DAILY MANPOWER/EQUIPEMENTS REPORT
*MANPOWER STATUS
Wednesday, June 26, 2013
DESCRIPTION
NO.
PREVIOUS TOTAL Manhours
1
SURVEYOR
M/D
253
2555
1
10
2565
2
GENERAL FORMAN
M/D
202
2050
1
10
2060
3
FOREMAN
M/D
261
2616
1
10
2626
4
LEAD MAN
M/D
1179
11994
7
70
12064
5
CLADDING FORMAN
M/D
129
6
STEEL ERECTOR
M/D
4672
7
RIGGERS
M/D
1027
8
WELDER
M/D
9
LABOR /HELPER
M/D
10
FLAGMAN
M/D
120
1260
3
30
1290
11
SCAFFOLDER
M/D
720
7460
5
50
7510
12
ClLADDING INSTALLER
M/D
70
4840
5
50
4890
13
DRIVER
M/D
209
3192
1
14
MAN LIFT OPERATOR
M/D
1735
17720
15
TRUCK OPERATOR
M/D
16
FORK LIFT OPERATOR
M/D
305
17
CRANE OPERATOR
M/D
1240
18
WATER TANK DRIVER
M/D
DIRECT SUBTOTAL TOTAL MANPOWER(DIRECT+INDIRECT)
287 263 228 241 278 276 250 293 50 135 207 144 241 123 123 2462
632
2707 2621 2238 2203 2044 2454 1870 2946 528 1360 1944 1312 2426 1240 1240 27531
UNIT
140
EXPAT 1 1 1 1 1
SAUDI
Manhour
#
M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D
SAUDI
Total Manhours
INDIRECT SITE MANAGER HSE MANAGER SENIOR CONSTRUCTION ENGINEER MECHANICAL QA/QC INSPECTOR PURCHASING OFFICER PUBLIC RELATION OFFICER QA/QC SUPERVISOR SAFETY OFFICER SAFETY ASSISTANT SECRETARY DOCUMENT CONTROLLER QA/QC ASSISTANT STORE KEEPER/TIME KEEPER MALE NURSE OFFICE BOY INDIRECT SUBTOTAL DIRECT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
UNIT
EXPAT / total days
1 1
1 1 1 1 1 1 1 1 11 EXPAT
910
1
48936
24
10600
6
4 LOCAL
2
10 10 10 10 0 8 10 10 8 10 8 0 10 10 10 124 TOTAL
2717 2631 2248 2213 2044 2462 1880 2956 536 1370 1952 1312 2436 1250 1250 29257
0
910
256
49192
60
10660 0 0
110
1
18
3210
10
100
17820
3105
1
10
3115
12775
4
40
12815
130,013 157,544
70
714
0 130,727 159,984
0
12122
250
DESCRIPTION
QTY
3
*EQUIPMENT STATUS
S.No.
NAMES
TOTAL Days previous Hours.
Today hours
TOTAL
1
CRANES (XCMG)
25 TON
1
230
2318
10
2328
2
CRANES (SANY)
100TON
0
263
2620
0
2620
3 4 5 6 7 8 9 10 11 12 13 14 15 16
CRANES (SANY) CRANES (XCMG) CRANES(XCMG) FORK LIFTS FORK LIFTS MAN LIFT MAN LIFT MAN LIFT MAN LIFT POWER GENERATOR AIR COMPRESSOR HEAVY TRUCK WELDING MACHINE FUIL TANK
75TON 70 TON 50 TON 16 TON 7 TON 40 M. Ht.. 38 M. Ht.. 27 M.Ht. 20 M.Ht. 150 KVA Benzene Type 12 m.
