.1.2

Koefsien Harga Satuan (Rp.)

Pemasangan Pemasangan 1 m3 pondasi batu belah 1sp : 4pp

4

5

Jumlah Harga (Rp.) 6

3.2.1.9

Pekerja

OH

1.500

160,200

240,300

Tukang Tuk ang batu

OH

0.750

180,100

135,075

Kepala tukang

OH

0.075

218,200

16,365

Mandor

OH

0.075

186,700

14,003

Batu belah Uk. >15 Cm Semen Portland

M3 Kg

1.200 163.000

440,000 1,892

528,000 308,396

Pasir pasang

M3

0.520

509,500

264,940

Jumlah

1,507,079

Overhead & Proft

-

Harga Satuan Pekerjaan

1,507,079

Pemasangan 1 m3 batu kosong (anstamping) Pekerja OH Tukang Tuk ang batu OH Kepala tukang OH

0.780

160,200

124,956

0.390

180,100

70,239

0.039

218,200

8,510

Mandor

OH

0.039

186,700

7,281

Batu belah Uk. >15 Cm

M3

1.200

440,000

528,000

Pasir urug

M3

0.432

447,300

193,234

Jumlah Overhead & Proft

932,220 -

Harga Satuan Pekerjaan

932,220

 

GO TO

 

  EKAP

 

A.3.3

Analisa Harga Satuan Pekerjaan Pembesian Beton

No.

Uraian

Satuan

Koefsien

Harga Satuan (Rp.)

1

2

3

4

5

B.17 B.17.a .a

Untu Untuk k Pem Pembe besi sian an Pl Pla at ((10 100 0 Kg) Kg)  Pekerja OH Tukang Tuk ang Besi OH Kepala tukang OH Mandor OH Besi Beton (Polos/Ulir) (Polos/Ulir) Kg Kawat Ikat Kg

0.700

160,200

0.700

180,100

0.070

218,200

0.070

186,700

105.000

13,400

1.500

27,200 Jumlah Overhead & Proft

Harga Satuan Pekerjaan (100 Kg) Harga Satuan Pekerjaan/Kg

B.17.b B.1 7.b

Un Untuk tuk Pemb Pembesi esian an Kolo Kolom, m, Balo Balok, k, Ring Ringbal balk k dan dan Sloo Sloo (10 (100 0 Kg) Kg) Pekerja OH 2.100 Tukang Tuk ang Besi OH 1.400 Kepala tukang OH 0.140 Mandor OH 0.210 Besi Beton (Polos/Ulir) (Polos/Ulir) Kg 105.000 Kawat Ikat Kg 2.100

160,200 180,100 218,200 186,700 13,400 27,200 Jumlah Overhead & Proft

Harga Satuan Pekerjaan (100 Kg) Harga Satuan Pekerjaan/Kg

 

Jumlah Harga (Rp.) 6

 

112,140 126,070 15,274 13,069 1,407,000 40,800 1,714,353 -

1,714,353 17,143.53

336,420 252,140 30,548 39,207 1,407,000 57,120 2,122,435 -

2,122,435 21,224.35

GO T

 

  O REKAP

 

4.1. 4.1.1 1

An Anal alis isa aH Har arg ga S Sat atua uan n Pek Peker erja jaan an Beto Beton n

No.

Uraian

Satuan

Koefsien

Harga Satuan (Rp.)

Jumlah Harga (Rp.)

1

2

3

4

5

6

4.1.1.1 4.1.1. 1

4.1.1.7

4.1.1.8

Membuat Membuat 1 m3 beton beton m mutu utu 'c = 7,4 mpa mpa (K 100), slum slump p (12-2) (12-2) cm, cm, w/c w/c = 0,87  Pekerja OH 1.650 160,200

264,330

Tukang Tuk ang batu

OH

0.275

180,100

49,528

Kepala tukang

OH

0.028

218,200

6,110

Mandor Semen Portland

OH Kg

0.083 247.000

186,700 1,892

15,496 467,324

Pasir beton

Kg

869.000

293.701

255,226

Koral beton

Kg

999.000

341.829

341,487

Air

Ltr

215.000

80.00

17,200

Jumlah Overhead & Proft

1,416,700 -

Harga Satuan Pekerjaan

1,416,700

Membuat 1 m3 beton mutu 'c = 19,3 mpa mpa (K 225), slump slump (12-2) cm, w/c = 0,58 Pekerja OH 1.650 160,200

264,330

Tukang Tuk ang batu

OH

0.275

180,100

49,528

Kepala tukang

OH

0.028

218,200

6,110

Mandor

OH

0.083

186,700

15,496

Semen Portland Pasir beton

Kg Kg

371.000 698.000

1,892 293.701

701,932 205,004

Koral beton

Kg

1,047.000

341.829

357,895

Air

Ltr

215.000

80

17,200

Jumlah

1,617,493

Overhead & Proft

-

Harga Satuan Pekerjaan

1,617,493

Membuat 1 m3 beton mutu 'c = 21,7 mpa mpa (K 250), slump slump (12-2) cm, w/c = 0,56 Pekerja OH 1.650 160,200 Tukang Tuk ang batu OH 0.275 180,100 Kepala tukang OH 0.028 218,200 Mandor OH 0.083 186,700 Semen Portland Kg 384.000 1,892 Pasir beton Kg 692.000 293.701 Koral beton Kg 1,039.000 341.829 Air Ltr 215.000 80 Jumlah

264,330 49,528 6,110 15,496 726,528 203,241 355,160 17,200 1,637,592

Overhead & Proft

-

Harga Satuan Pekerjaan

1,637,592

 

No.

Uraian

Satuan

Koefsien

Harga Satuan (Rp.)

Jumlah Harga (Rp.)

1

2

3

4

5

6

 

No.

Uraian

Satuan

Koefsien

Harga Satuan (Rp.)

Jumlah Harga (Rp.)

