S A U D I O G E R P R O D U C T I V I T Y R AT E TRADE

ACTIVITY DESCRIPTION

005

EARTHWORKS Bed manual Final Grading in Normal soil EARTHWORKS Bed manual Final Grading in Rock FOUNDATIONS REINFORCED CONCRETE STRUCTURE GROUND SLAB/CRAWL SPACE VERTICAL STRUCTURE HORIZONTAL STRUCTURE MASONRY WORKS BLOCKS (0.10; 0.15; 0.20) REINFORCEMENT REINFORCEMENT AND BLOCKS PLASTERS SCREEDS BLOCKS FOR CLOSING SHAFTS WATERPROOFING INSULATING WATERPROOF 2 LAYERS DRAINING PROTECTION WITH SCREED PROTECTION WITH GRAVEL MULTI-LAYERS WATERPROOF INTERIOR (DAMP ROOM) TECHNICAL ROOM (SURFACE50 m²) SWIMMING POOL AND FOUNTAIN ROOF-COVERING TILES TILES DOMES INSULATING LINING DRY ROOM (CD1 panels 3.00 x 1.20) DAMP ROOM (CD10 Siporex) Ceiling CD30 (fibralith) DRY AREA PARTITION DRY ROOM WITH INSULATION (HT < 3m) DRY ROOM WITH INSULATION (HT > 3m) MOVABLE PARTITION RAIL PANELS FALSE CEILING MINERAL FIBER METAL FIBROUS PLASTER-GYPSUM SIMPLE STAFF (Flat,no cornice with bank moulding) MEDIUM STAFF (Cornice, rosace, frise) COMPLEX STAFF (Cornice with fillet,rosace,luminous ramp) EXTERIOR WOOD JOINERY WINDOW (FRAME) WINDOW (LEAF) WINDOW (GLAZING) WINDOW: ALL (Frame,window leaf, glazing) DOOR (FRAME) DOOR (LEAF) ALL (Door frame & leaf) DOOR NOBLE (VIP) DOOR STAFF EXTERIOR ALUMINUM JOINERY

010 020

030

080

090

100

110

120

130

131

150

151 160

Estimated Unit Quantity

500 500

Prepared by: Russel Carandang, RCE

Days

Gv. Qty

Gv. Days

m³ m³ m³ m³ m³ m³ m³

0 0 0 0 0 0 0

70 18 5 5 5 3 5

1.0 1.0 1.0 1.0 1.0 1.0 1.0

m² ML m² m² m² m²

0 0 0 42 0 42

5 10 3 3 70 3

1.0 1.0 1.0 1.0 1.0 1.0

m² m² m² m² m² m² m² m² m² m²

0 0 0 0 0 0 0 0 0 0

175 150 150 70 125 30 10 25 100 400

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

m² m²

0 0

2 5

1.0 1.0

m² m² m²

0 0 0

25 17 30

1.0 1.0 1.0

m² m²

0 0

7 4

1.0 1.0

m² m²

0 0

10 20

1.0 1.0

m² m²

0 0

20 15

1.0 1.0

m² m² m²

0 0 0

3 2 2

1.0 1.0 1.0

u u u u u u u u u

0 0 0 0 0 0 0 0 0

4 4 6 1 10 2 1 1 3

1.0 1.0 1.0 1.0 1.0 1.0 0.6 1.0 1.0

Page 1

190

191

200 210 211 220

230 240

250

260

261

270

300

320

WINDOW (Frame) WINDOW (Leaf) WINDOW (Glazing) WINDOW (Bulletproof glazing) WINDOW ALL STANDARD ROOLING SHUTTER FOR STANDARD WINDOW DOOR (Frame) DOOR (Leaf) DOOR (Block) ROOLING SHUTTER FOR STANDARD DOOR METAL WORKS METAL GATE METAL DOOR SUPPORT CHANDELIER SUPPORT CHANDELIER TEST SUPPORT MARBLE (VANITY) BATHROOM ACCESSTRAP DECORATIVE METAL WORKS RAILING STAIR HANDRAIL MIRRORS GLUED CARPET VINYL TILE PLAIN CARPET DESIGN CARPET TILING WORKS GLUED WALL TILLING GLUED FLOOR TILLING STRETCHED WALL FABRICS INTERNAL MARBLE MATCHED GLUED FAÇADE SURFACE FINISHING MANUAL SANDTEX MECHANICAL SANDTEX CLOSE SURFACE OPEN SURFACE INTERIOR PAINTING WALL (MAKING GOOD) WALL (MECHANICAL SANDTEX) ROLLER PAINTING SPRAY GUN PAINTING CEILING (PLASTER) CEILING (SANDPAPER) CEILING (SPRAYGUN PAINTING) CEILING (COLOR FILLET) BONDED COVERING WALL FABRICS MAKING GOOD MECHANICAL SANDPAPER 1 LAYER FIXING LAYING EXTERNAL MARBLE NORMAL ELEVATION DIFFICULT ELEVATION CURTAINS RAIL FABRICATION LAYING LIGHTING FIXTURES AND CHANDELIERS CHANDELIER WALL LIGHT Prepared by: Russel Carandang, RCE

