INDONESIA

PENGELOLAAN LINGKUNGAN PT. VALE INDONESIA Tbk.

September, 20131

Alur Presentasi •  Sekilas tentang perusahaan •  Visi & Misi •  Penambangan & Pemurnian Bijih •  Pengelolaan Dampak Lingkungan •  Pengelolaan kualitas udara •  Pengelolaan limbah B3 •  Pengelolaan batuan penutup/disposal •  Pengelolaan kualitas air •  Rehabilitasi lahan pasca tambang

INDONESIA

INDONESIA

Areal Kontrak Karya MANADO

Wilayah Kontrak Karya : - Sulawesi Selatan

TOMINI BAY

118,387 ha - Sulawesi Tengah

PALU

36,635 ha KOLONEDALE

- Sulawesi Tenggara 35,486 ha Total = 190,509 ha

TOLO BAY SOROAKO

MAKASSAR

BAHODOPI

LATAO MATARAPE

Kontrak Karya PT INCO No. B745/PRES/12/1995

berlaku sampai dengan tahun 2025

LASOLO

SUASUA

BONE BAY

PAOPAO

KENDARI

POMALAA TOROBULU

Persetujuan AMDAL No. 4627/0115/SJT/1995

INDONESIA

Areal Operasi di Sorowako Matano Matano Lake

Petea Lampesue N&S

WB EB Processing Plant Lingkona Mahalona

Malili

Towuti Lake

Tanamalia

Lasubonti Lingke Lengkobale

INDONESIA

Visi & Misi Perusahaan VISI Menjadi perusahaan sumberdaya alam berskala global terbaik dalam hal menciptakan nilai jangka panjang melalui kinerja yang unggul dan kepedulian pada kemanusiaan

MISI Mengubah sumberdaya alam menjadi kesejahteraan dan pembangunan yang berkelanjutan

INDONESIA

Kepemilikan Saham

VALE 61%

20%

Sumitomo Metal Mining • 

19%

Public Float

Vale Inco memiliki 61% saham dan berdasarkan KK harus mempertahankan kepemilikannya di PTI lebih besar dari 50% •  Pemegang saham pengendali adalah Vale dari Brasil •  Tercatat di Bursa Saham Indonesia (BEI) sejak 1990

Kebijakan K3-L Perusahaan PT Vale Tbk berkomitmen untuk menerapkan Pengelolaan Lingkungan, Kesehatan dan Keselamatan Kerja sesuai dengan praktek pengalaman terbaik (best Practice) yang ada .

INDONESIA

INDONESIA

Profil Penampang Bijih

Plant requirement : Fe = 18.5% – 22.5% ; SiO2/MgO = 2.05 – 2.25 ; CoG = 1.5%

Visualisasi Penyebaran Bijih

Red hematite zone

Yellow Limonite zone

Ferruginous zone

Saprolite zone

Bedrock pinnacle

INDONESIA

INDONESIA

Skema Alur Penambangan Penambangan (Pembersihan hutan, Pembuatan jalan Penyelamatan tanah pucuk, Pengupasan tanah penutup) Eksploitasi bijih

