PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil

m3

hours

14.50

20.00

25.60

0.0690

0.0500

0.0391

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds

m3

hours

15.20

20.40

25.60

0.0658

0.0490

0.0391

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk

m3

hours

12.30

18.50

23.20

0.0813

0.0541

0.0431

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay

m3

hours

11.20

16.90

21.30

0.0893

0.0592

0.0469

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil

m3

hours

25.40

30.30

35.70

0.0394

0.0330

0.0280

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds

m3

hours

25.60

31.30

37.00

0.0391

0.0319

0.0270

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk

m3

hours

22.50

27.80

33.30

0.0444

0.0360

0.0300

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay

m3

hours

18.90

24.40

30.30

0.0529

0.0410

0.0330

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Excavate and Remove

Load Spoil to Barge, capacity 2,000m3

hours

-

8.00

-

-

0.1250

-

Load Spoil to Barge, capacity 1,500m3

hours

-

6.50

-

-

0.1538

-

Load Spoil to Barge, capacity 1,000m3

hours

-

5.50

-

-

0.1818

-

m3

hours

-

260.00

-

-

0.0038

-

Concrete Road surfacing, Kerbs or Side Haunches

m3

hours

0.40

-

2.5000

-

Concrete Road surfacing, 150mm thick

m2

hours

12.50

-

0.0800

-

Concrete Road surfacing, 200mm thick

m2

hours

7.70

-

0.1299

-

Concrete Road surfacing, 300mm thick

m2

hours

6.70

-

0.1493

-

Spread & Compact Production = 30m3/hr

m3

hours

30.00

-

0.0333

-

Trimming Production = 250m2/hr

m2

hours

250.00

-

0.0040

-

Spread & Compact Production = 50m3/hr

m3

hours

50.00

-

0.0200

-

Trimming Production = 350m2/hr

m2

hours

350.00

-

0.0029

-

Spoil conveyor, 600mm belt, 150m/min

Concrete Road surfacing

Basecourse Production Rates Urban environment:

Rural environment:

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Metal KwikStage, 5 Boards with 2m lifts

m run

hours

11.10

11.90

12.50

0.0901

0.0840

0.0800

Metal KwikStage, 5 Boards with 3m lifts

m run

hours

9.10

10.00

10.50

0.1099

0.1000

0.0952

Metal KwikStage, House Scaffold with 3 lifts

m run

hours

2.80

3.20

3.80

0.3571

0.3125

0.2632

Metal Tube and Fittings, 5-6 Boards wide

m run

hours

3.20

3.70

4.60

0.3125

0.2703

0.2174

Tube and Fitting Platforms, 50-250m3

m3

hours

10.60

12.50

18.50

0.0943

0.0800

0.0541

Tube and Fitting Platforms, 250-1000m3

m3

hours

18.50

22.50

24.50

0.0541

0.0444

0.0408

Tube and Fitting Platforms, over 1000m3

m3

hours

24.50

30.00

33.50

0.0408

0.0333

0.0299

-

200.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Working Platforms

Tube and Fitting Platforms, striking

% x erect

-

200.00

-

Waterproofing Asphalt coatings, horizontal surfaces

m2

hours

3.50

4.20

5.80

0.2857

0.2381

0.1724

Asphalt coatings, vertical surfaces

m2

hours

1.20

1.70

2.20

0.8333

0.5882

0.4545

Bituminous Brushed application, 2 coats

m2

hours

4.80

5.00

6.30

0.2083

0.2000

0.1587

Bituminous Brushed application, 3 coats

m2

hours

3.30

3.50

4.40

0.3030

0.2857

0.2273

Bituminous Sheets, horizontal surfaces

m2

hours

3.80

4.00

4.80

0.2632

0.2500

0.2083

Bituminous Sheets, vertical surfaces

m2

hours

3.30

3.50

4.20

0.3030

0.2857

0.2381

Polythene Sheets, horizontal surfaces

m2

hours

-

0.0500

-

Bentonite Sheets, horizontal surfaces

m2

hours

31.30

0.0535

0.0400

0.0319

Bentonite Sheets, vertical surfaces

m2

hours

17.30

0.0893

0.0667

0.0578

Epoxy Based application, 1 coat

m2

hours

-

75.00

-

-

0.0133

-

Epoxy Based application, 2 coat

m2

hours

-

38.00

-

-

0.0263

-

Strip Existing Wallpaper (3 layers) & Prepare Walls

m2

hours

-

5.00

-

-

0.2000

-

Fix Wallpaper and lining paper

m2

hours

-

5.00

-

-

0.2000

-

Fix Vinyl and Washable paper

m2

hours

-

4.20

-

-

0.2381

-

-

20.00 18.70

25.00

11.20

15.00

-

Wallpapering

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

m2

hours

-

Mosaic Tiling, 0.045x0.045m

no

hours

-

1.10

Clay, quarry Tiles, Window Cills, setout and level

m

hours

-

55.50

-

Clay, quarry Tiles, Window Cills, fix, grout and clean

m2

hours

-

1.50

-

Ceramic Tiles 150x150mm, Ledges/Upstands

no

hours

20.40

27.10

Ceramic Tiles 150x150mm, Areas under 1.5m2 per room

m2

hours

0.90

Ceramic Tiles 150x150mm, Areas of 1.5-2.5m2 per room

m2

hours

1.40

Ceramic Tiles 150x150mm, Areas over 2.5m2 per room

m2

hours

1.50

Ceramic Tiles 150x150mm, Extra Over for Cutting

no

hours

-

41.60

Ceramic Tiles 108x108mm, Ledges/Upstands

no

hours

-

62.50

Ceramic Tiles 108x108mm, Areas under 1.5m2 per room

m2

hours

1.00

1.30

Ceramic Tiles 108x108mm, Areas of 1.5-2.5m2 per room

m2

hours

1.60

Ceramic Tiles 108x108mm, Areas over 2.5m2 per room

m2

hours

1.70

Ceramic Tiles 108x108mm, Extra Over for Cutting

no

hours

-

Ceramic Tiles, Grouting Works

m2

hours

2.20

DESCRIPTION

ITEM NO.

Fix Ceiling Lining Paper

REMARKS Average

Fast 4.00

Slow

-

Average

Fast

-

0.2500

-

-

0.9091

0.6667

-

0.0180

-

-

0.6667

-

32.00

0.0490

0.0369

0.0313

1.00

1.20

1.1111

1.0000

0.8333

1.60

1.90

0.7143

0.6250

0.5263

1.70

2.10

0.6667

0.5882

0.4762

-

-

0.0240

-

-

-

0.0160

-

1.50

1.0000

0.7692

0.6667

1.80

2.10

0.6250

0.5556

0.4762

1.90

2.20

0.5882

0.5263

0.4545

-

-

0.0080

-

2.60

0.4545

0.4000

0.3846

Wall Finishes

125.00 2.50

1.50

PRODUCTION RATES

DESCRIPTION

ITEM NO.

UNIT FOR QUANTITY

PRODUCTION RATES (Qty per Time)

UNIT FOR TIME

Slow

PRODUCTION RATES (Time per Quantity) REMARKS

Average

Fast

Slow

Average

Fast

Underpinning Concrete Pinning, 4th or 5th pin cycles

m

day

-

1.20

2.20

-

0.8333

0.4545

Brickwork Pinning, 1.0 brick thick

m2

hours

-

0.40

0.70

-

2.5000

1.4286

Brickwork Pinning, 1.5 brick thick

m2

hours

3.3333

-

Brickwork Pinning, 2.0 brick thick

m2

hours

Wedge and Pin Method, 102mm wall

m

Wedge and Pin Method, 215mm wall Wedge and Pin Method, 317mm wall

0.10

0.30

-

10.0000

-

0.20

-

-

5.0000

-

hours

-

0.80

-

-

1.2500

-

m

hours

-

0.70

-

-

1.4286

-

m

hours

-

0.50

-

-

2.0000

-

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

m3

hours

5.60

7.10

8.20

0.1786

0.1408

0.1220

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

m3

hours

4.80

6.10

7.30

0.2083

0.1639

0.1370

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

m3

hours

4.80

6.10

7.10

0.2083

0.1639

0.1408

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

m3

hours

9.70

5.40

6.40

0.1031

0.1852

0.1563

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

m3

hours

20.50

25.00

29.20

0.0488

0.0400

0.0342

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

m3

hours

18.20

22.20

26.00

0.0549

0.0450

0.0385

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

m3

hours

18.20

22.20

26.00

0.0549

0.0450

0.0385

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

m3

hours

17.00

20.00

23.40

0.0588

0.0500

0.0427

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

m3

hours

26.00

28.60

33.10

0.0385

0.0350

0.0302

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

m3

hours

26.30

28.60

33.20

0.0380

0.0350

0.0301

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

m3

hours

26.30

28.60

33.20

0.0380

0.0350

0.0301

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

m3

hours

22.70

25.00

28.80

0.0441

0.0400

0.0347

Excavate and Board Trench, 0.5-1.5m deep, < 2.0m wide

m2

hours

3.30

4.50

6.80

0.3030

0.2222

0.1471

Excavate and Board Trench, 1.5-3.0m deep, < 2.0m wide

m2

hours

3.00

4.20

6.50

0.3333

0.2381

0.1538

Excavate and Board Trench, 3.0-4.5m deep, < 2.0m wide

m2

hours

2.70

4.00

6.00

0.3704

0.2500

0.1667

Excavate and Board Trench, 0.5-1.5m deep, > 2.0m wide

m2

hours

6.60

7.10

8.80

0.1515

0.1408

0.1136

Excavate and Board Trench, 1.5-3.0m deep, > 2.0m wide

m2

hours

6.20

6.70

9.20

0.1613

0.1493

0.1087

Excavate and Board Trench, 3.0-4.5m deep, > 2.0m wide

m2

hours

5.80

6.20

10.50

0.1724

0.1613

0.0952

Trench Excavation

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

UNIT FOR QUANTITY

UNIT FOR TIME

FST Floating Track Slab, side restraints

m

days

FST Floating Track Slab, resin pads

m

days

FST Floating Track Slab, slab units

m

days

10.60

PCBT - Pre-cast Concrete Block Track, in Bored Tunnels

m

days

17.10

PCBT - Pre-cast Concrete Block Track, in Cut and Cover Tunnels

m

days

PCBT - Pre-cast Concrete Block Track, in Station Tunnels

m

IST - Isolated Slab Track, in Bored Tunnels

DESCRIPTION

ITEM NO.

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average

Fast

Slow

Average

Fast

9.60

-

-

0.1042

-

-

10.20

-

-

0.0980

-

-

-

-

0.0943

-

-

41.00

-

0.0585

0.0244

-

-

35.00

-

-

0.0286

-

days

-

35.00

-

-

0.0286

-

m

days

-

20.00

-

-

0.0500

-

IST - Isolated Slab Track, in Cut and Cover Tunnels

m

days

-

34.00

-

-

0.0294

-

IST - Isolated Slab Track, in Station

m

days

-

29.00

-

-

0.0345

-

FST - Floating Slab Track, in Station

m

days

5.70

0.2778

0.2174

0.1754

Ballasted Track, in Mainline

m

days

115.00

0.0175

0.0141

0.0087

Ballasted Track, in Depot

m

days

-

0.0357

-

Non-Ballasted Track, in Depot

m

days

0.1176

0.0781

0.0575

Embedded / Paved Track, in Depot

m

days

-

71.00

-

-

0.0141

-

Heavy Maintenance / Train Wash Track, in Depot

m

days

-

29.00

-

-

0.0345

-

Maintenance Pit, in Depot

m

days

-

52.00

-

-

0.0192

-

Siding Trackwork, in Depot

m

days

-

38.00

-

-

0.0263

-

Erect and Setup 50m gib

days

-

-

-

-

11.00

Dismantle 50m gib

days

-

-

-

-

10.00

-

Trackwork

3.60

4.60

57.00

71.00

-

28.00 8.50

-

12.80

17.40

Tower Cranes

Lifting, Reinforcement Bins and Cages, 1st 15m lift Lifting, Reinforcement Bins and Cages, above 1st 15m lift Lifting, Crane Tracking Time

7.50

lift

mins

-

-

-

-

3.20

-

15m

mins

-

-

-

-

0.50

-

m

seconds

-

-

-

-

3.30

-

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Roof Trusses

no

hours

-

1.30

-

-

0.7692

-

Wall Plates

m

hours

-

2.70

-

-

0.3704

-

Roof Rafters

m

hours

-

1.20

-

-

0.8333

-

Ceiling Joists

m

hours

-

32.10

-

-

0.0312

-

Roof Carcass, Common Rafters, under 3m

no

hours

18.20

20.00

21.70

0.0549

0.0500

0.0461

Roof Carcass, Common Rafters, 3-6mm

no

hours

13.30

16.60

18.20

0.0752

0.0602

0.0549

Roof Carcass, Common Rafters, over 6m

no

hours

14.10

15.60

16.10

0.0709

0.0641

0.0621

Roof Carcass, Jack Rafters, under 3m

no

hours

18.80

20.10

21.70

0.0532

0.0498

0.0461

Roof Carcass, Jack Rafters, 3-6mm

no

hours

10.40

16.10

16.60

0.0962

0.0621

0.0602

Roof Carcass, Purlins, under 3m

no

hours

5.10

5.40

5.80

0.1961

0.1852

0.1724

Roof Carcass, Purlins, 3-6mm

no

hours

4.30

4.80

5.10

0.2326

0.2083

0.1961

Roof Carcass, Purlins, over 6m

no

hours

3.50

4.30

4.60

0.2857

0.2326

0.2174

Roof Carcass, Binders, under 3m

no

hours

5.70

6.60

7.60

0.1754

0.1515

0.1316

Roof Carcass, Binders, 3-6mm

no

hours

2.10

2.30

2.50

0.4762

0.4348

0.4000

Roof Carcass, Binders, over 6m

no

hours

1.30

1.50

1.60

0.7692

0.6667

0.6250

Roof Carcass, Hangers, under 3m

no

hours

8.20

9.00

9.60

0.1220

0.1111

0.1042

Roof Carcass, Collars under 3m

no

hours

7.60

8.00

9.10

0.1316

0.1250

0.1099

Roof Carcass, Collars 3-m

no

hours

6.50

7.40

8.30

0.1538

0.1351

0.1205

Roof Carcass, Ridge Boards under 3m

no

hours

12.00

13.10

15.30

0.0833

0.0763

0.0654

Roof Carcass, Cut Rafter Feet to line

no

hours

142.00

166.00

175.00

0.0070

0.0060

0.0057

Roof Soffits, Softwood, nailed

m

hours

-

9.20

-

-

0.1087

-

Roof Soffits, Softwood, screwed

m

hours

-

3.90

-

-

0.2564

-

Roof Soffits Asbestos, under 300mm nailed

m

hours

-

9.10

-

-

0.1099

-

Roof Soffits Asbestos, under 300mm screwed

m

hours

-

3.80

-

-

0.2632

-

Roof Soffits, Asbestos, over 300mm nailed

m

hours

-

3.50

-

-

0.2857

-

Roof Soffits, Asbestos, over 300mm screwed

m

hours

-

1.30

-

-

0.7692

-

Roof Facia Panels, Softwood

m

hours

5.10

7.20

9.30

0.1961

0.1389

0.1075

Roof Facia Panels, Asbestos

m

hours

1.30

2.50

3.90

0.7692

0.4000

0.2564

Roof Facia Panel Studding, nailed

m

hours

7.30

8.10

9.00

0.1370

0.1235

0.1111

Roof Facia Panel Studding, screwed

m

hours

4.60

5.20

5.80

0.2174

0.1923

0.1724

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Timber Frames

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Roof Facia Panel Studding, bolted to beams

