PROJECT COST : Total capital outlay: Particulars Land Land Development 1 .Factory Shed & Building 2. Total Plant & Machinery 3. Furniture & Fixture & Accessories 4. Security Deposit for power connection of 125 KW. 5. installation , Electrification & Others 6. Preliminary and Pre-operative Expenses 7. Working capital (Margin Money) 8. Project cost 9. working capital loan 10. Total capital investment
Value (Rs. In Lac.) On Lease 5.50 36.22 417.75 3.10 4.74 11.21 5.99 279.81 764.32 839.411 1603.73
Investment structure: Particulars Total Fixed Cost Total Working Capital Total
Value (Rs. In Lac.) 484.51 1119.22 1603.73
COST OF CONSTRUCTION THE COST & DETAILS OF CONSTRUCTION IS GIVEN HERE UNDER Description Main Plant Shed Gantry Shed with staircase & platform office Buildings Store Room Laboratory Building Electric Room Meter Generator Panel Room Security Guard room Including toilet W/C, Toilet Labour Quarters Cum Rest Room Total Cost of the Building Total Cost of the Land & Building
Area 5569 1000 250 700
sq.ft. 807 sq.ft. sq.ft. sq.ft.
100 400 100 100
sq.ft. sq.ft. sq.ft. sq.ft.
300
sq.ft.
Rate (Rs.) 300 sq.ft. 500 400 500
Value / Cost (Rs. In Lacs) 16.71 6.21 5.00 1.00 3.50
300
1.80
300
0.30 0.50
400
1.20 36.22
—
41.72
Plant & Machinery: Amount (Rs) Tankages: a. Bitumen Storage Tank with Insulation capacity 100 MT. with heating arrangement ' b. Bitumen heating tank for Emulsion capacity 40 MT with heating arrangement c. Bitumen heating tank for CRMB & PMB capacity 25 MT with heating arrangement d. Emulsion Processing/Storage tank Capacity 75 MT. with foundation e. CRMB Processing/Storage tank with insulation Capacity 25 MT with foundation f.
PMB Processing/Storage tank with insulation Capacity 25 MT with foundation Decanting Vat with heating arrangement Boiler including installation Capacity 6 lacks calorie Thermic fluid 25 drums Cooling Tower with pipeline Compressor Emulsion Plant: a. Collouid Mill b. Rest of the emulsion plant CRMB/PMB Plant: a. High Shear Mill b. Rest of the crmb/pmb plant Tank Loading Gantry: a. Shed & Structure c. Sheeting & painting b. Gantry pipe line with fittings Emulsion filling machine CRMB / PMB filling machine Empty & Filled barrel conveyor Pipeline, Motors & Valves Total Plant & Machinery Other Fixed Assets : Water Storage Tank K capacity 50 KL Kerosene day Tank with installation capacity 25 KL Diesel Tank with installation capacity 25 KL Electric Panel: MCC main Electric distribution panel Electric Wiring Wires. Cables etc Cabling charges Laboratory Equipments Submersible pump with pipeline HT Electric Equipments Genet including installation: a. 30KVA b. 125 KVA
Amount (Rs)
2 tanks @ Rs
1375000
2750000
1 tank @ Rs
375000
375000
2 tanks @ Rs
285000
570000
4 tanks @ Rs
750000
3000000
2 tanks @ Rs
920000
1840000
2 tanks @ Rs
1020000
2040000
165000
165000
950000
950000
5225 Liters @Rs
11.5
MT @ Rs
2 2
Pes Pes
611325 50000 75000
4000000 4800000
8800000
54000 130000 100000 171600 140000
851000
343200 280000 630000 3600000 35,830,525.00
1 tank @ Rs
375000
375000
1 tank @ Rs
275000
275000
1 tank @ Rs
275000
275000
1
475000
475000
645000 475000
1120000 500000 225000 1500000 1149000
380000 769000 5,944,000.00
Value in Rs. Lacs FURNITURE & FIXTURE Working table. Stool. Office table & Chairs. Almirah. Wooden Rack and Computer & Printer etc. Electrification, Installation & Others towing & Design Charges 125.000 1.25 Erection & Commissioning Charges 800.000 8.00 Others 196.175 1.96 11.21 1.121 175
3.10
PRELIMINARY AND PRE-OPERATIVE EXPENSES Company Formation Expenses 1.05 Establishment / Rent / Rates and Taxes 0.34 Salary and Wages 060 Project Report. Consultant. Technical Fees and market research report TOTAL FIXED CAPITAL 1. Land Development 2. Shed & Building 3. Plant & Machinery 4. Utility Services 5. Furniture & Fixture 6. Electrification. Installation & Others 7. Preliminary & Preoperative Exp. Total Fixed Capital requirement
550 36.22 417.75 4.74 3 10 11.21 5.99 484.51
4.00
5.99
Raw material Requirement for the Production of the proposed products as detailed below: Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9.
