RAB (Rencana Anggaran Biaya) JUDUL PROYEK LOKASI JADWAL PELAKSANAAN

No.

A. 1 2

Lingkup / Jenis Pekerjaan

: : : :

RAB GEDUNG PESANTREN SYAICHONA CHOLIL BALIKPAPAN GEDUNG PONDOK PESANTREN HARAMAIN BALIKPAPAN BALIKPAPAN 1 November 2011 s.d. 31 Desember 2013

Volume

Analisa

6 7 8 9 10

Total Harga

(Rp.)

(Rp.)

Pekerjaan Persiapan Pembersihan Lokasi Pengukuran & Pemasangan Bouwplank

12.625,00 12.625,00

M2 M1

SNI.T.01.a SNI.T.01.1.a Sub Jumlah

B. 1 2 3 4 5

Harga Satuan

5.125,00 55.220,00 A

64.703.125,00 697.152.500,00 761.855.625,00

Pekerjaan Pondasi Galian Pondasi Lapisan Pasir bawah Pondasi & Lantai Kerja Pondasi Rolaag (1:4) Pondasi Tiang pancang Bekisting pilecap Beton Pilecap Besi pilecap Bekisting pedestal Beton pedestal Besi pedestal

10.100,00

M3

SNI.T.01.2.a

34.000,00

343.400.000,00

1.010,00 8.080,00 7.575,00 6.600,00 990,00 8.806,78 1.056,00 61,40 2.693,07

M3

SNI.T.02.1.n Anl. Arg Anl. Pile2 Anl. F.8.a Anl. G.41 Anl. 1.2.a Anl. F.8.a Anl. G.41 Anl. 1.2.a

443.500,00 659.500,00 165.000,00 238.940,00 1.297.537,50 17.143,00 238.940,00 1.297.537,50 17.143,00

447.935.000,00 5.328.760.000,00 1.249.875.000,00 1.577.004.000,00 1.284.562.125,00 150.974.560,97 252.320.640,00 79.668.802,50 46.167.321,87

M3 M¹ M² M3 kg M² M3 kg

Sub Jumlah

B

10.760.667.450,34

C. 1 a. b c. d .

Pekerjaan Struktur (Portal) Sloof (groundbeam) 0,25 x 0,40 Beton Besi D12; Ø6; Pemasangan Bekisting Pembongkaran Bekisting

1.260,00 60.600,56 8.470,00 8.470,00

M3 kg M2 M2

Anl. G.41 Anl. 1.2.a Anl. F.8.b Anl. F.8.b

1.297.537,50 17.143,00 336.015,00 33.601,50

Sub Jumlah 2 a. b c. d

Kolom Lantai 1 & 2 Beton Besi Pemasangan Bekisting Pembongkaran Bekisting

1.543,20 280.232,57 12.282,20 12.282,20

M3 kg M2 M2

Anl. G.41 Anl. 1.2.a Anl. F.8.c Anl. F.8.c

5.804.424.439,37 1.297.537,50 17.143,00 390.545,00 39.054,50

Sub Jumlah 3 a. b c. d

Kolom Lantai 3 & 4 Beton Besi Pemasangan Bekisting Pembongkaran Bekisting

1.543,20 192.819,53 12.678,40 12.678,40

M3 kg M2 M2

Anl. G.41 Anl. 1.2.a Anl. F.8.c Anl. F.8.c

a. b

Kolom CP 0,12 x 0,12 semua lantai Beton Besi

c. d

Pemasangan Bekisting Pembongkaran Bekisting

2.002.359.870,00 4.804.026.913,22 4.796.751.799,00 479.675.179,90 12.082.813.762,12

1.297.537,50 17.143,00 390.545,00 39.054,50

Sub Jumlah 4

1.634.897.250,00 1.038.875.434,37 2.846.047.050,00 284.604.705,00

2.002.359.870,00 3.305.505.168,50 4.951.485.728,00 495.148.572,80 10.754.499.339,30

161,71 24.577,11

M3 kg

Anl Supl.V Anl. 1.2.a1

697.710,00 18.685,87

112.824.730,51 459.244.762,17

2.173,44 2.173,44

M2 M2

Anl. F.8.c Anl. F.8.c

390.545,00 39.054,50

848.826.124,80 84.882.612,48

Sub Jumlah

1.505.778.229,96

5 a. b c. d

Balok Induk 1 Lantai 2 , 3 , 4 Beton Besi Pemasangan Bekisting Pembongkaran Bekisting