u u u u u u u u u u

0 0 0 0 0 0 0 0 0 0

10 10 5 5 1 1 1 1 1 1

1.0 1.0 1.0 1.0 0.4 0.4 0.4 0.4 0.5 0.4

u u u u u u

0 0 0 0 0 0

1 3 4 4 3 4

1.0 1.0 1.0 2.0 1.0 1.0

u u u m² m² m² m²

0 0 0 0 0 0 0

1 1 1 200 100 30 20

1.0 1.0 1.0 1.0 1.0 1.0 1.0

m² m² m²

0 0 0

6 8 100

1.0 1.0 2.0

m² m²

0 0

2 5

1.0 1.0

m² m² m² m²

0 0 0 0

20 150 250 115

1.0 1.0 1.0 1.0

m² m² m² m² m² m² m² m²

0 0 0 0 0 0 0 0

250 450 150 600 25 50 80 2

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

m² m² m² m²

0 0 0 0

250 450 200 60

1.0 1.0 1.0 1.0

m² m²

0 0

4 2

1.0 1.0

ML pair u

0 0 0

20 1 1

1.0 1.0 0.3

u u

0 0

1 10

1.0 1.0 Page 2

330

WOOD FITTINGS WOOD WALL FITTING WOOD CORNICE WOOD SKIRTING WOOD MOULDING STAFF VERTICAL CUPBOARD CURTAIN BOX 400 HVAC GLOBAL PER m² DUCTING AND PIPPING EQUIPMENT FINISHING TESTING 410 PLUMBING GLOBAL PER m² PIPES AND NETWORKS EQUIPMENT FINISHING AND TESTING 420/430 INDUSTRIAL KITCHEN/PANTRIES ELECTRIC EUROPEAN (VIP-ROYALE) ELECTRIC STAFF GAZ EUROPEAN (VIP-ROYALE) GAZ STAFF 450/460 HIGH CURRENT / LOW CURRENT GLOBAL PER m² INCORPORATIONS CABLE TRAY PIPPING AND WIRING FINISHING AND TESTING 790 LANDSCAPING 800 SIGN POST INTERIOR SIGN POST EXTERIOR 900 EXTERNAL PAVING 910 EXTERNAL FOUNTAIN MARBLE EXTERNAL FOUNTAIN MOSAIC 1000 FINAL CLEANING

Prepared by: Russel Carandang, RCE

m² m² ML ML ML m² u m² m² m² m² m² m² m² m² m² m²

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 2 2 20 25 2 1 1 1 1 1 1 1 1 1 1 1

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.1 0.3 0.4 0.3 0.1 0.5 0.1 0.3 0.0

u u u u m² m² m² m² m² m² u u m² m² m² m²

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 1 1 1 1 1 1 1 1 10 5 8 1 3 300

15.0 10.0 21.0 16.0 0.7 0.1 0.2 0.3 0.0 0.2 1.0 1.0 1.0 1.0 1.0 1.0

Page 3

Gv.men

Min.Req'd No.of men

Hrs/unit

1 1 1 1 1 1 1

1 1 1 1 1 1 1

0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 1 1 1 6 1

1 1 1 4 6 4

0.00 0.00 0.00 138.89 0.00 138.89

3 1 1 6 6 1 1 1 1 3

3 1 1 6 6 1 1 1 1 3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 1

1 1

0.00 0.00

2 3 4

2 3 4

0.00 0.00 0.00

2 2

2 2

0.00 0.00

2 2

2 2

0.00 0.00

2 2

2 2

0.00 0.00

1 1 1

1 1 1

0.00 0.00 0.00

2 4 2 2 2 2 2 1 1

2 4 2 2 2 2 2 1 1

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Prepared by: Russel Carandang, RCE

Page 4

2 2 2 8 2 2 2 2 2 2

2 2 2 8 2 2 2 2 2 2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 3 2 1 2 2

4 3 2 1 2 2

0.00 0.00 0.00 0.00 0.00 0.00

4 4 1 2 3 2 2

4 4 1 2 3 2 2

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 2 4

2 2 4

0.00 0.00 0.00

1 1

1 1

0.00 0.00

2 2 12 12

2 2 12 12

0.00 0.00 0.00 0.00

3 4 2 2 2 4 2 1

3 4 2 2 2 4 2 1

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 4 2 2

3 4 2 2

0.00 0.00 0.00 0.00

1 1

1 1

0.00 0.00

1 1 1

1 1 1

0.00 0.00 0.00

1 1

1 1

0.00 0.00

Prepared by: Russel Carandang, RCE

Page 5

1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 6 6 6 1 1 1 1 1 1 1 1 1 1 1 8

6 6 6 6 1 1 1 1 1 1 1 1 1 1 1 8

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Prepared by: Russel Carandang, RCE