m

hours

0.1852

0.1695

0.1515

Roof Works, Fix Herringbone Strutting

m

hours

-

5.10

-

-

0.1961

-

Roof Works, Fix Firing Strips

m

hours

-

25.00

-

-

0.0400

-

Roof Works, Fix Drip/Tilt Filleting

m

hours

-

20.50

-

-

0.0488

-

Simple Universal Beam Steel Bridge, erect support steel H frames

no

days

-

0.8333

-

-

1.2000

-

Simple Universal Beam Steel Bridge, erect 15m truss

m

days

-

3.30

-

-

0.3030

-

Fix 0.5m2 Stones to Metal Support Frame

m2

days

5.60

7.00

7.80

0.1786

0.1429

0.1282

Fix 0.5-0.75m2 Stones to Metal Support Frame

m2

days

7.20

9.00

10.10

0.1389

0.1111

0.0990

Fix 0.75-1.0m2 Stones to Metal Support Frame

m2

days

6.90

8.70

9.70

0.1449

0.1149

0.1031

Fix Complex Stonework to Metal Support Frame

m2

days

-

0.5556

-

Fix Curved Stone Cladding

m2

days

9.20

0.1449

0.1250

0.1087

Fix Stone Edge Beams/Window Reveals

m2

days

-

2.30

3.20

-

0.4348

0.3125

Fix Stone Soffits

m2

days

-

4.00

-

0.2500

-

Stone Floors

m2

days

0.1449

0.0962

0.0820

Granite Wall Panels, First Fix

m2

hours

-

1.30

-

-

0.7692

-

Granite Wall Panels, Second Fix

m2

hours

-

1.10

-

-

0.9091

-

no

days

-

0.5000

-

-

2.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average 5.40

Fast 5.90

Slow 6.60

Average

Fast

Structural Steelwork

Stonework

-

1.80 6.90

6.90

-

8.00

-

10.40

12.20

Steel Strutting Horizontal heavy duty strutting

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

no

days

-

Steel Frame and Roof Members

Tons

days

Wall Frame, Bow String Truss and Frame

Tons

days

-

1.60

Roof Frame, Curved Truss and Frame

Tons

days

-

5.20

Wall Frame, Glazed Frame and Atrium

Tons

days

-

0.30

Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile

m3

hours

Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile

m3

hours

Crawler Shovel, 0.8m3 bucket, Gravel, pushed 5-50m to stockpile

m3

hours

Crawler Shovel, 0.8m3 bucket, Gravel, pushed 50-120m to stockpile

m3

hours

Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 5-50m to stockpile

m3

Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 50-120m to stockpile Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 5-50m to stockpile

DESCRIPTION

ITEM NO.

Diagonal heavy duty strutting

PRODUCTION RATES (Time per Quantity) REMARKS

Average

Fast

0.1667

Slow

-

Average

Fast

-

6.00

-

0.2941

-

0.2174

-

-

0.6250

-

-

-

0.1923

-

-

-

3.3333

-

Steel Frames 3.40

-

4.60

Spread and Level 13.90

20.40

25.00

0.0719

0.0490

0.0400

7.60

9.50

12.60

0.1316

0.1053

0.0794

14.20

20.40

25.60

0.0704

0.0490

0.0391

7.60

10.20

12.80

0.1316

0.0980

0.0781

hours

12.70

18.40

23.20

0.0787

0.0543

0.0431

m3

hours

6.90

8.90

11.60

0.1449

0.1124

0.0862

m3

hours

11.60

16.90

21.30

0.0862

0.0592

0.0469

Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3

hours

6.30

8.20

10.40

0.1587

0.1220

0.0962

Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 5-50m to stockpile

m3

hours

23.80

28.50

35.70

0.0420

0.0351

0.0280

Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 50-120m to stockpile

m3

hours

16.70

18.50

20.40

0.0599

0.0541

0.0490

Crawler Shovel, 1.2m3 bucket, Gravel, pushed 5-50m to stockpile

m3

hours

25.00

32.00

37.00

0.0400

0.0313

0.0270

Crawler Shovel, 1.2m3 bucket, Gravel, pushed 50-120m to stockpile

m3

hours

17.20

19.30

21.20

0.0581

0.0518

0.0472

Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 5-50m to stockpile

m3

hours

21.70

27.50

33.30

0.0461

0.0364

0.0300

Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 50-120m to stockpile

m3

hours

15.10

16.90

18.80

0.0662

0.0592

0.0532

Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 5-50m to stockpile

m3

hours

19.60

24.50

30.30

0.0510

0.0408

0.0330

Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3

hours

13.70

15.90

17.50

0.0730

0.0629

0.0571

Crawler Shovel, 0.6m3 bucket, 50-200m2, Sand/Soil

hours

18.60

28.50

38.50

0.0538

0.0351

0.0260

m3

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Crawler Shovel, 0.6m3 bucket, over 200m2, Sand/Soil

m3

hours

24.40

37.20

50.00

0.0410

0.0269

0.0200

Crawler Shovel, 0.6m3 bucket, 50-200m2, Gravel

m3

hours

18.90

28.60

38.40

0.0529

0.0350

0.0260

Crawler Shovel, 0.6m3 bucket, over 200m2, Gravel

m3

hours

24.20

37.20

50.00

0.0413

0.0269

0.0200

Crawler Shovel, 0.6m3 bucket, 50-200m2, Hardcore

m3

hours

15.80

23.50

31.20

0.0633

0.0426

0.0321

Crawler Shovel, 0.6m3 bucket, over 200m2, Hardcore

m3

hours

19.20

29.60

40.00

0.0521

0.0338

0.0250

Crawler Shovel, 0.6m3 bucket, 50-200m2, Boulder Clay

m3

hours

17.20

26.40

35.70

0.0581

0.0379

0.0280

Crawler Shovel, 0.6m3 bucket, over 200m2, Boulder Clay

m3

hours

22.20

33.80

45.40

0.0450

0.0296

0.0220

Crawler Shovel, 1.2m3 bucket, 50-200m2, Sand/Soil

m3

hours

43.50

48.00

52.60

0.0230

0.0208

0.0190

Crawler Shovel, 1.2m3 bucket, over 200m2, Sand/Soil

m3

hours

55.50

61.10

66.70

0.0180

0.0164

0.0150

Crawler Shovel, 1.2m3 bucket, 50-200m2, Gravel

m3

hours

43.80

48.30

52.90

0.0228

0.0207

0.0189

Crawler Shovel, 1.2m3 bucket, over 200m2, Gravel

m3

hours

55.50

61.10

66.70

0.0180

0.0164

0.0150

Crawler Shovel, 1.2m3 bucket, 50-200m2, Hardcore

m3

hours

37.10

40.30

43.50

0.0270

0.0248

0.0230

Crawler Shovel, 1.2m3 bucket, over 200m2, Hardcore

m3

hours

47.60

51.60

55.60

0.0210

0.0194

0.0180

Crawler Shovel, 1.2m3 bucket, 50-200m2, Boulder Clay

m3

hours

43.80

45.70

47.60

0.0228

0.0219

0.0210

Crawler Shovel, 1.2m3 bucket, over 200m2, Boulder Clay

m3

hours

55.60

59.10

62.50

0.0180

0.0169

0.0160

m

days

3.80

4.50

6.40

0.2632

0.2222

0.1563

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

m3

hours

6.70

8.40

9.90

0.1493

0.1190

0.1010

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

m3

hours

3.20

4.50

5.00

0.3125

0.2222

0.2000

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

m3

hours

3.30

4.10

5.20

0.3030

0.2439

0.1923

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

m3

hours

3.30

4.10

5.20

0.3030

0.2439

0.1923

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

m3

hours

8.20

10.00

11.70

0.1220

0.1000

0.0855

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

m3

hours

7.10

8.70

10.20

0.1408

0.1149

0.0980

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Soil Mix Walls Three Auger Drill, cement and cure

Small or Deep Excavation

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

m3

hours

6.50

8.30

9.40

0.1538

0.1205

0.1064

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

m3

hours

6.30

7.70

9.10

0.1587

0.1299

0.1099

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

m3

hours

12.20

13.30

15.40

0.0820

0.0752

0.0649

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

m3

hours

10.20

11.10

12.90

0.0980

0.0901

0.0775

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

m3

hours

9.70

10.50

12.10

0.1031

0.0952

0.0826

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

m3

hours

6.10

6.70

7.70

0.1639

0.1493

0.1299

m

days

1.80

2.50

3.40

0.5556

0.4000

0.2941

Slate Roofs, Welsh Slate 3-5mm

m2

days

-

18.00

-

-

0.0556

-

Slate Roofs, Cumbrian Slate 8-11mm

m2

days

-

8.50

-

-

0.1176

-

Slate Roofs, Asbestos Slates

m2

days

-

36.00

-

-

0.0278

-

Tiled Roofs, Concrete Tiles

m2

days

-

52.00

-

-

0.0192

-

Tiled Roofs, Clay Pan Tiles

m2

days

-

26.00

-

-

0.0385

-

Pre Drilling, Rercussive or Rotary, soft deposits

m

hours

8.00

10.00

14.00

0.1250

0.1000

0.0714

Pre Drilling, Wash Boring, grade V/IV rock

m

hours

2.50

3.20

3.90

0.4000

0.3125

0.2564

Pre Drilling, Triple Tube Sampling, grade V/IV rock

m

hours

0.40

0.80

0.90

2.5000

1.2500

1.1111

Pre Drilling, Rotary, grade III/II rock

m

hours

0.20

0.50

0.70

5.0000

2.0000

1.4286

Pre Drilling, Triple Tube Sampling, grade III/II rock

m

hours

0.10

0.40

0.70

10.0000

2.5000

1.4286

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Slurry Mix Walls Crane grab, cement/bentonite and sheet piles

Slates and Tiling

Site Investigation

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Shrubs and Bushes, dig up and removal

m2

hours

-

25.00

-

0.0400

0.0263

Turf, lifting and removal

m2

hours

-

2.90

-

-

0.3448

-

Trees, small sizes and shrubs

m2

hours

-

14.00

-

-

0.0714

-

Trees and Shrubs, 500mm - 900mm girth

no

hours

-

0.0556

-

-

18.00

-

Trees and Shrubs, 900mm - 1200mm girth

no

hours

-

0.0455

-

-

22.00

-

Trees and Shrubs, 1200mm - 1500mm girth

no

hours

-

0.0385

-

-

26.00

-

Hedges and Roots, 0.5-1.0m high

m

hours

-

0.90

-

-

1.1111

-

Hedges and Roots, 1.0-1.5m high

m

hours

-

0.80

-

-

1.2500

-

Hedges and Roots, 1.5-2.0m high

m

hours

-

0.60

-

-

1.6667

-

PVC Sheeted Roofs, large areas

m2

days

-

50.00

-

-

0.0200

-

PVC Sheeted Roofs, small areas

m2

days

-

40.00

-

-

0.0250

-

Plastic Profiled Sheet Systems

m2

days

-

54.00

-

-

0.0185

-

Vibro/Drop Hammer, 10m deep Sand

m

days

-

Vibro/Drop Hammer, 35m deep Sand

m

days

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Site Clearance 38.00

Sheeted Roofs

Sheet Piling

3.50

55.00

60.00

-

0.0182

0.0167

32.00

10.50

0.2857

0.0313

0.0952

PRODUCTION RATES

DESCRIPTION

ITEM NO.

UNIT FOR QUANTITY

PRODUCTION RATES (Qty per Time)

UNIT FOR TIME

Slow

weeks

-

-

PRODUCTION RATES (Time per Quantity) REMARKS

Average

Fast

Slow

Average

Fast

Secant Piling Construct 30m dia cofferdam, 255 piles/concrete base

-

-

12.00

-

Screeding Sand/Cement Floor Screed, 15-20mm thick

m2

hours

-

4.80

5.70

-

0.2083

0.1754

Sand/Cement Floor Screed, 20-30mm thick

m2

hours

-

4.60

5.50

-

0.2174

0.1818

Sand/Cement Floor Screed, 30-40mm thick

m2

hours

3.20

4.20

5.30

0.3125

0.2381

0.1887

Sand/Cement Floor Screed, 40-50mm thick

m2

hours

2.00

3.80

5.20

0.5000

0.2632

0.1923

Sand/Cement Floor Screed, 50-65mm thick

m2

hours

-

3.30

3.90

-

0.3030

0.2564

Sand/Cement Floor Screed, 65-100mm thick

m2

hours

-

3.00

3.60

-

0.3333

0.2778

Fix/Setout Screed Battens

m

hours

-

10.00

-

0.1000

-

no.

days

Ground Excavation, Hydraulic Backhoe

m3

days

Bored Piling, 25-70m deep

no.

days

-

Rule of Thumb Site Investigation Pre Drilling

Formwork Fixing

0.2000

0.2500

0.1000

0.1250

-

50.00

0.3333

5.00

0.1667

10.00

-

-

4.00 0.0200 8.00

3.00 6.00

m2

days

-

12.00

-

-

0.0833

-

Reinforcement Fixing

Tonnes

days

-

0.70

-

-

1.4286

-

Concrete Placement

m3

days

-

16.00

-

-

0.0625

-

Scaffold Erection, Steel Falsework

m3

days

-

140.00

-

-

0.0071

-

Blockwork Laying

m2

days

-

7.00

-

-

0.1429

-

Plastering and Rendering

m2

days

-

12.00

-

-

0.0833

-

Blockwork Laying

m2

days

0.1429

0.0833

0.0571

Stonework Cladding

m2

days

-

5.10

-

-

0.1961

-

Window Glazing

m2

hours

-

1.50

-

-

0.6667

-

7.00

12.00

17.50

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Granolithic Flooring

m2

hours

-

4.50

-

-

0.2222

-

Floor Screeding

m2

hours

-

4.50

-

-

0.2222

-

Floor Screeding

m2

days

-

60.00

-

-

0.0167

-

Ceramic Wall Tiling

m2

hours

-

1.50

-

-

0.6667

-

mins

-

-

-

8.00

6.00

5.50

Excavation, non explosive chemical method, Class I Granite

m3

cycle

0.30

0.90

1.20

3.3333

1.1111

0.8333

Excavation, non explosive chemical method, Class II Granite

m3

cycle

2.00

2.60

2.90

0.5000

0.3846

0.3448

Excavation, non explosive chemical method, Class III Granite

m3

cycle

1.20

1.40

1.80

0.8333

0.7143

0.5556

Façade Cleaning, Water Jetting

m2

days

-

25.00

-

-

0.0400

-

Façade Cleaning, Acid Etching

m2

days

-

9.00

-

-

0.1111

-

Façade Cleaning, Grit Blasting

m2

days

-

12.00

-

-

0.0833

-

Cladding Restoration, Brickwork

m2

days

-

6.50

-

-

0.1538

-

Cladding Restoration, Stonework courses

m

days

-

20.00

-

-

0.0500

-

Large Wall Areas, applied in 2 coats

m2

hours

-

2.20

2.70

-

0.4545

0.3704

Small Wall Areas, applied in 2 coats

m2

hours

-

1.50

1.70

-

0.6667

0.5882

Narrow Widths, applied in 2 coats

m2

hours

-

1.20

1.40

-

0.8333

0.7143

Columns and Beams, applied in 2 coats

m2

hours

-

1.50

1.70

-

0.6667

0.5882

Staircase and Soffits, applied in 2 coats

m2

hours

-

1.40

-

0.7143

-

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Rock Tunnels Excavation, non explosive chemical method, cycle time

Restoration Works

Rendering

-

PRODUCTION RATES

UNIT FOR QUANTITY

PRODUCTION RATES (Qty per Time)

UNIT FOR TIME

Slow

Drill 30m shaft

hours

-

Install strands/setup anchor

hours

-

Grout in strands

hours

DESCRIPTION

ITEM NO.

