RAB DERMAGA

March 23, 2017 | Author: Ksatria W. Hutama | Category: N/A
Share Embed Donate


Short Description

Download RAB DERMAGA...

Description

REKAPITULASI BIAYA Program

: Pembangunan Destinasi Pariwisata

Kegiatan

: Perencanaan Pembangunan Pantai Pariwisata Pangempang

Lokasi

:

Tahun Anggaran

:

Sumber Dana

:

No. A. B. I

URAIAN PEKERJAAN

UNIT

PEKERJAAN PENDAHULUAN

JUMLAH HARGA (Rp) Rp

32,500,000.00

2

Rp

208,225,559.66

1

Rp

607,727,405.31 19,417,675.74

PEKERJAAN UNTUK LOKASI PARKIR PEKERJAAN BANGUNAN KIOS

II

PEKERJAAN BANGUNAN FOOD COURT

III

PEKERJAAN BANGUNAN POS JAGA

IV

PEKERJAAN BANGUNAN GAZEBO PARKIR

1

Rp

10

Rp

29,508,315.69 798,424,916.81

V

PEKERJAAN BANGUNAN LANDSCAPE PARKIR

1

Rp

VI

PEKERJAAN GAPURA DAN PAGAR

1

Rp

67,980,714.39

C.

PEKERJAAN UNTUK LOKASI PANTAI 208,225,559.66

I

PEKERJAAN BANGUNAN KIOS

2

Rp

II

PEKERJAAN BANGUNAN TEMPAT WUDHU

1

Rp

41,529,882.79

III

PEKERJAAN BANGUNAN RUANG GANTI

3

Rp

159,116,196.19

IV

PEKERJAAN BANGUNAN MUSHOLLAH

1

Rp

89,701,517.19

V

PEKERJAAN BANGUNAN RUMAH PANGGUNG

5

Rp

184,610,598.56

VI

PEKERJAAN BANGUNAN CAFÉ

1

Rp

65,619,340.02

1

Rp

94,667,364.96

VII

PEKERJAAN BANGUNAN PLAZA

VIII

PEKERJAAN BANGUNAN LANDSCAPE PULAU

IX

PEKERJAAN BANGUNAN GAZEBO

1

Rp

192,477,058.59

16

Rp

35,542,111.73

1

Rp

87,929,006.54

X

PEKERJAAN BANGUNAN DERMAGA

D.

PEKERJAAN AKHIR

Rp

46,254,094.51

A

JUMLAH

Rp

2,969,457,318.34

B

PPN 10 % ( A )

Rp

296,945,731.83

C

IMB 3 % (A)

Rp

89,083,719.55

D

TOTAL ( A + B + C )

Rp

3,355,486,769.73

DIBULATKAN

Rp

3,355,490,000.00

TERBILANG : TIGA MILYAR TIGA RATUS LIMA PULUH LIMA JUTA EMPAT RATUS SEMBILAN PULUH RIBU RUPIAH

DAFTAR ANALISA HARGA SATUAN PEKERJAAN Program

:

Pembangunan Destinasi Pariwisata

Kegiatan

:

Perencanaan Pembangunan Pantai Pariwisata Pangempang

Lokasi

:

Tahun Anggaran

:

Sumber Dana

:

NO

URAIAN PEKERJAAN

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

1 Mobilisasi dan Demobilisasi

ls

1.000

Rp 25,000,000.00

Rp

25,000,000.00

2 Pembersihan Lokasi

ls

1.000

Rp

2,500,000.00

Rp

2,500,000.00

3 Direksi Ket dan Gudang

ls

1.000

Rp

2,000,000.00

Rp

2,000,000.00

4 Bangsal Kerja, P3K dan MCK

ls

1.000

Rp

2,500,000.00

Rp

2,500,000.00

5 Pembuatan Papan Proyek

bh

1.000

Rp

500,000.00

Rp

500,000.00

Rp

32,500,000.00

A PEKERJAAN PENDAHULUAN

JUMLAH TOTAL B PEKERJAAN UNTUK LOKASI PARKIR I

PEKERJAAN BANGUNAN KIOS BANGUNAN UTAMA

1 Pemasangan Bowplank

m2

46.000

Rp

18,705.00

Rp

860,430.00

2 Galian Pondasi

m3

30.927

Rp

23,240.00

Rp

718,743.48

3 Urugan Tanah

m3

23.266

Rp

18,810.00

Rp

437,635.81

4 Pas. Batu Pondasi

m3

11.152

Rp

605,475.00

Rp

6,751,992.30

5 Pas. Batu Kosong

m3

3.134

Rp

208,779.00

Rp

654,287.29

6 Urugan Pasir

m3

1.476

Rp

105,810.00

Rp

156,124.91

7 Tiang Pancang Ulin (10/10)

ttk

19.000

Rp

102,570.00

Rp

1,948,830.00

8 Beton (1 : 2 : 3)

m3

3.842

Rp

698,880.00

Rp

2,684,747.52

9 Bekisting Sloof (15/20)

m3

18.800

Rp

111,185.00

Rp

2,090,278.00

10 Bekisting Ringbalk dan Kolom (15/15) m2

74.820

Rp

133,726.00

Rp

10,005,379.32

11 Penulangan

Kg

701.362 Rp

13,745.30

Rp

9,640,430.94

12 Pas. Batu Bata 1 : 4

m2

114.463 Rp

83,490.00

Rp

9,556,474.13

13 Plesteran 1 : 4, Tebal 15 mm

m2

219.325 Rp

33,250.00

Rp

7,292,556.25

14 Acian Tembok

m2

219.325 Rp

6,033.25

Rp

1,323,242.56

15 Kusen Ulin (5/10)

m3

0.239

Rp

4,274,300.00

Rp

1,021,557.70

16 Pintu Panil

m2

22.266

Rp

359,300.00

Rp

8,000,173.80

17 Lisplank (2/20)

m2

9.350

Rp

29,750.00

Rp

278,162.50

18 Keramik 30/30

m2

34.412

Rp

137,552.00

Rp

4,733,439.42

19 Keramik 20/20

m2

20.253

Rp

210,552.00

Rp

4,264,309.66

20 Atap Sakura Roof

m2

90.756

Rp

78,681.00

Rp

7,140,788.57

NO

URAIAN PEKERJAAN

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

m

13.380

Rp

33,402.50

Rp

446,925.45

22 Kasau dan Reng (5/7 & 2/3)

m2

90.756

Rp

31,205.00

Rp

2,832,047.22

23 Rangka Plafond

m2

42.000

Rp

27,652.50

Rp

1,161,405.00

24 Plafond Tripleks 5 mm

m2

42.000

Rp

34,483.50

Rp

1,448,307.00

25 Jalusi

m2

0.420

Rp

207,675.00

Rp

87,223.50

26 Ventilasi

m2

0.450

Rp

340,740.00

Rp

153,333.00

27 Kuda-Kuda dan Gording

m3

0.934

Rp

3,698,200.00

Rp

3,452,813.34

28 Baut

bh

40.000

Rp

2,500.00

Rp

100,000.00

29 Bongkar Bekisting

m2

93.620

Rp

22,230.00

Rp

2,081,172.60

30 Pasang Titik Lampu

ttk

9

Rp

68,050.00

Rp

612,450.00

31 Pasang Stop Kontak

bh

1

Rp

33,050.00

Rp

33,050.00

32 Pasang Saklar Tunggal

bh

3

Rp

28,050.00

Rp

84,150.00

33 Pasang Saklar Ganda

bh

3

Rp

33,050.00

Rp

99,150.00

34 Pasang Pipa Listrik

m

26

Rp

5,000.00

Rp

130,000.00

35 Pasang Kabel Listrik

m

32

Rp

3,000.00

Rp

96,000.00

36 Sambungan

bh

8

Rp

1,500.00

Rp

12,000.00

37 Pasang Kran 3/4" atau 1/2"

bh

3

Rp

37,455.00

Rp

112,365.00

38 Pasang Kloset Jongkok

bh

2

Rp

123,465.00

Rp

246,930.00

39 Pasang Bak Air

bh

3

Rp

210,015.00

Rp

630,045.00

40 Pasang Pipa PVC Ø 3/4"

m

19

Rp

13,471.63

Rp

255,961.03

41 Pasang Pipa PVC Ø 3"

m

4

Rp

28,838.70

Rp

115,354.80

42 Pasang Wastafel

bh

1

Rp

325,015.00

Rp

325,015.00

43 Pasang Engsel Pintu

Psg

71

Rp

37,510.75

Rp

2,663,263.25

44 Pasang Grendel Pintu

set

12

Rp

66,705.00

Rp

800,460.00

45 Pasang Kunci Pintu Tanam 2 Slaag

set

2

Rp

81,705.00

Rp

163,410.00

46 Pasang Engsel Jendela

Psg

6

Rp

28,364.80

Rp

170,188.80

47 Pasang Grendel Jendela

bh

3

Rp

66,705.00

Rp

200,115.00

48 Pasang Hak Angin Kait-Kait Jendela

Psg

6

Rp

27,510.75

Rp

165,064.50

219.325 Rp

15,032.50

Rp

3,297,003.06

21 Bubungan Sakura Roof

INSTALASI LISTRIK

INSTALASI AIR

PINTU DAN JENDELA

PENGECATAN 49 Pengecatan Tembok

m2

50 Pengecatan Plafond

m2

42

Rp

12,632.50

Rp

530,565.00

51 Pengecatan Kayu

m2

58.402

Rp

35,057.50

Rp

2,047,428.12

JUMLAH TOTAL

Rp 104,112,779.83

NO

URAIAN PEKERJAAN

SAT

VOL

HARGA SATUAN

JML.HARGA

(RP)

(RP)

II PEKERJAAN BANGUNAN FOOD COURT BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

160.000 Rp

18,705.00

Rp

2,992,800.00

2 Galian Pondasi

m3

211.311 Rp

23,240.00

Rp

4,910,864.74

3 Urugan Tanah

m3

Rp

18,810.00

Rp

1,393,661.12

4 Pas. Batu Pondasi

m3

175.468 Rp

605,475.00

Rp

106,241,562.98

5 Pas. Batu Kosong

m3

26.796

Rp

208,779.00

Rp

5,594,363.79

6 Urugan Pasir

m3

15.836

Rp

105,810.00

Rp

1,675,567.48

7 Tiang Pancang Ulin (10/10)

ttk

20.000

Rp

102,570.00

Rp

2,051,400.00

8 Sloof Tiang Pokok

m

20.000

Rp

48,344.00

Rp

966,880.00

m3

18.984

Rp

698,880.00

Rp

13,267,537.92

m3

92.200

Rp

111,185.00

Rp

10,251,257.00

242.100 Rp

133,726.00

Rp

32,375,064.60

Rp

70,301.90

Rp

3,163,585.68

9 Beton (1 : 2 : 3) 10 Bekisting Sloof (15/20)

11 Bekisting Ringbalk dan Kolom (15/15) m2

74.092

12 Bekisting Lantai Playwood

m2

13 Penulangan Besi

Kg

2650.373 Rp

13,745.30

Rp

36,430,170.34

14 Pas. Batu Bata 1 : 4

m2

838.315 Rp

83,490.00

Rp

69,990,919.35

15 Plesteran 1 : 4, Tebal 15 mm

m2 1594.670 Rp

33,250.00

Rp

53,022,777.50

16 Acian Tembok

m2 1594.670 Rp

6,033.25

Rp

9,621,042.78

17 Kusen Ulin (5/10)

m3

1.028

Rp

4,274,300.00

Rp

4,395,476.41

18 Pintu Panil

m2

20.475

Rp

359,300.00

Rp

7,356,667.50

ls

6.000

Rp

300,000.00

Rp

1,800,000.00

20 Ventilasi Kaca

m2

0.600

Rp

340,740.00

Rp

204,444.00

21 Jendela Kaca

m2

27.360

Rp

340,740.00

Rp

9,322,646.40

22 Pintu Rooling Door

m2

12.125

Rp

800,000.00

Rp

9,700,000.00

23 Roster (25/25)

m2

4.188

Rp

261,760.00

Rp

1,096,120.00

24 Lisplank (2/20)

m2

42.024

Rp

29,750.00

Rp

1,250,214.00

25 Keramik 30/30

m2

351.000 Rp

137,552.00

Rp

48,280,752.00

26 Keramik 20/20

m2

102.640 Rp

210,552.00

Rp

21,611,057.28

27 Atap Sakura Roof

m2

512.249 Rp

19 Pintu WC (Plastik)

28 Bubungan Sakura Roof

m

45.000

29.150

78,681.00

Rp

40,304,263.57

Rp

33,402.50

Rp

973,682.88

29 Kasau dan Reng (5/7 & 2/3)

m2

512.249 Rp

31,205.00

Rp

15,984,730.05

30 Rangka Plafond

m2

381.000 Rp

27,652.50

Rp

10,535,602.50

31 Plafond Tripleks 5 mm

m2

381.000 Rp

34,483.50

Rp

13,138,213.50

32 Kuda-Kuda dan Gording

m3

Rp

3,698,200.00

Rp

10,193,134.16

33 Bongkar Bekisting

M3

379.300 Rp

22,230.00

Rp

8,431,839.00

2.756

INSTALASI LISTRIK 34 Pasang Titik Lampu

ttk

21.000

Rp

68,050.00

Rp

1,429,050.00

35 Pasang Stop Kontak

bh

15.000

Rp

33,050.00

Rp

495,750.00

35 Pasang Saklar Tunggal

bh

29.000

Rp

28,050.00

Rp

813,450.00

36 Pasang Saklar Ganda

bh

2.000

Rp

33,050.00

Rp

66,100.00

NO

URAIAN PEKERJAAN

36 Pasang Pipa Listrik

SAT

VOL

HARGA SATUAN

JML.HARGA

(RP)

(RP)

m

100.000 Rp

5,000.00

Rp

500,000.00

37 Pasang Kabel Listrik

m

125.000 Rp

3,000.00

Rp

375,000.00

37 Sambungan

bh

50.000

Rp

1,500.00

Rp

75,000.00

38 Pasang Kran 3/4" atau 1/2"

bh

28

Rp

37,455.00

Rp

1,048,740.00

39 Pasang Kloset Jongkok

bh

6

Rp

123,465.00

Rp

740,790.00

40 Pasang Bak Air

bh

6

Rp

210,015.00

Rp

1,260,090.00

41 Pasang Pipa PVC Ø 3/4"

m

70

Rp

13,471.63

Rp

943,014.33

42 Pasang Pipa PVC Ø 3"

m

12

Rp

28,838.70

Rp

346,064.40

43 Pasang Wastafel

bh

5

Rp

325,015.00

Rp

1,625,075.00

44 Pasang Engsel Pintu

Psg

26

Rp

37,510.75

Rp

975,279.50

45 Pasang Handle Pintu

set

13

Rp

81,705.00

Rp

1,062,165.00

46 Pasang Engsel Jendela dan Ventilasi

Psg

56

Rp

28,364.80

Rp

1,588,428.80

47 Pasang Grendel Jendela dan Ventilasi bh

28

Rp

66,705.00

Rp

1,867,740.00

8

Rp

27,510.75

Rp

220,086.00

49 Pengecatan Tembok

m2 1594.670 Rp

15,032.50

Rp

23,971,876.78

50 Pengecatan Plafond

m2

381.000 Rp

12,632.50

Rp

4,812,982.50

m2

142.122 Rp

35,057.50

Rp

4,982,424.49

INSTALASI AIR

PINTU DAN JENDELA

48 Pasang Hak Angin Kait-Kait Jendela

Psg

PENGECATAN

51 Pengecatan Kayu

JUMLAH TOTAL

Rp 607,727,405.31

III PEKERJAAN BANGUNAN POS JAGA BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

9.000

Rp

18,705.00

Rp

168,345.00

2 Galian Pondasi

m3

8.058

Rp

23,240.00

Rp

187,267.92

3 Urugan Tanah

m3

7.280

Rp

18,810.00

Rp

136,936.80

4 Pas. Batu Pondasi

m3

2.520

Rp

605,475.00

Rp

1,525,797.00

5 Pas. Batu Kosong

m3

1.116

Rp

208,779.00

Rp

232,997.36

6 Urugan Pasir

m3

0.662

Rp

105,810.00

Rp

70,046.22

7 Beton (1 : 2 : 3)

m3

0.864

Rp

698,880.00

Rp

603,832.32

8 Bekisting Sloof (15/20)

m3

4.800

Rp

111,185.00

Rp

533,688.00

11.640

Rp

133,726.00

Rp

1,556,570.64

9 Bekisting Ringbalk dan Kolom (15/15) m2 10 Penulangan

Kg

41.823

Rp

13,745.30

Rp

574,871.17

11 Pas. Batu Bata 1 : 4

m2

36.040

Rp

83,490.00

Rp

3,008,979.60

12 Plesteran 1 : 4, Tebal 15 mm

m2

62.496

Rp

33,250.00

Rp

2,077,992.00

13 Acian Tembok

m2

62.496

Rp

6,033.25

Rp

377,053.99

14 Kusen Ulin (5/10)

m3

0.054

Rp

4,274,300.00

Rp

230,812.20

15 Pintu Panil

m2

1.500

Rp

359,300.00

Rp

538,950.00

16 Jendela Kaca

m2

1.140

Rp

340,740.00

Rp

388,443.60

17 Lisplank (2/20)

m2

3.200

Rp

29,750.00

Rp

95,200.00

NO

URAIAN PEKERJAAN

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

18 Keramik 30/30

m2

15.000

Rp

137,552.00

Rp

2,063,280.00

19 Atap Sakura Roof

m2

7.200

Rp

78,681.00

Rp

566,503.20

m

16.480

Rp

33,402.50

Rp

550,473.20

21 Kasau dan Reng (5/7 & 2/3)

m2

7.200

Rp

31,205.00

Rp

224,676.00

22 Rangka Plafond

m2

9.000

Rp

27,652.50

Rp

248,872.50

23 Plafond Tripleks 5 mm

m2

9.000

Rp

34,483.50

Rp

310,351.50

24 Kuda-Kuda dan Gording

m3

0.170

Rp

3,698,200.00

Rp

628,398.14

25 Bongkar Bekisting

m2

16.440

Rp

22,230.00

Rp

365,461.20

26 Pasang Titik Lampu

ttk

2

Rp

68,050.00

Rp

136,100.00

27 Pasang Stop Kontak

bh

1

Rp

33,050.00

Rp

33,050.00

28 Pasang Saklar Ganda

bh

1

Rp

33,050.00

Rp

33,050.00

29 Pasang Pipa Listrik

m

3

Rp

5,000.00

Rp

15,000.00

30 Pasang Kabel Listrik

m

5

Rp

3,000.00

Rp

15,000.00

31 Sambungan

bh

2

Rp

1,500.00

Rp

3,000.00

32 Pasang Engsel Pintu

Psg

2

Rp

37,510.75

Rp

75,021.50

33 Pasang Handle Pintu

set

1

Rp

81,705.00

Rp

81,705.00

34 Pasang Engsel Jendela

Psg

4

Rp

28,364.80

Rp

113,459.20

35 Pasang Grendel Jendela

bh

2

Rp

66,705.00

Rp

133,410.00

36 Pasang Hak Angin Kait-Kait Jendela

Psg

4

Rp

27,510.75

Rp

110,043.00

37 Pengecatan Tembok

m2

62.496

Rp

15,032.50

Rp

939,471.12

38 Pengecatan Plafond

m2

9.000

Rp

12,632.50

Rp

113,692.50

m2

9.980

Rp

35,057.50

Rp

349,873.85

Rp

19,417,675.74

20 Bubungan Sakura Roof

INSTALASI LISTRIK

PINTU DAN JENDELA

PENGECATAN

39 Pengecatan Kayu

JUMLAH TOTAL IV PEKERJAAN BANGUNAN GAZEBO PARKIR 1 Galian Pondasi

m3

0.989

Rp

23,240.00

Rp

22,984.36

2 Pas. Batu Bata 1 : 4

m2

4.640

Rp

83,490.00

Rp

387,393.60

3 BETON (1 : 2 : 3)

m3

0.809

Rp

698,880.00

Rp

565,393.92

4 Bekisting

m2

15.540

Rp

70,301.90

Rp

1,092,491.59

5 Kuda-kuda dan Gording Ulin

m3

0.045

Rp

102,570.00

Rp

4,615.65

6 Lisplank 2 (2/20)

m2

2.400

Rp

29,750.00

Rp

71,400.00

7 Atap Sakura Roof

m2

2.700

Rp

78,681.00

Rp

212,438.70

8 Kasau dan Reng

m2

2.700

Rp

31,205.00

Rp

84,253.50

9 Bongkar Bekisting

m2

15.540

Rp

22,230.00

Rp

345,454.20

10 Pengecatan Cat Minyak

m2

2.700

Rp

35,057.50

Rp

94,655.25

11 Pengecatan Tembok

m2

4.640

Rp

15,032.50

Rp

69,750.80

Rp

2,950,831.57

PENGECATAN

JUMLAH TOTAL

NO

URAIAN PEKERJAAN

SAT

VOL

HARGA SATUAN

JML.HARGA

(RP)

(RP)

V PEKERJAAN BANGUNAN LANDSCAPE PARKIR AREAL PARKIR, TROTOAR, DAN SALURAN DRAINASE 1 Galian Pondasi

m3

123.790 Rp

23,240.00

Rp

2,876,873.79

2 Urugan Tanah dipadatkan

m3 1550.459 Rp

34,810.00

Rp

53,971,470.83

3 Pas. Batu Bata 1 : 4

m2

83,490.00

Rp

16,150,305.60

4 Pas. Batu Pondasi

m3

605,475.00

Rp

12,973,633.92

5 Pas. Conblok

m2

333.306 Rp

86,155.00

Rp

28,715,978.43

6 Beton (1 : 2 : 3)

m3

785.879 Rp

698,880.00

Rp

549,234,946.39

7 Penulangan

kg

306.673 Rp

13,745.30

Rp

4,215,312.36

8 Bekisting

m2

735.235 Rp

70,301.90

Rp

51,688,434.49

9 Urugan Pasir

m2

270.847 Rp

83,490.00

Rp

22,612,982.63

m2

735.235 Rp

22,230.00

Rp

16,344,278.50

10 Bongkar Bekisting

193.440 Rp 21.427

Rp

JUMLAH

Rp 758,784,216.94

POT BUNGA TIPE A 11 Galian Pondasi

m3

0.117

Rp

23,240.00

Rp

2,719.08

12 Urugan Tanah

m3

2.000

13 Beton (1 : 2 : 3)

m3

0.117

Rp

18,810.00

Rp

37,620.00

Rp

698,880.00

Rp

81,768.96

14 Bekisting

m2

0.618

Rp

70,301.90

Rp

43,446.58

15 Pas. Batu Bata 1 : 4

m2

2.900

Rp

83,490.00

Rp

242,121.00

16 Plesteran (1 : 4)

m2

2.950

Rp

33,250.00

Rp

98,087.50

17 Bongkar Bekisting

m2

0.618

Rp

22,230.00

Rp

13,738.14

1 UNIT

Rp

519,501.26

31 UNIT

Rp

16,104,538.96

JUMLAH POT BUNGA TIPE B 18 Galian Pondasi

m3

0.117

Rp

23,240.00

Rp

2,719.08

19 Urugan Tanah

m3

2.000

Rp

18,810.00

Rp

37,620.00

20 Beton (1 : 2 : 3)

m3

0.117

Rp

698,880.00

Rp

81,768.96

21 Bekisting

m2

0.618

Rp

70,301.90

Rp

43,446.58

22 Pas. Batu Bata 1 : 4

m2

3.020

Rp

83,490.00

Rp

252,139.80

23 Plesteran (1 : 4)

m2

3.070

Rp

33,250.00

Rp

102,077.50

24 Bongkar Bekisting

m2

0.618

Rp

22,230.00

Rp

13,738.14

1 UNIT

Rp

533,510.06

16 UNIT

Rp

8,536,160.91

2,000,000.00

Rp

2,000,000.00

1 UNIT

Rp

2,000,000.00

5 UNIT

Rp

10,000,000.00

1,000,000.00

Rp

1,000,000.00

1 UNIT

Rp

1,000,000.00

5 UNIT

Rp

5,000,000.00

JUMLAH LAMPU TAMAN TIPE A

ls

1.000

Rp

JUMLAH LAMPU TAMAN TIPE A

ls

JUMLAH JUMLAH TOTAL

1.000

Rp

Rp 798,424,916.81

NO

URAIAN PEKERJAAN

SAT

VOL

1 Pemasangan Bowplank

m2

23.250

2 Galian Pondasi

m3

3 Urugan Tanah

m3

64.700

4 Pas. Batu Pondasi

m3

5 Pas. Batu Kosong 6 Urugan Pasir

HARGA SATUAN

JML.HARGA

(RP)

(RP)

