Published on Planning Planet (http://www.planningplanet.com) Home > Rates, Norms & Durations

By PP Wiki Created 5 Feb 2009 - 05:54

Rates, Norms & Durations What is needed to come up with a production rate? A duration of time, the manhours involved, and an amount of work produced? This section is here to document this. What information do you have that you can share?

Automotive Automotive Production Rates & Build Times:

Bridges Bridges Production Rates & Buld Times:

Bridge Decking Traffic Decking Installation of temporary traffic decking, consisting of steel beam decking and concrete panels. • A typical rate of = 1.6 m2/hr.

Cable Stringing Covered Steel Footbridge Simple universal beam steel bridge in modular sections, welded on site. 16 truss sections each 15 m in length, supported on H-frame vertical columns / supports. • • • • • • •

Support Steelwork Fabrication (4 bays) = 25 days Support Steelwork Erection (4 bays) = 30 days Truss erections (4 bays) = 18 days Paintwork To Steel (16 bays) = 35 days Bridge Deck Concrete Works (16 bays) = 60 days (staggered) Bridge Lighting, Roof etc (16 bays) = 40 days Bridge Finishing, Handrails and Grano = 14 days

Structural Steelwork... Task / Description

Slow

Ave

Fast

Units

Simple Universal Beam Steel Bridge, erect support steel H frames

-

1.2

-

days/no

Simple Universal Beam Steel Bridge, erect 15m truss

-

3.3

-

m/day

Design Final Finishes

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 2 of 100

Formwork & Bases Paintwork Structural Steelwork Steel Frames Task / Description

Slow

Ave

Fast

3.4

-

4.6

Tons/day

Wall Frame, Bow String Truss and Frame

-

1.6

-

Tons/day

Roof Frame, Curved Truss and Frame

-

5.2

-

Tons/day

Wall Frame, Glazed Frame and Atrium

-

0.3

-

Tons/day

Steel Frame and Roof Members

Units

Building & Construction Building & Construction Production Rates & Build Times:

Blockwork Blockwork Task / Description

Slow

Ave

Fast

Units

Thermalite Blockwork, under 100mm thick

1.8

2.5

3.2

m2/hr

Thermalite Blockwork, under 100-150mm thick

1.4

1.9

2.5

m2/hr

Thermalite Blockwork, over 150mm thick

1.2

1.6

2.1

m2/hr

Lightweight Concrete Blockwork, under 100mm thick

1.5

2.2

2.9

m2/hr

Lightweight Concrete Blockwork, under 100-150mm thick

1.4

1.9

2.1

m2/hr

Lightweight Concrete Blockwork, over 150mm thick

1.2

1.6

2.0

m2/hr

Heavyweight Concrete Blockwork, under 100mm thick

1.4

2.1

2.9

m2/hr

Heavyweight Concrete Blockwork, under 100-150mm thick

1.2

1.6

2.1

m2/hr

Heavyweight Concrete Blockwork, over 150mm thick

1.1

1.4

1.8

m2/hr

Face Finish, Raked Out

-

71.4

-

m2/hr

Face Finish, Bag Rubbed

-

29.4

-

m2/hr

Face Finish, Flush Pointing

-

17.6

-

m2/hr

Building Frameworks Curtain Walling Curtain Walling rate Assume 30m2 per week for general curtain walling Slow

Ave

Fast

Vertical Glazed Lights, 6m x 2.5m

Task / Description

-

14.5

-

m2/day

Vertical Glazed Walls, large scale

-

70.0

-

m2/day

Clerestory Frame/Glazing, 3m x 4m

-

28.0

-

m2/day

Oriel Window Frame/Glazing, 4m x 2m

-

35.0

-

m2/day

Glazed Curtain Wall, First Fix

-

1.2

-

m2/hr

http://www.planningplanet.com/print/book/export/html/422384

Units

11/3/2014

Page 3 of 100

Glazed Curtain Wall, Second Fix

-

1.1

-

m2/hr

High Quality Glazed Curtain Walling

-

25.0

-

m2/day

Holding Down Bolts Stanchion Bases stanchion.

Bolt 4 No Numbers -->

6 No

8 No

Make Softwood Framework

0.50

0.70

0.93

Fix Bolts / Framework

1.32

1.54

1.73

Strike Framework

0.38

0.44

0.49

Item

Metal Frameworks Roof Structure Structural Steel Structures

For medium sized applications with a single crane and fixing gang.

A typical rate

3.4 - 4.6 tonnes/day.

Structural steel for glazed wall, made of 18 no "bow string" strusses 25 m tall, cross braced and wired together, consisting of 69 tonnes of steelwork. Erection in 6 weeks.

Erection Rate

1.65 tonnes/day

Strucural steelwork for curved building roof, 18 number curved complex trussess and cross pearlins etc. Consisting of 500 tonnes of steel. Initially programmed for 14 weeks site installation period.

All Rates in Weeks...

GA drawings

0- 6

Shop Drawings

4 - 13

Buildings Dept Approval

14 - 17

Shop Fabrication

18 - 30

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 4 of 100

Corrosion Protection

22 - 32

Site Pre-Assembly

32 - 34

Erection Time

35 - 38 (24 hr working)

Erection Rate

8.95 tonnes/day

Structural steelwork for glazed wall and atria over, 4 number bow string trussess in wall and in roof. Consisting of 7.5 tonnes of steelwork. Erection in 6.5 weeks.

Erection Rate

0.23 tones/day

Timber Frameworks Roof Structure Usually carried out with a minimum of a 2 man gang, sometimes with an additional labourer. For a typical semi-detached house structure or similar...

Roof Trusses 1.28 no/hr

Wall Plates

2.76 m/hr

Rafters

1.17 m/hr

Ceiling Joists 32.10 m/hr

Timber frame superstructure Timber framing rates for hospital of 3173m2 GIFA Assuming that the labour is a 4 man squad working an 8 hour day as this would be normal practice • Wall panels up to 3m in hieght including both external and internal panels ; 30 panels per day (average panel 3.5m long) • Wall panels over 3m in height including both internal and external panels ; 20 panels per day (average panel 2.5m long) • Loose floor joists position and fix 175m sq per day • Loose floor joists position, fix & position and fix floor decking 125m sq per day • Floor/roof cassette assumed simple 12 X 2.4m 300m sq per day • Floor/roof cassette complex shape 150 – 200 m sq per day • Trussed roof erect, brace,sark and felt 100m sq per day (up to 8m span measured at horizantial) • Trussed roof erect, brace,sark and felt 80m sq per day (up to 12m span measured at horizantial)

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 5 of 100

• Hip or valley up to 12m long 1 man a day • Medium dormer window (2.4m wide) 1 man a day I hope this helps , but please bare in mind that the more complex projects will take longer. Timber Frames... Task / Description

Slow

Ave

Fast

Units

Roof Trusses

-

1.3

-

no/hr

Wall Plates

-

2.7

-

m/hr

Roof Rafters

-

1.2

-

m/hr

Ceiling Joists

-

32.1

-

m/hr

Roof Carcass, Common Rafters, under 3m

18.2

20.0

21.7

no/hr

Roof Carcass, Common Rafters, 3-6mm

13.3

16.6

18.2

no/hr

Roof Carcass, Common Rafters, over 6m

14.1

15.6

16.1

no/hr

Roof Carcass, Jack Rafters, under 3m

18.8

20.1

21.7

no/hr

Roof Carcass, Jack Rafters, 3-6mm

10.4

16.1

16.6

no/hr

Roof Carcass, Purlins, under 3m

5.1

5.4

5.8

no/hr

Roof Carcass, Purlins, 3-6mm

4.3

4.8

5.1

no/hr

Roof Carcass, Purlins, over 6m

3.5

4.3

4.6

no/hr

Roof Carcass, Binders, under 3m

5.7

6.6

7.6

no/hr

Roof Carcass, Binders, 3-6mm

2.1

2.3

2.5

no/hr

Roof Carcass, Binders, over 6m

1.3

1.5

1.6

no/hr

Roof Carcass, Hangers, under 3m

8.2

9.0

9.6

no/hr

Roof Carcass, Collars under 3m

7.6

8.0

9.1

no/hr

Roof Carcass, Collars 3-m

6.5

7.4

8.3

no/hr

12.0

13.1

15.3

no/hr

142.0

166.0

175.0

no/hr

Roof Soffits, Softwood, nailed

-

9.2

-

m/hr

Roof Soffits, Softwood, screwed

-

3.9

-

m/hr

Roof Soffits Asbestos, under 300mm nailed

-

9.1

-

m/hr

Roof Soffits Asbestos, under 300mm screwed

-

3.8

-

m/hr

Roof Soffits, Asbestos, over 300mm nailed

-

3.5

-

m/hr

Roof Soffits, Asbestos, over 300mm screwed

-

1.3

-

m/hr

Roof Facia Panels, Softwood

5.1

7.2

9.3

m/hr

Roof Facia Panels, Asbestos

1.3

2.5

3.9

m/hr

Roof Facia Panel Studding, nailed

7.3

8.1

9.0

m/hr

Roof Facia Panel Studding, screwed

4.6

5.2

5.8

m/hr

Roof Facia Panel Studding, bolted to beams

5.4

5.9

6.6

m/hr

Roof Works, Fix Herringbone Strutting

-

5.1

-

m/hr

Roof Works, Fix Firing Strips

-

25.0

-

m/hr

Roof Works, Fix Drip/Tilt Filleting

-

20.5

-

m/hr

Roof Carcass, Ridge Boards under 3m Roof Carcass, Cut Rafter Feet to line

Chases Chases

Cutting Chases In Brickwork In Brickwork (m/hr)

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 6 of 100

By Hand

Chase depth -->

0-25mm

25-37mm

37-50mm

Ne 25 mm wide

4.17

2.78

2.08

25-50 mm wide

3.45

2.27

1.69

50-75 mm wide

2.86

1.92

1.45

75-100 mm wide

2.50

1.67

1.23

Ne 25 mm wide

11.1

5.56

4.17

25-50 mm wide

6.67

4.55

3.33

50-75 mm wide

6.67

4.55

3.33

75-100 mm wide

5.00

3.33

2.50

Machine

Cutting Chases In Concrete In Concrete (m/hr) By Hand

Chase depth -->

0-25mm

25-37mm

37-50mm

Ne 25 mm wide

3.03

2.04

1.54

25-50 mm wide

2.50

1.67

1.25

50-75 mm wide

2.13

1.41

1.05

75-100 mm wide

1.82

1.22

0.92

Chase depth -->

0-25mm

25-37mm

37-50mm

Ne 25 mm wide

5.88

4.00

3.03

25-50 mm wide

5.00

3.33

2.50

50-75 mm wide

4.17

2.86

2.13

75-100 mm wide

3.70

2.44

1.81

Machine

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 7 of 100

Cutting Chases In Heavyweight Blockwork In Heavyweight Blockwork (m/hr) By Hand

Chase depth -->

0-25mm

25-37mm

37-50mm

Ne 25 mm wide

3.85

2.63

1.96

25-50 mm wide

3.23

2.17

1.64

50-75 mm wide

2.70

1.82

1.36

75-100 mm wide

2.33

1.56

1.18

Machine

Ne 25 mm wide

7.69

5.00

3.85

25-50 mm wide

6.25

4.17

3.13

50-75 mm wide

5.26

3.57

2.70

75-100 mm wide

4.55

3.13

2.33

Cutting Chases In Lightweight Blockwork In Lightweight Blockwork (m/hr) By Hand

Chase depth -->

0-25mm

25-37mm

37-50mm

Ne 25 mm wide

7.69

5.00

3.85

25-50 mm wide

6.25

4.17

3.13

50-75 mm wide

5.26

3.45

2.63

75-100 mm wide

4.55

3.03

2.27

Chase depth -->

0-25mm

25-37mm

37-50mm

Ne 25 mm wide

14.2

10.0

7.69

25-50 mm wide

11.1

7.69

5.88

50-75 mm wide

10.0

7.14

5.26

Machine

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 8 of 100

75-100 mm wide

9.09

6.25

4.76

Cutting Switch Boxes Cutting Switch Boxes etc (No/hr)

Box Type -->

Small

Large

Hand

7.14

3.57

Machine

12.5

5.56

Hand

6.67

4.17

Machine

12.5

6.25

Lightweight Blockwork Hand

Hand Machine

20.0 25.0

10.0 14.3

Heavyweight Blockwork Hand

Hand Machine

7.69 12.5

3.85 5.88

Concrete

Brickwork

Computer Room / Raised Floors Typically installed by a 2 man gang Medium sized room incl cutting 2.67 m2/hr

Concrete Related Works Formwork Beam Falsework Formwork Rates include for making, fixing, cleaning and minor repair works etc, rates in m2/hr. Soffits - On runners and props, including erection of props etc.

Hight of Beam Soffit---> Width

0 - 3.5 m

Fix

3.5 - 5.0 m

Strike

Fix

Strike

100 0.70 200 mm

1.23

0.58

1.02

200 0.81 300 mm

1.39

0.68

1.15

300 0.93 500 mm

1.54

0.78

1.28

500 1.16 750 mm

1.85

0.96

1.54

1.23

2.17

1.03

1.82

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 9 of 100

exc 750 mm

Soffits - On runners and props, on previously erected props etc.

Hight of 0 - 3.5 m Beam Soffit--->

3.5 - 5.0 m

Width

Strike

Fix

Strike

100 0.96 200 mm

1.69

0.91

1.67

200 1.11 300 mm

1.92

1.05

1.82

300 1.27 500 mm

2.08

1.20

2.00

500 1.56 750 mm

2.50

1.49

2.44

exc 750 1.64 mm

2.86

1.39

2.70

Fix

Sides - Strutted from soffit bearers etc.

