SECONDARY AIRFLOW AND LUBRICATION SYSTEMS Fan Exit Fairing and Support
Nacelle Anti-ice
Customer ECS
Start Bleed
ACC Air
Buffer Air Heat Exchanger
FEGV
To Core Compartment
TIC/LPT Cooling Air 4 Pipes
FLG P
3 Pipes
FLG FLG R S FLG To
HPT Cooling Air 4 Pipes FES
Pressure Oil To Bearing Compartments 1,1.5, 2
V I G V
S1
S2
No. 3 Bearing Breather Air To Deoiler FLG E
EGV
V I G V No. 1 Bearing
No. 1.5 Bearing
S 1
S 3
S 5
S 6
V1
S8
S7
R2
STA 2.5
R 3
R 4
R 5
R 6
R 7
R 8
T1
STA 3
R3
R2
V2
FLG Ti
No. 4 Bearing
R1
STA 2
V3
V2
V1 TIC
No. 3 Bearing
No. 2 Bearing
R1
S 2
S 4
FLG N
FLG M
FLG H
FLG N1
No. 6 Bearing
No. 5 Bearing
To Scavenge Pump
T2 STA
4.5
STA 4
T1
T2
T3 STA 4.9
To Scavenge Pump
2.5 Bleed Air
To Bearing Compartments
R1
Stage
STA 12
STA 14
Blades
R1
20 (Fan)
R1 R2 R3
31 53 67
Stage FES FEGV VIGV S1 S2 EGV
Stage
IBR Airfoils
R
C
Stage
64 48 61 65 63 81
T1 T2
2014 United Technologies Corporation, Pratt & Whitney - All Rights Reserved
Blades 44 44
TURBINE ROTORS (LPT)
Vanes
Stage
VIGV S1 S2 S3 S4 S5 S6 S7 S8
39 46 61 78 106 120 140 130 117
T1 T2 T3
26 38 52 58 68 73 70 66 (Blades)
SECONDARY AIR SOURCES
TURBINE STATORS (HPT) Stage V1 V2
Vanes 32 26
Blades 84 86 78
TURBINE STATORS (LPT) Stage V1 (TIC) V2 V3
Vanes 16 60 66
LUBRICATION SYSTEM
Fan Air
Pressure Oil
LPC Discharge Air
Breather Air
HPC 3rd Stage Air
Scavenge Oil
Cooled HPC 3rd Stage Buffer Air
Combined Breather Air and Scavenge Oil
HPC 6th Stage Air
Stage
WARNING - This document contains technical data the export of which is or may be restricted by the Export Administration Act and the Export Administration Regulations (EAR), 15 C.F.R. parts 730-774. Diversion contrary to U.S. law is prohibited. The export, reexport, transfer or re-transfer of this technical data to any other company, entity, person, or destination, or for any use or purpose other than that for which the technical data was originally provided by Pratt & Whitney, is prohibited without prior written approval from Pratt & Whitney and authorization under applicable export control laws.
HPC 7th Stage Air HPC 8th Stage (HPC Discharge) Air HPC 6th & HPC 8th Stage Air HPC 7th & HPC 8th Stage Air LPC Discharge Air & HPC 3rd Stage Air
Check Valve Control Valve Air Flow FLG Flange STA Station
Flow Conditions Shown Are Representative Of Above Idle Engine Operation
PROPRIETARY STATEMENT: This document/product is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document/product or any information in it, for any purpose including without limitation to design, manufacture, or repair parts, or obtain FAA or other government approval to do so, without UTC's express written permission. Neither receipt nor possession of this document/product alone, from any source, constitutes such permission. Possession, use, copying or disclosure by anyone without UTC's express written permission is not authorized and may result in criminal and/or civil liability. The foregoing legend shall not apply if this document/product is delivered to the U.S. Government under an applicable and conflicting contract clause or regulation.
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.