VI PEKERJAAN GAPURA DAN PAGAR PEKERJAAN PAGAR Rp

18,705.00

Rp

434,891.25

112.800 Rp

23,240.00

Rp

2,621,472.00

Rp

18,810.00

Rp

1,217,007.00

33.600

Rp

605,475.00

Rp

20,343,960.00

m3

11.040

Rp

208,779.00

Rp

2,304,920.16

m3

3.460

Rp

105,810.00

Rp

366,102.60

7 Beton (1 : 2 : 3)

m3

6.035

Rp

698,880.00

Rp

4,217,740.80

8 Bekisting Sloof (15/20)

m3

32.000

Rp

111,185.00

Rp

3,557,920.00

9 Bekisting Kolom (15/15)

m2

50.900

Rp

133,726.00

Rp

6,806,653.40

10 Penulangan

Kg

496.249 Rp

13,745.30

Rp

6,821,088.44

11 Pas. Batu Bata 1 : 4

m2

110.400 Rp

83,490.00

Rp

9,217,296.00

12 Bongkar Bekisting

m2

82.900

Rp

22,230.00

Rp

1,842,867.00

13 Pemasangan Bowplank

m2

36.000

Rp

18,705.00

Rp

673,380.00

14 Tiang Pancang Ulin 10/10

ttk

8.000

Rp

102,570.00

Rp

820,560.00

15 Sloof Tiang Pokok

m

8.000

Rp

48,344.00

Rp

386,752.00

16 Gelagar Ulin 10/10

m

17.000

Rp

52,760.00

Rp

896,920.00

17 Gelagar Ulin 5/10

m

109.920 Rp

25,372.00

Rp

2,788,890.24

18 Kandang Rase Ulin 2/5 & 5/8

m

22.000

Rp

40,948.00

Rp

900,856.00

m2

2.160

Rp

50,000.00

Rp

108,000.00

m

10.360

Rp

75,000.00

Rp

777,000.00

m2

25.000

Rp

35,057.50

Rp

876,437.50

Rp

67,980,714.39

PEKERJAAN GAPURA

19 Seng Plat 20 Pipa Galvanis (Stainless Steel) PENGECATAN 21 Pengecatan Kayu

JUMLAH TOTAL C PEKERJAAN UNTUK LOKASI PANTAI I

PEKERJAAN BANGUNAN KIOS BANGUNAN UTAMA

1 Pemasangan Bowplank

m2

46.000

Rp

18,705.00

Rp

860,430.00

2 Galian Pondasi

m3

30.927

Rp

23,240.00

Rp

718,743.48

3 Urugan Tanah

m3

23.266

Rp

18,810.00

Rp

437,635.81

4 Pas. Batu Pondasi

m3

11.152

Rp

605,475.00

Rp

6,751,992.30

5 Pas. Batu Kosong

m3

3.134

Rp

208,779.00

Rp

654,287.29

6 Urugan Pasir

m3

1.476

Rp

105,810.00

Rp

156,124.91

7 Tiang Pancang Ulin (10/10)

ttk

19.000

Rp

102,570.00

Rp

1,948,830.00

8 Beton (1 : 2 : 3)

m3

3.842

Rp

698,880.00

Rp

2,684,747.52

9 Bekisting Sloof (15/20)

m3

18.800

Rp

111,185.00

Rp

2,090,278.00

10 Bekisting Ringbalk dan Kolom (15/15) m2

74.820

Rp

133,726.00

Rp

10,005,379.32

NO

URAIAN PEKERJAAN

SAT

VOL

HARGA SATUAN

JML.HARGA

(RP)

(RP)

11 Penulangan

Kg

701.362 Rp

13,745.30

Rp

9,640,430.94

12 Pas. Batu Bata 1 : 4

m2

114.463 Rp

83,490.00

Rp

9,556,474.13

13 Plesteran 1 : 4, Tebal 15 mm

m2

219.325 Rp

33,250.00

Rp

7,292,556.25

14 Acian Tembok

m2

219.325 Rp

6,033.25

Rp

1,323,242.56

15 Kusen Ulin (5/10)

m3

0.239

Rp

4,274,300.00

Rp

1,021,557.70

16 Pintu Panil

m2

22.266

Rp

359,300.00

Rp

8,000,173.80

17 Lisplank (2/20)

m2

9.350

Rp

29,750.00

Rp

278,162.50

18 Keramik 30/30

m2

34.412

Rp

137,552.00

Rp

4,733,439.42

19 Keramik 20/20

m2

20.253

Rp

210,552.00

Rp

4,264,309.66

20 Atap Sakura Roof

m2

90.756

Rp

78,681.00

Rp

7,140,788.57

21 Bubungan Sakura Roof

m

13.380

Rp

33,402.50

Rp

446,925.45

22 Kasau dan Reng (5/7 & 2/3)

m2

90.756

Rp

31,205.00

Rp

2,832,047.22

23 Rangka Plafond

m2

42.000

Rp

27,652.50

Rp

1,161,405.00

24 Plafond Tripleks 5 mm

m2

42.000

Rp

34,483.50

Rp

1,448,307.00

25 Jalusi

m2

0.420

Rp

207,675.00

Rp

87,223.50

26 Ventilasi

m2

0.450

Rp

340,740.00

Rp

153,333.00

27 Kuda-Kuda dan Gording

m3

0.934

Rp

3,698,200.00

Rp

3,452,813.34

28 Baut

bh

40.000

Rp

2,500.00

Rp

100,000.00

29 Bongkar Bekisting

m2

93.620

Rp

22,230.00

Rp

2,081,172.60

30 Pasang Titik Lampu

ttk

9

Rp

68,050.00

Rp

612,450.00

31 Pasang Stop Kontak

bh

1

Rp

33,050.00

Rp

33,050.00

32 Pasang Saklar Tunggal

bh

3

Rp

28,050.00

Rp

84,150.00

33 Pasang Saklar Ganda

bh

3

Rp

33,050.00

Rp

99,150.00

34 Pasang Pipa Listrik

m

26

Rp

5,000.00

Rp

130,000.00

35 Pasang Kabel Listrik

m

32

Rp

3,000.00

Rp

96,000.00

36 Sambungan

bh

8

Rp

1,500.00

Rp

12,000.00

37 Pasang Kran 3/4" atau 1/2"

bh

3

Rp

37,455.00

Rp

112,365.00

38 Pasang Kloset Jongkok

bh

2

Rp

123,465.00

Rp

246,930.00

39 Pasang Bak Air

bh

3

Rp

210,015.00

Rp

630,045.00

40 Pasang Pipa PVC Ø 3/4"

m

19

Rp

13,471.63

Rp

255,961.03

41 Pasang Pipa PVC Ø 3"

m

4

Rp

28,838.70

Rp

115,354.80

42 Pasang Wastafel

bh

1

Rp

325,015.00

Rp

325,015.00

43 Pasang Engsel Pintu

Psg

71

Rp

37,510.75

Rp

2,663,263.25

44 Pasang Grendel Pintu

set

12

Rp

66,705.00

Rp

800,460.00

45 Pasang Kunci Pintu Tanam 2 Slaag

set

2

Rp

81,705.00

Rp

163,410.00

46 Pasang Engsel Jendela

Psg

6

Rp

28,364.80

Rp

170,188.80

47 Pasang Grendel Jendela

bh

3

Rp

66,705.00

Rp

200,115.00

INSTALASI LISTRIK

INSTALASI AIR

PINTU DAN JENDELA

NO

URAIAN PEKERJAAN

48 Pasang Hak Angin Kait-Kait Jendela

SAT

VOL

Psg

6

HARGA SATUAN

JML.HARGA

(RP)

(RP)

Rp

27,510.75

Rp

165,064.50

219.325 Rp

15,032.50

Rp

3,297,003.06

PENGECATAN 49 Pengecatan Tembok

m2

50 Pengecatan Plafond

m2

42.000

Rp

12,632.50

Rp

530,565.00

51 Pengecatan Kayu

m2

58.402

Rp

35,057.50

Rp

2,047,428.12

JUMLAH TOTAL

Rp 104,112,779.83

II PEKERJAAN BANGUNAN TEMPAT WUDHU BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

15.925

Rp

18,705.00

Rp

297,877.13

2 Galian Pondasi

m3

10.170

Rp

23,240.00

Rp

236,351.67

3 Urugan Tanah

m3

5.151

Rp

18,810.00

Rp

96,887.72

4 Pas. Batu Pondasi

m3

3.161

Rp

605,475.00

Rp

1,913,603.74

5 Pas. Batu Kosong

m3

1.422

Rp

208,779.00

Rp

296,930.71

6 Urugan Pasir

m3

0.436

Rp

105,810.00

Rp

46,180.77

7 Tiang Pancang Ulin (10/10)

ttk

0.000

Rp

102,570.00

Rp

8 Beton (1 : 2 : 3)

m3

1.753

Rp

698,880.00

Rp

1,225,224.00

9 Beton Rabat

m3

0.499

Rp

704,580.00

Rp

351,585.42

m3

6.020

Rp

111,185.00

Rp

669,333.70

19.418

Rp

133,726.00

Rp

2,596,624.61

251.039 Rp

13,745.30

Rp

3,450,600.35

10 Bekisting Sloof (15/20)

11 Bekisting Ringbalk dan Kolom (15/15) m2

-

12 Penulangan

kg

13 Pas. Batu Bata 1 : 4

m2

56.213

Rp

83,490.00

Rp

4,693,223.37

14 Plesteran 1 : 4, Tebal 15 mm

m2

56.071

Rp

33,250.00

Rp

1,864,344.13

16 Acian Tembok

m2

56.071

Rp

6,033.25

Rp

338,287.34

17 Roster 25/25

m2

2.625

Rp

261,760.00

Rp

687,120.00

18 Kusen Ulin (5/10)

m3

0.036

Rp

4,274,300.00

Rp

151,737.65

19 Pintu Panil

m2

2.400

Rp

359,300.00

Rp

862,320.00

20 Lisplank (2/20)

m2

4.772

Rp

29,750.00

Rp

141,967.00

21 Keramik 20/20

m2

53.358

Rp

210,552.00

Rp

11,234,633.62

22 Atap Sakura Roof

m2

35.563

Rp

78,681.00

Rp

2,798,132.40

m

6.100

Rp

33,402.50

Rp

203,755.25

24 Rangka Plafond

m2

15.925

Rp

27,652.50

Rp

440,366.06

25 Plafond Tripleks 5 mm

m2

15.925

Rp

34,483.50

Rp

549,149.74

26 Kasau dan Reng (5/7 & 2/3)

m2

35.563

Rp

31,205.00

Rp

1,109,743.42

27 Kuda-Kuda dan Gording

m3

0.465

Rp

3,698,200.00

Rp

1,718,583.13

28 Baut

bh

18.000

Rp

2,500.00

Rp

45,000.00

29 Bongkar Bekisting

m2

25.438

22,230.00 Rp

565,475.63

ttk

4

Rp

68,050.00

Rp

272,200.00

30 Pasang Saklar Ganda

bh

2

Rp

33,050.00

Rp

66,100.00

31 Pasang Pipa Listrik

m

14

Rp

5,000.00

Rp

70,000.00

23 Bubungan Sakura Roof

INSTALASI LISTRIK Pasang Titik Lampu

NO

URAIAN PEKERJAAN

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

32 Pasang Kabel Listrik

m

18

Rp

3,000.00

Rp

54,000.00

33 Sambungan

bh

4

Rp

1,500.00

Rp

6,000.00

34 Pasang Kran 3/4" atau 1/2"

bh

10

Rp

37,455.00

Rp

374,550.00

35 Pasang Kloset Jongkok

bh

2

Rp

123,465.00

Rp

246,930.00

36 Pasang Pipa PVC Ø 3/4"

m

3

Rp

13,471.63

Rp

40,414.90

37 Pasang Pipa PVC Ø 3"

m

3

Rp

28,838.70

Rp

86,516.10

38 Pasang Engsel Pintu

Psg

4

Rp

37,510.75

Rp

150,043.00

39 Pasang Kunci Pintu Tanam 2 Slaag

set

2

Rp

81,705.00

Rp

163,410.00

40 Pengecatan Tembok

m2

56.071

Rp

15,032.50

Rp

842,879.79

41 Pengecatan Plafond

m2

15.925

Rp

12,632.50

Rp

201,172.56

42 Pengecatan Kayu

m2

10.572

Rp

35,057.50

Rp

370,627.89

Rp

41,529,882.79

INSTALASI AIR

PINTU DAN JENDELA

PENGECATAN

JUMLAH TOTAL III PEKERJAAN BANGUNAN RUANG GANTI BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

18.000

Rp

18,705.00

Rp

336,690.00

2 Galian Pondasi

m3

23.496

Rp

23,240.00

Rp

546,047.04

3 Urugan Tanah

m3

14.120

Rp

18,810.00

Rp

265,587.80

4 Pas. Batu Pondasi

m3

7.313

Rp

605,475.00

Rp

4,427,535.94

5 Pas. Batu Kosong

m3

3.240

Rp

208,779.00

Rp

676,443.96

6 Urugan Pasir

m3

1.964

Rp

105,810.00

Rp

207,832.00

7 Tiang Pancang Ulin (10/10)

ttk

13.000

Rp

102,570.00

Rp

1,333,410.00

8 BETON (1 : 2 : 3)

m3

2.174

Rp

698,880.00

Rp

1,519,330.18

9 Bekisting Sloof (15/20)

m2

12.000

Rp

111,185.00

Rp

1,334,220.00

m2

30.728

Rp

133,726.00

Rp

4,109,065.67

370.650 Rp

10 Bekisting Ringbalk dn Kolom 11 Penulangan

kg

12 Pas. Batu Bata 1 : 4

m2

13,745.30

Rp

5,094,702.27

Rp

83,490.00

Rp

5,950,332.30

13 Plesteran 1 : 4, Tebal 15 mm

m2

126.340 Rp

33,250.00

Rp

4,200,805.00

14 Acian Tembok

m2

126.340 Rp

6,033.25

Rp

762,240.81

16 Roster 25/25

m2

0.500

Rp

261,760.00

Rp

130,880.00

17 Kusen Ulin (5/10)

m3

0.033

Rp

4,274,300.00

Rp

142,120.48

18 Pintu WC (Plastik)

ls

4.000

Rp

300,000.00

Rp

1,200,000.00

19 Lisplank (2/20)

m2

2.438

Rp

29,750.00

Rp

72,530.50

20 Keramik 20/20 (Lantai)

m2

20.460

Rp

210,552.00

Rp

4,307,893.92

21 Keramik 20/20 (Dinding)

m2

16.200

Rp

210,552.00

Rp

3,410,942.40

22 Atap Sakura Roof

m2

35.574

Rp

78,681.00

Rp

2,798,997.89

23 Kasau dan Reng (5/7 & 2/3)

m2

35.574

Rp

31,205.00

Rp

1,110,086.67

24 Gording Ulin (5/10)

m3

0.150

Rp

3,698,200.00

Rp

554,508.11

71.270

NO

URAIAN PEKERJAAN

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

25 Rangka Plafond

m2

18.000

Rp

27,652.50

Rp

497,745.00

26 Plafond Tripleks 5 mm

m2

18.000

Rp

34,483.50

Rp

620,703.00

27 Bongkar Bekisting

m2

42.728

Rp

22,230.00

Rp

949,832.33

28 Pasang Titik Lampu

ttk

6.000

Rp

68,050.00

Rp

408,300.00

29 Pasang Saklar Tunggal

bh

6.000

Rp

28,050.00

Rp

168,300.00

30 Pasang Pipa Listrik

m

20.000

Rp

5,000.00

Rp

100,000.00

31 Pasang Kabel Listrik

m

28.000

Rp

3,000.00

Rp

84,000.00

32 Sambungan

bh

7.000

Rp

1,500.00

Rp

10,500.00

33 Pasang Kran 3/4" atau 1/2"

bh

6

Rp

37,455.00

Rp

224,730.00

34 Pasang Kloset Jongkok

bh

4

Rp

123,465.00

Rp

493,860.00

35 Pasang Bak Air

bh

4

Rp

210,015.00

Rp

840,060.00

36 Pasang Pipa PVC Ø 3/4"

m

28

Rp

13,471.63

Rp

377,205.73

37 Pasang Pipa PVC Ø 3"

m

5

Rp

28,838.70

Rp

144,193.50

38 Pasang Wastafel

bh

2

Rp

325,015.00

Rp

650,030.00

39 Pasang Engsel Jendela

Psg

8

Rp

28,364.80

Rp

226,918.40

40 Pasang Grendel Jendela

bh

4

Rp

66,705.00

Rp

266,820.00

41 Pasang Hak Angin Kait-Kait Jendela

Psg

8

Rp

27,510.75

Rp

220,086.00

126.340 Rp

15,032.50

Rp

1,899,206.05

INSTALASI LISTRIK

INSTALASI AIR

PINTU DAN JENDELA

PENGECATAN 42 Pengecatan Tembok

m2

43 Pengecatan Plafond

m2

18.000

Rp

12,632.50

Rp

227,385.00

m2

3.898

Rp

35,057.50

Rp

136,654.14

Rp

53,038,732.06

44 Pengecatan Kayu

JUMLAH TOTAL IV PEKERJAAN BANGUNAN MUSHOLLAH BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

54.000

Rp

18,705.00

Rp

1,010,070.00

2 Tiang Pancang Ulin 10/10

ttk

67.000

Rp

102,570.00

Rp

6,872,190.00

3 Sloof Tiang Pokok

m

67.000

Rp

48,344.00

Rp

3,239,048.00

4 Tiang Pokok 10/10

m3

0.930

Rp

4,258,300.00

Rp

3,960,219.00

5 Gelagar Ulin 10/10

m

45.000

Rp

52,760.00

Rp

2,374,200.00

6 Gelagar Ulin 5/10

m

117.000 Rp

25,372.00

Rp

2,968,524.00

7 Ringbalk Ulin 10/10

m

24.000

Rp

60,866.00

Rp

1,460,784.00

8 Lantai Ulin

m2

61.060

Rp

66,110.00

Rp

4,036,676.60

9 Dinding Meranti

m2

254.765 Rp

43,610.00

Rp

11,110,297.29

10 Kusen Ulin (5/10)

m3

0.357

Rp

4,274,300.00

Rp

1,524,856.53

11 Pintu Panil

m2

11.548

Rp

359,300.00

Rp

4,149,016.75

12 Jendela Kaca Mati + kusen

m2

11.188

Rp

523,700.00

Rp

5,858,946.12

m

26.050

Rp

40,948.00

Rp

1,066,695.40

13 Kandang Rase Ulin 2/5 & 5/8

NO

URAIAN PEKERJAAN

SAT

VOL

14 Lisplank (2/20)

m2

15.590

15 Sakura Roof

m2

HARGA SATUAN

JML.HARGA

(RP)

(RP)

Rp

29,750.00

Rp

463,802.50

146.543 Rp

78,681.00

Rp

11,530,149.78

m

31.792

Rp

33,402.50

Rp

1,061,932.28

17 Rangka Plafond

m2

40.500

Rp

27,652.50

Rp

1,119,926.25

18 Plafond Tripleks 5 mm

m2

40.500

Rp

34,483.50

Rp

1,396,581.75

19 Kasau dan Reng (5/7 & 2/3)

m2

146.543 Rp

31,205.00

Rp

4,572,874.32

16 Bubungan Sakura Roof

20 Baut

bh

40.000

Rp

2,500.00

Rp

100,000.00

21 Kuda-Kuda dan Gording

m3

0.978

Rp

3,698,200.00

Rp

3,615,503.22

22 Pasang Kepala Lampu

ttk

10

Rp

68,050.00

Rp

680,500.00

23 Pasang Stop Kontak

bh

4

Rp

33,050.00

Rp

132,200.00

24 Pasang Saklar Tunggal

bh

2

Rp

28,050.00

Rp

56,100.00

25 Pasang Saklar Ganda

bh

2

Rp

33,050.00

Rp

66,100.00

26 Pasang Pipa Listrik

m

25

Rp

5,000.00

Rp

125,000.00

27 Pasang Kabel Listrik

m

30

Rp

3,000.00

Rp

90,000.00

28 Sambungan

bh

10

Rp

1,500.00

Rp

15,000.00

29 Pasang Engsel Pintu

Psg

14

Rp

37,510.75

Rp

525,150.50

30 PasangGrendel Pintu

set

6

Rp

66,705.00

Rp

400,230.00

31 Pasang Handle Tangan

set

7

Rp

81,705.00

Rp

571,935.00

32 Pengecatan Plafond

m2

40.500

Rp

12,632.50

Rp

511,616.25

33 Pengecatan Kayu

m2

371.829 Rp

35,057.50

Rp

13,035,391.66

Rp

89,701,517.19

INSTALASI LISTRIK

PINTU DAN JENDELA

PENGECATAN

JUMLAH TOTAL V PEKERJAAN BANGUNAN RUMAH PANGGUNG BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

36.000

Rp

18,705.00

Rp

673,380.00

2 Tiang Pancang Ulin 10/10

ttk

28.000

Rp

102,570.00

Rp

2,871,960.00

3 Sloof Tiang Pokok

m

28.000

Rp

48,344.00

Rp

1,353,632.00

4 Tiang Pokok 10/10

m3

0.659

Rp

4,258,300.00

Rp

2,807,923.02

5 Gelagar Ulin 10/10

m

28.000

Rp

52,760.00

Rp

1,477,280.00

6 Gelagar Ulin 5/10

m

36.000

Rp

25,372.00

Rp

913,392.00

7 Ringbalk Ulin 10/10

m

26.000

Rp

60,866.00

Rp

1,582,516.00

8 Lantai Ulin

m2

36.000

Rp

66,110.00

Rp

2,379,960.00

9 Dinding Meranti

m2

70.913

Rp

43,610.00

Rp

3,092,494.13

10 Kusen Ulin (5/10)

m3

0.052

Rp

4,274,300.00

Rp

221,195.03

11 Pintu Panil

m2

1.300

Rp

359,300.00

Rp

467,090.00

12 Ventilasi

m2

0.694

Rp

340,740.00

Rp

236,473.56

m

22.000

Rp

40,948.00

Rp

900,856.00

m2

4.364

Rp

29,750.00

Rp

129,829.00

13 Kandang Rase Ulin 2/5 & 5/8 14 Lisplank (2/20)

NO

URAIAN PEKERJAAN

16 Atap Sakura Roof 17 Bubungan Sakura Roof

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

m2

39.430

Rp

78,681.00

Rp

3,102,352.49

m

11.770

Rp

33,402.50

Rp

393,147.43

18 Rangka Plafond

m2

36.000

Rp

27,652.50

Rp

995,490.00

19 Plafond Tripleks 5 mm

m2

36.000

Rp

34,483.50

Rp

1,241,406.00

20 Kasau dan Reng (5/7 & 2/3)

m2

39.430

Rp

31,205.00

Rp

1,230,397.55

21 Baut

bh

40.000

Rp

2,500.00

Rp

100,000.00

22 Kuda-Kuda dan Gording

m3

1.147

Rp

3,698,200.00

Rp

4,240,851.68

ttk

5

Rp

68,050.00

Rp

340,250.00

23 Pasang Stop Kontak

bh

1

Rp

33,050.00

Rp

33,050.00

24 Pasang Saklar Tunggal

bh

1

Rp

28,050.00

Rp

28,050.00

25 Pasang Saklar Ganda

bh

2

Rp

33,050.00

Rp

66,100.00

26 Pasang Pipa Listrik

m

15

Rp

5,000.00

Rp

75,000.00

27 Pasang Kabel Listrik

m

19

Rp

3,000.00

Rp

57,000.00

28 Sambungan

bh

5

Rp

1,500.00

Rp

7,500.00

29 Pasang Kran 3/4" atau 1/2"

bh

1

Rp

37,455.00

Rp

37,455.00

30 Pasang Kloset Jongkok

bh

1

Rp

123,465.00

Rp

123,465.00

31 Pasang Pipa PVC Ø 3/4"

m

4

Rp

13,471.63

Rp

53,886.53

32 Pasang Pipa PVC Ø 3"

m

4

Rp

28,838.70

Rp

115,354.80

33 Pasang Kunci Pintu Tanam 2 Slaag

set

1

Rp

81,705.00

Rp

81,705.00

34 Pasang Engsel Pintu

Psg

2

Rp

37,510.75

Rp

75,021.50

35 Pasang Engsel Jendela

Psg

6

Rp

28,364.80

Rp

170,188.80

36 Pasang Grendel Jendela

bh

3

Rp

66,705.00

Rp

200,115.00

37 Pasang Hak Angin Kait-Kait Jendela

Psg

6

Rp

27,510.75

Rp

165,064.50

m2

36.000

Rp

12,632.50

Rp

454,770.00

126.265 Rp

35,057.50

Rp

4,426,517.71

Rp

36,922,119.71

INSTALASI LISTRIK Pasang Kepala Lampu

INSTALASI AIR

PINTU DAN JENDELA

PENGECATAN 38 Pengecatan Plafond 39 Pengecatan Kayu

m2 JUMLAH TOTAL

VI PEKERJAAN BANGUNAN CAFÉ BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