Hight of 0 - 3.5 m Beam Soffit--->

3.5 - 5.0 m

Depth

Strike

Fix

Strike

100 0.78 200 mm

1.23

0.74

1.18

200 0.93 300 mm

1.39

0.88

1.32

300 1.06 500 mm

1.54

1.02

1.47

500 1.47 750 mm

2.08

1.39

2.00

exc 750 1.54 mm

2.33

1.47

2.33

Fix

Sides - Using clamps and struts etc. Hight of 0 - 3.5 m Beam Soffit--->

3.5 - 5.0 m

Depth

Strike

Fix

Strike

100 0.91 200 mm

1.47

0.87

1.39

200 1.09 300 mm

1.64

1.04

1.56

300 1.27 500 mm

1.82

1.20

1.72

Fix

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 10 of 100

Columns Formwork Rates include for fixing, cleaning and minor repair works etc, rates in m2/hr unless otherwise stated.

Cross Sectional Area-->

Ne 0.2 m2

Exc 0.2 m2

Item

Fix

Strike

Fix

Strike

KickersDirect to slab (no/hr)

4.00

12.50

2.63

8.33

KickersSuspended (no/hr)

2.08

12.50

1.39

8.33

Square Sides-Timber Clamped and Propped Column Height--> Item Cross Section

2-3m

Fix

3-4m

Strike

Fix

Strike

0.00 1.35 0.05 m2

2.70

1.67

3.57

1.69 0.05 0.10 m2

3.45

1.82

3.85

0.10 1.82 0.20 m2

4.00

2.33

4.55

2.04 0.20 0.40 m2

4.55

2.44

5.00

exc 2.33 0.40 m2

5.26

2.50

5.88

Footing formwork Activity

Labor (L) Helper (Mandays)

Material (M)

Material (M)

Material (M)

Sqm

0.8 Mandays/10Sqm

1.5 Mandays/10Sqm

MS Wall Form Panel - 1250 x 500 : 16Nos/10Sqm

Props 2m to 3m Long : 2 Nos/Rm

Shuttering Oil : 4Ltr/10Sqm

Footing Deshuttering & Sqm insitu Stacking

0.48 Mandays/10Sqm

0.9 Mandays/10Sqm

TASKS

Footing Footing Shuttering & formwork Providing Support

Task Labor (L) Carpenter UOM (Mandays)

Formwork & Falsework - Ground Foundation Formwork FORMWORK & FALSEWORK Ground Foundation Formwork All formwork rates in m2/hr.

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 11 of 100

Item

Shutter size

Fix

Strike

1.64

3.85

1.82

4.55

1.50 - 2.25 m2 2.00

5.00

2.25 - 3.00 m2 2.22

5.56

exc 3.00 m2

2.50

7.14

1.72

4.55

0.75 - 1.50 m2 1.82

4.55

1.50 - 3.00 m2 2.50

6.25

3.00 - 5.00 m2 2.63

6.67

2

To Pilecaps 0.75 m

0.75 - 1.50 m

2

To 0.75 m2 Foundations

To Ground Beams

2

1.82

4.55

1.50 - 3.00 m2 2.63

6.67

3.00 - 5.00 m2 2.70

7.14

1.50 m

Formwork Formwork Task / Description

Slow

Ave

Fast

Units

Pilecaps, < 0.7m2

0.9

1.6

2.0

m2/hr

Pilecaps, 0.7-2.5m2

1.6

2.0

2.3

m2/hr

Pilecaps, 2.5-3.0m2

2.0

2.3

2.5

m2/hr

Pilecaps, > 3.0m2

2.3

2.5

3.1

m2/hr

Ground Beams, < 0.7m2

1.1

1.7

1.8

m2/hr

Ground Beams, 0.7-1.5m2

1.7

1.8

2.5

m2/hr

Ground Beams, 1.5-3.0m2

1.8

2.5

2.6

m2/hr

Ground Beams, 3.0-5.0m2

2.5

2.6

3.5

m2/hr

Elevated Plain Slab Soffit

0.6

0.8

1.2

m2/hr

Beams, on erected falsework, width 100-200mm

0.9

1.0

1.1

m2/hr

Beams, on erected falsework, width 200-300mm

1.0

1.1

1.3

m2/hr

Beams, on erected falsework, width 300-500mm

1.2

1.3

1.5

m2/hr

Beams, on erected falsework, width 500-750mm

1.5

1.6

1.8

m2/hr

Beams, on erected falsework, width over 750mm

1.4

1.5

1.7

m2/hr

Walls, Construct Kickers

5.3

7.1

10.0

m2/hr

Walls, Fully Framed Formwork/Struts, 1.0-2.0m2

0.9

1.8

1.9

m2/hr

Walls, Fully Framed Formwork/Struts, 2.0-5.0m2

1.0

2.2

2.5

m2/hr

Walls, Fully Framed Formwork/Struts, over 5.0m2

1.2

2.5

2.9

m2/hr

Walls, StoriForm Shutters, 1.0-3.0m2

1.0

1.4

2.0

m2/hr

Walls, StoriForm Shutters, 3.0-5.0m2

1.9

2.3

3.3

m2/hr

Walls, StoriForm Shutters, 5.0-10.0m2

2.3

2.8

3.5

m2/hr

Walls, StoriForm Shutters, 10.0-15.0m2

3.2

4.5

4.0

m2/hr

Walls, StoriForm Shutters, over 15.0m2

3.8

4.8

5.4

m2/hr

Ground Slabs

1.0

1.5

1.8

m2/hr

Columns, Construct Kickers, direct to slab

3.2

4.1

5.4

no/hr

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 12 of 100

Columns, Construct Kickers, suspended from soffit slab

1.2

2.8

3.2

no/hr

Columns, Square Sides, Timber Clamp/Prop, csa < 0.1m2

1.3

1.6

1.8

m2/hr

Columns, Square Sides, Timber Clamp/Prop, csa 0.1-0.4m2

1.8

2.1

2.4

m2/hr

Columns, Square Sides, Timber Clamp/Prop, csa over 0.4m2

2.0

2.3

2.5

m2/hr

Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high

7.9

9.5

10.3

m2/hr

Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high

6.9

7.5

8.3

m2/hr

Columns, Square Sides, Steel Forms, 2.0 x 4.0 x 9.0m high

8.5

10.2

12.0

m2/hr

Columns, Round Sides, Sacrificial Plastic Mould, 3.0-4.0m dia

3.5

4.5

6.0

m2/hr

Columns, Round Sides, Steel Mould, 3.0-4.0m dia

5.2

6.5

7.5

m2/hr

Columns, Sloping Column Heads, extra over rate

-

2.5

3.5

hrs/no

Staircases, Stair Soffit, Sloping

0.7

0.8

1.0

m2/hr

Staircases, Stair Soffit, Flat Landing

0.8

0.9

1.2

m2/hr

Staircases, Wall Strings

0.4

0.6

-

m2/hr

Staircases, Open Strings

0.7

0.8

-

m2/hr

Staircases, Riser Boards fixed to strings

-

2.5

2.8

m2/hr

Staircases, Risers fixed to Strings

-

2.3

2.6

m2/hr

1.1

1.4

1.8

m2/hr

-

300.0

500.0

mm/hr

Table Form, Aluminum System, 400m2 bays

2.1

3.2

3.8

m2/hr

Table Form, H-Frame Steel Falsework, 400m2 bays

1.9

3.0

3.5

m2/hr

Tunnel Forms, Wall and Slab poured as one

-

15.6

17.5

m2/hr

Hollorib Decking, lay deck

-

43.5

47.5

m2/hr

Hollorib Decking, shear connecting studs

-

29.3

31.2

m2/hr

Stop Ends, no perforations

2.8

3.5

4.2

m2/hr

Stop Ends, minor perforations

1.2

1.5

1.9

m2/hr

Stop Ends, dense perforations

0.9

1.1

1.4

m2/hr

Box Outs, 0.01-0.05m2

7.6

8.2

9.1

no/hr

Box Outs, over 0.05m2

3.1

3.9

4.5

no/hr

Dummy Frames, under 3.0m2

4.5

6.2

7.1

no/hr

Dummy Frames, over 3.0m2

3.1

3.7

4.5

no/hr

Waffle Flooring, 2.4m grid Shaft Slip Forming

Formwork Re-Use Typical rate for number of formwork uses before shutter remake. NOTE: This varies significantly depending on care taken with shutters and programme time available etc. • Walls = 20 uses • Slab Soffits = 10 - 15 uses • Beam & Column Boxes = 30 uses

Hollorib Decking Hollorib Decking Lay decking = 350 m2/day Shear Connecting Studs 235 m2 studded per day per gun (4,000 studs/week) Concrete topping = 4,000 m2/week or 2,000 m2/week incl power floating

Raft formwork

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 13 of 100

Activity

Task Labor (L) Carpenter UOM (Mandays)

Labor (L) Helper (Mandays)

Material (M)

Material (M)

Material (M)

Sqm

0.71 Mandays/10Sqm

1.41 Mandays/10Sqm

MS Wall Form Panel - 1250 x 500 : 16Nos/10Sqm

Props 2m to 3m Long : 2 Nos/Rm

Shuttering Oil : 4Ltr/10Sqm

Raft Deshuttering & Sqm insitu Stacking

0.42 Mandays/10Sqm

0.84 Mandays/10Sqm

TASKS

Raft Raft Shuttering & formwork Providing Support

Ramp formwork

Activity

Ramp formwork

TASKS

Task - UOM

Ramp Shuttering & Sqm Providing Support

Ramp Deshuttering & Stacking Sqm Appropriately at Same Location

Labor (L) Carpenter (Mandays)

Labor (L) Helper (Mandays)

Material (M)

Material (M)

Material (M)

Adjustable Props 2.02m to MS Floor Form MS Floor 3.75 m : 0.22 0.44 Panel - 750 x Form Panel 2Nos/Sqm Mandays/Sqm Mandays/Sqm 600 1250 x 500 : and 13.3Nos/10Sqm 6.4Nos/10Sqm Shuttering Oil : 5Ltr/10Sqm

0.13 0.26 Mandays/Sqm Mandays/Sqm

Shades Formwork

Activity

TASKS

Shades Formwork

Weather Shade, Chajjas, Corbels Shuttering (Including Propping)

Task - UOM

Labor (L) Carpenter (Mandays)

Labor (L) Helper (Mandays)

Sqm

Adjustable MS Floor Props 0.12 0.14 Form Panel 2.02m to Mandays/Sqm Mandays/Sqm 750 x 600 3.75 m : 2.2Nos/Sqm 2Nos/Sqm

http://www.planningplanet.com/print/book/export/html/422384

Material (M)

Material (M)

Material (M)

Shuttering Oil : 0.3Ltr/Sqm

11/3/2014

Page 14 of 100

Weather Sqm Shade, Chajjas, Corbels Deshuttering & Stacking Appropriately at Same Location

0.07 0.08 Mandays/Sqm Mandays/Sqm

Staircase formwork Task Labor (L) Carpenter UOM (Mandays)

Activity

TASKS

Staircase formwork

Staircase (Excluding Spiral Staircase) Shuttering & Providing Support

Sqm

Staircase (Excluding Spiral Staircase) Deshuttering & Stacking Appropriately at Same Location

Sqm

Labor (L) Helper (Mandays)

Material (M)

0.23 Mandays/Sqm

0.46 Mandays/Sqm

Adjustable MS Floor Form Props Panel - 750 x 2.02m to 600 3.75 m : 2.2Nos/Sqm 2Nos/Sqm

0.14 Mandays/Sqm

0.28 Mandays/Sqm

Material (M)

Material (M)

Shuttering Oil : 5Ltr/10Sqm

Tunnel Forms Concrete - Tunnel Forms A system of forms which enables walls and slabs to be cast in the same pour. suited to buildings with large number of identically sized rooms, such as hotels or flats. Used in conjunction with high speed concrete pumps, pre-formed reinforced cages. Rates Setup

14 days

Slab & Walls 125 m2/day (equals 3.5 rooms) Dismantle

7 days

Waffle Flooring Rate includes for erection of decking and infill beams, cut position & nail plywood ribs, transport position and fix 800 mm x 800 mm waffle forms, clean and oil plywood and adjust to levels (m2/hr). Conservative Erection Rate... • 2.4 m grid, ne 3.5 m high soffit = 1.42 m2/hr • 3.5 - 5.5 m high soffit = 1.13 m2.hr Typical composite rate of 18.5 m2/day per 4 man gang. Rate includes decking, waffles and reinforcement fixing.