Eksplorasi & Perhitungan cadangan. Perencanaan

Tanah pucuk & tanah penutup

ROM/Bijih Penyaringan

Bijih telah tersaring

Material off grade

Pasca Tambang

Penyimpanan

REHABILITASI Pengolahan Aliran material off grade

Aliran bijih

INDONESIA

Ilustrasi Penambangan Sebelum penambangan

Kompartemen-A

Top Soil Over Burden Soft Saprolite

Blue Zone

Kompartemen-B

INDONESIA

Ilustrasi Penambangan Land clearing

Kompartemen-A

Top Soil Over Burden Soft Saprolite

Blue Zone

Kompartemen-B

INDONESIA

Ilustrasi Penambangan Pengupasan topsoil Kompartemen-A

Top Soil Over Burden Soft Saprolite

Blue Zone

INDONESIA

Ilustrasi Penambangan Penyimpanan topsoil untuk digunakan kembali

Top Soil Stock Pile Top Soil Stock Pile

INDONESIA

Ilustrasi Penambangan Pengupasan tanah penutup

Kompartemen-A

Over Burden Soft Saprolite

Blue Zone

INDONESIA

Ilustrasi Penambangan Penambangan bijih nikel

Kompartemen-A

To Screening Station

Soft Saprolite

Blue Zone

INDONESIA

Ilustrasi Penambangan Lahan pasca tambang & penambangan kompartemen berikutnya

Kompartemen-A

Blue Zone

Kompartemen-B

Sistem Penambangan Backfilling/Penimbunan kembali

Kompartemen-A

Blue Zone DISPOSAL

INDONESIA

INDONESIA

INDONESIA

Skema Alur Pemurnian Bijih 9M WMT @ 35% H2O Batched by Ore Type

Wet Ore Stockpile

13% Dust Recycle

3 ea Dryer Kilns HSFO

-1”

Dryer Kiln Product (DKP) 4.8M DMT @1.84%Ni 75 West:25 East Blend Calcine 700 C

5 ea Reduction Kilns HSFO, Coal Dry Ore Storage

Liquid Sulphur F. Matte 1380 C 300 kT @27% Ni

E.L

4.2 MT SLAG (1550 C)Disposed 14 ea Slag Pot Carriers E.L

E.L

Fluid Bed Dryer Diesel

4 ea 90MW Electric Furnaces

101kT Matte @ 78%Ni 79kT (173Mlbs) Nickel

Silica

Matte Granulation 3 ea P.S Converters

Ship to Japan

INDONESIA

Dampak Penting Yang Dikelola •  •  •  •  • 

Pengelolaan emisi udara Pengelolaan limbah B3 Pengelolaan batuan penutup Pengelolaan kualitas air Rehabilitasi lahan

INDONESIA

Pengelolaan Emisi Udara Untuk mengelola emisi udara PT VI memasang unit-unit penangkap debu pada seluruh cerobong tanur pemurnian bijih: 1.  Tanur pereduksi (kiln) à penangkap debu Electrostatic Precipitator (ESP) berjumlah 3 unit, total biaya USD 71.8 juta, tujuan: •  Menurunkan emisi dibawah 50 mg/Nm3 •  Meniadakan emisi yang terlihat dari cerobong •  Mengoptimalkan kapasitas kiln 2.  Tanur peleburan (furnace) à penangkap debu Bag House berjumlah 4 unit, total biaya USD 61 juta, tujuan: •  Menurunkan partikel debu terbuang •  Menurunkan emisi CO

INDONESIA

Hasil Pengelolaan Emisi Udara Total Particulate and Nickel Matte production per year Nickel Matte, Ni+Co+S (Tonnes)

100

50%

Particulates/ Nickel Matte

YTD Q1_13

2012

2011

2010

2009

0% 2008

2007

10%

2006

20

2005

20%

2004

40

2003

30%

2002

60

2001

40%

2000

80

1999

Particulate and Nickel (Tonnes x 1000)

60%

Particulates (Tonnes)

Particulate/Nickel Matte ratio (%)

120

INDONESIA

Hasil Pengelolaan Emisi Udara (Foto) Tanur pereduksi (Kiln) Sebelum  

Kiln 2,3 Kiln 1

Kiln 1

Kiln 2

Kiln 3

K1,2,3 ventury scrubber system

Sesudah   K1,2,3 after replaced by ESP

INDONESIA

Hasil Pengelolaan Emisi Udara (Foto)

Sebelum  (2005)   Tanur peleburan (Furnace)

Sesudah  (2005)  

INDONESIA

Pengelolaan Limbah B3 •  •  •  • 

Berupaya untuk mengurangi, memilah dan memanfatkan kembali limbah B3 di lingkungan operasi PT Vale Indonesia Tbk. Penyediaan fasilitas penyimpanan sementara limbah B3 dan melengkapinya dengan perijinan sesuai peraturan yang berlaku Menerapkan standar internal sekaligus pelaksanaan audit serta inspeksi tentang hydrocarbon dan waste management Bekerjasama dengan pihak ketiga yang telah mendapatkan ijin dari KLH untuk melakukan pengelolaan akhir limbah B3

INDONESIA

Pengelolaan Timbunan Batuan Penutup Pengelolaan  0mbunan  batuan  penutup  (disposal)  bertujuan  untuk   mengembalikan  fungsi  lahan  dengan  cara  pengisian  lubang  bekas   tambang  dengan  tanah  buangan  (overburden)  atau  waste  material   sehingga   lahan   bekas   tambang   tersebut   dapat   ditanam   kembali   sesuai  dengan  peruntukan  lahan.      