75.000

Rp

18,705.00

Rp

1,402,875.00

2 Tiang Pancang Ulin 10/10

ttk

48.000

Rp

102,570.00

Rp

4,923,360.00

3 Sloof Tiang Pokok

m

48.000

Rp

48,344.00

Rp

2,320,512.00

4 Tiang Pokok 10/10

m3

0.855

Rp

4,258,300.00

Rp

3,640,846.50

5 Gelagar Ulin 10/10

m

60.000

Rp

52,760.00

Rp

3,165,600.00

6 Gelagar Ulin 5/10

m

160.000 Rp

25,372.00

Rp

4,059,520.00

7 Ringbalk Ulin 10/10

m

40.000

Rp

60,866.00

Rp

2,434,640.00

m2

78.000

Rp

66,110.00

Rp

5,156,580.00

8 Lantai Ulin

NO

URAIAN PEKERJAAN

9 Dinding Meranti 10 Kandang Rase Ulin 2/5 & 5/8

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

m2

55.849

Rp

43,610.00

Rp

2,435,574.89

m

44.100

Rp

40,948.00

Rp

1,805,806.80

11 Lisplank (2/20)

m2

5.284

Rp

29,750.00

Rp

157,199.00

12 Atap Sakura Roof

m2

129.258 Rp

78,681.00

Rp

10,170,148.70

13 Bubungan Sakura Roof

m

40.480

Rp

33,402.50

Rp

1,352,133.20

14 Rangka Plafond

m2

75.000

Rp

27,652.50

Rp

2,073,937.50

16 Plafond Tripleks 5 mm

m2

75.000

Rp

34,483.50

Rp

2,586,262.50

17 Kasau dan Reng (5/7 & 2/3)

m2

129.258 Rp

31,205.00

Rp

4,033,495.89

18 Baut

bh

60.000

Rp

2,500.00

Rp

150,000.00

19 Kuda-Kuda dan Gording

m3

1.752

Rp

3,698,200.00

Rp

6,480,237.52

20 Pasang Kepala Lampu

ttk

5

Rp

68,050.00

Rp

340,250.00

21 Pasang Stop Kontak

bh

2

Rp

33,050.00

Rp

66,100.00

22 Pasang Saklar Tunggal

bh

1

Rp

28,050.00

Rp

28,050.00

23 Pasang Saklar Ganda

bh

2

Rp

33,050.00

Rp

66,100.00

24 Pasang Pipa Listrik

m

20

Rp

5,000.00

Rp

100,000.00

25 Pasang Kabel Listrik

m

22

Rp

3,000.00

Rp

66,000.00

26 Sambungan

bh

4

Rp

1,500.00

Rp

6,000.00

75.000

Rp

12,632.50

Rp

947,437.50

161.183 Rp

35,057.50

Rp

5,650,673.02

Rp

65,619,340.02

INSTALASI LISTRIK

PENGECATAN 27 Pengecatan Plafond

m2

28 Pengecatan Kayu

m2 JUMLAH TOTAL

VII PEKERJAAN BANGUNAN PLAZA BANGUNAN UTAMA 1 Galian Pondasi

m3

2 Urugan Tanah

m3

3 Pas. Batu Pondasi

m3

4 Beton (1 : 2 : 3)

m3

5 Bekisting

m2

6 Pas. Batu Bata 1 : 4

m2

7 Plesteran (1 : 4)

9.210

Rp

23,240.00

Rp

214,045.51

110.257 Rp

18,810.00

Rp

2,073,937.09

9.210

Rp

605,475.00

Rp

5,576,557.95

45.868

Rp

698,880.00

Rp

32,056,190.80

126.853 Rp

70,301.90

Rp

8,918,035.87

Rp

83,490.00

Rp

7,459,080.09

m2

132.996 Rp

33,250.00

Rp

4,422,128.97

8 Bongkar Bekisting

m2

126.853 Rp

22,230.00

Rp

2,819,951.18

9 Pengecatan Tembok

m2

75.000

Rp

15,032.50

Rp

1,127,437.50

ls

1.000

Rp

2,000,000.00

Rp

2,000,000.00

1 UNIT

Rp

2,000,000.00

10 UNIT

Rp

20,000,000.00

1,000,000.00

Rp

1,000,000.00

1 UNIT

Rp

1,000,000.00

10 UNIT

Rp

10,000,000.00

Rp

94,667,364.96

LAMPU TAMAN TIPE A

89.341

JUMLAH LAMPU TAMAN TIPE A

ls

JUMLAH JUMLAH TOTAL

1.000

Rp

NO

URAIAN PEKERJAAN

SAT

VOL

HARGA SATUAN

JML.HARGA

(RP)

(RP)

VIII PEKERJAAN BANGUNAN LANDSCAPE PULAU TROTOAR 1 Galian Pondasi

m3

4.200

Rp

23,240.00

Rp

97,608.00

2 Urugan Tanah dipadatkan

m3

48.300

Rp

34,810.00

Rp

1,681,323.00

3 Pas. Conblok

m2

966.000 Rp

86,155.00

Rp

83,225,730.00

4 Beton (1 : 2 : 3)

m3

Rp

698,880.00

Rp

8,805,888.00

5 Bekisting

m2

315.000 Rp

6 Urugan Pasir

m2

7 Bongkar Bekisting

m2

12.600

70,301.90

Rp

22,145,099.78

Rp

83,490.00

Rp

3,226,053.60

315.000 Rp

22,230.00

Rp

7,002,450.00

38.640

JUMLAH

Rp 126,184,152.38

BAK TANAMAN TIPE A 8 Galian Pondasi

m3

0.698

Rp

23,240.00

Rp

16,209.90

9 Urugan Tanah

m3

1.463

Rp

18,810.00

Rp

27,509.63

10 Pas. Batu Pondasi

m3

0.698

Rp

605,475.00

Rp

422,318.81

11 Beton (1 : 2 : 3)

m3

0.255

Rp

698,880.00

Rp

178,214.40

12 Bekisting

m2

4.250

Rp

70,301.90

Rp

298,783.09

13 Pas. Batu Bata 1 : 4

m2

5.925

Rp

83,490.00

Rp

494,678.25

14 Plesteran (1 : 4)

m2

8.925

Rp

33,250.00

Rp

296,756.25

15 Bongkar Bekisting

m2

4.250

Rp

22,230.00

Rp

94,477.50

JUMLAH

1 UNIT

Rp

1,828,947.83

12 UNIT

Rp

21,947,373.96

BAK TANAMAN TIPE B 16 Galian Pondasi

m3

0.490

Rp

23,240.00

Rp

11,383.88

17 Urugan Tanah

m3

0.471

Rp

18,810.00

Rp

8,859.51

18 Pas. Batu Pondasi

m3

0.490

Rp

605,475.00

Rp

296,585.87

19 Beton (1 : 2 : 3)

m3

0.122

Rp

698,880.00

Rp

85,584.84

20 Bekisting

m2

2.041

Rp

70,301.90

Rp

143,486.19

21 Pas. Batu Bata 1 : 4

m2

2.449

Rp

83,490.00

Rp

204,483.71

22 Plesteran (1 : 4)

m2

4.082

Rp

33,250.00

Rp

135,726.50

23 Bongkar Bekisting

m2

2.041

Rp

22,230.00

Rp

45,371.43

1 UNIT

Rp

931,481.93

4 UNIT

Rp

3,725,927.74

JUMLAH BAK TANAMAN TIPE C 24 Beton (1 : 2 : 3)

m3

0.005

Rp

698,880.00

Rp

3,494.40

25 Bekisting

m2

1.948

Rp

70,301.90

Rp

136,966.39

26 Bongkar Bekisting

m2

1.948

Rp

22,230.00

Rp

43,309.82

JUMLAH

1 UNIT

Rp

183,770.61

9 UNIT

Rp

1,653,935.47

NO

URAIAN PEKERJAAN

HARGA SATUAN

JML.HARGA

(RP)

(RP)

SAT

VOL

27 Galian Pondasi

m3

0.075

Rp

23,240.00

Rp

1,751.37

28 Beton (1 : 2 : 3)

m3

0.325

Rp

698,880.00

Rp

227,163.96

29 Bekisting

m3

5.827

Rp

70,301.90

Rp

409,663.26

30 Penulangan

kg

19.855

Rp

13,745.30

Rp

272,909.76

31 Plesteran

m2

1.130

Rp

33,250.00

Rp

37,585.80

32 Keramik 20/20

m2

2.520

Rp

210,552.00

Rp

530,591.04

33 Bongkar Bekisting

m2

5.827

Rp

22,230.00

Rp

129,538.66

1 UNIT

Rp

1,609,203.84

18 UNIT

Rp

28,965,669.05

Rp

500,000.00

1 UNIT

Rp

500,000.00

20 UNIT

Rp

10,000,000.00

BANGKU TAMAN

JUMLAH TEMPAT SAMPAH 34 Tempat Sampah

ls

1

Rp

JUMLAH

500,000.00

JUMLAH TOTAL

Rp 192,477,058.59

IX PEKERJAAN BANGUNAN GAZEBO 1 Galian Pondasi

m3

0.096

Rp

23,240.00

Rp

2,231.04

2 Pas. Batu Pondasi

m3

0.096

Rp

605,475.00

Rp

58,125.60

3 Gording Ulin (10/10)

m3

3.740

Rp

102,570.00

Rp

383,611.80

4 Beton (1 : 2 : 3)

m3

0.176

Rp

698,880.00

Rp

123,002.88

5 Bekisting

m2

2.210

Rp

70,301.90

Rp

155,367.21

6 Penulangan Besi

kg

8.627

Rp

13,745.30

Rp

118,582.76

7 Pas. Batu Bata 1 : 4

m2

1.620

Rp

83,490.00

Rp

135,253.80

8 Lisplank 2 (2/20)

m2

1.620

Rp

29,750.00

Rp

48,195.00

9 Keramik 20/20

m2

1.090

Rp

210,552.00

Rp

229,501.68

10 Atap Sakura Roof

m2

7.560

Rp

78,681.00

Rp

594,828.36

11 Kasau dan Reng

m2

7.560

Rp

31,205.00

Rp

235,909.80

12 Bongkar Bekisting

m2

2.210

Rp

22,230.00

Rp

49,128.30

13 Pengecatan Kayu

m2

2.500

Rp

35,057.50

Rp

87,643.75

Rp

2,221,381.98

JUMLAH TOTAL X PEKERJAAN BANGUNAN TANDON AIR 1 Pemasangan Bowplank

m2

3.780

Rp

18,705.00

Rp

70,704.90

2 Gelagar Ulin 10/10

m

18.000

Rp

52,760.00

Rp

949,680.00

3 Gelagar Ulin 5/10

m

47.760

Rp

25,372.00

Rp

1,211,766.72

m2

3.780

Rp

140,934.00

Rp

532,730.52

5 Baut Dia 3/8"

bh

45.000

Rp

3,500.00

Rp

157,500.00

6 Galian Tanah

m3

0.068

Rp

23,240.00

Rp

1,568.70

7 Beton (1 : 2 : 3)

m3

0.270

Rp

698,880.00

Rp

188,697.60

m

12.000

Rp

13,471.63

Rp

161,659.60

Rp

3,274,308.04

4 Lantai Ulin

8 Pasang Pipa PVC Ø 3/4"

JUMLAH TOTAL

NO

URAIAN PEKERJAAN

SAT

VOL

HARGA SATUAN

JML.HARGA

(RP)

(RP)

XI PEKERJAAN BANGUNAN SEPTICTANK BANGUNAN UTAMA 1 Galian Tanah

m3

0.393

Rp

23,240.00

Rp

9,136.23

2 Pas. Batu Bata 1 : 4

m2

12.580

Rp

81,305.00

Rp

1,022,816.90

3 Beton (1 : 2 : 3)

m3

0.030

Rp

698,880.00

Rp

20,980.38

m

3.250

Rp

28,838.70

Rp

93,725.78

Rp

1,146,659.28

4 Pasang Pipa PVC Ø 3"

JUMLAH TOTAL XII PEKERJAAN BANGUNAN DERMAGA BANGUNAN UTAMA 1 Pemasangan Bowplank

m2

186.000 Rp

18,705.00

Rp

3,479,130.00

2 Tiang Pancang Ulin 10/10

ttk

129.000 Rp

102,570.00

Rp

13,231,530.00

3 Sloof Tiang Pokok

m

129.000 Rp

48,344.00

Rp

6,236,376.00

4 Gelagar Ulin 10/10

m

365.500 Rp

52,760.00

Rp

19,283,780.00

5 Gelagar Ulin 5/10

m

1228.800 Rp

25,372.00

Rp

31,177,113.60

6 Lantai Ulin

m2

186.000 Rp

66,110.00

Rp

12,296,460.00

7 Baut Dia 3/8"

bh

729.000 Rp

2,500.00

Rp

1,822,500.00

8 Pas. Batu Gunung

m3

0.540

Rp

605,475.00

Rp

326,956.50

m3

0.360

Rp

208,779.00

Rp

75,160.44

Rp

87,929,006.54

9 Pas. Batu Kosong

JUMLAH TOTAL C PEKERJAAN AKHIR 1 Pekerjaan Septik Tank

ls

5.000

Rp

1,146,659.28

Rp

5,733,296.39

2 Pekerjaan Menara Air

ls

5.000

Rp

3,274,308.04

Rp

16,371,540.20

3 Pasang Bak Tandon Air

bh

8.000

Rp

1,050,000.00

Rp

8,400,000.00

4 Pasang Pipa PVC Ø 3/4"

m

222.000

13,471.63 Rp

2,990,702.60

5 Pasang Pipa PVC Ø 3"

m

137.000

28,838.70 Rp

3,950,901.90

6 Pasang Dinamo Air

bh

5.000

Rp

250,000.00

Rp

1,250,000.00

7 Pekerjaan Sumur Air Bersih

bh

5.000

Rp

1,011,530.68

Rp

5,057,653.42

8 Pek. Pembersihan Akhir

ls

1.000

Rp

2,500,000.00

Rp

2,500,000.00

Rp

46,254,094.51

JUMLAH TOTAL

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

LUAS

PJG

SISI

TOTAL 1

Sisi

6760

1150

2

15.548

M3

6760

400

4

10.816

M3

6760

675

1

4.563

M3

3315

1150

2

7.625

M3

3315

400

4

5.304

M3

3315

675

1

2.238

M3

360000

20

1

7.200

M3

60000

15

1

0.900

M3

2437.5

1150

2

5.606

M3

2437.5

400

4

3.900

M3

2437.5

675

1

1.645

M3

685

1150

2

1.576

M3

685

400

4

1.096

M3

685

675

1

0.462

M3

322.5

1150

2

0.742

M3

322.5

400

4

0.516

M3

322.5

675

1

0.218

M3

Urugan Pasir (LANTAI)

41.912

1

2

0.000

M3

f.

Tiang Pancang (10/10)

19

1

1

19.000

TTK

2

BETON

a.

Sloof (15/20)

300

900

2

0.540

M3

300

400

4

0.480

M3

300

350

2

0.210

M3

300

300

2

0.180

M3

225

900

2

0.405

M3

225

400

4

0.360

M3

225

250

2

0.113

M3

225

300

1

0.068

M3

225

310

13

0.907

M3

225

285

6

0.385

M3

Dapur

65

300

10

0.195

M3

Bekisting Sloof (15/20)

20

900

2

1

7.200

M2

20

400

4

1

6.400

M2

20

350

2

1

2.800

M2

20

300

2

1

2.400

M2

15

900

2

1

8.100

M2

15

400

4

1

7.200

M2

15

250

2

1

2.250

M2

1

PONDASI

a.

Galian Pondasi

b.

Urugan Tanah Pondasi

Lantai

c.

d.

e.

b.

c.

Pas. Batu Pondasi

Pas. Batu Kosong

Urugan Pasir (PONDASI)

Ringbalk (15/15)

Kolom (15/15)

Bekisting Ringbalk (15/15)

15

300

1

1

1.350

M2

15

310

13

1

24.180

M2

15

285

6

1

10.260

M2

65

300

1

1.950

M2

10

0.13

0.6

0.730

M2

12

1.1304

4700

4

0.021

M3

8

0.5024

54

313.3333333

0.009

M3

12

1.1304

4200

4

0.019

M3

8

0.5024

44

280

0.006

M3

12

1.1304

5740

4

0.026

M3

8

0.5024

44

382.6666667

5740

0.008

M3

310

400

4

1

49.600

M2

310

300

6

1

34.920

M2

285

250

3

1

16.010

M2

285

425

1

1

12.113

M2

70

65

1

4

1.820

M2

49.600

2

1

99.200

M2

34.920

2

1

69.840

M2

16.010

2

1

32.020

M2

12.113

2

1

24.225

M2

0.455

3

2

2.730

M2

0.520

3

1

1.560

M2

- Jalusi

50

60

35

2

0.019

M3

- Ventilasi

50

60

40

3

0.030

M3

- Pintu Wc

50

90

215

1

0.026

M3

- Pintu Wc

50

70

215

2

0.050

M3

- Pintu Lipat

50

280

240

3

0.114

M3

Pintu WC1

60

210

2

1

2.520

M2

Pintu WC2

90

123

40

2

0.852

M2

Pintu Lipat

268

235

3

1

18.894

M2

Jalusi

60

35

2

1

0.420

M2

Ventilasi

50

30

3

1

0.450

M2

Lisplank 2 (2/20)

20

1030

2

1

4.120

M2

20

352.5

4

1

2.820

M2

20

308

2

1

1.232

M2

Bekisting Kolom (15/15)

Bekisting Lantai Dapur

PEMBESIAN Sloof (15/20) Tul. Utama Tul. Bagi (jarak 15 cm)

4700

Ringbalk (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

4200

Kolom (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

3

DINDING

a.

Pas. Batu Bata

Dapur

b.

Plesteran

Dapur

c.

Acian

4

KAYU

a.

Kusen Ulin (5/10)

b.

c.

5

20

294.5

2

1

1.178

M2

386

263

3

1

30.455

M2

63

461

1

1

2.904

M2

63

63

1

1

0.397

M2

58

113

1

1

0.655

M2

Keramik 20/20 (Lantai)

250

300

1

1

7.500

M2

Keramik 20/20 (Dinding)

120

125

8

1

10.250

M2

12

70

4

3

1.008

M2

65

80

1

1

0.520

M2

150

65

1

1

0.975

M2

352.5

1030

2

72.615

M2

294.5

308

2

18.141

M2

13.380

M

LANTAI Keramik 30/30 Selasar

Dapur

6

ATAP

a.

Sakura Roof

b.

Bubungan (5/10)

c.

Kasau (5/7)

Reng (2/3)

d.

e.

f.

Gording Ulin (5/10)

Balok Tarik (6/12)

Balok Kuda (6/12)

1338

7

352.5

17

2

8.390

M3

7

294.5

6

2

2.474

M3

3

1030

10

2

6.180

M3

3

308

9

2

1.663

M3

50

1030

4

2

0.412

M3

50

308

3

2

0.092

M3

72

452

1

4

0.130

M3

72

352

1

2

0.051

M3

72

325

2

4

0.047

M3

72

266

2

2

0.038

M3

0.067

M3

g.

Nok (5/10)

50

1338

1

h.

Balok Tegak (6/12)

72

152

1

4

0.011

M3

72

72

2

4

0.010

M3

73

123

1

2

0.009

M3

73

56

2

2

0.008

M3

72

73

2

2

0.011

M3

72

100

2

4

0.014

50

330

2

3

0.033

i.

Balok Miring (6/12)

j.

Balok Angin (5/10)

7

RANGKA PLAFOND

M2

8

PLAFOND TRIPLEKS

M2

1

Pemasangan Bowplank

2

46

m2

Rp

18,705.00

Rp

860,430.00

Galian Pondasi

30.927

m3

Rp

23,240.00

Rp

718,743.48

3

Urugan Tanah

23.266

m3

Rp

18,810.00

Rp

437,635.81

4

Pas. Batu Pondasi

11.152

m3

Rp

605,475.00

Rp

6,751,992.30

5

Pas. Batu Kosong

3.134

m3

Rp

208,779.00

Rp

654,287.29

6

Urugan Pasir

1.476

m3

Rp

105,810.00

Rp

156,124.91

7

Tiang Pancang Ulin (10/10)

19.000

ttk

102,570.00

Rp

1,948,830.00

8

Beton (1 : 2 : 3)

3.842

m3

698,880.00

Rp

2,684,747.52

M3

9

Bekisting Sloof (15/20)

18.800

m3

111,185.00

Rp

2,090,278.00

74.820

m2

133,726.00

Rp

10,005,379.32

11 Penulangan

701.362

Kg

13,745.30

Rp

9,640,430.94

12 Pas. Batu Bata 1 : 4

114.463

m2

83,490.00

Rp

9,556,474.13

13 Plesteran 1 : 4, Tebal 15 mm

219.325

m2

33,250.00

Rp

7,292,556.25

14 Acian Tembok

219.325

m2

6,033.25

Rp

1,323,242.56

0.239

m3

4,274,300.00

Rp

1,021,557.70

22.266

m2

359,300.00

Rp

8,000,173.80

17 Lisplank (2/20)

9.350

m2

29,750.00

Rp

278,162.50

18 Keramik 30/30

34.412

m2

137,552.00

Rp

4,733,439.42

19 Keramik 20/20

20.253

m2

210,552.00

Rp

4,264,309.66

20 Atap Sakura Roof

90.756

m2

78,681.00

Rp

7,140,788.57

21 Bubungan Sakura Roof

13.380

m

33,402.50

Rp

446,925.45

22 Kasau dan Reng (5/7 & 2/3)

90.756

m2

31,205.00

Rp

2,832,047.22

23 Rangka Plafond

42.000

m2

27,652.50

Rp

1,161,405.00

24 Plafond Tripleks 5 mm

42.000

m2

34,483.50

Rp

1,448,307.00

25 Jalusi

0.420

m2

207,675.00

Rp

87,223.50

26 Ventilasi

0.450

m2

340,740.00

Rp

153,333.00

27 Kuda-Kuda dan Gording

0.934

m3

3,698,200.00

Rp

3,452,813.34

Gording Ulin (5/10)

0.504

M3

3,698,200.00

Rp

1,865,372.08

Balok Tarik (6/12)

0.181

M3

3,698,200.00

Rp

668,871.24

Balok Kuda (6/12)

0.085

M3

3,698,200.00

Rp

314,731.61

Nok (5/10)

0.067

M3

3,698,200.00

Rp

247,409.58

Balok Tegak (6/12)

0.038

M3

3,698,200.00

Rp

142,258.66

Balok Miring (6/12)

0.025

M3

3,698,200.00

Rp

92,129.56

Balok Angin (5/10)

0.033

M3

3,698,200.00

Rp

122,040.60

Rp

89,141,638.67

10 Bekisting Ringbalk dan Kolom (15/15)

15 Kusen Ulin (5/10) 16 Pintu Panil

INSTALASI LISTRIK Pasang Titik Lampu

9

ttk

68,050.00

Rp

612,450.00

Pasang Stop Kontak

1

bh

33,050.00

Rp

33,050.00

Pasang Saklar Tunggal

3

bh

28,050.00

Rp

84,150.00

Pasang Saklar Ganda

3

bh

33,050.00

Rp

99,150.00

Pasang Pipa Listrik

26

m

Rp

5,000.00

Rp

130,000.00

Pasang Kabel Listrik

32

m

Rp

3,000.00

Rp

96,000.00

8

bh

Rp

12,000.00

Rp

1,066,800.00

Sambungan

1500

INSTALASI AIR Pasang Kran 3/4" atau 1/2"

3

bh

37,455.00

Rp

112,365.00

Pasang Kloset Jongkok

2

bh

123,465.00

Rp

246,930.00

Pasang Bak Air

3

bh

210,015.00

Rp

630,045.00

19

m

13,471.63

Rp

255,961.03

Pasang Pipa PVC Ø 3"

4

m

28,838.70

Rp

115,354.80

Pasang Wastafel

1

bh

325,015.00

Rp

325,015.00

Rp

1,685,670.83

Pasang Pipa PVC Ø 3/4"

PINTU DAN JENDELA

63

Pasang Engsel Pintu

71

Psg

37,510.75

Rp

2,663,263.25

2

Pasang Grendel Pintu

12

set

66,705.00

Rp

800,460.00

4

Pasang Kunci Pintu Tanam 2 Slaag

2

set

81,705.00

Rp

163,410.00

Pasang Engsel Jendela

6

Psg

28,364.80

Rp

170,188.80

Pasang Grendel Jendela

3

bh

66,705.00

Rp

200,115.00

Pasang Hak Angin Kait-Kait Jendela

6

Psg

27,510.75

Rp

165,064.50

4

Rp

4,162,501.55

PENGECATAN Pengecatan Tembok

219.325

m2

15,032.50

Rp

3,297,003.06

Pengecatan Plafond

42.000

m2

12,632.50

Rp

530,565.00

Pengecatan Kayu

58.402

m2

35,057.50

Rp

2,047,428.12

Kusen

4.520

m2

35,057.50

Rp

158,459.90

Pintu

44.532

m2

35,057.50

Rp

1,561,180.59

9.350

m2

35,057.50

Rp

327,787.63

Rp

5,874,996.18

Lisplank

TOTAL

Rp 101,931,607.23

X1

Total

30.927

23.266

11.152

3.134

1.476

1.410

0.945

1.292 0.195 3.842

18.800

18.900

34.440 74.820

2.680

166.8244

KG

66.72977

149.0772

KG

48.58811

203.7388

0.8874

kg/m

0.3944

kg/m

0.8874 0.3944

KG

66.40375

0.8874 0.3944

701.362

20.88 5.365 114.463

219.325

219.325

Cat Pintu 0.42 0.54

0.239

20

520

1.04

20

500

1

20

760

1.52 3.56

22.266

9.350

34.412

20.253

90.756

13.380

18.707

0.504

0.181

0.085 0.067

0.038

0.025 0.033

42.000

42.000

21

63 8

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PONDASI

a.

Galian Pondasi

b.

Urugan Tanah Pondasi Lantai

LUAS

PJG

SISI

6715

300

4

3400

300

4

400

400

20

c.

Pas. Batu Pondasi

2100

300

4

d.

Pas. Batu Kosong

930

300

4

e.

Urugan Pasir (PONDASI)

285

300

4

Urugan Pasir (LANTAI)

400

400

2

2

BETON

a.

Sloof (15/20)

300

300

4

b.

Ringbalk (15/15)

225

300

4

c.

Kolom (15/15)

225

260

4

Bekisting Sloof (15/20)

20

300

4

Bekisting Ringbalk (15/15)

15

300

4

Bekisting Kolom (15/15)

15

260

4

12

1.1304

300

4

8

0.5024

54

21

12

1.1304

300

4

8

0.5024

44

21

12

1.1304

260

4

8

0.5024

44

18.33333333

300

260

4

40

250

8

280

283

4

300

283

4

- Pintu

50

85

205

- Jendela

50

105

135

Pintu

75

200

1

Jendela

60

95

2

Lisplank 2 (2/20)

20

400

4

0

0

2

PEMBESIAN Sloof (15/20) Tul. Utama Tul. Bagi (jarak 15 cm) Ringbalk (15/15) Tul. Utama Tul. Bagi (jarak 15 cm) Kolom (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

3

DINDING

a.

