PROJECT SITE MANAGEMENT CONTROL SYSTEM
( Essential Duties and Responsibilities )
1. To be responsible for the supervision and control of all project activities related to Contracts ( such as : established budgetary constraints ,Quality specification and operational requirements,timeline).
Bertanggung jawab untuk untuk pengawasan pengawasan dan kontrol kontrol pada pada semua aktifitas proyek yang berkaitan dengan kontrak ( ( seperti seperti :: batasan anggaran, spesifikasi spesifikasi mutu,dan mutu,dan persyaratan persyaratan operational, batasan waktu waktu ). ). Sources : Contract documents Contract documents ,catalogs ,catalogs , , SOP ,Regulations, SOP ,Regulations, timeline, etc.
2. To ensure that procedures and controls of construction of construction method and requirements are in place as per internal control requirements/processes.
Memastikan bahwa bahwa prosedur prosedur dan dan kontrol kontrol dari dari persyaratan persyaratan dan metode konstruksi berjalan sesuai sesuai kebutuhan kebutuhan / / proses pengendalian proses pengendalian internal. Sources :ASTM, ACI, :ASTM, ACI, ASCE, ASCE, ASCII, ASCII, JIS, JIS, BS, SNI etc.
3. Provide and review structure design, construction method and procedures for all project process.
Menyediakan dan meninjau ulang desain struktur, metode konstruksi konstruksi dan dan prosedur prosedur untuk untuk semua proses semua proses proyek. proyek. Sources : See ASTM, See ASTM, ACI, ACI, ASCE, ASCE, ASCII, ASCII, JIS, JIS, BS, SNI etc.
4. Provide and prepare quotation ( coordination with estimator team ) when asked.
Menyediakan dan mempersiapkan mempersiapkan penawaran penawaran (koordinasi (koordinasi dengan dengan tim tim penaksir) penaksir) bila diminta. Sources :Preliminary Design :Preliminary Design drawing/ propose propose drawing.
5. Together with estimator team to review and recalculate quantities of of quotation quotation before to be set become a contract.
Bersama dengan tim estimator estimator untuk untuk meninjau meninjau dan menghitung kembali kembali kuantiti kuantiti penawaran sebelum ditetapkan menjadi menjadi sebuah sebuah kontrak. Sources :Design drawing
6.Take the lead on all project schedule reviews and perform other duties as necessary.
Memimpin ulasan schedule schedule proyek proyek dan melakukan tugas lain yang diperlukan (berkaitan). Sources : Master Schedule , daily report / weekly report / monthly report / progress repor,technical report. repor,technical report.
7.To drive the scheduling, procedure controlling and input data to (*next program) database management for designated projects.
Mendorong ( mengarahkan ) scheduling, prosedur kontrol dan input data ke ( *program *program lanjutan ) lanjutan )manajemen manajemen database untuk proyek proyek ‐ proyek proyek yang yang ditunjuk. 1
PROJECT SITE MANAGEMENT CONTROL SYSTEM
( Essential Duties and Responsibilities ) Sources : Master Schedule , SOP, computer data base system.
8. To supervise Monthly Progress reporting cross checking coherence and accuracy between project site reporting and Bill of Quantities figures and to prepare specific reports to General Manager or Project Manager.
Mengawasi Kemajuan Progress Bulanan dengan cara crosscheck yang koheren dan akurat antara laporan lapangan dengan BQ serta menyiapkan laporan khusus kepada General Manajer atau Project Manager. Sources : BQ, Progress report.
9.To prepare any Project reports ( monthly report ), prepare and maintain schedules, develop and review Project baselines, monitor and track progress of Project Activities.
Mempersiapkan semua laporan Proyek (seperti laporan bulanan), mempersiapkan dan memaintain jadwal kerja, mengembangkan dan meninjau baseline proyek, memonitor dan melacak kemajuan Kegiatan Proyek. Sources : Photos project,Master schedule,Project report (daily/weekly/monthly) , BQ, technical report, computer data base.
10. To assist the Team
in producing reports suitable for the needs of the Owner and the
Project team.
Membantu Team membuat laporan yang cocok untuk kebutuhan owner dan team proyek. Sources : Sample report from owner etc.
11. Make Finalization Report at the end of project.
Membuat laporan Finalisasi pada akhir proyek. Sources :as built drawing, total project report.
(*12 next program ). Provide cost control on projects/assets through accurate reporting to enable decision making by project managers.
Menyediakan ( menyiapkan) pengendalian biaya pada proyek ‐ proyek / aset melalui pelaporan yang akurat untuk memungkinkan pengambilan keputusan oleh manajer proyek. Sources : Project cost control excell files, primavera,open project etc.
(*13 next program). Establish numbering scheme for identification of all Project activities and documents.
Membuat skema penomoran untuk identifikasi semua kegiatan dan dokumen Proyek. Sources : BQ, Shop drawing.
(*14 next program). To ensure that the Project produce structured data compatible with the Numbering Procedures . 2
PROJECT SITE MANAGEMENT CONTROL SYSTEM
( Essential Duties and Responsibilities ) Memastikan bahwa proyek menghasilkan data terstruktur yang kompatibel dengan Prosedur Penomoran.` Sources : Civil / ME / Procurement data, Civil departmental procedures.
(*15 next program). Update Project Management Control System with input from Project Construction Management Team ( If necessary ).
Memperbarui Proyek Manajemen kontrol sistem
dengan masukan dari Tim Proyek
Manajemen Konstruksi (Jika diperlukan). Sources : Project journal documentation such as quality report, technical report.
16.Responsible for the protection and promotion of the interest of the Company in all matters.
Bertanggung jawab atas perlindungan dan promosi kepentingan Perusahaan dalam segala hal. Sources :Regulations.
17. Reporting directly to the Project site team leader and Project Manager.
Melapor langsung kepada Pimpinan Team Proyek ( atau ) Manajer Proyek. Sources : Total Project Control Report (1‐ project status ,2‐ project progress,3.‐outstanding
issues ,4‐top issues,(*5)‐ongoing activities,6‐ project plan gantt chart,(*7)‐Burndown chart Planned vs actual,8‐ project timeline ).