Program  pengelolaan  tanah  0mbunan  yang  dilakukan  antara  lain:   •    •  •  •  •  • 

Desain  dan  perencanaan  disposal   Penetapan  0pe  disposal  (finger,  semi  induced,  atau  induced  flow)   Penyelidikan  geoteknik  (bila  diperlukan)   Penilaian  kestabilan  lereng  geoteknik   Penongkangan  (dumping)  tanah  buangan  (overburden)   Inspeksi  dan  pemantauan  kestabilan  geoteknik  secara  reguler  

SOP Timbunan Batuan Penutup

INDONESIA

INDONESIA

Contoh Desain Batuan Penutup (Disposal)

Penyelidikan Geoteknik di Lokasi Rencana Disposal

Parameter  Geoteknik  yang  diperoleh:   -­‐       Data  SPT,  Data  CPT,  Kuat  Geser  Tanah  (Shear  Strength),  dsb   -­‐       Parameter  Mekanika  Tanah:  Kohesi  (c),  Sudut  Geser  Dalam  (ϕ),  dsb   -­‐       Parameter  Indeks  Tanah:  Berat  Satuan  Isi  (γ),  plas0sitas,  permeabilitas,  dsb  

INDONESIA

INDONESIA

Hasil Penyelidikan Geoteknik di Lokasi Tapak

Su  =  30  kPa   3.4  m  depth   Su  =  90  kPa  

9.4  m  depth  

INDONESIA

Pemodelan Kestabilan Disposal Name:  Back-­‐Analysis  Latjuba  Elv.+479  m  -­‐  Section  I-­‐I'_R.00.gsz 520

0

20

40

60

80

100

120

140

160

180

200

220

240

260 520

510

510

500

Elevation (m)

Pemodelan   Kestabilan   Lereng   pada   Dumping   Point   Disposal   dilakukan   dengan   menggunakan   soOware   GeoStudio  2004  (Slope/W)  

500

1.12

490

490

480

480

470

470

460

460

450

450

440

440

430

430

420 0

20

40

60

80

100

120

140

160

180

200

220

240

420 260

Distance (m) Material   #:   1          Description:  Ballast   Material          Model:  MohrCoulomb          Wt:  20          Cohesion:  10          Phi:  34          Piezometric  Line:   0           Material   #:   2          Description:  O verburden   Material          Model:  UndrainedPhiZero           Wt:  17          C ohesion:  35           Piezometric  Line:  0           Material   #:   3          Description:  Medium   Stiff  to  Stiff  Soil          Model:  UndrainedPhiZero          Wt:  17          Cohesion:   75          Piezometric  Line:  0           Material   #:   4          Description:  V ery  Soft  to  Soft  Soil          Model:  SFnDepth          Wt:  17          C-­‐Top   of  Layer:  15          C -­‐Rate  o f  Increase:  1           Limiting  C:  20          Piezometric   Line:   0           Material   #:   5          Description:  Stiff  Soil           Model:   SFnDepth          Wt:  17          C-­‐Top  of  Layer:  50           C-­‐Rate  of  Increase:  5          Limiting   C:  75           Piezometric  Line:  0           Material   #:   6          Description:  V ery  Stiff  Soil          Model:  SFnDepth          Wt:  17          C -­‐Top  of   Layer:   130           C-­‐Rate   of  Increase:  5          Limiting  C :  200          Piezometric   Line:  0           Material   #:   7          Description:  Bedrock          Model:  SFnDepth           Wt:  17          C -­‐Top  of   Layer:   120           C-­‐Rate  of  Increase:  5          Limiting   C:  350          Piezometric   Line:   0           Material   #:   8          Description:  Firm  to  Medium  Stiff  Soil          Model:  SFnDepth          Wt:  17           C-­‐Top   of  Layer:  45          C -­‐Rate  o f  Increase:   5          Limiting  C:  60          Piezometric   Line:  0          