1

2

3

4

5

6

 4.1.1.21  4.1.1. 21

4.1.1.22 4.1.1.2 2

Pemasangan Pemasangan 1 m2 m2 bekisng bekisng untuk sloo Pekerja OH Tukang Tuk ang kayu OH Kepala tukang OH Mandor OH Kayu klas III M3 Paku 5 - 10 cm Kg Minyak bekisng Ltr

Pemasangan 1 m2 bekisng untuk kolom Pekerja OH Tukang Tuk ang kayu OH Kepala tukang OH Mandor OH Kayu klas III M3 Paku 5 - 12 cm Kg Minyak bekisng Ltr Kayu 5/10 M3

0.520

160,200

83,304

0.260

180,100

46,826

0.026

218,200

5,673

0.026

186,700

4,854

0.045

3,400,000

153,000

0.300

23,900

7,170

0.100

28,050

2,805

Jumlah

303,632

Overhead & Proft

-

Harga Satuan Pekerjaan

303,632

0.660

160,200

105,732

0.330

180,100

59,433

0.033

218,200

7,201

0.033

186,700

6,161

0.040

3,400,000

136,000

0.400

23,900

9,560

0.200

28,050

5,610

0.015

4,675,000

70,125

4.1.1.23

Plywood tebal 10 mm

Lbr

0.350

185,000

64,750

Dolken Kayu 5/5 400 cm

Btng

2.000

35,200

70,400

Jumlah

534,972

Overhead & Proft

-

Harga Satuan Pekerjaan

534,972

Pemasangan Pemasangan 1 m2 m2 bekisng bekisng untuk balok Pekerja OH Tukang Tuk ang kayu OH Kepala tukang OH

0.660

160,200

105,732

0.330

180,100

59,433

0.033

218,200

7,201

Mandor

OH

0.033

186,700

6,161

Kayu klas III

M3

0.040

3,400,000

136,000

Paku 5 - 12 cm

Kg

0.400

23,900

9,560

Minyak bekisng

Ltr

0.200

28,050

5,610

Kayu 5/7

M3

0.018

4,675,000

84,150

Plywood tebal 10 mm

Lbr

0.350

185,000

64,750

Dolken Kayu 5/5 400 cm

Btng

2.000

35,200

70,400

Jumlah

548,997

Overhead & Proft

-

Harga Satuan Pekerjaan

548,997

 

4.2.1 4.2 .1

Ana Anali lisa sa Har Harga ga Sa Satua tuan nP Pek ekerj erjaan aan Bes Besii d dan an Al Alum umuni unium um

No.

Uraian

Satuan

1

2

3

 4.2.1.11 4.2.1.1 1

4.2.1.12

4.2.1.13 4.2.1.1 3

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

Pemasangan 1 m kusen pintu alumunium Pekerja OH

0.043

160,200

6,889

Tukang Tuk ang almunium

OH

0.043

180,100

7,744

Kepala tukang

OH

0.004

218,200

938

Mandor

OH

0.002

186,700

392

Prol alumunium

M'

1.100

177,700

195,470

Skrup xer

Bh

2.000

400

800

Sealant

Tube Tube

0.060

37,400

2,244

Jumlah

214,477

Overhead & Proft

-

Harga Satuan Pekerjaan

214,477

Pemasangan Pemasangan 1 m2 pintu pintu alumunium strip lebar 8 cm Pekerja OH 0.085 Tukang Tuk ang almunium OH 0.085 Kepala tukang OH 0.0085 Mandor OH 0.0042 Prol alumunium M' 4.400 Almunium strip M' 14.600

160,200

13,617

180,100

15,309

218,200

1,855

186,700

784

177,700

781,880

4,657

67,987

Jumlah

881,432

Overhead & Proft

-

Harga Satuan Pekerjaan

881,432

Pemasangan 1 m2 pintu/jendela pintu/jendel a kaca rangka alumunium Pekerja

OH

0.085

160,200

13,617

4.2.1.21

Tukang Tuk ang almunium

OH

0.085

180,100

15,309

Kepala tukang

OH

0.009

218,200

1,964

Mandor

OH

0.005

186,700

934

Prol Alumunium

M'

4.400

177,700

781,880

Prol Alumunium T

M'

4.500

33,000

148,500

Prol kaca 5 mm

M2

1.000

182,701

182,701

Sealant

Tube Tube

0.270

37,400

10,098

Jumlah

1,155,001

Overhead & Proft

-

Harga Satuan Pekerjaan

1,155,001

Pemasangan Pemasangan 1 m2 m2 rangka rangka besi hollow 1x40.40.3mm, 1x40.40.3mm, modul modul 60x60cm, p plaon laon

 

 Pekerja

OH

0.350

160,200

56,070

Tukang Tuk ang besi

OH

0.350

180,100

63,035

Kepala tukang

OH

0.035

218,200

7,637

Mandor

OH

0.018

186,700

3,361

Rangka metal hollow 40.40.3 mm

M'

4.000

6,714

26,855

Assesoris (perkuatan, las, dll)

Ls

6,714

6,714

Jumlah

163,672

Overhead & Proft

-

Harga Satuan Pekerjaan

163,672

 100% harga rangka

354,619

 

 

1.89 2,182,952.65

 

GO T

 

 

REKAP

 

4.4.1 4.4 .1

Ana Anali lisa sa Har Harga ga Sa Satua tuan nP Pek ekerj erjaan aan Pa Pasan sanga gan nD Din indin ding g

No.

Uraian

Satuan

1

2

3

 4.4.1.9

Koefsien Harga Satuan (Rp.) 4

Jumlah Harga (Rp.)

5

6

Pemasangan Pemasangan 1 m2 dinding dinding bata merah (5x11x22) cm tebal 1/2 batu batu camp. camp. 1sp 1sp : 4pp Pekerja OH 0.300 160,200 Tukang Tuk ang batu OH 0.100 180,100 Kepala tukang OH 0.010 218,200 Mandor OH 0.015 186,700 Bata Press Bh 35.000 2,300 Semen Portland Kg 5.750 1,892 Pasir pasang

M3

0.022

509,500 Jumlah

48,060 18,010 2,182 2,801 80,500 10,879

Overhead & Proft

10,954 173,386 -

Harga Satuan Pekerjaan

173,386

 

bata

8/12/24

semen

bata

semen

140

43.5

140

26.55

35

10.88

35

x

 

GO TO RE

 

6.64

 

AP

 

4.4. 4.4.2 2

An Anal alis isa a Ha Harg rga a Sa Satu tuan an P Pek eker erja jaan an Pl Ples este terran

No.