PRODUCTION RATES (Time per Quantity) REMARKS

Average

Fast

Slow

Average

Fast

-

-

-

7.00

-

-

-

-

6.00

-

-

-

-

-

2.00

-

-

Removable Anchors

Reinforcement Ratios Pile Cap, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

14.80

Base Slab, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

13.20

Suspended Slab, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

20.60

Platform Slab, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

15.60

Columns, Concrete m3 x Ratio = Rebar Tonnes

% ratio

15.80

18.70

Walls, Concrete m3 x Ratio = Rebar Tonnes

% ratio

14.70

15.00

-

-

-

14.10

-

-

-

25.60

-

-

-

-

-

-

-

-

-

-

-

-

28.70 -

Reinforcement Slabs/Foundations, steelfixing, 6mm

tonne

hours

0.0248

0.0260

0.0274

40.30

38.40

36.50

Slabs/Foundations, steelfixing, 8mm

tonne

hours

0.0355

0.0372

0.0388

28.20

26.90

25.80

Slabs/Foundations, steelfixing, 10mm

tonne

hours

0.0444

0.0485

0.0498

22.50

20.60

20.10

Slabs/Foundations, steelfixing, 12mm

tonne

hours

0.0592

0.0613

0.0649

16.90

16.30

15.40

Slabs/Foundations, steelfixing, 16mm

tonne

hours

0.0833

0.0870

0.0917

12.00

11.50

10.90

Slabs/Foundations, steelfixing, 20mm

tonne

hours

0.1087

0.1163

0.1220

9.20

8.60

8.20

Slabs/Foundations, steelfixing, 25mm

tonne

hours

0.1449

0.1493

0.1538

6.90

6.70

6.50

Slabs/Foundations, steelfixing, 32mm

tonne

hours

0.1754

0.1818

0.1923

5.70

5.50

5.20

Slabs/Foundations, steelfixing, 40mm

tonne

hours

0.1887

0.1961

0.2041

5.30

5.10

4.90

Slabs/Foundations, steelfixing, 50mm

tonne

hours

0.1923

0.2041

0.2174

5.20

4.90

4.60

Beams/Columns, steelfixing, 6mm

tonne

hours

0.0181

0.0189

0.0198

55.40

52.80

50.60

Beams/Columns, steelfixing, 8mm

tonne

hours

0.0258

0.0270

0.0285

38.80

37.00

35.10

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Beams/Columns, steelfixing, 10mm

tonne

hours

0.0339

#VALUE!

0.0372

29.50

28.4

26.90

Beams/Columns, steelfixing, 12mm

tonne

hours

0.0427

0.0446

0.0457

23.40

22.40

21.90

Beams/Columns, steelfixing, 16mm

tonne

hours

0.0602

0.0633

0.0662

16.60

15.80

15.10

Beams/Columns, steelfixing, 20mm

tonne

hours

0.0806

0.0840

0.0885

12.40

11.90

11.30

Beams/Columns, steelfixing, 25mm

tonne

hours

0.1010

0.1087

0.1149

9.90

9.20

8.70

Beams/Columns, steelfixing, 32mm

tonne

hours

0.1471

0.1515

0.1613

6.80

6.60

6.20

Beams/Columns, steelfixing, 40mm

tonne

hours

0.1639

0.1695

0.1786

6.10

5.90

5.60

Beams/Columns, steelfixing, 50mm

tonne

hours

0.1639

0.1695

0.1786

6.10

5.90

5.60

Walls, steelfixing, 6mm

tonne

hours

0.0243

0.0245

0.0256

41.20

40.80

39.10

Walls, steelfixing, 8mm

tonne

hours

0.0342

0.0350

0.0365

29.20

28.60

27.40

Walls, steelfixing, 10mm

tonne

hours

0.0441

0.0455

0.0472

22.70

22.00

21.20

Walls, steelfixing, 12mm

tonne

hours

0.0568

0.0578

0.0592

17.60

17.30

16.90

Walls, steelfixing, 16mm

tonne

hours

0.0806

0.0820

0.0847

12.40

12.20

11.80

Walls, steelfixing, 20mm

tonne

hours

0.1064

0.1087

0.1149

9.40

9.20

8.70

Walls, steelfixing, 25mm

tonne

hours

0.1351

0.1389

0.1429

7.40

7.20

7.00

Walls, steelfixing, 32mm

tonne

hours

0.1429

0.1471

0.1563

7.00

6.80

6.40

Walls, steelfixing, 40mm

tonne

hours

0.1563

0.1639

0.1695

6.40

6.10

5.90

Walls, steelfixing, 50mm

tonne

hours

0.1887

0.1961

0.2083

5.30

5.10

4.80

Staircases, steelfixing, 6mm

tonne

hours

0.0204

0.0208

0.0220

48.90

48.00

45.50

Staircases, steelfixing, 8mm

tonne

hours

0.0291

0.0298

0.0313

34.40

33.60

31.90

Staircases, steelfixing, 10mm

tonne

hours

0.0376

0.0388

0.0412

26.60

25.80

24.30

Staircases, steelfixing, 12mm

tonne

hours

0.0478

0.0490

0.0513

20.90

20.40

19.50

Staircases, steelfixing, 16mm

tonne

hours

0.0685

0.0694

0.0725

14.60

14.40

13.80

Staircases, steelfixing, 20mm

tonne

hours

0.0885

0.0926

0.0952

11.30

10.80

10.50

Staircases, steelfixing, 25mm

tonne

hours

0.1163

0.1190

0.1220

8.60

8.40

8.20

UPVC Downpipes, 75mm

m

hours

-

3.30

-

-

0.3030

-

UPVC Guttering, 75mm

m

hours

-

3.10

-

-

0.3226

-

UPVC RWP Fittings, 75mm

no

hours

-

3.10

-

-

0.3226

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Rainwater Works

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Cast Iron Downpipes, 75mm

m

hours

-

2.10

-

-

0.4762

-

Cast Iron Guttering, 75mm

m

hours

-

2.50

-

-

0.4000

-

Cast Iron RWP Fittings, 75mm

no

hours

-

2.20

-

-

0.4545

-

Aluminium Downpipes, 72mm

m

hours

-

2.50

-

-

0.4000

-

Aluminium Guttering, 72mm

m

hours

-

2.90

-

-

0.3448

-

Aluminium RWP Fittings, 72mm

no

hours

-

1.90

-

-

0.5263

-

AC Install 2 no Service transformers, 6 men

days

-

-

-

-

12.00

-

AC Install 2 no Switchgear, 7 men

days

-

-

-

-

12.00

-

AC Install Associated Trays and ladders, 3 men

days

-

-

-

11.00

5.00

-

AC Cable Terminations in Tx and SWG Rooms, 3 men

days

-

-

-

12.00

6.00

-

DC Install Insulated Flooring in DC Room, 1 men

days

-

-

-

-

5.00

-

DC Install 1 set Rectifier Transformer and Rectifier, 7 men

days

-

-

-

-

1.00

-

DC Install Switchgear, 7 men

days

-

-

-

-

10.00

-

DC Primary Cable Terminations and Busduct, 18 men

days

-

-

-

12.0

9.00

-

DC Secondary Cable Terminations and Connections, 9 men

days

-

-

-

12.0

6.00

-

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Power Supply

Trackside Cabling 33kV/Pilot Cables, 10 men

m run

Trackside Cabling Terminations, 6 men

days

2,100.00

-

-

0.0005

-

-

days

-

-

-

-

1.0

Lag for Initial Stress Tensioning after 1st bay cast

hrs

-

-

-

-

48.00

-

Lag for Final Stress Tensioning after Initial Stress

hrs

-

-

-

-

120.00

-

0.4545

0.3571

0.3226

Post Tensioning

Plastering Browning (undercoat), Internal Walls under 2.5m high

m2

hours

2.20

2.80

3.10

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Browning (undercoat), Internal Walls over 2.5m high

m2

hours

2.10

2.60

2.80

0.4762

0.3846

0.3571

Browning (undercoat), Reveals and Columns less than 100mm wide

m2

hours

9.90

10.00

10.10

0.1010

0.1000

0.0990

Browning (undercoat), Reveals and Columns 100-200mm wide

m2

hours

5.20

5.40

6.40

0.1923

0.1852

0.1563

Browning (undercoat), Reveals and Columns 200-300mm wide

m2

hours

3.30

3.60

3.90

0.3030

0.2778

0.2564

Covings

m2

hours

-

0.2000

-

Skimming (topcoat), Internal Walls under 2.5m high

m2

hours

6.10

6.70

7.30

0.1639

0.1493

0.1370

Skimming (topcoat), Internal Walls over 2.5m high

m2

hours

5.50

6.10

6.70

0.1818

0.1639

0.1493

Skimming (topcoat), Reveals and Columns less than 100mm wide

m2

hours

12.60

13.80

15.40

0.0794

0.0725

0.0649

Skimming (topcoat), Reveals and Columns 100-200mm wide

m2

hours

7.70

8.30

9.80

0.1299

0.1205

0.1020

Skimming (topcoat), Reveals and Columns 200-300mm wide

m2

hours

4.50

5.00

5.50

0.2222

0.2000

0.1818

Plaster Board to Ceilings

m2

hours

3.20

4.50

5.50

0.3125

0.2222

0.1818

Plastering Ceilings, 1 Bonding, 1 Skimming

m2

hours

1.10

1.70

2.40

0.9091

0.5882

0.4167

Plastering Ceilings, Topcoat Skimming

m2

hours

2.70

3.20

5.40

0.3704

0.3125

0.1852

Boarding to Plaster dabs

m2

hours

3.60

4.00

5.50

0.2778

0.2500

0.1818

Boarding to Stud-work/Metal Lathes

m2

hours

4.00

5.00

6.70

0.2500

0.2000

0.1493

Boarding 12mm nailed to studding

m2

hours

-

12.50

-

-

0.0800

-

Boarding 19mm nailed to studding

m2

hours

-

16.50

-

-

0.0606

-

Tape, Jointing and Sanding

m

hours

-

10.00

-

-

0.10

-

Timber Studding

m

hours

5.90

6.20

6.80

0.1695

0.1613

0.1471

Metalwork System (MF) Studding

m2

hours

1.60

2.00

2.50

0.6250

0.5000

0.4000

Tape, Joint Sand and Top Coat Plasterboard

m2

hours

1.10

1.50

2.10

0.9091

0.6667

0.4762

Skimming to Plasterboards

m2

hours

5.50

6.10

6.70

0.1818

0.1639

0.1493

5mm Hardboard Paneling, excluding studding time

m2

hours

3.20

3.60

-

0.3125

0.2778

100mm Pine Paneling, excluding studding time

m2

hours

1.10

1.40

1.2500

0.9091

0.7143

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

-

Fast

5.00

Slow

-

Average

Fast

Plasterboard

Partitioning

0.80

PRODUCTION RATES

UNIT FOR QUANTITY

UNIT FOR TIME

Quality Hardwood Paneling, excluding studding time

m2

hours

Fix 50mm Rocksil Insulation to cavities

m2

hours

Fix Timber Studding and Paramount Partitions

m2

hours

Fix Timber Studding and Demountable Partitions

m2

hours

Fix Timber Studding and Hills Duraboard Partitions

m2

Fix Timber Studding and Gyproc Laminated Partitions

DESCRIPTION

ITEM NO.

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average 0.30

Fast

Slow

Average

Fast

0.50

0.60

3.3333

2.0000

1.6667

17.80

20.20

-

0.0562

0.0495

2.60

3.00

3.40

0.3846

0.3333

0.2941

0.80

1.10

1.60

1.2500

0.9091

0.6250

hours

3.00

3.50

3.90

0.3333

0.2857

0.2564

m2

hours

2.20

2.60

2.90

0.4545

0.3846

0.3448

Stud Partitions, Butt Jointed, nailed

m

hours

5.90

7.30

9.10

0.1695

0.1370

0.1099

Stud Partitions, Butt Jointed, screwed

m

hours

3.50

4.60

5.80

0.2857

0.2174

0.1724

Stud Partitions, T&G Jointed, nailed

m

hours

2.90

3.60

4.80

0.3448

0.2778

0.2083

Stud Partitions, T&G Jointed, screwed

m

hours

2.10

2.80

3.70

0.4762

0.3571

0.2703

Stud Partitions, Fix Sole Plates

m

hours

-

11.10

-

-

0.0901

-

Stud Partitions, Fix Noggins

m

hours

-

16.60

-

-

0.0602

-

Stud Partitions, Drill 25-40mm Holes

no

hours

-

28.50

-

-

0.0351

-

Fix Toilet Partition System, Separation panels

no

hours

-

1.25

-

-

0.80

-

Fix Toilet Partition System, Wall Front Panels

no

hours

-

1.43

-

-

0.70

-

Fix Toilet Partition System, Separation Front Panels

no

hours

-

1.67

-

-

0.60

-

Fix Toilet Partition System, End Front Panels

no

hours

-

1.67

-

-

0.60

-

Fix Toilet Partition System, Hang Door to Panel

no

hours

-

2.50

-

-

0.40

-

Fix Toilet Partition System, Hand Door plugged to wall

no

hours

-

1.67

-

-

0.60

-

Fix Toilet Partition System, Fix Head Rails

no

hours

-

10.00

-

-

0.10

-

Prepare Walls

m2

hours

-

14.20

-

-

0.0704

-

Prepare Doors

m2

hours

-

12.50

-

-

0.0800

-

Prepare Door Frames

m

hours

-

25.00

-

-

0.0400

-

Burn Off / Heat Strip Paintwork

m2

hours

-

1.10

-

-

0.9091

-

Internal Timber, 1 coat primer before fixing, generally

m2

hours

-

6.70

-

-

0.1493

-

Internal Timber, 1 coat primer before fixing, timber lengths

m

hours

-

20.00

-

-

0.0500

-

Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss

m2

hours

-

1.70

2.10

-

0.5882

0.4762

Internal Timber, touchup primer, 1 undercoat, 1 coat gloss

m2

hours

-

3.10

3.80

-

0.3226

0.2632

-

Painting

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Internal Timber, polyurethane varnish, 2 coats

