TAHUN PEKERJAAN LOKASI
: : :
2016 MASJID UKURAN 12X12 METER JOGJAKARTA
RINCIAN RENCANA ANGGARAN BIAYA No
Uraian Pekerjaan
I
1 2
Volume
PEKERJAAN PE PENDAHULUAN Pembersihan lokasi sebelum dan sesudah Bowplank
144.00 48.00
Harga satuan ( Rp )
Satuan
m² m'
12,000.00 18,600.00 Sub Jumlah
II
PEK PEKERJA RJAAN TA TANAH NAH DA DAN PA PASIR 1 Galian Tanah 2 Urug pasir bawah lantai dan bawah pondasi 3 Urugan Tanah Kembali
53.46 4.91 13.37
m³ m³ m³
35,200.00 264,800.00 16,880.00 Sub Jumlah
III III
PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN BATU BATU Pasangan batu belah camp 1pc:5psr
IV
1 2 3 4 5 6 7 8
PEKE PEKERJ RJAA AAN N STR STRUK UKTU TUR R BET BETON ON BERT BERTUL ULAN ANG G Pondasi Footplat 1,2 x 1,2 m kedalaman 1,5 Beton sloof SL 15x20cm Beton kolom praktis 15x15cm Beton kolom K1 40x40 Beton kolom K2 30x40 Beton kolom K3 20x20 Beton balok B1 20x40 Beton balok B2 20x30 Beton Balok Kantilever Tritisan 20x40
2.52
4.32
1.44 0.91 3.65 5.47 0.32 10.88 3.79 1.01
m³
m³ m³ m³ m³ m³ m³ m³ m³ m³
1 2 3
PEKE PEKERJ RJAA AAN N PASA PASANG NGAN AN DAN DAN PLE PLEST STER ERAN AN Pasang dinding bata 1:5 1/2 bata Plesteran Beton Plesteran dinding camp. 1pc:5psr + acian
1 4 5 6
PEKERJ PEKERJAA AAN N LANT LANTAI AI,, DIND DINDING ING,, PLAF PLAFON OND D DAN DAN ATAP ATAP Keramik lantai 40x40 cm (setara platinum) List plank 3x30 kayu jati Rangka Atap Kayu Genteng
125.78 345.60 251.55
m² m² m²² m m² m²
224.00 60.00 257.20 257.20
m² m' m² m²
1 2 3
PEKE PEKERJ RJAA AAN N CAT CAT,, FIN FINIS ISHI HING NG Cat dinding eksterior dulux Cat dinding interior vinilex cat natural usuk dan gording
125.78 125.78 144.00
m² m² m²
PEK PEKERJA RJAAN PIN PINTU TU 1 P1 1 da un un Pintu Geser Jati k ob obinasi k ac aca finishing mela mi mi 2 P2 2 daun Pintu Geser Jati Kombinasi Kaca finishing mel 3 Perlengkapan Pintu Handel, engsel dll
IX
1 2 3 4
PEK PEKERJA RJAAN ELEKT LEKTR RIKAL IKAL Instalasi Lampu Memasang Stop Kontak Memasang Lampu dan Fitting Memasang Saklar Ganda
2.000 2.000 1.000
9.000 3.000 9.00 3.00
Unit Unit Ls Ls
unit unit un unit un unit un
3,407,645.60
2,654,316.00
3,143,400.00 3,897,073.33 5,317,728.89 5,726,043.33 5,956,713.33 5,993,416.67 5,862,560.83 5,862,560.83 4,259,720.83
138,210.00 54,000.00 51,485.00
185,170.10 204,800.00 25,840.00 75,760.00
39,534.00 20,000.00 40,000.00 Sub Jumlah
VIII III
1,881,792.00 1,300,168.00 225,685.60
2,654,316.00
Sub Jumlah
VII VII
2,620,800.00
Sub Jumlah
Sub Jumlah
VI
1,728,000.00 892,800.00
1,053,300.00
Sub Jumlah
V
Jumlah Harga ( Rp )
13,579,488.00 5,611,785.60 4,839,133.29 20,900,058.17 32,583,221.93 1,917,893.33 63,784,661.87 22,219,105.56 4,302,318.04 169,737,665.79
17,384,053.80 18,662,400.00 12,951,051.75 48,997,505.55
41,478,101.50 12,288,000.00 6,646,048.00 19,485,472.00 79,897,621.50
4,972,586.52 2,515,600.00 5,760,000.00 13,248,186.52
2,500,000.00 4,000,000.00 1,000,000.00
5,000,000.00 8,000,000.00 1,000,000.00
Sub Jumlah
14,000,000.00
212,040.00 49,600.00 69,600.00 74,200.00 Sub Jumlah
1,908,360.00 148,800.00 626,400.00 222,600.00 2,906,160.00
REKAPITULASI RENCANA ANGGARAN BIAYA
Uraian Pekerjaan
NO
Jumlah Harga
I
PEKERJAAN PENDAHULUAN
Rp
2,620,800.00
II
PEKERJAAN TANAH DAN PASIR
Rp
3,407,645.60
III
PEKERJAAN PASANGAN BATU
Rp
2,654,316.00
IV
PEKERJAAN STRUKTUR BETON BERTULANG
Rp
169,737,665.79
V
PEKERJAAN PASANGAN DAN PLESTERAN
Rp
48,997,505.55
VI
PEKERJAAN LANTAI, DINDING, PLAFOND DAN ATAP
Rp
79,897,621.50
Rp
13,248,186.52
PEKERJAAN PINTU
Rp
14,000,000.00
PEKERJAAN ELEKTRIKAL
Rp
2,906,160.00
Jumlah Total
Rp
337,469,900.96
Dibulatkan
Rp
337,469,000.00
VII VIII IX
PEKERJAAN CAT, FINISHING
TIGA RATUS TIGA PULUH TUJUH JUTA EMPAT RATUS ENAM PULUH SEMBILAN RIBU RUPIAH