QFM-DKN-25-01 Rev: 0 Date: 19.11.2012 Page : 1 of 6
JOB SAFETY ANALYSIS
PETROSERV LIMITED
RISK MATRIX
PROJECT/JOB DETAILS Project Ref./ Job Title / Work Order:
INCREASING PROBABILITY Potential Severity
People
Asset / Production
Environment
Reputation
A Never heard of in industry
B Has Occurred in Industry
C Has Occurred in QP
D Occurs several times a year in QP
E Occurs several times a year at this site
No Risk
Low
Low
Low
Low
0
No Injury
No damage
No affect
No Impact
1
Slight injury or health effects
Slight damage, No disruption to operation
Slight effect
Slight impact
Low
Low
Low
Low
Low
2
Minor injury or health effects
Minor damage (=QR 250,000)
Minor effect
Limited impact
Low
Low
Medium
Medium
Medium
3
Major Fatality or permanent total disability
Major damage (=QR 1,300,000)
Localized Effect
National impact
Low
Medium
Medium
Medium
High
4
Single fatality or permanent total disability
Major damage (=25,000,000)
Major effect
Regional Impact
Low
Medium
Medium
High
High
5
Multiple fatalities
Extensive damage(=25,000,000)
Massive Effect
International Impact
Medium
Medium
High
High
High
Probability Factor
DATE: 19/11/2012 JSA No: REVISION:
3475 / GC 12104700
Brief Description of job: Painting Job Location : Dukhan
Permit Requirements: Hot/cold/Radiography
Sponsoring Department: Performing Department: Permit Authority
Participants(parties involved in JSA)
JSAApproved by
Hazard Area Classification:
All the mitigation measures identified in JSA are in place before starting the activates
Work site supervisor
0
QFM-DKN-25-01 Rev: 0 Date: 19.11.2012 Page : 2 of 6
JOB SAFETY ANALYSIS
Sl. No. 1
2
Activity (Job Steps )
Raise relevant permit clearance
Site Preparation
Potential Hazards
Severity Before Mitigation
Incorrect information on permit/clearance
P= 3C(M) A=2B (M) E= 2B(M) R= 2C(M)
Ground conditions
P= 2C (M) A= 0B (L) E= 0A(NR) R= 1B(L)
Plant Hazards
Exposure to Hazardous gases
P= 2C (M) A= 0B (L) E= 0A(NR) R= 1B(L)
P= 3C(M) A= 0A(NR) E= 0A(NR) R= 2C(M)
Required Control/Mitigation Measures
P= 1C(L) Have a clear understanding of A= 1A(L) work to be performed and E= 1A(L) R= 1C(L) location Attention to be paid on uneven terrain structure. Hold pre-job safety meeting
Get Authorization of work permit
Site safety rules shall be followed
Hold pre-job safety meeting
Check with operations Identify potential Plant Hazards i.e. (critical valves that can be knocked or damaged while passing).
Appropriate PPE shall be used
Get Authorization of work permit
Carry out gas test before entry.
Severity After Mitigation
Get Authorization of work permit
PETROSERV LIMITED
Use personal H2S monitor in hazardous area If required, go for continuous gas test. Maintain gas leak awareness by location and wind direction. If monitor warning actuates leave area and use a predetermined escape route across wind Marking off hazardous areas
Action Party
Supervisor, Safety Officer
P= 1C(L) A= 0A(NR) E= 0A(NR) R= 0B(L)
Site Engineer, Supervisor.
P= 1C(L) A= 0A(NR) E= 0A(NR) R= 0B(L)
Supervisor
P= 1C(L) A= 0A(NR) E= 0A(NR) R= 1C(L)
Site Engineer, Supervisor, Safety Officer.
QFM-DKN-25-01 Rev: 0 Date: 19.11.2012 Page : 3 of 6
JOB SAFETY ANALYSIS
Transportation
P= 3C (M) A= 3C (M) E= 2C(M) R= 2C(M)
Material Handling (Manual)
P= 3C (M) A= 1C (L) E= 1C(L) R= 1B(L)
PETROSERV LIMITED
P= 1C (L) A= 1C (L) Inspection and maintenance of E= 1C(L) R= 1B(L) vehicle shall be done periodically Traffic rules & regulations shall be followed
Supervisor.
All loads transported in a pick-up (or utility) truck or other cargo vehicle shall be securely fastened and shall not exceed the manufacturer’s load specifications and legal limits for the vehicles Shut off the engine and hand brake shall be applied when leaving the vehicle, the driver must leave his vehicle and not return to it until the loading / unloading activity is complete. Ensure that sub-contractors shall follow traffic Rules & Regulations Try to use trolleys wheelbarrows if possible.
or
If required use lifting equipment to unload materials from vehicle. Personnel shall follow proper lifting techniques When lifting a load with another person(s), communicate with the other person(s) before lowering your end of the load. Do not try lifting a load that is too heavy – ask for help Do not twist your body while carrying a heavy load Appropriate PPE shall be used
P= 1C (L) A= 0B (NR) E= 0A(NR) R= 0B(L)
Supervisor.
