Project No.
: Cilacap Resid Fluid Catalytic Craking Project
Contract No.
:
PROJECT MASTER SCHEDULE CILACAP RFCC PROJECT ADHI KARYA SCOPE
Document No. : XXX-00-PL-PR-01302-001 2011
YEAR
NO
DESCRIPTION
I
MILESTONES
II
ENGINEERING
III
PROCUREMENT & CONSTRUCTION
2012
2013
:
ORIGINATOR
: Ardhi
REVIWER
: Risko N
APPROVED
: Silverwin
REV
:B
: 16 January 2012
16-Jan-12
2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
-1
NO DATE
31
32
33
34
35
36
Apr
May
Jun
Jul
Aug
Sep
39
REMARKS
MONTH
CONTRACT AWARD
1
2
3
4
6,7
5
8
13
12
10,11
9
14,15
17
16
18
19
20,21,22
23
24
28,29,30
25.26.27
31,32 33,34
35
36
37
38
39
NO DETAIL DESIGN
BASIC DESIGN
III.1
CIVIL COMMON AREA Temporary Facility
SUB CONTRACT TEMP. FACILITIES
MAIN OFFICE & UTILITY
SITE PREP
TOILET, FENCE, MILL SHELTER, LAYDOWN AREA ALL COMPLETE
WAREHOUSE S/C SOIL INVEST.
INTERIM REPORT FINAL REPORT
Soil Investigation
MOBILIZATION
Mobilization
CONTINUE CONSTR. JETTY
S/C CONST JETTY
Construction Jetty
READY FOR OCCUPANCY ROAD & ACCESS FOR TEMPORARY FACILITY
CONSTRUCTION ACCESS
Road & Acces
Soil Improvement / Site Preparation
SUB CONTRACT SOIL IMPROVEMENT
START PILING ON PROCESS, UTILITY & PLANT BUILDING SOIL FILL & STABILIZATION
SOIL DISPOSAL
START PILING ON OFFSITE
OFFSITE AREA Offshore Work PO
Pile Material
Sea Water Intake System
FABRICATION STEEL PILE
DELIVERY
DREDGING
S/C DREDGING
DECK
PILE CAP
PILING
READY FOR PIPE, EQUIPMENT, E & I INSTALL
DREDGING
PILING
Jetty (64)
PILING
DREDGING
Jetty (68) PO
FABRICATION
1ST DELIVERY
DECK
PILE CAP
Piling (PC)
READY FOR PIPE, EQUIPMENT, E & I INSTALL
PILE CAP
PLANT BUILDING & TANK FONDATION
LABORATORY
DECK
READY FOR PIPE, EQUIPMENT, E & I INSTALL
PIPE RACK & OTHER FONDATION
C/B & S/S COMPLETED
1
1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
9 13 15 17 20 21 30 32 34 36 39 44 45 46 49 51 54 56 63 65 66 70 73 77 78
27
79
28 29 30 31 32 33 34 35 36 37 38 39
87 88 89 91 92 98 99 100 105 112 115 116
Milestone Description 1M-Issue for Approval - Correspondence & Communication Procedure, Document Numbering Procedure, Review & Approval Procedure (1st Issue) 2M-Issue Inquiry for Soil Investigation 3M-Issue Inquiry for Soil Improvement 4M-Site Preparation Start (Land clearing, stripping, mud/bad soil disposing) 5M-Soil Improvement Work Start 6M-Issue Requisition - Tank 6M-Issue Inquiry - Desalination Package 8M-Issue PO to Vendor - Desalination Package 9M-Issue PO to Vendor - Demineralization Package 10M-Issue PO for Tank 10M-Issue PO to Vendor - Seawater Intake Pump 11M-Complete Soil Improvement Construction - Process Area 14M-Piling Work start - Utility Substation Building 15M-Issue for Construction - Foundation Drawing Control Building 15M-1st Tank Plate Delivery to Site - Tank 16M-Complete Soil Improvement - Offsite Area 17M-Tank Foundation Start 19M-Complete Piling for Sea Water Intake 20M-Complete Piling for Utility Area 24M-Complete Spherical Tank Foundation 24M-Delivery to Site - WWT Package 24M-Delivery to Site - Demineralization Package 25M-Delvery to Site - Seawater Intake Pump 