Pas. Batu Bata

b.

Plesteran

c.

Acian

4

KAYU

a.

Kusen Ulin (5/10)

c.

5

LANTAI Keramik 30/30

300

300

1

Selasar

300

100

2

72000

1

1

412

4

72

360

1

72

360

1

72

360

2

72

360

2

72

200

1

0

1

1

300

300

1

9

m2

Rp

18,705.00

6

ATAP

a.

Sakura Roof

b.

Bubungan

e.

Balok Tarik (6/12)

f.

h.

Balok Kuda (6/12)

Balok Tegak (6/12)

7

RANGKA PLAFOND

8

PLAFOND TRIPLEKS

1

Pemasangan Bowplank

2

Galian Pondasi

8.058

m3

Rp

23,240.00

3

Urugan Tanah

7.280

m3

Rp

18,810.00

4

Pas. Batu Pondasi

2.520

m3

Rp

605,475.00

5

Pas. Batu Kosong

1.116

m3

Rp

208,779.00

6

Urugan Pasir

0.662

m3

Rp

105,810.00

7

Beton (1 : 2 : 3)

0.864

m3

698,880.00

8

Bekisting Sloof (15/20)

4.800

m3

111,185.00

9

Bekisting Ringbalk dan Kolom (15/15)

11.640

m2

133,726.00

10 Penulangan

41.823

Kg

13,745.30

11 Pas. Batu Bata 1 : 4

36.040

m2

83,490.00

12 Plesteran 1 : 4, Tebal 15 mm

62.496

m2

33,250.00

13 Acian Tembok

62.496

m2

6,033.25

14 Kusen Ulin (5/10)

0.054

m3

4,274,300.00

15 Pintu Panil

1.500

m2

359,300.00

16 Jendela Kaca

1.140

m2

340,740.00

17 Lisplank (2/20)

3.200

m2

29,750.00

18 Keramik 30/30

15.000

m2

137,552.00

7.200

m2

78,681.00

16.480

m

33,402.50

21 Kasau dan Reng (5/7 & 2/3)

7.200

m2

31,205.00

22 Rangka Plafond

9.000

m2

27,652.50

23 Plafond Tripleks 5 mm

9.000

m2

34,483.50

16.440

m2

25 Kuda-Kuda dan Gording

0.170

m3

3,698,200.00

Balok Tarik (6/12)

0.052

M3

3,698,200.00

Balok Kuda (6/12)

0.104

M3

3,698,200.00

Balok Tegak (6/12)

0.014

M3

3,698,200.00

Pasang Titik Lampu

2

ttk

Rp

68,050.00

Pasang Stop Kontak

1

bh

Rp

33,050.00

Pasang Saklar Ganda

1

bh

Rp

33,050.00

Pasang Pipa Listrik

3

m

Rp

5,000.00

Pasang Kabel Listrik

5

m

Rp

3,000.00

Sambungan

2

bh

Rp

1,500.00

Pasang Engsel Pintu

2

Psg

Rp

37,510.75

Pasang Handle Pintu

1

set

Rp

81,705.00

19 Atap Sakura Roof 20 Bubungan Sakura Roof

24 Bongkar Bekisting

Rp

22,230.00

INSTALASI LISTRIK

PINTU DAN JENDELA

Pasang Engsel Jendela

4

Psg

Rp

28,364.80

Pasang Grendel Jendela

2

bh

Rp

66,705.00

Pasang Hak Angin Kait-Kait Jendela

4

Psg

Rp

27,510.75

Pengecatan Tembok

62.496

m2

Rp

15,032.50

Pengecatan Plafond

9.000

m2

Rp

12,632.50

Pengecatan Kayu

9.980

m2

Rp

35,057.50

Kusen

1.500

m2

Rp

35,057.50

Pintu

3.000

m2

Rp

35,057.50

Jendela

2.280

m2

Rp

35,057.50

Lisplank

3.200

m2

Rp

35,057.50

PENGECATAN

TOTAL

TRUKSI BANGUNAN

TOTAL 1

Sisi

8.058

M3 M3

4.080

M3

3.200

M3 M3

2.520

8.058

7.280

2.520

M3 M3

0.342

Total

M3 M3

1.116

X1

1.116

M3 M3

0.662

0.320

M3

0.360

M3

0.360

0.270

M3

0.270

0.234

M3

0.234 0.864

1

4.800

M2 4.800

1

5.400

M2

5.400

1

6.240

M2

6.240 11.640

300

300

260

0.001

M3

10.64837

0.001

M3

4.472315

0.001

M3

10.64837

0.000

M3

3.644108

0.001

M3

9.228586

0.000

M3

3.181364

KG

KG

KG

41.823

1

31.200

M2

1

8.000

M2

31.696

M2

33.960

M2

3.16

Kusen 36.040

3.16

dikurangi Kusen

Kusen 62.496

dikurangi Kusen

62.496

Cat Pintu 1

0.025

M3

1.7425

1

0.029

M3

0.054

1

1.500

M2

1.500

1

1.140

M2

1.140

1

3.200

M2

1

0.000

M2

3.200

20

1

9.000

M2

1

6.000

M2 M2

7.200

Rp

168,345.00

Rp

187,267.92

Rp

136,936.80

Rp

1,525,797.00

Rp

232,997.36

Rp

70,046.22

Rp

603,832.32

Rp

533,688.00

Rp

1,556,570.64

15.000

M2 M2

7.200

16.480

M

16.480

0.026

M3

0.026

M3

0.052

M3

0.052

M3

0.014

M3

0.000

M3

0.014

9.000

M2

9.000

M2

9.000

0.052

0.104

Rp

574,871.17

Rp

3,008,979.60

Rp

2,077,992.00

Rp

377,053.99

Rp

230,812.20

Rp

538,950.00

Rp

388,443.60

Rp

95,200.00

Rp

2,063,280.00

Rp

566,503.20

Rp

550,473.20

Rp

224,676.00

Rp

248,872.50

Rp

310,351.50

Rp

365,461.20

Rp

628,398.14

Rp

191,714.69

Rp

383,429.38

Rp

53,254.08

Rp

17,265,799.57

Rp

136,100.00

Rp

33,050.00

Rp

33,050.00

Rp

15,000.00

Rp

15,000.00

Rp

3,000.00

Rp

235,200.00

63 Rp

75,021.50

Rp

81,705.00

21 2

63 8

Rp

113,459.20

Rp

133,410.00

Rp

110,043.00

Rp

513,638.70

Rp

939,471.12

Rp

113,692.50

Rp

349,873.85

Rp

52,586.25

Rp

105,172.50

Rp

79,931.10

Rp

112,184.00

Rp

1,403,037.47

Rp

19,417,675.74

4

375

0.75 0.75

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PLAZA UTAMA

1

Galian Pondasi

LUAS

PJG

SISI

TOTAL 1

Sisi

190912

10

1

1.909

m3

1480 1719464

30

1

51.584

m3

1400 1538600

25

1

38.465

m3

5

1

9.552

m3

1560

TEBAL

1480 2

Pas. Batu Gunung

3

Urugan Tanah DIPADATKAN

3

Urugan PASIR

1560 1910376

6

Beton

1560

190912

50

1

9.546

m3

1480

180864

25

1

4.522

m3

1400 1538600

20

1

30.772

m3

1560

4898.4

50

1

1

47.728

m2

1480

4647.2

25

1

1

22.608

m2

1400

4396

20

1

1

8.792

m2

3.095

m3

7

Bekisting

1

PLAZA SATU

1

Urugan Tanah

222

38687.9

80

1

2

Pas. Batu Bata

232

728.48

70

1

1

5.099

m2

3

Plesteran

232

728.48

70

1

1

5.099

m2

4

Beton

252

29249.1

10

1

0.292

m3

162 7

Bekisting

m3

252

791.28

10

1

1

0.791

m2

162

508.68

10

1

1

0.509

m2

252

29249.1

1

1

1

2.925

m3

162

1

PLAZA DUA

1

Galian Pondasi

m3

20

20

236

1

0.094

m3

20

20

215

1

0.086

20

20

20

2

0.008

m3

2

Pas. Batu Gunung

3

Urugan Tanah

65

176

75

1

0.858

m3

4

Pas. Batu Bata

140

156

1

1

2.184

m2

140

135

1

1

1.890

m2

140

40

1

1

0.560

m2

140

80

2

1

2.240

m2

140

60

2

1

1.680

m2

140

316

1

1

4.424

m2

140

295

1

1

4.130

m2

140

80

2

1

2.240

m2

157

35

2

1

1.099

m2

80

80

5

2

0.064

m3

2198

30

1

2

0.132

m3

5

6

2

Plesteran

Beton 80 60 Pot bunga

50 40

m3 706.5

18

1

2

0.025

X1

7

Bekisting

2

BAK TAMAN TIPE B

1

Galian Pondasi

80

80

1

2

1.280

m2

80

80

5

2

0.320

m2

80

251.2

30

1

2

1.507

m2

60

188.4

30

1

2

1.130

m2

50

157

18

1

2

0.565

40

125.6

18

1

2

0.452

m2

50

157

18

1

2

0.006

m2

40

125.6

18

1

2

0.005

m2

170

16328

30

1

0.490

m3

90 2

Pas. Batu Gunung

3

Urugan Tanah

100

7850

60

1

0.471

m3

4

Pas. Batu Bata

130

408.2

60

1

2.449

m2

5

Plesteran

408.2

70

1

2.857

m2

12246

1

1

1.225

m2

12246

10

1

0.122

m3

100

314

10

1

1

0.314

m2

160

502.4

10

1

1

0.502

m2

160

12246

1

1

1.225

m2

150

120

80

5

0.048

m3

90

6358.5

5

1

0.032

m3

0.005

m3

6

Beton

160 100

7

Bekisting

100

3

BAK TAMAN TIPE C

1

Beton

2

Bekisting

150

120

80

2

1

1.920

m2

90

282.6

1

1

1

0.028

m2

REKAP BANGUNAN PLAZA UTAMA 1

Galian Pondasi

1.909

m3

Rp 23,240.00

Rp

44,367.95

2

Urugan Tanah Dipadatkan

90.049

m3

Rp 18,810.00

Rp

1,693,820.19

3

Pas. Batu Pondasi

1.909

m3

Rp 605,475.00

Rp

1,155,924.43

4

Beton (1 : 2 : 3)

42.395

m3

698,880.00

Rp

29,629,157.38

5

Bekisting

67.168

m2

70,301.90

Rp

4,722,038.29

6

Bongkar Bekisting

67.168

m2

22,230.00

Rp

1,493,144.64

Rp

38,738,452.87

PLAZA SATU 1

Urugan Tanah

3.095

m3

Rp 18,810.00

Rp

58,217.61

2

Beton (1 : 2 : 3)

0.292

m3

698,880.00

Rp

204,416.11

3

Bekisting

4.225

m2

70,301.90

Rp

297,016.41

4

Plesteran (1 : 4)

5.099

m2

33,250.00

Rp

169,553.72

5

Bongkar Bekisting

4.225

m2

22,230.00

Rp

93,918.86

Rp

823,122.71

Rp

823,122.71

1

UNIT

PLAZA DUA 1

Galian Pondasi

0.188

m3

Rp 23,240.00

Rp

4,378.42

2

Urugan Tanah

0.378

m3

Rp 18,810.00

Rp

7,115.82

3

Pas. Batu Pondasi

0.188

m3

Rp 605,475.00

Rp

114,071.49

4

Beton (1 : 2 : 3)

0.221

m3

698,880.00

Rp

154,671.93

5

Bekisting

5.265

m2

70,301.90

Rp

370,148.92

6

Pas. Batu Bata 1 : 4

8.554

m2

83,490.00

Rp

714,173.46

7

Plesteran (1 : 4)

11.893

m2

33,250.00

Rp

395,442.25

8

Bongkar Bekisting

5.265

m2

22,230.00

Rp

117,043.92

Rp

1,877,046.20

4

UNIT

Rp

7,508,184.82

REKAP 1

Galian Pondasi

9.210

m3

Rp 23,240.00

Rp

214,045.51

2

Urugan Tanah

110.257

m3

Rp 18,810.00

Rp

2,073,937.09

3

Pas. Batu Pondasi

9.210

m3

Rp 605,475.00

Rp

5,576,557.95

4

Beton (1 : 2 : 3)

45.868

m3

698,880.00

Rp

32,056,190.80

5

Bekisting

126.853

m2

70,301.90

Rp

8,918,035.87

6

Pas. Batu Bata 1 : 4

89.341

m2

83,490.00

Rp

7,459,080.09

7

Plesteran (1 : 4)

132.996

m2

33,250.00

Rp

4,422,128.97

8

Bongkar Bekisting

126.853

m2

22,230.00

Rp

2,819,951.18

Rp

63,539,927.46

BAK TAMAN TIPE A1 1

Galian Pondasi

1.8495

m3

Rp 23,240.00

Rp

42,982.38

2

Urugan Tanah

4.5825

m3

Rp 18,810.00

Rp

86,196.83

3

Pas. Batu Pondasi

1.8495

m3

Rp 605,475.00

Rp

1,119,826.01

4

BETON (1 : 2 : 3)

0.639

m3

Rp 698,880.00

Rp

446,584.32

5

Bekisting

9.58

m2

Rp 70,301.90

Rp

673,492.24

6

Pas. Batu Bata 1 : 4

15.525

m2

Rp 83,490.00

Rp

1,296,182.25

7

Plesteran (1 : 4)

22.365

m2

Rp 33,250.00

Rp

743,636.25

8

Bongkar Bekisting

9.58

m2

Rp 22,230.00

Rp

212,963.40

Rp

4,621,863.68

2

UNIT

Rp

9,243,727.36

BAK TAMAN TIPE A2 1

Galian Pondasi

0.9495

m3

Rp 23,240.00

Rp

22,066.38

2

Urugan Tanah

2.145

m3

Rp 18,810.00

Rp

40,347.45

3

Pas. Batu Pondasi

0.9495

m3

Rp 605,475.00

Rp

574,898.51

4

BETON (1 : 2 : 3)

0.339

m3

Rp 698,880.00

Rp

236,920.32

5

Bekisting

5.08

m2

Rp 70,301.90

Rp

357,133.67

6

Pas. Batu Bata 1 : 4

8.025

m2

Rp 83,490.00

Rp

670,007.25

7

Plesteran (1 : 4)

11.865

m2

Rp 33,250.00

Rp

394,511.25

8

Bongkar Bekisting

5.08

m2

Rp 22,230.00

Rp

112,928.40

Rp

2,408,813.24

Rp

7,226,439.71

3

UNIT

Total

1.909

1.909

90.049

9.552

2.444

Pot bunga

11.96

Pot bunga

42.395

67.168

3.095 5.099 5.099 0.292

4.225

0.188 0.188 0.858

8.554

11.893

0.221

5.265

0.490 0.490 0.471 2.449

4.082 0.122

2.041

0.005

1.948

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No 1

Bagian Rumah

PJG

SISI

1256

30

1

300

60

10

40

10

40

30

80

2

10

0.785

300

2

10

0.785

60

10

10

0.785

90

2

10

0.785

94.2

2

30

94.2

80

1

18000

1

1

3600

1

1

18000

1

1

3600

1

1

94.2

60

1

PONDASI Galian Pondasi

2

LUAS

20

BETON (1 : 2 : 3) Beton

Pembesian

Bekisting

4

DINDING

a.

Keramik 20/20

b.

Plesteran

30

1

Galian Pondasi

0.075

m3

2

Beton (1 : 2 : 3)

0.325

m3

698,880.00

3

Bekisting

5.827

m3

70,301.90

4

Penulangan

19.855

kg

13,745.30

Rp

23,240.00

5

Plesteran

1.130

m2

33,250.00

6

Keramik 20/20

2.520

m2

210,552.00

Bongkar Bekisting

5.827

m2

22,230.00

18

UNIT

NSTRUKSI BANGUNAN

TEBAL

TOTAL 1

Sisi

2

0.075

M3

0.180

M3

0.032

M3

0.113

M3

0.000

M3

3.69735

0.000

M3

3.69735

6

0.001

M3

6.65523

5

0.001

M3

5.80484

2

1.507

M2

2

3.600

M2

2

0.720

M2

1

1.800

M2

2

0.720

M2

2

M2

2

1.130

Rp

1,751.37

Rp

227,163.96

Rp

409,663.26

Rp

272,909.76

M2

X1

Total

0.075

0.325

KG

19.855

5.827

2.520

Rp

37,585.80

Rp

530,591.04

Rp

129,538.66

Rp

1,609,203.84

Rp 28,965,669.05

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

BAK TAMAN TIPE A

1

Galian Pondasi

LUAS

PJG

SISI

TEBAL

TOTAL 1

Sisi

30

30

360

2

0.648

m3

30

30

55

2

0.050

m3

2

Pas. Batu Gunung

3

Urugan Tanah

65

300

75

1

1.463

m3

4

Pas. Batu Bata

95

75

2

1

1.425

m2

300

75

2

1

4.500

m2

330

75

2

1

4.950

m2

95

75

2

1

1.425

m2

850

30

1

1

2.550

m2

5

Plesteran

6

Beton

850

30

10

1

0.255

m3

7

Bekisting

970

10

1

1

0.970

m2

850

30

1

1

2.550

m2

730

10

1

1

0.730

m2

30

30

1000

2

1.800

m3

30

30

55

2

0.050

m3

1

BAK TAMAN TIPE A1

1

Galian Pondasi

2

Pas. Batu Gunung

3

Urugan Tanah

65

940

75

1

4.583

m3

4

Pas. Batu Bata

95

75

2

1

1.425

m2

940

75

2

1

14.100

m2

970

75

2

1

14.550

m2

95

75

2

1

1.425

m2

2130

30

1

1

6.390

m2

5

Plesteran

6

Beton

2130

30

10

1

0.639

m3

7

Bekisting

2250

10

1

1

2.250

m2

2130

30

1

1

6.390

m2

940

10

1

1

0.940

m2

30

30

500

2

0.900

m3

30

30

55

2

0.050

m3

1

BAK TAMAN TIPE A2

1

Galian Pondasi

2

Pas. Batu Gunung

3

Urugan Tanah

65

440

75

1

2.145

m3

4

Pas. Batu Bata

95

75

2

1

1.425

m2

440

75

2

1

6.600

m2

470

75

2

1

7.050

m2

95

75

2

1

1.425

m2

1130

30

1

1

3.390

m2

5

Plesteran

6

Beton

1130

30

10

1

0.339

m3

7

Bekisting

1250

10

1

1

1.250

m2

1130

30

1

1

3.390

m2

440

10

1

1

0.440

m2

16328

30

1

0.490

m3

2

BAK TAMAN TIPE B

1

Galian Pondasi

170 90

2

Pas. Batu Gunung

X1

3

Urugan Tanah

100

7850

60

1

0.471

m3

4

Pas. Batu Bata

130

408.2

60

1

2.449

m2

5

Plesteran

408.2

70

1

2.857

m2

12246

1

1

1.225

m2

12246

10

1

0.122

m3

100

314

10

1

1

0.314

m2

160

502.4

10

1

1

0.502

m2

160

12246

1

1

1.225

m2

150

120

80

5

0.048

m3

90

6358.5

5

1

0.032

m3

0.005

m3

6

Beton

160 100

7

Bekisting

100

3

BAK TAMAN TIPE C

1

Beton

2

Bekisting

150

120

80

2

1

1.920

m2

90

282.6

1

1

1

0.028

m2

REKAP BANGUNAN BAK TAMAN TIPE A 1

Galian Pondasi

0.698

m3

Rp 23,240.00

Rp

16,209.90

2

Urugan Tanah

1.463

m3

Rp 18,810.00

Rp

27,509.63

3

Pas. Batu Pondasi

0.698

m3

Rp 605,475.00

Rp

422,318.81

4

Beton (1 : 2 : 3)

0.255

m3

698,880.00

Rp

178,214.40

5

Bekisting

4.250

m2

70,301.90

Rp

298,783.09

6

Pas. Batu Bata 1 : 4

5.925

m2

83,490.00

Rp

494,678.25

7

Plesteran (1 : 4)

8.925

m2

33,250.00

Rp

296,756.25

8

Bongkar Bekisting

4.250

m2

22,230.00

Rp

94,477.50

Rp

1,828,947.83

12

UNIT

Rp

21,947,373.96

BAK TAMAN TIPE A1 1

Galian Pondasi

1.850

m3

Rp 23,240.00

Rp

42,982.38

2

Urugan Tanah

4.583

m3

Rp 18,810.00

Rp

86,196.83

3

Pas. Batu Pondasi

1.850

m3

Rp 605,475.00

Rp

1,119,826.01

4

BETON (1 : 2 : 3)

0.639

m3

698,880.00

Rp

446,584.32

5

Bekisting

9.580

m2

70,301.90

Rp

673,492.24

6

Pas. Batu Bata 1 : 4

15.525

m2

83,490.00

Rp

1,296,182.25

7

Plesteran (1 : 4)

22.365

m2

33,250.00

Rp

743,636.25

8

Bongkar Bekisting

9.580

m2

22,230.00

Rp

212,963.40

Rp

4,621,863.68

2

UNIT

Rp

9,243,727.36

BAK TAMAN TIPE A2 1

Galian Pondasi

0.950

m3

Rp 23,240.00

Rp

22,066.38

2

Urugan Tanah

2.145

m3

Rp 18,810.00

Rp

40,347.45

3

Pas. Batu Pondasi

0.950

m3

Rp 605,475.00

Rp

574,898.51

4

BETON (1 : 2 : 3)

0.339

m3

698,880.00

Rp

236,920.32

5

Bekisting

5.080

m2

70,301.90

Rp

357,133.67

6

Pas. Batu Bata 1 : 4

8.025

m2

83,490.00

Rp

670,007.25

7

Plesteran (1 : 4)

11.865

m2

33,250.00

Rp

394,511.25

8

Bongkar Bekisting

5.080

m2

22,230.00

Rp

112,928.40

Rp

2,408,813.24

3

UNIT

Rp

7,226,439.71

BAK TAMAN TIPE B 1

Galian Pondasi

0.490

m3

Rp 23,240.00

Rp

11,383.88

2

Urugan Tanah

0.471

m3

Rp 18,810.00

Rp

8,859.51

3

Pas. Batu Pondasi

0.490

m3

Rp 605,475.00

Rp

296,585.87

4

Beton (1 : 2 : 3)

0.122

m3

698,880.00

Rp

85,584.84

5

Bekisting

2.041

m2

70,301.90

Rp

143,486.19

6

Pas. Batu Bata 1 : 4

2.449

m2

83,490.00

Rp

204,483.71

7

Plesteran (1 : 4)

4.082

m2

33,250.00

Rp

135,726.50

8

Bongkar Bekisting

2.041

m2

22,230.00

Rp

45,371.43

Rp

931,481.93

Rp

3,725,927.74

4

UNIT

BAK TAMAN TIPE C 1

Beton (1 : 2 : 3)

0.005

m3

698,880.00

Rp

3,494.40

2

Bekisting

1.948

m2

70,301.90

Rp

136,966.39

8

Bongkar Bekisting

1.948

m2

22,230.00

Rp

43,309.82

Rp

183,770.61

Rp

1,653,935.47

9

UNIT

Total

0.698 0.698 1.463

5.925

8.925 0.255

4.250

1.850 1.850 4.583

15.525

22.365 0.639

9.580

0.950 0.950 2.145

8.025

11.865 0.339

5.080

0.490 0.490

0.471 2.449

4.082 0.122

2.041

0.005

1.948

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

LUAS

PJG

SISI

5

8

52500

A

TROTOAR

1

Galian Pondasi

2

Urugan Tanah dipadatkan

184

5

52500

3

Pas. Conblock

184

1

52500

4

Urugan Pasir

184

4

52500

6

Beton

8

15

52500

7

Bekisting

15

1

52500

2

BAK TAMAN TIPE B

1

Galian Pondasi

16328

30

1

170 90

2

Pas. Batu Gunung

3

Urugan Tanah

100

7850

60

1

4

Pas. Batu Bata

130

408.2

60

1

5

Plesteran

408.2

70

1

12246

1

1

12246

10

1

100

314

10

1

160

502.4

10

1

160

12246

1

1

6

Beton

160 100

7

Bekisting

100

3

BAK TAMAN TIPE C

1

2

Beton

Bekisting

150

120

80

5

90

6358.5

5

1

150

120

80

2

90

282.6

1

1

REKAP BANGUNAN A

TROTOAR

1

Galian Pondasi

2

Urugan Tanah dipadatkan

3

Pas. Conblok

4

Beton (1 : 2 : 3)

5

Bekisting

6

Urugan Pasir

8

Bongkar Bekisting

4.200

m3

Rp 23,240.00

48.300

m3

Rp 34,810.00

966.000

m2

Rp 86,155.00

12.600

m3

698,880.00

315.000

m2

70,301.90

38.640

m2

83,490.00

315.000

m2

22,230.00

1

UNIT

ONSTRUKSI BANGUNAN

TEBAL

TOTAL 1

Sisi

X1

Total

2

4.200

m3

4.200

1

48.300

m3

48.300

1

966.000

m2

966.000

1

38.640

m3

38.640

2

12.600

m3

12.600

4

315.000

m2

315.000

0.490

m3 0.490 0.490

0.471

m3

0.471

2.449

m2

2.449

2.857

m2

1.225

m2

4.082

0.122

m3

0.122

1

0.314

m2

1

0.502

m2

1.225

m2

2.041

0.048

m3

0.032

m3

0.005

m3

1

1.920

m2

1

0.028

m2

Rp

97,608.00

Rp

1,681,323.00

Rp

83,225,730.00

Rp

8,805,888.00

Rp

22,145,099.78

Rp

3,226,053.60

Rp

7,002,450.00

Rp 119,181,702.38 Rp 119,181,702.38

0.005

1.948

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No 1

Bagian Rumah

LUAS

PJG

SISI

TEBAL

TOTAL 1

Sisi

40

40

15

2

0.048

M3

40

40

30

1

0.048

M3

10

10

50

0.005

M3

70

70

10

0.049

M3

40

40

20

0.032

M3

30

30

70

0.063

M3

40

40

10

0.032

M3

X1

PONDASI Galian Pondasi

Urugan Tanah Kursi

2

BETON (1 : 2 : 3) Beton

Kursi

2

Pembesian Hor

10

0.785

90

6

0.000

M3

3.327615

Ver

10

0.785

75

4

0.000

M3

1.848675

hor meja 1

10

0.785

70

4

0.000

M3

1.72543

hor meja 2

10

0.785

70

4

0.000

M3

1.72543

30

30

70

1

0.840

M2

70

70

10

2

0.560

M2

70

70

1

1

0.490

M2

40

40

10

2

0.320

100

232

1

2.320

m

71

2

1.420

m

30

40

2

2

0.480

M2

270

4

15

1

1.620

M2

40

40

1

1

0.160

M2

40

40

10

1

0.160

70

70

1

1

0.490

M2

70

70

10

1

0.280

M2

270

140

4

7.560

M2

Bekisting

Kursi

Gelagar 10/10 Gelagar 6/8

3

DINDING

a.

