INDONESIA
PENGELOLAAN LINGKUNGAN PT. VALE INDONESIA Tbk.
September, 20131
Alur Presentasi • Sekilas tentang perusahaan • Visi & Misi • Penambangan & Pemurnian Bijih • Pengelolaan Dampak Lingkungan • Pengelolaan kualitas udara • Pengelolaan limbah B3 • Pengelolaan batuan penutup/disposal • Pengelolaan kualitas air • Rehabilitasi lahan pasca tambang
INDONESIA
INDONESIA
Areal Kontrak Karya MANADO
Wilayah Kontrak Karya : - Sulawesi Selatan
TOMINI BAY
118,387 ha - Sulawesi Tengah
PALU
36,635 ha KOLONEDALE
- Sulawesi Tenggara 35,486 ha Total = 190,509 ha
TOLO BAY SOROAKO
MAKASSAR
BAHODOPI
LATAO MATARAPE
Kontrak Karya PT INCO No. B745/PRES/12/1995
berlaku sampai dengan tahun 2025
LASOLO
SUASUA
BONE BAY
PAOPAO
KENDARI
POMALAA TOROBULU
Persetujuan AMDAL No. 4627/0115/SJT/1995
INDONESIA
Areal Operasi di Sorowako Matano Matano Lake
Petea Lampesue N&S
WB EB Processing Plant Lingkona Mahalona
Malili
Towuti Lake
Tanamalia
Lasubonti Lingke Lengkobale
INDONESIA
Visi & Misi Perusahaan VISI Menjadi perusahaan sumberdaya alam berskala global terbaik dalam hal menciptakan nilai jangka panjang melalui kinerja yang unggul dan kepedulian pada kemanusiaan
MISI Mengubah sumberdaya alam menjadi kesejahteraan dan pembangunan yang berkelanjutan
INDONESIA
Kepemilikan Saham
VALE 61%
20%
Sumitomo Metal Mining •
19%
Public Float
Vale Inco memiliki 61% saham dan berdasarkan KK harus mempertahankan kepemilikannya di PTI lebih besar dari 50% • Pemegang saham pengendali adalah Vale dari Brasil • Tercatat di Bursa Saham Indonesia (BEI) sejak 1990
Kebijakan K3-L Perusahaan PT Vale Tbk berkomitmen untuk menerapkan Pengelolaan Lingkungan, Kesehatan dan Keselamatan Kerja sesuai dengan praktek pengalaman terbaik (best Practice) yang ada .
INDONESIA
INDONESIA
Profil Penampang Bijih
Plant requirement : Fe = 18.5% – 22.5% ; SiO2/MgO = 2.05 – 2.25 ; CoG = 1.5%
Visualisasi Penyebaran Bijih
Red hematite zone
Yellow Limonite zone
Ferruginous zone
Saprolite zone
Bedrock pinnacle
INDONESIA
INDONESIA
Skema Alur Penambangan Penambangan (Pembersihan hutan, Pembuatan jalan Penyelamatan tanah pucuk, Pengupasan tanah penutup) Eksploitasi bijih
Eksplorasi & Perhitungan cadangan. Perencanaan
Tanah pucuk & tanah penutup
ROM/Bijih Penyaringan
Bijih telah tersaring
Material off grade
Pasca Tambang
Penyimpanan
REHABILITASI Pengolahan Aliran material off grade
Aliran bijih
INDONESIA
Ilustrasi Penambangan Sebelum penambangan
Kompartemen-A
Top Soil Over Burden Soft Saprolite
Blue Zone
Kompartemen-B
INDONESIA
Ilustrasi Penambangan Land clearing
Kompartemen-A
Top Soil Over Burden Soft Saprolite
Blue Zone
Kompartemen-B
INDONESIA
Ilustrasi Penambangan Pengupasan topsoil Kompartemen-A
Top Soil Over Burden Soft Saprolite
Blue Zone
INDONESIA
Ilustrasi Penambangan Penyimpanan topsoil untuk digunakan kembali
Top Soil Stock Pile Top Soil Stock Pile
INDONESIA
Ilustrasi Penambangan Pengupasan tanah penutup
Kompartemen-A
Over Burden Soft Saprolite
Blue Zone
INDONESIA
Ilustrasi Penambangan Penambangan bijih nikel
Kompartemen-A