Walls formwork

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 15 of 100

Activity

TASKS

Task Labor (L) Carpenter UOM (Mandays)

Walls (Any Thickness), Including Walls Buttresses formwork Shuttering & Providing Support - Up to 3.5m Height

Walls Deshuttering & insitu Stacking

Labor (L) Helper (Mandays)

Sqm

2.22 Mandays/10Sqm (Including Both Sides)

2.64 Mandays/10Sqm (Including Both Sides)

Sqm

1.32 Mandays/10Sqm (Including Both Sides)

1.76 Mandays/10Sqm (Including Both Sides)

Material (M)

Material (M)

MS Wall Form Panel - 1250 x 500 - 32 Nos/10Sqm (Including Both Sides)

Props - 2m to 3m Long : 4Nos/Rm (Including Both Sides)

Material (M)

Shuttering Oil : 5Ltr/10Sqm (On One Side)

Making Good Concrete Rates including blowing out, preparations, clean and shutter joints and making a fair faced finish. By Hand

With Mechanical Sander

Walls

5.56 m2/hr

8.62 m2/hr

Columns

2.80 m2/hr

6.99 m2/hr

Sides and Soffits of Beams

2.80 m2/hr

6.99 m2/hr

Soffits of Slabs

4.21 m2/hr

7.58 m2/hr

Vertical Bolt Holes

16.67 no/hr

Horizontal Bolt Holes

14.49 no/hr

Vertical 28.57 Shutter Joints m/hr Horizontal 25.00 Shutter Joints m/hr Rub Down Precast Concrete

16.95 m2/hr

Scabble Single head brush hammer

0 - 4 mm 30.74 hrs/m2

Three head brush hammer

0 - 4 mm 37.14 hrs/m2

0 - 8 mm 59.14 hrs/m2

0 - 8 mm

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 16 of 100

71.12 hrs/m2

Mixing Concrete Mixing By Hand A typical rate of 0.32 m3/hr of concrete. Compulsory Paddle Mixer Generally with one or two 3.5m3 drums, giving a cycle time of 60 to 80 seconds (m3/Hr). Mix Time -->

60 secs

80 secs

Single drum plant

210

158

Double drum 420 plant

315

Task / Description

Slow

Ave

Fast

Units

Concrete Weight, 1m3

-

2.4

-

Tonnes

Readymix Lorry, Length

-

8.3

-

m

Readymix Lorry, Width

-

2.5

-

m

Readymix Lorry, Height

-

3.7

-

m

Readymix Lorry, Length

-

24.4

-

Tonnes

Readymix Lorry, Turning Circle

-

16.4

-

m

Readymix Lorry, Allowable Access Ramp Gradient

-

17.0

20.0

Mixing Concrete, By Hand

-

0.3

-

m3/hr

Mixing Concrete, Single Drum Paddle Mixer

158.0

180.0

210.0

m3/hr

Mixing Concrete, Double Drum Paddle Mixer

315.0

370.0

420.0

m3/hr

Mixing Concrete, Single Drum Plant Pan Mixer

-

120.0

-

m3/hr

Mixing Concrete, Dry Mix Plant

-

90.0

-

m3/hr

degrees

CONCRETING Properties 1 m3 of concrete weights 2.4 tonnes Skip Capacities Dual Flow Skips Skip Size

Qty Per Lift

Laiden Weight

0.50 m3

0.44 m3

1,261 kg

0.75 m3

0.68 m3

1,850 kg

3

3

2,585 kg

1.00 m

0.94 m

Rollover Skips, Front discharge Skip Size

Qty Per Lift

Laiden Weight

0.50 m3

0.44 m3

1,361 kg

0.75 m3

0.68 m3

2,057 kg

Readymix Lorries - Length

8.23 m

- Width

2.43 m

- Height

3.66 m

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 17 of 100

- Weight

24.38 tonnes

- Turning Circle

16.36 m

Dry Lean Concrete From readymix truck and spade finish (m3/hr). Roads and Runway Areas

1.39

Paths

0.57

Drains, tipped direct

0.85

Drains, thrown in

0.68

Placement & Finishing Concrete Cycle Times Blinding Concrete Placing blinding direct from ready mix truck, rate of 4-5 m2/hr or 0.2-0.3 m3/hr. Base / Floor Slabs Concourse slab concrete pour, 36 m x 18 m, concrete volume of 1,500 m3 and 290 tonnes of reinforcement. Blind 1 day, formwork 2 days, reinforcement 5 days and concrete on day 8. Adit base slabs, concrete volume of 140 m3. Steelfixing for 4 days and concrete on the 5th day. Tunnel Sections Simple cooling watermain tunnels, a typical cycle time of 5 days per 8 m sections, or a rate of 0.16 m/hr. Track Slab Track slab concrete pour, 36 m x 28 m, concrete volume of 1,050 m3 and 360 tonnes of reinforcement. Excavate 6 m from one edge 7 days, strut 9 days, final excavation 3 days, pile chipping 5 days, blind 4 days, reinforcement 5 days and concrete on day 32. On simple pours, with little formwork, 24 m x 28 m, concrete volume of 1,200 m3 and 220 tonnes of reinforcement. Blind 3 days, reinforcement 3 days and concrete on day 8. Wall Slabs Adit wall construction, concrete volume of 80 m3. Steelfixing for 3 days and concrete on 4th day. Roof Slabs Adit roof slab construction, concrete volume of 80 m3. Steelfixing for 4 - 5 days and concrete on the 6th day. Staircases Standard staircase, concrete volume of 60 - 80 m3. Steelfixing for 4 days, formwork for 3 days and concrete on the 7 th day. Simple staircase from track slab up to platform edge, a rise of 1.2 m, a typical cycle time of 3 days per flight.

Slip Forming Concrete - Slip Forming A typical period of 10 - 14 days is required to setup the shutter on the ground and cast the platform. Rate of climb of formwork = 200 - 300 mm/hr.

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 18 of 100

Table Forms Concrete - Table Forms Fast method of forming walls/slabs with movable shutter. This rate is inclusive of walls and columns etc. Rate of 100 - 150 m2/day

Concrete Finishing Concrete Finishing Task / Description

Slow

Ave

Fast

Units

Surface Finishing, Steel Float By Hand

9.2

13.9

25.0

m2/hr

Surface Finishing, Wood Float By Hand

11.7

17.2

29.4

m2/hr

Surface Finishing, Power Float

13.9

20.8

37.0

m2/hr

Surface Finishing, Light Brush on Trowel

55.8

90.1

170.0

m2/hr

Surface Finishing, Brush on Trowel Margin

28.8

48.5

85.0

m2/hr

Surface Finishing, Sprayed By Pump, expose aggregate

65.0

95.0

145.0

m2/hr

Surface Finishing, Wire Brush, expose aggregate

15.0

25.0

30.0

m2/hr

Making Good Walls, prepare, shutter, pour

-

5.5

8.6

m2/hr

Making Good Columns, prepare, shutter, pour

-

2.8

6.9

m2/hr

Making Good Sides of Beams, prepare, shutter, pour

-

2.8

7.0

m2/hr

Making Good Slab Soffits, prepare, shutter, pour

-

4.2

5.5

m2/hr

14.8

16.8

25.8

no/hr

-

18.0

-

m2/hr

30.7

59.5

73.8

Making Good Bolt Holes, prepare, shutter, pour Making Good Rubdown Precast Concrete, prepare, shutter, pour Making Good Scabble 3 head brush hammer, prepare, shutter, pour

hrs/m2

Concrete Finishes (m2/hr). Area Finished -->

0-40 m2

40-200 m2

exc 200 m2

Steel Float by Hand

9.26

13.89

25.00

Wood Float 11.76 by Hand

17.24

29.41

Power Float

13.89

20.83

37.04

Light Brush 55.56 on Trowel

90.91

166.67

Brush on Trowel Margin

27.78

45.45

83.33

Sprayed 55.56 using hand pump

90.91

142.86

Wire 6.99 Brush, expose agg

11.76

20.83

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 19 of 100

Concrete Pumping Large Concrete Pours, lorry pump. Simple Rule Of Thumb, concretors 0.5 - 1.0 hrs/m3 of concrete, depending on access, pour size and concrete availability. Base Slabs etc, 1,200m3 equalling 25 - 35m3/hr per pump, with 3 No pumps and 12 men for 2 shifts of 12 hrs.

OFC Laying OFC Laying By Using Concrete/Road Cutter Equipment Resources • • • • •

Survey Team of 4 (1 Suveyor , 3 Assistants) Equipment with Operator and Helper Cutting Line Marking team ( 2-3 Persons) OFC cable laying team ( 4 Persons) Splicing team (2 technicians )

Productivity if everything is planned properly with adequate overlap of 3-4 days. 400-500m/day can be achieved. By using trenching machine • • • •

Equipment with Operator and helper Mini Dozer with operator OFC Laying laying team (6-8 persons) Rest resources as per above

Productivity If everything has planned properly with adequate overlap of 2-3 days. 250-300m/day can be achieved.

Place Concrete Barrowing Concrete (m3/hr). Receive concrete from mixer/lorry direct to barrow, wheel to placing position, tip and return. Distance

0 - 10 m

2.32

10 - 20 m

1.81

20 - 50 m

1.08

As above but including load concrete from deck/tray. Distance

0 - 10 m

0.99

10 - 20 m

0.87

20 - 50 m

0.66

Extra over to place direct, for dump and shovel in from side, a typical rate of 0.26 hrs/m3.Direct From Ready Mix Lorry (m3/hr). Type

Ready Mix

Via Dumper

Via Dumper

Tip Direct

Tip Direct

Thrown In

Mass Fill

3.12

2.56

1.49

50mm Blinding

1.27

1.06

0.82

Ground Beams ne 0.1 m2 SA

1.52

1.30

1.00

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 20 of 100

Ground Beams ex 0.1 m2 SA

1.69

1.49

1.16

Pile Caps ne 0.1 m2 SA

1.16

1.06

0.79

Pile Caps ex 0.1 m2 SA

2.56

2.13

7.69

Duct Walls

0.78

0.71

0.52

Stub Columns

0.43

0.39

0.29

Ground Slab ne 155 mm

2.13

1.82

1.22

Ground Slab 150300 mm

2.33

1.96

1.27

Ground Slab 300500 mm

2.56

2.13

1.35

Drains, Bed 0.91 & Cover

0.85

0.73

By Lorry Mounted Concrete Pump (m3/hr). Thickness 13.5 m3/hr -->

18 m3/hr

ne 100 mm

2.17

2.63

100 - 150 2.44 mm

2.94

150 - 200 2.63 mm

3.23

200 - 300 2.86 mm

3.45

300 - 500 3.23 mm

3.85

1.64

1.82

0.5 - 0.10 1.59 m2

1.59

exc 0.10 m2

1.82

1.82

ne 150 mm

1.61

1.89

150 - 225 1.89 mm

2.33

exc 225 mm

2.56

3.23

Independent Beams

1.54

1.54

Stairs and Landings

1.27

1.89

Solid Slabs

Coffered Slabs Columns

Wall

By Dumper, From Ready Mix Lorry To Position (m3/hr). Dumper 0.6 m3 Capacity -->

0.8 m3

1.2 m3

1.5 m3

2.3 m3

0 - 20 m

14.08

18.82

25.00

33.33

10.41

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 21 of 100

20 - 50 m

9.09

12.36

16.39

22.22

29.41

50 - 100 m

7.29

10.41

13.88

18.86

25.00

100 250 m

5.78

7.87

10.00

13.51

18.18

250 500 m

3.65

4.95

8.33

8.95

12.35

500 750 m

2.16

2.92

4.27

5.43

7.87

750 1,000 m

-

-

-

3.97

5.78

By Tower/Mobile Crane (m3/hr). 0.4 m 0.6 Skip m Skip

0.8 m Skip

Pile Caps

SA ne 2 1.19 m2

1.39

1.61

Mass Fill Pours

SA 2-5 m3

1.75

2.04

2.33

ne 10 m3

3.70

4.17

4.76

10-25 m3

4.00

4.55

0.84

exc 25 m3

4.35

5.00

5.86

ne 100 mm

0.90

1.09

1.21

100-150 1.09 mm

1.31

1.47

150-200 1.26 mm

1.53

1.69

200-300 1.26 mm

1.53

1.69

Exc 300 1.38 mm

1.66

1.85

Trough & Coffered Slabs

0.95

1.09

1.21

Structural Topping ne 100 mm

0.90

1.09

1.25

Stairs & Landings

0.64

0.64

0.64

Slabs

Blinding

ne 150 mm

0.88

1.00

1.10

Beams

SA 0-0.05 m

0.52

0.58

0.69

SA 0.58 0.05-0.1 m

0.65

0.78

SA ex 0.1 m

0.76

0.85

1.02

ne 100 mm

0.64

0.76

0.88

Walls

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 22 of 100

Columns

100-150 0.76 mm

0.92

1.05

150-300 0.95 mm

1.11

1.28

exc 300 mm

1.10

1.28

1.47

SA ne 0.05 m2

0.43

0.45

0.48

0.48 SA 0.05-0.1 m2

0.50

0.54

SA ex 0.1 m2

0.53

0.57

0.51

Concrete Placement Task / Description

Slow

Ave

Fast

Units

Placing concrete, lorry based pump

30.0

40.0

50.0

m3/hr

Hollorib Decking, concrete topping

85.0

100.0

120.0

m2/hr

Hollorib Decking, concrete topping, incl PowerFloat

40.0

50.0

70.0

m2/hr

Placing Concrete, By Wheelbarrow over 1-10m

2.1

2.3

2.5

m3/hr

Placing Concrete, By Wheelbarrow over 10-20m

1.5

1.8

2.1

m3/hr

Placing Concrete, By Wheelbarrow over 20-50m

0.8

1.1

1.5

m3/hr

Placing Direct From Readymix Lorry, Mass Fill

2.8

3.1

3.3

m3/hr

Placing Direct From Readymix Lorry, 50mm Blinding

-

1.3

1.6

m3/hr

Placing Direct From Readymix Lorry, Ground Beams

1.5

-

1.7

m3/hr

Placing Direct From Readymix Lorry, Pile Caps

1.0

1.5

2.3

m3/hr

Placing Direct From Readymix Lorry, Duct Walls

-

0.8

1.1

m3/hr

Placing Direct From Readymix Lorry, Stub Columns

-

0.4

0.6

m3/hr

2.1

2.3

2.6

m3/hr

-

0.9

1.0

m3/hr

Placing From Tower Crane, Pile Caps

1.2

1.4

1.6

m3/hr

Placing From Tower Crane, Mass Fill

4.0

4.5

5.5

m3/hr

Placing From Tower Crane, Slabs under 150mm thick

0.9

1.3

1.7

m3/hr

Placing From Tower Crane, Slabs over 150mm thick

1.2

1.5

1.8

m3/hr

Placing From Tower Crane, Trough/Coffered Slabs

0.9

1.1

1.2

m3/hr

Placing From Tower Crane, Stairs and Landings

0.6

0.7

0.9

m3/hr

Placing Direct From Readymix Lorry, Ground Slab Placing Direct From Readymix Lorry,Drains Bed and Cover

Placing From Tower Crane, Blinding

0.8

1.0

1.1

m3/hr

Placing From Tower Crane, Beams under 150mm thick

0.5

0.6

0.8

m3/hr

Placing From Tower Crane, Beams over 150mm thick

0.6

0.8

1.0

m3/hr

Placing From Tower Crane, Walls

0.6

1.1

1.5

m3/hr

Placing From Tower Crane, Columns

0.4

0.5

0.6

m3/hr

Post Tensioning Works Post Tensioning Concrete - Post Tensioning Sequence: • Concrete poured 1st Bay. • After 48 hrs concrete is stressed to initial strength (15 kN takes 1 day). • 5 days after initial stressing, concrete is stressed to final strength (30 kN takes 1 day).

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 23 of 100

• Formwork may now be struck and adjacent bay poured. Post Tensioning Task / Description

Slow

Ave

Fast

Units

Lag for Initial Stress Tensioning after 1st bay cast

-

48.0

-

hrs

Lag for Final Stress Tensioning after Initial Stress

-

120.0

-

hrs

Pre-Cast Works PRECAST CONCRETE FLOOR SYSTEMS Plank Elements (crane handled) Rates given in hours/plank.

