PROIECT TEHNIC SERA – 10.400 MP
CUPRINS 1. MEMORIU TEHNIC JUSTIFICATIV 2. PLAN FUNDATIE 3. STRUCTURA METALICA 4. SISTEM VENTILATIE 5. MATERIALE ACOPERIRE 6. SISTEM IRIGARE + CEATA 7. SISTEM INCALZIRE 8. DATE ECONOMICE
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 2 of 63
PROIECT TEHNIC SERA – 10.400 MP
CAPITOLUL 1 MEMORIU TEHNIC JUSTIFICATIV
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 3 of 63
PROIECT TEHNIC SERA – 10.400 MP
OBIECTIV: SERA bloc 1. Denumirea obiectivului: Sera de 1,04 ha cu posibilitatea de extindere in viitor. 2. Utilitati existente: Racord electric, sursa de apa, drum de acces pe reteaua rutiera publica. 3. Profilul de productie: Legume in stare proaspata. 4. Fundamentarea necesitatii si oportunitatii: Cererea de legume proaspete tot timpul anului pe piata interna intrece foarte mult capacitatea de productia interna in solarii si sere. Din aceasta cauza, cererea interna se bazeaza pe legume si conserve din import (Turcia, Bulgaria, Grecia, Italia, Ungaria) iar florile taiate sunt importate din Olanda. Serele construite inainte de 1990 au fost dezafectate si vandute ca fier vechi. Tipul de sere construite inainte de 1990 aveau suprafete foarte mari, zeci de ha pana la 150-200 ha sera bloc, care erau exploatate de mari unitati de stat, subventionate de stat. Constructia era din schelet din otel cu travei de 3,2 m si 6,4 m acoperite cu sticla, avand inaltime mica si suprafete imense de acoperis din sticla. In momentul scumpirii combustibilului importat, serele au ramas neincalzite pe timp de iarna si sub greutatea zapezilor s-au prabusit. Este necesara o noua solutie constructiva, adecvata fermelor private actuale. Peste 80% din suprafata agricola a Romaniei apartine micilor proprietari, care sunt interesati sa-si valorifice intensiv terenurile agricole. Cresterea productiei interne in sere asigura calitatea si cantitatile necesare pentru export. Romania a avut o mare piata de export de legume si conserve. Prezentul proiect va fi un model tehnic modern, cu utilajele si tehnologiile cele mai moderne. Constructia de sere in extravilan va fi un prim factor activ pentru dezvoltarea rurala. 5. Productia legumelor in camp este supusa factorilor naturali care pericliteaza adeseori productia agricola, sau o degradeaza. 6. Descrierea obiectivului: Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 4 of 63
PROIECT TEHNIC SERA – 10.400 MP
Prezentul proiect prevede un bloc de 1,04 hhectare. Scheletul serei va fi din profile usoare din otel galvanizat iar acoperisul si peretii exteriori din folie dubla de polietilena cu perna de aer cald. Am ales sera cu latimea traveei de 8 m si inaltime de 3 m la cornise si 4,85 la creasta. Intre cele doua folii de polietilena se insufla aer sub presiune, cu o instalatie cu control automat, pentru a asigura presiunea necesara intre folii. Aerul este un izolator termic excelent.
Climatizarea serei se va face prin ventilatie naturala cu control automat, sistem de umidificare (ceata) cu control automat al temperaturii si umiditatii si sistem de incalzire cu apa calda cu control automat. Pentru asigurarea paramentrilor optimi ai aerului si ai terenului se prevad urmatoarele masuri tehnice: - temperatura aerului si a terenului (incalzire, racire, ventilatie) - umiditatea relativa in sera Asigurarea parametrilor tehnici optimi se face prin folosirea unui echipament modern de monitorizare si control pe baza informatiilor primate de la senzorii interiori si exteriori serei. DESCRIEREA FUNCTIONALA SI TEHNOLOGICA In sprijinul unei exploatari eficiente, trebuie avut in vedere ca urmatori parametrii sa se gaseasca in limitele normale: - temperatura minima a patului de cultura - temperatura minima biologica - temperaturile optime de zi si de noapte - temperatura maxima biologica - temperatura de germinare - continut optim de CO2 - umiditatea relativa a aerului Acesti parametrii ne indica aparatura necesara pentru controlul automat. Incalzirea aerului depinde de diferenta intre temperatura exterioara si temperatura interna necesara, de pierderile de caldura prin pereti si acoperis, de “cubatura unitara” – raportul intre volumul de aer in sera si suprafata terenului acoperit, de orientarea serei, de natura si stadiul culturii, de constructia serei s.a. Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 5 of 63
PROIECT TEHNIC SERA – 10.400 MP
Racirea aerului in sera este necesara pe timp de vara cand temperaturile exterioare pe timpul zilei ating valori ridicate. Racirea se poate obtine prin: - umbrire - ventilatia naturala sau fortata - ceata fina (evaporarea apei). - folosirea foliei cu efect termic pentru acoperirea serei Umbrirea este un procedeu vechi dar putin eficient deoarece nu reduce temperatura in sera sub temperatura exterioara si in plus reduce din lumina, dar in combinatie cu celelalte metode da rezultate destul de bune. Ventilatia naturala este ieftina, iar eficienta ei depinde de vant si de constructia serei. Racirea prin evaporarea apei, sistem “ceata” este eficient daca este combinat cu ventilatia si umbrirea. Solutia aleasa depinde de tipul de constructie al serei, de vant, de orientarea serei, de costul energiei electrice, deci trebuie stabilit printr-un calcul minutios de la caz la caz. Pentru ceata este necesara o presiune de minim 4 bari, cu implicatiile respective.