Name:  Back-­‐Analysis  Latjuba  Elv.+481  m  -­‐  Section  I-­‐I'_R.00.gsz

Name:  Back-­‐Analysis  Latjuba  Elv.+477  m  -­‐  Section  I-­‐I'_R.00.gsz 520

260 520

510

510

510

510

500

500

500

490

490

20

40

60

80

100

120

140

180

200

220

240

1.21

490

Elevation (m)

160

0

Elevation (m)

520

260 520

0

20

40

60

80

100

120

140

160

180

200

220

240

500

0.93

490

480

480

470

470

460

460

450

450

450

440

440

440

440

430

430

430

430

420

420 260

420

480

480

470

470

460

460

450

0

20

40

60

80

100

120

140

160

180

200

220

240

Distance (m) Material   #:   1          Description:   Ballast   Material          Model:  MohrCoulomb          Wt:  20          Cohesion:  10          Phi:  34          Piezometric  Line:  0           Material   #:   2          Description:   Overburden   Material          Model:  UndrainedPhiZero          Wt:  17           Cohesion:  35          Piezometric  Line:  0           Material   #:   3          Description:   Medium   Stiff  to  Stiff  Soil           Model:   UndrainedPhiZero          Wt:   17          Cohesion:  75          Piezometric   Line:   0           Material   #:   4          Description:   Very  Soft  to  Soft  Soil          Model:  SFnDepth          Wt:   17          C-­‐Top  of  Layer:  15           C-­‐Rate   of  Increase:  1          Limiting  C:  20          Piezometric  Line:  0           Material   #:   5          Description:   Stiff  Soil           Model:   SFnDepth          Wt:  17          C-­‐Top  of  Layer:   50          C-­‐Rate  of  Increase:  5          Limiting  C:  75          Piezometric  Line:  0           Material   #:   6          Description:   Very  Stiff   Soil          Model:  SFnDepth           Wt:  17          C-­‐Top  of  Layer:  130          C-­‐Rate  of  Increase:  5          Limiting   C:  200          Piezometric  Line:   0           Material   #:   7          Description:   Bedrock          Model:  SFnDepth           Wt:  17           C-­‐Top  o f  Layer:  120          C-­‐Rate  of  Increase:  5          Limiting  C:  350          Piezometric  Line:  0           Material   #:   8          Description:   Firm  to  Medium  Stiff  Soil          Model:  SFnDepth          Wt:  17          C-­‐Top   of  Layer:  45          C-­‐Rate   of  Increase:  5           Limiting  C:  60          Piezometric  Line:  0          

0

20

40

60

80

100

120

140

160

180

200

220

240

Distance (m) Material  #:   1          Description:   Ballast   Material          Model:  MohrCoulomb           Wt:  20          C ohesion:  10           Phi:  34           Piezometric  Line:  0           Material  #:   2          Description:   Overburden   Material          Model:  UndrainedPhiZero          Wt:  17          Cohesion:  35          Piezometric  Line:  0           Material  #:   3          Description:   Medium   Stiff  to   Stiff  Soil           Model:   UndrainedPhiZero          Wt:  17          Cohesion:  75          Piezometric  Line:   0           Material  #:   4          Description:   Very  Soft  to  Soft  Soil          Model:  SFnDepth          Wt:   17          C-­‐Top  of  Layer:  15           C-­‐Rate  of  Increase:  1          Limiting   C:  20           Piezometric  Line:  0           Material  #:   5          Description:   Stiff  Soil           Model:   SFnDepth          Wt:  17          C -­‐Top  of   Layer:   50          C-­‐Rate  of  Increase:  5          Limiting  C:  75          Piezometric  Line:  0           Material  #:   6          Description:   Very  Stiff   Soil          Model:  SFnDepth           Wt:  17           C-­‐Top  o f  Layer:  130          C-­‐Rate  of  Increase:  5          Limiting  C:  200          Piezometric  Line:  0           Material  #:   7          Description:   Bedrock          Model:  SFnDepth          Wt:  17           C-­‐Top   of  Layer:  120          C-­‐Rate  of  Increase:  5          Limiting  C:  350           Piezometric  Line:  0           Material  #:   8          Description:   Firm  to  Medium  Stiff  Soil          Model:  SFnDepth          Wt:   17          C-­‐Top  of  Layer:  45           C-­‐Rate  of  Increase:  5          Limiting  C :  60          Piezometric  Line:  0          

420 260

INDONESIA

Rekomendasi Geoteknik No. 1.