Uraian

Satuan

1

2

3

4.4.2. 4.4 .2.2 2

Koefsien Harga Satuan (Rp.) 4

5

6

Pema Pemasan sanga gan n 1 m2 m2 pl ples este tera ran n 1sp 1sp : 2pp 2pp tteba eball 15 mm mm Pekerja OH 0.3

160,200

48 48,060

Tukang batu

OH

0.15

180,100

27,015

Kepala tukang

OH

0.015

218,200

3,273

Mandor Semen Portland

OH Kg

0.015 10.224

186,700 1,892

2,801 19,344

Pasir pasang

M3

0.02

509,500

10,190

Jumlah Jum lah

4.4.2. 4.4 .2.4 4

4.4.2.20 4.4.2. 20

-

Harga Satuan Pekerjaan  

110,682

Pema Pemasan sanga gan n 1 m2 m2 pl ples este tera ran n 1sp 1sp : 4pp 4pp tteba eball 15 mm mm Pekerja OH 0.3 Tukang batu OH 0.15 Kepala tukang OH 0.015 Mandor OH 0.015 Semen Portland

Kg

Pasir pasang

M3

160,200

48 48,060

180,100

27,015

218,200

3,273

186,700

2,801

6.24

1,892

11,806

0.024

509,500

12,228

Jumlah Jumlah Overhead & Proft   

105, 105,183 183 -

Harga Satuan Pekerjaan  

105,183

Pem Pemasang asangan an 1 m' ples plester teran an skonin skoning g 1sp : 3pp lebar lebar 10 cm cm Pekerja OH 0.08 Tukang batu OH 0.4 Kepala tukang OH 0.04 Mandor OH 0.004 Semen Portland Kg 0.5 Pasir pasang M3 0.013

Pema Pemasa sang ngan an 1 m m2 2 acia acian n Pekerja Tukang batu Kepala tukang Mandor

Semen Portland

110, 110,682 682

Overhead & Proft   

160,200

12 12,816

180,100

72,040

218,200

8,728

186,700

747

1,892

946

509,500

6,624

Jumlah Jum lah

4.4. 4. 4.2. 2.27 27

Jumlah Harga (Rp.)

101, 101,900 900

Overhead & Proft   

-

Harga Satuan Pekerjaan  

101,900

OH

0.2

160,200

32 32,040

OH

0.1

180,100

18,010

OH

0.01

218,200

2,182

OH

0.01

186,700

1,867

Kg

3.25

1,892

6,149

Jumlah Jum lah

60,248 60,248

 

Overhead & Proft   

-

Harga Satuan Pekerjaan  

60,248

 

GO TO RE

 

hal. 473

 

AP

 

4.4.3 4.4 .3

Ana Anali lisa sa Har Harga ga Sa Satua tuan n Pek Pekerj erjaan aan P Penu enutup tup Lant Lantai ai da dan n Penutu Penutup p Din Dindi ding ng

No.

Uraian

Satuan

1

2

3

4.4.3.35 4.4.3. 35

4.4.3.51 4.4.3. 51

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

Pem Pemasang asangan an 1 m2 lant lantai ai ke keram ramik ik uk ukura uran n 30cm x 30cm Pekerja OH 0.7

160,200

112,140

Tukang batu Kepala tukang

OH OH

0.35 0.035

180,100 218,200

63,035 7,637

Mandor

OH

0.035

186,700

6,535

Ubin keramik 30 x 30

Dos

1.05

96,600

101,430

Semen Portland

Kg

10.0

1,892

18,920

Pasir pasang

M3

0.045

509,500

22,928

Semen warna

Kg

0.5

27,000 Jumlah Jum lah

13,500 346, 346,124 124

Overhead & Proft   

-

Harga Satuan Pekerjaan  

346,124

Pem Pemasang asangan an 1 m2 dinding dinding kera keramik mik ars arsk k ukuran ukuran 10cm x 20cm Pekerja OH 0.9 Tukang batu OH 0.45 Kepala tukang OH 0.045 Mandor OH 0.045 Keramik arsk Bh 53 Err:509 Semen Portland Kg 9.3 Pasir pasang M3 0.018 Semen warna Kg 2.75

160,200

144,180

180,100

81,045

218,200

9,819

186,700

8,402 Err:509

1,892

17,596

509,500

9,171

27,000

74,250

Jumlah

Err:509

Overhead & Proft   

-

Harga Satuan Pekerjaan

4.4. 4.4.3. 3.

Pema Pemasa sang ngan an 1 m2 la lant ntai ai ker keram amik ik uku ukurran 40c 40cm m x 40c 40cm m Pekerja OH 0.7 Tukang batu OH 0.35 Kepala tukang OH 0.035 Mandor OH 0.035 Ubin keramik 40 x 40 Dos 1.05 Semen Portland Kg 10 Pasir pasang M3 0.045 Semen warna Kg 0.5

Err:509

160,200

112,140

180,100

63,035

218,200

7,637

186,700

6,535

109,000

114,450

1,892

18,920

509,500

22,928

27,000

13,500

Jumlah Jum lah

359, 359,144 144

Overhead & Proft   

-

 

No.

Uraian

Satuan

1

2

3

Koefsien Harga Satuan (Rp.) 4

5

Harga Satuan Pekerjaan  

Jumlah Harga (Rp.) 6

359,144

 

No.

Uraian

Satuan

1

2

3

4.4. 4.4.3. 3.

Koefsien Harga Satuan (Rp.) 4

5

Pema Pemasa sang ngan an 1 m2 m2 lant lantai ai Gran Granit it ukur ukuran an 60 60cm cm x 60c 60cm m Pekerja OH 0.24 Tukang batu OH 0.12 Kepala tukang OH 0.012 Mandor OH 0.012 Granit Bh 3.10 Semen Portland Kg 9.6 Semen warna Kg 1.5 Pasir pasang M3 0.045

6

160,200

38 38,448

180,100

21,612

218,200

2,618

186,700

2,240

81,400

252,340

1,892

18,163

27,000

40,500

509,500

22,928

Jumlah Jum lah

4.4. 4. 4.3 3

Jumlah Harga (Rp.)

398, 398,850 850

Overhead & Proft   

-

Harga Satuan Pekerjaan  

398,850

Pema Pemasa sang ngan an 1 m2 m2 din dindi ding ng kera kerami mik k uku ukurran 25 25cm cm x 40c 40cm m Pekerja OH 0.9 Tukang batu OH 0.45

160,200

144,180

180,100

81,045

Kepala tukang

OH

0.045

218,200

9,819

Mandor

OH

0.045

186,700

8,402

Keramik

Bh

10.0

8,360

83,600

Semen Portland

Kg

9.3

1,892

17,596

Pasir pasang

M3

0.018

509,500

9,171

Semen warna

Kg

0.96

27,000

25,920

Jumlah Jum lah

379, 379,732 732

Overhead & Proft   

-

Harga Satuan Pekerjaan  

379,732

 

4.5.1 4.5 .1

Ana Anali lisa sa H Harg arga a Sa Satua tuan nP Pek ekerj erjaan aan LLang angit it - LLang angit it (P (Pla lao ond nd))

No.

Uraian

Satuan

1

2

3

4.5.1.7 4.5.1. 7

Koefsien Harga Satuan (Rp.) 4

Jumlah Harga (Rp.)