Umiditatea necesara in sera este asigurata cel mai bine prin termoventilatia cu aer umed sau folosind sistemul de producere a cetei. In cazul serelor pentru producerea rasadului se cere un grad mai ridicat de umiditate, apropiat de umiditatea de saturatie. DESINFECTIA SI DEZINFESTAREA TERENULUI Inainte de inceperea culturii, terenul trebuie dezinfectat. Sunt doua procedee – fizice (prin caldura vaporilor de apa) si chimice, folosind substante chimice adecvate care se introduce prin sistemul de irigare prin picurare. Este recomandata realizarea dezinfectiei din 2 in 2 ani, vara, iar dupa aplicarea acesteia solul trebuie lasat necultivat timp de circa 10 zile. MULTICULTURA SIMULTANA Pentru a valorifica la maximum spatiul protejat, se pot cultiva mai multe specii simultan, fie pe orizontala, fie pe verticala, cu conditia de a fi compatibile intre ele si a suporta acelasi regim climatic. FERTILIZAREA Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 6 of 63
PROIECT TEHNIC SERA – 10.400 MP
Se poate face prin ingrasaminte organice, de preferinta gunoi fermentat maturizat si dezinfectat sau prin ingrasaminte chimice adecvate solului si plantelor respective. FERTIRIGAREA Este procedeul cel mai modern si mai economic, atat ca material, cat si ca monopera, iar uniformitatea fertilizarii este optima. Pentru dozarea exacta a ingrasamintelor aplicate se pot prevedea echipamente computerizate pentru efectuarea fertilizarii. Aceste echipamente masoara in mod continuu electroconductivitatea si PH-ul solului si realizeaza mixarea si aplicarea ingrasamintelor in functie de acesti parametrii. FERTILIZAREA CARBONICA Consta in introducerea de CO2 in sera cand conditiile de temperatura, luminozitate si inchiderea tuturor ferestrelor sunt asigurate. In acest scop, se cer conditii speciale la construirea serei cat si echipamente speciale de automatizare (celule foto electrice, senzori de temperatura maxima si minima, controlul automat al ferestrelor). IRIGAREA Instalatia de irigare in sera este obligatorie, iar aceasta se poate efectua prin picurare (cea mai performanta) sau microaspersie. DENSITATEA plantelor in sera este mai mica decat in camp si depinde de luminozitate. Deci asigurarea luminozitatii este iarasi un element de retinut la proiectare.
VARIANTE CONSTRUCTIVE: Sera acoperita cu folie dubla gonflabila Avantaje: • Folia este mult mai ieftina in comparatie cu sticla • Realizeaza o izolare termica mult mai buna ceea ce duce la o economie de combustibil de pana la 45% • Nu prezinta pericolul distrugerii in cazul caderilor de grindina Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 7 of 63
• • •
•
PROIECT TEHNIC SERA – 10.400 MP Poate fi cu efect termic ceea ce duce la o diferenta de temperatura intre interiorul serei si exterior de pana la 5 grade atat pe timp de iarna cat si vara Are aproape acelasi coeficient de transmitere al luminii ca si sticla Prezinta fenomenul de difuzie al luminii ceea ce reduce cu circa 80% fenomenul de umbrire in sera (frunzele plantei nu se umbresc un ape cealalta ceea ce duce la intensificarea procesului de fotosinteza si implicit la o dezvoltare mai rapida a plantelor) Elimina aproape in totalitate actiunea directa a razelor ultraviolete asupra plantelor ceea ce reduce posibilitatea aparitiei bolilor in cultura
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 8 of 63
PROIECT TEHNIC SERA – 10.400 MP
CAPITOLUL 2 PLAN FUNDATIE
Chapter A
FOUNDATION
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 1 of 63
PROIECT TEHNIC SERA – 10.400 MP
In acest capitol se vor analiza pasii necesari realizarii fundatiei serei. Figura1: Plan sera multispan cu trei travei Lungime: Χ (100 m) Latime: Υ= (13 x 8m=104 m)
100 m
2,5 m
104 m
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 2 of 63
PROIECT TEHNIC SERA – 10.400 MP
Pasul 1: Innainte de inceperea fundatiei avem nevoie de un punct de unde putem incepe (punctul XY-Figura 2). Pornind de la acest punct, la o distanta de 1 m se va infige in pamant un tarus, acest punct constituind punctul de incepere a fundatiei serei (XY).