Plank ne 3m Lengths

3-6m

ex 6m

Unload/stack at ground level

0.016

0.019

0.022

Unload/stack upper levels

0.021

0.024

0.028

Sling from ground to levels

0.019

0.021

0.025

Place in position from stack

0.120

0.150

0.180

Activity

Block Elements Rates given in hours/thousand blocks.

Block 75125ex Thickness 125mm 200mm 200mm Activity Unload By pallets/stack forklift on ground By Crane

0.90

1.02

1.20

1.20

1.26

1.38

Unload By pallets/stack forklift at upper By levels Crane

1.50

1.62

1.80

2.34

2.40

2.70

Sling from ground to levels

By forklift

1.44

1.56

1.74

By Crane

1.56

1.62

1.80

12.00

13.80

15.00

Place in position from stacks

Reinforcement Footing Reinforcement

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 24 of 100

Activity

Task L Barbender/Fitter UOM (Mandays)

TASKS

Foot Rein - Placing in Position & Footing Binding - Using Mt Reinforcement TMT Bars, Mild Steel, Tor Steel

L - Helper (Mandays)

M

0.28 Mandays/0.1Mt

Bars 0.38 Include Mandays/0.1Mt 5% Wastage

Bars 0.28 Include Mandays/0.1Mt 5% Wastage

Bars 0.32 Include Mandays/0.1Mt 5% Wastage

Foot Rein Straightening, Cutting (With Machine Cutting), bending - Using TMT Bars, Mild Steel, Tor Steel

Mt

0.2 Mandays/0.1Mt

Foot Rein Straightening, Cutting (With Manual Cutting), bending - Using TMT Bars, Mild Steel, Tor Steel

Mt

0.29 Mandays/0.1Mt

M

M

Binding Wire : 5 kg/0.1Mt

Cover Blocks 10No/0.1Mt

Reinforcement Mesh reinforcement - to slabs = 10.5 m2/hr Mesh reinformcement - to beams/columns = 2.5 m2/hr Reinforcement Task / Description

Slow

Ave

Fast

Units

Slabs/Foundations, steelfixing, 6mm

40.3

38.4

36.5

hrs/tonne

Slabs/Foundations, steelfixing, 8mm

28.2

26.9

25.8

hrs/tonne

Slabs/Foundations, steelfixing, 10mm

22.5

20.6

20.1

hrs/tonne

Slabs/Foundations, steelfixing, 12mm

16.9

16.3

15.4

hrs/tonne

Slabs/Foundations, steelfixing, 16mm

12.0

11.5

10.9

hrs/tonne

Slabs/Foundations, steelfixing, 20mm

9.2

8.6

8.2

hrs/tonne

Slabs/Foundations, steelfixing, 25mm

6.9

6.7

6.5

hrs/tonne

Slabs/Foundations, steelfixing, 32mm

5.7

5.5

5.2

hrs/tonne

Slabs/Foundations, steelfixing, 40mm

5.3

5.1

4.9

hrs/tonne

Slabs/Foundations, steelfixing, 50mm

5.2

4.9

4.6

hrs/tonne

Beams/Columns, steelfixing, 6mm

55.4

52.8

50.6

hrs/tonne

Beams/Columns, steelfixing, 8mm

38.8

37.0

35.1

hrs/tonne

Beams/Columns, steelfixing, 10mm

29.5

28.4

26.9

hrs/tonne

Beams/Columns, steelfixing, 12mm

23.4

22.4

21.9

hrs/tonne

Beams/Columns, steelfixing, 16mm

16.6

15.8

15.1

hrs/tonne

Beams/Columns, steelfixing, 20mm

12.4

11.9

11.3

hrs/tonne

Beams/Columns, steelfixing, 25mm

9.9

9.2

8.7

hrs/tonne

Beams/Columns, steelfixing, 32mm

6.8

6.6

6.2

hrs/tonne

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 25 of 100

Beams/Columns, steelfixing, 40mm

6.1

5.9

5.6

hrs/tonne

Beams/Columns, steelfixing, 50mm

6.1

5.9

5.6

hrs/tonne

Walls, steelfixing, 6mm

41.2

40.8

39.1

hrs/tonne

Walls, steelfixing, 8mm

29.2

28.6

27.4

hrs/tonne

Walls, steelfixing, 10mm

22.7

22.0

21.2

hrs/tonne

Walls, steelfixing, 12mm

17.6

17.3

16.9

hrs/tonne

Walls, steelfixing, 16mm

12.4

12.2

11.8

hrs/tonne

Walls, steelfixing, 20mm

9.4

9.2

8.7

hrs/tonne

Walls, steelfixing, 25mm

7.4

7.2

7.0

hrs/tonne

Walls, steelfixing, 32mm

7.0

6.8

6.4

hrs/tonne

Walls, steelfixing, 40mm

6.4

6.1

5.9

hrs/tonne

Walls, steelfixing, 50mm

5.3

5.1

4.8

hrs/tonne

Staircases, steelfixing, 6mm

48.9

48.0

45.5

hrs/tonne

Staircases, steelfixing, 8mm

34.4

33.6

31.9

hrs/tonne

Staircases, steelfixing, 10mm

26.6

25.8

24.3

hrs/tonne

Staircases, steelfixing, 12mm

20.9

20.4

19.5

hrs/tonne

Staircases, steelfixing, 16mm

14.6

14.4

13.8

hrs/tonne

Staircases, steelfixing, 20mm

11.3

10.8

10.5

hrs/tonne

Staircases, steelfixing, 25mm

8.6

8.4

8.2

hrs/tonne

Reinforcement Ratios Reinforcement Ratios Task / Description

Slow

Ave

Fast

Units

Pile Cap, Concrete m3 x Ratio = Rebar Tonnes

-

14.8

-

% ratio

Base Slab, Concrete m3 x Ratio = Rebar Tonnes

-

13.2

14.1

% ratio

Suspended Slab, Concrete m3 x Ratio = Rebar Tonnes

-

20.6

25.6

% ratio

Platform Slab, Concrete m3 x Ratio = Rebar Tonnes

-

15.6

-

% ratio

Columns, Concrete m3 x Ratio = Rebar Tonnes

15.8

18.7

28.7

% ratio

Walls, Concrete m3 x Ratio = Rebar Tonnes

14.7

15.0

-

% ratio

M

M

M

Binding Wire : 5 kg/0.1Mt

Cover Blocks 10No/0.1Mt

Staircase Reinforcement

Activity

TASKS

Staircase Rein Placing in Position Staircase & Binding - Using Reinforcement TMT Bars, Mild Steel, Tor Steel

Task L Barbender/Fitter UOM (Mandays)

Mt

0.32 Mandays/0.1Mt

L - Helper (Mandays)

Bars 0.34 Include Mandays/0.1Mt 5% Wastage

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 26 of 100

Staircase Rein Straightening, Cutting (With Machine Cutting), bending - Using TMT Bars, Mild Steel, Tor Steel.

Staircase ReinStraightening, Cutting (With Manual Cutting), bending - Using TMT Bars, Mild Steel, Tor Steel.

Mt

Mt

0.2 Mandays/0.1Mt

0.29 Mandays/0.1Mt

0.28 Bars Mandays/0.1Mt Include 5% Wastage

Bars 0.32 Include Mandays/0.1Mt 5% Wastage

Walls Reinforcement

Activity

TASKS

Walls Rein Placing in Position Walls & Binding - Using Reinforcement TMT Bars, Mild Steel, Tor Steel

Task L Barbender/Fitter UOM (Mandays)

L - Helper (Mandays)

M

Mt

0.41 Mandays/0.1Mt

Bars 0.45 Include Mandays/0.1Mt 5% Wastage

Walls Rein Straightening, Cutting (With Machine Cutting), bending - Using TMT Bars, Mild Steel, Tor Steel.

Mt

0.2 Mandays/0.1Mt

Bars 0.28 Include Mandays/0.1Mt 5% Wastage

Walls Rein Straightening, Cutting (With Manual Cutting), bending - Using TMT Bars, Mild Steel, Tor Steel.

Mt

0.39 Mandays/0.1Mt

Bars 0.43 Include Mandays/0.1Mt 5% Wastage

Mt

0.47 Mandays/0.1Mt

Bars 0.5 Include Mandays/0.1Mt 5% Wastage

Mt

0.55 Mandays/0.1Mt

Bars 0.57 Include Mandays/0.1Mt 5% Wastage

Walls Rein Stirrups Cutting and Bending

Walls Rein Stirrups Teing

M

M

Binding Wire : 5 kg/0.1Mt

Cover Blocks 10No/0.1Mt

Decking

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 27 of 100

Decking Task / Description

Slow

Ave

Fast

-

7.1

-

Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover

Units

m/day

Demolition & Break Out Breaking Out & Openings Breaking Out Concrete And Remove (hrs/m3)

Slabs - unreinforced

Slabs - reinforced

Walls - unreinforced

Depth

Hand Machine

Ne 50 mm

2.35

1.96

50 - 100 mm

3.15

2.46

100 - 200 mm 3.75

3.94

200 - 300 mm 4.12

5.55

Ne 50 mm

4.71

3.92

50 - 100 mm

5.52

4.32

100 - 200 mm 5.88

4.71

200 - 300 mm 6.12

9.09

all walls

3.04

4.71

Walls - reinforced

all walls

5.52

3.92

Beams - reinforced

all sizes

7.50

5.89

Columns - reinforced

all sizes

9.20

7.30

Foundations - unreinforced all sizes

3.60

3.00

Foundations - reinforced

5.40

4.80

all sizes

Breaking Out Tarmac Rates include for breaking out and removal of rubble (hrs/m3).

Pavings

Depth

Hand Machine

Ne 50 mm

1.96

1.56

50-100 mm

2.08

1.64

100-150 mm 2.17

1.75

Roadways upto 150 mm

3.57

Breaking Out Brickwork Rates include for breaking out and removal of rubble (hrs/m3). Depth

Hand Machine

Walls/columns Ne 100 mm 2.40

1.38

exc 100 mm 2.75

1.57

all sizes

1.57

Foundation

2.75

Breaking Diaphragm Wall

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 28 of 100

Breaking Openings using coring machine 0.2m3/hour Breaking out to expose couplers using hand held braker 1.75m2/day ot 2.5m run/day (0.7m slab)

Task / Description

Slow

Ave

Fast

Units

Concrete Slabs, unreinforced 50-150mm

3.2

-

1.9

hrs/m3

Concrete Slabs, unreinforced 150-300mm

5.5

4.1

3.7

hrs/m3

Concrete Slabs, reinforced 50-150mm

5.2

-

3.9

hrs/m3

Concrete Slabs, reinforced 150-300mm

9.1

6.2

4.7

hrs/m3

Concrete Walls, unreinforced

4.7

3.9

3.1

hrs/m3

Concrete Walls, reinforced

5.6

4.7

3.9

hrs/m3

Concrete Foundations, unreinforced

3.6

3.3

3.0

hrs/m3

Concrete Foundations, reinforced

5.4

5.1

4.8

hrs/m3

Concrete Beams

7.5

6.5

5.6

hrs/m3

Concrete Columns

9.2

8.2

7.3

hrs/m3

Tarmac paving 20-50mm thick

1.9

1.7

1.5

hrs/m3

Tarmac paving 50-100mm thick

2.1

-

1.6

hrs/m3

Tarmac paving 100-150mm thick

2.1

-

1.7

hrs/m3

Tarmac roadway 150mm thick

-

3.6

-

hrs/m3

Brickwork, walls and columns

2.4

1.8

1.3

hrs/m3

Brickwork, foundations

2.7

2.1

1.5

hrs/m3

Cutting Holes Cutting Holes in concrete by Hand (no/hr

Hole depth (mm) --> 0-75 75-125 125-250 250-375 375-500

Ne 50 cm2

2.94 1.85

1.75

-

-

50-100 cm2

2.22 1.39

1.32

-

-

100-150 cm2

1.67 1.11

1.05

-

-

250-500 cm2

1.28 0.88

0.83

-

-

Cutting Holes in concrete by Machine (no/hr)

Hole depth (mm) --> 0-75 75-125 125-250 250-375 375-500

Ne 50 cm2

-

-

5.88

5.00

4.55

50-100 cm2

-

-

4.00

3.45

3.03

100-150 cm2

-

-

2.50

2.17

1.92

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 29 of 100

150-250 cm2

-

-

1.67

1.45

1.28

250-500 cm2

Common Brickwork Common Brickwork, by Machine (no/hr) Hole depth (mm) --> 0-75 75-125 125-250 250-375 375-500 Ne 100 cm2

-

16.6

7.69

5.26

4.00

100-250 cm2

-

12.5

5.88

4.00

2.94

250-500 cm2

-

10.0

5.00

3.33

2.50

500-100 cm2

-

8.33

4.17

2.78

2.08

Common Brickwork, by Hand (no/hr) Hole depth (mm) --> 0-75 75-125 125-250 250-375 375-500 Ne 100 cm2

11.1 8.33

5.56

3.85

-

100-250 cm2

9.09 7.14

4.55

3.23

-

250-500 cm2

7.69 5.88

3.85

2.70

-

500-100 cm2

6.67 4.76

3.23

2.27

-

Cutting Back Cutting Back Concrete Cutting Piles For Pile Caps, Using Breaker & Air Tools Providing A Rough Finish (hrs/pile)

Pile Diameter-->

0.35m 0.5m 0.6m 0.79m 0.94m 1.1m 2.2m

0 - 100mm high

0.32

0.44 0.63 0.93

1.38

1.74

8.10

100-200mm high

0.39

0.56 0.81 1.22

1.83

2.16

8.58

200-300mm high

0.44

0.64 0.94 1.45

1.92

2.34

9.00

300-500mm high

0.49

0.72 1.07 1.65

2.10

2.50

9.50

500-750mm high

0.68

1.02 1.54 2.16

2.55

2.55 10.01

750-1000mm high 0.83

1.32 1.78 2.36

3.37

4.20 10.52

Providing A Neat Finish (hrs/pile)