m2

hours

-

3.30

-

-

0.3030

-

Internal Timber, polyurethane varnish, 3 coats

m2

hours

-

2.20

-

-

0.4545

-

Internal Timber, linseed oil to hardwood, 2 coats

m2

hours

-

3.60

-

-

0.2778

-

External Timber, windows and frames

m2

hours

-

2.40

-

-

0.4167

-

External Timber, knot, 1 primer, 2 undercoats, 1 coat gloss,

m2

hours

-

1.50

-

-

0.6667

-

External Timber, touchup primer, 2 undercoats, 1 coat gloss,

m2

hours

-

2.00

-

-

0.5000

-

External Timber, 2 coats wood preservative

m2

hours

-

4.00

-

-

0.2500

-

External Timber, 3 coats polyurethane varnish

m2

hours

-

2.00

-

-

0.5000

-

Internal Walls, 2 coats emulsion to plaster

m2

hours

-

8.00

-

-

0.1250

-

Internal Walls, 2 coats emulsion to brick/blockwork

m2

hours

-

6.00

-

-

0.1667

-

Internal Walls, 1 mist, 2 coats emulsion to plaster

m2

hours

-

6.00

-

-

0.1667

-

Internal Walls, 1 mist, 2 coats emulsion to brick/blockwork

m2

hours

-

4.50

-

-

0.2222

-

Internal Walls, 1 primer, 1 undercoat, 1 gloss to plaster

m2

hours

-

2.30

-

-

0.4348

-

Internal Walls, undercoat to door frame

m

hours

-

20.00

-

-

0.0500

-

Internal Walls, gloss to door frame

m

hours

-

16.50

-

-

0.0606

-

Internal Walls, undercoat to door

m2

hours

-

7.10

-

-

0.1408

-

Internal Walls, gloss to door

m2

hours

-

6.20

-

-

0.1613

-

External Walls, 2 coats sandtex to render/concrete

m2

hours

-

2.50

-

-

0.4000

-

External Walls, 2 coats sandtex to brick/blockwork

m2

hours

-

2.00

-

-

0.5000

-

External Walls, 1 sealer, 2 emulsion to render/concrete

m2

hours

-

2.00

-

-

0.5000

-

External Walls, 1 sealer, 2 emulsion to brick/blockwork

m2

hours

-

1.70

-

-

0.5882

-

Floors, epoxy paint

m2

hours

-

2.90

-

-

0.3448

-

Ceilings, emulsion paint, 2 coats

m2

hours

-

6.10

-

-

0.1639

-

Ceilings, emulsion paint, 3 coats

m2

hours

-

5.00

-

-

0.2000

-

Ceilings, textured paint

m2

hours

-

4.20

-

-

0.2381

-

Ceilings, artex finish

m2

hours

-

4.10

-

-

0.2439

-

Internal Steelwork, 1 primer, 1 undercoat, 1 gloss

m2

hours

1.30

2.40

-

0.7692

0.4167

-

External Steelwork, 1 primer, 2 undercoats, 1 gloss

m2

hours

0.90

1.70

-

1.1111

0.5882

-

Guttering Steelwork, 1 coat primer, 2 undercoats, 1 gloss

m

hours

2.50

-

-

0.4000

-

DESCRIPTION

ITEM NO.

REMARKS

-

Average

Fast

Slow

Average

Fast

PRODUCTION RATES

DESCRIPTION

ITEM NO.

UNIT FOR QUANTITY

UNIT FOR TIME

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average

Fast

Slow

Average

Fast

NATM Tunnels Standard Advance Method, used on tunnels with max diameter

m

-

7.00

-

-

-

-

Half Face Advance Method, used on tunnels with max diameter

m

-

10.00

-

-

-

-

Double side Drift Advance Method, used on tunnels with diameter over

m

-

10.00

-

-

-

-

Double side Drift Advance Method, used on tunnels with diameter over

m

-

10.00

-

-

-

-

Excavation, London Clay, internal diameter under 7.0m

m

days

2.50

2.90

3.20

0.4000

0.3448

0.3125

Excavation, London Clay, internal diameter 7.0-10.0m

m

days

1.50

2.00

2.50

0.6667

0.5000

0.4000

Excavation, London Clay, internal diameter over 10.0m

m

days

1.00

1.30

1.5

1.0000

0.7692

-

Excavation, Woolwich/Reading Beds, internal diameter 2.0-7.0m

m

days

1.50

1.80

2.0

0.6667

0.5556

-

Excavation, Woolwich/Reading Beds, internal diameter 7.0-10.0m

m

days

-

1.50

-

-

0.6667

-

Excavation, Woolwich/Reading Beds, internal diameter over 10.0m

m

days

-

1.00

1.5

-

1.0000

-

Excavation, London Clay, Inclined Tunnels, diameter 2.0-7.0m

m

days

1.50

2.00

3.2

0.6667

0.5000

-

Excavation, London Clay, Inclined Tunnels, diameter 7.0-10.0m

m

days

0.50

1.00

2.2

2.0000

1.0000

-

Excavation, London Clay, Vertical Shafts, diameter 2.0-9.0m

m

days

1.00

1.50

2.2

1.0000

0.6667

-

Excavation, London Clay, Vertical Shafts, diameter 9.0-15.0m

m

days

0.50

1.00

2.6

2.0000

1.0000

-

0.80

1.00

1.2

1.2500

1.0000

-

0.20

-

-

5.0000

-

Excavation, London Clay, Circulation Halls

m of circumf

days

Excavation, London Clay, Junction Excavation

m

days

Mucking Capacity, 1 access with 2 crews

m3

days

190.00

225.00

279.0

0.0053

0.0044

-

Mucking Capacity, 1 access with 4 crews

m3

days

255.00

300.00

366.0

0.0039

0.0033

-

Mucking Capacity, 2 access with 4 crews

m3

days

382.00

450.00

549.0

0.0026

0.0022

-

Sprayed Secondary Lining, Tunnels, diameter under 6.5m

m

days

2.10

2.50

2.8

0.4762

0.4000

-

Sprayed Secondary Lining, Tunnels, diameter over 6.5m

m

days

1.50

2.00

2.4

0.6667

0.5000

-

Sprayed Secondary Lining, Inclined Tunnels, diameter under 6.5m

m

days

1.50

2.00

2.3

0.6667

0.5000

-

Sprayed Secondary Lining, Inclined Tunnels, diameter over 6.5m

m

days

1.00

1.50

1.9

1.0000

0.6667

-

Sprayed Secondary Lining, Vertical Shafts, diameter under 6.5m

m

days

1.80

2.00

2.5

0.5556

0.5000

-

Sprayed Secondary Lining, Vertical Shafts, diameter over 6.5m

m

days

2.20

2.50

3.1

0.4545

0.4000

-

Sprayed Secondary Lining, Circulation Halls, diameter under 11.0m

m

days

2.00

2.3

-

0.5000

-

Sprayed Secondary Lining, Intermediate Landing Tunnels with columns

m

days

1.70

2.00

2.1

0.5882

0.5000

-

Sprayed Secondary Lining, Intermediate Landing Tunnels without columns m

days

1.60

2.10

2.3

0.6250

0.4762

-

Sprayed Secondary Lining, Tunnel Junctions

m

days

-

0.20

0.3

-

5.0000

-

Insitu Permanent Lining, 12m bays, 350-400mm reinforced with PCV backingm

days

-

8.40

12.0

-

0.1190

-

-

-

PRODUCTION RATES

DESCRIPTION

ITEM NO.

UNIT FOR QUANTITY

UNIT FOR TIME

Insitu Permanent Lining, extra over excavate/lining time to allow for permanent % lining

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average

-

Fast

Slow

Average

Fast

25.00

-

-

-

-

Excavate and Line Cycle Time , Running Tunnels

m

days

3.20

4.00

4.9

0.3125

0.2500

-

Excavate and Line Cycle Time, Station Access Adits

m

days

3.30

3.90

4.2

0.3030

0.2564

-

Excavate and Line Cycle Time, Concourse Tunnels

m

days

2.20

2.50

2.7

0.4545

0.4000

-

Excavate and Line Cycle Time, Escalator Tunnels

m

days

1.20

1.50

1.7

0.8333

0.6667

-

Metal Decking, large areas

m2

days

-

70.00

-

-

0.0143

-

Metal Decking, small or complicated

m2

days

-

28.00

-

-

0.0357

-

Titanium Sheeted Roofs

m2

days

-

9.50

-

-

0.1053

-

Copper Roofs, flat work

m2

days

-

3.00

-

-

0.3333

-

Copper Roofs, sloping work

m2

days

-

2.70

-

-

0.3704

-

Zinc Roofs, flat work

m2

days

-

2.40

-

-

0.4167

-

Zinc Roofs, sloping work

m2

days

-

2.10

-

-

0.4762

-

Aluminium Roofs, flat work

m2

days

-

2.80

-

-

0.3571

-

Aluminium Roofs, sloping work

m2

days

-

1.90

-

-

0.5263

-

Lead Roofs, flat work

m2

days

-

2.50

-

-

0.4000

-

Lead Roofs, sloping work

m2

days

-

2.10

-

-

0.4762

-

Lead Roofs, dormer cheeks

m2

days

-

1.30

-

-

0.7692

-

Lead Roofs, flat gutters

m

days

-

88.00

-

-

0.0114

-

Lead Roofs, flat copings

m

days

-

76.00

-

-

0.0132

-

Lead Roofs, stepped gutters

m

days

-

3.50

-

-

0.2857

-

Lead Roofs, shaped copings

m

days

-

3.30

-

-

0.3030

-

Lead Roofs, cover step flashings

m

days

-

3.20

-

-

0.3125

-

Lead Roofs, rooflight flashings

no

days

-

0.80

-

-

1.2500

-

Lead Roofs, domed roof coverings

m2

days

-

0.70

-

-

1.4286

-

Metal Decking

Manholes and Gulleys

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Concrete Pre-Cast Manhole Units, 610 x 455 x 51 mm

no

hours

-

0.8333

-

-

1.20

-

Concrete Pre-Cast Manhole Units, 990 x 610 x 64 mm

no

hours

-

0.6250

-

-

1.60

-

Brickwork Manhole, 1.0 brick engineering

m2

hours

-

0.30

-

-

3.3333

-

Brickwork Manhole, 1.5 brick engineering

m2

hours

-

0.20

-

-

5.0000

-

Brickwork Manhole, 2.0 brick engineering

m2

hours

-

0.20

-

-

5.0000

-

Benching to Manhole, under 0.5m2

no

hours

-

1.1111

-

-

0.90

-

Benching to Manhole, 0.5-0.75m2

no

hours

-

0.8333

-

-

1.20

-

Benching to Manhole, 0.75-1.0m2

no

hours

-

0.5556

-

-

1.80

-

Brickwork Manhole, build in pipes, under 150mm dia

no

hours

-

10.0000

-

-

0.10

-

Brickwork Manhole, build in pipes, 150-225mm dia

no

hours

-

5.0000

-

-

0.20

-

Brickwork Manhole, build in pipes, over 225mm dia

no

hours

-

3.3333

-

-

0.30

-

Brickwork Manhole, build in cast iron covers

no

hours

0.30

0.60

1.20

Yard Gulleys, 75-150mm dia pipes, bed and level

no

hours

-

2.20

-

-

0.4545

-

Yard Gulleys, 150-225mm dia pipes, bed and level

no

hours

-

1.80

-

-

0.5556

-

Yard Gulleys, 225-300mm dia pipes, bed and level

no

hours

-

1.50

-

-

0.6667

-

Road Gulleys, 600mm deep, bed and level

no

hours

-

1.20

-

-

0.8333

-

Road Gulleys, 750mm deep, bed and level

no

hours

-

0.80

-

-

1.2500

-

Road Gulleys, 900mm deep, bed and level

no

hours

-

0.40

-

-

2.5000

-

Road Gulleys, 1,200mm deep, bed and level

no

hours

-

0.30

-

-

3.3333

-

Road Gulleys, install gratings

no

hours

-

5.00

-

-

0.2000

-

PVC Manhole

no

minutes

-

0.0667

-

-

15.00

-

Hydraulic Lift, Install 2 to 3 storeys

floor

weeks

-

0.3333

-

-

3.00

-

Hydraulic Lift, Install 4 storeys and above

floor

weeks

-

0.5000

-

-

2.00

-

Hydraulic Lift, Testing allow 2 wks plus

floor

days

-

1.0000

-

-

1.00

-

Standard Lift, Manufacture, test and deliver

weeks

-

-

-

-

12.00

-

Non-Standard Lift, Manufacture, test and deliver

weeks

-

-

-

75.00

65.00

52.00

DESCRIPTION

ITEM NO.