Pas. Batu Bata 1 : 4

4

KAYU Lisplank 2 (2/20)

5

LANTAI

a.

Keramik 20/20 (LANTAI) - Kursi

- Meja

6

ATAP

a.

Sakura Roof

b.

Kasau Dan Reng

REKAP BANGUNAN 1

Galian Pondasi

0.096

m3

Rp 23,240.00

Rp

2,231.04

2

Pas. Batu Pondasi

0.096

m3

Rp 605,475.00

Rp

58,125.60

3

Gording Ulin (10/10)

3.740

m3

102,570.00

Rp

383,611.80

4

Beton (1 : 2 : 3)

0.176

m3

698,880.00

Rp

123,002.88

5

Bekisting

2.210

m2

70,301.90

Rp

155,367.21

6

Penulangan Besi

8.627

kg

13,745.30

Rp

118,582.76

7

Pas. Batu Bata 1 : 4

1.620

m2

83,490.00

Rp

135,253.80

8

Lisplank 2 (2/20)

1.620

m2

29,750.00

Rp

48,195.00

9

Keramik 20/20

1.090

m2

210,552.00

Rp

229,501.68

10 Atap Sakura Roof

7.560

m2

78,681.00

Rp

594,828.36

11 Kasau dan Reng

7.560

m2

31,205.00

Rp

235,909.80

12 Bongkar Bekisting

2.210

m2

22,230.00

Rp

49,128.30

2.500

m2

Rp 35,057.50

Rp

87,643.75

Rp

2,084,609.93

Rp

33,353,758.93

Pengecatan Kayu

16

UNIT

Total

0.096

0.176

Kg

8.627

2.210

3.740

0.480

1.620

1.090

7.560

7.560

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

LUAS

PJG

SISI

TOTAL 1

1

LANTAI

270

140

2

TIANG

10/10

300

6

18.000

3

MIRING

5/10

270

4

10.800

140

6

8.400

5/10

176

6

10.560

5/10

300

6

18.000

4

BALOK

3.780

5

BETON

900

50

6

0.270

6

PIPA 1,5 "

250

450

500

12.000

7

GALI

30

75

30

0.068

3.78

m2

Rp 18,705.00

Rp

70,704.90

Gelagar Ulin 10/10

18.000

m

Rp 52,760.00

Rp

949,680.00

Gelagar Ulin 5/10

47.760

m

Rp 25,372.00

Rp 1,211,766.72

3.780

m2

140934

Baut Dia 3/8"

45

bh

Galian Tanah

0.068

REKAP Pemasangan Bowplank

Lantai Ulin

Beton (1 : 2 : 3) Pasang Pipa PVC Ø 3/4"

Rp

532,730.52

3,500.00

Rp

157,500.00

m3

Rp 23,240.00

Rp

1,568.70

0.27

m3

698,880.00

Rp

188,697.60

12.000

m

13,471.63

Rp

161,659.60

Rp 3,274,308.04

Pemasangan Bowplank Tiang Pancang Ulin 10/10 Sloof Tiang Pokok

Gelagar Ulin 10/10 Gelagar Ulin 5/10 Lantai Ulin Baut Dia 3/8"

UNAN

SAT

BALOK ULIN

M2

PAPAN ULIN

BETON

3.780

m

18.000

m

10.800

m

8.400

m

10.560

m

18.000

M3

0.270

M M3 65.760

3.780

0.27

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

LUAS

PJG

SISI

TOTAL 1

SAT

BATA

100

100

2

2.000

M2

2.000

100

100

2

2.000

M2

2.000

180

100

8

0.014

M3

165

110

2

3.630

M2

3.630

100

110

2

2.200

M2

2.200

165

100

1

1.650

M2

1.650

165

100

8

0.013

M3

BATA

55

50

4

1.100

M2

BETON

55

55

8

0.002

M3

D

PIPA 3'"

75

150

100

3.250

M

E

PAPAN

50

100

2

1.000

M2

F

GALIAN

55

55

50

0.015

M3

0.015

165

120

100

0.198

M3

0.198

180

100

100

0.180

M3

0.180

A

Bagian Rumah

BETON (1 : 2 : 3)

0.014

SEPTICTANK BATA

BETON C

GALIAN

SUMUR PERESAPAN BATA 1 : 2

B

BETON

0.013

BAK KONTROL 1.100 0.002

12.58

REKAP Galian Tanah Pas. Batu Bata 1 : 4 Beton (1 : 2 : 3) Pasang Pipa PVC Ø 3"

0.39313

m3

Rp 23,240.00

Rp

9,136.23

12.58

m2

Rp 81,305.00

Rp

1,022,816.90

0.03002

m3

Rp 698,880.00

Rp

20,980.38

3.250

m

Rp 28,838.70

Rp

93,725.78

Rp 1,146,659.28

0.03002

0.393125

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No 1

Bagian Rumah

LUAS

PJG

SISI

1

21

1

2

900

1

7

400

3

52.5

1

1

1

900

8

180

7

6

200

6

6

400

900

1

7

9

6

9

PJG

TINGGI

JML

1

108

1

DERMAGA A Tiang Pancang 10/10

Sloof Tiang Pokok

Gelagar 10/10

Gelagar 5/10

Lantai Ulin Baut Dia 3/8"

21

Pengecatan

2

DERMAGA B Tiang Pancang 10/10

Sloof Tiang Pokok

108

Gelagar 10/10

300

1

3

5000

1

2

1

Gelagar 5/10

Lantai Ulin Baut Dia 3/8"

Pas. Batu Gunung

Pas. Batu Kosong

102

1

1

5000

1

8

160

7

6

180

9

6

200

9

6

200

7

6

160

8

4

180

10

4

180

10

4

180

8

4

300

5000

1

36

9

32

9

20

30

300

20

60

300

20

60

300

1

REKAP BANGUNAN 1

Pemasangan Bowplank

36

m2

Rp

18,705.00

Rp

673,380.00

2

Tiang Pancang Ulin 10/10

21.000

ttk

Rp

102,570.00

Rp

2,153,970.00

3

Sloof Tiang Pokok

21.000

m

Rp

48,344.00

Rp

1,015,224.00

4

Gelagar Ulin 10/10

154.500

m

Rp

52,760.00

Rp

8,151,420.00

5

Gelagar Ulin 5/10

219.600

m

Rp

25,372.00

Rp

5,571,691.20

6

Lantai Ulin

36.000

m2

Rp

66,110.00

Rp

2,379,960.00

7

Baut Dia 3/8"

117.000

bh

2,500.00

Rp

292,500.00

Rp 20,238,145.20

REKAP BANGUNAN 1

Pemasangan Bowplank

150

m2

Rp

18,705.00

Rp

2,805,750.00

2

Tiang Pancang Ulin 10/10

108.000

ttk

Rp

102,570.00

Rp

11,077,560.00

3

Sloof Tiang Pokok

108.000

m

Rp

48,344.00

Rp

5,221,152.00

4

Gelagar Ulin 10/10

211.000

m

Rp

52,760.00

Rp

11,132,360.00

5

Gelagar Ulin 5/10

1009.200

m

Rp

25,372.00

Rp

25,605,422.40

6

Lantai Ulin

150.000

m2

Rp

66,110.00

Rp

9,916,500.00

7

Baut Dia 3/8"

612.000

bh

2,500.00

Rp

1,530,000.00

8

Pas. Batu Gunung

0.540

m3

Rp

605,475.00

Rp

326,956.50

9

Pas. Batu Kosong

0.360

m3

Rp

208,779.00

Rp

75,160.44

Rp 67,690,861.34 REKAP 1

Pemasangan Bowplank

186

m2

Rp

18,705.00

Rp

3,479,130.00

2

Tiang Pancang Ulin 10/10

129

ttk

Rp

102,570.00

Rp

13,231,530.00

3

Sloof Tiang Pokok

129

m

Rp

48,344.00

Rp

6,236,376.00

4

Gelagar Ulin 10/10

365.5

m

Rp

52,760.00

Rp

19,283,780.00

5

Gelagar Ulin 5/10

1228.8

m

Rp

25,372.00

Rp

31,177,113.60

6

Lantai Ulin

186

m2

Rp

66,110.00

Rp

12,296,460.00

7

Baut Dia 3/8"

729

bh

2,500.00

Rp

1,822,500.00

8

Pas. Batu Gunung

0.540

m3

Rp

605,475.00

Rp

326,956.50

9

Pas. Batu Kosong

0.360

m3

Rp

208,779.00

Rp

75,160.44

Rp 87,929,006.54

BANGUNAN

TOTAL 1

Sisi

X1

Total

21.000

titik

21.000

21.000

M

21.000

18.000

m

154.500

84.000

m

52.500

m

72.000

m

75.600

m

72.000

m

36.000

M2

219.600

36.000

63.000 54.000

117.000

108.000

titik

108.000

108.000

M

108.000

9.000

m

211.000

100.000

m

102.000

m

400.000

m

1009.200

M2

150.000

67.200 97.200 108.000 84.000 51.200 72.000 72.000 57.600

150.000 324.000 288.000

612.000

0.180 0.360

0.540

0.360

0.360

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

LUAS

PJG

SISI

8

1

1

PONDASI

a.

Tiang Pancang 10/10

1

b.

Sloof Tiang Pokok

8

d.

Gelagar 10/10

1

425

4

e.

Gelagar 5/10

2

424

4

2

125

12

2

575

4

Seng Plat

288

75

1

Pipa Galvanis

109

4

1

75

4

2

Kandang Rase

REKAP BANGUNAN 1

Pemasangan Bowplank

36

m2

Rp

18,705.00

Rp

673,380.00

2

Tiang Pancang Ulin 10/10

8.000

ttk

Rp

102,570.00

Rp

820,560.00

3

Sloof Tiang Pokok

8.000

m

Rp

48,344.00

Rp

386,752.00

4

Gelagar Ulin 10/10

17.000

m

Rp

52,760.00

Rp

896,920.00

5

Gelagar Ulin 5/10

109.920

m

Rp

25,372.00

Rp

2,788,890.24

6

Kandang Rase Ulin 2/5 & 5/8

22.000

m

40,948.00

Rp

900,856.00

7

Seng Plat

2.160

m2

50,000.00

Rp

108,000.00

8

Pipa Galvanis (Stainless Steel)

10.360

m

75,000.00

Rp

777,000.00

Pengecatan Kayu

25.000

m2

35,057.50

Rp

876,437.50

Rp

8,228,795.74

BANGUNAN

TOTAL 1

Sisi

X1

Total

8.000

titik

8.000

8.000

M

8.000

17.000

m

17.000

33.920

m

109.920

30.000

m

46.000

m

2.160

m2

4.360

m

6.000

m

2.160

10.360

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

BAK TAMAN TIPE A

1

Galian Pondasi

LUAS

PJG

SISI

30

30

360

30

30

55

2

Pas. Batu Gunung

3

Urugan Tanah

65

300

75

4

Pas. Batu Bata

95

75

2

300

75

2

330

75

2

95

75

2

850

30

1

5

Plesteran

6

Beton

850

30

10

7

Bekisting

970

10

1

850

30

1

730

10

1

30

30

1000

30

30

55

1

BAK TAMAN TIPE B + t4 duduk

1

Galian Pondasi

2

Pas. Batu Gunung

3

Urugan Tanah

65

940

75

4

Pas. Batu Bata

95

75

2

940

75

2

970

75

2

95

75

2

2130

30

1

5

Plesteran

6

Beton

2130

30

10

7

Bekisting

2250

10

1

2130

30

1

940

10

1

1

BAK TAMAN TIPE A2

1

Galian Pondasi

30

30

500

30

30

55

2

Pas. Batu Gunung

3

Urugan Tanah

65

440

75

4

Pas. Batu Bata

95

75

2

440

75

2

470

75

2

95

75

2

1130

30

1

5

Plesteran

6

Beton

1130

30

10

7

Bekisting

1250

10

1

1130

30

1

440

10

1

16328

30

1

2

BAK TAMAN TIPE B

1

Galian Pondasi

170 90

2

Pas. Batu Gunung

3

Urugan Tanah

100

7850

60

1

4

Pas. Batu Bata

130

408.2

60

1

5

Plesteran

408.2

70

1

12246

1

1

12246

10

1

100

314

10

1

160

502.4

10

1

160

12246

1

1

120

80

5

6

Beton

160 100

7

Bekisting

100

3

BAK TAMAN TIPE C

1

Beton

150

2

Bekisting

90

6358.5

5

1

150

120

80

2

90

282.6

1

1

REKAP BANGUNAN BAK TAMAN TIPE A 1

Galian Pondasi

0.117

m3

Rp 23,240.00

2

Urugan Tanah

2.000

m3

Rp 18,810.00

3

Beton (1 : 2 : 3)

0.117

m3

698,880.00

4

Bekisting

0.618

m2

70,301.90

5

Pas. Batu Bata 1 : 4

2.9

m2

83,490.00

6

Plesteran (1 : 4)

2.95

m2

33,250.00

7

Bongkar Bekisting

0.618

m2

22,230.00

31

UNIT

BAK TAMAN TIPE B + t4 duduk 1

Galian Pondasi

0.117

m3

Rp 23,240.00

2

Urugan Tanah

2.000

m3

Rp 18,810.00

3

Beton (1 : 2 : 3)

0.117

m3

698,880.00

4

Bekisting

0.618

m2

70,301.90

5

Pas. Batu Bata 1 : 4

3.020

m2

83,490.00

6

Plesteran (1 : 4)

3.070

m2

33,250.00

7

Bongkar Bekisting

0.618

m2

22,230.00

16

UNIT

1

Galian Pondasi

m3

Rp 23,240.00

2

Urugan Tanah

m3

Rp 18,810.00

3

Pas. Batu Pondasi

m3

Rp 605,475.00

4

BETON (1 : 2 : 3)

m3

698,880.00

5

Bekisting

m2

70,301.90

6

Pas. Batu Bata 1 : 4

m2

83,490.00

7

Plesteran (1 : 4)

m2

33,250.00

8

Bongkar Bekisting

m2

22,230.00

3

UNIT

1

Galian Pondasi

m3

Rp 23,240.00

2

Urugan Tanah

m3

Rp 18,810.00

3

Pas. Batu Pondasi

m3

Rp 605,475.00

4

BETON (1 : 2 : 3)

m3

698,880.00

5

Bekisting

m2

70,301.90

6

Pas. Batu Bata 1 : 4

m2

83,490.00

7

Plesteran (1 : 4)

m2

33,250.00

4

UNIT

1

BETON (1 : 2 : 3)

m3

698,880.00

2

Bekisting

m2

70,301.90

9

UNIT

ONSTRUKSI BANGUNAN

TEBAL

TOTAL 1

Sisi

2

0.648

m3

2

0.050

m3

X1

Total

0.698 0.698

1

1.463

m3

1.463

1

1.425

m2

1

4.500

m2

1

4.950

m2

1

1.425

m2

1

2.550

m2

8.925

1

0.255

m3

0.255

1

0.970

m2

1

2.550

m2

1

0.730

m2

2

1.800

m3

2

0.050

m3

5.925

4.250

1.850 1.850

1

4.583

m3

4.583

1

1.425

m2

1

14.100

m2

1

14.550

m2

1

1.425

m2

1

6.390

m2

22.365

1

0.639

m3

0.639

1

2.250

m2

1

6.390

m2

1

0.940

m2

15.525

9.580

2

0.900

m3

2

0.050

m3

0.950 0.950

1

2.145

m3

2.145

1

1.425

m2

1

6.600

m2

1

7.050

m2

1

1.425

m2

1

3.390

m2

11.865

1

0.339

m3

0.339

1

1.250

m2

1

3.390

m2

1

0.440

m2

0.490

m3

8.025

5.080

0.490 0.490 0.471

m3

0.471

2.449

m2

2.449

2.857

m2

1.225

m2

4.082

0.122

m3

0.122

1

0.314

m2

1

0.502

m2

1.225

m2

0.048

m3

2.041

0.032

m3

0.005

m3

1

1.920

m2

1

0.028

m2

15

Rp

2,719.08

Rp

0.005

1.948

50

156

117000

Galian Tanah

0.11

37,620.00

Cor Beton 1PC : 2 Psr : 3 Krl

0.11

Rp

81,768.96

Bongkar Begisting

0.11

Rp

43,446.58

Pasangan Batu Bata

2.90

Rp

242,121.00

Plesteran

2.95

Rp

98,087.50

Rp

13,738.14

Rp

519,501.26

Rp

16,104,538.96

Rp

2,719.08

Galian Tanah

0.45

Rp

37,620.00

Cor Beton 1PC : 2 Psr : 3 Krl

0.45

Rp

81,768.96

Bongkar Begisting

0.45

Rp

43,446.58

Pasangan Batu Bata

7.20

Rp

252,139.80

Plesteran

7.80

Rp

102,077.50

Rp

13,738.14

Rp

519,771.92

Rp

8,316,350.67

Rp

-

Rp

-

Rp

-

Rp

-

15

56

156

131040

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

Rp

-

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PONDASI

a.

Galian Pondasi

LUAS

PJG

SISI

150

14100

4000

1

85

14100

4000

1

8087.5

4000

1

8087.5

4000

1

70

4200

4000

1

35

4200

4000

1

88

1380

4000

1

96

1380

4000

1

88

432.5

4000

1

85

432.5

4000

1

400

4000

1

400

4000

1

900

175

18

120 b.

Urugan Tanah Pondasi

c.

Pas. Batu Pondasi

80

d.

Pas. Batu Kosong

15

e.

Urugan Pasir (PONDASI)

5

2

BETON

a.

Sloof (20/20)

c.

Kolom (30/30)

Bekisting Sloof (20/20)

20

4000

1

20

4000

1

15

175

18

15

0

0

10

0.785

8000

4

8

0.5024

64

534.3333333

10

0.785

3150

4

8

0.5024

104

211

470

150

8

470

150

8

23.25

m2

Rp

18,705.00

Bekisting Kolom (15/15)

PEMBESIAN Sloof (20/20) Tul. Utama Tul. Bagi (jarak 15 cm) Kolom (30/30) Tul. Utama Tul. Bagi (jarak 15 cm)

3

DINDING

a.

Pas. Batu Bata

1

Pemasangan Bowplank

2

Galian Pondasi

112.800

m3

Rp

23,240.00

3

Urugan Tanah

64.700

m3

Rp

18,810.00

4

Pas. Batu Pondasi

33.600

m3

Rp

605,475.00

5

Pas. Batu Kosong

11.040

m3

Rp

208,779.00

6

Urugan Pasir

3.460

m3

Rp

105,810.00

7

Beton (1 : 2 : 3)

6.035

m3

698,880.00

8

Bekisting Sloof (15/20)

32.000

m3

111,185.00

9

Bekisting Kolom (15/15)

50.900

m2

133,726.00

10 Penulangan

496.249

Kg

13,745.30

11 Pas. Batu Bata 1 : 4

110.400

m2

83,490.00

Bongkar Bekisting

82.900

m2

22,230.00

RUKSI BANGUNAN

TOTAL 1

Sisi

56.400

M3

56.400

M3 M3

32.350

M3

32.350

M3 M3

16.800

M3

16.800

M3

0.000

M3

5.520

M3

5.520

M3

0.000

M3

1.730

M3

1.730

M3

0.000

M3

1.600

M3

1.600

M3

2.835

M3 M3

X1

Total

112.800

64.700

33.600

11.040

3.460

3.200

2.835 6.035

1

16.000

M2

1

16.000

M2

1

18.900

M2

1

0.000

M2

32.000

18.900 50.900

8000

3150

0.025

M3

197.192

0.017

M3

134.8688

0.010

M3

77.64435

0.011

M3

86.54362

KG

KG

496.249

1

56.400

M2

1

56.400

M2

1 110.400

1.4 2.4

Rp

434,891.25

Rp

2,621,472.00

Rp

1,217,007.00

Rp

20,343,960.00

Rp

2,304,920.16

Rp

366,102.60

Rp

4,217,740.80

Rp

3,557,920.00

Rp

6,806,653.40

Rp

6,821,088.44

Rp

9,217,296.00

Rp

1,842,867.00

Rp

59,751,918.65

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No A

Bagian Rumah

LUAS

PJG

SISI

TERBUKA

0.27

161.2

1

TERTUTUP

0.86

69.12

1

CONBLOCK

138.817

2

0.075

1.2

161.2

1

0.31

69.12

1

5168.196

0.3

1

55.672

1

2

221.962

1

1

1

1

162.16

0.05

1

177.85

0.05

1

319

0.05

1

291.18

0.05

1

362.5

0.05

1

1659.442

0.05

1

1918.43

0.05

1

55.672

0.05

1

221.962

0.05

1

TROTOAR Parkir Drainase

1

Galian Pondasi

PAS BATU Bata PAS BATU GUNUNG

2

Urugan Tanah dipadatkan

3

Pas. Conblock

4

Urugan Pasir Beton

Conblock

SALURAN AIR

0.6

0.1

161.2

0.4

0.1

69.12

1.1304

345.6

100

326.419

1

0.15

Jalan Kiri

162.16

1

0.15

Jalan Kanan

177.85

1

0.15

319

1

0.15

291.18

1

0.15

362.5

1

0.15

1659.442

1

0.15

Parkir Kiri

1918.43

1

0.15

Trotoar

138.817

0.15

0.08

Taman

931.35

0.2

0.35

TROTOAR

0.15

138.817

2

TAMAN

0.35

931.35

1

PENULANGAN

6

Beton

Jalan Atas Jalan Bawah Jalan Eksisting Parkir Kanan

7

12

Bekisting

REKAP BANGUNAN A

TROTOAR Parkir

1

Galian Pondasi

2

Urugan Tanah dipadatkan

3

Pas. Batu Bata 1 : 4

4

Pas. Batu Pondasi

5

123.790

m3

Rp 23,240.00

1550.459

m3

Rp 34,810.00

193.440

m2

83,490.00

21.427

m3

Rp 605,475.00

Pas. Conblok

333.306

m2

Rp 86,155.00

6

Beton (1 : 2 : 3)

785.879

m3

698,880.00

7

Penulangan

306.673

kg

13,745.30

8

Bekisting

735.235

m2

70,301.90

9

Urugan Pasir

270.847

m2

83,490.00

10 Bongkar Bekisting

735.235

m2

22,230.00

1

UNIT

ONSTRUKSI BANGUNAN

TEBAL

TOTAL 1

Sisi

m3

X1

Total

123.790

1

43.524

m3

1

59.443

m3

1

20.823

m3

1

193.440

m2

1

21.427

m3

1550.459

m3

1550.459

1

111.344

m2

333.306

1

221.962

m2

1

0.000

m2

m3 8.108

m3

8.893

m3

15.950

m3

14.559

m3

18.125

m3

82.972

m3

95.922

m3

2.784

m3

11.098

m3

277.634 2

270.847

terbuka

9.672

m3

tertutup

2.765

m3

0.039

M3

Bulatan

48.963

m3

1

24.324

m3

1

26.678

m3

1

47.850

m3

1

43.677

m3

1

54.375

m3

1

248.916

m3

1

287.765

m3

2

3.332

m3

1

65.195

m3

306.673

KG

785.879

735.235 2

83.290

m2

2

651.945

m2

Rp

2,876,873.79

Rp

53,971,470.83

Rp

16,150,305.60

Rp

12,973,633.92

Rp

28,715,978.43

Rp

549,234,946.39

Rp

4,215,312.36

Rp

51,688,434.49

Rp

22,612,982.63

Rp

16,344,278.50

Rp 758,784,216.94 Rp 758,784,216.94

138.817

REKAP BANGUNAN 1

1

Galian Pondasi

m3

0.989

4

2

Pas. Batu Bata 1 : 4

m2

4.640

83,490.00

2

3

BETON (1 : 2 : 3)

m3

0.809

698,880.00

3

4

Bekisting

m2

15.540

1

5

Kuda-kuda dan Gording Ulin

m3

0.045

102,570.00

5

6

Lisplank 2 (2/20)

m2

2.400

29,750.00

6

7

Atap Sakura Roof

m2

2.700

78,681.00

7

8

Kasau dan Reng

m2

2.700

31,205.00

8

9

Bongkar Bekisting

m2

15.540

22,230.00

10

Pengecatan Cat Minyak

m2

2.700

35,057.50

11

Pengecatan Tembok

m2

4.640

15,032.50

10

Rp

23,240.00

70,301.90

UNIT

Rp

22,984.36

Rp

387,393.60

Rp

565,393.92

Rp

1,092,491.59

Rp

4,615.65

Rp

71,400.00

Rp

212,438.70

Rp

84,253.50

Rp

345,454.20

Rp

94,655.25

Rp

69,750.80

Rp

2,440,971.32

Rp

24,409,713.19

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

LUAS

PJG

SISI

TOTAL 1

Sisi

122

9167.5

2400

4

88.008

M3

71

9167.5

1500

4

55.005

M3

95

9167.5

400

13

47.671

M3

9167.5

100

6

5.501

M3

9167.5

1650

1

15.126

M3

30

2400

4

0.288

M3

30

1500

4

0.180

M3

30

400

13

0.156

M3

30

100

6

0.018

M3

30

1650

1

0.050

M3

1500

2400

20

72.000

M3

200

700

10

1.400

M3

122

7612.5

2400

4

73.080

M3

81

7612.5

1500

4

45.675

M3

75

7612.5

400

13

39.585

M3

7612.5

100

6

4.568

M3

7612.5

1650

1

12.561

M3

74

1162.5

2400

4

11.160

M3

81

1162.5

1500

4

6.975

M3

15

1162.5

400

13

6.045

M3

1162.5

100

6

0.698

M3

1162.5

1650

1

1.918

M3

71

362.5

2400

4

3.480

M3

74

362.5

1500

4

2.175

M3

5

362.5

400

13

1.885

M3

362.5

100

6

0.218

M3

362.5

1650

1

0.598

M3

Urugan Pasir (LANTAI)

374.000

1

2

7.480

M3

f.