XY
Figura 2
Figura 3 Pasul 2: Se ia o sfoara si se intinde in partea opusa a punctului XY la o distanta de X metri (lungimea serei) plus 2 sau 3 metri si se infige un tarus in acel punct X (Figura 3). Pasul 3: Cu ajutorul a doi muncitori se procedeaza in acelasi mod ca la pasul 2 pentru cealalta directie. Se va intinde o noua sfoara la o distanta de Y metri (latimea serei) plus 2 sau 3 metri. Pentru a fi siguri ca obtinem un unghi perfect de 90 0 putem face urmatorul control: masuram de la punctual XY 3 m pe directia Y si 4 m pe directia X, obtinandu-se astfel doua puncte pe cela doua directii. In momentul Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 3 of 63
PROIECT TEHNIC SERA – 10.400 MP
in care distanta dintre cele doua puncte nou obtinute masoara exact 5 m (Z = 5 m) se pot bate cei doi tarusi in pamant in punctele X si Y (Figura 3).
Figura 4 Pasul 4: In punctual X din figura 3 trebuie procedat la fel ca in cazul pasilor 2 si 3. Asta inseamna ca trebuie intinsa o sfoara la distanta de Y metri si apoi se face controlul cu distanta Z=5m (pasul 3) apoi se infige un tarus in pamant in punctual respective. In acest mod se obtine punctual X1Y1 (Figura 4). Pasul 5 : In final se intinde o sfoara intre punctual Y si X1Y1 pentru a obtine colturile serei (Figura 4).
Figura 5
104 m 100 m
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 4 of 63
PROIECT TEHNIC SERA – 10.400 MP
Pasul 6: In acest moment se poate incepe marcarea punctelor unde urmeaza sa fie montati stalpii. Cu ajutorul a trei muncitori si a unei sfori, la o distanta de A metri (latimea traveei) din punctual XY spre punctual X, se va incepe sa se intinda sforile care vor marca traveele serei. Dupa aceea, cu ajutorul a trei muncitori si a unei sfori, se incepe de la punctele XY si Y sa se masoare lungimi egale de 2,5 m (sau distanta exacta intre stalpi) si se marcheaza punctele de intersectie cu sforile deja instalate anterior (Figura 5).
Pasul 7: In acest moment se vor sapa in pamant gropi adanci de 800 mm, avand un diametru de 500 mm, la cele doua capete ale serei si la jumatatea acesteia. Si se vor monta stalpii in beton. Este necesar sa se monteze stalpii cu o panta de 0,5% pentru a asigura curgerea apei pe jgheaburi. Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
PROIECT TEHNIC SERA – 10.400 MP
Page 5 of 63
Pasul 8: In final se vor sapa toate gropile pentru stalpii serei si se vor monta si restul de stalpi.
Stalp
DIMENSIUNI STALP FUNDATIE
ATENTIE Cand toate gropile sunt sapate Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 6 of 63
PROIECT TEHNIC SERA – 10.400 MP
0,16 m3 beton/groapa
CAPITOLUL 3 STRUCTURA METALICA
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
PROIECT TEHNIC SERA – 10.400 MP
Page 7 of 63
DIMENSIUNI MODUL • • • • • • •
LATIME MODUL LATIME TRAVEE NUMAR TRAVEE MODUL LUNGIME MODUL INALTIME LA VARF INALTIME LA JGHEAB ARIE TOTALA ACOPERITA
104 m 8m 13 100 m 4,85 m 3m 10400 mp
STRUCTURA Este realizata din teava galvanizata Z 275 si are urmatoarele rezistente: -
vant : 125 km/ora zapada 75 kg/mp grad de incarcare al cuturii: 15 kg/mp • • • • • • • • •
STALPI 60mm x 2,2mm ARCURI DE CERC 60 mm diametru x 1,8 mm grosime perete BARA SUPORT CULTURA 32mm diametru x 1,8 mm RAMFORSARE SUPORT CULTURA 32mm diametru x 1,5 mm RAMFORSARE CENTRALA 32mm diametru x 1,8 mm RAME RAMFORSARE 60mm diametru x 1,5 mm RAMFORSARE VANT 32mm diametru x 1,5 mm DISTANTA INTRE FIECARE ANSAMBLU STALP/ARC 2,5 m JGHEAB Facut din foaie de tabla galvanizata 1,5 mm * 50 cm
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 8 of 63
PROIECT TEHNIC SERA – 10.400 MP
USILE SEREI Sera va fi echipata cu doua usi glisante acoperite cu policarbonat de 6 mm. Dimensiunile usilor sunt de 2,63m x 2,63m.
