Construction Activity Pollution Prevention Site Selection 1 Development Density and Community Connectivity 5 Brownfield Redevelopment 1 Alternative Tr Transportation—Public Tr Transportation Ac Access 6 Alte Alterna rnativ tive e Trans Transpo porta rtati tion— on—Bi Bicy cycle cle Sto Stora rage ge and and Chan Changi ging ng Room Roomss 1 Alternative Alternative Transportation—Lo Transportation—Low-Emitt w-Emitting ing and Fuel-Efficient Fuel-Efficient Vehicles 3 Alternative Transportation—Parking Capacity 2 Site Development—Protect or Restore Habitat 1 Site Development—Maximize Open Space 1 Stormwater Design—Quantity Control 1 Stormwater Design—Quality Control 1 Heat Island Effect—Non-roof 1 Heat Island Effect—Roof 1 Light Pollution Reduction 1
Fundamental Commissioning of Building Energy Systems Minimum Energy Performance Fundamental Refrigerant Management Optimize Energy Performance On-Site Renewable Energy Enhanced Commissioning Enhanced Refrigerant Management Measurement and Verification Green Power
Credit 8.2
0
0
0
Materials and Resources
0
Prereq 1 Credit 1.1 Credit 1.2 Credit 2 Credit 3
Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control Outdoor Air Delivery Monitoring Increased Ventilation Construction IA IAQ Management Pl Plan—During Construction Construction IAQ Management Plan—Before Occupancy Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings Low-Emitting Materials—Flooring Systems LowLow-Em Emitt itting ing Mate Materia rials ls—C —Com ompo posit site e Wood Wood and and Agr Agrif ifibe iberr Prod Product uctss Indoor Chemical and Pollutant Source Control Controllability of Systems—Lighting Controllability of Systems—Thermal Comfort Thermal Comfort—Design Thermal Comfort—Verification Daylight and Views—Daylight Daylight and Views—Views
Innovation in Design: Specific Innovation in Design: Specific Innovation in Design: Specific Innovation in Design: Specific Innovation in Design: Specific LEED Accredited Professional
Storage and Collection of Recyclables Building Reuse—Maintain Ex Existing Walls, Fl Floors, and Ro Roof Building Building Reuse— Reuse—Mai Maintai ntain n 50% of Interio Interiorr Non-Str Non-Structu uctural ral Elemen Elements ts Construction Waste Management Materials Reuse
0 1 to 3 1 1 to 2 1 to 2
Credit 1.2 Credit 1.3 Credit 1.4
0
0
Regional Regional Regional Regional
Priority: Priority: Priority: Priority:
Specific Specific Specific Specific
Credit Credit Credit Credit
0 Total Certified 40 to 49 points
1 1 1 1
Possible Points: 110 Silver 50 to 59 points
Gold 60 to 79 points
Platinum 80 to 110
LEED 2009 for New Construction and Major Renovations
Project Name
Project Checklist 0
0
0
Y
?
N
Y
0
0
0
Y
?
N
Y
Sustainable Sites
Date
Possible Points: 26
d/C
Notes:
C
Prereq 1
Construction Activity Pollution Prevention
d
Credit 1
Site Selection
1
d
Credit 2
Development Density and Community Connectivity
5
d
Credit 3
Brownfield Redevelopment
1
d
Credit 4.1
Alternative Transportation—Public Transportation Access
6
d
Credit 4.2
Alternative Transportation—Bicycle Storage and Changing Rooms
1
d
Credit 4.3
Alter na native Tr an anspo rt rtation —L —Low-E mi mi tt tting and Fuel-Ef fi ficien t Vehi cl cles
3 2
d
Credit 4.4
Alternative Transportation—Parking Capacity
C
Credit 5.1
Site Development—Protect or Restore Habitat
1
d
Credit 5.2
Site Development—Maximize Open Space
1
d
Credit 6.1
Stormwater Design—Quantity Control
1
d
Credit 6.2
Stormwater Design—Quality Control
1
C
Credit 7.1
Heat Island Effect—Non-roof
1
d
Credit 7.2
Heat Island Effect—Roof
1
d
Credit 8
Light Pollution Reduction
1
Water Efficiency
Possible Points: 10 Notes:
d
Prereq 1
Water Use Reduction—20% Reduction
d
Credit 1
Water Efficient Landscaping Reduce by 50% No Potable Water Use or Irrigation
d
Credit 2
Innovative Wastewater Technologies
d
Credit 3
Water Use Reduction
2 to 4 2 4 2 2 to 4
Reduce by 30%
2
Reduce by 35%
3
Reduce by 40%
4
0
0
0
Y
?