26M-Delivery to Site - Switch Gear 27M-Complete Mechanical Erection - Demineralization Package 27M-Complete Mechanical Erection - WWT Package 27M-Control Building and Utility Substation Building Ready for Instrument & Electrical Panel 29M-Complete Mechanical Erection - Desalination Package 29M-Complete Mechanical Erection - Seawater Intake Pump 29M-Ready to Start-up - WWT Package 30M-Complete Mechanical Erection - Sea Water Intake Package 30M-Ready to Start-up - Demineralization Package 30M-Ready to Start-up - Seawater Intake Pump 30M-Ready to Start-up - WWT Package 31M-Ready for Start-up - Desalination Package 34M-Complete Mechanical Erection - Tank (excluding Hydro Test) 35M-Ready to Feed-in - Tank 36M-Mechanical Completion 39M-Operational Acceptance
OTHERS FDN
TANK FOUNDATION
Foundation for Equipment
Milestone No
No
FOLLOW UP
EQUIPMENT FOUNDATION
Building & Shelter GROUND SLAB
Main Control Building
COLUMN AND STRUCTURE
FOUNDATION
FOUNDATION
Process Substation
FOUNDATION
Utility Substation
GROUND SLAB
COLUMN AND STRUCTURE
FLOOR, ME, INTERIOR
ROOF
FLOOR, ME, INTERIOR
PANEL READY
ROOF
FLOOR, ME, INTERIOR
PANEL READY
ROOF
GROUND SLAB COLUMN AND STRUCTURE
PANEL READY
EXTERIOR & FINISHING
FINISHING
FINISHING
PANEL READY FOUNDATION
Water Intake Substation
FOUNDATION
WWT Substation
FOUNDATION
LPG & PP Tank Yard Substation
FOUNDATION
Oil Tank Yard Substation
Spare Parts Warehouse
DEMOLISH EXISTING
Fire Shelter
FLOOR, ME, INTERIOR
COLUMN, STRUCTURE , ROOF & WALL
COLUMN, STRUCTURE , ROOF & WALL
FLOOR, ME, INTERIOR
FLOOR, ME, INTERIOR
COLUMN, STRUCTURE , ROOF & WALL
FLOOR, ME, INTERIOR
COLUMN, STRUCTURE , ROOF & WALL
FOUNDATION
Laboratory Building
FLOOR, ME, INTERIOR
COLUMN, STRUCTURE , ROOF & WALL
PILE/FOUNDATION
FINISHING
PANEL READY FINISHING
PANEL READY
FINISHING
PANEL READY FINISHING
LABORATORY FURNITURE AND EQUIPMENT READY FINISHING
COLUMN, STRUCTURE , ROOF & WALL
FINISHING
FOUNDATION
Field Operator House (4 Nos)
FOUNDATION
Chemical Storage Building
FOUNDATION
Chemical Storage Shed
FOUNDATION
Propylene & Propylene Vapour Return Metering Shelter
FOUNDATION
FOUNDATION
Equip. Shelter (WWT Control Building)
FOUNDATION
Nitrogen Unit Shelter
Fresh Catalyst Temporary Storage Building
FOUNDATION
Spent Catalyst Warehouse
FOUNDATION
Road & Access UTILITY AREA Piling
PERMANENT ROAD
DREDGING
PILING
PILE CAP
DECK
PILING
LOAD TEST
Foundation for Equipment & Pipe Rack
MAJOR FDN
Pipe Rack / Equipment Support
PIPE RACK
Steel Structure
Road & Access
MINOR FDN
STEEL STRUCTURE
PERMANENT ROAD
CONSTRUCTION ROAD
PROCESS Road & Access
CONSTRUCTION ROAD
PERMANENT ROAD
Calendar Date Okt/2011 Nop/2011 Des/2011 Jan/2012 Feb/2012 Mar/2012 Mar/2012 Mei/2012 Jun/2012 Jul/2012 Jul/2012 Agust/2012 Nop/2012 Des/2012 Des/2012 Jan/2013 Feb/2013 Apr/2013 Mei/2013 Sep/2013 Sep/2013 Sep/2013 Okt/2013 Nop/2013 Des/2013 Des/2013 Des/2013 Feb/2014 Feb/2014 Feb/2014 Mar/2014 Mar/2014 Mar/2014 Mar/2014 Apr/2014 Jul/2014 Agust/2014 Sep/2014 Des/2014
Project No.
: Cilacap Resid Fluid Catalytic Craking Project
Contract No.