5

6

Pemasang Pemasangan an 1 m2 m2 langit-l langit-langi angitt gypsum gypsum board board uk ukura uran n (120 x 240 x 9) cm, cm, tebal tebal 9 mm Pekerja OH 0.1 160,200 Tukang kayu OH 0.05 180,100 Kepala tukang OH 0.005 218,200 Mandor OH 0.005 186,700 Gypsum board Lbr 0.364 115,000 Paku skrup Kg 0.11 38,700 Jumlah Jum lah Overhead & Proft    Harga Satuan Pekerjaan  

Pemasangan 1 m' list langit-langit Gypsum 10 cm Pekerja OH 0.05 Tukang kayu OH 0.05 Kepala tukang OH 0.005 Mandor OH 0.003 Prol Gipsum   1.050 M' Paku Gypsum   0.150 Kg

16 16,020 9,005 1,091 934 41,860 4,257 73,167 73,167 73,167

160,200

8,010

180,100

9,005

218,200

1,091

186,700

560

13,520

14,196

38,700

5,805

Jumlah Jum lah

38,667 38,667

Overhead & Proft   

-

Harga Satuan Pekerjaan  

38,667

 

GO TO REK

 

P

 

4.6.2 4.6 .2

Ana Anali lisa sa Har Harga ga Sa Satua tuan n Pe Pek kerj erjaan aan Ku Kunci nci dan Kaca Kaca

No.

Uraian

Satuan

1

2

3

4.6.2. 4.6 .2.1 1

Koefsien Harga Satuan (Rp.) 4

5

6

Pema Pemasan sanga gan n 1 bh kunci kunci tanam tanam kuali kualitas tas baik baik Pekerja OH

0.06

160,200

9,612

Tukang kayu Kepala tukang

OH OH

0.6 0.06

180,100 218,200

108,060 13,092

Mandor

OH

0.003

186,700

560

Kunci tanam kualitas baik

Bh

1

234,800

234,800

Jumlah Jum lah Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6. 4. 6.2. 2.2 2

Jumlah Harga (Rp.)

Pema Pemasa sang ngan an 1 bh bh kun kunci ci ta tana nam m bia biasa sa Pekerja OH Tukang kayu OH Kepala tukang OH Mandor OH Kunci tanam biasa Bh

366, 366,124 124 366,124

0.01

160,200

1,602

0.5

180,100

90,050

0.05

218,200

10,910

0.005

186,700

934

1

85,000

85,000

Jumlah Jum lah

188, 188,496 496

Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

188,496

 

4.6. 4.6.2. 2.3 3

Pema Pemasa sang ngan an 1 bh bh kun kunci ci kama kamarr man mandi di Pekerja OH Tukang kayu OH

0.005

160,200

801

0.5

180,100

90,050

Kepala tukang

OH

0.05

218,200

10,910

Mandor

OH

0.003

186,700

560

Kunci tanam KM

Bh

1

83,000

83,000

Jumlah Jum lah

185, 185,321 321

Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6. 4. 6.2. 2.4 4

OH

0.005

160,200

801

Tukang kayu

OH

0.5

180,100

90,050

Kepala tukang

OH

0.05

218,200

10,910

Mandor

OH

0.003

186,700

560

Kunci silinder

Bh

1 Err:509

Err:509

Overhead & Proft   

Harga Satuan Pekerjaan

Err:509

Pekerja

OH

0.015

160,200

2,403

Tukang kayu

OH

0.15

180,100

27,015

Kepala tukang

OH

0.015

218,200

3,273

Mandor Engsel pintu

OH Bh

0.0008 1

186,700 59,000

149 59,000

Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

Pema Pemasa sang ngan an 1 bh bh eng engse sell jjen ende dela la Pekerja Tukang kayu Kepala tukang Mandor Engsel jendela

91,840

0.01

160,200

1,602

OH OH

0.1 0.01

180,100 218,200

18,010 2,182

OH

0.0005

186,700

93

Bh

1

38,000

38,000

Jumlah Jum lah

59,887 59,887

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

Pem emas asan ang gan 1 bh bh kai kaitt a ang ngin in Pekerja Tukang kayu Kepala tukang

91,840 91,840

OH

Overhead & Proft   

4. 4.6. 6.2. 2.9 9

Err:509

Pema Pemasa sang ngan an 1 bh bh en engs gsel el pint pintu u

Jumlah Jum lah

4.6. 4. 6.2. 2.6 6

185,321

Pema Pemasa sang ngan an 1 bh bh kun kunci ci si sili lind nder er Pekerja

Jumlah

4.6. 4. 6.2. 2.5 5

-

59,887

OH

0.015

160,200

2,403

OH

0.15

180,100

27,015

OH

0.015

218,200

3,273

Mandor

OH

0.008

186,700

1,494

Kait angin

Bh

1

13,300

13,300

Jumlah Jum lah

47,485 47,485

 

Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6.2. 4.6 .2.10 10

Pema Pemasan sanga gan n 1 bh bh d door oor closer closer Pekerja Tukang kayu Kepala tukang Mandor Door closer

47,485

OH

0.05

160,200

8,010

OH

0.5

180,100

90,050

OH

0.05

218,200

10,910

OH

0.003

186,700

560

Bh

1

697,100

697,100

Jumlah Jum lah

806, 806,630 630

Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6.2. 4.6 .2.12 12

OH

0.05

160,200

8,010

OH

0.5

180,100

90,050

Kepala tukang

OH

0.05

218,200

10,910

Mandor

OH

0.003

186,700

560

Door holder

Bh

1 Err:509

Err:509

Overhead & Proft   

Harga Satuan Pekerjaan

Err:509 Err:509

Pema Pemasan sanga gan n 1 bh bh d door oor st stop op Pekerja Tukang kayu

OH OH

0.01 0.1

160,200 180,100

1,602 18,010

Kepala tukang

OH

0.01

218,200

2,182

Mandor

OH

0.005

186,700

934

Door stop

Bh

1

38,940

38,940

Jumlah Jum lah

61,668 61,668

Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6.2. 4.6 .2.14 14

806,630

Pema Pemasan sanga gan n 1 bh bh d door oor holder holder Pekerja Tukang kayu

Jumlah

4.6.2. 4.6 .2.13 13

-

Pema Pemasan sanga gan n 1 bh rel rel pi pint ntu u sor sorong ong Pekerja OH

61,668

0.06

160,200

9,612

Tukang kayu

OH

0.6

180,100

108,060

Kepala tukang

OH

0.06

218,200

13,092

Mandor

OH

0.003

186,700

560

Rel pintu sorong

Bh

1

244,200 Jumlah Jum lah Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

244,200 375, 375,524 524 375,524

 