Tiang Pancang (10/10)

20

1

1

20.000

TTK

2

BETON

a.

Sloof (15/20)

300

2400

4

2.880

M3

300

1500

4

1.800

M3

300

400

13

1.560

M3

300

100

6

0.180

M3

300

1650

1

0.495

M3

225

1500

5

1.688

M3

225

2400

4

2.160

M3

225

375

4

0.338

M3

225

400

66

5.940

M3

225

0

0

0.000

M3

90

60

10

0.648

M3

1

PONDASI

a.

Galian Pondasi

b.

Urugan Tanah Pondasi

Lantai

c.

d.

e.

b.

c.

Pas. Batu Pondasi

Pas. Batu Kosong

Urugan Pasir (PONDASI)

Ringbalk (15/15)

Kolom (15/15)

Dapur

12

90

60

10

12

0.648

M3

90

60

10

12

0.648

M3

20

2400

4

1

38.400

M2

20

1500

4

1

24.000

M2

20

400

13

1

20.800

M2

20

100

6

1

2.400

M2

20

1650

1

1

6.600

M2

15

1500

5

1

33.750

M2

15

2400

4

1

43.200

15

375

4

1

6.750

M2

15

400

66

1

158.400

M2

15

0

0

1

0.000

M2

90

60

12

1

6.480

M2

200

60

12

1

14.400

M2

220

60

12

1

15.840

M2

210

10

12

1

2.520

M2

480

10

12

1

5.760

M2

12

1.1304

23050

1

0.026

M3

8

0.5024

54

1537.666667

0.042

M3

12

1.1304

17100

4

0.077

M3

8

0.5024

44

1141

17100

0.025

M3

12

1.1304

1500

4

KUDA2 BETON

0.007

M3

8

0.5024

44

101

1500

0.002

M3

12

1.1304

26400

4

0.119

M3

8

0.5024

44

1761

26400

0.039

M3

400

2400

4

1

384.000

M2

400

1500

4

1

240.000

M2

400

400

13

1

208.000

M2

400

100

6

1

24.000

M2

400

1650

1

1

66.000

M2

90

60

12

2

12.960

M2

70

60

12

3

15.120

M2

70

60

12

3

15.120

M2

384.000

2

1

768.000

M2

240.000

2

1

480.000

M2

208.000

2

1

416.000

M2

24.000

2

1

48.000

M2

66.000

2

1

132.000

M2

Bekisting Sloof (15/20)

Bekisting Ringbalk (15/15)

Bekisting Kolom (15/15)

Bekisting Dapur

PEMBESIAN Sloof (15/20) Tul. Utama Tul. Bagi (jarak 15 cm)

23050

Ringbalk (15/15) Tul. Utama Tul. Bagi (jarak 15 cm) Tul. Utama Tul. Bagi (jarak 15 cm) Kolom (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

3

DINDING

a.

Pas. Batu Bata

Dapur

b.

Plesteran

Dapur

60

90

2

1.080

M2

60

70

8

3.360

M2

- Pintu Panil

50

205

75

13

0.231

M3

- Jendela

50

60

95

48

0.744

M3

- Ventilasi

50

50

30

4

0.032

M3

Lubang A

50

210

6

1

0.022

M3

Pintu WC1

210

75

6

1

9.450

M2

X

Pintu Lipat

485

250

1

1

12.125

M2

X

Pintu Panil

210

75

13

1

20.475

M3

X

Roster

25

25

67

1

4.188

M2

X

Jendela

60

95

24

2

27.360

M2

X

Ventilasi

50

30

4

1

0.600

M2

X

Lubang B

250

135

15

1

50.625

m2

X

Lubang A

200

100

3

2

12.000

m2

X

Pintu Lipat

485

250

1

1

12.125

m2

X

- Pintu Panil

205

75

13

1

19.988

m2

X

- Jendela

60

95

48

1

27.360

m2

X

- Ventilasi

50

30

4

1

0.600

m2

X

Roster

25

25

67

1

4.188

m2

c.

Lisplank 2 (2/20)

20

923

4

2

14.768

M2

20

492

2

2

3.936

M2

20

2615

2

2

20.920

M2

20

300

2

2

2.400

M2

2400

1500

1

1

330.000

M2

300

700

1

1

21.000

M2

Keramik 20/20 (Lantai)

1000

300

1

1

30.000

M2

Keramik 20/20 (Dinding)

1000

100

1

1

10.000

M2

15

5

80

12

7.200

M2

80

60

2

12

11.520

M2

60

420

1

12

30.240

M2

90

60

1

12

6.480

M2

60

100

1

12

7.200

M2

923

2615

2

482.729

M2

492

300

2

29.520

M2

29.150

M

c.

Acian

4

KAYU

a.

Kusen Ulin (5/10)

5

LANTAI Keramik 30/30 Selasar WC

Dapur

6

ATAP

a.

Sakura Roof

b.

Bubungan (5/10)

c.

Kasau (5/7)

Reng (2/3)

2915

7

923

17

2

21.967

M3

7

492

6

2

4.133

M3

3

2615

10

2

15.690

M3

d.

Gording Ulin (5/10)

3

300

9

2

1.620

M3

50

2615

6

2

1.569

M3

50

300

4

2

0.120

M3

e.

Balok Tarik (6/12)

72

1576

1

5

0.567

M3

f.

Balok Kuda (6/12)

72

895

2

5

0.129

M3 M3

g.

Nok (5/10)

50

2915

1

h.

Balok Tegak (6/12)

72

335

1

72

245

72 i.

Balok Miring (6/12)

0.146

M3

5

0.024

M3

2

5

0.035

M3

185

2

5

0.027

M3

72

290

2

5

0.042

M3

72

208

2

5

0.030

2

4

0.068

M3

M2

j.

Balok Angin (5/10)

50

675

7

RANGKA PLAFOND

2400

1500

360.000

300

700

21.000

8

PLAFOND TRIPLEKS

1

Pemasangan Bowplank

2

M2

160

m2

Rp

18,705.00

Rp

2,992,800.00

Galian Pondasi

211.311

m3

Rp

23,240.00

Rp

4,910,864.74

3

Urugan Tanah

74.092

m3

Rp

18,810.00

Rp

1,393,661.12

4

Pas. Batu Pondasi

175.468

m3

Rp

605,475.00

Rp

106,241,562.98

5

Pas. Batu Kosong

26.796

m3

Rp

208,779.00

Rp

5,594,363.79

6

Urugan Pasir

15.836

m3

Rp

105,810.00

Rp

1,675,567.48

7

Tiang Pancang Ulin (10/10)

20.000

ttk

Rp

102,570.00

Rp

2,051,400.00

8

Sloof Tiang Pokok

20.000

m

Rp

48,344.00

Rp

966,880.00

9

Beton (1 : 2 : 3)

18.984

m3

Rp

698,880.00

Rp

13,267,537.92

92.200

m3

Rp

111,185.00

Rp

10,251,257.00

242.100

m2

Rp

133,726.00

Rp

32,375,064.60

45.000

m2

Rp

70,301.90

Rp

3,163,585.68

2650.373

Kg

Rp

13,745.30

Rp

36,430,170.34

838.315

m2

Rp

83,490.00

Rp

69,990,919.35

15 Plesteran 1 : 4, Tebal 15 mm

1594.670

m2

33,250.00

Rp

53,022,777.50

16 Acian Tembok

1594.670

m2

Rp

6,033.25

Rp

9,621,042.78

1.028

m3

Rp 4,274,300.00

Rp

4,395,476.41

20.475

m2

Rp

359,300.00

Rp

7,356,667.50

19 Pintu WC (Plastik)

6.000

ls

Rp

300,000.00

Rp

1,800,000.00

20 Ventilasi Kaca

0.600

m2

Rp

340,740.00

Rp

204,444.00

21 Jendela Kaca

27.360

m2

340,740.00

Rp

9,322,646.40

22 Pintu Rooling Door

12.125

m2

800,000.00

Rp

9,700,000.00

23 Roster (25/25)

4.188

m2

261,760.00

Rp

1,096,120.00

24 Lisplank (2/20)

42.024

m2

Rp

29,750.00

Rp

1,250,214.00

25 Keramik 30/30

351.000

m2

Rp

137,552.00

Rp

48,280,752.00

26 Keramik 20/20

102.640

m2

Rp

210,552.00

Rp

21,611,057.28

27 Atap Sakura Roof

512.249

m2

Rp

78,681.00

Rp

40,304,263.57

29.150

m

Rp

33,402.50

Rp

973,682.88

29 Kasau dan Reng (5/7 & 2/3)

512.249

m2

Rp

31,205.00

Rp

15,984,730.05

30 Rangka Plafond

381.000

m2

Rp

27,652.50

Rp

10,535,602.50

31 Plafond Tripleks 5 mm

381.000

m2

Rp

34,483.50

Rp

13,138,213.50

10 Bekisting Sloof (15/20) 11 Bekisting Ringbalk dan Kolom (15/15) 12 Bekisting Lantai Playwood 13 Penulangan Besi 14 Pas. Batu Bata 1 : 4

17 Kusen Ulin (5/10) 18 Pintu Panil

28 Bubungan Sakura Roof

Rp

32 Kuda-Kuda dan Gording

2.756

m3

Rp 3,698,200.00

Rp

10,193,134.16

Gording Ulin (5/10)

1.689

M3

Rp 3,698,200.00

Rp

6,246,259.80

Balok Tarik (6/12)

0.567

M3

Rp 3,698,200.00

Rp

2,098,210.75

Balok Kuda (6/12)

0.129

M3

Rp 3,698,200.00

Rp

476,624.02

Nok (5/10)

0.146

M3

Rp 3,698,200.00

Rp

539,012.65

Balok Tegak (6/12)

0.086

M3

Rp 3,698,200.00

Rp

318,193.13

Balok Miring (6/12)

0.072

M3

Rp 3,698,200.00

Rp

265,205.32

Balok Angin (5/10)

0.068

M3

Rp 3,698,200.00

Rp

249,628.50

Rp 550,096,459.52

INSTALASI LISTRIK Pasang Titik Lampu

21

ttk

Rp

68,050.00

Rp

1,429,050.00

Pasang Stop Kontak

15

bh

Rp

33,050.00

Rp

495,750.00

Pasang Saklar Tunggal

29

bh

Rp

28,050.00

Rp

813,450.00

2

bh

Rp

33,050.00

Rp

66,100.00

Pasang Pipa Listrik

100

m

Rp

5,000.00

Rp

500,000.00

Pasang Kabel Listrik

125

m

Rp

3,000.00

Rp

375,000.00

50

bh

Rp

1,500.00

Rp

75,000.00

Rp

3,754,350.00

Pasang Saklar Ganda

Sambungan

INSTALASI AIR Pasang Kran 3/4" atau 1/2"

28

bh

Rp

37,455.00

Rp

1,048,740.00

Pasang Kloset Jongkok

6

bh

Rp

123,465.00

Rp

740,790.00

Pasang Bak Air

6

bh

Rp

210,015.00

Rp

1,260,090.00

Pasang Pipa PVC Ø 3/4"

70

m

Rp

13,471.63

Rp

943,014.33

Pasang Pipa PVC Ø 3"

12

m

Rp

28,838.70

Rp

346,064.40

5

bh

Rp

325,015.00

Rp

1,625,075.00

Rp

5,963,773.73

Pasang Wastafel

PINTU DAN JENDELA Pasang Engsel Pintu

26

Psg

Rp

37,510.75

Rp

975,279.50

Pasang Handle Pintu

13

set

Rp

81,705.00

Rp

1,062,165.00

Pasang Engsel Jendela dan Ventilasi

56

Psg

Rp

28,364.80

Rp

1,588,428.80

Pasang Grendel Jendela dan Ventilasi

28

bh

Rp

66,705.00

Rp

1,867,740.00

8

Psg

Rp

27,510.75

Rp

220,086.00

Rp

5,713,699.30

Pasang Hak Angin Kait-Kait Jendela

PENGECATAN Pengecatan Tembok

1594.670

m2

Rp

15,032.50

Rp

23,971,876.78

Pengecatan Plafond

381.000

m2

Rp

12,632.50

Rp

4,812,982.50

Pengecatan Kayu

142.122

m2

Rp

35,057.50

Rp

4,982,424.49

Kusen

40.508

m2

Rp

35,057.50

Rp

1,420,091.68

Pintu

59.590

m2

Rp

35,057.50

Rp

2,089,076.43

Lisplank

42.024

m2

Rp

35,057.50

Rp

1,473,256.38

Rp

33,767,283.76

TOTAL

Rp 599,295,566.31

X1

Total

211.311

74.092

175.468

26.796

15.836

9600 6000 5200 600 6.915

1650 23050 7500

4.185

9600

17100 26400 5.940 26400

1.944 18.984

92.200

83.700

158.400 242.100

45.000

204.5374

KG

327.4728

606.957

KG

197.9965 53.24184

0.8874

kg/m

0.3944

kg/m

0.8874 0.3944

KG

17.52642

937.0564

KG

305.5845

0.8874 0.3944

2650.373

126.885 838.315

253.770

1594.670 1594.670

Cat Pintu 19.9875 20.52 0.45 1.028

21.575 3.56

52.623

126.885

20

252

0.504

20

101

0.202

20

191

0.382

42.024

351.000

102.640

922.5 512.249

29.150

43.410

1.689

0.567

0.129 0.146

0.086

0.072 0.068

381.000

381.000

KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

TOTAL 1

Sisi

ARAH X

48.564

M3

3

ARAH Y

60.705

M3

300

5

WC

15.176

M3

10117.5

1850

1

TNG DN SLSR

18.717

M3

4502.5

800

6

ARAH X

21.612

M3

4502.5

2000

3

ARAH Y

27.015

M3

4502.5

300

5

WC

6.754

M3

4502.5

1850

1

TNG DN SLSR

8.330

M3

Lantai

2000

800

23

36.800

M3

Selasar

115

2000

15

3.450

M3

68

3430

800

6

ARAH X

16.464

M3

30

3430

2000

3

ARAH Y

20.580

M3

70

3430

300

5

WC

5.145

M3

3430

1850

1

TNG DN SLSR

6.346

M3

94

1350

800

6

ARAH X

6.480

M3

86

1350

2000

3

ARAH Y

8.100

M3

15

1350

300

5

WC

2.025

M3

1350

1850

1

TNG DN SLSR

2.498

M3

86

835

800

6

ARAH X

4.008

M3

81

835

2000

3

ARAH Y

5.010

M3

10

835

300

5

WC

1.253

M3

- Tangga dan Selasar

835

1850

1

TNG DN SLSR

1.545

M3

SELASAR

115

2000

10

2.300

M3

Urugan Pasir (LANTAI)

2000

800

10

LANTAI

16.000

M3

POER

8100

5

18

POER

0.729

M3

18

5

POER

90.000

TTK

4

5

PONDASI

23.000

TTK

700

800

6

1

ARAH X

3.360

M3

700

2000

3

1

ARAH Y

4.200

M3

- WC

700

300

5

1

WC

1.050

M3

- Tangga dan Selasar

700

1850

1

1

Tangga dan Selasar

1.295

M3

Ringbalk (20/20)

400

810

6

1

ARAH X

1.944

M3

400

2000

3

1

ARAH Y

2.400

M3

0.000

M3

1

PONDASI

a.

Galian Pondasi

- WC

LUAS

PJG

SISI

132

10117.5

800

6

81

10117.5

2000

95

10117.5

- Tangga dan Selasar b.

Urugan Tanah Pondasi

c.

Pas. Batu Pondasi

- WC - Tangga dan Selasar d.

Pas. Batu Kosong

- WC - Tangga dan Selasar e.

Urugan Pasir (PONDASI)

- WC

f.

Tiang Pancang (10/10)

2

BETON

a.

Sloof (20/35)

Sloof (15/20)

Ringbalk (15/20)

300

300

5

1

0.450

M3

300

250

5

3

1.125

M3

Kolom (20/20)

400

600

6

3

4.320

M3

Kolom (15/15)

225

300

23

1

Lantai 1

1.553

M3

225

300

28

1

Lantai 2

1.890

M3

X1

0.135

M3

3

0.864

M3

20

18

2.916

810

6

1

Y

2.916

M3

600

2000

3

1

X

3.600

M3

300

750

5

1

Y+X

1.125

M3

300

2000

2

1

X

1.200

M3

300

300

5

1

Y

0.450

M3

920

2

70

1

0.129

M3

1080

15

70

1

1.134

M3

Saluran Air A

7162.884

2000

1

28579.9081

14.326

M3

Saluran Air B

13148.49

2200

1

52462.4627

28.927

M3

Saluran Air c

3690.576

2200

1

14194.5217

8.119

M3

Lantai Tebal 12

2000

800

12

19.200

M3

Selasar

2000

100

12

2.400

M3

35

800

6

1

33.600

M2

35

2000

3

1

42.000

M2

20

300

5

1

6.000

M2

20

1850

1

1

7.400

M2

20

810

6

1

29.160

M2

20

2000

3

1

36.000

M2

15

300

5

1

8.250

M2

20

250

5

3

20.625

M2

20

810

6

1

38.880

M2

30

2000

3

1

48.000

M2

15

750

5

1

20.625

M2

20

2000

2

1

22.000

300

5

1

8.250

M2

600

6

3

86.400

M2

POER (20/20) LANTAI POER (90/90)

Balok (20/30)

Balok (15/20)

Tangga

3

BEKISTING Bekisting Sloof (20/35)

Bekisting Sloof (15/20)

Bekisting Ringbalk (20/20)

Bekisting Ringbalk (15/20)

Bekisting Balok (20/30)

Bekisting Balok (15/20)

Bekisting Kolom (20/20)

225

100

6

1

400

120

6

90

90

600

SELASAR

KEL

20

M2 Bekisting Kolom (15/15)

15

300

23

1

41.400

M2

15

300

28

1

50.400

M2

15

100

6

1

3.600

M2

Bekisting Poer 20/20

20

120

6

3

17.280

M2

Lantai 90/90

90

20

4

18

12.960

M2

Lantai 90/90

90

90

2

18

29.160

M2

Bekisting Lantai

12

2000

810

1

162.000

M2

1

M2

Bekisting Sal Air A

325.6646

2000

1

1299.4016

65.133

M2

Bekisting Sal Air B

475.7605

2200

1

1898.2843

104.667

M2

Bekisting Sal Air C

180.055

2200

1

692.5194

39.612

M2

920

2

1

1

0.184

M3

1080

15

1

1

1.620

M3

20

70

15

1

2.100

M3

Tul. Utama

14

1.5386

10800

7

0.116

M3

913.0976

Tul. Bagi (jarak 15 cm)

10

0.785

94

721

0.053

M3

417.6403

Tul. Utama

14

1.5386

3350

7

0.036

M3

283.2293

Tul. Bagi (jarak 15 cm)

10

0.785

54

224.3333333

0.010

M3

74.6495

Tul. Utama

14

1.5386

10860

7

0.117

M3

918.1703

Tul. Bagi (jarak 15 cm)

10

0.785

64

725

0.036

M3

285.9284

Tul. Utama

14

1.5386

5250

7

0.057

M3

443.8669

Tul. Bagi (jarak 15 cm)

10

0.785

54

351

0.015

M3

116.7993

Tul. Utama

14

1.5386

10800

8

0.133

M3

1043.54

Tul. Bagi (jarak 15 cm)

10

0.785

64

721

0.036

M3

284.3509

Tul. Utama

14

1.5386

15900

8

0.196

M3

1536.323

Tul. Bagi (jarak 15 cm)

10

0.785

44

1061

0.037

M3

287.6785

14

1.5386

106

16

0.003

M3

20.4843

14

1.5386

86

16

106

0.002

M3

16.61934

A

10

0.785

900

134

1

0.095

M3

743.1674

B

10

0.785

200

61

1

0.010

M3

75.17945

C

10

0.785

105

201

1

0.017

M3

130.0543

D

10

0.785

105

84

1

0.007

M3

54.35105

E

10

0.785

200

201

2

0.032

M3

247.7225

F

10

0.785

205

21

10

0.003

M3

26.52849

G

10

0.785

205

21

10

0.003

M3

26.52849

H

10

0.785

205

21

8

0.003

M3

26.52849

Tulangan Sal Air A

10

0.785

425.042

100

0.250609656

0.008

M3

65.64007

8

0.5024

896.073

100

0.250609656

0.011

M3

88.56462

8

0.5024

14

2000

1

0.014

M3

110.4275

10

0.785

256.112

110

1

0.022

M3

173.6052

8

0.5024

278.194

110

1

0.015

M3

120.6867

8

0.5024

18

2200

1

0.020

M3

156.1761

10

0.785

54.5123

110

1

0.005

M3

36.95101

8

0.5024

49.329

110

1

0.003

M3

21.40001

8

0.5024

2

2200

1

0.002

M3

17.3529

10

0.785

45

65

Tul Siku

0.002

M3

18.02458

Bekisting Tangga

4

PEMBESIAN Sloof (20/35)

10800

Sloof (15/20)

3350

Ringbalk (20/20)

10860

Ringbalk (15/20)

5250

Kolom (20/20)

10800

Kolom (15/15)

15900

POER (20/20) Tul. Utama

Tulangan Lantai

Tulangan Sal Air B

Tulangan Sal Air C

Tulangan Tangga

3

DINDING

a.

Pas. Batu Bata

10

0.785

90

5

Tul Siku

0.000

M3

2.773013

10

0.785

70

47

Tul Lurus Siku

0.003

M3

20.2738

12

1.1304

220

10

Tul Lurus X

0.002

M3

19.52201

12

1.1304

280

10

Tul Lurus Y

0.003

M3

24.84619

10

0.785

22.6667

70

Tul Bagi

0.001

M3

9.777437

10

0.785

27.6667

70

Tul Bagi

0.002

M3

11.93422

2000

4

280

1

224.000

M2

Mahkota

150

5

280

1

21.000

M2

Balkon

810

12

280

1

272.160

M2

300

10

280

1

84.000

M2

250

10

280

1

70.000

M2

5

1

0.000

M2

56.912

M2

Balkon dinding kuda

b.

Plesteran

650.785

1

2

1301.570

M2 M2

c.

Acian

Pas Conblock

Dpn

90

2000

18

M2

Blkg

100

2000

20

M2

lebar

tinggi

- Jendela

50

70

130

20

0.400

M3

- Ventilasi

50

60

40

5

0.050

M3

- Pintu Kamar

50

85

215

20

0.515

M3

- Pintu Wc

50

2

0.000

M3

- Pintu Lipat

90

4

KAYU

a.

Kusen Ulin (5/10)

370

241

5

0.383

M3

Jendela

60

120

20

14.400

M3

Ventilasi

50

30

5

0.750

M3

Pintu Kamar

75

210

20

31.500

M3

358

235

5

42.065

M3

1980

2

1

7.920

M2

2

2

0.000

M2

Pintu Lipat

c.

Lisplank 2 (2/20)

5

LANTAI

a.

Keramik 30/30 Teras + Balkon

20

95

385

15

1

54.863

M2

Lantai bawah

385

800

5

1

154.000

M2

Lantai atas

385

800

5

1

154.000

M2

1

1

0.000

M2

WC Keramik 20/20 (Lantai)

135

135

4

1

7.290

M2

Keramik 20/20 (Dinding)

135

150

4

5

35.625

M2

70

70

1

1

0.490

M2

20

70

15

1

2.100

M2

25

70

13

1

2.275

M2

Tangga

6

ATAP

a.