:
PROJECT MASTER SCHEDULE CILACAP RFCC PROJECT ADHI KARYA SCOPE
Document No. : XXX-00-PL-PR-01302-001 2011
YEAR
NO
III.2
DESCRIPTION
MECHANICAL
2012
2013
:
ORIGINATOR
: Ardhi
REVIWER
: Risko N
APPROVED
: Silverwin
REV
:B
: 16 January 2012
16-Jan-12
2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
-1
NO DATE
31
32
33
34
35
36
Apr
May
Jun
Jul
Aug
Sep
MONTH
31,32
CONTRACT PILING
COMMON AREA
FDN, PIPE RACK SUPPORTFDN, STRUCTURE & ARCHITECTURAL
DELIVERY
PO
Pump API
INQUIRY
Fire Water Pump
INQUIRY
Desalination Package
FABRICATION
PO
DELIVERY
INSTALL
INSTALL
FABRICATION
PO
INQUIRY
Waste Water Treatment
FABRICATION
PO
INQUIRY
Demineralization & Polisher
INSTALL
DELIVERY
FABRICATION
PO
INQUIRY
DELIVERY
INSTALL
DELIVERY
FABRICATION
Hypochloride Generator
INQUIRY
PO
FABRICATION
Chemical Injection Pakcage
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INSTALL
DELIVERY
INSTALL
OFFSITE AREA Sea Water Clarifier
INQUIRY
PO
Loading Arm
INQUIRY
PO
FABRICATION
Spherical Tank
DELIVERY
INSTALL
TEST
FIELD ERECTION
TEST
DELIVERY
FABRICATION
PO INQUIRY
III.3
INSTALL
DELIVERY
FABRICATION
INQUIRY PO
Field Erection Tank
DELIVERY
FABRICATION
FIELD ERECTION
TEST
PIPING DELIVERY PO Pipe Material
Piping INQUIRY
III.4
UTILITY COMPLETE
INQUIRY
FABRICATION
U/G PIPE
A/G
ELECTRICAL DELIVERY
Switchgear & MCC
PO
INQUIRY
INSTALL
FABRICATION
DELIVERY
Power & Distribution Transformer
PO
INQUIRY
AC - DC UPS
PO
INQUIRY
Cathodic Protection System
INQUIRY
PO
Cable Tray
INQUIRY
PO
DELIVERY
FABRICATION
INSTALL
INSTALL
DELIVERY
FABRICATION
DELIVERY
INQUIRY
Telecommunication System
Power Distribution Board
DELIVERY
INQUIRY
INSTALL
PO
FABRICATION
PO
INQUIRY
INQUIRY
III.5
INSTALL
FABRICATION
PO
Bus Duct
INSTALL
DELIVERY
FABRICATION
PO
INQUIRY
Power & Control Cable
INSTALL
FABRICATION
INSTALL
PO
DELIVERY
FABRICATION
PO
INSTALL
DELIVERY
FABRICATION
INSTALL
FABRICATION
INSTALL
INSTRUMENT & CONTROL Pressure Instrument
INQUIRY
Temperature Instrument
INQUIRY
Flow Instrument
PO
DELIVERY
DELIVERY
FABRICATION
PO
PO
INQUIRY
DELIVERY
FABRICATION
FABRICATION
INSTALL
INQUIRY
Analyzer System
DELIVERY
PO
INQUIRY
FABRICATION
INSTALL
INSTALL
DELIVERY
DELIVERY
Bulk Material
INQUIRY
PO
INQUIRY
PO
Cable
INQUIRY
PO
FABRICATION
Pressure Regulating Valve
INQUIRY
Auto Recirculating Valve
INQUIRY
On-Off Valve
INQUIRY
INSTALL
DELIVERY
FABRICATION
DELIVERY
INSTALL
DELIVERY
FABRICATION
PO
INQUIRY
INSTALL
FABRICATION
Junction Box
INSTALL
FABRICATION
PO
INQUIRY
INSTALL
DELIVERY
PO
INQUIRY
Level Instrument
INSTALL
DELIVERY
PO
FABRICATION
PO
INSTALL
INSTALL
DELIVERY
FABRICATION
INSTALL
INQUIRY
PO
DELIVERY
FABRICATION
PO
INSTALL
DELIVERY
INQUIRY
Fire & Gas Field Device
INSTALL
FABRICATION
PO
INQUIRY
Flow Metering
Motor Operated Valve
INSTALL
DELIVERY
Tank Gauging
Control Valve
INSTALL
FABRICATION
FABRICATION
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
ALL COMPLETE
39
REMARKS
Project No.
: Cilacap Resid Fluid Catalytic Craking Project
Contract No.
:
PROJECT MASTER SCHEDULE CILACAP RFCC PROJECT ADHI KARYA SCOPE
Document No. : XXX-00-PL-PR-01302-001 2011
YEAR
NO
III.6
DESCRIPTION
2012
2013
:
ORIGINATOR
: Ardhi
REVIWER
: Risko N
APPROVED
: Silverwin
REV
:B
: 16 January 2012
16-Jan-12
2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
-1
NO DATE
31
32
33
34
35
36
Apr
May
Jun
Jul
Aug
Sep
39
MONTH
PROCESS EQUIPMENT
REMARKS
31,32
CONTRACT
Fire Extinguisher
PO
INQUIRY
DELIVERY
FABRICATION
INSTALL
DELIVERY
Fire Fighting Equipment
INQUIRY
Fire Supression System
INQUIRY
PO
FABRICATION
PO
INSTALL
FABRICATION
DELIVERY
FABRICATION INQUIRY
Pressure Safety Valve
Breather Valve (Flame Arrester)
INQUIRY
Safety & Fire Vehicle
INQUIRY
PO
Fire Alarm & Detecting
IV
PRECOMM
V
MECHANICAL COMPLETION SCHEDULE
DELIVERY
FABRICATION
PO
INSTALL
INSTALL
DELIVERY FABRICATION
PO
INQUIRY INQUIRY
INSTALL
FABRICATION
PO
INQUIRY
INSTALL
DELIVERY
PO
INSTALL
FABRICATION
PO
INSTALL
FABRICATION
DELIVERY
INSTALL
PRECOMM MECHANICAL COMPLETION
PROJECT MONTH
NO
DESCRIPTION
-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
FINAL ACCEPTANCE
…39
View more...
Comments