To Screening Station
Soft Saprolite
Blue Zone
INDONESIA
Ilustrasi Penambangan Lahan pasca tambang & penambangan kompartemen berikutnya
Kompartemen-A
Blue Zone
Kompartemen-B
Sistem Penambangan Backfilling/Penimbunan kembali
Kompartemen-A
Blue Zone DISPOSAL
INDONESIA
INDONESIA
INDONESIA
Skema Alur Pemurnian Bijih 9M WMT @ 35% H2O Batched by Ore Type
Wet Ore Stockpile
13% Dust Recycle
3 ea Dryer Kilns HSFO
-1”
Dryer Kiln Product (DKP) 4.8M DMT @1.84%Ni 75 West:25 East Blend Calcine 700 C
5 ea Reduction Kilns HSFO, Coal Dry Ore Storage
Liquid Sulphur F. Matte 1380 C 300 kT @27% Ni
E.L
4.2 MT SLAG (1550 C)Disposed 14 ea Slag Pot Carriers E.L
E.L
Fluid Bed Dryer Diesel
4 ea 90MW Electric Furnaces
101kT Matte @ 78%Ni 79kT (173Mlbs) Nickel
Silica
Matte Granulation 3 ea P.S Converters
Ship to Japan
INDONESIA
Dampak Penting Yang Dikelola • • • • •
Pengelolaan emisi udara Pengelolaan limbah B3 Pengelolaan batuan penutup Pengelolaan kualitas air Rehabilitasi lahan
INDONESIA
Pengelolaan Emisi Udara Untuk mengelola emisi udara PT VI memasang unit-unit penangkap debu pada seluruh cerobong tanur pemurnian bijih: 1. Tanur pereduksi (kiln) à penangkap debu Electrostatic Precipitator (ESP) berjumlah 3 unit, total biaya USD 71.8 juta, tujuan: • Menurunkan emisi dibawah 50 mg/Nm3 • Meniadakan emisi yang terlihat dari cerobong • Mengoptimalkan kapasitas kiln 2. Tanur peleburan (furnace) à penangkap debu Bag House berjumlah 4 unit, total biaya USD 61 juta, tujuan: • Menurunkan partikel debu terbuang • Menurunkan emisi CO
INDONESIA
Hasil Pengelolaan Emisi Udara Total Particulate and Nickel Matte production per year Nickel Matte, Ni+Co+S (Tonnes)
100
50%
Particulates/ Nickel Matte
YTD Q1_13
2012
2011
2010
2009
0% 2008
2007
10%
2006
20
2005
20%
2004
40
2003
30%
2002
60
2001
40%
2000
80
1999
Particulate and Nickel (Tonnes x 1000)
60%
Particulates (Tonnes)
Particulate/Nickel Matte ratio (%)
120
INDONESIA
Hasil Pengelolaan Emisi Udara (Foto) Tanur pereduksi (Kiln) Sebelum
Kiln 2,3 Kiln 1
Kiln 1
Kiln 2
Kiln 3
K1,2,3 ventury scrubber system
Sesudah K1,2,3 after replaced by ESP
INDONESIA
Hasil Pengelolaan Emisi Udara (Foto)
Sebelum (2005) Tanur peleburan (Furnace)
Sesudah (2005)
INDONESIA
Pengelolaan Limbah B3 • • • •
Berupaya untuk mengurangi, memilah dan memanfatkan kembali limbah B3 di lingkungan operasi PT Vale Indonesia Tbk. Penyediaan fasilitas penyimpanan sementara limbah B3 dan melengkapinya dengan perijinan sesuai peraturan yang berlaku Menerapkan standar internal sekaligus pelaksanaan audit serta inspeksi tentang hydrocarbon dan waste management Bekerjasama dengan pihak ketiga yang telah mendapatkan ijin dari KLH untuk melakukan pengelolaan akhir limbah B3
INDONESIA
Pengelolaan Timbunan Batuan Penutup Pengelolaan 0mbunan batuan penutup (disposal) bertujuan untuk mengembalikan fungsi lahan dengan cara pengisian lubang bekas tambang dengan tanah buangan (overburden) atau waste material sehingga lahan bekas tambang tersebut dapat ditanam kembali sesuai dengan peruntukan lahan.