REMARKS Average

3.33

Fast

1.6667

Slow

0.83

Average

Fast

Lift Installation

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Top Soil, spread, level and prepare for turf or seeding

m2

hours

-

2.50

-

-

0.4000

-

Top Soil, rake in fertilizer for seeding

m2

hours

-

25.00

-

-

0.0400

-

Planting, Shrubs and Hedges, under 750mm high

no

hours

-

4.00

-

-

0.2500

-

Planting, Shrubs and Hedges, over 750mm high

no

hours

-

1.50

-

-

0.6667

-

Planting, Saplings, under 3.0m high

no

hours

-

1.70

-

-

0.5882

-

Turfing, including for minor preparations

m2

hours

-

16.80

-

-

0.0595

-

Land Drains, Concrete, butt jointed, under 150mm dia, 0-5m run

m

hours

-

11.60

-

-

0.0862

-

Land Drains, Concrete, butt jointed, under 150mm dia, 5-30m run

m

hours

-

14.10

-

-

0.0709

-

Land Drains, Concrete, butt jointed, under 150mm dia, over 30m run

m

hours

-

18.80

-

-

0.0532

-

Land Drains, Concrete, butt jointed, 150-225mm dia, 0-5m run

m

hours

-

8.40

-

-

0.1190

-

Land Drains, Concrete, butt jointed, 150-225mm dia, 5-30m run

m

hours

-

10.20

-

-

0.0980

-

Land Drains, Concrete, butt jointed, 150-225mm dia, over 30m run

m

hours

-

11.90

-

-

0.0840

-

Land Drains, Concrete, butt jointed, 225-300mm dia, 0-5m run

m

hours

-

5.40

-

-

0.1852

-

Land Drains, Concrete, butt jointed, 225-300mm dia, 5-30m run

m

hours

-

6.50

-

-

0.1538

-

Land Drains, Concrete, butt jointed, 225-300mm dia, over 30m run

m

hours

-

7.90

-

-

0.1266

-

Concrete Slabs, laid on bedding, to slight falls

m2

hours

2.70

-

4.20

0.3704

-

0.2381

Concrete Slabs, laid on bedding, to steep falls

m2

hours

2.30

-

2.70

0.4348

-

0.3704

Concrete Slabs, laid in mortar, to slight falls

m2

hours

1.50

-

2.30

0.6667

-

0.4348

Concrete Slabs, laid in mortar, to steep falls

m2

hours

1.10

-

1.50

0.9091

-

0.6667

Concrete Slabs, laid on sand, to slight falls

m2

hours

1.70

-

2.80

0.5882

-

0.3571

Concrete Slabs, laid on sand, to steep falls

m2

hours

1.60

-

1.90

0.6250

-

0.5263

Cobble Stones, laid in mortar, no patterns

m2

hours

-

3.3333

-

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Landscaping

Land Drains

Kerbs & Paving

-

0.30

-

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Cobble Stones, laid in mortar, with patterns

m2

hours

-

0.20

-

-

5.0000

-

Artificial Stone, laid on sand, with patterns

m2

hours

-

2.50

-

-

0.4000

-

Brick Paviors, in mortar, straight joints

m2

hours

1.30

1.90

1.1111

0.7692

0.5263

Brick Paviors, in mortar, herringbone pattern

m2

hours

-

1.00

1.20

-

1.0000

0.8333

Gravel Paths, including preparation of sub-base

m2

hours

-

10.50

-

-

0.0952

-

Concrete Paths, 100mm thick, including preparation of sub-base

m2

hours

-

2.50

-

-

0.4000

-

Concrete Kerbs or Channels, laid straight

m

hours

-

6.20

-

-

0.1613

-

Concrete Kerbs or Channels, laid to 5m radius

m

hours

-

4.50

-

-

0.2222

-

Concrete Kerbs or Channels, laid to 10m radius

m

hours

-

5.00

-

-

0.2000

-

Concrete Kerbs or Channels, laid to 20m radius

m

hours

-

5.50

-

-

0.1818

-

Stone/Granite Kerbs or Channels, laid straight

m

hours

-

3.50

-

-

0.2857

-

Concrete Edging, laid straight

m

hours

-

7.70

-

-

0.1299

-

Concrete Edging, laid to 5m radius

m

hours

-

5.80

-

-

0.1724

-

Concrete Edging, laid to 10m radius

m

hours

-

6.20

-

-

0.1613

-

Concrete Edging, laid to 20m radius

m

hours

-

7.10

-

-

0.1408

-

Cutting and Fitting Ends, Concrete Kerbs

no

hours

-

6.60

-

-

0.1515

-

Cutting and Fitting Ends, Channels

no

hours

-

5.80

-

-

0.1724

-

Cutting and Fitting Ends, Concrete Edging

no

hours

-

8.30

-

-

0.1205

-

Deep Vibroflot, 3m centres

m3

hours

330.00

380.00

465.00

0.0030

0.0026

0.0022

Vibro-Roller, Sand

m2

hours

28.50

31.20

45.20

0.0351

0.0321

0.0221

Vibro-Roller, Soil

m2

hours

-

58.80

-

-

0.0170

-

Vibro-Roller, Clay

m2

hours

-

55.60

-

-

0.0180

-

Vibro-Roller, Hardcore

m2

hours

-

38.40

-

-

0.0260

-

Vibro-Roller, Ash

m2

hours

-

57.80

-

-

0.0173

-

DESCRIPTION

ITEM NO.

REMARKS Average

0.90

Fast

Slow

Average

Fast

Ground Compaction

Formwork

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Pilecaps, < 0.7m2

m2

hours

0.90

1.60

2.00

1.1111

0.6250

0.5000

Pilecaps, 0.7-2.5m2

m2

hours

1.60

2.00

2.30

0.6250

0.5000

0.4348

Pilecaps, 2.5-3.0m2

m2

hours

2.00

2.30

2.50

0.5000

0.4348

0.4000

Pilecaps, > 3.0m2

m2

hours

2.30

2.50

3.10

0.4348

0.4000

0.3226

Ground Beams, < 0.7m2

m2

hours

1.10

1.70

1.80

0.9091

0.5882

0.5556

Ground Beams, 0.7-1.5m2

m2

hours

1.70

1.80

2.50

0.5882

0.5556

0.4000

Ground Beams, 1.5-3.0m2

m2

hours

1.80

2.50

2.60

0.5556

0.4000

0.3846

Ground Beams, 3.0-5.0m2

m2

hours

2.50

2.60

3.50

0.4000

0.3846

0.2857

Elevated Plain Slab Soffit

m2

hours

0.60

0.80

1.20

1.6667

1.2500

0.8333

Beams, on erected falsework, width 100-200mm

m2

hours

0.90

1.00

1.10

1.1111

1.0000

0.9091

Beams, on erected falsework, width 200-300mm

m2

hours

1.00

1.10

1.30

1.0000

0.9091

0.7692

Beams, on erected falsework, width 300-500mm

m2

hours

1.20

1.30

1.50

0.8333

0.7692

0.6667

Beams, on erected falsework, width 500-750mm

m2

hours

1.50

1.60

1.80

0.6667

0.6250

0.5556

Beams, on erected falsework, width over 750mm

m2

hours

1.40

1.50

1.70

0.7143

0.6667

0.5882

Walls, Construct Kickers

m2

hours

5.30

7.10

10.00

0.1887

0.1408

0.1000

Walls, Fully Framed Formwork/Struts, 1.0-2.0m2

m2

hours

0.90

1.80

1.90

1.1111

0.5556

0.5263

Walls, Fully Framed Formwork/Struts, 2.0-5.0m2

m2

hours

1.00

2.20

2.50

1.0000

0.4545

0.4000

Walls, Fully Framed Formwork/Struts, over 5.0m2

m2

hours

1.20

2.50

2.90

0.8333

0.4000

0.3448

Walls, StoriForm Shutters, 1.0-3.0m2

m2

hours

1.00

1.40

2.00

1.0000

0.7143

0.5000

Walls, StoriForm Shutters, 3.0-5.0m2

m2

hours

1.90

2.30

3.30

0.5263

0.4348

0.3030

Walls, StoriForm Shutters, 5.0-10.0m2

m2

hours

2.30

2.80

3.50

0.4348

0.3571

0.2857

Walls, StoriForm Shutters, 10.0-15.0m2

m2

hours

3.20

4.50

4.00

0.3125

0.2222

0.2500

Walls, StoriForm Shutters, over 15.0m2

m2

hours

3.80

4.80

5.40

0.2632

0.2083

0.1852

Ground Slabs

m2

hours

1.00

1.50

1.80

1.0000

0.6667

0.5556

Columns, Construct Kickers, direct to slab

no

hours

3.20

4.10

5.40

0.3125

0.2439

0.1852

Columns, Construct Kickers, suspended from soffit slab

no

hours

1.20

2.80

3.20

0.8333

0.3571

0.3125

Columns, Square Sides, Timber Clamp/Prop, csa < 0.1m2

m2

hours

1.30

1.60

1.80

0.7692

0.6250

0.5556

Columns, Square Sides, Timber Clamp/Prop, csa 0.1-0.4m2

m2

hours

1.80

2.10

2.40

0.5556

0.4762

0.4167

Columns, Square Sides, Timber Clamp/Prop, csa over 0.4m2

m2

hours

2.00

2.30

2.50

0.5000

0.4348

0.4000

Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high

m2

hours

7.90

9.50

10.30

0.1266

0.1053

0.0971

Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high

m2

hours

6.90

7.50

8.30

0.1449

0.1333

0.1205

Columns, Square Sides, Steel Forms, 2.0 x 4.0 x 9.0m high

m2

hours

8.50

10.20

12.00

0.1176

0.0980

0.0833

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Columns, Round Sides, Sacrificial Plastic Mould, 3.0-4.0m dia

m2

hours

3.50

4.50

6.00

0.2857

0.2222

0.1667

Columns, Round Sides, Steel Mould, 3.0-4.0m dia

m2

hours

5.20

6.50

7.50

0.1923

0.1538

0.1333

Columns, Sloping Column Heads, extra over rate

no

hours

0.40

0.29

-

2.50

3.50

Staircases, Stair Soffit, Sloping

m2

hours

0.70

0.80

1.00

1.4286

1.2500

1.0000

Staircases, Stair Soffit, Flat Landing

m2

hours

0.80

0.90

1.20

1.2500

1.1111

0.8333

Staircases, Wall Strings

m2

hours

0.40

0.60

-

2.5000

1.6667

-

Staircases, Open Strings

m2

hours

0.70

0.80

-

1.4286

1.2500

-

Staircases, Riser Boards fixed to strings

m2

hours

-

2.50

2.80

-

0.4000

0.3571

Staircases, Risers fixed to Strings

m2

hours

-

2.30

2.60

-

0.4348

0.3846

Waffle Flooring, 2.4m grid

m2

hours

1.40

1.80

0.9091

0.7143

0.5556

Shaft Slip Forming

mm

hours

300.00

500.00

-

0.0033

0.0020

Table Form, Aluminum System, 400m2 bays

m2

hours

3.20

3.80

0.4762

0.3125

0.2632

Table Form, H-Frame Steel Falsework, 400m2 bays

m2

hours

3.00

3.50

0.5263

0.3333

0.2857

Tunnel Forms, Wall and Slab poured as one

m2

hours

-

15.60

17.50

-

0.0641

0.0571

Hollorib Decking, lay deck

m2

hours

-

43.50

47.50

-

0.0230

0.0211

Hollorib Decking, shear connecting studs

m2

hours

-

29.30

31.20

-

0.0341

0.0321

Stop Ends, no perforations

m2

hours

2.80

3.50

4.20

0.3571

0.2857

0.2381

Stop Ends, minor perforations

m2

hours

1.20

1.50

1.90

0.8333

0.6667

0.5263

Stop Ends, dense perforations

m2

hours

0.90

1.10

1.40

1.1111

0.9091

0.7143

Box Outs, 0.01-0.05m2

no

hours

7.60

8.20

9.10

0.1316

0.1220

0.1099

Box Outs, over 0.05m2

no

hours

3.10

3.90

4.50

0.3226

0.2564

0.2222

Dummy Frames, under 3.0m2

no

hours

4.50

6.20

7.10

0.2222

0.1613

0.1408

Dummy Frames, over 3.0m2

no

hours

3.10

3.70

4.50

0.3226

0.2703

0.2222

Granolithic Flooring

m2

hours

-

3.10

-

-

0.3226

-

Terrazzo Flooring, in-situ

m2

hours

-

3.60

-

-

0.2778

-

Terrazzo Flooring, pre-cast

m2

hours

-

4.60

5.10

-

0.2174

0.1961

Mosaic Tiling, 0.045x0.045m

m2

hours

-

1.50

2.20

-

0.6667

0.4545

Clay, quarry Tiles, small areas, much cutting

m2

hours

-

0.80

1.10

-

1.2500

0.9091

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

-

1.10 2.10 1.90

Fast

Slow

Average

Fast

Floor Finishes

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Clay, quarry Tiles, large areas, little cutting

m2

hours

-

2.20

Raised Floor System

m2

hours

-

2.60

Linolium/Thermo-Plastic Flooring

m2

hours

-

3.10

Thermo-Plastic Floor Tiles

m2

hours

-

3.30

Wood Block Flooring, lay blocks

m2

hours

-

1.50

Wood Block Flooring, sand and polish

m2

hours

-

3.10

Carpeting, Underlay & Gripper

m2

hours

-

5.60

Carpeting, Adhesive Fixing

m2

hours

-

Carpeting, Fully Fitted

m2

hours

-

Hardboard Sheeting Coverings, small areas

m2

hours

Hardboard Sheeting Coverings, large areas

m2

Floor Sheeting Coverings, Lay Lino

DESCRIPTION

ITEM NO.

PRODUCTION RATES (Time per Quantity) REMARKS

Average

Fast

Slow 2.80

Average

Fast

-

0.4545

0.3571

-

0.3846

-

5.00

-

0.3226

0.2000

5.60

-

0.3030

0.1786

2.10

-

0.6667

0.4762

-

0.3226

-

6.10

-

0.1786

0.1639

3.50

4.20

-

0.2857

0.2381

2.00

2.80

-

0.5000

0.3571

-

3.70

4.10

-

0.2703

0.2439

hours

-

6.60

7.20

-

0.1515

0.1389

m2

hours

-

9.50

10.50

-

0.1053

0.0952

Asphalt Roof in layers

m2

days

-

45.00

-

-

0.0222

-

Asbestos Sheets in layers

m2

days

-

39.00

-

-

0.0256

-

Felt Roofs, large areas

m2

days

-

52.00

-

-

0.0192

-

Felt Roofs, small or complicated

m2

days

-

35.00

-

-

0.0286

-

Felt Roofs, Gravel roof chippings

Tons

days

-

1.40

-

-

0.7143

-

Site Hoarding, timber posts, plywood nailed to horizontal rails

m

hours

1.00

1.20

-

1.0000

0.8333

-

Post Erection, Timber / Metal, dig, erect, fix

no

hours

3.30

4.50

-

0.3030

0.2222

-

Post Erection, Concrete, dig, erect, fix

no

hours

3.20

4.00

-

0.3125

0.2500

-

Fence Erection, Chainlink, posts at 1.5m

m

hours

-

4.20

-

-

0.2381

-

Fence Erection, Chainlink, posts at 2.0m

m

hours

-

4.40

-

-

0.2273

-

Fence Erection, Chainlink, posts at 3.0m

m

hours

-

5.50

-

-

0.1818

-

Fence Erection, Chestnut Pailings, posts at 1.5m

m

hours

-

23.80

-

-

0.0420

-

-

-

Flat and Layered Roofs

Fencing Works

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Fence Erection, Chestnut Pailings, posts at 2.0m

m

hours

-

33.30

-

-

0.0300

-

Fence Erection, Chestnut Pailings, posts at 3.0m

m

hours

-

41.60

-

-

0.0240

-

Fence Erection, Barbed Wire, posts at 1.5m

m

hours

-

71.40

-

-

0.0140

-

Fence Erection, Barbed Wire, posts at 2.0m

m

hours

-

100.00

-

-

0.0100

-

Fence Erection, Barbed Wire, posts at 3.0m

m

hours

-

125.00

-

-

0.0080

-

Gate Erection, Chainlink on frame

no

hours

-

4.10

-

-

0.2439

-

Truss type, Overall Installation (excl arch finishes)