2.985,00 468.030,75 16.038,00 16.038,00

M3 kg M2 M2

Anl. G.41 Anl. 1.2.a1 Anl. F.8.d Anl. F.8.d

1.297.537,50 18.685,87 406.190,00 40.619,00

Sub Jumlah 6 a. b

Balok Induk 2 Lantai 2 , 3 , 4 Beton Besi

c. d

Pemasangan Bekisting Pembongkaran Bekisting

19.784.633.930,00

1.023,00 165.025,94

M3 kg

Anl. G.41 Anl. 1.2.a1

1.297.537,50 18.685,87

1.327.380.862,50 3.083.653.224,10

9.408,00 9.408,00

M2 M2

Anl. F.8.d Anl. F.8.d

406.190,00 40.619,00

3.821.435.520,00 382.143.552,00

Sub Jumlah 7 a. b

Balok Anak Lantai 2 , 3 , 4 Beton Besi

c. d

Pemasangan Bekisting Pembongkaran Bekisting

8.614.613.158,60

1.023,00 130.283,54

M3 kg

Anl. G.41 Anl. 1.2.a1

1.297.537,50 18.685,87

1.327.380.862,50 2.434.461.254,21

27.720,00 27.720,00

M2 M2

Anl. F.8.d Anl. F.8.d

406.190,00 40.619,00

11.259.586.800,00 1.125.958.680,00

Sub Jumlah 8 a. b

Plat Lantai tebal 0,15 Beton Besi

c. d

Pemasangan Bekisting Pembongkaran Bekisting

3.873.149.437,50 8.745.561.750,50 6.514.475.220,00 651.447.522,00

16.147.387.596,71

6.367,50 403.007,36

M3 kg

Anl. G.41 Anl. 1.2.a2

1.297.537,50 20.367,60

8.262.070.031,25 8.208.292.031,74

2.300,00 2.300,00

M2 M2

Anl. F.8.e Anl. F.8.e

472.045,00 47.204,50

1.085.703.500,00 108.570.350,00

Sub Jumlah

17.664.635.912,99

9 a. b c.

Ring Balok Beton Besi Pemasangan Bekisting

d

Pembongkaran Bekisting

2.031,00 257.566,39 23.520,00

M3 kg M2

Anl. G.41 Anl. 1.2.a3 Anl. F.8.e2

1.297.537,50 22.200,68 581.606,64

2.635.298.662,50 5.718.149.467,34 13.679.388.278,64

23.520,00

M2

Anl. F.8.c2

58.160,66

1.367.938.827,86

Sub Jumlah 10 a b c d

Tangga Lantai 1 ke-4 Beton Besi Pemasangan Bekisting Pemasangan Bekisting

159,00 21.541,89 3.974,40 3.974,40

M3 kg M2 M2

Anl. G.41 Anl. 1.2.a Anl. F.8.c Anl. F.8.c Sub Jumlah TOTAL

D. 1 2 3 4 5

1.297.537,50 17.143,00 390.545,00 39.054,50 C

206.308.462,50 369.292.583,24 1.552.182.048,00 155.218.204,80 2.283.001.298,54 118.042.562.903,94

a b

Pekerjaan Dinding Pemasangan dinding bata Plasteran (1:4)

26.400,00 52.800,00

M2 M2

SNI.T.03.1.l SNI.T.03.3.d

140.035,00 48.850,00

3.696.924.000,00 2.579.280.000,00

c d e

Acian Keramik Dinding 20x25 cm KM/WC Roaster 25x25

52.800,00 144,00 19,20

M2 M2 M2

SNI.T.03.3.b Anl Supl. IVa SNI.T.03.1.m Sub Jumlah

53.725,00 107.755,00 139.812,50 D

2.836.680.000,00 15.516.720,00 2.684.400,00 9.131.085.120,00

2.070,00 207,00

M3 M3

Anl A .18 SNI.T.02.1.n

263.500,00 443.500,00

545.445.000,00 91.804.500,00

207,00

M3

Anl G.67

642.600,00

133.018.200,00

42.450,00 530,00

M2

Anl Supl. IIIa Anl Supl. IIIc

309.755,00 94.755,00

13.149.099.750,00 50.220.150,00

E. 1 2

Pekerjaan Lantai Urugan Tanah Pasir Urug

3

Beton tumbuk

4 5

23.400.775.236,34

Pemasangan Keramik Pemasangan Keramik

M2

6

Pemasangan Keramik dinding

26.400,00

M2

Anl Supl. IVa Sub Jumlah

107.755,00 E

2.844.732.000,00 13.969.587.600,00

F. 1 2

Pekerjaan Sanitasi Pemasangan Pipa dia. 3/4" Pemasangan Pipa dia. 3"