4.6.2. 4.6 .2.16 16

Pema Pemasan sanga gan n 1 m2 kaca kaca te tebal bal 3 mm Pekerja Tukang kayu

OH OH

0.015 0.15

160,200 180,100

2,403 27,015

Kepala tukang

OH

0.015

218,200

3,273

Mandor

OH

0.0008

186,700

149

Kaca tebal 3 mm

M2

1.1

122,196

134,415

Sealant

Kg

0.05

37,400

1,870

Jumlah Jum lah Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6.2. 4.6 .2.17 17

Pema Pemasan sanga gan n 1 m2 kaca kaca te tebal bal 5 mm Pekerja OH Tukang kayu OH Kepala tukang OH Mandor OH Kaca tebal 5 mm M2 Sealant Kg

169, 169,126 126 169,126

0.015

160,200

2,403

0.15

180,100

27,015

0.015

218,200

3,273

0.0008

186,700

149

1.1

182,701

200,971

0.05

37,400

1,870

Jumlah Jum lah Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

235, 235,681 681 235,681

4.6.2. 4.6 .2.18 18

Pema Pemasan sanga gan n 1 m2 kaca kaca te tebal bal 10 10 mm Pekerja OH Tukang kayu OH

0.017

160,200

2,723

0.17

180,100

30,617

Kepala tukang

OH

0.017

218,200

3,709

Mandor

OH

0.0009

186,700

168

Kaca tebal 10 mm

M2

1.1

464,166

510,583

Sealant

Kg

0.07

37,400

2,618

Jumlah Jum lah Overhead & Proft   

Harga Harg a Satuan Satuan Pek Pekerjaan erjaan

4.6.2.19 4.6.2. 19

Pem Pemasang asangan an 1 m2 kaca kaca bur buram am tebal tebal 12 mm Pekerja OH Tukang kayu OH Kepala tukang OH Mandor OH M2 Kaca buram tebal 12 mm Sealant Kg

550, 550,419 419 550,419

0.025

160,200

4,005

0.25

180,100

45,025

0.025

218,200

5,455

0.0013

186,700

243

1.1

1,284,000

1 1,,412,400

0.07

37,400

2,618

Jumlah Jumla h

1,469,746 1,469,746

Overhead & Proft   

Harga Satuan Pekerjaan

1,469,746

 

4.6.2.20 4.6.2. 20

Pem Pemasang asangan an 1 m2 kaca kaca ce cermin rmin teb tebal al 5 mm Pekerja OH Tukang kayu OH Kepala tukang OH Mandor Kaca cermin tebal 5 mm

OH M2

0.015

160,200

2,403

0.15

180,100

27,015

0.015

218,200

3,273

0.008 1.1

186,700 958,700

1,494 1,054,570

Jumlah Jumla h

1,088,755 1,088,755

Overhead & Proft   

Harga Satuan Pekerjaan

4.6.2.21 4.6.2. 21

Pem Pemasang asangan an 1 m2 kaca kaca ce cermin rmin teb tebal al 8 mm Pekerja OH Tukang kayu OH Kepala tukang OH Mandor OH M2 Kaca cermin tebal 8 mm

1,088,755

0.017

160,200

2,723

0.17

180,100

30,617

0.017

218,200

3,709

0.009

186,700

1,680

1.1 Err:509

Err:509 Jumlah

Overhead & Proft   

Harga Satuan Pekerjaan

Err:509 Err:509

 

4.7. 4.7.1 1

An Anal alis isa a Har Harg ga Sa Satu tuan an P Pek eker erja jaan an P Pen enge geca cata tan n

No.

Uraian

Satuan

1

2

3

4.7.1. 4.7 .1.1 1

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

1 m2 Pengi Pengikis kisan/ an/pen penge gero rokan kan permu permukaa kaan n cat cat la lama ma Pekerja OH 0.15

160,200

24 24,030

Mandor

OH

186,700

560

Soda api

Kg

0.003 0.05 Err:509

Err:509 Jumlah

Overhead & Proft   

Harga Satuan Pekerjaan

4.7.1. 4.7 .1.2 2

1 m2 P Penc encuci ucian an bi bidan dang g permu permuka kaan an tem tembok bok yang yang pern pernah ah dica dicatt Pekerja OH 0.15 Mandor OH 0.003 Sabun Kg 0.05

Err:509

24 24,030 560

15,000

75 750 25,340 25,340

Overhead & Proft   

-

Harga Satuan Pekerjaan  

25,340

1 m2 P Peng enger erok okan an kara karatt pada pada permu permukaa kaan n baja baja car cara a manua manuall Pekerja OH 0.15 Mandor OH 0.008 Sabun Kg 0.05

160,200

24 24,030

186,700

1,494

15,000

75 750

Jumlah Jum lah

4.7.1.4 4.7.1. 4

-

160,200 186,700 Jumlah Jum lah

4.7.1. 4.7 .1.3 3

Err:509

26,274 26,274

Overhead & Proft   

-

Harga Satuan Pekerjaan  

26,274

1 m2 Penge Pengecat catan an bid bidang ang kayu kayu baru baru (1 lapis plamir plamir,, 1 lapis cat cat dasar dasar,, 2 lapis cat cat penutup penutup)) Pekerja OH 0.07 160,200

11 11,214

Tukang cat Kepala tukang

OH OH

0.009 0.006

180,100 218,200

1,621 1,309

Mandor

OH

0.003

186,700

560

Cat menie

Kg

0.2

49,800

9,960

Plamir

Kg

0.15

12,400

1,860

Cat kayu/besi

Kg

0.17

69,600

11,832

Cat kayu/besi

Kg

0.26

69,600

18,096

Kuas

Bh

0.01

23,200

23 232

Pengencer

Kg

0.03

36,400

1,092

Ampelas

Lbr

0.2

11,300

2,260

Jumlah Jum lah

60,036 60,036

Overhead & Proft   

-

 

No.

Uraian

Satuan

1

2

3

Koefsien Harga Satuan (Rp.) 4

5

Harga Satuan Pekerjaan  

 

Jumlah Harga (Rp.) 6

60,036

No.

Uraian

Satuan

1

2

3

4.7.1.5 4.7.1. 5

4.7.1. 4.7 .1.9 9

4.7.1.11 4.7.1. 11

4

Jumlah Harga (Rp.)