wks

-

-

-

14.00

12.00

11.00

Truss type, Manufacture, test and deliver

wks

-

-

-

-

60.00

48.00

Truss type, Phase A assemble truss , position/level

wks

-

-

-

-

Truss type, Stop-Work for surrounding finishes

wks

-

-

-

Truss type, Phase B decking and glazing etc

wks

-

-

-

-

5.00

-

Truss type, Phase C performance testing

wks

-

-

-

-

2.00

-

Truss type, Phase D full load testing

wks

-

-

-

-

2.00

-

Truss type, Phase E final test and inspection

wks

-

-

-

-

2.00

-

Railway Station 1st Fix

wks

-

-

-

-

38.0

-

Railway Station 2nd Fix

wks

-

-

-

-

16.0

-

Railway Station T&C

wks

-

-

-

-

8.0

-

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Escalators

1.00 8.00

-

6.00

4.00

Electrical System

Cable Installation, 1 cable laid in trench and protect

m

hours

-

6.20

-

-

0.1613

-

Cable Installation, 2 cable laid in trench and protect

m

hours

-

5.60

-

-

0.1786

-

Cable Installation, 5 cable laid in trench and protect

m

hours

-

4.30

-

-

0.2326

-

Cable Installation, 7 cable laid in trench and protect

m

hours

-

3.70

-

-

0.2703

-

Cable Installation, 8 cable laid in trench and protect

m

hours

-

3.50

-

-

0.2857

-

Cable Installation, 2 cable laid in trench and protect, 100mm dia

m

hours

-

1.80

-

-

0.5556

-

Cable Installation, 2 cable laid in trench and protect, 135mm dia

m

hours

-

1.60

-

-

0.6250

-

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Cable Installation, 3 cable laid in trench and protect, 100mm dia

m

hours

-

1.00

1.50

-

1.0000

0.6667

Cable Installation, 6 cable laid in trench and protect, 100mm dia

m

hours

-

0.70

1.20

-

1.4286

0.8333

Cable Installation, 4 cable laid in trench and protect, 150mm dia

m

hours

3.10

1.4286

0.8333

0.3226

Cable Installation, 36 cable laid in trench and protect, 100mm dia

m

hours

-

0.20

-

-

5.0000

-

Cable Installation, 10 cable laid in trench and protect, 100mm dia

m

hours

-

0.50

-

-

2.0000

-

Cable Installation, 1 cable laid in trench and protect, 300mm dia

m

hours

-

1.30

-

-

0.7692

-

PVC Drainage, 1m pipes, 100-150mm dia, 0-5m run

m

hours

-

5.70

-

-

0.1754

-

PVC Drainage, 1m pipes, 100-150mm dia, 5-30m run

m

hours

-

8.10

-

-

0.1235

-

PVC Drainage, 1m pipes, 100-150mm dia, over 30m run

m

hours

-

9.50

-

-

0.1053

-

PVC Drainage, 3m pipes, 100-150mm dia, 0-5m run

m

hours

-

12.20

-

-

0.0820

-

PVC Drainage, 3m pipes, 100-150mm dia, 5-30m run

m

hours

-

15.20

-

-

0.0658

-

PVC Drainage, 3m pipes, 100-150mm dia, over 30m run

m

hours

-

18.20

-

-

0.0549

-

PVC Drainage, 6m pipes, 100-150mm dia, 0-5m run

m

hours

-

22.20

-

-

0.0450

-

PVC Drainage, 6m pipes, 100-150mm dia, 5-30m run

m

hours

-

27.70

-

-

0.0361

-

PVC Drainage, 6m pipes, 100-150mm dia, over 30m run

m

hours

-

33.30

-

-

0.0300

-

PVC Drainage, 3m pipes, 150-200mm dia, 5-30m run

m

hours

-

10.60

-

-

0.0943

-

PVC Drainage, 3m pipes, 150-200mm dia, over 30m run

m

hours

-

12.80

-

-

0.0781

-

PVC Drainage, 6m pipes, 150-200mm dia, 5-30m run

m

hours

-

21.20

-

-

0.0472

-

PVC Drainage, 6m pipes, 150-200mm dia, over 30m run

m

hours

-

25.60

-

-

0.0391

-

Stoneware Drainage, Cement/Sand Joints, 75mm dia, 0-5m run

m

hours

-

4.70

-

-

0.2128

-

Stoneware Drainage, Cement/Sand Joints, 75mm dia, 5-30m run

m

hours

-

5.50

-

-

0.1818

-

Stoneware Drainage, Cement/Sand Joints, 75mm dia, over 30m run

m

hours

-

6.60

-

-

0.1515

-

Stoneware Drainage, Cement/Sand Joints, 100mm dia, 0-5m run

m

hours

-

4.40

-

-

0.2273

-

Stoneware Drainage, Cement/Sand Joints, 100mm dia, 5-30m run

m

hours

-

5.00

-

-

0.2000

-

Stoneware Drainage, Cement/Sand Joints, 100mm dia, over 30m run

m

hours

-

6.20

-

-

0.1613

-

Stoneware Drainage, Cement/Sand Joints, 150mm dia, 0-5m run

m

hours

-

3.20

-

-

0.3125

-

Stoneware Drainage, Cement/Sand Joints, 150mm dia, 5-30m run

m

hours

-

3.80

-

-

0.2632

-

Stoneware Drainage, Cement/Sand Joints, 150mm dia, over 30m run

m

hours

-

4.50

-

-

0.2222

-

DESCRIPTION

ITEM NO.

REMARKS Average

0.70

Fast

1.20

Slow

Average

Fast

Drainage

PRODUCTION RATES

ITEM NO.

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Stoneware Drainage, Cement/Sand Joints, 225mm dia, 0-5m run

m

hours

-

2.10

-

-

0.4762

-

Stoneware Drainage, Cement/Sand Joints, 225mm dia, 5-30m run

m

hours

-

2.60

-

-

0.3846

-

Stoneware Drainage, Cement/Sand Joints, 225mm dia, over 30m run

m

hours

-

3.10

-

-

0.3226

-

Stoneware Drainage, Cement/Sand Joints, 300mm dia, 0-5m run

m

hours

-

1.40

-

-

0.7143

-

Stoneware Drainage, Cement/Sand Joints, 300mm dia, 5-30m run

m

hours

-

1.70

-

-

0.5882

-

Stoneware Drainage, Cement/Sand Joints, 300mm dia, over 30m run

m

hours

-

2.40

-

-

0.4167

-

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 0-5m run

m

hours

-

1.10

-

-

0.9091

-

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 5-30m run

DESCRIPTION

REMARKS Average

Fast

Slow

Average

Fast

m

hours

-

1.30

-

-

0.7692

-

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, over 30m run m

hours

-

1.60

-

-

0.6250

-

Stoneware Drainage, Flexible Joints, 75mm dia, 0-5m run

m

hours

-

8.30

-

-

0.1205

-

Stoneware Drainage, Flexible Joints, 75mm dia, 5-30m run

m

hours

-

10.00

-

-

0.1000

-

Stoneware Drainage, Flexible Joints, 75mm dia, over 30m run

m

hours

-

12.50

-

-

0.0800

-

Stoneware Drainage, Flexible Joints, 100mm dia, 0-5m run

m

hours

-

7.70

-

-

0.1299

-

Stoneware Drainage, Flexible Joints, 100mm dia, 5-30m run

m

hours

-

9.10

-

-

0.1099

-

Stoneware Drainage, Flexible Joints, 100mm dia, over 30m run

m

hours

-

10.00

-

-

0.1000

-

Stoneware Drainage, Flexible Joints, 150mm dia, 0-5m run

m

hours

-

5.20

-

-

0.1923

-

Stoneware Drainage, Flexible Joints, 150mm dia, 5-30m run

m

hours

-

6.20

-

-

0.1613

-

Stoneware Drainage, Flexible Joints, 150mm dia, over 30m run

m

hours

-

7.70

-

-

0.1299

-

Stoneware Drainage, Flexible Joints, 225mm dia, 0-5m run

m

hours

-

2.70

-

-

0.3704

-

Stoneware Drainage, Flexible Joints, 225mm dia, 5-30m run

m

hours

-

3.30

-

-

0.3030

-

Stoneware Drainage, Flexible Joints, 225mm dia, over 30m run

m

hours

-

4.00

-

-

0.2500

-

Stoneware Drainage, Flexible Joints, 300mm dia, 0-5m run

m

hours

-

1.70

-

-

0.5882

-

Stoneware Drainage, Flexible Joints, 300mm dia, 5-30m run

m

hours

-

2.10

-

-

0.4762

-

Stoneware Drainage, Flexible Joints, 300mm dia, over 30m run

m

hours

-

2.50

-

-

0.4000

-

Stoneware Drainage, Flexible Joints, over 375mm dia, 0-5m run

m

hours

-

1.40

-

-

0.7143

-

Stoneware Drainage, Flexible Joints, over 375mm dia, 5-30m run

m

hours

-

1.60

-

-

0.6250

-

Stoneware Drainage, Flexible Joints, over 375mm dia, over 30m run

m

hours

-

2.10

-

-

0.4762

-

PVC, Stoneware, Pitch Fibre & Concrete Joints

no

minutes

-

0.4167

-

-

2.40

-

Pitch Fibre Pipes, 75mm dia, 0-5m run

m

hours

-

9.10

-

-

0.1099

-

Pitch Fibre Pipes, 75mm dia, 5-30m run

m

hours

-

16.60

-

-

0.0602

-

Pitch Fibre Pipes, 75mm dia, over 30m run

m

hours

-

20.00

-

-

0.0500

-

Pitch Fibre Pipes, 100mm dia, 0-5m run

m

hours

-

9.10

-

-

0.1099

-

PRODUCTION RATES

ITEM NO.

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Pitch Fibre Pipes, 100mm dia, 5-30m run

m

hours

-

16.60

-

-

0.0602

-

Pitch Fibre Pipes, 100mm dia, over 30m run

m

hours

-

20.00

-

-

0.0500

-

Pitch Fibre Pipes, 150mm dia, 0-5m run

m

hours

-

6.60

-

-

0.1515

-

Pitch Fibre Pipes, 150mm dia, 5-30m run

m

hours

-

12.50

-

-

0.0800

-

Pitch Fibre Pipes, 150mm dia, over 30m run

m

hours

-

14.30

-

-

0.0699

-

Pitch Fibre Pipes, 200mm dia, 0-5m run

m

hours

-

6.20

-

-

0.1613

-

Pitch Fibre Pipes, 200mm dia, 5-30m run

m

hours

-

11.10

-

-

0.0901

-

Pitch Fibre Pipes, 200mm dia, over 30m run

m

hours

-

12.50

-

-

0.0800

-

Pitch Fibre Pipes, 225mm dia, 0-5m run

m

hours

-

5.80

-

-

0.1724

-

Pitch Fibre Pipes, 225mm dia, 5-30m run

m

hours

-

10.00

-

-

0.1000

-

Pitch Fibre Pipes, 225mm dia, over 30m run

m

hours

-

12.10

-

-

0.0826

-

Hepsleve Rubber Joint System, 75mm dia, 0-5m run

m

hours

-

12.50

-

-

0.0800

-

Hepsleve Rubber Joint System, 75mm dia, 5-30m run

m

hours

-

14.30

-

Hepsleve Rubber Joint System, 75mm dia, over 30m run

m

hours

Hepsleve Rubber Joint System, 100mm dia, 0-5m run

m

hours

-

10.00

Hepsleve Rubber Joint System, 100mm dia, 5-30m run

m

hours

-

12.50

Hepsleve Rubber Joint System, 100mm dia, over 30m run

m

hours

-

Hepsleve Rubber Joint System, 150mm dia, 0-5m run

m

hours

-

Hepsleve Rubber Joint System, 150mm dia, 5-30m run

m

hours

-

Hepsleve Rubber Joint System, 150mm dia, over 30m run

m

hours

Hepsleve Rubber Joint System, 225mm dia, 0-5m run

m

hours

-

6.80

Hepsleve Rubber Joint System, 225mm dia, 5-30m run

m

hours

-

Hepsleve Rubber Joint System, 225mm dia, over 30m run

m

hours

-

Hepsleve Rubber Joint System, 300mm dia, 0-5m run

m

hours

Hepsleve Rubber Joint System, 300mm dia, 5-30m run

m

Hepsleve Rubber Joint System, 300mm dia, over 30m run

DESCRIPTION

REMARKS Average

Fast

Slow

Average

Fast

-

0.0699

-

0.0893

0.0602

0.0332

-

-

0.1000

-

-

-

0.0800

-

14.30

-

-

0.0699

-

7.10

-

-

0.1408

-

9.10

-

-

0.1099

-

0.1205

0.1000

0.0725

-

-

0.1471

-

4.50

-

-

0.2222

-

5.50

-

-

0.1818

-

-

2.50

-

-

0.4000

-

hours

-

2.90

-

-

0.3448

-

m

hours

-

3.70

-

-

0.2703

-

Hepsleve Rubber Joint System, over 375mm dia, 0-5m run

m

hours

-

1.90

-

-

0.5263

-

Hepsleve Rubber Joint System, over 375mm dia, 5-30m run

m

hours

-

2.30

-

-

0.4348

-

Hepsleve Rubber Joint System, over 375mm dia, over 30m run

m

hours

-

2.70

-

-

0.3704

-

Concrete Pipes, 1.5m pipes, 375mm dia, 0-5m run

m

hours

-

2.80

-

-

0.3571

-

Concrete Pipes, 1.5m pipes, 375mm dia, 5-30m run

m

hours

-

3.40

-

-

0.2941

-

Concrete Pipes, 1.5m pipes, 375mm dia, over 30m run

m

hours

-

3.80

-

-

0.2632

-

11.20

8.30

16.60

30.10

10.00

13.80

PRODUCTION RATES

ITEM NO.