1 0 2 0 1 2 4 4 0 1 2
231 213 474 102 249 549 419 791 118 209 256
2318 2120 4537 1030 2480 4090 4230 7880 1180 2030 2580
10 0 20 0 10 20 40 40 0 10 20
2328 2120 4557 1030 2490 4110 4270 7920 1180 2040 2600
17 18
WATER TANK POWER GENERATOR
6 m3 50 KVA
YASREF / TECHINT-SP-3, YANBU SULFUR STORAGE BUILDING
J-3255 C Daily Progress Report DATE 13-September-2012
Senior Site Engineer
QA/QC
SITE MANAGER
Ahmad Ghazal
Nabeel Al-Share
ASHRAF M.YOUSEF
HIGH WIND
Weather Temperature
1. Manpower Status
2. Safety Mileage
Today
Category Indirect
Category
HSE Manager
Irfan Ahmed
3. Major Areas of Concerns
M/H
Direct
IBSF
SULFUR STORAGE BUILDING ERECTION
Others
Total
4. Work Activities Actual OF 27 JUN 2013
Plan for 29 JUN 2013
Steel Erection, Alignment, Finishing works Steel Erection, Alignment, Finishing works and and Mat'ls Unloading Mat'ls Unloading SL# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
GRIDLINE
PIECE MARK #
YASREF / TECHINT-SP-3, YANBU COKE STORAGE BUILDING
J-3255 B Daily Progress Report DATE Senior Site Engineer
QA/QC
SITE MANAGER
Ahmad Ghazal
Nabeel AlShare
ASHRAF M.YOUSEF
13-September-2012 Weather Temperature
1. Manpower Status
2. Safety Mileage
Today Category
Category
3. Major Areas of Concerns M/H
Indirect
COKE STORAGE BUILDING ERECTION
IBSF Others
Total
4. Work Activities
SL# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Actual OF 27 JUN 2013
Plan for 29 JUN 2013
Steel Erection,Truss Assembly and Mat'ls Unloading
Steel Erection,Truss Assembly and Mat'ls Unloading
GRIDLINE A/E 24/25 A/E 24/25 A/E 24/25 A/E 24/25 A 31/32 A 31/32 A 31/32 A 31/32 A/E 29/30 A/E 29/30 A/E 13/14 A/E 13/14 A/E 12/13 A/E 12/13 A/E 12/13 A/E 12/13 A/E 12/13 A/E 12/13
PU 72 PU 71 PU 76 PU 70 GI 100 GI 98 SR 30 SR 25 PU 62 SR 29 SA 16 SA 13 SA 12 SA 13 SA 14 SA 16 SR 29 SR 27
PIECE MARK # ( 1 PCS) ( 1 PCS) ( 1 PCS) ( 10 PCS) (2 PCS) (8 PCS) (2 PCS) (6 PCS) (7 PCS) (6 PCS) (1 PCS ) (1 PCS ) (1 PCS ) (1 PCS ) (1 PCS ) (1 PCS ) (2 PCS ) (2 PCS )
41 42 43 44 45 46 47 48 49 50 51 52 53 54
J-3255C, DAILY PROGRESS REPORT AS OF 27 JUN 2013 1. SULFUR STORAGE BUILDING ERECTION & DELIVERY PREVIOUSE TODA Remaining DELIVER TOTAL Progres DELIVER TOTAL LY Y Qty. to Y AS OF Erected s% Y TODAY Delivered ERECTED Erected Erect yesterday
S.No.
Description
Total Qty.
1
COLUMNS
254.640
228.497
228.497
26.143
89.73%
254.640
254.640
2
TRUSS FRAMES
370.440
324.560
324.560
45.880
87.61%
370.440
370.440
3
BEAMS
93.800
78.139
78.139
15.661
83.30%
93.400
93.400
4
ROOF HORIZONTAL BRACE
53.880
42.627
42.627
11.253
79.11%
53.850
53.850
5
ROOF STRUTS
95.200
74.217
74.217
20.983
77.96%
95.020
95.020
6
VERTICAL BRACE
21.820
13.212
13.212
8.608
60.55%
21.730
21.730
7
ANGLES
16.520
9.980
9.980
6.540
60.41%
16.520
16.520
8
FASTENER
16.300
11.410
11.410
4.890
70.00%
16.290
16.290
9
MISC.
1.220
1.220
1.220
10 CF-CHANNELS / EAVE STRUTS 8.020
3.324
3.324
4.696
41.45%
8.020
8.020
11
GIRT
65.940
31.164
32.004
33.936
48.54%
65.940
65.940
12
SAG RODS
8.950
5.835
5.871
3.079
65.60%
8.910
8.910
13
FRAME
12.230
11.694
11.694
0.536
95.62%
12.230
12.230
14
POST
8.500
7.088
7.088
1.412
83.39%
8.500
8.500
15
JACK BEAM
5.320
1.071
1.071
4.249
20.13%
5.320
5.320
16
RAFTER
7.790
2.036
#REF!
#REF!
#REF!
7.790
7.790
17
PURLINS
160.560
122.860
124.660
35.900
77.64%
160.560
160.560
18
Grating
17.620
0.034
0.034
17.586
0.19%
17.620
17.620
19
Handrails
12.410
3.028
3.028
9.382
24.40%
11.450
11.450
20
Safety Gate
0.090
0.020
0.020
21
Ladder
1.980
0.917
0.917
1.063
46.31%
1.980
1.980
22
Bracket
1.910
1.365
1.365
0.545
71.47%
1.910
1.910
#REF!
#REF!
TOTAL STEEL Materials ####### 23
ANCHOR BOLT
973.058
0.000
26.470
26.470
0.875
1,233.360 100.00%
0.000
1233.360
26.470
26.470
3.900
3.900
4.920
4.920
44.610
44.610
CLADDING MATERIALS. 24
Angles For Sheeting
3.900
25
Trims
4.930
26
Roof Panel
44.610
27
Side Wall Panel
15.840
15.840
15.840
28
End Wall Panel
7.130
7.130
7.130
TOTAL CLADDING MAT. 76.410 GRAND TOTAL
#######
22.410
49.755
102.870
102.870
#REF!