Program pengelolaan tanah 0mbunan yang dilakukan antara lain: • • • • • •
Desain dan perencanaan disposal Penetapan 0pe disposal (finger, semi induced, atau induced flow) Penyelidikan geoteknik (bila diperlukan) Penilaian kestabilan lereng geoteknik Penongkangan (dumping) tanah buangan (overburden) Inspeksi dan pemantauan kestabilan geoteknik secara reguler
SOP Timbunan Batuan Penutup
INDONESIA
INDONESIA
Contoh Desain Batuan Penutup (Disposal)
Penyelidikan Geoteknik di Lokasi Rencana Disposal
Parameter Geoteknik yang diperoleh: -‐ Data SPT, Data CPT, Kuat Geser Tanah (Shear Strength), dsb -‐ Parameter Mekanika Tanah: Kohesi (c), Sudut Geser Dalam (ϕ), dsb -‐ Parameter Indeks Tanah: Berat Satuan Isi (γ), plas0sitas, permeabilitas, dsb
INDONESIA
INDONESIA
Hasil Penyelidikan Geoteknik di Lokasi Tapak
Su = 30 kPa 3.4 m depth Su = 90 kPa
9.4 m depth
INDONESIA
Pemodelan Kestabilan Disposal Name: Back-‐Analysis Latjuba Elv.+479 m -‐ Section I-‐I'_R.00.gsz 520
0
20
40
60
80
100
120
140
160
180
200
220
240
260 520
510
510
500
Elevation (m)
Pemodelan Kestabilan Lereng pada Dumping Point Disposal dilakukan dengan menggunakan soOware GeoStudio 2004 (Slope/W)
500
1.12
490
490
480
480
470
470
460
460
450
450
440
440
430
430
420 0
20
40
60
80
100
120
140
160
180
200
220
240
420 260
Distance (m) Material #: 1 Description: Ballast Material Model: MohrCoulomb Wt: 20 Cohesion: 10 Phi: 34 Piezometric Line: 0 Material #: 2 Description: O verburden Material Model: UndrainedPhiZero Wt: 17 C ohesion: 35 Piezometric Line: 0 Material #: 3 Description: Medium Stiff to Stiff Soil Model: UndrainedPhiZero Wt: 17 Cohesion: 75 Piezometric Line: 0 Material #: 4 Description: V ery Soft to Soft Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 15 C -‐Rate o f Increase: 1 Limiting C: 20 Piezometric Line: 0 Material #: 5 Description: Stiff Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 50 C-‐Rate of Increase: 5 Limiting C: 75 Piezometric Line: 0 Material #: 6 Description: V ery Stiff Soil Model: SFnDepth Wt: 17 C -‐Top of Layer: 130 C-‐Rate of Increase: 5 Limiting C : 200 Piezometric Line: 0 Material #: 7 Description: Bedrock Model: SFnDepth Wt: 17 C -‐Top of Layer: 120 C-‐Rate of Increase: 5 Limiting C: 350 Piezometric Line: 0 Material #: 8 Description: Firm to Medium Stiff Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 45 C -‐Rate o f Increase: 5 Limiting C: 60 Piezometric Line: 0
Name: Back-‐Analysis Latjuba Elv.+481 m -‐ Section I-‐I'_R.00.gsz
Name: Back-‐Analysis Latjuba Elv.+477 m -‐ Section I-‐I'_R.00.gsz 520
260 520
510
510
510
510
500
500
500
490
490
20
40
60
80
100
120
140
180
200
220
240
1.21
490
Elevation (m)
160
0
Elevation (m)
520
260 520
0
20
40
60
80
100
120
140
160
180
200
220
240
500
0.93
490
480
480
470
470
460
460
450
450
450
440
440
440
440
430
430
430
430
420
420 260
420
480
480
470
470
460
460
450
0
20
40
60
80
100
120
140
160
180
200
220
240