N
Energy and Atmosphere
Possible Points: 35 Notes:
Y
C
Prereq 1
Fundamental Commissioning of Building Energy Systems
Y
d
Prereq 2
Minimum Energy Performance
Y
d
Prereq 3
Fundamental Refrigerant Management
d
Credit 1
Optimize Energy Performance
1
Impro Improve ve by 14% 14% for for New Buil Building dingss or 10% 10% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
2
Impro Improve ve by 16% 16% for for New Buil Building dingss or 12% 12% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
3
Impro Improve ve by 18% 18% for for New Buil Building dingss or 14% 14% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
4
Impro Improve ve by 20% 20% for for New Buil Building dingss or 16% 16% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
5
Impro Improve ve by 22% 22% for for New Buil Building dingss or 18% 18% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
6
Impro Improve ve by 24% 24% for for New Buil Building dingss or 20% 20% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
7
Impro Improve ve by 26% 26% for for New Buil Building dingss or 22% 22% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
8
Impro Improve ve by 28% 28% for for New Buil Building dingss or 24% 24% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
9
Impro Improve ve by 30% 30% for for New Buil Building dingss or 26% 26% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
10
Impro Improve ve by 32% 32% for for New Buil Building dingss or 28% 28% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
11
Impro Improve ve by 34% 34% for for New Buil Building dingss or 30% 30% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
12
Impro Improve ve by 36% 36% for for New Buil Building dingss or 32% 32% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
13
Impro Improve ve by 38% 38% for for New Buil Building dingss or 34% 34% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
14
Impro Improve ve by 40% 40% for for New Buil Building dingss or 36% 36% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
15
Impro Improve ve by 42% 42% for for New Buil Building dingss or 38% 38% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
16
Impro Improve ve by 44% 44% for for New Buil Building dingss or 40% 40% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
17
Impro Improve ve by 46% 46% for for New Buil Building dingss or 42% 42% for for Exist Existing ing Buil Building ding Renova Renovatio tions ns
18
Improve Improve by 48%+ 48%+ for New Building Buildingss or 44%+ for for Existing Existing Building Building Renovati Renovations ons d
Credit 2
1 to 19
Impro Improve ve by 12% for New Buildin Buildings gs or 8% for Existi Existing ng Buildi Building ng Renova Renovatio tions ns
On-Site Renewable Energy
19 1 to 7
1% Renewable Energy
1
3% Renewable Energy
2
5% Renewable Energy
3
7% Renewable Energy
4
9% Renewable Energy
5
11% Renewable Energy
6
13% Renewable Energy
7
C
Credit 3
Enhanced Commissioning
2
d
Credit 4
Enhanced Refrigerant Management
2
C
Credit 5
Measurement and Verification
3
C
Credit 6
Green Power
2
0
0
0
Y
?
N
Y
Materials and Resources
Possible Points: 14 Notes:
d
Prereq 1
Storage and Collection of Recyclables
C
Credit 1.1
Building Reuse—Maintain Existing Walls, Floors, and Roof
1 to 3
Reuse 55%
1
Reuse 75%
2
Reuse 95%
3
C
Credit 1.2
Building Reuse—Maintain 50% of Interior Non-Structural Elements
1
C
Credit 2
Construction Waste Management
1 to 2
50% Recycled or Salvaged 75% Recycled or Salvaged C
C
Credit 3
Credit 4
Materials Reuse
1
Reuse 10%
2
Recycled Content 20% of Content
Credit 5
2 1 to 2
Reuse 5%
10% of Content C
1
Regional Materials
1 to 2 1 2 1 to 2
10% of Materials
1
20% of Materials
2
C
Credit 6
Rapidly Renewable Materials
1
C
Credit 7
Certified Wood
1
0
0
0
Y
?
N
Indoor Environmental Quality
Possible Points: 15 Notes:
Y
d
Y
d
Prereq 2
Environmental Tobacco Smoke (ETS) Control
d
Credit 1
Outdoor Air Delivery Monitoring
d
Credit 2
Increased Ventilation
1
C
Credit 3.1
Construction IAQ Management Plan—During Construction
1
C
Credit 3.2
Construction IAQ Management Plan—Before Occupancy
1
C
Credit 4.1
Low-Emitting Materials—Adhesives and Sealants
1
C
Credit 4.2
Low-Emitting Materials—Paints and Coatings
1
C
Credit 4.3
Low-Emitting Materials—Flooring Systems
1
C
Credit 4.4
Low-Emitting Materials—Composite Wood and Agrifiber Products
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.