5

6

1 m2 Penge Pengecat catan an bid bidang ang kayu kayu baru baru (1 lapis plamir plamir,, 1 lapis cat cat dasar dasar,, 3 lapis cat cat penutup penutup)) Pekerja OH 0.07 160,200

11 11,214

Tukang cat

OH

0.105

180,100

18,911

Kepala tukang

OH

0.004

218,200

873

Mandor

OH

0.003

186,700

560

Cat menie

Kg

0.2

49,800

9,960

Plamir

Kg

0.15

12,400

1,860

Cat kayu/besi

Kg

0.17

69,600

11,832

Cat kayu/besi Kuas

Kg Bh

0.35 0.01

69,600 23,200

24,360 23 232

Pengencer

Kg

0.03

36,400

1,092

Ampelas

Lbr

0.2

11,300

2,260

Jumlah Jum lah

83,153 83,153

1m m2 2 Pela Pelabur buran an bidang bidang kayu kayu denga dengan nv vern ernis is Pekerja OH Tukang cat OH Kepala tukang OH Mandor OH Vernis Ltr Dempul Ampelas

4.7.1.10

Koefsien Harga Satuan (Rp.)

Overhead & Proft   

-

Harga Satuan Pekerjaan  

83,153

0.16

160,200

25 25,632

0.16

180,100

28,816

0.016

218,200

3,491

0.003

186,700

560

0.15

66,100

9,915

0.05 0.1

49,800 11,300

2,490 1,130

Jumlah Jum lah

72,034 72,034

Kg Lbr

Overhead & Proft   

-

Harga Satuan Pekerjaan  

72,034

1 m2 Pengeca Pengecatan tan tembok tembok baru (1 lapis plamir plamir,, 1 lapis cat dasar dasar, 2 lapis cat penutup) penutup) Pekerja OH 0.02 160,200 Tukang cat OH 0.063 180,100 Kepala tukang OH 0.0063 218,200 Mandor OH 0.003 186,700 Plamir Kg 0.1 Cat Tembok Kg 0.1 49,120 Cat Tembok Kg 0.26 49,120

3,204 11,346 1,375 560 4,912 12,771

Jumlah Jumlah Overhead & Proft   

34,168 34,168 -

Harga Satuan Pekerjaan  

34,168

1 m2 Peng Pengeca ecatan tan tembo tembok k lama (1 lapis lapis cat dasar dasar,, 2 lapis cat cat penutup) penutup) Pekerja OH 0.028 160,200 Tukang cat OH 0.042 180,100

4,486 7,564

 

No.

Uraian

Satuan

1

2

3

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

Kepala tukang

OH

0.0042

218,200

916

Mandor

OH

0.003

186,700

560

Cat Tembok

Kg

0.12

49,120

5,894

Cat Tembok

Kg

0.18

49,120

8,842

Jumlah Jum lah

28,262 28,262

Overhead & Proft   

-

Harga Satuan Pekerjaan  

28,262

 

No.

Uraian

Satuan

1

2

3

4.7.1. 4.7 .1.15 15

1 m2 m2 Pem Pemasa asang ngan an wallp wallpape aperr Pekerja Tukang cat Kepala tukang Mandor Wallpaper Lem Wallpaper

Koefsien Harga Satuan (Rp.) 4

5

6

OH

0.02

160,200

3,204

OH

0.2

180,100

36,020

OH

0.02

218,200

4,364

OH

0.0025

186,700

467

M2

1.2

47,740

57,288

Kg

0.2

24,420

4,884

Jumlah Jum lah

4.7.1.16 4.7.1. 16

Jumlah Harga (Rp.)

106, 106,227 227

Overhead & Proft   

-

Harga Satuan Pekerjaan  

106,227

1 m2 P Peng engeca ecatan tan permu permukaan kaan baja deng dengan an me meni ni besi besi Pekerja OH 0.02 Tukang cat OH 0.2 Kepala tukang OH 0.02 Mandor OH 0.0025

160,200

3,204

180,100

36,020

218,200

4,364

186,700

467

Meni besi

Kg

0.1

69,900

6,990

Kuas

Bh

0.01

23,200

23 232

Jumlah Jum lah

4.7.1.17 4.7.1. 17

51,277 51,277

Overhead & Proft   

-

Harga Satuan Pekerjaan  

51,277

1 m2 Peng Pengeca ecatan tan permu permukaan kaan baja baja dengan dengan men menii besi dengan dengan peran perancah cah Pekerja OH 0.25 160,200

40 40,050

Tukang cat

OH

0.225

180,100

40,523

Kepala tukang

OH

0.0225

218,200

4,910

Mandor Meni besi

OH Kg

0.0075 0.1

186,700 69,900

1,400 6,990

Pengencer

Ltr

0.01

36,400

364

Kuas

Bh

0.01

23,200

23 232

Perancah kayu

M3

0.002

4,675,000

9,350

Jumlah Jum lah

4.7.1.19

103, 103,818 818

Overhead & Proft   

-

Harga Satuan Pekerjaan  

103,818

1 m2 Pengeca Pengecatan tan permukaan permukaan baja galv galvanis anis secara secara manual manual sistem sistem 1 lap lapis is cat mutakhir Pekerja OH 0.06 160,200 Tukang cat OH 0.06 180,100 Kepala tukang OH 0.012 218,200

9,612 10,806 2,618

Mandor Cat kayu/besi

OH Kg

0.003 0.3

186,700 69,600

560 20,880

Kuas

Bh

0.01

23,200

23 232

Koefsien Harga Satuan (Rp.)

Jumlah Harga (Rp.)

 

No.

Uraian

Satuan

1

2

3

Pengencer

Ltr

4

5

0.01

6

36,400 Jumlah Jum lah

364 45,073 45,073

Overhead & Proft   

-

Harga Satuan Pekerjaan  

45,073

 

No.

Uraian

Satuan

1

2

3

4.7.1.20 4.7.1. 20

Koefsien Harga Satuan (Rp.) 4

Jumlah Harga (Rp.)

5

6

1 m2 Peng Pengeca ecatan tan permuk permukaan aan baja galva galvanis nis secara secara manual manual sistem sistem 3 lapis lapis Pekerja OH 0.4 160,200 Tukang cat OH 0.8 180,100

144,080

Kepala tukang Mandor

OH OH

0.08 0.02

218,200 186,700

17,456 3,734

Cat kayu/besi

Kg

0.11

69,600

7,656

Cat kayu/besi

Kg

0.17

69,600

11,832

Cat kayu/besi

Kg

0.08

69,600

5,568

Kuas

Bh

0.01

23,200

23 232

Pengencer

Ltr

0.01

36,400

364

Jumlah Jum lah

4.7.1.21

64 64,080

255, 255,002 002

Overhead & Proft   

-

Harga Satuan Pekerjaan  

255,002

1 m2 Pengeca Pengecatan tan permukaan permukaan baja galv galvanis anis secara secara semprot semprot sistem sistem 3 lapis cat cat mut mutakhir akhir Pekerja OH 0.4 160,200 Tukang cat OH 0.7 180,100 Kepala tukang OH 0.07 218,200 Mandor OH 0.02 186,700 Cat kayu/besi Kg 0.3 69,600 Pengencer Ltr 0.01 36,400 Jumlah Jum lah Overhead & Proft    Harga Satuan Pekerjaan  

64 64,080 126,070 15,274 3,734 20,880 364 230, 230,402 402 -

230,402

 

5.1.1 5.1 .1

Ana Anali lisa sa H Harg arga a Sa Satua tuan nP Pek ekerj erjaan aan San Sanit itasi asi Dalam Dalam Ged Gedung ung

No.