Distance (m) Material #: 1 Description: Ballast Material Model: MohrCoulomb Wt: 20 Cohesion: 10 Phi: 34 Piezometric Line: 0 Material #: 2 Description: Overburden Material Model: UndrainedPhiZero Wt: 17 Cohesion: 35 Piezometric Line: 0 Material #: 3 Description: Medium Stiff to Stiff Soil Model: UndrainedPhiZero Wt: 17 Cohesion: 75 Piezometric Line: 0 Material #: 4 Description: Very Soft to Soft Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 15 C-‐Rate of Increase: 1 Limiting C: 20 Piezometric Line: 0 Material #: 5 Description: Stiff Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 50 C-‐Rate of Increase: 5 Limiting C: 75 Piezometric Line: 0 Material #: 6 Description: Very Stiff Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 130 C-‐Rate of Increase: 5 Limiting C: 200 Piezometric Line: 0 Material #: 7 Description: Bedrock Model: SFnDepth Wt: 17 C-‐Top o f Layer: 120 C-‐Rate of Increase: 5 Limiting C: 350 Piezometric Line: 0 Material #: 8 Description: Firm to Medium Stiff Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 45 C-‐Rate of Increase: 5 Limiting C: 60 Piezometric Line: 0
0
20
40
60
80
100
120
140
160
180
200
220
240
Distance (m) Material #: 1 Description: Ballast Material Model: MohrCoulomb Wt: 20 C ohesion: 10 Phi: 34 Piezometric Line: 0 Material #: 2 Description: Overburden Material Model: UndrainedPhiZero Wt: 17 Cohesion: 35 Piezometric Line: 0 Material #: 3 Description: Medium Stiff to Stiff Soil Model: UndrainedPhiZero Wt: 17 Cohesion: 75 Piezometric Line: 0 Material #: 4 Description: Very Soft to Soft Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 15 C-‐Rate of Increase: 1 Limiting C: 20 Piezometric Line: 0 Material #: 5 Description: Stiff Soil Model: SFnDepth Wt: 17 C -‐Top of Layer: 50 C-‐Rate of Increase: 5 Limiting C: 75 Piezometric Line: 0 Material #: 6 Description: Very Stiff Soil Model: SFnDepth Wt: 17 C-‐Top o f Layer: 130 C-‐Rate of Increase: 5 Limiting C: 200 Piezometric Line: 0 Material #: 7 Description: Bedrock Model: SFnDepth Wt: 17 C-‐Top of Layer: 120 C-‐Rate of Increase: 5 Limiting C: 350 Piezometric Line: 0 Material #: 8 Description: Firm to Medium Stiff Soil Model: SFnDepth Wt: 17 C-‐Top of Layer: 45 C-‐Rate of Increase: 5 Limiting C : 60 Piezometric Line: 0
420 260
INDONESIA
Rekomendasi Geoteknik No. 1.
2.
3.
Description Original Disposal Information Disposal Name Type of Disposal Plan Level Operational Dumping : § Crest Limit § Dumping Limit § Lowest Point § Dumping Direction Civil Material for Ballast Dumped Material Drainage System Disposal Setting & Risk Matrix ANO24 – ANO27 DP Alignment ANO24 DL on Sta. 0+085 RL +540 m ANO27 DL on Sta. 0+195 RL +540 m ANO28 – ANO21 DP Alignment ANO28 DL on Sta. 0+140 RL +530 m ANO21 DL on Sta. 0+210 RL +530 m Recommendation § Following Original Design § Dumping Material § Backward § Reduce Level § Proposed Boundary / Limit § Re-sloping § Change Management
Remark ANO24 – ANO27 DP and ANO28 – ANO21 DP Our Ref Finger with the dumping limits are fully controlled Level +540 m (including ballast material) for ANO24 – ANO27 DP Level +530 m (including ballast material) for ANO28 – ANO21 DP
M11011-DP-M
As progressive crest under this review Progressive with dumping limits are fully controlled +528 m for ANO24 – ANO27 DP and +518 m for ANO28 – ANO21 DP To the East-ward and West-ward Refer to reject and slag material Overburden or waste material Avoid water ponding on disposal area FS PTI GTX Analysis Result 1.25 1.28
L-4 L-4
24 (3) 24 (3)
1.23 1.21 Yes √ √ √ -
L-4 L-4 No √ √ √ √