2.

3.

Description Original Disposal Information Disposal Name Type of Disposal Plan Level Operational Dumping : § Crest Limit § Dumping Limit § Lowest Point § Dumping Direction Civil Material for Ballast Dumped Material Drainage System Disposal Setting & Risk Matrix ANO24 – ANO27 DP Alignment ANO24 DL on Sta. 0+085 RL +540 m ANO27 DL on Sta. 0+195 RL +540 m ANO28 – ANO21 DP Alignment ANO28 DL on Sta. 0+140 RL +530 m ANO21 DL on Sta. 0+210 RL +530 m Recommendation § Following Original Design § Dumping Material § Backward § Reduce Level § Proposed Boundary / Limit § Re-sloping § Change Management

Remark ANO24 – ANO27 DP and ANO28 – ANO21 DP Our Ref Finger with the dumping limits are fully controlled Level +540 m (including ballast material) for ANO24 – ANO27 DP Level +530 m (including ballast material) for ANO28 – ANO21 DP

M11011-DP-M

As progressive crest under this review Progressive with dumping limits are fully controlled +528 m for ANO24 – ANO27 DP and +518 m for ANO28 – ANO21 DP To the East-ward and West-ward Refer to reject and slag material Overburden or waste material Avoid water ponding on disposal area FS PTI GTX Analysis Result 1.25 1.28

L-4 L-4

24 (3) 24 (3)

1.23 1.21 Yes √ √ √ -

L-4 L-4 No √ √ √ √

24 (3) 24 (3)

ANO24 with DL on Sta. 0+085 RL +540 m is recommended ANO27 with DL on Sta. 0+195 RL +540 m is recommended

ANO28 with DL on Sta. 0+140 RL +530 m is recommended ANO21 with DL on Sta. 0+210 RL +530 m is recommended Remark Dumping limits must be controlled respectively. Reject material and overburden for finger dumping point is recommended. Not applicable Not applicable Recommended dumping limits are attached in dxf format. Not applicable Not applicable

Inspeksi dan Pemantauan Kestabilan Disposal

INDONESIA

INDONESIA

Pengelolaan Kualitas Air (TSS) Pengendalian sedimen direncanakan dan dilakukan secara terpadu mulai dari tahapan eksplorasi, perencanaan tambang, operasi tambang sampai penanganan lahan pasca tambang Program dan bentuk-bentuk pengendalian sedimen: •  •  •  •  •  • 

Penetapan Standar pengendalian sedimen Pembuatan kolam pengendap (Settlement pond) Pembangunan sedimen dam (Check dam) Pengerukan sarana pengendalian sedimen Penghijauan areal pasca tambang Pemantauan & monitoring secara reguler

INDONESIA

Standar Pengendalian Sedimen                      Metoda  :   -­‐  In  Pit  Drainage   -­‐  Intercep7on  Drainage     Around  Pit   -­‐  Sediment  Containment   (Pond/Dam)     -­‐  Channel/Ditch  

Lokasi Fasilitas Pengendalian Sedimen

INDONESIA

INDONESIA

Lokasi – Lokasi Titik Penaatan LC3  

Lamangka  

LC3  

Lamangka  

Lokasi – Lokasi Titik Penaatan

INDONESIA

Petea  West  

Petea  West   Petea  East  

Petea  East  

Fasilitas Pengendalian Sedimen

INDONESIA

"   Site  Drainage  :  cross  slope,   contour  drains,  rock-­‐line  steeper   channels  etc   "   Pocket  Pond   "   Chanel   "   Check  Dam   "   Road  Drainage   "   Infiltra0on  Pond   "   Disposal  Berm   "   Sediment  Ponds   "   Sediment  Dams   "   Revegeta0on                