Sakura Roof

526

1980

2

208.296

M2 M2

b.

Bubungan (5/10)

c.

Kasau dan Reng

1980

19.800

M

M3 Luas

Pjg

Jml

Sisi

M3

d.

Gording Ulin (5/10)

50

1980

24

2

4.752

M3

e.

Balok Tarik (6/12)

72

815

4

1

0.235

M3

f.

Balok Kuda (6/12)

72

526

4

2

0.151

M3

g.

Nok (5/10)

50

1980

1

0.099

M3

h.

Balok Tegak (6/12)

72

160

4

2

0.046

M3

72

310

4

2

0.089

M3

i.

Balok Miring (6/12)

72

260

4

2

0.075

M3

j.

Balok Angin (5/10)

50

450

2

3

0.045

M3

7

RANGKA PLAFOND

2

20

8

8

PLAFOND TRIPLEKS

M2

Kandang Rase Atas

6.6

5

1

Pemasangan Bowplank

160

m2

Rp

18,705.00

Rp

2,992,800.00

2

Galian Pondasi

143.163

m3

Rp

23,240.00

Rp

3,327,099.41

3

Urugan Tanah

103.960

m3

Rp

18,810.00

Rp

1,955,494.65

4

Pas. Batu Pondasi

48.535

m3

Rp

605,475.00

Rp

29,386,426.39

5

Pas. Batu Kosong

19.103

m3

Rp

208,779.00

Rp

3,988,200.85

6

Urugan Pasir

30.844

m3

Rp

105,810.00

Rp

3,263,630.09

7

Tiang Pancang Ulin (10/10)

113.000

ttk

102,570.00

Rp

11,590,410.00

8

Beton (1 : 2 : 3)

89.427

m3

698,880.00

Rp

62,498,745.99

9

Baton Lantai (K-225)

21.600

m3

1,147,400.00

Rp

24,783,840.00

89.000

m2

111,185.00

Rp

9,895,465.00

11 Bekisting Ringbalk dn Balok

231.790

m2

134,726.00

Rp

31,228,139.54

12 Bekisting Kolom dan Poer

199.080

m2

133,726.00

Rp

26,622,172.08

13 Bekisting Lantai

204.120

m2

153,913.00

Rp

31,416,721.56

14 Bekisting Playwood

213.316

m2

70,301.90

Rp

14,996,543.94

8870.393

kg

13,745.30

Rp

121,926,210.92

650.785

m2

83,490.00

Rp

54,334,031.30

38.000

m2

86,155.00

Rp

3,273,890.00

18 Plesteran 1 : 4, Tebal 15 mm

1260.601

m2

33,250.00

Rp

41,914,984.91

19 Acian Tembok

1260.601

m2

6,033.25

Rp

7,605,521.28

1.348

m3

4,274,300.00

Rp

5,763,466.12

21 Pintu Panil

73.565

m2

359,300.00

Rp

26,431,904.50

22 Jendela dan Ventilasi Kaca

15.150

m2

340,740.00

Rp

5,162,211.00

7.920

m2

29,750.00

Rp

235,620.00

10 Bekisting Sloof (15/20)

15 Penulangan Besi 16 Pas. Batu Bata 1 : 4 17 Pas. Conblock

20 Kusen Ulin (5/10)

23 Lisplank 2 (2/20)

M2

M

Rp

24 Pas. Keramik 30/30

362.863

m2

137,552.00

Rp

49,912,462.60

25 Pas. Keramik 20/20

47.780

m2

210,552.00

Rp

10,060,174.56

208.296

m2

78,681.00

Rp

16,388,937.58

19.800

m

33,402.50

Rp

661,369.50

28 Kasau dan Reng (5/7 & 2/3)

208.296

m2

31,205.00

Rp

6,499,876.68

29 Rangka Plafond

320.000

m2

27,652.50

Rp

8,848,800.00

30 Plafond Tripleks 5 mm

320.000

m2

34,483.50

Rp

11,034,720.00

40,948.00

Rp

1,351,284.00

26 Atap Sakura Roof 27 Bubungan Sakura Roof

31 Railing Besi

m

32 Kandang Rase Atas

33.000

m

33 Kuda Kuda dan Gording

5.492

m3

3,698,200.00

Rp

20,312,171.19

Gording Ulin (5/10)

4.752

M3

3,698,200.00

Rp

17,573,846.40

Balok Tarik (6/12)

0.235

M3

3,698,200.00

Rp

868,041.50

Balok Kuda (6/12)

0.151

M3

3,698,200.00

Rp

560,232.92

Nok (5/10)

0.099

M3

3,698,200.00

Rp

366,121.80

Balok Tegak (6/12)

0.135

M3

3,698,200.00

Rp

500,588.35

Balok Miring (6/12)

0.075

M3

3,698,200.00

Rp

276,921.22

Balok Angin (5/10)

0.045

M3

3,698,200.00

Rp

166,419.00

Rp

649,663,325.64

INSTALASI LISTRIK

lt1

lt2

Pasang Titik Lampu

55

ttk

68,050.00

Rp

3,742,750.00

6

5

Pasang Stop Kontak

30

bh

33,050.00

Rp

991,500.00

3

3

Pasang Saklar Tunggal

25

bh

28,050.00

Rp

701,250.00

2

3

Pasang Saklar Ganda

15

bh

33,050.00

Rp

495,750.00

2

1

Pasang Pipa Listrik

250

m

Rp

5,000.00

Rp

1,250,000.00

25

25

Pasang Kabel Listrik

300

m

Rp

3,000.00

Rp

900,000.00

30

30

Sambungan

100

bh

Rp

150,000.00

10

10

Rp

8,231,250.00

63

21

1500

INSTALASI AIR Pasang Kran 3/4" atau 1/2"

5

bh

37,455.00

Rp

187,275.00

Pasang Kloset Jongkok

5

bh

123,465.00

Rp

617,325.00

Pasang Bak Air

5

bh

210,015.00

Rp

1,050,075.00

Pasang Pipa PVC Ø 3/4"

25

m

13,471.63

Rp

336,790.83

Pasang Pipa PVC Ø 3"

10

m

28,838.70

Rp

288,387.00

0

bh

325,015.00

Rp

Wastafel

Rp

2,479,852.83

PINTU DAN JENDELA 180

Psg

37,510.75

Rp

6,751,935.00

2

Grendel Pintu

20

set

66,705.00

Rp

1,334,100.00

4

Pasang Handle Pintu

20

set

81,705.00

Rp

1,634,100.00

Pasang Engsel Jendela

50

Psg

28,364.80

Rp

1,418,240.00

Pasang Grendel Jendela

25

Bh

66,705.00

Rp

1,667,625.00

Pasang Hak Angin Kait-Kait Jendela

50

Psg

27,510.75

Rp

1,375,537.50

Rp

14,181,537.50

Pasang Engsel Pintu

PENGECATAN Pengecatan Tembok

1260.601

m2

15,032.50

Rp

18,949,985.28

Cat Plafond

320.000

m2

12,632.50

Rp

4,042,400.00

Cat Kayu

170.200

m2

35,057.50

Rp

5,966,786.50

Pintu dll

162.280

m2

35,057.50

Rp

5,689,131.10

Lisplank

7.920

m2

35,057.50

Rp

277,655.40

Rp

28,959,171.78

4

TOTAL

Rp

703,515,137.76

Total

143.163

103.960

48.535

19.103

30.844

113.000

7.560

2.345

4.344

1.575

4.320

3.578 12.584

3.780

6.516

89.427

21.600

89.000

231.790

199.080

204.120

213.316

KG

KG

KG

KG

KG

0 0

KG

0 0

KG

0 0

8870.393

KG

KG

KG

20.81

Roster

4.5

m2

15

Jendela

18.2

m2

Ventilasi

1.2

m2

K. Tidur

36.55

m2

K. Mandi

8.0625

m2

P. Lipat

44.585

m2

650.785

113.098 K mandi

40.9688

1260.601

1260.601

38.000

1.348

15.150

73.565

7.920

Tangga

2.75

Wc

11.25

14

7.5

7.5

Tangga dinding dinding 362.863

47.780

208.296

19.800

208.296

4.752

0.235

0.151 0.099

0.135

0.075

0.045

320.000

320.000

33

63 8

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PONDASI

a.

Tiang Pancang 10/10

b.

Sloof Tiang Pokok

c.

Tiang Pokok 10/10

d.

Gelagar 10/10

e.

f.

g.

Gelagar 5/10

Ringbalk 10/10

Lantai Ulin

Lantai Tangga

h.

Dinding Meranti

Rangka Plafond

LUAS

PJG

SISI

TOTAL 1

Sisi

1

48

1

48.000

titik

48.000

M

48

100

450

19

0.855

M3

1

500

4

20.000

M

1

1000

4

40.000

M

1

500

10

50.000

M

1

1000

11

110.000

M

1

1000

2

20.000

M

1

1000

2

20.000

M

1000

500

1

1

50.000

M2

250

500

2

1

25.000

M2

125

60

4

1

3.000

M2

PJG

TINGGI

JML

50

1010

3

1

15.150

M2

255

125

4

1

12.750

M2

510

499

1

1

25.449

M2

50

250

2

1

2.500

M2

1000

500

1

1

50.000

M2

250

500

2

1

25.000

M2

Plafond

6

ATAP

a.

Sakura Roof

b.

Bubungan Sakura Roof

c.

Kasau (5/7)

Reng (2/3)

M3

250

585

1000

387

8

129.258

M2

1000

20.000

M

512

4

20.480

M

DIM

PJG

JML

SISI

7

375.5

3

8

6.308

M3

7

282.5

1

8

1.582

M3

7

167.5

1

8

0.938

M3

7

52

1

8

0.291

M3

7

269

1

8

1.506

M3

7

303.7

1

8

1.701

M3

7

338.3

1

8

1.894

M3

7

373

1

8

2.089

M3

7

407.6

1

8

2.283

M3

7

442.2

1

8

2.476

M3

7

476.9

1

8

2.671

M3

7

511.5

1

8

2.864

M3

7

546.2

1

8

3.059

M3

7

577

1

8

3.231

M3

X1

d.

Gording Ulin (5/10)

DIM

PJG

JML

SISI

50

290

4

2

0.116

M3

50

420

4

2

0.168

M3

50

550

4

2

0.220

M3

e.

Balok Tarik (6/12)

72

552

9

1

0.358

M3

f.

Balok Kuda (6/12)

72

359

9

2

0.465

M3

g.

Nok (5/10)

50

2000

1

1

0.100

M3

50

512

4

1

0.102

M3

72

177.5

9

1

0.115

M3

72

90

9

2

0.058

M3

h.

Balok Tegak (6/12)

i.

Balok Miring (6/12)

72

122

2

2

0.018

M3

i.

Balok Angin (5/10)

50

320

2

2

0.032

M3

Lisplank 2 (2/20)

20

387

4

1

3.096

M2

20

273.5

4

1

2.188

M2

Kandang Rase Atas

M

REKAP BANGUNAN 1

Pemasangan Bowplank

75

m2

Rp

18,705.00

Rp

1,402,875.00

2

Tiang Pancang Ulin 10/10

48.000

ttk

Rp

102,570.00

Rp

4,923,360.00

3

Sloof Tiang Pokok

48.000

m

Rp

48,344.00

Rp

2,320,512.00

4

Tiang Pokok 10/10

0.855

m3

Rp 4,258,300.00

Rp

3,640,846.50

5

Gelagar Ulin 10/10

60.000

m

Rp

52,760.00

Rp

3,165,600.00

6

Gelagar Ulin 5/10

160.000

m

Rp

25,372.00

Rp

4,059,520.00

7

Ringbalk Ulin 10/10

40.000

m

Rp

60,866.00

Rp

2,434,640.00

8

Lantai Ulin

78.000

m2

Rp

66,110.00

Rp

5,156,580.00

9

Dinding Meranti

55.849

m2

Rp

43,610.00

Rp

2,435,574.89

44.100

m

40,948.00

Rp

1,805,806.80

5.284

m2

29,750.00

Rp

157,199.00

129.258

m2

78,681.00

Rp

10,170,148.70

13 Bubungan Sakura Roof

40.480

m

33,402.50

Rp

1,352,133.20

14 Rangka Plafond

75.000

m2

27,652.50

Rp

2,073,937.50

15 Plafond Tripleks 5 mm

75.000

m2

34,483.50

Rp

2,586,262.50

129.258

m2

31,205.00

Rp

4,033,495.89

3,698,200.00

Rp

6,480,237.52

10 Kandang Rase Ulin 2/5 & 5/8 11 Lisplank (2/20) 12 Atap Sakura Roof

16 Kasau dan Reng (5/7 & 2/3) 17 Baut

bh

18 Kuda-Kuda dan Gording

1.752

m3

Gording Ulin (5/10)

0.504

3,698,200.00

Rp

1,863,892.80

Balok Tarik (6/12)

0.358

3,698,200.00

Rp

1,322,831.35

Balok Kuda (6/12)

0.465

3,698,200.00

Rp

1,720,639.32

Nok (5/10)

0.202

3,698,200.00

Rp

748,515.68

Balok Tegak (6/12)

0.173

3,698,200.00

Rp

641,045.99

Balok Miring (6/12)

0.018

3,698,200.00

Rp

64,969.98

Balok Angin (5/10)

0.032

3,698,200.00

Rp

118,342.40

Rp 58,198,729.50

INSTALASI LISTRIK

Pasang Kepala Lampu

5

ttk

68,050.00

Rp

340,250.00

Pasang Stop Kontak

2

bh

33,050.00

Rp

66,100.00

Pasang Saklar Tunggal

1

bh

28,050.00

Rp

28,050.00

Pasang Saklar Ganda

2

bh

33,050.00

Rp

66,100.00

Pasang Pipa Listrik

20

m

Rp

5,000.00

Rp

100,000.00

Pasang Kabel Listrik

22

m

Rp

3,000.00

Rp

66,000.00

4

bh

1500 Rp

6,000.00

Rp

672,500.00

Sambungan

PENGECATAN Pengecatan Plafond

75.000

m2

12,632.50

Rp

947,437.50

161.183

m2

35,057.50

Rp

5,650,673.02

Lantai

78.000

m2

35,057.50

Rp

2,734,485.00

Dinding

55.849

m2

35,057.50

Rp

1,957,926.32

Lisplank

5.284

m2

35,057.50

Rp

185,243.83

22.050

m2

35,057.50

Rp

773,017.88

Rp

6,598,110.52

Pengecatan Kayu

Kandang Rase

TOTAL

Rp 65,469,340.02

Total

48.000

48.000

0.855

60.000

160.000

40.000

78.000

55.849

75.000

75.000

129.258

40.480

32.894

0.504 0.358

0.465

0.202

0.173 0.018

0.032

5.284

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PONDASI

a.

Tiang Pancang 10/10

b.

Sloof Tiang Pokok

c.

Tiang Pokok 10/10

d.

e.

f.

g.

h.

Gelagar 10/10

Gelagar 5/10

Ringbalk 10/10

LUAS

PJG

SISI

TOTAL 1

Sisi

1

67

1

67.000

titik

67.000

M

67

100

500

16

0.800

M3

100

100

6

0.060

M3

100

175

4

0.070

M3

100

300

2

6.000

M

100

600

2

12.000

M

100

900

3

27.000

M

50

300

6

18.000

M

50

600

6

36.000

M

50

900

7

63.000

M

0

0.000

M

24.000

M

100 100

600

4

Lantai Ulin

600

600

1

1

36.000

M2

Muhrab

200

350

1

1

7.000

M2

Selasar

300

150

3

1

13.500

M2

Lantai Tangga

120

95

4

1

4.560

M2

PJG

TINGGI

JML

600

500

4

2

240.000

M2

150

500

3

2

45.000

M2

0.000

M2

0.000

M2

Dinding Meranti

Rangka Plafond

600

600

1

1

36.000

M2

150

300

1

1

4.500

M2

Plafond

6

ATAP

a.

Sakura Roof

b.

c.

Bubungan Sakura Roof

Kasau (5/7)

Reng (2/3)

M3

310

816

373

4

84.000

M2

270

234

1

3

18.954

M2

461

234

1

1

10.787

M2

355

231

1

4

32.802

M2

291.3

4

1

1

11.652

M

503.5

4

1

1

20.140

DIM

PJG

JML

SISI 0.000

M3

0.000

M3

0.000

M3

0.000

M3

0.000

M3

0.000

M3

0.000

M3

0.000

M3

X1

30.235

d.

f.

M3

0.000

M3

0.000

M3

0.000

M3

0.000

M3

0.000

M3

DIM

PJG

JML

SISI

50

300

4

1

0.060

M3

50

600

4

1

0.120

M3

50

1271

3

1

0.191

M3

72

649.5

1

2

0.094

M3

72

249.5

1

1

0.018

M3

Kanopi

72

138

2

4

0.079

M3

Balok Kuda (6/12)

72

356.2

1

8

0.205

M3

72

200.36

1

2

0.029

M3

72

197

2

4

0.113

M3

0.002

M3

Gording Ulin (5/10)

Kanopi e.

0.000

Balok Tarik (6/12)

Kanopi g.

Nok (5/10)

50

31.792

1

h.

Balok Tegak (6/12)

72

78.5

1

8

0.006

M3

72

140

1

8

0.010

M3

72

120

1

1

0.009

M3

72

139

2

4

0.020

M3

72

100

1

8

0.007

M3

72

59

1

4

0.004

M3

72

77

2

4

0.011

M3

20

816

4

1

6.528

M2

20

355

4

1

2.840

M2

20

730

3

1

4.380

M2

20

921

1

1

1.842

M2

Kanopi i.

Balok Miring (6/12)

Kanopi Lisplank (2/20)

Kandang Rase

M

KANOPI

4

KAYU

a.

Kusen Ulin (5/10) Pintu Besar

50

584

1

3

0.088

M3

Pintu Kecil

50

65

205

1

0.024

M3

Jend. Besar

50

756

1

6

0.227

M3

Jend. Kecil

50

30

150

1

0.018

M3

Pintu Besar

10.215

1

1

1

10.215

M2

Pintu Kesil

1.3325

1

1

1

1.333

M2

PINTU PANIL

JENDELA KACA + KUSEN Jend. Besar

10.7076

10.708

M2

Jend. Kecil

0.48

0.480

M2

REKAP BANGUNAN 1

Pemasangan Bowplank

54

m2

Rp

18,705.00

Rp

1,010,070.00

2

Tiang Pancang Ulin 10/10

67.000

ttk

Rp

102,570.00

Rp

6,872,190.00

3

Sloof Tiang Pokok

67.000

m

Rp

48,344.00

Rp

3,239,048.00

4

Tiang Pokok 10/10

0.930

m3

Rp 4,258,300.00

Rp

3,960,219.00

5

Gelagar Ulin 10/10

45.000

m

Rp

52,760.00

Rp

2,374,200.00

6

Gelagar Ulin 5/10

117.000

m

Rp

25,372.00

Rp

2,968,524.00

7

Ringbalk Ulin 10/10

24.000

m

Rp

60,866.00

Rp

1,460,784.00

8

Lantai Ulin

61.060

m2

Rp

66,110.00

Rp

4,036,676.60

9

Dinding Meranti

254.765

m2

Rp

43,610.00

Rp

11,110,297.29

0.357

m3

4,274,300.00

Rp

1,524,856.53

11 Pintu Panil

11.548

m2

359,300.00

Rp

4,149,016.75

12 Jendela Kaca Mati + kusen

11.188

m2

523,700.00

Rp

5,858,946.12

13 Kandang Rase Ulin 2/5 & 5/8

26.050

m

40,948.00

Rp

1,066,695.40

14 Lisplank (2/20)

15.590

m2

29,750.00

Rp

463,802.50

146.543

m2

78,681.00

Rp

11,530,149.78

16 Bubungan Sakura Roof

31.792

m

33,402.50

Rp

1,061,932.28

17 Rangka Plafond

40.500

m2

27,652.50

Rp

1,119,926.25

18 Plafond Tripleks 5 mm

40.500

m2

34,483.50

Rp

1,396,581.75

146.543

m2

31,205.00

Rp

4,572,874.32

bh

2,500.00

10 Kusen Ulin (5/10)

15 Sakura Roof

19 Kasau dan Reng (5/7 & 2/3) 20 Baut 21 Kuda-Kuda dan Gording

0.978

m3

3,698,200.00

Rp

3,615,503.22

Gording Ulin (5/10)

0.371

m3

3,698,200.00

Rp

1,370,737.83

Balok Tarik (6/12)

0.191

m3

3,698,200.00

Rp

706,282.24

Balok Kuda (6/12)

0.347

m3

3,698,200.00

Rp

1,285,106.16

Nok (5/10)

0.002

m3

3,698,200.00

Rp

5,878.66

Balok Tegak (6/12)

0.044

m3

3,698,200.00

Rp

164,155.70

Balok Miring (6/12)

0.023

m3

3,698,200.00

Rp

83,342.64

Rp 73,392,293.78

INSTALASI LISTRIK Pasang Kepala Lampu

10

ttk

68,050.00

Rp

Pasang Stop Kontak

bh

33,050.00

Rp

-

Pasang Saklar Tunggal

bh

28,050.00

Rp

-

Pasang Saklar Ganda

bh

33,050.00

Rp

-

Pasang Pipa Listrik

m

Rp

5,000.00

Rp

-

Pasang Kabel Listrik

m

Rp

3,000.00

Rp

-

Sambungan

bh

Rp

-

1500

680,500.00

Rp

680,500.00

INSTALASI AIR

PINTU DAN JENDELA Pasang Engsel Pintu

14

Psg

37,510.75

Rp

525,150.50

PasangGrendel Pintu

6

set

66,705.00

Rp

400,230.00

Pasang Handle Tangan

7

set

81,705.00

Rp

571,935.00

Rp

1,497,315.50

PENGECATAN Pengecatan Plafond Pengecatan Kayu Lantai Dinding

40.500

m2

12,632.50

Rp

511,616.25

371.829

m2

35,057.50

Rp

13,035,391.66

61.060

m2

35,057.50

Rp

2,140,610.95

254.765

m2

35,057.50

Rp

8,931,420.48

Kusen

4.294

m2

35,057.50

Rp

150,536.91

Pintu

23.095

m2

35,057.50

Rp

809,652.96

Kandang Rase

13.025

m2

35,057.50

Rp

456,623.94

Lisplank

15.590

m2

35,057.50

Rp

546,546.43

Rp 13,547,007.91

TOTAL

Rp 89,117,117.19

Total

67.000

67.000

0.930

45.000

117.000

24.000

61.060

Mimbar Jendela dan pintu

7.5

Pintu Besar

10.215

Pintu Kecil

1.3325

Jend. Besar 10.7076 254.765

Jend. Kecil

0.48 30.2351

40.500

40.500

146.543

31.792

60

1

0.000

0.371 0.191

0.347

0.002

0.044

0.023

15.590

12.750

Cat Pintu

0.357

20

584

1.168

20

475

0.95

20

758

1.516

20

330

0.66 4.294

11.548

11.188

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PONDASI

a.

Tiang Pancang 10/10

b.

Sloof Tiang Pokok

c.

Tiang Pokok 10/10

LUAS

PJG

SISI

TOTAL 1

Sisi

1

28

1

28.000

titik

28.000

M

28

100

375

16

0.600

m3

100

297

2

0.059

m3

X1

d.

Gelagar 10/10

1

400

7

28.000

m

e.

Gelagar 5/10

1

900

4

36.000

m

f.

Ringbalk 10/10

1

400

2

8.000

m

1

900

2

18.000

m

400

900

1

1

36.000

M2

PJG

TINGGI

JML

150

365

4

1

21.900

M2

300

365

2

1

21.900

M2

400

365

2

1

29.200

M2

Pintu

50

205

75

1

0.024

M3

Ventilasi

50

60

40

1

0.010

M3

50

135

40

1

0.018

M3

Rangka Plafond

400

900

1

1

36.000

M3

Plafond

400

900

1

1

36.000

M3

932

335

1

1

31.222

M2

245

335

1

1

8.208

M2

932

245

11.770

M

DIM

PJG

JML

SISI

35

335

18

2

21.855

M3

17.64

35

335

4

2

5.745

M3

3.9

6

932

12

2

0.067

M3

12.16667

6

245

12

2

0.018

M3

12.16667

DIM

PJG

JML

SISI

50

932

3

2

0.280

M3

50

245

3

2

0.074

M3

g.

h.

Lantai Ulin

Dinding Meranti

2.088

Kusen (balok 5/10)

6

ATAP

a.

Sakura Roof

b.

c.

Bubungan Sakura Roof

Kasau (5/7)

Reng (2/3)

d.

Gording Ulin (5/10)

e.

Balok Tarik (6/12)

72

452

7

1

0.228

M3

f.

Balok Kuda (6/12)

72

307

7

2

0.309

M3

g.

Nok (5/10)

50

1177

1

1

0.059

M3

h.

Balok Tegak (6/12)

72

148.5

7

1

0.075

M3

72

69.5

7

2

0.035

M3

i.

Balok Miring (6/12)

72

99.5

7

2

0.050

M3

i.