24 (3) 24 (3)
ANO24 with DL on Sta. 0+085 RL +540 m is recommended ANO27 with DL on Sta. 0+195 RL +540 m is recommended
ANO28 with DL on Sta. 0+140 RL +530 m is recommended ANO21 with DL on Sta. 0+210 RL +530 m is recommended Remark Dumping limits must be controlled respectively. Reject material and overburden for finger dumping point is recommended. Not applicable Not applicable Recommended dumping limits are attached in dxf format. Not applicable Not applicable
Inspeksi dan Pemantauan Kestabilan Disposal
INDONESIA
INDONESIA
Pengelolaan Kualitas Air (TSS) Pengendalian sedimen direncanakan dan dilakukan secara terpadu mulai dari tahapan eksplorasi, perencanaan tambang, operasi tambang sampai penanganan lahan pasca tambang Program dan bentuk-bentuk pengendalian sedimen: • • • • • •
Penetapan Standar pengendalian sedimen Pembuatan kolam pengendap (Settlement pond) Pembangunan sedimen dam (Check dam) Pengerukan sarana pengendalian sedimen Penghijauan areal pasca tambang Pemantauan & monitoring secara reguler
INDONESIA
Standar Pengendalian Sedimen Metoda : -‐ In Pit Drainage -‐ Intercep7on Drainage Around Pit -‐ Sediment Containment (Pond/Dam) -‐ Channel/Ditch
Lokasi Fasilitas Pengendalian Sedimen
INDONESIA
INDONESIA
Lokasi – Lokasi Titik Penaatan LC3
Lamangka
LC3
Lamangka
Lokasi – Lokasi Titik Penaatan
INDONESIA
Petea West
Petea West Petea East
Petea East
Fasilitas Pengendalian Sedimen
INDONESIA
" Site Drainage : cross slope, contour drains, rock-‐line steeper channels etc " Pocket Pond " Chanel " Check Dam " Road Drainage " Infiltra0on Pond " Disposal Berm " Sediment Ponds " Sediment Dams " Revegeta0on
Ada 82 fasilitas pengendalian sediment di Sorowako dan Petea Area dengan kapasitas sedimen 1.000 m3 hingga 13.000.000 m3
INDONESIA
Realisasi Pengendalian Sediment Tahun 2012 KEGIATAN
RENCANA
REALISASI
9 unit
9 unit
Tambahan kapasitas pengendapan baru
180 K m3
187,3 K m3
Pengerukan kolam pengendapan
210 k m3
445 K m3
1.4 M (USD)
2.3 M (USD)
Pembangunan kolam pengendapan
Total biaya pengendalian sedimen
INDONESIA
Realisasi Pengendalian Sediment YTD Tahun 2013 2013
Aktivitas Pengendalian Sediment Pengerukan Sediment (Small Fleet) Pemompaan Lumpur (Slurry Pump) Pembangunan Fasilitas Mine Effluent Pengerukan Sediment (Small Fleet) Pemompaan Lumpur (Slurry Pump) Pembangunan Fasilitas Mine Effluent Pengerukan Sediment (Small Fleet) Pemompaan Lumpur (Slurry Pump) Pembangunan Fasilitas Mine Effluent Pengerukan Sediment (Small Fleet) Pemompaan Lumpur (Slurry Pump) Pembangunan Fasilitas Mine Effluent
Q1
Q2
Q3
Q4
Total Realisasi Pengendalian Sediment (Rp.)
Jenis Aktivitas Pengendalian Sediment Konstruksi (Rp.) 1,098,674,635 8,312,345,642 105,043,922
Reclaim (Rp.)
Volume
Aktual
(BCM)
Total (Rp.)
4,722,416,546 738,226,734
215,546 34,415
2,793,685,002 1,277,259,999
164,595 73,003
9,531,588,281
487,559
681,019,277
10,197,083,475
5,821,091,181 738,226,734 8,312,345,642 2,898,728,924 1,277,259,999 681,019,277 0 0 0 0 0 0 19,728,671,757
Catatan: Aktivitas pengendalian sediment diantaranya adalah pengerukan sedimen, pemompaan lumpur, perbaikan saluran drainase, konstruksi tanggul, gabion, drop structures, check-dam, dan riprap serta pembangunan fasilitas mine effluent.
