Progress Report 27 -Jun-13

November 19, 2017 | Author: Nabeel Adeeb Alshare | Category: N/A
Share Embed Donate


Short Description

report...

Description

J- 3255

DAILY MANPOWER/EQUIPEMENTS REPORT

*MANPOWER STATUS

Wednesday, June 26, 2013

DESCRIPTION

NO.

PREVIOUS TOTAL Manhours

1

SURVEYOR

M/D

253

2555

1

10

2565

2

GENERAL FORMAN

M/D

202

2050

1

10

2060

3

FOREMAN

M/D

261

2616

1

10

2626

4

LEAD MAN

M/D

1179

11994

7

70

12064

5

CLADDING FORMAN

M/D

129

6

STEEL ERECTOR

M/D

4672

7

RIGGERS

M/D

1027

8

WELDER

M/D

9

LABOR /HELPER

M/D

10

FLAGMAN

M/D

120

1260

3

30

1290

11

SCAFFOLDER

M/D

720

7460

5

50

7510

12

ClLADDING INSTALLER

M/D

70

4840

5

50

4890

13

DRIVER

M/D

209

3192

1

14

MAN LIFT OPERATOR

M/D

1735

17720

15

TRUCK OPERATOR

M/D

16

FORK LIFT OPERATOR

M/D

305

17

CRANE OPERATOR

M/D

1240

18

WATER TANK DRIVER

M/D

DIRECT SUBTOTAL TOTAL MANPOWER(DIRECT+INDIRECT)

287 263 228 241 278 276 250 293 50 135 207 144 241 123 123 2462

632

2707 2621 2238 2203 2044 2454 1870 2946 528 1360 1944 1312 2426 1240 1240 27531

UNIT

140

EXPAT 1 1 1 1 1

SAUDI

Manhour

#

M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D M/D

SAUDI

Total Manhours

INDIRECT SITE MANAGER HSE MANAGER SENIOR CONSTRUCTION ENGINEER MECHANICAL QA/QC INSPECTOR PURCHASING OFFICER PUBLIC RELATION OFFICER QA/QC SUPERVISOR SAFETY OFFICER SAFETY ASSISTANT SECRETARY DOCUMENT CONTROLLER QA/QC ASSISTANT STORE KEEPER/TIME KEEPER MALE NURSE OFFICE BOY INDIRECT SUBTOTAL DIRECT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

UNIT

EXPAT / total days

1 1

1 1 1 1 1 1 1 1 11 EXPAT

910

1

48936

24

10600

6

4 LOCAL

2

10 10 10 10 0 8 10 10 8 10 8 0 10 10 10 124 TOTAL

2717 2631 2248 2213 2044 2462 1880 2956 536 1370 1952 1312 2436 1250 1250 29257

0

910

256

49192

60

10660 0 0

110

1

18

3210

10

100

17820

3105

1

10

3115

12775

4

40

12815

130,013 157,544

70

714

0 130,727 159,984

0

12122

250

DESCRIPTION

QTY

3

*EQUIPMENT STATUS

S.No.

NAMES

TOTAL Days previous Hours.

Today hours

TOTAL

1

CRANES (XCMG)

25 TON

1

230

2318

10

2328

2

CRANES (SANY)

100TON

0

263

2620

0

2620

3 4 5 6 7 8 9 10 11 12 13 14 15 16

CRANES (SANY) CRANES (XCMG) CRANES(XCMG) FORK LIFTS FORK LIFTS MAN LIFT MAN LIFT MAN LIFT MAN LIFT POWER GENERATOR AIR COMPRESSOR HEAVY TRUCK WELDING MACHINE FUIL TANK

75TON 70 TON 50 TON 16 TON 7 TON 40 M. Ht.. 38 M. Ht.. 27 M.Ht. 20 M.Ht. 150 KVA Benzene Type 12 m.

1 0 2 0 1 2 4 4 0 1 2

231 213 474 102 249 549 419 791 118 209 256

2318 2120 4537 1030 2480 4090 4230 7880 1180 2030 2580

10 0 20 0 10 20 40 40 0 10 20

2328 2120 4557 1030 2490 4110 4270 7920 1180 2040 2600

17 18

WATER TANK POWER GENERATOR

6 m3 50 KVA

YASREF / TECHINT-SP-3, YANBU SULFUR STORAGE BUILDING

J-3255 C Daily Progress Report DATE 13-September-2012

Senior Site Engineer

QA/QC

SITE MANAGER

Ahmad Ghazal

Nabeel Al-Share

ASHRAF M.YOUSEF

HIGH WIND

Weather Temperature

1. Manpower Status

2. Safety Mileage

Today

Category Indirect

Category

HSE Manager

Irfan Ahmed

3. Major Areas of Concerns

M/H

Direct

IBSF

SULFUR STORAGE BUILDING ERECTION

Others

Total

4. Work Activities Actual OF 27 JUN 2013

Plan for 29 JUN 2013

Steel Erection, Alignment, Finishing works Steel Erection, Alignment, Finishing works and and Mat'ls Unloading Mat'ls Unloading SL# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