Particulars
QTY
Bulk Bitumen Emulsifier Kerosene - SKO Crum Rubber Gilsonite Polymer SBS Cacl2 Misc.(Cacl2. HCL) Packing Materials - Drums 8000
3060 10 45 12 108 40 1.2 16
Unit (MT/KL) MT MT ML MT MT MT MT KL
Sources
IOCL / HPCL Akzo Nobel IOCL/HPCL Middleton Spectrum Spectrum Open market Open market Balmer Lawrie
Rate units Including Transportation 25350.00 186000.00 35000 00 18500.00 26000.00 160000.00 23000.00 80000.00
Cost (Rs. In Lac) 775.71 1860 15 75 222 2808 64.00 0 28 12 80
875.00
70 00
pes
Total Requirement at 100% Capacity utilization For the above calculation is based on one month's requirement. And at 100% capacity utilization
987.44
ANNUAL CONSUMPTION AT :60%
70%
Raw Material a) In MT b) In Rs. (Lacs)
80%
28800 7109.54
33600 38400 8294 46 9479.39
Consumable a) In MT b) In Rs (Lacs)
10.66
1244
1422
Packing a) In Rs. (Lacs)
24.19
28.22
32 26
TOTAL
7144.40
8335.13 9525.86
Amt. in Rs Amt in Rs
POWER PLANNING & COST SATTEMENT OF SALARY AND WAGES Operation (Primary Cost) Plant Manager /Lab In-charge Plant Operator
1 2
40000 21000 21000 7500 7000 6000 6000 9000 10000 8500 15000 10000
Loading/Packing Supervisor Gantry & drum filling operator
1 2
Recanting Tank Operator Casual Labour Lab Assistant Store & Maintenance Manager Logistic & invoicing Maintenance Other Benefit Total Monthly Cost Total Annual Primary Staff Cost
1 2 1 1 1 1
Marketing (Administrative Cost) bd Sales Sales Executive - Kolkata Sales Assistant - Kolkata Sales Executive - Bhubaneshwar Sales Executive - Patna Manager - Special Projects Regional Sales Manager - Guwahati Sales Executive - Ranchi Finance Accoun tant Cashier Manager Administration Peon/Delivery/Collection Boy Inception Office Asst. Manager procurement Purchase Asst Manager HR & IT Total for Marketing & Finance Owner Benefits
1
75000
1 1 1 1 1 1 1
25000 18000 22000 22000 25000 35000 20000 25000
1 1 1 1 1 1 4 1
18000 15000 5000 9000 4500 20000 7500 15000
Amt in Rs
161000 24150 185150 2221800
242000
119000 361000 54150
415150 Total Monthly Cost Total Annual Staff Cost 4981800 Management Technical Team 2 50000 Consultant 1 50000 Managing Director 1 90000 Director 1 60000 EA to MD 1 15000 265000 Owner Benefits 39750 Total Monthly Cost 304750 Total Annual Primary Staff Cost 3657000 Total Man Power & their Annual Cost 36 10860600 The total manpower requirement as envisaged for the project has been estimated on the are Plant
SALES DETAILS (PERANNUM)AFTER WASTAGE (100% UTILIZATION) Sl. no
Products name & quantity
Rate Per Mt. (Rs.)
Value (Rs.in Lao
I.
Bitumen Emulsion -24.000 Ml
2. 3.
CRMB -14,400 MT PMB - 9,600
TOTAL SALE (100%)
-
23,900
5736.00
30000 32,000 TOTAL
4320.00 3072.00 13,128.00
Rs. 13,128.00 Lac.