Penambahan Kolam Pengendapan 2012 Area LC#3
Peningkatan kapasitas fasilitas pengelolaan effluent catchment area LC#3:
6
1. Saranga à 16,500 m3 2. Upper Kockum à 55,000 m3 3. SS#11 à 7,000 m3 4. SS#8 à 20,000 m3 5. Pongsesa à 60,200 m3 6. Fasilitas Pengelolaan Chromium
5
3
INDONESIA
2
1 4
Penambahan Kolam Pengendapan 2012 Area Petea
INDONESIA
Peningkatan kapasitas fasilitas pengelolaan effluent catchment area Petea East: 3
1
4 2
1. Petea Pond-‐2 à 18,300 m3 2. Petea Pond-‐3a/b à 36,800 m3 3. Petea Pond-‐4 à 2,000 m3 4. Fasilitas Pengelolaan Chromium
INDONESIA
Konstruksi & Kolam Pengendapan
Kolam Pengendapan PP#1
Penambahan Tanggul Pongsesa
Kolam Pengendapan SS#8
Kolam Pengendapan LMK#3
INDONESIA
Konstruksi & Kolam Pengendapan
Lokasi perluasan kolam pengendapan eksis0ng di Petea Pond 3A dan 3B
Outlet kolam pengendapan eksis0ng di Petea Pond 3A dan 3B
Perluasan kantong pengendapan eksis0ng di lokasi Pocket Pond 4A
Lokasi pembuatan kolam pengendapan yang baru di lokasi Petea Pond 2 (selesai dikonstruksi)
Foto-foto Fasilitas Pengendapan Sedimen
Rante Pond
Fiona Pond
Kathryn Pond
Petea Pond 2c
Loraine Pond
Petea Pond 6
Kathryn Pond
Wawono Pond
Hasan Pond
INDONESIA
Pemantauan Fasilitas Pengendalian Sedimen
INDONESIA
INDONESIA
Hasil Pemantauan TSS di Titik Penaatan
INDONESIA
Uji Coba Lamella Gravity Settler/LGS
(Mempercepat pengendapan & Efisiensi Luasan) Skema sederhana LGS
Skema Pilot Project LGS
INDONESIA
Pengelolaan Kualitas Air (Chromium) • Sumber kromium dalam laterit nikel, 1.7-4.8% (LAPI-ITB, 2005), 1-3.5% (Hulett, 2008) • Dalam zona limonit, kromium terikat dalam bentuk krom-spinel (55-75%), sisanya terikat pada Goethite • Dalam zona limonit ini, kromium terikat secara fisik teradsorpsi pada mineral. Lepasnya Cr(6) dari lapisan lateritik dipengaruhi oleh: • Konsentrasi ion kromit • Cahaya ultraviolet sebagai oksidator kuat • Waktu reaksi • Kondisi kimia fisik (pH-Eh, temperatur, Mn) • Pengaruh air
INDONESIA
Pengelolaan Kualitas Air (Chromium) Pengelolaan chromium dilakukan dengan mengalirkan Ferrous sulfat/ FeSO4 Fungsi FeSO4 dalam proses pengolahan Cr(6) adalah: • Untuk mereduksi Cr(6) menjadi Cr(III) • Memberikan efek ko-presipitasi terhadap Cr(OH)3 yang terbentuk (Asam) (Basa)
INDONESIA
Fasilitas Pengelolaan Chromium LC#3
Fasilitas pengelolaan Fasilitas pengelolaan
INDONESIA
Fasilitas Pengelolaan Chromium
Sensor debit
Titik injeksi
Arah aliran
Proses pengadukan
INDONESIA
Hasil Pemantauan Chromium Total
INDONESIA
Hasil Pemantauan Chromium(VI)
INDONESIA
Rehabilitasi Lahan LAHAN PASCA TAMBANG
BACK FILLING
Reklamasi Belum berhasil
PENATAAN LAHAN
Landscaping, Pengembalian tanah pucuk, Pengendalian erosi & Sedimentasi, Pengaturan sistim drainase
KONSERVASI/PRESERVASI Sumber plasma nutfah Penelitian & pengembangan
Penyelamatan Tanah Pucuk
PERBAIKAN LAHAN
Pembudidayaan Tanaman Produktif
Penanaman cover crop & Jenis-jenis pohon pioneer
KAWASAN HPT/APL
KAWASAN HUTAN LINDUNG
Agroforestry
Restorasi
PEMELIHARAAN
Pemupukan lanjutan, Pembersihan gulma, Penyulaman Pengendalian hama penyakit
PEMANTAUAN
Pertumbuhan, Perkembangan tanah Tingkat suksesi, migrasi fauna, dll.