GRIDLINE

PIECE MARK #

YASREF / TECHINT-SP-3, YANBU COKE STORAGE BUILDING

J-3255 B Daily Progress Report DATE Senior Site Engineer

QA/QC

SITE MANAGER

Ahmad Ghazal

Nabeel AlShare

ASHRAF M.YOUSEF

13-September-2012 Weather Temperature

1. Manpower Status

2. Safety Mileage

Today Category

Category

3. Major Areas of Concerns M/H

Indirect

COKE STORAGE BUILDING ERECTION

IBSF Others

Total

4. Work Activities

SL# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Actual OF 27 JUN 2013

Plan for 29 JUN 2013

Steel Erection,Truss Assembly and Mat'ls Unloading

Steel Erection,Truss Assembly and Mat'ls Unloading

GRIDLINE A/E 24/25 A/E 24/25 A/E 24/25 A/E 24/25 A 31/32 A 31/32 A 31/32 A 31/32 A/E 29/30 A/E 29/30 A/E 13/14 A/E 13/14 A/E 12/13 A/E 12/13 A/E 12/13 A/E 12/13 A/E 12/13 A/E 12/13

PU 72 PU 71 PU 76 PU 70 GI 100 GI 98 SR 30 SR 25 PU 62 SR 29 SA 16 SA 13 SA 12 SA 13 SA 14 SA 16 SR 29 SR 27

PIECE MARK # ( 1 PCS) ( 1 PCS) ( 1 PCS) ( 10 PCS) (2 PCS) (8 PCS) (2 PCS) (6 PCS) (7 PCS) (6 PCS) (1 PCS ) (1 PCS ) (1 PCS ) (1 PCS ) (1 PCS ) (1 PCS ) (2 PCS ) (2 PCS )

41 42 43 44 45 46 47 48 49 50 51 52 53 54

J-3255C, DAILY PROGRESS REPORT AS OF 27 JUN 2013 1. SULFUR STORAGE BUILDING ERECTION & DELIVERY PREVIOUSE TODA Remaining DELIVER TOTAL Progres DELIVER TOTAL LY Y Qty. to Y AS OF Erected s% Y TODAY Delivered ERECTED Erected Erect yesterday

S.No.

Description

Total Qty.

1

COLUMNS

254.640

228.497

228.497

26.143

89.73%

254.640

254.640

2

TRUSS FRAMES

370.440

324.560

324.560

45.880

87.61%

370.440

370.440

3

BEAMS

93.800

78.139

78.139

15.661

83.30%

93.400

93.400

4

ROOF HORIZONTAL BRACE

53.880

42.627

42.627

11.253

79.11%

53.850

53.850

5

ROOF STRUTS

95.200

74.217

74.217

20.983

77.96%

95.020

95.020

6

VERTICAL BRACE

21.820

13.212

13.212

8.608

60.55%

21.730

21.730

7

ANGLES

16.520

9.980

9.980

6.540

60.41%

16.520

16.520

8

FASTENER

16.300

11.410

11.410

4.890

70.00%

16.290

16.290

9

MISC.

1.220

1.220

1.220

10 CF-CHANNELS / EAVE STRUTS 8.020

3.324

3.324

4.696

41.45%

8.020

8.020

11

GIRT

65.940

31.164

32.004

33.936

48.54%

65.940

65.940

12

SAG RODS

8.950

5.835

5.871

3.079

65.60%

8.910

8.910

13

FRAME

12.230

11.694

11.694

0.536

95.62%

12.230

12.230

14

POST

8.500

7.088

7.088

1.412

83.39%

8.500

8.500

15

JACK BEAM

5.320

1.071

1.071

4.249

20.13%

5.320

5.320

16

RAFTER

7.790

2.036

#REF!

#REF!

#REF!

7.790

7.790

17

PURLINS

160.560

122.860

124.660

35.900

77.64%

160.560

160.560

18

Grating

17.620

0.034

0.034

17.586

0.19%

17.620

17.620

19

Handrails

12.410

3.028

3.028

9.382

24.40%

11.450

11.450

20

Safety Gate

0.090

0.020

0.020

21

Ladder

1.980

0.917

0.917

1.063

46.31%

1.980

1.980

22

Bracket

1.910

1.365

1.365

0.545

71.47%

1.910

1.910

#REF!

#REF!

TOTAL STEEL Materials ####### 23

ANCHOR BOLT

973.058

0.000

26.470

26.470

0.875

1,233.360 100.00%

0.000

1233.360

26.470

26.470

3.900

3.900

4.920

4.920

44.610

44.610

CLADDING MATERIALS. 24

Angles For Sheeting

3.900

25

Trims

4.930

26

Roof Panel

44.610

27

Side Wall Panel

15.840

15.840

15.840

28

End Wall Panel

7.130

7.130

7.130

TOTAL CLADDING MAT. 76.410 GRAND TOTAL

#######

22.410

49.755

102.870

102.870

#REF!