Pile Diameter-->

0.35m 0.5m 0.6m 0.79m 0.94m 1.1m 2.2m

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 30 of 100

0 - 100 mm high

-

0.63 0.90 1.32

1.93

2.25

9.72

100-200 mm high

-

0.76 1.11 1.65

2.39

2.81 10.29

200-300 mm high

-

0.85 1.25 1.93

2.49

3.04 10.85

300-500 mm high

-

1.05 1.59 2.38

2.73

3.25 11.40

500-750 mm high

-

1.41 2.13 2.97

3.45

4.30 12.01

750-1000mm high -

2.07 2.79 3.72

4.38

5.43 12.62

Cut Concrete Slabs Using Trolley Type Clipper Saw (m/hr)

Ne 25 mm deep 15.2

25-50 mm deep 11.5

50-75 mm deep 6.67

Cutting Back Task / Description

Slow

Ave

Fast

Units

Concrete Pile Caps, 50-300mm deep and 0.6m dia

0.6

-

0.3

hrs/no

Concrete Pile Caps, 300-750mm deep and 0.6m dia

1.5

-

0.4

hrs/no

Concrete Pile Caps, > 750mm deep and 0.6m dia

1.8

-

0.8

hrs/no

Concrete Pile Caps, 50-300mm deep and 1.1m dia

1.9

-

0.8

hrs/no

Concrete Pile Caps, 300-750mm deep and 1.1m dia

2.5

-

1.1

hrs/no

Concrete Pile Caps, > 750mm deep and 1.1m dia

4.2

-

2.3

hrs/no

Concrete Pile Caps, 50-300mm deep and 2.5m dia

9.2

-

8.2

hrs/no

Concrete Pile Caps, 300-750mm deep and 2.5m dia

10.1

-

9.5

hrs/no

Concrete Pile Caps, > 750mm deep and 2.5m dia

11.5

-

10.2

hrs/no

Concrete, Cutting Slabs, 5-25m deep

-

15.2

-

m/hr

Concrete, Cutting Slabs, 25-50m deep

-

11.5

-

m/hr

Concrete, Cutting Slabs, 50-75m deep

-

6.7

-

m/hr

Concrete, Cutting Holes, coring machine

-

0.2

-

m3/hr

Concrete, Cutting Back to expose couplers 0.7m slab

-

2.5

-

m/day

Slow

Ave

Fast

Units

Concrete, cutting by hand, < 25mm wide

1.5

2.1

3.1

m/hr

Concrete, cutting by hand, 25-50mm wide

1.2

1.6

2.5

m/hr

Cutting Chases Cutting Chases Task / Description

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 31 of 100

Concrete, cutting by hand, 50-75mm wide

1.0

1.4

2.1

m/hr

Concrete, cutting by hand, 75-100mm wide

0.9

1.2

1.8

m/hr

Concrete, cutting by machine, < 25mm wide

3.1

4.0

5.8

m/hr

Concrete, cutting by machine, 25-50mm wide

2.5

3.3

5.0

m/hr

Concrete, cutting by machine, 50-75mm wide

2.1

2.9

4.2

m/hr

Concrete, cutting by machine, 75-100mm wide

1.8

2.4

3.7

m/hr

Brickwork, cutting by hand, < 25mm wide

2.1

2.7

4.1

m/hr

Brickwork, cutting by hand, 25-50mm wide

1.6

2.3

3.5

m/hr

Brickwork, cutting by hand, 50-75mm wide

1.4

1.9

2.8

m/hr

Brickwork, cutting by hand, 75-100mm wide

1.2

1.6

2.5

m/hr

Brickwork, cutting by machine, < 25mm wide

4.2

5.5

11.1

m/hr

Brickwork, cutting by machine, 25-50mm wide

3.3

4.5

6.7

m/hr

Brickwork, cutting by machine, 50-75mm wide

3.3

4.5

6.7

m/hr

Brickwork, cutting by machine, 75-100mm wide

2.5

3.3

5.0

m/hr

Light Blockwork, cutting by hand, < 25mm wide

3.8

5.0

7.7

m/hr

Light Blockwork, cutting by hand, 25-50mm wide

3.2

4.2

6.3

m/hr

Light Blockwork, cutting by hand, 50-75mm wide

2.6

3.4

5.3

m/hr

Light Blockwork, cutting by hand, 75-100mm wide

2.3

3.1

4.5

m/hr

Light Blockwork, cutting by machine, < 25mm wide

7.7

10.0

14.2

m/hr

Light Blockwork, cutting by machine, 25-50mm wide

5.9

7.7

11.1

m/hr

Light Blockwork, cutting by machine, 50-75mm wide

5.2

7.2

10.0

m/hr

Light Blockwork, cutting by machine, 75-100mm wide

4.7

6.3

9.1

m/hr

Heavy Blockwork, cutting by hand, < 25mm wide

1.9

2.6

3.8

m/hr

Heavy Blockwork, cutting by hand, 25-50mm wide

1.6

2.1

3.2

m/hr

Heavy Blockwork, cutting by hand, 50-75mm wide

1.3

1.8

2.7

m/hr

Heavy Blockwork, cutting by hand, 75-100mm wide

1.2

1.5

2.3

m/hr

Heavy Blockwork, cutting by machine, < 25mm wide

3.8

5.0

7.7

m/hr

Heavy Blockwork, cutting by machine, 25-50mm wide

3.2

4.2

6.2

m/hr

Heavy Blockwork, cutting by machine, 50-75mm wide

2.7

3.6

5.2

m/hr

Heavy Blockwork, cutting by machine, 75-100mm wide

2.3

3.1

4.5

m/hr

Slow

Ave

Fast

Units

Cutting in Concrete, small box

7.1

9.5

12.5

no/hr

Cutting in Concrete, large box

3.6

4.5

5.6

no/hr

Cutting in Brickwork, small box

6.6

9.5

12.5

no/hr

Cutting in Brickwork, large box

4.2

5.3

6.3

no/hr

Cutting in Lightweight Blockwork, small box

20.0

23.0

25.0

no/hr

Cutting in Lightweight Blockwork, large box

10.0

12.5

14.3

no/hr

Cutting in Heavyweight Blockwork, small box

7.7

10.0

12.5

no/hr

Cutting in Heavyweight Blockwork, large box

3.8

4.8

5.9

no/hr

Cutting Switchboxes Cutting Switchboxes Task / Description

Housing Demolitions Demolition

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 32 of 100

Task / Description

Slow

Ave

Fast

-

2.5

-

Remove & Cart away, Ceramic Wall Tiles

2.0

2.5

3.4

m2/hr

Remove & Cart away, Wallpaper, 1 layer

-

8.7

-

m2/hr

Remove & Cart away, Wallpaper, 2 layers

-

7.1

-

m2/hr

Remove & Cart away, Wallpaper, 3 layers

-

5.7

-

m2/hr

Remove & Cart away, Lathe and Plaster Ceilings

3.2

4.6

5.0

m2/hr

Remove & Cart away, Plaster to Walls

2.1

3.1

5.9

m2/hr

Weight, Structural Steel

Units Tonnes/m3

Remove & Cart away, External Render

-

3.9

-

m2/hr

Remove & Cart away, Floor Screed

-

3.2

-

m2/hr

Remove & Cart away, Concrete Paving

-

4.0

-

m2/hr

Remove & Cart away, Brickwork Walls, 1.0 brick thick

-

1.3

-

m2/hr

Remove & Cart away, Brickwork Walls, 0.5 brick thick

-

2.6

-

m2/hr

Remove & Cart away, Brickwork Walls, Sand/Lime Mortar

-

1.8

-

hrs/100

Remove & Cart away, Fireplace and Hearth

-

1.9

-

hrs/no

Remove & Cart away, Floor Boards

-

6.2

-

m2/hr

Remove & Cart away, Skirting, Architrave, Dado rail etc

-

16.5

-

m/hr

Remove & Cart away, Staircase

-

7.3

-

hrs/no

Remove & Cart away, Windows, 0-1m2

-

0.6

-

hrs/no

Remove & Cart away, Windows 1-2m2

-

0.8

-

hrs/no

Remove & Cart away, Windows 2-3m2

-

0.9

-

hrs/no

Remove & Cart away, Doors

-

0.3

-

hrs/on

Remove & Cart away, Door Frame

-

0.1

-

hrs/no

Remove & Cart away, Floor and Ceiling Joists

-

1.1

-

hrs/m

Remove & Cart away, Wall Plates

-

3.9

-

hrs/m

Remove & Cart away, Iron Bath

-

1.4

-

/hrs/no

Remove & Cart away, Wash Basin/Sink

-

0.8

-

/hrs/no

Remove & Cart away, Pipework including brackets etc

-

6.1

-

m/hr

Removal of Housing Finishes HACKING OFF/ REMOVE MATERIALS Removal of Housing Finishes

Ceramic wall tiles Wallpaper

.

All rates in m2/hr, unless otherwise indicated. Remove and cart away.