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 1 of 63
PROIECT TEHNIC SERA 10.400 MP
DESCRIEREA MATERIALELOR CE INTRA IN COMPONENTA SEREI TEAVA GALVANIZATA Ф = 1” ; ½” S = 1,8 mm pt bara support cultura si ranforsare centrala – 1” S = 2,6 mm bara ½” ranforsari + ventilatie laterala
SINA ALUMINIU PRINDERE FOLIE
SINA PVC PRINDERE FOLIE
SINA PVC SIGURANTA Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 2 of 63
PROIECT TEHNIC SERA 10.400 MP
CLIPS PLASTIC ½ - FOLIE VENTILATIE LATERALA
CLEMA PRINDERE 1’’
CLEMA PRINDERE 2’’ Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 3 of 63
PROIECT TEHNIC SERA 10.400 MP
CLEMA PRINDERE ½’’
CLEMA PRINDERE IN CRUCE ½’’ Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 4 of 63
PROIECT TEHNIC SERA 10.400 MP
CLEMA PRINDERE IN CRUCE 2’’
CLEMA PRINDERE IN CRUCE 1’’ Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 5 of 63
PROIECT TEHNIC SERA 10.400 MP
BARA RIGIDIZARE STALP ARC
NOTA: Acelasi model de bara dar cu lungimi diferite pentru: contravantuiri si bara rigidizare in X = 4 m, bara rigidizare arc = 1,95 m
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 6 of 63
PROIECT TEHNIC SERA 10.400 MP BARA RIGIDIZARE CENTRALA
MANIVELA VENTILATIE LATERALA
STALP FUNDATIE Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 7 of 63
PROIECT TEHNIC SERA 10.400 MP
STALP SERA
JGHEAB - MIJLOC
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 8 of 63
PROIECT TEHNIC SERA 10.400 MP
CAPAT JGHEAB
JGHEAB CAPAT Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 9 of 63
PROIECT TEHNIC SERA 10.400 MP
DRENAJ
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 10 of 63
PROIECT TEHNIC SERA 10.400 MP JGHEAB LATERAL
PIESA CONECTARE Y
CREMALIERA – VENTILATIE PANOU RABATANT Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 11 of 63
PROIECT TEHNIC SERA 10.400 MP
SUPORT MOTOREDUCTOR
MOTOR ELECTRIC 0,5 HP Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 12 of 63
PROIECT TEHNIC SERA 10.400 MP
PIESA SUSTINERE CREMALIERA
CLEMA FIXARE CREMALIERA Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 13 of 63
PROIECT TEHNIC SERA 10.400 MP
PIESA SUSTINERE BARA TRANSMISIE MOTOREDUCTOR
ROATA DINTATA Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 14 of 63
PROIECT TEHNIC SERA 10.400 MP
PIESA CUPLARE BRAT RABATANT
CONECTOR ARCE
SCHEMA ANSAMBLU STRUCTURA SERA Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
PROIECT TEHNIC SERA 10.400 MP
Page 15 of 63
9
6
1 0
7 4 2 11
1 3
8
Nr. 1 2 3 4 5 6 7 8 9 10 11
5
ELEMENTE PRINCIPALE Descriere Stalp 2” 1,1 m – fundatie, 2,4 m - sustinere Arc Φ60 mm Bara support cultura Φ33 Bara ranforsare arc Φ33 Bara ranforsare Φ33 x 4 m Jgheab mijloc Jgheab lateral Bara ranforsare contravantuire Φ33 x 4 m Bara rigidizare centrala Φ33 Bara rigidizare – support cultura ½” Bara rigidizare stalp - arc Φ33 x 1,95 m
MONTAJ ARCE Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 16 of 63
PROIECT TEHNIC SERA 10.400 MP
PASUL 1: Asamblarea arcelor din mijloc NOTA IMPORTANTA Initial se monteaza arcel pe sol dupa care se monteaza pe stalpii fundatiei
Detaliu A – imbinare bara rigidizare – arc - stalp
Conector Y Stalpii si arcele se vor asigura cu suruburi autofiletante ¼’’X19
DETALIU A Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 17 of 63
PROIECT TEHNIC SERA 10.400 MP
ATENTIE: barele de rigidizare se vor monta ca in DETALIU A pe aceeasi parte a clemelor de inbinare
Innaintea inceperii confectionarii arcelor se va construi un model care se va aseza pe cutii de lemn astfel in cat sa formeze o suprafata perfect plana
CONSTRUIREA MODELULUI Dupa montarea arcului si asigurarea imbinarilor cu suruburi autofiletante se vor monta 6 cleme 2” ca in figura de mai jos. Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 18 of 63
PROIECT TEHNIC SERA 10.400 MP
Stalp sau arc
Clema imbinare 2”
Support plan
Surub autofiletant
DETALIU CONECTOR Y Arc
Suruburi M8X25 Surub autofiletant ¼’’X19 Surub autofiletant ¼’’X19
Bara support cultura Φ33
Bara support cultura Φ33 Surub + piulita M8X25
Piesa Y intermediara Surub autofiletant Stalp
Initial se vor conecta cele doua piese ale conectorului Y folosind suruburi cu piulita M8 fara a le strange la maxim. Dupa aceea se introduc arcele si Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 19 of 63
PROIECT TEHNIC SERA 10.400 MP
stalpii, se strang suruburile si se asigura arcele si stalpii cu suruburi autofiletante.