1,336.230

1336.230

AS OF 27 JUN 2013 2. COKE STORAGE BUILDING ERECTION & DELIVERY PREVIOUSEL Y ERECTED

TODAY Erected

TOTAL Erected

S.No.

Description

Total Qty.

1 2 3 4 5 6

COLUMNS TRUSS FRAMES BEAMS ROOF HORIZONTAL BRACE FLANGE BRACE VERTICAL BRACE Rafter ROOF STRUTS ANGLES FASTENER MISC. CF-CHANNELS / EAVE STRUTS GIRT SAG RODS FRAME POST JACK BEAM PURLINS

1011.350 1237.430 139.190 136.030 32.100 91.060 13.880 376.860 12.210 43.750 13.500 12.760 174.340 19.910 17.910 9.450 4.160 335.670

823.720 1016.210 59.629 97.906 7.063 50.550

Grating Handrails Safety Gate Ladder Bracket

43.340

0.000

0.000

23.860

0.000

0.160

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

24.76% 47.67% 34.71% 43.80% 37.52%

376.620 11.220 43.750 13.480 9.410 137.190 19.910 8.960 4.430

61.31%

322.610

322.610

41.750

41.750

0.000

22.760

22.760

0.000

0.000

0.110

0.110

2.710

0.000

0.000

1.360

1.360

1.570

0.236

0.236

ANCHOR BOLT

53.990

3.160 82.260 6.874 7.844 3.546 0.000 203.999

2,681.493

0.840 0.036

1.800

2.712

53.99

297.410 2.092 19.030

79.450 10.118 24.720

81.45% 82.12% 42.84% 71.97% 22.00% 55.51% 0.00% 78.92% 17.13% 43.50%

3.160 83.100 6.910 7.844 3.546 0.000 205.799

9.600 91.240 13.000 10.066 5.904 129.871

TOTAL Delivered

376.620 11.220 43.750 13.480 9.410 137.190 19.910 8.960 4.430

0.036

187.630 221.220 79.561 38.124 25.037 40.510

DELIVERY TODAY

898.690 1087.600 81.920 131.930 23.800 86.470

297.410 2.056 19.03

823.720 1016.210 59.629 97.906 7.063 50.550

DELIVERY AS OF yesterday

898.690 1087.600 81.920 131.930 23.800 86.470

TOTAL STEEL MATERIALS 3753.200 23

Remaining Qty. Progress % to Erect

1.334

2684.205 1,068.995 53.990

0.000

15.03%

1.190

B

3,325.160

100.00%

53.990

1.190 0.000

3325.160 53.990

CLADDING MATERIALS. 24 25 26 27 28 29

ANGLES FOR SHEETING TRIMS SKY LIGHT ROOF PANEL SIDE WALL PANEL END WALL PANEL TOTAL CLADDING MAT. TOTAL

0.740

0.740

0.740

11.480

12.330

12.330

9.160

9.160

9.160

86.390

89.510

89.510

39.050

44.260

44.260

95.870

96.700

96.700

242.690 4049.880

252.700 3631.850

252.700 3631.850

2,735.483

2.712

2738.195 1,311.685

67.61%

0.000

J-3255C, CLADDING DAILY PROGRESS REPORT AS OF 27 JUN 2013 SULFUR STORAGE BUILDING CLADDING INSTALLATION S.No. 2 3 4 5 6 7 8

CLADDING MATERIALS. ROOF PANEL SIDE WALL PANEL END WALL PANEL Angles For Sheeting Trims GUTTER

TOTAL Qty. TOTAL M. TONS. Qty. SQ. M.

TODAY Installed

PREVIOUSELY TOTAL Installed Installed

Remaining Qty. to Install

Progress DELIVERY % Status M.T.

7.130

21046.31 6709.73 2715.02

3.900

N/A

3.900

4.930

N/A

4.920

590 L.M.

590 L.M.

44.610 15.840

76.410

15,725.080

15,725.080

5,321.230

74.72%

44.610 15.840 7.130

J-3255B, CLADDING DAILY PROGRESS REPORT AS OF 27 JUN 2013 COKE STORAGE BUILDING CLADDING INSTALLATION S.No. 2 3 4 5 6 7 8

CLADDING MATERIALS.

TOTAL Qty. TOTAL M. TONS. Qty. SQ. M.

ROOF PANEL SIDE WALL PANEL END WALL PANEL Angles For Sheeting Trims GUTTER TOTAL CLADDING

TODAY Installed

PREVIOUSELY TOTAL Installed Installed

Remaining Qty. to Install

Progress DELIVERY % Status M.T.

95.870

41686 7097.82 5153.3

0.740

N/A

0.740

11.480

N/A

11.480

86.390 39.050

281.595

5,302.840

5,584.435

36,101.565

15.47%

86.390 39.050 95.870

1030 L. M. 233.530