2.50 -1 layer

8.70

-2 layers

7.05

-3 layers

5.75

Lathe & Plaster ceilings

4.55

Plaster to walls

3.05

External render

3.90

Floor screed

3.05

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 33 of 100

Concrete paving Brickwalls London Stocks

4.00 x 1 brick

1.35

- Londond Stocks x 0.5 bricks

2.65

Sand/Lime mortar

1.80 hrs/100

Fireplace and metal hearth

1.90 hrs/no

Floor Boards

6.20

Architrave, dado, skirting etc

16.50 m/hr

Staircase Windows

7.35 hrs/no 2

0.65 hrs/no

1 - 2 m2

0.80 hrs/no

2 - 3 m2

0.91 hrs/no

0-1m

Doors

0.25 hrs/no

Door frame

0.10 hrs/no

Floor & Ceiling Joists

1.09 hrs/m

Wall plate

3.90 hrs/m

Bath

1.45 hrs/no

Basin

0.85 hrs/no

Pipework, incl brackets etc

6.15 m/hr

Drainage, Manholes and Gulleys Manholes and Gulleys Slow

Ave

Fast

Concrete Pre-Cast Manhole Units, 610 x 455 x 51 mm

Task / Description

-

1.2

-

hrs/no

Concrete Pre-Cast Manhole Units, 990 x 610 x 64 mm

-

1.6

-

hrs/no

Brickwork Manhole, 1.0 brick engineering

-

0.3

-

m2/hr

Brickwork Manhole, 1.5 brick engineering

-

0.2

-

m2/hr

Brickwork Manhole, 2.0 brick engineering

-

0.2

-

m2/hr

Benching to Manhole, under 0.5m2

-

0.9

-

hrs/no

Benching to Manhole, 0.5-0.75m2

-

1.2

-

hrs/no

Benching to Manhole, 0.75-1.0m2

-

1.8

-

hrs/no

Brickwork Manhole, build in pipes, under 150mm dia

-

0.1

-

hrs/no

Brickwork Manhole, build in pipes, 150-225mm dia

-

0.2

-

hrs/no

Brickwork Manhole, build in pipes, over 225mm dia

-

0.3

-

hrs/no

0.3

0.6

1.2

hrs/no

Yard Gulleys, 75-150mm dia pipes, bed and level

-

2.2

-

no/hr

Yard Gulleys, 150-225mm dia pipes, bed and level

-

1.8

-

no/hr

Yard Gulleys, 225-300mm dia pipes, bed and level

-

1.5

-

no/hr

Brickwork Manhole, build in cast iron covers

http://www.planningplanet.com/print/book/export/html/422384

Units

11/3/2014

Page 34 of 100

Road Gulleys, 600mm deep, bed and level

-

1.2

-

no/hr

Road Gulleys, 750mm deep, bed and level

-

0.8

-

no/hr

Road Gulleys, 900mm deep, bed and level

-

0.4

-

no/hr

Road Gulleys, 1,200mm deep, bed and level

-

0.3

-

no/hr

Road Gulleys, install gratings

-

5.0

-

no/hr

PVC Manhole

-

15.0

-

mins/no

Land Drains Task / Description

Slow

Ave

Fast

Units

Land Drains, Concrete, butt jointed, under 150mm dia, 0-5m run

-

11.6

-

m/hr

Land Drains, Concrete, butt jointed, under 150mm dia, 5-30m run

-

14.1

-

m/hr

Land Drains, Concrete, butt jointed, under 150mm dia, over 30m run

-

18.8

-

m/hr

Land Drains, Concrete, butt jointed, 150-225mm dia, 0-5m run

-

8.4

-

m/hr

Land Drains, Concrete, butt jointed, 150-225mm dia, 5-30m run

-

10.2

-

m/hr

Land Drains, Concrete, butt jointed, 150-225mm dia, over 30m run

-

11.9

-

m/hr

Land Drains, Concrete, butt jointed, 225-300mm dia, 0-5m run

-

5.4

-

m/hr

Land Drains, Concrete, butt jointed, 225-300mm dia, 5-30m run

-

6.5

-

m/hr

Land Drains, Concrete, butt jointed, 225-300mm dia, over 30m run

-

7.9

-

m/hr

Drainage Task / Description

Slow

Ave

Fast

Units

PVC Drainage, 1m pipes, 100-150mm dia, 0-5m run

-

5.7

-

m/hr

PVC Drainage, 1m pipes, 100-150mm dia, 5-30m run

-

8.1

-

m/hr

PVC Drainage, 1m pipes, 100-150mm dia, over 30m run

-

9.5

-

m/hr

PVC Drainage, 3m pipes, 100-150mm dia, 0-5m run

-

12.2

-

m/hr

PVC Drainage, 3m pipes, 100-150mm dia, 5-30m run

-

15.2

-

m/hr

PVC Drainage, 3m pipes, 100-150mm dia, over 30m run

-

18.2

-

m/hr

PVC Drainage, 6m pipes, 100-150mm dia, 0-5m run

-

22.2

-

m/hr

PVC Drainage, 6m pipes, 100-150mm dia, 5-30m run

-

27.7

-

m/hr

PVC Drainage, 6m pipes, 100-150mm dia, over 30m run

-

33.3

-

m/hr

PVC Drainage, 3m pipes, 150-200mm dia, 5-30m run

-

10.6

-

m/hr

PVC Drainage, 3m pipes, 150-200mm dia, over 30m run

-

12.8

-

m/hr

PVC Drainage, 6m pipes, 150-200mm dia, 5-30m run

-

21.2

-

m/hr

PVC Drainage, 6m pipes, 150-200mm dia, over 30m run

-

25.6

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 75mm dia, 0-5m run

-

4.7

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 75mm dia, 5-30m run

-

5.5

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 75mm dia, over 30m run

-

6.6

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 100mm dia, 0-5m run

-

4.4

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 100mm dia, 5-30m run

-

5.0

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 100mm dia, over 30m run

-

6.2

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 150mm dia, 0-5m run

-

3.2

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 150mm dia, 5-30m run

-

3.8

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 150mm dia, over 30m run

-

4.5

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 225mm dia, 0-5m run

-

2.1

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 225mm dia, 5-30m run

-

2.6

-

m/hr

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 35 of 100

Stoneware Drainage, Cement/Sand Joints, 225mm dia, over 30m run

-

3.1

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 300mm dia, 0-5m run

-

1.4

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 300mm dia, 5-30m run

-

1.7

-

m/hr

Stoneware Drainage, Cement/Sand Joints, 300mm dia, over 30m run

-

2.4

-

m/hr

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 0-5m run

-

1.1

-

m/hr

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 5-30m run

-

1.3

-

m/hr

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, over 30m run

-

1.6

-

m/hr

Stoneware Drainage, Flexible Joints, 75mm dia, 0-5m run

-

8.3

-

m/hr

Stoneware Drainage, Flexible Joints, 75mm dia, 5-30m run

-

10.0

-

m/hr

Stoneware Drainage, Flexible Joints, 75mm dia, over 30m run

-

12.5

-

m/hr

Stoneware Drainage, Flexible Joints, 100mm dia, 0-5m run

-

7.7

-

m/hr

Stoneware Drainage, Flexible Joints, 100mm dia, 5-30m run

-

9.1

-

m/hr

Stoneware Drainage, Flexible Joints, 100mm dia, over 30m run

-

10.0

-

m/hr

Stoneware Drainage, Flexible Joints, 150mm dia, 0-5m run

-

5.2

-

m/hr

Stoneware Drainage, Flexible Joints, 150mm dia, 5-30m run

-

6.2

-

m/hr

Stoneware Drainage, Flexible Joints, 150mm dia, over 30m run

-

7.7

-

m/hr

Stoneware Drainage, Flexible Joints, 225mm dia, 0-5m run

-

2.7

-

m/hr

Stoneware Drainage, Flexible Joints, 225mm dia, 5-30m run

-

3.3

-

m/hr

Stoneware Drainage, Flexible Joints, 225mm dia, over 30m run

-

4.0

-

m/hr

Stoneware Drainage, Flexible Joints, 300mm dia, 0-5m run

-

1.7

-

m/hr

Stoneware Drainage, Flexible Joints, 300mm dia, 5-30m run

-

2.1

-

m/hr

Stoneware Drainage, Flexible Joints, 300mm dia, over 30m run

-

2.5

-

m/hr

Stoneware Drainage, Flexible Joints, over 375mm dia, 0-5m run

-

1.4

-

m/hr

Stoneware Drainage, Flexible Joints, over 375mm dia, 5-30m run

-

1.6

-

m/hr

Stoneware Drainage, Flexible Joints, over 375mm dia, over 30m run

-

2.1

-

m/hr

PVC, Stoneware, Pitch Fibre & Concrete Joints

-

2.4

-

mins/no

Pitch Fibre Pipes, 75mm dia, 0-5m run

-

9.1

-

m/hr

Pitch Fibre Pipes, 75mm dia, 5-30m run

-

16.6

-

m/hr

Pitch Fibre Pipes, 75mm dia, over 30m run

-

20.0

-

m/hr

Pitch Fibre Pipes, 100mm dia, 0-5m run

-

9.1

-

m/hr

Pitch Fibre Pipes, 100mm dia, 5-30m run

-

16.6

-

m/hr

Pitch Fibre Pipes, 100mm dia, over 30m run

-

20.0

-

m/hr

Pitch Fibre Pipes, 150mm dia, 0-5m run

-

6.6

-

m/hr

Pitch Fibre Pipes, 150mm dia, 5-30m run

-

12.5

-

m/hr

Pitch Fibre Pipes, 150mm dia, over 30m run

-

14.3

-

m/hr

Pitch Fibre Pipes, 200mm dia, 0-5m run

-

6.2

-

m/hr

Pitch Fibre Pipes, 200mm dia, 5-30m run

-

11.1

-

m/hr

Pitch Fibre Pipes, 200mm dia, over 30m run

-

12.5

-

m/hr

Pitch Fibre Pipes, 225mm dia, 0-5m run

-

5.8

-

m/hr

Pitch Fibre Pipes, 225mm dia, 5-30m run

-

10.0

-

m/hr

Pitch Fibre Pipes, 225mm dia, over 30m run

-

12.1

-

m/hr

Hepsleve Rubber Joint System, 75mm dia, 0-5m run

-

12.5

-

m/hr

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 36 of 100

Hepsleve Rubber Joint System, 75mm dia, 5-30m run

-

14.3

-

m/hr

11.2

16.6

30.1

m/hr

Hepsleve Rubber Joint System, 100mm dia, 0-5m run

-

10.0

-

m/hr

Hepsleve Rubber Joint System, 100mm dia, 5-30m run

-

12.5

-

m/hr

Hepsleve Rubber Joint System, 100mm dia, over 30m run

-

14.3

-

m/hr

Hepsleve Rubber Joint System, 150mm dia, 0-5m run

-

7.1

-

m/hr

Hepsleve Rubber Joint System, 150mm dia, 5-30m run

-

9.1

-

m/hr

8.3

10.0

13.8

m/hr

Hepsleve Rubber Joint System, 225mm dia, 0-5m run

-

6.8

-

m/hr

Hepsleve Rubber Joint System, 225mm dia, 5-30m run

-

4.5

-

m/hr

Hepsleve Rubber Joint System, 225mm dia, over 30m run

-

5.5

-

m/hr

Hepsleve Rubber Joint System, 300mm dia, 0-5m run

-

2.5

-

m/hr

Hepsleve Rubber Joint System, 300mm dia, 5-30m run

-

2.9

-

m/hr

Hepsleve Rubber Joint System, 300mm dia, over 30m run

-

3.7

-

m/hr

Hepsleve Rubber Joint System, over 375mm dia, 0-5m run

-

1.9

-

m/hr

Hepsleve Rubber Joint System, over 375mm dia, 5-30m run

-

2.3

-

m/hr

Hepsleve Rubber Joint System, over 375mm dia, over 30m run

-

2.7

-

m/hr

Concrete Pipes, 1.5m pipes, 375mm dia, 0-5m run

-

2.8

-

m/hr

Concrete Pipes, 1.5m pipes, 375mm dia, 5-30m run

-

3.4

-

m/hr

Concrete Pipes, 1.5m pipes, 375mm dia, over 30m run

-

3.8

-

m/hr

Concrete Pipes, 1.5m pipes, 450mm dia, 0-5m run

-

2.7

-

m/hr

Concrete Pipes, 1.5m pipes, 450mm dia, 5-30m run

-

3.2

-

m/hr

Concrete Pipes, 1.5m pipes, 450mm dia, over 30m run

-

3.6

-

m/hr

Concrete Pipes, 1.5m pipes, 525mm dia, 0-5m run

-

2.5

-

m/hr

Concrete Pipes, 1.5m pipes, 525mm dia, 5-30m run

-

2.9

-

m/hr

Concrete Pipes, 1.5m pipes, 525mm dia, over 30m run

-

3.4

-

m/hr

Concrete Pipes, 1.5m pipes, 600mm dia, 0-5m run

-

2.4

-

m/hr

Concrete Pipes, 1.5m pipes, 600mm dia, 5-30m run

-

2.7

-

m/hr

Concrete Pipes, 1.5m pipes, 600mm dia, over 30m run

-

3.3

-

m/hr

Concrete Pipes, 1.5m pipes, 675mm dia, 0-5m run

-

2.2

-

m/hr

Concrete Pipes, 1.5m pipes, 675mm dia, 5-30m run

-

2.6

-

m/hr

Concrete Pipes, 1.5m pipes, 675mm dia, over 30m run

-

2.9

-

m/hr

Concrete Pipes, 1.5m pipes, 750mm dia, 0-5m run

-

1.1

-

m/hr

Concrete Pipes, 1.5m pipes, 750mm dia, 5-30m run

-

2.4

-

m/hr

Concrete Pipes, 1.5m pipes, 750mm dia, over 30m run

-

2.5

-

m/hr

Concrete Pipes, 1.5m pipes, 1,050mm dia

-

2.9

4.2

m/day

Concrete Pipes, 1.5m pipes, 1,500mm dia

-

2.5

3.8

m/day

Concrete Pipes, 1.5m pipes, 1,800mm dia

-

2.1

2.6

m/day

Concrete Pipes, 2.5m pipes, 375mm dia, 0-5m run

-

3.6

-

m/hr

Concrete Pipes, 2.5m pipes, 375mm dia, 5-30m run

-

4.3

-

m/hr

Concrete Pipes, 2.5m pipes, 375mm dia, over 30m run

-

5.0

8.0

m/hr

Concrete Pipes, 2.5m pipes, 450mm dia, 0-5m run

-

3.4

-

m/hr

Concrete Pipes, 2.5m pipes, 450mm dia, 5-30m run

-

4.1

-

m/hr

Concrete Pipes, 2.5m pipes, 450mm dia, over 30m run

-

4.5

9.0

m/hr

Concrete Pipes, 2.5m pipes, 525mm dia, 0-5m run

-

3.3

-

m/hr

Concrete Pipes, 2.5m pipes, 525mm dia, 5-30m run

-

3.8

-

m/hr

Hepsleve Rubber Joint System, 75mm dia, over 30m run

Hepsleve Rubber Joint System, 150mm dia, over 30m run

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 37 of 100

Concrete Pipes, 2.5m pipes, 525mm dia, over 30m run

-

4.1

-

m/hr

Concrete Pipes, 2.5m pipes, 600mm dia, 0-5m run

-

3.0

-

m/hr

Concrete Pipes, 2.5m pipes, 600mm dia, 5-30m run

-

3.5

-

m/hr

Concrete Pipes, 2.5m pipes, 600mm dia, over 30m run

-

4.0

-

m/hr

Concrete Pipes, 2.5m pipes, 675mm dia, 0-5m run

-

2.8

-

m/hr

Concrete Pipes, 2.5m pipes, 675mm dia, 5-30m run

-

3.3

-

m/hr

Concrete Pipes, 2.5m pipes, 675mm dia, over 30m run

-

3.7

-

m/hr

Concrete Pipes, 2.5m pipes, 750mm dia, 0-5m run

-

2.6

-

m/hr

Concrete Pipes, 2.5m pipes, 750mm dia, 5-30m run

-

3.1

-

m/hr

Concrete Pipes, 2.5m pipes, 750mm dia, over 30m run

-

3.6

-

m/hr

Lay Shingle Around Pipework, under 150mm dia

-

7.0

-

m/hr

Lay Shingle Around Pipework, over 150mm dia

4.0

5.5

9.0

m/hr

Slow

Ave

Fast

Units

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works

6.4

8.0

9.4

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works

5.5

6.9

8.1

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works

5.2

6.5

7.9

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works

4.7

5.9

8.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works

12.6

15.4

18.9

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works

11.7

14.3

16.7

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works

10.9

13.3

15.6

m3/hr

9.7

11.8

14.0

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works

18.2

20.0

23.0

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works

16.5

18.1

20.0

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works

15.4

16.7

19.3

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works

13.3

15.4

17.7

m3/hr

Slow

Ave

Fast

Units

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil

14.5

20.0

25.6

m3/hr

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds

15.2

20.4

25.6

m3/hr

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk

12.3

18.5

23.2

m3/hr

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay

11.2

16.9

21.3

m3/hr

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil

25.4

30.3

35.7

m3/hr

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds

25.6

31.3

37.0

m3/hr

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk

22.5

27.8

33.3

m3/hr

Earthworks & Excavation Basement Excavations Basement Excavation Basement Excavation Task / Description

Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works

Excavate and Remove Excavate and Remove Task / Description

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 38 of 100

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay

18.9

24.4

30.3

m3/hr

Load Spoil to Barge, capacity 2,000m3

-

8.0

-

hrs

Load Spoil to Barge, capacity 1,500m3

-

6.5

-

hrs

Load Spoil to Barge, capacity 1,000m3

-

5.5

-

hrs

Spoil conveyor, 600mm belt, 150m/min

-

260.0

-

m3/hr

Bell Ground Anchors Bell Ground Anchors Task / Description

Slow

Ave

Fast

Units

Uncased Anchors, 10m long

-

2.0

-

no/day

Top Cased Anchors, 15m long

-

1.0

-

no/day

Anchors stressing

-

2.2

-

no/day

Bored Piling Bored Piling Task / Description

Slow

Ave

Fast

Cycle Time, 5-20m deep

8.0

4.0

4.0

days/no

Cycle Time, 20-40m deep

10.0

8.0

-

days/no

Cycle Time, 40-70m deep

25.0

10.0

-

days/no

Cycle Time, 70-90m deep

45.0

25.0

-

days/no

Cycle Time, 90-135m deep

60.0

45.0

-

days/no

Move piling setup to next location

-

2.0

-

hrs

Excave shaft by grab, general fill/uppr levels

-

3.5

-

m/hr

Excave shaft by grab, sand/minor rubble

-

2.1

-

m/hr

Excave shaft by grab, marinve/aluvium

-

2.5

-

m/hr

Excave shaft by grab/RCD, CDT

-

0.5

-

m/hr

Excave shaft by grab/RCD, CDG 200/gravel

-

0.5

-

m/hr

Excave shaft by RCD/Chisel, corestones

-

0.5

-

m/hr

Excave Rock Socket by RCD, grade IV/V rock

-

0.2

0.3

m/hr

Excave Rock Socket by RCD, grade II/III rock

-

0.1

0.2

m/hr

Excave Rock Socket by RCD, tendering rate

-

0.1

-

m/hr

Add/remove RCD plant

-

2.0

-

hrs

Add/remove RCD drill string/drill bit

-

5.0

-

hrs

Remove Obstruction, above water hand hammers

-

0.8

-

m/hr

Remove Obstruction, below water heavy chisel

-

0.5

-

m/hr

60.0

53.0

50.0

hrs

Install air lift tremmie tube

-

5.0

-

hrs

Fabricate reinforcement cages

-

2.5

-

hs/cage

Install reinforcement cages

-

2.0

-

hrs/no

Shaft cleaning, air lifting after excavation

-

8.0

-

hrs

Shaft cleaning, air lifting after cage installed

-

2.0

-

hrs

Concrete Plug, RCD off/tremmie/concrete/cure/RCD on

http://www.planningplanet.com/print/book/export/html/422384

Units

11/3/2014

Page 39 of 100

Shaft concreting/extract casing 5-70m deep

-

12.0

-

hrs

Shaft concreting/extract casing 70-95m deep

-

14.0

-

hrs

Shaft concreting/extract casing 95-135m deep

-

48.0

-

hrs

Concrete curing prior to remove telescopic casing

-

72.0

-

hrs

Concrete Testing, Coring Test

-

3.2

2.2

Concrete Testing, Sonic Logging Test

-

2.5

-

hrs/no

Concrete Testing, Vibration Test

-

6.5

-

hrs/no

m/hr

Bulk Excavation Bulk Excavation Task / Description

Slow

Ave

Fast

Units

Excavation Bulking Factor, Sand/Soil

-

15.0

20.0

%

Excavation Bulking Factor, Gravel

-

33.0

-

%

Excavation Bulking Factor, Clay/Chalk

-

40.0

-

%

Excavation Bulking Factor, Boulder Clay

-

45.0

-

%

Excavation Bulking Factor, Rock

-

60.0

-

%

Spoil Weight, Rock

-

2.5

-

Tonnes/m3

Spoil Weight, Concrete

-

2.4

-

Tonnes/m3

Spoil Weight, Landfill/CDG

-

1.9

-

Tonnes/m3

Spoil Weight, Sand

-

1.8

-

Tonnes/m3

Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle

30.0

48.0

59.0

m3/hr

Crane Mounted Clamshell Grab, 2.0m3 bucket 2.9min lift cycle

25.0

33.0

41.0

m3/hr

Crane Mounted Clamshell Grab, 2.5m3 bucket 2.9min lift cycle

34.0

42.0

52.0

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

6.9

8.7

10.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

23.4

28.6

33.4

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

45.5

50.0

58.0

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

5.6

7.1

8.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

20.5

25.0

29.0

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

36.8

40.0

46.0

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

5.6

7.1

8.3

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

20.5

25.0

28.7

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

37.0

40.0

46.0

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

4.5

6.1

7.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

17.9

22.2

25.0

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

25.7

28.6

32.9

m3/hr

Dewatering Cofferdam Works Soil Mix Wall Three auger machine drilling and mixing cement into three cores. H-piles dropped into two, then machine moves along by two holes. • An average output was 4 - 5 m/day.

Dewatering

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 40 of 100

To setup a cofferdam dewatering system, including boring, pump installation and outflow pipework and drainage tanks etc, typical rates are... • Small 2 hole system, for an overrun tunnel, with a single drilling rig takes about 7 - 10 days to get up and running. • A larger system, with 10 - 15 holes, for a station type cofferdam will take in the region of 3 weeks with 2 rigs. This can be speeded up with the use of more rigs to reduce the well boring times. A typical rate of 2.5 days per pump installation can be used to calculate detailed pumping arrangements. The water level can be dropped in a "closed cofferdam" within a 6 to 8 hour period for a 25,000 m2 cofferdam with a 2 m water level reduction. For smaller closed areas it will take only a few hours at most to reduce the water level by 2.5 - 3 metres. Recharge System - Average well depth of say 55 m deep, not into rock, 9 wells in 10 days or 1.11 days/no with an additional 4 - 5 days to connect pipework and recharge backup tanks etc. Dewatering Task / Description

Slow

Ave

Fast

Units

10.0

8.0

6.0

days

Setup large 15 hole system

-

21.0

-

days

Calculate system times per pump

-

2.5

-

days/pump

Setup Recharge System

-

3.5

-

days/pump

Setup small 2 hole system

Excavate & Reduce Levels Excavate By Hand Trenches (m3/hr)

Depth in Metres->

Ne 1.5

1.5-3.0

3.0-4.5

Sand/Soil lose

0.66

0.45

0.33

Sand/Soil firm 0.57

0.38

0.28

Gravel

0.45

0.31

0.23

Clay/Heavy Soil

0.46

0.31

0.24

Boulder Clay

0.38

0.26

0.19

2

3

Pits or Bases Ne 2 m (m /hr) Depth in Metres->

Ne 1.5

1.5-3.0

3.0-4.5

Sand/Soil lose

0.5

0.33

-

Sand/Soil firm 0.43

0.29

-

Gravel

0.34

0.23

-

Clay/Heavy Soil

0.35

0.24

-

Boulder Clay

0.28

0.19

-

Hand Transportation of Spoil (m3/hr) Wheel 0 - 10 m

6.25

10 - 20 m

3.23

20 - 50 m

2.13

Trim Excavation (m3/hr) Ave Thickness

Sand

Gravel

Clay

Boulders

0 - 25 mm

20.00

16.67

20.00

14.29

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 41 of 100

25 - 50 mm

11.11

8.33

9.09

7.69

50 - 75 mm

7.69

5.88

6.25

5.00

75 - 125 mm

5.56

4.35

4.55

3.70

Excavate & Spread and Level Small Scale Spread and Level By Hand Including load and wheel an average of 20 m from tipped heap (m3/hr) Layers ->

n.e.25mm 2575mm

75.200mm Exc.200mm

n.e. 200 m2

1.03

1.03

1.12

1.23

exc. 200 m2

1.37

1.37

1.49

1.64

n.e. 200 m2

-

0.86

0.93

1.03

exc. 200 m2

-

1.14

1.23

1.37

n.e. 200 m2

-

0.85

1.02

1.27

exc. 200 m2

-

1.02

1.27

1.69

Sand/Soil

Gravel/Shingle

Hardcore

Spread and Level By Crawler Shovel Rates in (m3/hr) 0.6m3

0.8m3

1.0m3

1.2m3

n.e. 200 m2

18.67

38.46

43.48

52.63

exc. 200 m2

24.39

50.00

55.56

66.67

n.e. 200 m2

18.87

38.46

43.48

52.63

exc. 200 m2

24.39

50.00

55.56

66.67

n.e. 200 m2

15.87

31.25

37.04

43.48

2

19.23

40.00

47.62

55.56

n.e. 200 m2

17.24

35.71

43.48

47.62

exc. 200 m2

22.22

45.45

55.56

62.50

Machine Bucket-> Sand/Soil

Gravel/Shingle

Hardcore

exc. 200 m Clay

Note: • n.e means "not exceeding"

Excavation Works Excavate & Load Excavate Spoil Heaps and Load to Transport (m3/hr):

Material

0.6 m3

0.8 m3

1.0 m3

1.2 m3

Sand/Soil

20.0

25.6

30.3

35.7

Gravel

20.4

25.6

31.3

37.0

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 42 of 100

Clay/Chalk

18.5

23.2

27.8

33.3

Boulder Clay 16.9

21.3

24.4

30.3

Note: • 0.6m3, 0.8m3, 1.0m3 and 1.2m3 are excavator bucket capacity. • 20.0, 25.6, 30.3 and 35.7 etc are excavation rates in m3 / hr

Excavate By Crawler Shovel. Including excavate and bank/stock pile (m3/hr) Sand/Soil

Machine Bucket -> 0.6m3

0.8m3

1.0m3

1.2m3

Pushed n.e.20 m

20.00

25.00

30.30

35.71

Pushed 20 50 m

13.89

20.41

23.81

27.78

Pushed 50 125 m

7.63

12.66

16.67

20.41

20.40

25.64

31.25

37.04

Pushed 20 - 14.29 50 m

20.83

25.00

28.57

Pushed 50 100 m

12.82

17.24

21.28

18.52

23.26

27.78

33.33

Pushed 20 - 12.66 50 m

18.52

21.74

25.64

Pushed 50 100 m

11.63

15.15

18.87

16.95

21.28

24.39

30.30

Pushed 20 - 11.63 50 m

16.95

19.61

23.26

Pushed 50 100 m

10.42

13.70

17.54

Gravel

Pushed n.e. 20 m

7.69

Clay/Chalk/Heavy Soil Pushed n.e. 20 m

6.99

Boulder Clay Pushed n.e. 20 m

6.33

Including excavate and load to transport (m3/hr) Machine Bucket ->

0.6m3

0.8m3

1.0m3

1.2m3

Sand/Soil

17.86

23.26

27.03

30.30

Gravel

16.67

23.26

27.78

31.25

Chalk/Heavy Soil

14.71

21.74

25.00

29.41

Boulder Clay

13.70

19.61

22.22

27.03

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 43 of 100

Ground Excavation Ground Excavation Rates (m3/hr): Ground Type

Bucket

Bulk Works

Basements

Trenches

Small & Deep

Sand/Soil

0.3m3

8.7

8.0

7.1

8.4>

0.4m3

28.5

15.4

25.0

10.0

0.5m3

50.0

20.0

28.6

13.3

0.3m3

7.1

6.9

6.1

4.5

0.4m3

25.9

14.3

22.2

8.7

0.5m3

40.0

18.1

28.6

11.1

0.3m3

7.1

6.5

6.1

4.1

Gravel

Clay/Chalk

V.Difficult

0.4m3

25.0

13.3

22.2

8.3

0.5m3

40.0

16.7

28.6

10.5

0.3m3

6.1

5.9

5.4

4.1

0.4m3

22.2

11.8

20.0

7.7

0.5m3

28.6

11.8

20.0

6.7

Small or Deep Excavations Task / Description

Slow

Ave

Fast

Units

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

6.7

8.4

9.9

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

3.2

4.5

5.0

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

3.3

4.1

5.2

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

3.3

4.1

5.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

8.2

10.0

11.7

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

7.1

8.7

10.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

6.5

8.3

9.4

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

6.3

7.7

9.1

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

12.2

13.3

15.4

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

10.2

11.1

12.9

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

9.7

10.5

12.1

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

6.1

6.7

7.7

m3/hr

Material Weights Wagon sizes and tonnage capacities vary and should be taken into consideration. • • • •

Rock = 2.5 T/m3 Concrete = 2.4 T/m3 Landfill / CDG = 1.9 T/m3 Sand = 1.8 T/m3

Spoil By Barge Removal / Transportation Of Spoil By Barge: The size, getting material to the facility, location and movement restrictions of the barge loading facilities are critical to production. A 2,000 m3 flat bottom barge, could easily be loaded 1.5 times per day, with a planned allowance of 2 no movements per day for example... • 1,000 m3 barge, filled in 9.5 hrs = 2 movements/day • 1,500 m3 barge, filled in 6.5 hrs = 3.5 movements/day

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 44 of 100

Spoil By Conveyor Removal / Transportation Of Spoil By Conveyor: The size and location of the conveyor are critical to production and should be sized according to the most critical peaks in excavation. • There are the following parameters to select... Max excavation per hour

185 m3/hr

Assume belt size

600 mm

Assume conveyor trough angle 20 degrees • From the above you read off specific parameters from the suppliers table... Recommended belt speed

150 m/min

Angle of repose for dry sand 35 degrees Angle of surcharge

20 degrees

• You must then read off, from the manufacturers tables the conveyor capacity... Cross-sectional area of load

0.02979 m2

At a speed of 150 m/min gives 268 m3/hr • Assume a bulking factor for excavated sane = 15%, and assume 50 minutes work per hour to allow for blockages and maintenance etc... • 268 x 85% x 50/60 = 190 so therefore capacity of conveyor = 190 m3 per hour = OK. Hong Kong Airport Express Station conveyor was capable of 11,500 m3/week.