Actual Sale:Year
Production capacity 60% 70% 80%
1st 2nd 3rd & onwards
Sale value 7876.80 9189.60 10,502.40
After wastage of Raw Materials @ 2% (Final Sale Value) 7719.28 9005.81 10,292.35
COMPUTATION OF WORKING CAPITAL 1st year Particulars
Basis days
Raw materials Work-inprocess Stock of finished products Sundry debtors TOTAL
59.54
Total amount required 277.84
208.38
69.46
3rd Year Total Bank Margin amount Finance money required 317.53 238.15 79.38
92.83
30.95
144.41
108.31
36.10
165.04
123.78
41.26
371.33
278.50
92.83
433.22
324.91
108.51
495.11
371.33
123.78
75%
385.%
289.47
96.49
450.29
337.72
112.57
514.62
385.%
128.66
75%
1119.22
839.41
279.81
1305.76
979.32
326.44
1492.30 1119.22 373.08
Bank finance
Margin money
10
Bank Total finance amount required 75% 238.15
178.61
5
75%
123.78
15
75%
15 45
2nd year Bank Margin finance money
PROFITABILITY STATEMENT Particulars Installed capacity of total products (Pes. In Lac) % of utilization of installed capacity Production during the year (Pes. In Lac.) Sales value of total production. Cost of production Raw Materials Salary & wages Electricity charges Land lease Rent Repair & Maintenance Tax insurance Postage & Stationery/Printing Transport/Conveyance Office expenses Packaging & forwarding Miscellaneous Expenses Depreciation Total cost of production Gross profit Less Interest on loan Preliminary expenses written off @ 10% Profit before tax Taxation Profit after tax Depreciation add back cash accrual Repayment Net Cash Accrual
1st year 48,000
2nd year 3rd sear
4th year
5,h year
48,000
48,000
48,000
48,000
60 28,224 7719.28
70 32.928 9005.81
80 37,632 1029235
80 37,632 10292.35
80 37,632 10292.35
7144.40 108.60 65.10 52.00 2.40 1.20 0.72 6.48 0.42 0.72 0.21 44.33 7426.58 292.70
8335.13 119.46 75.95 52.00 2.64 1.32 0.84 7.56 0.48 0.84 24 39.92 8636.78 369.03
9525.86 130.32 86.80 52.00 2.88 1.44 0.96 8.64 0.54 0.96 0.27 35.95 9S46.62 445.73
9525.86 141.18 86.80 52.00 3.12 1.44 0.96 8.64 0.54 0.96 0.27 32.39 9854.16 438.19
9525.86 142.04 86.80 52.00 3.36 1.44 0.96 8.64 0.54 0.96 0.27 29.20 9852.07 440.28
144.35 0.60 147.75 44.33 103.42 44.33 147.75 43.38 104.37
153.52 0.60 214.91 64.47 150.44 39.92 190.36 80.00 110.36
160.71 0.60 284.42 85.33 199.09 35.95 235.04 80.00 155.04
151.11 0.60 286.48 85.94 200.54 3239 232.93 80.00 152.93
141.51 0.60 298.17 89.45 208.72 29.20 237.92 80.00 157.92
BREAK EVEN POINT (1sl year assessment) Rs.in Lac 7719.28
A. Sales Value B. Variable Cost a) Raw material cost
7144.40
b) Utilities! 80 %) c) Wages d) Interest on W/C loan
52.08 58.79 100.73 7356.00 363.28
C. Contribution(A-B) D. Fixed cost a) Salary/Admn. expenses b) Repair & maintenances c) Utilities (20%) d) Depreciation e) Tax & Insurance f) Interest on term loan
B.E.P
49.81 2.40 13.02 44.33 1.20 43.62 154.38
Fixed cost X 100 =42%
=
Contribution 1. Profit on Sale
:
04% On (PBT).
2. Profit on Investment
:
18% On (PBT).
3. B. E. P.
:
42%
PROCESS FLOW CHART
WATER
Cacl2
HCL
EMULSIFIER
CHEMICAL MIXING TANK
KEROSENE
EMULSIFIER SOLUTION
WATER REQUIRED
STATIC MIXTURE BITUMEN COLLIOD MILL
FINISHED PRODUCTS
FINISHED PRODUCTS TANK
PACKED (BARRELS)
BULK
DESPATCH