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Concrete Pipes, 1.5m pipes, 450mm dia, 0-5m run

m

hours

-

2.70

-

-

0.3704

-

Concrete Pipes, 1.5m pipes, 450mm dia, 5-30m run

m

hours

-

3.20

-

-

0.3125

-

Concrete Pipes, 1.5m pipes, 450mm dia, over 30m run

m

hours

-

3.60

-

-

0.2778

-

Concrete Pipes, 1.5m pipes, 525mm dia, 0-5m run

m

hours

-

2.50

-

-

0.4000

-

Concrete Pipes, 1.5m pipes, 525mm dia, 5-30m run

m

hours

-

2.90

-

-

0.3448

-

Concrete Pipes, 1.5m pipes, 525mm dia, over 30m run

m

hours

-

3.40

-

-

0.2941

-

Concrete Pipes, 1.5m pipes, 600mm dia, 0-5m run

m

hours

-

2.40

-

-

0.4167

-

Concrete Pipes, 1.5m pipes, 600mm dia, 5-30m run

m

hours

-

2.70

-

-

0.3704

-

Concrete Pipes, 1.5m pipes, 600mm dia, over 30m run

m

hours

-

3.30

-

-

0.3030

-

Concrete Pipes, 1.5m pipes, 675mm dia, 0-5m run

m

hours

-

2.20

-

-

0.4545

-

Concrete Pipes, 1.5m pipes, 675mm dia, 5-30m run

m

hours

-

2.60

-

-

0.3846

-

Concrete Pipes, 1.5m pipes, 675mm dia, over 30m run

m

hours

-

2.90

-

-

0.3448

-

Concrete Pipes, 1.5m pipes, 750mm dia, 0-5m run

m

hours

-

1.10

-

-

0.9091

-

Concrete Pipes, 1.5m pipes, 750mm dia, 5-30m run

m

hours

-

2.40

-

-

0.4167

-

Concrete Pipes, 1.5m pipes, 750mm dia, over 30m run

m

hours

-

2.50

-

-

0.4000

-

Concrete Pipes, 1.5m pipes, 1,050mm dia

m

days

-

2.90

4.20

-

0.3448

0.2381

Concrete Pipes, 1.5m pipes, 1,500mm dia

m

days

-

2.50

3.80

-

0.4000

0.2632

Concrete Pipes, 1.5m pipes, 1,800mm dia

m

days

-

2.10

2.60

-

0.4762

0.3846

Concrete Pipes, 2.5m pipes, 375mm dia, 0-5m run

m

hours

-

3.60

-

-

0.2778

-

Concrete Pipes, 2.5m pipes, 375mm dia, 5-30m run

m

hours

-

4.30

-

-

0.2326

-

Concrete Pipes, 2.5m pipes, 375mm dia, over 30m run

m

hours

-

5.00

-

0.2000

0.1250

Concrete Pipes, 2.5m pipes, 450mm dia, 0-5m run

m

hours

-

3.40

-

-

0.2941

-

Concrete Pipes, 2.5m pipes, 450mm dia, 5-30m run

m

hours

-

4.10

-

-

0.2439

-

Concrete Pipes, 2.5m pipes, 450mm dia, over 30m run

m

hours

-

4.50

-

0.2222

0.1111

Concrete Pipes, 2.5m pipes, 525mm dia, 0-5m run

m

hours

-

3.30

-

-

0.3030

-

Concrete Pipes, 2.5m pipes, 525mm dia, 5-30m run

m

hours

-

3.80

-

-

0.2632

-

Concrete Pipes, 2.5m pipes, 525mm dia, over 30m run

m

hours

-

4.10

-

-

0.2439

-

Concrete Pipes, 2.5m pipes, 600mm dia, 0-5m run

m

hours

-

3.00

-

-

0.3333

-

Concrete Pipes, 2.5m pipes, 600mm dia, 5-30m run

m

hours

-

3.50

-

-

0.2857

-

Concrete Pipes, 2.5m pipes, 600mm dia, over 30m run

m

hours

-

4.00

-

-

0.2500

-

Concrete Pipes, 2.5m pipes, 675mm dia, 0-5m run

m

hours

-

2.80

-

-

0.3571

-

Concrete Pipes, 2.5m pipes, 675mm dia, 5-30m run

m

hours

-

3.30

-

-

0.3030

-

DESCRIPTION

REMARKS Average

Fast

Slow

8.00

9.00

Average

Fast

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Concrete Pipes, 2.5m pipes, 675mm dia, over 30m run

m

hours

-

3.70

-

-

0.2703

-

Concrete Pipes, 2.5m pipes, 750mm dia, 0-5m run

m

hours

-

2.60

-

-

0.3846

-

Concrete Pipes, 2.5m pipes, 750mm dia, 5-30m run

m

hours

-

3.10

-

-

0.3226

-

Concrete Pipes, 2.5m pipes, 750mm dia, over 30m run

m

hours

-

3.60

-

-

0.2778

-

Lay Shingle Around Pipework, under 150mm dia

m

hours

-

7.00

-

-

0.1429

-

Lay Shingle Around Pipework, over 150mm dia

m

hours

0.2500

0.1818

0.1111

Mastic Pointing to Frames

m

hours

-

9.50

-

-

0.1053

-

Fix Metal and Timber Windows After Wall Complete

m2

hours

-

2.00

-

-

0.5000

-

Window Glazing

m2

hours

-

1.30

-

-

0.7692

-

Window Glazing, Single Glazed Units

m2

hours

-

2.00

-

-

0.5000

-

Window Glazing, Double Glazed Units

m2

hours

-

1.30

-

-

0.7692

-

Thermalite Blockwork, under 100mm thick

m2

hours

1.80

2.50

3.20

0.5556

0.4000

0.3125

Thermalite Blockwork, under 100-150mm thick

m2

hours

1.40

1.90

2.50

0.7143

0.5263

0.4000

Thermalite Blockwork, over 150mm thick

m2

hours

1.20

1.60

2.10

0.8333

0.6250

0.4762

Lightweight Concrete Blockwork, under 100mm thick

m2

hours

1.50

2.20

2.90

0.6667

0.4545

0.3448

Lightweight Concrete Blockwork, under 100-150mm thick

m2

hours

1.40

1.90

2.10

0.7143

0.5263

0.4762

Lightweight Concrete Blockwork, over 150mm thick

m2

hours

1.20

1.60

2.00

0.8333

0.6250

0.5000

Heavyweight Concrete Blockwork, under 100mm thick

m2

hours

1.40

2.10

2.90

0.7143

0.4762

0.3448

Heavyweight Concrete Blockwork, under 100-150mm thick

m2

hours

1.20

1.60

2.10

0.8333

0.6250

0.4762

Heavyweight Concrete Blockwork, over 150mm thick

m2

hours

1.10

1.40

1.80

0.9091

0.7143

0.5556

Face Finish, Raked Out

m2

hours

-

71.40

-

-

0.0140

-

Face Finish, Bag Rubbed

m2

hours

-

29.40

-

-

0.0340

-

Face Finish, Flush Pointing

m2

hours

-

17.60

-

-

0.0568

-

DESCRIPTION

ITEM NO.

REMARKS Average

4.00

Fast

5.50

Slow

9.00

Average

Fast

Doors and Windows

Blockwork

PRODUCTION RATES

UNIT FOR QUANTITY

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR TIME

Slow

Setup small 2 hole system

days

-

-

-

Setup large 15 hole system

days

-

-

-

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Dewatering 10.00 -

8.00 21.00

6.00 -

Calculate system times per pump

pump

days

-

0.4000

-

-

2.50

-

Setup Recharge System

pump

days

-

0.2857

-

-

3.50

-

Tonnes

m3

-

2.50

-

-

0.4000

-

Remove & Cart away, Ceramic Wall Tiles

m2

hours

0.5000

0.4000

0.2941

Remove & Cart away, Wallpaper, 1 layer

m2

hours

-

8.70

-

-

0.1149

-

Remove & Cart away, Wallpaper, 2 layers

m2

hours

-

7.10

-

-

0.1408

-

Remove & Cart away, Wallpaper, 3 layers

m2

hours

-

5.70

-

-

0.1754

-

Remove & Cart away, Lathe and Plaster Ceilings

m2

hours

3.20

4.60

5.00

0.3125

0.2174

0.2000

Remove & Cart away, Plaster to Walls

m2

hours

2.10

3.10

5.90

0.4762

0.3226

0.1695

Remove & Cart away, External Render

m2

hours

-

3.90

-

-

0.2564

-

Remove & Cart away, Floor Screed

m2

hours

-

3.20

-

-

0.3125

-

Remove & Cart away, Concrete Paving

m2

hours

-

4.00

-

-

0.2500

-

Remove & Cart away, Brickwork Walls, 1.0 brick thick

m2

hours

-

1.30

-

-

0.7692

-

Remove & Cart away, Brickwork Walls, 0.5 brick thick

m2

hours

-

2.60

-

-

0.3846

-

Remove & Cart away, Brickwork Walls, Sand/Lime Mortar

100

hours

-

0.5556

-

-

1.80

-

Remove & Cart away, Fireplace and Hearth

no

hours

-

0.5263

-

-

1.90

-

Remove & Cart away, Floor Boards

m2

hours

-

6.20

-

-

0.1613

-

Remove & Cart away, Skirting, Architrave, Dado rail etc

m

hours

-

16.50

-

-

0.0606

-

Remove & Cart away, Staircase

no

hours

-

0.1370

-

-

7.30

-

Remove & Cart away, Windows, 0-1m2

no

hours

-

1.6667

-

-

0.60

-

Remove & Cart away, Windows 1-2m2

no

hours

-

1.2500

-

-

0.80

-

Remove & Cart away, Windows 2-3m2

no

hours

-

1.1111

-

-

0.90

-

Remove & Cart away, Doors

no

hours

-

3.3333

-

-

0.30

-

Demolition Weight, Structural Steel

2.00

2.50

3.40

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Remove & Cart away, Door Frame

no

hours

-

10.0000

-

-

0.10

-

Remove & Cart away, Floor and Ceiling Joists

m

hours

-

0.9091

-

-

1.10

-

Remove & Cart away, Wall Plates

m

hours

-

0.2564

-

-

3.90

-

Remove & Cart away, Iron Bath

no

hours

-

0.7143

-

-

1.40

-

Remove & Cart away, Wash Basin/Sink

no

hours

-

1.2500

-

-

0.80

-

Remove & Cart away, Pipework including brackets etc

m

hours

-

6.10

-

-

0.1639

-

m

days

-

7.10

-

-

0.1408

-

Cutting in Concrete, small box

no

hours

7.10

9.50

12.50

0.1408

0.1053

0.0800

Cutting in Concrete, large box

no

hours

3.60

4.50

5.60

0.2778

0.2222

0.1786

Cutting in Brickwork, small box

no

hours

6.60

9.50

12.50

0.1515

0.1053

0.0800

Cutting in Brickwork, large box

no

hours

4.20

5.30

6.30

0.2381

0.1887

0.1587

Cutting in Lightweight Blockwork, small box

no

hours

20.00

23.00

25.00

0.0500

0.0435

0.0400

Cutting in Lightweight Blockwork, large box

no

hours

10.00

12.50

14.30

0.1000

0.0800

0.0699

Cutting in Heavyweight Blockwork, small box

no

hours

7.70

10.00

12.50

0.1299

0.1000

0.0800

Cutting in Heavyweight Blockwork, large box

no

hours

3.80

4.80

5.90

0.2632

0.2083

0.1695

Concrete, cutting by hand, < 25mm wide

m

hours

1.50

2.10

3.10

0.6667

0.4762

0.3226

Concrete, cutting by hand, 25-50mm wide

m

hours

1.20

1.60

2.50

0.8333

0.6250

0.4000

Concrete, cutting by hand, 50-75mm wide

m

hours

1.00

1.40

2.10

1.0000

0.7143

0.4762

Concrete, cutting by hand, 75-100mm wide

m

hours

0.90

1.20

1.80

1.1111

0.8333

0.5556

Concrete, cutting by machine, < 25mm wide

m

hours

3.10

4.00

5.80

0.3226

0.2500

0.1724

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Decking Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover

Cutting Switchboxes

Cutting Chases

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Concrete, cutting by machine, 25-50mm wide

m

hours

2.50

3.30

5.00

0.4000

0.3030

0.2000

Concrete, cutting by machine, 50-75mm wide

m

hours

2.10

2.90

4.20

0.4762

0.3448

0.2381

Concrete, cutting by machine, 75-100mm wide

m

hours

1.80

2.40

3.70

0.5556

0.4167

0.2703

Brickwork, cutting by hand, < 25mm wide

m

hours

2.10

2.70

4.10

0.4762

0.3704

0.2439

Brickwork, cutting by hand, 25-50mm wide

m

hours

1.60

2.30

3.50

0.6250

0.4348

0.2857

Brickwork, cutting by hand, 50-75mm wide

m

hours

1.40

1.90

2.80

0.7143

0.5263

0.3571

Brickwork, cutting by hand, 75-100mm wide

m

hours

1.20

1.60

2.50

0.8333

0.6250

0.4000

Brickwork, cutting by machine, < 25mm wide

m

hours

4.20

5.50

11.10

0.2381

0.1818

0.0901

Brickwork, cutting by machine, 25-50mm wide

m

hours

3.30

4.50

6.70

0.3030

0.2222

0.1493

Brickwork, cutting by machine, 50-75mm wide

m

hours

3.30

4.50

6.70

0.3030

0.2222

0.1493

Brickwork, cutting by machine, 75-100mm wide

m

hours

2.50

3.30

5.00

0.4000

0.3030

0.2000

Light Blockwork, cutting by hand, < 25mm wide

m

hours

3.80

5.00

7.70

0.2632

0.2000

0.1299

Light Blockwork, cutting by hand, 25-50mm wide

m

hours

3.20

4.20

6.30

0.3125

0.2381

0.1587

Light Blockwork, cutting by hand, 50-75mm wide

m

hours

2.60

3.40

5.30

0.3846

0.2941

0.1887

Light Blockwork, cutting by hand, 75-100mm wide

m

hours

2.30

3.10

4.50

0.4348

0.3226

0.2222

Light Blockwork, cutting by machine, < 25mm wide

m

hours

7.70

10.00

14.20

0.1299

0.1000

0.0704

Light Blockwork, cutting by machine, 25-50mm wide

m

hours

5.90

7.70

11.10

0.1695

0.1299

0.0901

Light Blockwork, cutting by machine, 50-75mm wide

m

hours

5.20

7.20

10.00

0.1923

0.1389

0.1000

Light Blockwork, cutting by machine, 75-100mm wide

m

hours

4.70

6.30

9.10

0.2128

0.1587

0.1099

Heavy Blockwork, cutting by hand, < 25mm wide

m

hours

1.90

2.60

3.80

0.5263

0.3846

0.2632

Heavy Blockwork, cutting by hand, 25-50mm wide

m

hours

1.60

2.10

3.20

0.6250

0.4762

0.3125

Heavy Blockwork, cutting by hand, 50-75mm wide

m

hours

1.30

1.80

2.70

0.7692

0.5556

0.3704

Heavy Blockwork, cutting by hand, 75-100mm wide

m

hours

1.20

1.50

2.30

0.8333

0.6667

0.4348

Heavy Blockwork, cutting by machine, < 25mm wide

m

hours

3.80

5.00

7.70

0.2632

0.2000

0.1299

Heavy Blockwork, cutting by machine, 25-50mm wide

m

hours

3.20

4.20

6.20

0.3125

0.2381

0.1613

Heavy Blockwork, cutting by machine, 50-75mm wide

m

hours

2.70

3.60

5.20

0.3704

0.2778

0.1923

Heavy Blockwork, cutting by machine, 75-100mm wide

m

hours

2.30

3.10

4.50

0.4348

0.3226

0.2222

no

hours

1.6667

3.3333

0.60

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Cutting Back Concrete Pile Caps, 50-300mm deep and 0.6m dia