NOTA IMPORTANTA
In monentul montarii arcelor se va monta si piesa de sustinere bara transmisie motoreductor ca in detaliul de mai jos
Piesa sustinere bara transmisie motoreductor
Clema imbinare 2”
La fel ca si modelele din mijloc se vor monta si modelele de margine. NOTA IMPORTANTA: Pentru toate arcele se va monta piesa de conectare in Y doar pe o singura parte. Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 20 of 63
PROIECT TEHNIC SERA 10.400 MP
DETALIU PIESA DE CONECTARE Y - LATERAL
IMPORTANT Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 21 of 63
PROIECT TEHNIC SERA 10.400 MP
DUPA TERMINAREA STRUCTURII STALPII SE VOR ASIGURA CU STALPII DIN FUNDATIE CU SURUBURI!
STALP SURUB + PIULITA M6x70
STALP FUNDATIE
MONTAREA PRIMELOR ARCE PE FUNDATIE Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 22 of 63
PROIECT TEHNIC SERA 10.400 MP
Se monteaza primele patru arce pe fundatie dupa care se vor monta clemele de prindere ca in detaliul de mai jos. Se va incepe montarea barelor de rigidizare longitudinale.
Piesa prindere 1’’
Piesa prindere 2’’
Conectarea barelor de rigidizare de 1” intre ele se va FACE ca in detaliul de mai jos cu ajutorul suruburilor autofiletante Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 23 of 63
PROIECT TEHNIC SERA 10.400 MP
Detaliu bara rigidizare 1’’ Bara rigidizare cu mufa TATA
Surub autofiletant
NOTA: DISTANTA INTRE ARCE SI STALPI TREBUIE SA FIE EXACTA IAR STALPII SE VOR POZITIONA CU AJUTORUL BOLOBOCULUI ASTFEL INCAT SA FIE PERFECT VERTICALI.
MONTAJUL RANFORSARILOR Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 24 of 63
PROIECT TEHNIC SERA 10.400 MP
DUPA MONTAREA BAREI DE RIGIDIZARE CENTRALE SE VOR MONTA BARELE PENTRU RANFORSAREA TRAVEEI CA IN DETALIUL DE MAI JOS VEDERE DE SUS
MODUL DE PRINDERE AL BARELOR DE RANFORSARE PE STALPI SI ARCE
Montarea jgheabului
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 25 of 63
PROIECT TEHNIC SERA 10.400 MP
Vedere generala jgheab
Montarea jgheabului va incepe din punctual de drenaj. Prima data se va monta jgheabul de drenaj iar apoi, peste acesta se vor monta celelalte tronsoane de jgheab, Montajul se va face ca in detaliul de mai jos. Jgheab capat
Jgheab
Surub + piulita
Detaliu P
Conector Y intermediar
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 26 of 63
FATA
PROIECT TEHNIC SERA 10.400 MP
SPATE
Detail P
Tronsoanele de jgheab se vor monta unul dupa celalalt ca in figura de mai jos
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 27 of 63
PROIECT TEHNIC SERA 10.400 MP
Drenaj Jgheab capat
Jgheab
Dupa conectarea tuturor jgheaburilor se vor izola inbinarile
Dupa montarea jgheaburilor se va monta sina de aluminium ca in detaliul de mai jos
Surub autofiletant Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 28 of 63
PROIECT TEHNIC SERA 10.400 MP Sina aluminiu
Jgheab
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 29 of 63
PROIECT TEHNIC SERA 10.400 MP
CAPITOLUL 4 SISTEM VENTILATIE
MONTAREA SISTEMULUI DE VENTILATIE
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
PROIECT TEHNIC SERA 10.400 MP
Page 30 of 63
Pentru a monta panoul rabatant se va monta un conector ½” cu ajutorul unei cleme de asamblare de ½” si o garnitura de ¾” intre cleme si bratul rabatant. Aceasta este necesara pentru a evita contactul intre bratul rabatant si clema de imbinare.