Ada    82  fasilitas  pengendalian  sediment   di  Sorowako  dan  Petea  Area  dengan   kapasitas  sedimen  1.000  m3  hingga   13.000.000  m3    

INDONESIA

Realisasi Pengendalian Sediment Tahun 2012 KEGIATAN

RENCANA

REALISASI

9 unit

9 unit

Tambahan kapasitas pengendapan baru

180 K m3

187,3 K m3

Pengerukan kolam pengendapan

210 k m3

445 K m3

1.4 M (USD)

2.3 M (USD)

Pembangunan kolam pengendapan

Total biaya pengendalian sedimen

INDONESIA

Realisasi Pengendalian Sediment YTD Tahun 2013 2013

Aktivitas  Pengendalian  Sediment Pengerukan  Sediment  (Small  Fleet) Pemompaan  Lumpur  (Slurry  Pump) Pembangunan  Fasilitas  Mine  Effluent Pengerukan  Sediment  (Small  Fleet) Pemompaan  Lumpur  (Slurry  Pump) Pembangunan  Fasilitas  Mine  Effluent Pengerukan  Sediment  (Small  Fleet) Pemompaan  Lumpur  (Slurry  Pump) Pembangunan  Fasilitas  Mine  Effluent Pengerukan  Sediment  (Small  Fleet) Pemompaan  Lumpur  (Slurry  Pump) Pembangunan  Fasilitas  Mine  Effluent

Q1

Q2

Q3

Q4

Total  Realisasi  Pengendalian  Sediment  (Rp.)

Jenis  Aktivitas  Pengendalian  Sediment Konstruksi  (Rp.) 1,098,674,635 8,312,345,642 105,043,922

Reclaim  (Rp.)

Volume

Aktual

(BCM)

Total  (Rp.)

4,722,416,546 738,226,734

215,546 34,415

2,793,685,002 1,277,259,999

164,595 73,003

9,531,588,281

487,559

681,019,277

10,197,083,475

5,821,091,181 738,226,734 8,312,345,642 2,898,728,924 1,277,259,999 681,019,277 0 0 0 0 0 0 19,728,671,757

Catatan: Aktivitas pengendalian sediment diantaranya adalah pengerukan sedimen, pemompaan lumpur, perbaikan saluran drainase, konstruksi tanggul, gabion, drop structures, check-dam, dan riprap serta pembangunan fasilitas mine effluent.

Penambahan Kolam Pengendapan 2012 Area LC#3

Peningkatan  kapasitas   fasilitas  pengelolaan   effluent  catchment  area   LC#3:    

6  

1.  Saranga                          à  16,500  m3   2.  Upper  Kockum  à  55,000  m3   3.  SS#11                                  à      7,000  m3   4.  SS#8                                      à  20,000  m3   5.  Pongsesa                    à  60,200  m3   6.  Fasilitas  Pengelolaan  Chromium  

5  

3  

INDONESIA

2  

1   4  

Penambahan Kolam Pengendapan 2012 Area Petea

INDONESIA

Peningkatan  kapasitas   fasilitas  pengelolaan   effluent  catchment  area   Petea  East:     3  

1  

4   2  

1.  Petea  Pond-­‐2              à  18,300  m3   2.  Petea  Pond-­‐3a/b  à  36,800  m3   3.  Petea  Pond-­‐4              à      2,000  m3   4.  Fasilitas  Pengelolaan  Chromium  

INDONESIA

Konstruksi & Kolam Pengendapan

Kolam  Pengendapan  PP#1  

Penambahan  Tanggul  Pongsesa  

Kolam  Pengendapan  SS#8  

Kolam  Pengendapan  LMK#3  

INDONESIA

Konstruksi & Kolam Pengendapan

Lokasi  perluasan  kolam  pengendapan  eksis0ng  di   Petea  Pond  3A  dan  3B  

Outlet  kolam  pengendapan  eksis0ng  di  Petea  Pond   3A  dan  3B  

Perluasan  kantong  pengendapan  eksis0ng  di  lokasi   Pocket  Pond  4A  

Lokasi  pembuatan  kolam  pengendapan  yang  baru  di   lokasi  Petea  Pond  2  (selesai  dikonstruksi)  