HUTAN YANG LESTARI/LAHAN PRODUKTIF
INDONESIA
Ilustrasi Rehabilitasi Penataan lahan dan penebaran topsoil
Kompartemen-A
Blue Zone
INDONESIA
Ilustrasi Rehabilitasi Penanaman tanaman penutup tanah dan jenis-jenis pioneer
Kompartemen-A
Blue Zone
INDONESIA
Rehabilitasi Progresif Petea-A Activity
2004
2005
2006
2007
2008
2004
2005
2006
2007
2008
Mining Backfilling Rehabilitation
Anoa Valley Activity Mining Backfilling Rehabilitation
INDONESIA
Status Lahan Tambang Kwt-2, 2013
Sisa lahan terbuka adalah 986 Ha (< 1,100 Ha sesuai komitmen)
Peta Lahan Tambang
INDONESIA
Contoh Desain Penataan Lahan
Pasca tambang
Design setelah penataan lahan
INDONESIA
Foto-foto Rehabilitasi Lahan
INDONESIA
Foto-foto….. (lanjutan)
INDONESIA
04/22/2005
Foto-foto….. (lanjutan)
INDONESIA
INDONESIA
Foto-foto….. (lanjutan)
Sebelum Penanaman
2 bulan setelah penanaman 4 Tahun Setelah
Foto-foto….. (lanjutan)
INDONESIA
Foto-foto….. (lanjutan)
INDONESIA
Multikultur
INDONESIA
Pemeliharaan Tanaman
INDONESIA
Pengayaan Tanaman
INDONESIA
Hasil Pengayaan Tanaman
INDONESIA
Hasil Pengayaan Tanaman
INDONESIA
Suksesi/regenerasi Alami
INDONESIA
Realisasi Reklamasi Lahan 2012 KEGIATAN
RENCANA
REALISASI
Pembukaan lahan
127,4 Ha
111,4 Ha
Rehabilitasi lahan
98,9 Ha
93.5 Ha
Pemeliharaan tanaman
230 Ha
230 Ha
Penanaman tanaman lokal
100 Ha
130 Ha
Biaya rehabilitasi (US $)
5,0 juta
5,8 juta
INDONESIA
INDONESIA
Realisasi Reklamasi Kwt-2, 2013 KEGIATAN
RENCANA
REALISASI
Pembukaan lahan
93,4 Ha
70,4 Ha
Rehabilitasi lahan
82,5 Ha
68,0 Ha
Pemeliharaan tanaman
45,5 Ha
50,4 Ha
Penanaman tanaman lokal
37,5 Ha
40,2 Ha
Biaya rehabilitasi (US $)
3,1 juta
2,5 juta
INDONESIA
Upaya Konservasi Pohon Lokal
Inventarisasi Jenis (Data base)
Pen entu an Prior itas
Kon serv asi ExSitu
Pembuatan Arboretum
Peng umpul an bijih dan perba nyaka n bibit
Penana man pada lahan pasca tamban g (kanopi ≥ 30%)
Upaya Konservasi Pohon Lokal
INDONESIA
Upaya Konservasi Pohon Lokal
INDONESIA
Arboretum
INDONESIA
Arboretum & Taman Tambang
INDONESIA
INDONESIA
Penanaman Jenis-jenis Lokal 2004 - 2011 Tahun tanam
Jumlah pohon (batang)
Luasan (Ha)
2004 - 2007
499,500
450
2008
161,800
150
2009
25,400
25
2010
141,700
140
2011
150,000
150
2012
150,000
150
Total
1,128,400
915
INDONESIA
Persemaian PT. Vale Indonesia
Persemaian PT. Vale Indonesia
INDONESIA
Persemaian PT. Vale Indonesia
INDONESIA
Persemaian PT. Vale Indonesia
INDONESIA
INDONESIA
Keterlibatan Masyarakat dalam Rehabilitasi • Melalui Kerjasama dengan Community Development, dibentuk 2 koperasi pemuda yang dididik dan dilatih untuk memproduksi kompos dan pembibitan tanaman lokal untuk memenuhi kebutuhan rehabilitasi lahan dengan total nilai sebesar 3 - 4 milyar/tahun. Hingga saat ini telah terserap 40 tenaga kerja dari kegiatan ini • Dalam kegiatan penanaman dan penataan lahan PT. Vale menggunakan kontraktor lokal yang menyerap lebih dari 500 tenaga kerja (90% adalah tenaga kerja lokal) • Pembentukan koperasi peternak sapi untuk pemanfaatan tanaman cover crop
INDONESIA
Keterlibatan Masyarakat
Kerjasama Dengan BKSDA Untuk Pemeliharaan Hewan Titipan
INDONESIA
INDONESIA
Kampanye Menanam Bersama
INDONESIA
TERIMAKASIH …………