½’’ Clema imbinare
½’’ Conector
Surub autofiletant
Se va monta bratul rabatant terminal in asa fel incat panza acestuia sa acopere primul arc. Pentru bratul terminal (brat dublu) se va monta conectorul ½”, Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
PROIECT TEHNIC SERA 10.400 MP
Page 31 of 63
garnitur ¾”, primul brat, clema asamblare ½”, garniture ¾” sic el de al doilea brat. Nu uitati sa asigurati clema de imbinare de 2”cu suruburi autofiletante ½’’ Conector NOTA: Trebuiesc desfacute suruburile autofiletante de pe conectorul bratului dublu, acestea fiind necesare doar pentru transport. Brat spate Panza Brat fata cu ½’’ tub
Window shaft
BRAT TERMINAL FEREASTRA
Toate celelalte brate rabatante trebuiesc montate ca in Detaliul P. Pentru fiecare arc trebuie montata o clema de imbinare (½’’ & 2’’) si apoi un conector ½’’, garnitura ¾’’ si bratul rabatant. Detaliu P BRAT-GARNITURA-½’’ CLEMA ASAMBLARE ¾’’ Garnitura
Brat rabatant
½’’ Clema asamblare
Conector
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 32 of 63
PROIECT TEHNIC SERA 10.400 MP
Cand se monteaza bratul rabatant trebuie avut grija ca acesta sa fie la 4 cm distanta de margine.
Detaliu cremaliera Capatul cremalierei se prinde cu ajutorul clemei de prindere, prin surub cu piulita, de bratul rabatant
Cremaliera
Detaliu cremaliera
Pozitie
1. Se va monta suportul cremalierei pe roata dintata. 2. Se introduce cremaliera prin suport ATENTIE You must install the Rack Facing the Rack gear
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 33 of 63
PROIECT TEHNIC SERA 10.400 MP
Se monteaza bara de rigidizare de ½”de la capetele panoului rabatant.
Instalati bara de rigidizare de ½” de-a lungul solarului ca in detaliul de mai jos. 1/2’’ segment bara
Surub autofiletant
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 34 of 63
PROIECT TEHNIC SERA 10.400 MP
AUTOMATIZARE SISTEM VENTILATIE
Panoul de automatizare cuprinde: Senzor de temperatura care masoara temperature in interiorul serei si comanda deschiderea sau inchiderea panourilor rabatante in functie de temperature din interiorul serei. Senzor de vant care comanda deschiderea sau inchiderea panourilor rabatante in functie de viteza vantului. Cheie comanda: STOP, AUTOMAT, MANUAL Intrerupator general Buton INCHIS – DESCHIS pe manual Programatoare senzori VENTILATIE LATERALA
Ventilatia laterala se realizeaza manual prin roluire. Aceasta se deschide pe timpul zilei cand temperature exterioara depaseste 15 grade si can conditiile atmosferice o permit (viteza vantului nu este mai mare de 25 Km/h. Pe partile laterale folia va fi intr-
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 35 of 63
PROIECT TEHNIC SERA 10.400 MP
CAPITOLUL 5 MATERIALE ACOPERIRE
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 36 of 63
PROIECT TEHNIC SERA 10.400 MP
Sera va fi acoperita dupa cum urmeaza:
Pe acoperis va fi prevazuta folie dubla gonflabila Pe partile laterale, in speta ventilatia laterala, un singur strat de folie Frontoanele fata – spate vor fi acoperite cu folie dubla gonflabila Usile vor vi culisante si vor fi acoperite cu policarbonat
Caracteristicile foliei:
Grosime 180 microni Garantie 3 ani Durata de viata 7 ani Efect termic Efect de difuzie a luminii Efect antipicurare 3 straturi
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 37 of 63
PROIECT TEHNIC SERA 10.400 MP
CAPITOLUL 6 SISTEM IRIGARE PRIN PICURARE - CEATA
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
PROIECT TEHNIC SERA 10.400 MP
Page 38 of 63
SCHEMA DE PRINCIPIU – VEZI ANEXA Sistemul de fertirigare prin picurare cuprinde: 1. Linii de picurare
12 linii pe travee 16 mm diametru 30 cm distanta intre picuratori Debit pe picurator 2 l/h Cantitate totala: 15.600 m
2. Cap control metalic
Diametru racord – 2 1/2” Vopsit in camp electrostatic Debit maxim 30 mc/h Cuprinde: separator hidrociclon, filtru, manometre Cantitate: 1
3. Rezervor fertilizare 90 l Cantitate: 1
4. Electrovalve
Diametru 2” Debit maxim 40 mc/h Tensiune de lucru 24 VAC Cantitate totala: 6