Foto-foto Fasilitas Pengendapan Sedimen

Rante    Pond  

Fiona  Pond  

Kathryn  Pond  

Petea  Pond  2c  

Loraine  Pond  

Petea  Pond  6  

Kathryn  Pond  

Wawono  Pond  

Hasan  Pond  

INDONESIA

Pemantauan Fasilitas Pengendalian Sedimen

INDONESIA

INDONESIA

Hasil Pemantauan TSS di Titik Penaatan

INDONESIA

Uji Coba Lamella Gravity Settler/LGS

(Mempercepat pengendapan & Efisiensi Luasan) Skema  sederhana  LGS  

Skema  Pilot  Project  LGS  

INDONESIA

Pengelolaan Kualitas Air (Chromium) •  Sumber kromium dalam laterit nikel, 1.7-4.8% (LAPI-ITB, 2005), 1-3.5% (Hulett, 2008) •  Dalam zona limonit, kromium terikat dalam bentuk krom-spinel (55-75%), sisanya terikat pada Goethite •  Dalam zona limonit ini, kromium terikat secara fisik teradsorpsi pada mineral. Lepasnya Cr(6) dari lapisan lateritik dipengaruhi oleh: •  Konsentrasi ion kromit •  Cahaya ultraviolet sebagai oksidator kuat •  Waktu reaksi •  Kondisi kimia fisik (pH-Eh, temperatur, Mn) •  Pengaruh air

INDONESIA

Pengelolaan Kualitas Air (Chromium) Pengelolaan chromium dilakukan dengan mengalirkan Ferrous sulfat/ FeSO4 Fungsi FeSO4 dalam proses pengolahan Cr(6) adalah: •  Untuk mereduksi Cr(6) menjadi Cr(III) •  Memberikan efek ko-presipitasi terhadap Cr(OH)3 yang terbentuk (Asam) (Basa)

INDONESIA

Fasilitas Pengelolaan Chromium LC#3

Fasilitas pengelolaan Fasilitas pengelolaan

INDONESIA

Fasilitas Pengelolaan Chromium

Sensor debit

Titik injeksi

Arah aliran

Proses pengadukan

INDONESIA

Hasil Pemantauan Chromium Total

INDONESIA

Hasil Pemantauan Chromium(VI)

INDONESIA

Rehabilitasi Lahan LAHAN PASCA TAMBANG

BACK FILLING

Reklamasi Belum berhasil

PENATAAN LAHAN

Landscaping, Pengembalian tanah pucuk, Pengendalian erosi & Sedimentasi, Pengaturan sistim drainase

KONSERVASI/PRESERVASI Sumber plasma nutfah Penelitian & pengembangan

Penyelamatan Tanah Pucuk

PERBAIKAN LAHAN

Pembudidayaan Tanaman Produktif

Penanaman cover crop & Jenis-jenis pohon pioneer

KAWASAN HPT/APL

KAWASAN HUTAN LINDUNG

Agroforestry

Restorasi

PEMELIHARAAN

Pemupukan lanjutan, Pembersihan gulma, Penyulaman Pengendalian hama penyakit

PEMANTAUAN

Pertumbuhan, Perkembangan tanah Tingkat suksesi, migrasi fauna, dll.

HUTAN YANG LESTARI/LAHAN PRODUKTIF

INDONESIA

Ilustrasi Rehabilitasi Penataan lahan dan penebaran topsoil

Kompartemen-A

Blue Zone

INDONESIA

Ilustrasi Rehabilitasi Penanaman tanaman penutup tanah dan jenis-jenis pioneer

Kompartemen-A

Blue Zone

INDONESIA

Rehabilitasi Progresif Petea-A Activity

2004

2005

2006

2007

2008

2004

2005

2006

2007

2008

Mining Backfilling Rehabilitation

Anoa Valley Activity Mining Backfilling Rehabilitation

INDONESIA

Status Lahan Tambang Kwt-2, 2013

Sisa lahan terbuka adalah 986 Ha (< 1,100 Ha sesuai komitmen)