1,336.230
1336.230
AS OF 27 JUN 2013 2. COKE STORAGE BUILDING ERECTION & DELIVERY PREVIOUSEL Y ERECTED
TODAY Erected
TOTAL Erected
S.No.
Description
Total Qty.
1 2 3 4 5 6
COLUMNS TRUSS FRAMES BEAMS ROOF HORIZONTAL BRACE FLANGE BRACE VERTICAL BRACE Rafter ROOF STRUTS ANGLES FASTENER MISC. CF-CHANNELS / EAVE STRUTS GIRT SAG RODS FRAME POST JACK BEAM PURLINS
1011.350 1237.430 139.190 136.030 32.100 91.060 13.880 376.860 12.210 43.750 13.500 12.760 174.340 19.910 17.910 9.450 4.160 335.670
823.720 1016.210 59.629 97.906 7.063 50.550
Grating Handrails Safety Gate Ladder Bracket
43.340
0.000
0.000
23.860
0.000
0.160
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
24.76% 47.67% 34.71% 43.80% 37.52%
376.620 11.220 43.750 13.480 9.410 137.190 19.910 8.960 4.430
61.31%
322.610
322.610
41.750
41.750
0.000
22.760
22.760
0.000
0.000
0.110
0.110
2.710
0.000
0.000
1.360
1.360
1.570
0.236
0.236
ANCHOR BOLT
53.990
3.160 82.260 6.874 7.844 3.546 0.000 203.999
2,681.493
0.840 0.036
1.800
2.712
53.99
297.410 2.092 19.030
79.450 10.118 24.720
81.45% 82.12% 42.84% 71.97% 22.00% 55.51% 0.00% 78.92% 17.13% 43.50%
3.160 83.100 6.910 7.844 3.546 0.000 205.799
9.600 91.240 13.000 10.066 5.904 129.871
TOTAL Delivered
376.620 11.220 43.750 13.480 9.410 137.190 19.910 8.960 4.430
0.036
187.630 221.220 79.561 38.124 25.037 40.510
DELIVERY TODAY
898.690 1087.600 81.920 131.930 23.800 86.470
297.410 2.056 19.03
823.720 1016.210 59.629 97.906 7.063 50.550
DELIVERY AS OF yesterday
898.690 1087.600 81.920 131.930 23.800 86.470
TOTAL STEEL MATERIALS 3753.200 23
Remaining Qty. Progress % to Erect
1.334
2684.205 1,068.995 53.990
0.000
15.03%
1.190
B
3,325.160
100.00%
53.990
1.190 0.000
3325.160 53.990
CLADDING MATERIALS. 24 25 26 27 28 29
ANGLES FOR SHEETING TRIMS SKY LIGHT ROOF PANEL SIDE WALL PANEL END WALL PANEL TOTAL CLADDING MAT. TOTAL
0.740
0.740
0.740
11.480
12.330
12.330
9.160
9.160
9.160
86.390
89.510
89.510
39.050
44.260
44.260
95.870
96.700
96.700
242.690 4049.880
252.700 3631.850
252.700 3631.850
2,735.483
2.712
2738.195 1,311.685
67.61%
0.000
J-3255C, CLADDING DAILY PROGRESS REPORT AS OF 27 JUN 2013 SULFUR STORAGE BUILDING CLADDING INSTALLATION S.No. 2 3 4 5 6 7 8
CLADDING MATERIALS. ROOF PANEL SIDE WALL PANEL END WALL PANEL Angles For Sheeting Trims GUTTER
TOTAL Qty. TOTAL M. TONS. Qty. SQ. M.
TODAY Installed
PREVIOUSELY TOTAL Installed Installed
Remaining Qty. to Install
Progress DELIVERY % Status M.T.
7.130
21046.31 6709.73 2715.02
3.900
N/A
3.900
4.930
N/A
4.920
590 L.M.
590 L.M.
44.610 15.840
76.410
15,725.080
15,725.080
5,321.230
74.72%
44.610 15.840 7.130
J-3255B, CLADDING DAILY PROGRESS REPORT AS OF 27 JUN 2013 COKE STORAGE BUILDING CLADDING INSTALLATION S.No. 2 3 4 5 6 7 8
CLADDING MATERIALS.
TOTAL Qty. TOTAL M. TONS. Qty. SQ. M.
ROOF PANEL SIDE WALL PANEL END WALL PANEL Angles For Sheeting Trims GUTTER TOTAL CLADDING
TODAY Installed
PREVIOUSELY TOTAL Installed Installed
Remaining Qty. to Install
Progress DELIVERY % Status M.T.
95.870
41686 7097.82 5153.3
0.740
N/A
0.740
11.480
N/A
11.480
86.390 39.050
281.595
5,302.840
5,584.435
36,101.565
15.47%
86.390 39.050 95.870
1030 L. M. 233.530
View more...