5. Programator electronic Numar maxim electrovalve: 9 Tensiune de lucru: 24 VAC Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 39 of 63
PROIECT TEHNIC SERA 10.400 MP
Posibilitatea programarii diferentiate pe zile Numar maxim de porniri pe zi 4 Cantitate: 1 Conform schemei anexate, de la unitatea centrala, montata in incinta centralei termice, se va pleca cu conducta de 75 mm pe langa aleea betonata de pe mijlocul serei. De o parte si de alta a aleei s-au prevazut cate 3 hidranti de 2”. De la hidrant se va merge ingropat pana la marginea serei, unde se va monta stangadreapta conducta de distributie cu diametrul de 63 mm. Liniile de picurare se vor monta in conducta de distributie cu ajutorul robinetilor de 16 mm si vor avea capatul, cu dop pentru spalare, la marginea aleei. Lista partilor componente ale sistemului de irigare prin picurare
Cap control metallic 2 ½” Rezervor fertilizare 90 l Conducta PE 75 mm Pn6 Conducta PE 63 mm Pn 6 Linie picurare DL 16 mm Robinet DL 16 mm Adaptor 16 x 3/4” + dop ¾” Cot compresiune 75 mm Cot compresiune 63 mm Adaptor 75 x 2 ½” FE Adaptor 63 x 2” FE Sa 75 x 2” Sa 63 x 1” Dop compresiune 63 mm Dop compresiune 75 mm Mufa 63 mm Mufa 75 mm Teu compresiune 63 mm Robinet PVC 2” Electrovalva ICV 2” Electrovalva ICV 1” Aerisitor 1” Sa 63 x ½” Manometru 6 bar Programator 9S Cablu electric Vana hidraulica (regulator pres.) 2
1 buc 1 buc 200 m 550 m 15.600 m 320 buc 320 buc 6 buc 30 buc 4 buc 30 buc 6 buc 6 buc 12 buc 1 buc 10 buc 5 buc 6 buc 6 buc 6 buc 1 buc 6 6 6 1
buc buc buc buc
½”
400 m 1 buc
Sistemul functioneaza automat, inclusiv fertilizarea, prin programarea sa in timp. Statia de pompare functioneaza automat pe baza de presostat Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 40 of 63
PROIECT TEHNIC SERA 10.400 MP
Pe fiecare travee s-au prevazut cate 12 linii de picurare. Sera a fost impartita in 6 sectiuni, fiecare fiind deservita de catre o electrovalva. Debit total necesar pe fiecare sectiune: 18 mc/h
SCHEMA DE PRINCIPIU (VEZI ANEXA) Sera a fost impartita in trei sectiuni, fiecare sectiune fiind deservita de catre un hydrant echipat cu electrovalva, robinet PVC, aerisitor si manometer. Sectiunile sunt: sectiunea de producere rasad, sectiunea 1 – 5000 mp, sectiunea 2 – 5000 mp. Fiecare sectiune este deservita de catre un senzor de umiditate care mentine pe fiecare sectiune in parte o umiditate constanta, in concordanta cu o valoare presetata. Pe fiecare travee au fost montate cate doua linii cu aspersoare, la distanta de 4 m intre ele. Aspersoarele pentru ceata au fost montate din 2 in 2 metri Lista partilor componente pentru sistemul de ceata Conducta PE 63 mm Pn 6 150 m Conducta PE 50 mm Pn 6 200 m Conducta PE 32 mm Pn 6 2600 m Robinet PVC 1” 56 buc Robinet PVC 2” 2 buc Aspersor ceata 1300 buc Dop compresiune 32 mm 56 buc Sa 50 x 1” 56 buc Sa 63 x 1” 4 buc Sa 40 x 1” 10 buc Sa 63 x ½” 2 buc Sa 40 x ½” 1 buc Manometru 6 bar 3 buc Niplu 1” 56 buc Cot compresiune 63 mm 10 buc Teu compresiune 63 mm 4 buc Teu compresiune 50 x 1 ½” FE x 50 mm 4 buc Adaptor 63 x 1 ½” FI 4 buc Dop compresiune 50 mm 8 buc Adaptor 63 x 2” FE 8 buc Cot compresiune 40 mm 6 buc Adaptor 40 x 1” FE 4 buc Conducta PE 40 mm Pn 6 50 m Sa 40 x 1” FE 10 buc Aerisitor 1” 3 buc Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 41 of 63
PROIECT TEHNIC SERA 10.400 MP
Electrovalva ICV 2” Electrovalva ICV 1” Senzor umiditate Controler sensor – electrovalva Bride plastic Cablu electric
2 buc 1 buc 3 buc 2 buc 3000 buc 300 m
Sistemul functioneaza automat, in functie de umiditatea din sera Pe fiecare travee s-au prevazut cate doua coloane cu aspersoare, la distanta de 4 m intre ele. Pe fiecare linie, lunga de 50 m s-au prevazut cate 25 aspersoare, montate din 2 in 2m Debitul necesar unei linii este de 0,7 mc/h Sera a fost impartita in trei sectiuni, debitul necesar pe sectiune fiind de 18 mc/h si 0,7 mc/h Fiecare linie are prevazut la ambele capete robineti pentru operarea manuala si pentru spalarea periodica.