Peta Lahan Tambang

INDONESIA

Contoh Desain Penataan Lahan

Pasca tambang

Design setelah penataan lahan

INDONESIA

Foto-foto Rehabilitasi Lahan

INDONESIA

Foto-foto….. (lanjutan)

INDONESIA

04/22/2005

Foto-foto….. (lanjutan)

INDONESIA

INDONESIA

Foto-foto….. (lanjutan)

Sebelum Penanaman

2 bulan setelah penanaman 4 Tahun Setelah

Foto-foto….. (lanjutan)

INDONESIA

Foto-foto….. (lanjutan)

INDONESIA

Multikultur

INDONESIA

Pemeliharaan Tanaman

INDONESIA

Pengayaan Tanaman

INDONESIA

Hasil Pengayaan Tanaman

INDONESIA

Hasil Pengayaan Tanaman

INDONESIA

Suksesi/regenerasi Alami

INDONESIA

Realisasi Reklamasi Lahan 2012 KEGIATAN

RENCANA

REALISASI

Pembukaan lahan

127,4 Ha

111,4 Ha

Rehabilitasi lahan

98,9 Ha

93.5 Ha

Pemeliharaan tanaman

230 Ha

230 Ha

Penanaman tanaman lokal

100 Ha

130 Ha

Biaya rehabilitasi (US $)

5,0 juta

5,8 juta

INDONESIA

INDONESIA

Realisasi Reklamasi Kwt-2, 2013 KEGIATAN

RENCANA

REALISASI

Pembukaan lahan

93,4 Ha

70,4 Ha

Rehabilitasi lahan

82,5 Ha

68,0 Ha

Pemeliharaan tanaman

45,5 Ha

50,4 Ha

Penanaman tanaman lokal

37,5 Ha

40,2 Ha

Biaya rehabilitasi (US $)

3,1 juta

2,5 juta

INDONESIA

Upaya Konservasi Pohon Lokal

Inventarisasi Jenis (Data base)

Pen entu an Prior itas

Kon serv asi ExSitu

Pembuatan Arboretum

Peng umpul an bijih dan perba nyaka n bibit

Penana man pada lahan pasca tamban g (kanopi ≥ 30%)

Upaya Konservasi Pohon Lokal

INDONESIA

Upaya Konservasi Pohon Lokal

INDONESIA

Arboretum

INDONESIA

Arboretum & Taman Tambang

INDONESIA

INDONESIA

Penanaman Jenis-jenis Lokal 2004 - 2011 Tahun tanam

Jumlah pohon (batang)

Luasan (Ha)

2004 - 2007

499,500

450

2008

161,800

150

2009

25,400

25

2010

141,700

140

2011

150,000

150

2012

150,000

150

Total

1,128,400

915

INDONESIA

Persemaian PT. Vale Indonesia

Persemaian PT. Vale Indonesia

INDONESIA

Persemaian PT. Vale Indonesia

INDONESIA

Persemaian PT. Vale Indonesia

INDONESIA

INDONESIA

Keterlibatan Masyarakat dalam Rehabilitasi •  Melalui Kerjasama dengan Community Development, dibentuk 2 koperasi pemuda yang dididik dan dilatih untuk memproduksi kompos dan pembibitan tanaman lokal untuk memenuhi kebutuhan rehabilitasi lahan dengan total nilai sebesar 3 - 4 milyar/tahun. Hingga saat ini telah terserap 40 tenaga kerja dari kegiatan ini •  Dalam kegiatan penanaman dan penataan lahan PT. Vale menggunakan kontraktor lokal yang menyerap lebih dari 500 tenaga kerja (90% adalah tenaga kerja lokal) •  Pembentukan koperasi peternak sapi untuk pemanfaatan tanaman cover crop

INDONESIA

Keterlibatan Masyarakat

Kerjasama Dengan BKSDA Untuk Pemeliharaan Hewan Titipan

INDONESIA

INDONESIA

Kampanye Menanam Bersama

INDONESIA

TERIMAKASIH …………