1.152,00 1.460,00

M1 M1

Anl. Plmb. Anl. Plmb.1

20.282,00 33.071,00

23.364.864,00 48.283.660,00

3 4 5 6 7 8 9

Pemasangan Pipa dia. 4" Pemasangan kran 1/2" Tangki Air Septick Tank Sumur Resapan Pemasangan Urinoir Pemasangan Kloset Jongkok

1.460,00 252,00 16,00 8,00 8,00 126,00 63,00

M1 pcs pcs pcs pcs pcs pcs

Anl. Plmb.2 Anl. Kran Anl. Wtr.Tnk perkiraan perkiraan perkiraan Anl. Plmb.wc Sub Jumlah

36.244,00 17.525,00 1.207.525,00 2.500.000,00 2.000.000,00 1.250.000,00 346.650,00 F

52.916.240,00 4.416.300,00 19.320.400,00 20.000.000,00 16.000.000,00 157.500.000,00 21.838.950,00 363.640.414,00

G. 1 2 3 4 5

Pekerjaan Pintu dan Jendela Pasang Kusen pintu Kayu meranti oven Pasang Daun pintu kayu & aksesoris Pasang Kusen & Pintu KM/WC Kusen Jendela Aluminium Daun Jendela Aluminium & Aksesoris

120,00 120,00 126,00 1.200,00 1.200,00

pcs pcs pcs pcs pcs

perkiraan perkiraan perkiraan perkiraan perkiraan Sub Jumlah

1.350.000,00 1.850.000,00 850.000,00 1.350.000,00 1.450.000,00 G

162.000.000,00 222.000.000,00 107.100.000,00 1.620.000.000,00 1.740.000.000,00 3.851.100.000,00

H. 1 2 3 4 5

Pekerjaan Instalasi Listrik Sambungan Listrik baru Pemasangan Lampu Pemasangan Stop Kontak Pemasangan MCB/Grouping Pemasangan Kipas Angin

4,00 1.200,00 850,00 24,00 150,00

ls pcs pcs pcs pcs

perkiraan perkiraan perkiraan perkiraan perkiraan Sub Jumlah

25.000.000,00 250.000,00 250.000,00 650.000,00 550.000,00 H

100.000.000,00 300.000.000,00 212.500.000,00 15.600.000,00 82.500.000,00 610.600.000,00

I. 1 2 3 4 5

Pekerjaan Pengecatan & Finishing Pengecatan Dinding luar & dalam Pengecatan Plafon Pengecatan Pintu Pengecatan Lisplank Finishing Fasade Arsitektur

J. 1 2 3 4 5 6 7

Pekerjaan Atap & Plafond Pemasangan Rangka Baja Ringan Pemasangan Genteng Keramik Pemasangan Nok Pemasangan Rangka Galvanis Plafond Pemasangan Plafond GRC Board Pemasangan Lisplank Pemasangan Lis Plafond

K. 1 2 3 4 5

52.800,00 37.875,00 208,00 235,00 3.450,00

M2 M2 M2 M¹ M2

Supl. IXa Supl. IXa Anl K10+K23+K28 Anl K10+K23+K28 perkiraan

45.544,00 45.544,00 28.305,00 28.305,00 500.000,00

2.404.723.200,00 1.724.979.000,00 5.887.440,00 6.651.675,00 1.725.000.000,00

Sub Jumlah

I

5.867.241.315,00

7.621,25 7.621,25 235,00 12.625,00 12.625,00 485,58 1.409,58

M2 M2 M¹ M2 M2 M2 M¹

perkiraan Anl H.gt Anl H.nok Anl Supl.VIIGlv Anl Supl.VIIGRC Anl F.38 Anl F.38 les Sub Jumlah

250.000,00 148.965,00 136.630,00 60.500,00 75.050,00 40.500,00 16.250,00 J

1.905.311.778,29 1.135.299.076,21 32.108.050,00 763.812.500,00 947.506.250,00 19.665.865,38 22.905.625,00 4.826.609.144,89

Pekerjaan Lansekap Saluran induk drainase

6.600,00

M2

perkiraan

65.000,00

429.000.000,00

Jalan & Parkir Pavingblok Pembuatan sumur bor & menara air Menara/Minaret Masjid Taman / lansekap

5.700,00 4,00 3,00 1,00

M2 pcs ls ls

perkiraan perkiraan perkiraan perkiraan Sub Jumlah

75.000,00 130.000.000,00 650.000.000,00 150.000.000,00 K

427.500.000,00 520.000.000,00 1.950.000.000,00 150.000.000,00 3.476.500.000,00

Grand Total Balikpapan, 28 September 2011 PONDOK PESANTREN SYAICHONA CHOLIL BALIKPAPAN

171.661.449.573,16