Ground Compaction Compact & Consolidate Compact & Consolidate using Vibratory Roller or compactor. • • • • •

Sand 31.25 m2/hr Soil 58.82 m2/hr Clay 55.56 m2/hr Hardcore 38.46 m2/hr Ash 57.85 m2/hr

Deep Compaction Essentially required in order to reduce expected ground settlement and to protect underground utilities / structures etc. • Deep compaction by 350 mm dia Vibroflot, 3 m centres in sand. • Working on 12 hour basis, a vibroflot will achieve an output of 3-4,000 m3/shift (5,000 m3/day has been achieved in an extended shift). Ground Compaction Task / Description

Slow

Ave

Fast

Units

330.0

380.0

465.0

m3/hr

28.5

31.2

45.2

m2/hr

Vibro-Roller, Soil

-

58.8

-

m2/hr

Vibro-Roller, Clay

-

55.6

-

m2/hr

Vibro-Roller, Hardcore

-

38.4

-

m2/hr

Vibro-Roller, Ash

-

57.8

-

m2/hr

Deep Vibroflot, 3m centres Vibro-Roller, Sand

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 45 of 100

Hand Fill & Compact Loose from side of excavation, including compaction (m3/hr)... Material

Ne 100m

100-200mm

200-300mm

exc 300m

Loose Sand/Soil

0.85

1.02

1.28

1.69

Clay/Heavy Chalk 0.77

0.92

1.16

1.56

Hoging

0.81

0.97

1.20

1.61

Hardcode

0.71

0.84

1.06

1.41

Ground Monitoring Reclamation & Filling Spread & Leveling Spread and Level Task / Description

Slow

Ave

Fast

Units

13.9

20.4

25.0

m3/hr

7.6

9.5

12.6

m3/hr

14.2

20.4

25.6

m3/hr

7.6

10.2

12.8

m3/hr

12.7

18.4

23.2

m3/hr

Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 50-120m to stockpile

6.9

8.9

11.6

m3/hr

Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 5-50m to stockpile

11.6

16.9

21.3

m3/hr

6.3

8.2

10.4

m3/hr

Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 5-50m to stockpile

23.8

28.5

35.7

m3/hr

Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 50-120m to stockpile

16.7

18.5

20.4

m3/hr

Crawler Shovel, 1.2m3 bucket, Gravel, pushed 5-50m to stockpile

25.0

32.0

37.0

m3/hr

Crawler Shovel, 1.2m3 bucket, Gravel, pushed 50-120m to stockpile

17.2

19.3

21.2

m3/hr

Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 5-50m to stockpile

21.7

27.5

33.3

m3/hr

Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 50-120m to stockpile

15.1

16.9

18.8

m3/hr

Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 5-50m to stockpile

19.6

24.5

30.3

m3/hr

Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 50-120m to stockpile

13.7

15.9

17.5

m3/hr

Crawler Shovel, 0.6m3 bucket, 50-200m2, Sand/Soil

18.6

28.5

38.5

m3/hr

Crawler Shovel, 0.6m3 bucket, over 200m2, Sand/Soil

24.4

37.2

50.0

m3/hr

Crawler Shovel, 0.6m3 bucket, 50-200m2, Gravel

18.9

28.6

38.4

m3/hr

Crawler Shovel, 0.6m3 bucket, over 200m2, Gravel

24.2

37.2

50.0

m3/hr

Crawler Shovel, 0.6m3 bucket, 50-200m2, Hardcore

15.8

23.5

31.2

m3/hr

Crawler Shovel, 0.6m3 bucket, over 200m2, Hardcore

19.2

29.6

40.0

m3/hr

Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile Crawler Shovel, 0.8m3 bucket, Gravel, pushed 5-50m to stockpile Crawler Shovel, 0.8m3 bucket, Gravel, pushed 50-120m to stockpile Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 5-50m to stockpile

Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 50-120m to stockpile

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 46 of 100

Crawler Shovel, 0.6m3 bucket, 50-200m2, Boulder Clay

17.2

26.4

35.7

m3/hr

Crawler Shovel, 0.6m3 bucket, over 200m2, Boulder Clay

22.2

33.8

45.4

m3/hr

Crawler Shovel, 1.2m3 bucket, 50-200m2, Sand/Soil

43.5

48.0

52.6

m3/hr

Crawler Shovel, 1.2m3 bucket, over 200m2, Sand/Soil

55.5

61.1

66.7

m3/hr

Crawler Shovel, 1.2m3 bucket, 50-200m2, Gravel

43.8

48.3

52.9

m3/hr

Crawler Shovel, 1.2m3 bucket, over 200m2, Gravel

55.5

61.1

66.7

m3/hr

Crawler Shovel, 1.2m3 bucket, 50-200m2, Hardcore

37.1

40.3

43.5

m3/hr

Crawler Shovel, 1.2m3 bucket, over 200m2, Hardcore

47.6

51.6

55.6

m3/hr

Crawler Shovel, 1.2m3 bucket, 50-200m2, Boulder Clay

43.8

45.7

47.6

m3/hr

Crawler Shovel, 1.2m3 bucket, over 200m2, Boulder Clay

55.6

59.1

62.5

m3/hr

Steel Strutting Steel Strutting... Task / Description

Slow

Ave

Fast

Units

Horizontal heavy duty strutting

-

2.0

-

days/no

Diagonal heavy duty strutting

-

6.0

-

days/no

Trench Excavations Trench Excavation... Slow

Ave

Fast

Units

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

Task / Description

5.6

7.1

8.2

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

4.8

6.1

7.3

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

4.8

6.1

7.1

m3/hr

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

9.7

5.4

6.4

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

20.5

25.0

29.2

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

18.2

22.2

26.0

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

18.2

22.2

26.0

m3/hr

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

17.0

20.0

23.4

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

26.0

28.6

33.1

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

26.3

28.6

33.2

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

26.3

28.6

33.2

m3/hr

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

22.7

25.0

28.8

m3/hr

Excavate and Board Trench, 0.5-1.5m deep, < 2.0m wide

3.3

4.5

6.8

m2/hr

Excavate and Board Trench, 1.5-3.0m deep, < 2.0m wide

3.0

4.2

6.5

m2/hr

Excavate and Board Trench, 3.0-4.5m deep, < 2.0m wide

2.7

4.0

6.0

m2/hr

Excavate and Board Trench, 0.5-1.5m deep, > 2.0m wide

6.6

7.1

8.8

m2/hr

Excavate and Board Trench, 1.5-3.0m deep, > 2.0m wide

6.2

6.7

9.2

m2/hr

Excavate and Board Trench, 3.0-4.5m deep, > 2.0m wide

5.8

6.2

10.5

m2/hr

Ground Trench Excavation Strut Rates Ground Trench Excavation / Strut Rates (m2/hr) Trench width not exceeding 2.0 m wide

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 47 of 100

Trench Depth -->

Ne1.5m

1.5-3m

3-4.5m

Single horiz boards

Fix Strike

16.7 33.3

--

--

Double horiz boards

Fix Strike

7.7 16.7

7.7 14.3

--

Single strut vert boards

Fix Strike

14.3 33.3

--

--

Close Boards,with whaling

Fix Strike

4.5 9.1

4.2 8.3

4.0 8.0

Trench width exceeding 2.0m wide

Trench Depth

Ne1.5m

1.5-3m

3-4.5m

Single horiz boards

Fix Strike

5.6 11.1

5.3 10.0

--

Double horiz boards

Fix Strike

7.1 14.3

7.1 14.3

--

Single strut Fix Strike vert boards

5.9 112.5

5.6 11.1

5.3 10.0

Close Boards, with whaling

7.1 14.3

6.7 1.3

6.7 12.5

Fix Strike

Traditional mass fill foundations Includes excavation and concrete pour. Assumes 450mm wide, average of 1.5m deep, No earthwork support, reinforcement or claymaster. 35 linear metres per day per gang.

Fencing Works Fencing Works Task / Description

Slow

Ave

Fast

Units

Site Hoarding, timber posts, plywood nailed to horizontal rails

1.0

1.2

-

m/hr

Post Erection, Timber / Metal, dig, erect, fix

3.3

4.5

-

no/hr

Post Erection, Concrete, dig, erect, fix

3.2

4.0

-

no/hr

Fence Erection, Chainlink, posts at 1.5m

-

4.2

-

m/hr

Fence Erection, Chainlink, posts at 2.0m

-

4.4

-

m/hr

Fence Erection, Chainlink, posts at 3.0m

-

5.5

-

m/hr

Fence Erection, Chestnut Pailings, posts at 1.5m

-

23.8

-

m/hr

Fence Erection, Chestnut Pailings, posts at 2.0m

-

33.3

-

m/hr

Fence Erection, Chestnut Pailings, posts at 3.0m

-

41.6

-

m/hr

Fence Erection, Barbed Wire, posts at 1.5m

-

71.4

-

m/hr

Fence Erection, Barbed Wire, posts at 2.0m

-

100.0

-

m/hr

Fence Erection, Barbed Wire, posts at 3.0m

-

125.0

-

m/hr

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 48 of 100

Gate Erection, Chainlink on frame

-

4.1

-

no/hr

Foundation Works Elements relating to substructures / foundations...

Barrette Piles Barrette Piles Task / Description

Slow

Ave

Fast

0.5

1.1

1.2

-

4.0

-

40.0

50.0

55.0

Trimming top of barrette panels

-

2.4

-

days/no

Concrete Testing, Coring Test

4.0

3.5

2.0

days/no

-

0.7

-

days/no

Rule of Thumb, overall rate by Mill Fabricate reinforcement cages Concreting barrette panels

Concrete Testing, Sonic Logging Test

Units hrs/no hrs/cage m3/hr

Bored Piling Pre-Drilling - Site Investigation • Pre-boring will be carried out at each location to ascertain the target founding level. • Rotary rig drilling operations incorporate the use of a steel core that is used when a core sample is required. Another type of boreing is called “Wash Bore” or “Percussive Bore” which simply means that a bore is flushed out and is used when no soil sample is required. Typical rates are... Type of Strata

Plant Used

Rate (m/hr)

Top soft deposits of site fill Percussive / Rotary

10.00

Grade V/IV rock deposits

3.15

Wash Boring

Triple Tube Sampling 0.75 Grade III/II rock deposits

Rotary

0.50

Triple Tube Sampling 0.50

With a standard rig, working a 12 hour shift, a typical output rate of 66 hrs/hole/rig is possible. • As-Built Information. On Central Reclamation, Contract UA11/91, borehole drilling completed with the following results... 1. 2. 3. 4.

Average depth of 61.15 m, total depth of 428 m Average rock socket depth of 4.65 m The durations ranged from 4 to 8 days Average of 5.85 days, total duration of 41 days.

The Target Founding level • This is defined as the required socket into the bedrock, which is defined as moderately decomposed rock grade III or better with a core recovery greater than 85% (allowable bearing capacity of 5 mPa). The continuity of the founding rock is demonstrated by continuing the pre-bored hole a maximum of 5 metres or 3 times the pile diameter, whichever is the greater. • The cores are logged, stored and photographed and submitted together with proposed founding levels for approval. Setting Out

Before starting excavation at the pile position the following steps are taken:

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 49 of 100

• Survey and record the existing ground level at the pile position • Setout the pile location from the reference points and in order to monitor the position of the steel casing, control pins are usually established at two orthogonal positions, offset from the centre of the pile. Pile Tolerances • In the case of out of position casings, adjustment can be made to keep the vertical alignment and plan position within the limits of no more than 75 mm off-centre on plan position and not deviating by more than 1:75 from the vertical axis. Pile Excavation / Casings • The shaft of the pile is excavated within a temporary steel casing with an outside diameter of say approximately 200 - 300 mm greater than the pile diameter. The casing is used mainly in areas of unstable ground and are driven using hydraulic casing oscillator attached to a crawler crane or a casing vibrator. • Shaft excavation is carried out using a single or double hammer grab supported by crawler crane. The steel casing toe is kept in front of the excavation level until it is 0.5 metres above the pile cut-of level. The pile shaft is often flooded with bentonite or water and excavation proceeds to the top of the CDG. • Excavation then proceeds by reverse circulation drilling (RCD) using large diameter drilling heads with special rock cutters and flushing by air lift. Bentonite or water levels are always maintained above the ground water level to ensure stability of the shaft. Calculation Of Bored Pile Construction / Excavation Time • Piling times can be reduced by the use of service cranes for reinforcement and concreting activities. • An additional extended shift would often be required for certain piles, as would RCD down-time. • Forecast construction times can be derived by using output rates (hours per item)...

Operation

Element

Details

Hours

Add or Remove

Reverse Circluation Drill Plant (RCD)

incl drill bit

2 hrs

Add or Remove

RCD drill bit

(incl assembly of drill string) 5 hrs

RCD bell-out bit

(incl drill string & stabilisers) 5 hrs

Installation

Cleaning Time

Concreting

Airlift tremmie tube

5 hrs

Reinforcement cages

(time for joining each cage) 2 hrs

Initial airlift cleaning

(after finishing excavation)

8 hrs

Final airlift cleaning

(after fixing steel cage)

2 hrs

Incl extract casing

( < 70 m deep)

12 hrs

( > 70 and < 95 m deep)

14 hrs

( > 95 and < 135 m deep)

48 hrs

Curing Time

Only required prior to removal of telescopic casings

72 hrs

Cycle Time

Move piling setup to next location

2 hrs

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 50 of 100

Shaft Excavation Strata

Plant Used

Rate (m/hr)

General Fill (upper ground levels)

Grab

3.50 m/hr

Sand, Minor Rubble

Grab

2.10 m/hr

Marine / Alluvium Deposits

Grab

2.50 m/hr

CDG < 150

RCD/Grab

1.50 m/hr

CDG > 150 < 200

RCD

1.00 m/hr

CDG > 200, Compacted Gravel

RCD

0.50 m/hr

CDT

RCD / Grab

0.50 m/hr

Corestones

RCD / Chisel

0.50 m/hr

Rock Socket - Grade IV/V

RCD

0.25 m/hr

Rock Socket - Grade II/III

RCD

0.125 m/hr

Rock Socket - (Tendering Rate)

RCD

0.10 m/hr

• Forecast excavation or cycle times can then be derived by analysing ground conditions. Site investigation will provide the depths / types of strata which can then be matched to production output rates (see above). • Note - A pile’s diameter has negligible effect on production time and as such is ignored. Example - For a pile founding on rock at 60 m deep... (a) Calculate Allowance For Plant Time / Other Elements (hrs)....

Element

Hours

Set up RCD

5.0

Excavate Time

See Below

Remove RCD (including drill bit, string and stabilisers) 5.0

Setup / Remove Airlift Tremmie Tube

5.0

Initial Post-Excavation Airlifting

5.0

Place reinforcement (5 No cages @ 12m = 5 x 2 hrs)

10.0

http://www.planningplanet.com/print/book/export/html/422384

11/3/2014

Page 51 of 100

Setup / Remove Airlift Tremmie Tube

5.0

Final Post-Reinforcement Airlifting

2.0

Concrete and remove casing

12.0

Move to next location

2.0

Calculate Total Construction / Plant Time

52.0 hrs

(b) Calculate Allowance For Excavation Time (hrs)...

Depth of Strata (m) Type of Rock

Production Rate (m/hr) Plant Used Time (Hrs)

0 - 20

Sand/minor rubble

2.00

Grab

10.0

20 - 35

CDG less than 150

1.50

RCD/Grab

10.0

35 - 47

CDG more than 150

1.00

RCD

12.0

47 - 57

CDG > 200/corestones

0.50

RCD

20.0

57 - 60

Rock socket

0.20

RCD

15.0

(c) Calculate Total Pile Excavation Time = 67.0 hrs (d) Overall Pile Time

Construction / Plant Time (“b” above) 52.0 hrs

Excavation Time

(“d” above) 67.0 hrs

OVERALL CYCLE TIME (“b” + “d”) 119 hrs

(With 12 hr shifts)

(“b” + “d”)

9.9 days

Bored Pile Construction As-Builts • General Rule of Thumb Pile Times (days)...