PROJECT NAME DATE BOQ ITEM # BOQ DESCRIPTION

ITEM NAME: J-18 LOCATION:

F&B, Hotel, Culinary and PAGCOR Area

ITEM #

DESCRIPTION

MATERIALS

Nr

H

L

Number of Labor

Units

Number of Days

Total Area to be apply

3

Overhead Cabinet PL-01 Exterior Side Area Thru Cross Section (Front) Area Thru Cross Section (Bottom) Area Thru Door Sides Shelving System S/S Adjustable Track S/S Adjustable Bracket PVC Edging for Adjustable Shelves

4 5 6

Miscellaneous VAT Mark-Up

1

2

7.1 7.2

Total Direct Cost Direct Unit Cost

8.1 8.2

Total Selling Cost Selling Unit Cost

ITEM #

DESCRIPTION

PORTION 1

PORTION 2

PORTION 3

MANPOWER Total Area to be Install Carcass Fabrication

2 Man

4

1 2

Carpenter Helper

2 Man 2 Man

4 4

3 4

Plastic Laminate Installation Painter Helper

2 Man 2 Man

4 4

5

Delivery

2 Man

4

6 7 8

Miscellaneous VAT Mark-Up

9

SELLING COST

ITEM #

DESCRIPTION

Number of Labor PORTION 1

OTHERS Total Area to be apply 1

TOTAL

2

SELLING COST

TOTAL COST FOR MATERIALS TOTAL COST FOR LABOR

Units PORTION 2

Number of Days PORTION 3

QTY

W

Total

Remarks

UNIT

Drawing Number 1.00 LOT

SQ.M. SQ.M. SQ.M. SQ.M. PCS. PCS. L.M. 8.00% 12.00% 0.00%

Units PORTION 4

Cost of Labor PORTION 5

Units

QTY

UNIT

PORTION 6

1.00 LOT Days

Pesos

Days Days

Pesos Pesos

9.00 DAY 9.00 DAY

Days Days

Pesos Pesos

8.00 DAY 8.00 DAY

Days

Pesos

5.00 %

8.00% 12.00% 0.00% 20.00% %

Units

Cost of Labor

PORTION 4

PORTION 5

Units

QTY

UNIT

PORTION 6

SQ.M

52.00 %

COM'L QTY

UNIT

UNIT COST

UNIT

TOTAL COST

UNIT

-

SQ.M.

PHP/SQ.M.

-

PHP

-

PCS. PCS. L.M.

PHP/PCS. PHP/PCS. PHP/L.M.

-

PHP PHP PHP

-

PHP PHP PHP

-

PHP PHP/LOT

-

PHP PHP/LOT

UNIT COST

UNIT

UNIT COST

UNIT

TOTAL COST

UNIT

9.00 DAY 9.00 DAY

550.00 PHP/DAY 460.00 PHP/DAY

4,950.00 PHP 4,140.00 PHP

8.00 DAY 8.00 DAY

550.00 PHP/DAY 460.00 PHP/DAY

4,400.00 PHP 3,680.00 PHP

#REF!

UNIT COST

UNIT

PHP/LOT

UNIT COST

#REF!

UNIT

#REF!

PHP

#REF! #REF! #REF!

PHP PHP PHP

#REF!

PHP

TOTAL COST

UNIT

-

PHP/LOT

-

PHP

-

PHP/LOT

-

PHP

-

PHP/LOT PHP/LOT

-

PHP PHP

#REF!