CAPITOLUL 7 SISTEM INCALZIRE
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 42 of 63
PROIECT TEHNIC SERA 10.400 MP
SCHEMA DE PRINCIPIU (VEZI ANEXA) Puterea totala instalata este de 2.500.000 Kcal/h ceea ce asigura o diferenta de temperature de 40 grade. In acest sens s-au prevazut doua cazane de 1.000.000 Kcal/h si un cazan de 500.000 Kcal/h. Cazanele functioneaza cu combustibil solid, alimentarea acestora facandu-se manual. Sera a fost impartita in trei sectiuni dupa cum urmeaza: Sectiunea 1 – producere rasad, Sectiunea 2 – 5000 mp, Sectiunea 3 – 5000 mp. Fiecare sectiune poate fi controlata independent fiind deservita de cate o pompa de circulatie agent termic. Controlul temperaturii se face prin intermediul senzorilor de temperature amplasatii in sera. Serpentinele sunt din polipropilena si au fost prevazute cate o serpentine pe fiecare rand de plante. Temperatura maxima de lucru 110 grade. Centrala termica este echipata cu vase de expansiune, panouri comanda control, cosuri fum, tevi metalice transport si distributie agent termic, distribuitor, collector, pompe circulatie etc. Exclus din oferta constructia necesara amplasarii centralei.
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 43 of 63
PROIECT TEHNIC SERA 10.400 MP
CAPITOLUL 9 PRETURI Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 44 of 63
PROIECT TEHNIC SERA 10.400 MP
OBLIGATII IN SARCINA CLIENTULUI toate uneltele si utilajele necesare realizarii lucrarii pregatirea terenului pentru realizarea constructiei serei ( inclusiv demolarea constructilor de pe teren-daca este cazul ) sapaturile pentru fundatia stalpilor betonul si toate materialele extra pentru fundatie racordul la utilitati costurile aferente betonului si alte materiale necesare pentru fixarea stalpilor si a centurii serei ( daca este cazul ) asigurarea unei echipe de 10-12 muncitori pe perioada realizarii proiectului asigurarea utilajelor pentru descarcarea echipamentelor ( macara, motostivuitor,etc… ) taxe, autorizatii, licente, aprobari ori ce alt cost ce poate apare pe parcursul elaborarii si implementarii proiectului PRETURI Preturile nu includ TVA si sunt in conditia de livrare loco client Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 45 of 63
PROIECT TEHNIC SERA 10.400 MP
Pret structura metalica + ventilatie + folie dubla gonflabila: 189.000 Euro + TVA Pret sistem incalzire apa calda + montaj sistem incalzire: 159.000 Euro + TVA Pret paturi producere rasad: 2.800 Euro + TVA Pret sistem irigare prin picurare: 6.500 Euro + TVA Pret sistem ceata automat, 3 sectoare: 12.500 Euro + TVA Pret instalatie pompare GRUNDFOSS 18 mc/h – 5 bar: 3.600 Euro + TVA Supervizare montaj sera – 2 luni: 6000 Euro + TVA TOTAL PROIECT: 379.400 Euro + TVA Nota: sistem incalzire aer cald (8 generatoare x 300.000 Kal/h + 1 generator 120.000 Kcal/h) combustibil solid: 76.500 Euro + TVA CONDITII DE PLATA - 30% avans - 40% la livrarea materialelor - 30% la finalizarea proiectului ( in termen de maxim 70 zile de la livrare ) Pentru platile doi si trei se vor garanta cu scrisoare de garantie bancara. Plata se va face la cursul Alpha Bank din ziua efectuarii platii
GARANTII Furnizorul garanteaza buna functionare a materialelor si echipamentelor oferite dupa cum urmeaza: 10 ani pentru structura de rezistenta in conditile de rezistenta date in oferta 24 luni pentru restul de echipamente ale serei Garantia se ofera in conditia in care montajul se va efectua de catre client, cu supervizarea tehnica din partea furnizorului. Nu fac obiectul garantiei bunurile furate, distruse sau deteriorate in urma exploatarii necorespunzatoare VALABILITATEA OFERTEI Oferta este valabila pana la 01 Martie 2006 TERMEN DE LIVRARE :
40 zile de la data achitarii avansului.
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 46 of 63
PROIECT TEHNIC SERA 10.400 MP
SC AGRIPROJECTS SRL Director Tehnic Ciprian Nae-Patrascu
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects
Page 47 of 63
PROIECT TEHNIC SERA 10.400 MP
Adresa: Bucuresti, Bulevardul Decebal, Nr. 16, Sector 3, Bloc S5, Sc. A, Et. 3, Ap. 8 Tel: 021 3215368; Fax: 021 3264906; E-mail:
[email protected] Banca: Alpha Bank – Marriott, Cont lei: RO18BUCU032350282511RO01
Agriprojects