Uraian

Satuan

1

2

3

5.1. 5.1.1. 1.2 2

5.1.1. 5.1 .1.14 14

5.1.1.19 5.1.1. 19

Koefsien Harga Satuan (Rp.) 4

5

6

Pema Pemasa sang ngan an 1 bh bh clo close sett jjon ongk gkok ok Pekerja Tukang batu

OH OH

1 1.5

160,200 180,100

160,200 270,150

Kepala tukang

OH

0.15

218,200

32,730

Mandor

OH

0.16

186,700

29 29,872

Closet jongkok

Unit

1

601,900

601,900

Semen portland

Kg

6

1,892

11,352

Pasir pasang

M3

0.01

509,500

5,095

Jumlah Juml ah

1,111,299 1,111,299

Pema Pemasan sanga gan n 1 bh bh o oor or dra drain in Pekerja Tukang batu Kepala tukang Mandor Floor drain

Overhead & Proft   

-

Harga Satuan Pekerjaan  

1,111,299

OH

0.01

160,200

1,602

OH

0.1

180,100

18,010

OH

0.01

218,200

2,182

OH

0.005

186,700

934

1

17,000

17,000

Jumlah Jum lah Overhead & Proft   

39,728 39,728 -

Harga Satuan Pekerjaan  

39,728

Unit

Pem Pemasang asangan an 1 bh kran kran dia. dia. 1/2" atau atau 3/4" 3/4" Pekerja OH Tukang batu OH Kepala tukang OH Mandor OH Kran air M Sealtape Bh

0.01

160,200

1,602

0.4

180,100

72,040

0.04

218,200

8,728

0.005

186,700

934

1

33,100

33,100

0.025

5,000

5,000

Jumlah Jum lah

5.1.1.25 5.1.1. 25

Jumlah Harga (Rp.)

Pem Pemasang asangan an 1 M' pipa pipa PVC PVC  pe pe AW AW dia. dia. 1/2" 1/2" Pekerja OH Tukang batu OH Kepala tukang OH

121, 121,404 404

Overhead & Proft   

-

Harga Satuan Pekerjaan  

121,404

0.036

160,200

5,767

0.06

180,100

10,806

0.006

218,200

1,309

 

No.

Uraian

Satuan

1

2

3

Mandor

OH

Pipa PVC 1/2" Perlengkapan

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

0.002

186,700

373

M

1.2

7,000

8,400

%

35

7,000

2,450

Jumlah Jum lah

29,106 29,106

Overhead & Proft   

-

Harga Satuan Pekerjaan  

29,106

 

No.

Uraian

Satuan

1

2

3

5.1.1.31 5.1.1. 31

Pem Pemasang asangan an 1 M' pipa pipa PVC PVC  pe pe AW AW dia. dia. 3"

Koefsien Harga Satuan (Rp.) 4

5

Jumlah Harga (Rp.) 6

5.1.1.32 5.1.1. 32

Pekerja

OH

0.081

160,200

12 12,976

Tukang batu

OH

0.135

180,100

24,314

Kepala tukang

OH

0.0135

218,200

2,946

Mandor

OH

0.004

186,700

747

Pipa PVC 3"

M

1.2

55,800

66,960

Perlengkapan

%

35

55,800

19,530

Jumlah Jum lah

127, 127,472 472

Pem Pemasang asangan an 1 M' pipa pipa PVC PVC  pe pe AW AW dia. dia. 4" Pekerja OH Tukang batu OH Kepala tukang OH Mandor OH Pipa PVC 4" M Perlengkapan %

Overhead & Proft   

-

Harga Satuan Pekerjaan  

127,472

0.081

160,200

12 12,976

0.135

180,100

24,314

0.0135

218,200

2,946

0.004

186,700

747

1.2

84,300

101,160

35

84,300

29,505

Jumlah Jum lah

171, 171,647 647

Overhead & Proft   

-

Harga Satuan Pekerjaan  

171,647

 

Analisa Harga Satuan Pekerjaan Elektrikal No.

Uraian

1

2

Memasang Tik Instalasi Pekerja Tukang Listrik Mandor Pipa Listrik T Dus

Satuan Koefsien 3

4

Harga Satuan (Rp.)

Jumlah Harga (Rp.) 5

6

OH

0.800

160,200

128,160

OH

0.750

180,100

135,075

OH

0.160

186,700

29,872

Staf

1.500

10,100

15,150

Bh

3.000

3,500

10,500

Jumlah Juml ah

318,757 -

Harga Satuan Pekerjaan  

318,757

Memasang 1 Bh Stop Kontak Pekerja OH

0.050

160,200

8 8,,010

Tukang Listrik

OH

0.050

180,100

9,005

Mandor

OH

0.005

186,700

934

Stop Kontak

Bh

1.000

25,300

25,300

Jumlah Jum lah

43,249 43,249 -

Harga Satuan Pekerjaan  

43,249

Memasang 1 Bh Saklar Ganda Pekerja OH

0.050

160,200

8 8,,010

Tukang Listrik Mandor

OH OH

0.050 0.005

180,100 186,700

9,005 934

Saklar Ganda

Bh

1.000

25,300

25,300

Jumlah Jum lah

43,249 43,249 -

Harga Satuan Pekerjaan  

43,249

Memasang 1 Bh Lampu LED Downlight 10 Wa Pekerja OH 0.050 Tukang Listrik OH 0.050

160,200

8 8,,010

180,100

9,005

Mandor

OH

0.005

186,700

934

Lampu Jari-jari 10 Wa

Bh

1.000

110,000

110,000

Jumlah Juml ah

127,949 -

Harga Satuan Pekerjaan  

127,949

 

No.

Uraian

1

2

Satuan Koefsien 3

Memasang 1 M' Kabel NYM Uk. 3x2,5 mm Pekerja OH Tukang Listrik OH Mandor OH Kabel NYM Uk. 3x2,5 mm M'

Harga Satuan (Rp.)