QFM-DKN-25-01 Rev: 0 Date: 19.11.2012 Page : 4 of 6
JOB SAFETY ANALYSIS
Defective Tools / Equipment
P= 3C (M) A= 2C (M) E= 2C(M) R= 2B(M)
4
Painting
Harmful vapour
P= 3C (M) A= 0A (NR) E= 1C(L) R= 2B(L)
Fire & Explosion
P= 3C (M) A= 3C (M) E= 3C(M) R= 2C(M)
PETROSERV LIMITED
P= 1C (L) A= 0B (L) E= 1B(L) R= 1B(L)
Supervisor, Painter
Work shall be done by certified personnel Obtain MSDS for the paint as well as thinner. Wear the required PPE (Long Sleeve Coverall, Apron, Face Shield & suitable respiratory protection etc.). Ensure proper ventilation of the area.
P= 1C (L) A= 0A (NR) E= 1A(L) R= 1B(L)
Supervisor, painter
Store paint & thinners in safe & designated location away from source of ignition. Do not leave unattended the Spray Paint Gun & Hose with on condition. Ensure there is no naked flame or spark generating equipment in the area where spray painting is to be done. Never smoke in the area where spray painting is in progress. Keep the suitable fire extinguishers ready
P= 1C (L) A= 1C (L) E= 1B(L) R= 1B(L)
Supervisor, safety officer
Ensure the equipment / tool to be used for painting (such as Spray Paint Gun, Hoses, pump etc.) are free from defect. The equipment and tools are adequately bonded to prevent accumulation of electrostatic charges. Maintenance shall be done regularly. Required PPE shall be used.
QFM-DKN-25-01 Rev: 0 Date: 19.11.2012 Page : 5 of 6
JOB SAFETY ANALYSIS
Contaminated Clothing
P= 3C (M) A= 0A (NR) E= 1C(L) R= 2C(M)
Unsafe Storage of Paint & Thinner
P= 2C (M) A= 2C (M) E= 1C(L) R= 1C(M)
Fire fighting & first aid training shall be provided P= 1C (L) A= 0A(NR) E= 0A(NR) R= 1B(L)
PM, Supervisor
Do not leave unattended the Spray Paint Gun & Hose with on condition. Isolate the equipment from all source of energy when not in use. Supervisor shall ensure the prior to leaving the site, equipment is shut off and tools are kept at safe or designated area
P= 1C (L) A= 1A(L) E= 0A(NR) R= 1A(L)
supervisor
Store the paint & thinners in
P= 1C (L) A= 1A(L) E= 0A(NR) R= 1A(L)
Supervisor, safety officer
P= 1C (L)
supervisor
Do not eat or smoke wearing a Clean / dispose safely the paint soaked coverall / gloves.
P= 2C (M) A= 2C (M) E= 1C(L) R= 1C(M)
Isolate the equipment from all source of energy when not in use.
paint soaked coverall / gloves
Un-attended Equipment / Tool
PETROSERV LIMITED
Wash properly consuming any food. Provide washing & facilities for personnel
before cleaning
safe & designated location away from source of ignition.
Do not leave unattended the Spray Paint Gun & Hose with on condition.
Illumination
P= 2C (M)
Isolate the equipment from all source of energy when not in use. Supervisor
shall
ensure
that
QFM-DKN-25-01 Rev: 0 Date: 19.11.2012 Page : 6 of 6
JOB SAFETY ANALYSIS
A= 2C (M) E= 1C(L) R= 1C(M)
5
Windup & Housekeeping
Scattered Material
P= 2C (M) A= 2C (M) E= 2C(L) R= 1C(M)
PETROSERV LIMITED
adequate lighting is available during painting activity. If required temporary lighting shall be provided.
A= 1A(L) E= 0A(NR) R= 1A(L)
Ensure proper wind up housekeeping at worksite.
P= 1C (L) A= 1A(L) E= 1B(L) R= 1A(L)
&
Spillages paints & thinner must be cleaned up as soon as is practicable. The accessories (spray paint gun, hoses & pump) not being used must be disconnected and stored separately. Keep walk ways, aisle, and staircases clear of materials, equipment’s and other items
JOB SAFETY ANALYSIS Job steps: List the main sequential steps. Each step should be analyzed with the associated risk involved and its severity Alternative Considered: What are the possible means of achieving the job outcome with less risks Now undertake the JAS and record in the table above. Using JSA Hazard Checklist, Critical Question & Risk Assessment tables.