Balok Angin (5/10)

50

250

3

2

0.038

M3

Daun Pintu

65

200

1

1

1.300

M2

Ventilasi

50

30

1

1

0.310

M2

60

30

2

1

0.384

M2

20

932

1

1

1.864

M2

20

245

1

1

0.490

M2

20

335

3

1

2.010

M2

Lisplank 2 (2/20)

Kandang Rase

M

REKAP BANGUNAN 1

Pemasangan Bowplank

36

m2

Rp

18,705.00

Rp

673,380.00

2

Tiang Pancang Ulin 10/10

28.000

ttk

Rp

102,570.00

Rp

2,871,960.00

3

Sloof Tiang Pokok

28.000

m

Rp

48,344.00

Rp

1,353,632.00

4

Tiang Pokok 10/10

0.659

m3

Rp 4,258,300.00

Rp

2,807,923.02

5

Gelagar Ulin 10/10

28.000

m

Rp

52,760.00

Rp

1,477,280.00

6

Gelagar Ulin 5/10

36.000

m

Rp

25,372.00

Rp

913,392.00

7

Ringbalk Ulin 10/10

26.000

m

Rp

60,866.00

Rp

1,582,516.00

8

Lantai Ulin

36.000

m2

Rp

66,110.00

Rp

2,379,960.00

9

Dinding Meranti

70.913

m2

Rp

43,610.00

Rp

3,092,494.13

10 Kusen Ulin (5/10)

0.052

m3

4,274,300.00

Rp

221,195.03

11 Pintu Panil

1.300

m2

359,300.00

Rp

467,090.00

12 Ventilasi

0.694

m2

340,740.00

Rp

236,473.56

22.000

m

40,948.00

Rp

900,856.00

4.364

m2

29,750.00

Rp

129,829.00

15 Atap Sakura Roof

39.430

m2

78,681.00

Rp

3,102,352.49

16 Bubungan Sakura Roof

11.770

m

33,402.50

Rp

393,147.43

17 Rangka Plafond

36.000

m2

27,652.50

Rp

995,490.00

18 Plafond Tripleks 5 mm

36.000

m2

34,483.50

Rp

1,241,406.00

19 Kasau dan Reng (5/7 & 2/3)

39.430

m2

31,205.00

Rp

1,230,397.55

13 Kandang Rase Ulin 2/5 & 5/8 14 Lisplank (2/20)

20 Baut

bh

21 Kuda-Kuda dan Gording

1.147

m3

3,698,200.00

Rp

4,240,851.68

Gording Ulin (5/10)

0.353

m3

3,698,200.00

Rp

1,305,834.42

Balok Tarik (6/12)

0.228

m3

3,698,200.00

Rp

842,479.55

Balok Kuda (6/12)

0.309

m3

3,698,200.00

Rp

1,144,430.18

Nok (5/10)

0.059

m4

3,698,200.00

Rp

217,639.07

Balok Tegak (6/12)

0.110

m3

3,698,200.00

Rp

406,328.63

Balok Miring (6/12)

0.050

m3

3,698,200.00

Rp

185,457.33

Balok Angin (5/10)

0.038

m3

3,698,200.00

Rp

138,682.50

Rp 30,311,625.87

INSTALASI LISTRIK Pasang Kepala Lampu

5

ttk

68,050.00

Rp

340,250.00

Pasang Stop Kontak

1

bh

33,050.00

Rp

33,050.00

Pasang Saklar Tunggal

1

bh

28,050.00

Rp

28,050.00

Pasang Saklar Ganda

2

bh

33,050.00

Rp

66,100.00

Pasang Pipa Listrik

15

m

Rp

5,000.00

Rp

75,000.00

Pasang Kabel Listrik

19

m

Rp

3,000.00

Rp

57,000.00

5

bh

Rp

7,500.00

Rp

606,950.00

Sambungan

1500

INSTALASI AIR Pasang Kran 3/4" atau 1/2"

1

bh

37,455.00

Rp

37,455.00

Pasang Kloset Jongkok

1

bh

123,465.00

Rp

123,465.00

Pasang Bak Air

0

bh

210,015.00

Rp

Pasang Pipa PVC Ø 3/4"

4

m

13,471.63

Rp

53,886.53

Pasang Pipa PVC Ø 3"

4

m

28,838.70

Rp

115,354.80

Rp

330,161.33

-

PINTU DAN JENDELA Pasang Kunci Pintu Tanam 2 Slaag

1

set

81,705.00

Rp

81,705.00

Pasang Engsel Pintu

2

Psg

37,510.75

Rp

75,021.50

Pasang Engsel Jendela

6

Psg

28,364.80

Rp

170,188.80

Pasang Grendel Jendela

3

bh

66,705.00

Rp

200,115.00

Pasang Hak Angin Kait-Kait Jendela

6

Psg

27,510.75

Rp

165,064.50

Rp

692,094.80

PENGECATAN Pengecatan Plafond

36.000

m2

12,632.50

Rp

454,770.00

126.265

m2

35,057.50

Rp

4,426,517.71

70.913

m2

35,057.50

Rp

2,486,014.97

36.000

m2

35,057.50

Rp

1,262,070.00

Lisplank

4.364

m2

35,057.50

Rp

152,990.93

Pintu

2.600

m2

35,057.50

Rp

91,149.50

Ventilasi

1.388

m2

35,057.50

Rp

48,659.81

11.000

m2

35,057.50

Rp

385,632.50

Rp

4,881,287.71

Pengecatan Kayu Cat Kayu

(Dinding) Lantai

Kandang Rase

TOTAL

Rp 36,822,119.71

Total

28.000

28.000

0.659

28.000

36.000

26.000

36.000

70.913

0.052

36.000

36.000

39.430

11.770

932 245 335 39.430

0.353 0.228

0.309

0.059

0.110 0.050

0.038

1.300

0.694

4.364

25.000

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

LUAS

PJG

SISI

7832

600

7832

TEBAL

TOTAL 1

Sisi

3

14.098

M3

300

3

7.049

M3

7832

150

2

2.350

M3

3979.5

600

3

7.163

M3

3979.5

300

3

3.582

M3

3979.5

150

2

1.194

M3

19600

4

10

0.784

M3

40600

2

10

0.812

M3

117000

1

5

0.585

M4

2437.5

600

3

4.388

M3

2437.5

300

3

2.194

M3

2437.5

150

2

0.731

M3

1080

600

3

1.944

M3

1080

300

3

0.972

M3

1080

150

2

0.324

M3

335

600

3

0.603

M3

335

300

3

0.302

M3

335

150

2

0.101

M3

19600

4

2

0.157

M3

40600

2

7

0.568

M3

117000

1

2

0.234

M3

13

1

1

13.000

M3

300

600

3

0.540

M3

300

150

8

0.360

M3

225

321

3

0.217

M3

225

600

2

0.270

M3

225

234

5

0.263

M3

225

275

5

0.309

M3

225

318

3

0.215

M3

20

600

3

1

7.200

M2

20

150

8

1

4.800

M2

15

321

3

1

4.334

M2

15

600

2

1

5.400

M2

15

234

5

1

7.020

M2

15

275

5

1

8.250

M2

BOWPLANK

1

PONDASI

a.

Galian Pondasi

b.

Urugan Tanah Pondasi

Lantai

c.

d.

e.

Pas. Batu Pondasi

Pas. Batu Kosong

Urugan Pasir Urugan Pasir (PONDASI)

Urugan Pasir (LANTAI)

Urugan Pasir (SELASAR)

f.

Tiang Pancang Ulin (10/10)

2

BETON (1 : 2 : 3)

a.

Sloof (15/20)

b.

c.

Ringbalk (15/15)

Kolom (15/15)

Bekisting Sloof (15/20)

Bekisting Ringbalk (15/15)

Bekisting Kolom (15/15)

X1

15

318

3

12

1.1304

3000

4

8

0.5024

54

200

12

1.1304

2163

4

8

0.5024

44

144.2

12

1.1304

2545

4

8

0.5024

44

169.6666667

234

600

275

1

5.724

M2

0.014

M3

106.4837

0.005

M3

42.59347

0.010

M3

76.77473

0.003

M3

25.02288

0.012

M3

90.33366

2545

0.004

M3

29.44208

1

1

14.040

M2

0.5

600

1

1

10.260

M2

6.24

318

600

1

1

13.780

M2

5.3

82800

3

1

1

24.840

M2

38175

2

1

1

7.635

M2

55

130

1

1

0.715

M2

14.040

2

1

28.08

M2

10.260

2

1

20.52

M2

13.780

2

1

27.56

M2

24.840

2

1

49.68

M2

7.635

2

1

15.27

M2

0.715

2

1

1.43

M3

625

2

4

0.50

M2

- Pintu WC LUAR

50

265

200

1

0.033

M3

Lisplank 2 (2/20)

20

735

1

1

1.470

M2

20

484

1

1

0.968

M2

- WC DALAM

150

600

1

1

7.560

M2

- WC LUAR

150

600

1

1

9.000

M2

- SELASAR

600

65

1

1

3.900

M2

Keramik 20/20 (Dinding)

150

100

16

1

16.200

M2

PEMBESIAN Sloof (15/20) Tul. Utama Tul. Bagi (jarak 15 cm)

3000

Ringbalk (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

2163

Kolom (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

3

DINDING

a.

Pas. Batu Bata 1 : 4

b.

Plesteran

c.

Acian

d.

Roster (25/25)

4

KAYU Kusen Ulin (5/10)

5

LANTAI

a.

Keramik 20/20 (LANTAI)

6

ATAP

a.

Sakura Roof

735

484

1

35.574

M2

b.

Kasau (5/7)

35

484

7

0.119

M3

6

735

9

0.040

M3

50

735

3

0.110

M3

Reng (2/3)

c.

Gording Ulin (5/10)

7

RANGKA PLAFOND

M2

8

PLAFOND TRIPLEKS

M2

9

LAIN LAIN Closed Jongkok

4

Bak Air

4

Wastafel Tunggal

2

Engsel Pintu

8

Kran Air

8

Titik Lampu

6

Saklar Tunggal

6

REKAP BANGUNAN 1

Pemasangan Bowplank

18

m2

Rp 18,705.00

Rp

336,690.00

2

Galian Pondasi

23.496

m3

Rp 23,240.00

Rp

546,047.04

3

Urugan Tanah

14.120

m3

Rp 18,810.00

Rp

265,587.80

4

Pas. Batu Pondasi

7.313

m3

Rp 605,475.00

Rp

4,427,535.94

5

Pas. Batu Kosong

3.240

m3

Rp 208,779.00

Rp

676,443.96

6

Urugan Pasir

1.964

m3

Rp 105,810.00

Rp

207,832.00

7

Tiang Pancang Ulin (10/10)

13.000

ttk

102,570.00

Rp

1,333,410.00

8

BETON (1 : 2 : 3)

2.174

m3

698,880.00

Rp

1,519,330.18

9

Bekisting Sloof (15/20)

12.000

m2

111,185.00

Rp

1,334,220.00

30.728

m2

133,726.00

Rp

4,109,065.67

370.650

kg

13,745.30

Rp

5,094,702.27

71.270

m2

83,490.00

Rp

5,950,332.30

13 Plesteran 1 : 4, Tebal 15 mm

126.340

m2

33,250.00

Rp

4,200,805.00

14 Acian Tembok

126.340

m2

6,033.25

Rp

762,240.81

15 Roster 25/25

0.500

m2

261,760.00

Rp

130,880.00

16 Kusen Ulin (5/10)

0.033

m3

4,274,300.00

Rp

142,120.48

17 Pintu WC (Plastik)

4

ls

Rp 300,000.00

Rp

1,200,000.00

2.438

m2

29,750.00

Rp

72,530.50

19 Keramik 20/20 (Lantai)

20.460

m2

210,552.00

Rp

4,307,893.92

20 Keramik 20/20 (Dinding)

16.200

m2

210,552.00

Rp

3,410,942.40

21 Atap Sakura Roof

35.574

m2

78,681.00

Rp

2,798,997.89

22 Kasau dan Reng (5/7 & 2/3)

35.574

m2

31,205.00

Rp

1,110,086.67

0.150

m3

3,698,200.00

Rp

554,508.11

24 Rangka Plafond

18.000

m2

27,652.50

Rp

497,745.00

25 Plafond Tripleks 5 mm

18.000

m2

34,483.50

Rp

620,703.00

26 Bongkar Bekisting

42.728

m2

22,230.00

Rp

949,832.33

Rp

46,560,483.25

10 Bekisting Ringbalk dn Kolom 11 Penulangan 12 Pas. Batu Bata 1 : 4

18 Lisplank (2/20)

23 Gording Ulin (5/10)

INSTALASI LISTRIK Pasang Titik Lampu

6

ttk

68,050.00

Rp

408,300.00

Pasang Saklar Tunggal

6

bh

28,050.00

Rp

168,300.00

Pasang Pipa Listrik

20

m

Rp

5,000.00

Rp

100,000.00

Pasang Kabel Listrik

28

m

Rp

3,000.00

Rp

84,000.00

Sambungan

7

bh

1500

Rp

10,500.00

Rp

771,100.00

INSTALASI AIR Pasang Kran 3/4" atau 1/2"

6

bh

37,455.00

Rp

224,730.00

Pasang Kloset Jongkok

4

bh

123,465.00

Rp

493,860.00

Pasang Bak Air

4

bh

210,015.00

Rp

840,060.00

28

m

13,471.63

Rp

377,205.73

Pasang Pipa PVC Ø 3"

5

m

28,838.70

Rp

144,193.50

Pasang Wastafel

2

bh

325,015.00

Rp

650,030.00

Rp

2,730,079.23

Pasang Pipa PVC Ø 3/4"

PINTU DAN JENDELA Pasang Engsel Jendela

8

Psg

28,364.80

Rp

226,918.40

Pasang Grendel Jendela

4

bh

66,705.00

Rp

266,820.00

Pasang Hak Angin Kait-Kait Jendela

8

Psg

27,510.75

Rp

220,086.00

Rp

713,824.40

PENGECATAN Pengecatan Tembok

126.340

m2

15,032.50

Rp

1,899,206.05

Pengecatan Plafond

18.000

m2

12,632.50

Rp

227,385.00

3.898

m2

35,057.50

Rp

136,654.14

Kusen

1.460

m2

35,057.50

Rp

51,183.95

Lisplank

2.438

m2

35,057.50

Rp

85,470.19

Rp

2,263,245.19

Rp

53,038,732.06

Pengecatan Kayu

TOTAL

Total

23.496

14.120

7.313

3.240

1.964

13.000

0.900

0.487

0.787

12.000

30.728

KG

KG

0.8874

kg/m

0.3944

kg/m

0.8874 0.3944

KG

0.8874 0.3944

370.650

Roster Pintu Dalam Pintu Luar

71.270

126.340

126.340

0.500

0.033

20

530

1.06

20

200

0.4 1.46

2.438

20.460 16.200

35.574

35.574

0.150

18.000

18.000

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No

Bagian Rumah

1

PONDASI

a.

Galian Pondasi

b.

d.

e.

SISI

6757.5

350

6757.5

TEBAL

TOTAL 1

Sisi

3

7.095

M3

455

1

3.075

M3

3422.5

350

3

3.594

M3

3422.5

455

1

1.557

M3

Lantai

350

25

0.000

M3

Tangga

1260

1

0.000

M3

1260

1

0.000

M4

Pas. Batu Pondasi

Pas. Batu Kosong

Urugan Pasir (PONDASI)

Urugan Pasir (WC) Urugan Pasir (LANTAI) Urugan Pasir (SELASAR)

f.

Tiang Pancang Ulin (10/10)

2

BETON (1 : 2 : 3)

a.

Sloof (15/20)

b.

PJG

X1

Urugan Tanah Pondasi

c.

LUAS

Ringbalk (15/15)

2100

350

3

2.205

M3

2100

455

1

0.956

M3

945

350

3

0.992

M3

945

455

1

0.430

M3

290

350

3

0.305

M3

290

455

1

0.132

M3

15625

2

0.000

M3

131125

15

0.000

M3

63350

2

0.000

M3

6

1

0.000

TTK

300

350

3

0.315

M3

300

455

1

0.137

M3

225

470

2

0.212

M3

225

365

3

0.246

M3

c.

Kolom (15/15)

225

285

6

0.385

M3

d.

Lantai Kolam

85

360

15

0.459

M2

Bekisting Sloof (15/20)

20

350

3

1

4.200

M2

20

455

1

1

1.820

M2

15

470

2

1

4.230

M2

15

365

3

1

4.928

M2

15

285

6

1

10.260

M2

12

1.1304

1505

4

0.007

M3

53.41931

8

0.5024

54

100.3333333

0.003

M3

21.36773

12

1.1304

2035

4

0.009

M3

72.23143

8

0.5024

44

135.6666667

0.003

M3

23.5421

Bekisting Ringbalk (15/15)

Bekisting Kolom (15/15)

PEMBESIAN Sloof (15/20) Tul. Utama Tul. Bagi (jarak 15 cm)

1505

Ringbalk (15/15) Tul. Utama Tul. Bagi (jarak 15 cm)

2035

Kolom (15/15) Tul. Utama

0.008

M3

60.6957

0.003

M3

19.7823

1

0.253

M3

10

1

0.247

M3

350

285

2

1

15.625

M2

4.33

455

285

1

1

10.468

M2

2.50

125

285

5

1

17.777

M2

0.036

250

211

2

1

10.550

M2

85

211

1

1

1.794

M2

7.425

2

1

14.85

M2

10.468

2

1

20.94

M2

17.777

2

1

35.55

M2

10.550

2

1

21.10

M2

1.794

2

1

3.59

M2

625

2

1

0.13

M2

625

40

1

2.50

M2

- Pintu WC

50

215

70

2

0.036

b.

Pintu

60

200

2

2.40

M2

c.

Lisplank 2 (2/20)

20

610

2

1

2.440

M2

20

291.5

4

1

2.332

M2

- WC DALAM

120

120

2

1

1.440

M2

- WC LUAR

250

125

2

1

6.250

M2

350

80

1

1

2.800

M2

0

40

1

1

0.000

M2

0

40

1

1

0.000

M2

0

30

1

1

0.000

M2

0

30

1

1

0.000

M2

120

100

8

1

8.200

M2

250

211

4

1

21.100

M2

85

211

3

1

5.381

M2

125

211

2

1

5.275

M2

Tul. Bagi (jarak 15 cm)

3

BETON RABAT

a.

Selasar

4

DINDING

a.

Pas. Batu Bata

Dinding Kolam

b.

12

1.1304

1710

4

8

0.5024

44

114

25250

10

24650

1710

Plesteran - Depan & Belakang - Samping Kanan

- Kolam

c.

Acian

d.

Roster (25/25)

4

KAYU

a.

Kusen Ulin (5/10)

5

LANTAI

a.

Keramik 20/20 (LANTAI)

Tangga (20/20)

b.

Keramik 20/20 (Dinding)

c.

Keramik Bak Air (20/20) - Dinding

39.956

M3

1.4

- Lantai

6

ATAP

a.

Sakura Roof

b.

Bubungan Sakura Roof

c.

Kasau (5/7)

Reng (2/3)

115

375

1

291.5

610

2

1

610

4.313

M2

35.563

M2

6.100

M

35

13

291.5

0.133

M3

6

11

610

0.040

M3

d.

Gording Ulin (5/10)

50

610

3

2

0.183

M3

e.

Balok Tarik (6/12)

72

365

3

1

0.079

M3

f.

Balok Kuda (6/12)

72

275

3

2

0.119

M3

g.

Nok (5/10)

50

610

1

0.031

M3

h.

Balok Tegak (6/12)

72

114

3

1

0.025

M3

72

54

3

2

0.012

M3

72

80

3

2

0.017

M3

i.

Balok Miring (6/12)

7

RANGKA PLAFOND

M2

8

PLAFOND TRIPLEKS

M2

7

LAIN LAIN Closed Jongkok Kran Air

4 10

Titik Lampu

4

Saklar Ganda

2

Engsel Pintu

1

Pemasangan Bowplank

15.925

m2

Rp

18,705.00

Rp

297,877.13

2

Galian Pondasi

10.170

m3

Rp

23,240.00

Rp

236,351.67

3

Urugan Tanah

5.151

m3

Rp

18,810.00

Rp

96,887.72

4

Pas. Batu Pondasi

3.161

m3

Rp 605,475.00

Rp

1,913,603.74

5

Pas. Batu Kosong

1.422

m3

Rp 208,779.00

Rp

296,930.71

6

Urugan Pasir

0.436

m3

Rp 105,810.00

Rp

46,180.77

7

Tiang Pancang Ulin (10/10)

0.000

ttk

102,570.00

Rp

8

Beton (1 : 2 : 3)

1.753

m3

698,880.00

Rp

1,225,224.00

9

Beton Rabat

0.499

m3

704,580.00

Rp

351,585.42

6.020

m3

111,185.00

Rp

669,333.70

19.418

m2

133,726.00

Rp

2,596,624.61

251.039

kg

13,745.30

Rp

3,450,600.35

56.213

m2

83,490.00

Rp

4,693,223.37

10 Bekisting Sloof (15/20) 11 Bekisting Ringbalk dan Kolom (15/15) 12 Penulangan 13 Pas. Batu Bata 1 : 4

-

14 Plesteran 1 : 4, Tebal 15 mm

56.071

m2

33,250.00

Rp

1,864,344.13

15 Acian Tembok

56.071

m2

6,033.25

Rp

338,287.34

16 Roster 25/25

2.625

m2

261,760.00

Rp

687,120.00

17 Kusen Ulin (5/10)

0.036

m3

4,274,300.00

Rp

151,737.65

18 Pintu Panil

2.400

m2

359,300.00

Rp

862,320.00

19 Lisplank (2/20)

4.772

m2

29,750.00

Rp

141,967.00

20 Keramik 20/20

53.358

m2

210,552.00

Rp

11,234,633.62

21 Atap Sakura Roof

35.563

m2

78,681.00

Rp

2,798,132.40

6.100

m

33,402.50

Rp

203,755.25

23 Rangka Plafond

15.925

m2

27,652.50

Rp

440,366.06

24 Plafond Tripleks 5 mm

15.925

m2

34,483.50

Rp

549,149.74

25 Kasau dan Reng (5/7 & 2/3)

35.563

m2

31,205.00

Rp

1,109,743.42

26 Kuda-Kuda dan Gording

0.465

m3

3,698,200.00

Rp

1,718,583.13

Gording Ulin (5/10)

0.183

m3

3,698,200.00

Rp

676,770.60

Balok Tarik (6/12)

0.079

m3

3,698,200.00

Rp

291,566.09

Balok Kuda (6/12)

0.119

m3

3,698,200.00

Rp

439,346.16

Nok (5/10)

0.031

m3

3,698,200.00

Rp

112,795.10

Balok Tegak (6/12)

0.036

m3

3,698,200.00

Rp

134,200.28

Balok Miring (6/12)

0.017

m3

3,698,200.00

Rp

63,904.90

22 Bubungan Sakura Roof

Rp 37,974,562.92

INSTALASI LISTRIK Pasang Titik Lampu

4

ttk

68,050.00

Rp

272,200.00

Pasang Saklar Ganda

2

bh

33,050.00

Rp

66,100.00

Pasang Pipa Listrik

14

m

Rp

5,000.00

Rp

70,000.00

Pasang Kabel Listrik

18

m

Rp

3,000.00

Rp

54,000.00

4

bh

Rp

6,000.00

Rp

468,300.00

Sambungan

1500

INSTALASI AIR Pasang Kran 3/4" atau 1/2"

10

bh

37,455.00

Rp

374,550.00

Pasang Kloset Jongkok

2

bh

123,465.00

Rp

246,930.00

Pasang Pipa PVC Ø 3/4"

3

m

13,471.63

Rp

40,414.90

Pasang Pipa PVC Ø 3"

3

m

28,838.70

Rp

86,516.10

Rp

748,411.00

PINTU DAN JENDELA Pasang Engsel Pintu

4

Psg

37,510.75

Rp

150,043.00

Pasang Kunci Pintu Tanam 2 Slaag

2

set

81,705.00

Rp

163,410.00

Rp

313,453.00

PENGECATAN Pengecatan Tembok

56.071

m2

15,032.50

Rp

842,879.79

Pengecatan Plafond

15.925

m2

12,632.50

Rp

201,172.56

Pengecatan Kayu

10.572

m2

35,057.50

Rp

370,627.89

Kusen

1.000

m2

35,057.50

Rp

35,057.50

Pintu

4.800

m2

35,057.50

Rp

168,276.00

Lisplank

4.772

m2

35,057.50

Rp

167,294.39

Rp

1,414,680.24

TOTAL

Rp 40,919,407.16

Total

10.170

5.151

3.161

1.422

0.436

0.000

0.452

0.458

0.385

0.459 1.753

6.020

19.418

KG

KG

0.8874

kg/m

0.3944

kg/m

0.8874 0.3944

KG

0.8874 0.3944

251.039

0.499

Roster + kosong Roster pintu

56.213

Tegel Dinding

56.071

56.071

2.625

W

0.036

2.400

4.772

10.490

6.800

20

430

0.86

20

70

0.14 1

36.068

12

10 22

15.925

15.925

REKAP KONSTRUKSI BANGUNAN Nama Bangunan :

No 1

Bagian Rumah

LUAS

PJG

SISI

70

3846.5

250

1

70

1884

250

1

PONDASI Galian Pondasi

2

DIA

BETON (1 : 3 : 5) Beton

50 Tutup

70

3846.5

10

1

Bekisting

50

157

250

1

1

Galian Pondasi

0.962

M3

Rp

23,240.00

2

Beton

0.962

M3

650,976.00

4

Bekisting

3.925

M2

70,301.90

5

Bongkar Bekisting

3.925

m2

22,230.00

NSTRUKSI BANGUNAN

TEBAL

TOTAL 1

Sisi

1

0.962

M3

0.471

M3

X1

0.962

M3

1

Rp

22,348.17

Rp

625,994.80

Rp

275,934.97

Rp

87,252.75

Rp

1,011,530.68

0.038

M3

3.925

M2

Total

0.509

3.925

70

15386

View more...