4

Jumlah Harga (Rp.) 5

6

0.050

160,200

8 8,,010

0.050

180,100

9,005

0.005

186,700

934

1.000

13,900

13,900

Jumlah Jum lah

31,849 31,849 -

Harga Satuan Pekerjaan  

Memasang 1 M' Kabel NYM Uk. 2x2,5 mm Pekerja OH Tukang Listrik OH Mandor OH Kabel NYM Uk. 2x2,5 mm M'

31,849

0.050

160,200

8 8,,010

0.050

180,100

9,005

0.005

186,700

934

1.000

11,400

11,400

Jumlah Jum lah

29,349 29,349 -

Harga Satuan Pekerjaan  

29,349

 

Harga Plat Strip Terbaru 2016 Ukuran Plat Strip

Harga ( Rp )

Plat Strip 6 x 50 x 6 M

Rp150,150

1

Plat Strip 6 x 40 x 6 M

Rp172,700

2

Plat Strip 6 x 30 x 6 M

Rp96,250

3

Plat Strip 8 x 95 x 6 M

Rp396,000

4

Plat Strip 9.5 CM x 4.5 MM

Rp313,500

5

Plat Strip 5 x 50 x 6 M

Rp127,600

6

Plat Strip 5 x 38 x 6 M

Rp93,500

7

Plat Strip 5 x 30 x 6 M

Rp75,900

8

Plat Strip 5 x 40 x 6 M Plat Strip 4.5 x 40

Rp93,500 Rp93,500

9 10

Plat Strip 4.5 x 3

Rp71,500

11

Plat Strip 4 x 40 x 6 M

Rp79,750

12

Plat Strip 3 x 50

Rp75,900

13

Plat Strip 3 x 30 x 6 M

Rp45,650

14 15 16 17 18 19 20 21 22

23 24 25 26

 

Ukuran Besi Wf

Berat Dalam Kg

Harga

Besi Baja I WF 100 x 50 x 5 x 7 mm – 12 M

112

Besi Baja I WF 125 x 60 x 6 x 8 mm – 12 M

158,4

1,261,200.00

Besi Baja I WF 148 x 100 x 6 x 9 mm – 12 M

253,2

2,023,600.00

Besi Baja I WF 150 x 75 x 5 x 7 mm – 12 M

168

1,343,000.00

Besi Baja I WF 175 x 90 x 5 x 8 mm – 12 M

217,2

1,731,600.00

Besi Baja I WF 194 x 150 x 6 x 9 mm – 12 M

367

2,931,000.00

Besi Baja I WF 198 x 99 x 4,7 x 7 mm – 12 M

218,4

1,741,200.00

Besi Baja I WF 200 x 100 x 5,7 x 8 mm – 12 M

256

2,041,000.00

Besi Baja I WF 244 x 175 x 7 x 11 mm – 12 M

529

4,232,000.00

Besi Baja I WF 248 x 124 x 5 x 8 mm – 12 M

308,4

2,461,200.00

Besi Baja I WF 250 x 125 x 6 x 9 mm – 12 M Besi Baja I WF 294 x 200 x 8 x 12 mm – 12 M

355,2 681

2,843,600.00 5,441,000.00

Besi Baja I WF 298 x 149 x 6 x 8 mm – 12 M

384

3,072,000.00

440,4

3,521,200.00

Besi Baja I WF 346 x 174 x 6 x 9 mm – 12 M

497

3,971,000.00

Besi Baja I WF 350 x 175 x 7 x 11 mm – 12 M

595,2

4,763,600.00

Besi Baja I WF 396 x 199 x 7 x 11 mm – 12 M

679,5

5,431,000.00

Besi Baja I WF 400 x 200 x 8 x 13 mm – 12 M

792

6,331,000.00

Besi Baja I WF 446 x 199 x 8 x 12 mm – 12 M

794,4

6,353,200.00

Besi Baja I WF 450 x 200 x 9 x 14 mm – 12 M Besi Baja I WF 500 x 200 x 10 x 16 mm – 12 M

912 1075

7,291,000.00 8,601,000.00

Besi Baja I WF 588 x 300 x 12 x 20 mm – 12 M

1812

14,491,000.00

Besi Baja I WF 600 x 200 x 11 x 17 mm – 12 M

1272

10,171,000.00

Besi Baja I WF 700 x 300 x 13 x 24 mm – 12 M

2220

17,761,000.00

Besi Baja I WF 800 x 300 x 14 x 26 mm – 12 M Besi Baja I WF 900 x 300 x 16 x 28 x 12 M

2520 2916

20,161,000.00 23,321,000.00

16513

164,181,400.00

Besi Baja I WF 200 x 150 x 6,7 x 9 mm – 12 M

891,000.00

635.1153846154

9,942.55 2,485.64

6,314,669.23

12,428.19

 

adukan 1:4 semen 1

1

0.76

0.76

pasir 4

4

0.675

2.7 3.46

semen

0.289

BJ Semen

1250

pasir

 

361.27 7.23

kg s ak

4

1.2

4.7.1.3 4.7.1. 3

4.7.1. 4.7 .1.4 4

4.7.1.4 4.7.1. 4

1 m2 Penge Pengecat catan an Pla Plaon on baru baru (1 lapis lapis cat cat dasar dasar, 2 lapis cat cat penutup penutup)) Pekerja OH 0.02 154,600

3, 3,092

Tukang cat

OH

0.063

173,600

10,937

Kepala tukang

OH

0.0063

210,100

1,324

Mandor

OH

0.003

180,000

540

Plamir

Kg

0.1

12,400

1,240

Cat Tembok

Kg

0.1

49,120

4,912

Cat Tembok

Kg

0.2

49,120

9,824

Jumlah Jum lah

31,868 31,868

Overhead & Proft   

-

Harga Satuan Pekerjaan  

31,868

1 m2 Pem Pemasa asang ngan an 1 Bh k kait ait angi angin n (Stopp (Stopper) er) Pekerja OH 0.015

154,600

2, 2 ,319

Tukang kayu

OH

0.150

173,600

26,040

Kepala tukang

OH

0.015

210,100

3,152

Mandor

OH

0.008

180,000

1, 1 ,440

Kait angin Aluminium

Bh

1.000

75,200

75,200

Jumlah Jum lah

108,151 108,151

Overhead & Proft   

-

Harga Satuan Pekerjaan  

108,151

1 m2 Pemasan Pemasangan gan 1 Bh grendel grendel jend jendela ela (Ram (Ram buncis) buncis) Pekerja OH 0.010 Tukang kayu OH 0.100 Kepala tukang OH 0.010 Mandor Kait angin Aluminium

OH Bh

0.001 1.000

154,600

1, 1 ,546

173,600

17,360

210,100

2,101

180,000 31,240

180 31,240

Jumlah Jum lah

52,427 52,427

Overhead & Proft   

-

Harga Satuan Pekerjaan  

52,427

 

GO TO RE

 