-

-

0.30

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Concrete Pile Caps, 300-750mm deep and 0.6m dia

no

hours

0.6667

-

2.5000

1.50

-

0.40

Concrete Pile Caps, > 750mm deep and 0.6m dia

no

hours

0.5556

-

1.2500

1.80

-

0.80

Concrete Pile Caps, 50-300mm deep and 1.1m dia

no

hours

0.5263

-

1.2500

1.90

-

0.80

Concrete Pile Caps, 300-750mm deep and 1.1m dia

no

hours

0.4000

-

0.9091

2.50

-

1.10

Concrete Pile Caps, > 750mm deep and 1.1m dia

no

hours

0.2381

-

0.4348

4.20

-

2.30

Concrete Pile Caps, 50-300mm deep and 2.5m dia

no

hours

0.1087

-

0.1220

9.20

-

8.20

Concrete Pile Caps, 300-750mm deep and 2.5m dia

no

hours

0.0990

-

0.1053

10.10

-

9.50

Concrete Pile Caps, > 750mm deep and 2.5m dia

no

hours

0.0980

11.50

-

10.20

Concrete, Cutting Slabs, 5-25m deep

m

hours

-

15.20

-

-

0.0658

-

Concrete, Cutting Slabs, 25-50m deep

m

hours

-

11.50

-

-

0.0870

-

Concrete, Cutting Slabs, 50-75m deep

m

hours

-

6.70

-

-

0.1493

-

Concrete, Cutting Holes, coring machine

m3

hours

-

0.20

-

-

5.0000

-

Concrete, Cutting Back to expose couplers 0.7m slab

m

days

-

2.50

-

-

0.4000

-

Vertical Glazed Lights, 6m x 2.5m

m2

days

-

14.50

-

-

0.0690

-

Vertical Glazed Walls, large scale

m2

days

-

70.00

-

-

0.0143

-

Clerestory Frame/Glazing, 3m x 4m

m2

days

-

28.00

-

-

0.0357

-

Oriel Window Frame/Glazing, 4m x 2m

m2

days

-

35.00

-

-

0.0286

-

Glazed Curtain Wall, First Fix

m2

hours

-

1.20

-

-

0.8333

-

Glazed Curtain Wall, Second Fix

m2

hours

-

1.10

-

-

0.9091

-

High Quality Glazed Curtain Walling

m2

days

-

25.00

-

-

0.0400

-

Placing concrete, lorry based pump

m3

hours

30.00

40.00

50.00

0.0333

0.0250

0.0200

Hollorib Decking, concrete topping

m2

hours

85.00

100.00

120.00

0.0118

0.0100

0.0083

Hollorib Decking, concrete topping, incl PowerFloat

m2

hours

40.00

50.00

70.00

0.0250

0.0200

0.0143

Placing Concrete, By Wheelbarrow over 1-10m

m3

hours

2.10

2.30

2.50

0.4762

0.4348

0.4000

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

0.0870

Fast

-

Slow

Average

Fast

Curtain Walling

Concrete Placement

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Placing Concrete, By Wheelbarrow over 10-20m

m3

hours

1.50

1.80

2.10

0.6667

0.5556

0.4762

Placing Concrete, By Wheelbarrow over 20-50m

m3

hours

0.80

1.10

1.50

1.2500

0.9091

0.6667

Placing Direct From Readymix Lorry, Mass Fill

m3

hours

2.80

3.10

3.30

0.3571

0.3226

0.3030

Placing Direct From Readymix Lorry, 50mm Blinding

m3

hours

1.30

1.60

-

0.7692

0.6250

Placing Direct From Readymix Lorry, Ground Beams

m3

hours

1.50

-

1.70

0.6667

-

0.5882

Placing Direct From Readymix Lorry, Pile Caps

m3

hours

1.00

1.50

2.30

1.0000

0.6667

0.4348

Placing Direct From Readymix Lorry, Duct Walls

m3

hours

-

0.80

1.10

-

1.2500

0.9091

Placing Direct From Readymix Lorry, Stub Columns

m3

hours

-

0.40

0.60

-

2.5000

1.6667

Placing Direct From Readymix Lorry, Ground Slab

m3

hours

2.30

2.60

0.4762

0.4348

0.3846

Placing Direct From Readymix Lorry,Drains Bed and Cover

m3

hours

0.90

1.00

-

1.1111

1.0000

Placing From Tower Crane, Pile Caps

m3

hours

1.20

1.40

1.60

0.8333

0.7143

0.6250

Placing From Tower Crane, Mass Fill

m3

hours

4.00

4.50

5.50

0.2500

0.2222

0.1818

Placing From Tower Crane, Slabs under 150mm thick

m3

hours

0.90

1.30

1.70

1.1111

0.7692

0.5882

Placing From Tower Crane, Slabs over 150mm thick

m3

hours

1.20

1.50

1.80

0.8333

0.6667

0.5556

Placing From Tower Crane, Trough/Coffered Slabs

m3

hours

0.90

1.10

1.20

1.1111

0.9091

0.8333

Placing From Tower Crane, Stairs and Landings

m3

hours

0.60

0.70

0.90

1.6667

1.4286

1.1111

Placing From Tower Crane, Blinding

m3

hours

0.80

1.00

1.10

1.2500

1.0000

0.9091

Placing From Tower Crane, Beams under 150mm thick

m3

hours

0.50

0.60

0.80

2.0000

1.6667

1.2500

Placing From Tower Crane, Beams over 150mm thick

m3

hours

0.60

0.80

1.00

1.6667

1.2500

1.0000

Placing From Tower Crane, Walls

m3

hours

0.60

1.10

1.50

1.6667

0.9091

0.6667

Placing From Tower Crane, Columns

m3

hours

0.40

0.50

0.60

2.5000

2.0000

1.6667

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

-

2.10 -

Fast

Slow

Average

Fast

Concrete Mixing Concrete Weight, 1m3

Tonnes

-

2.40

-

-

-

-

Readymix Lorry, Length

m

-

8.30

-

-

-

-

Readymix Lorry, Width

m

-

2.50

-

-

-

-

Readymix Lorry, Height

m

-

3.70

-

-

-

-

Readymix Lorry, Length

Tonnes

-

24.40

-

-

-

-

m

-

16.40

-

-

-

-

degrees

-

17.00

-

-

-

Readymix Lorry, Turning Circle Readymix Lorry, Allowable Access Ramp Gradient

20.00

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Mixing Concrete, By Hand

m3

hours

-

Mixing Concrete, Single Drum Paddle Mixer

m3

hours

Mixing Concrete, Double Drum Paddle Mixer

m3

hours

Mixing Concrete, Single Drum Plant Pan Mixer

m3

hours

-

120.00

-

Mixing Concrete, Dry Mix Plant

m3

hours

-

90.00

-

Surface Finishing, Steel Float By Hand

m2

hours

9.20

13.90

Surface Finishing, Wood Float By Hand

m2

hours

11.70

17.20

Surface Finishing, Power Float

m2

hours

13.90

Surface Finishing, Light Brush on Trowel

m2

hours

Surface Finishing, Brush on Trowel Margin

m2

hours

Surface Finishing, Sprayed By Pump, expose aggregate

m2

Surface Finishing, Wire Brush, expose aggregate

DESCRIPTION

ITEM NO.

REMARKS Average

Fast 0.30

Slow

Fast

-

3.3333

-

210.00

0.0063

0.0056

0.0048

420.00

0.0032

0.0027

0.0024

-

0.0083

-

-

0.0111

-

25.00

0.1087

0.0719

0.0400

29.40

0.0855

0.0581

0.0340

20.80

37.00

0.0719

0.0481

0.0270

55.80

90.10

170.00

0.0179

0.0111

0.0059

28.80

48.50

85.00

0.0347

0.0206

0.0118

hours

65.00

95.00

145.00

0.0154

0.0105

0.0069

m2

hours

15.00

25.00

30.00

0.0667

0.0400

0.0333

Making Good Walls, prepare, shutter, pour

m2

hours

-

5.50

8.60

-

0.1818

0.1163

Making Good Columns, prepare, shutter, pour

m2

hours

-

2.80

6.90

-

0.3571

0.1449

Making Good Sides of Beams, prepare, shutter, pour

m2

hours

-

2.80

7.00

-

0.3571

0.1429

Making Good Slab Soffits, prepare, shutter, pour

m2

hours

-

4.20

5.50

-

0.2381

0.1818

Making Good Bolt Holes, prepare, shutter, pour

no/hr

hours

16.80

25.80

0.0676

0.0595

0.0388

Making Good Rubdown Precast Concrete, prepare, shutter, pour

m2

hours

-

0.0556

-

Making Good Scabble 3 head brush hammer, prepare, shutter, pour

m2

hours

73.80

0.0326

0.0168

0.0136

158.00

180.00

315.00

370.00

-

Average

Concrete Finishing

14.80 -

18.00 30.70

-

59.50

Commercial Kitchen Overall Installation for 100 persons or 50m2

wks

-

-

-

-

3.00

-

Overall Installation for 500 persons or 150m2

wks

-

-

-

-

5.00

-

Overall Installation for 1000 persons or 250m2

wks

-

-

-

-

8.00

-

Install Ovens, friers and large mixers etc

mandays

-

-

-

-

1.00

-

Install Sinks, bain maries and washers etc

mandays

-

-

-

-

2.00

-

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Suspended Ceilings, office situations

m2

hours

-

2.60

-

0.3846

0.2857

Suspended Ceilings, First Fix

m2

hours

-

0.70

-

-

1.4286

-

Suspended Ceilings, Second Fix

m2

hours

-

1.20

-

-

0.8333

-

Windows, Softwood, 3.0-7.0m2

no

hours

1.6667

2.5000

3.3333

0.60

0.40

Windows, Softwood, 7.0-10.0m2

no

hours

0.7692

1.1111

1.6667

1.30

0.90

Windows, Hardwood, 1.0-3.0m2

no

hours

2.5000

3.3333

-

0.40

0.30

Windows, Hardwood, 3.0-7.0m2

no

hours

1.4286

2.0000

2.5000

0.70

0.50

0.40

Windows, Hardwood, 7.0-10.0m2

no

hours

0.6250

0.8333

1.4286

1.60

1.20

0.70

Windows, Aluminum, 1.0-3.0m2

no

hours

5.0000

3.3333

-

0.20

0.30

Windows, Aluminum, 3.0-7.0m2

no

hours

2.0000

2.5000

3.3333

0.50

0.40

0.30

Windows, Aluminum, 7.0-10.0m2

no

hours

0.8333

1.2500

2.0000

1.20

0.80

0.50

Windows, Steel, 1.0-3.0m2

no

hours

2.5000

3.3333

5.0000

0.40

0.30

0.20

Windows, Steel, 3.0-7.0m2

no

hours

0.8333

1.6667

2.0000

1.20

0.60

0.50

Windows, Steel, 7.0-10.0m2

no

hours

0.7143

0.8333

1.0000

1.40

1.20

1.00

Window Boards, nailed

m

hours

-

3.3333

5.0000

-

0.30

0.20

Window Boards, screwed

m

hours

-

2.5000

3.3333

-

0.40

0.30

Mouldings, Softwood, Nailed

m

hours

-

6.30

8.50

-

0.1587

0.1176

Mouldings, Softwood, Screwed

m

hours

-

4.60

5.60

-

0.2174

0.1786

Mouldings, Softwood, Gun Nailed

m

hours

-

8.20

11.10

-

0.1220

0.0901

Mouldings, Hardwood, Nailed

m

hours

-

3.30

5.50

-

0.3030

0.1818

Mouldings, Hardwood, Screwed

m

hours

-

2.40

3.70

-

0.4167

0.2703

Mouldings, Hardwood, Gun Nailed

m

hours

-

8.50

11.30

-

0.1176

0.0885

Skirting, Aluminum, Screwed 150-300mm centres

m

hours

-

7.60

-

-

0.1316

-

Skirting, Aluminum, Screwed 300-450mm centres

m

hours

-

4.50

-

-

0.2222

-

DESCRIPTION

ITEM NO.

REMARKS Average

Fast

Slow

Average

Fast

Ceiling Finishes 3.50

Carpentry Final Fixing 0.30 0.60 -

-

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Skirting, Plastic, Adhesive Fixing

m

hours

-

Architrave Mouldings

m

hours

door

hours

m

hours

Glazed Bead Mouldings

m

hours

15.50

Hanging Doors, Softwood, Single Pair Butts

no

hours

0.7692

Hanging Doors, Hardwood, Single Pair Butts

no

hours

0.5263

Cut Mortice to Receive Lock, Softwood

no

hours

Cut Mortice to Receive Lock, Hardwood

no

hours

Cut & Fix Formica Bath Panel

no

Kitchen Cupboards, Floor Units

DESCRIPTION

ITEM NO.

PRODUCTION RATES (Time per Quantity) REMARKS

Average

Fast

Fast

-

0.1163

-

0.1053

0.0820

0.0549

25.00

0.0990

0.0592

0.0400

18.60

20.40

0.0645

0.0538

0.0490

1.1111

1.6667

1.30

0.90

0.60

0.8333

1.1111

1.90

1.20

0.90

-

5.0000

-

-

0.20

-

-

1.6667

-

-

0.60

-

hours

-

2.5000

-

-

0.40

-

no

hours

-

1.2500

1.6667

-

0.80

0.60

Kitchen Cupboards, Wall Units

no

hours

-

1.4286

2.0000

-

0.70

0.50

Kitchen Cupboards, Shelf Units

no

hours

-

-

1.4286

-

0.8

0.70

Staircase, pre-made, simple, straight flight

no

hours

0.5263

0.6667

0.9091

1.90

1.50

1.10

Staircase, pre-made, 2 straight flights, 1 landing

no

hours

0.2703

0.3448

0.3846

3.70

2.90

Staircase, pre-made, 2 straight flights, 2 landings

no

hours

-

0.1587

-

Staircase, Balustrades/Handrails, fix horizontal

no

hours

0.8333

1.6667

10.0000

1.20

0.60

0.10

Staircase, Balustrades/Handrails, fix raking

no

hours

1.1111

2.0000

3.3333

0.90

0.50

0.30

Staircase, Cut and Fix Newel to Walls

no

hours

1.1111

-

5.0000

0.90

-

Windows, Softwood, 1.0-3.0m2

no

hours

3.3333

5.0000

-

0.30

0.20

Raised Flooring, metal system

m2

hours

Windows, Timber Frames for Bricklaying

no

hours

0.9091

2.0000

Windows, Drill, Screw & Plug extra over

no

hours

3.3333

10.0000

-

Door Frames, Softwood, 1.0-3.0m2

no

hours

-

5.0000

-

Door Frames, Softwood, 3.0-7.0m2

no

hours

2.0000

2.5000

-

Door Frames, Softwood, 7.0-10.0m2

no

hours

0.8333

1.2500

-

Door Frames, Hardwood, 1.0-3.0m2

no

hours

-

3.3333

-

Door Frames, Hardwood, 3.0-7.0m2

no

hours

1.6667

3.3333

-

Door Stop Mouldings

9.50 -

12.20 0.8333

10.10

-

-

Average

18.20

Architrave, Fix to Doors

8.60

Slow

-

16.90

0.50

-

-

-

1.20

6.30

-

-

2.60 -

0.20 -

2.0000

-

Carpentry Carcassing 10.0000

1.10

0.50

0.30

0.10

-

0.20

-

0.50

0.40

-

1.20

0.80

-

0.30

-

0.30

-

-

0.60

0.10

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Door Frames, Hardwood, 7.0-10.0m2

no

hours

Erect Water Tank Platform

no

hours

-

2.30

-

-

Fix Studding For Bath

m

hours

-

10.00

-

Cut Access Hatch

no

hours

-

0.30

-

Floor Joists, under 3m

no

hours

9.00

9.60

11.60

0.1111

0.1042

0.0862

Floor Joists, 3.0-4.5m

no

hours

6.80

7.20

9.70

0.1471

0.1389

0.1031

Floor Joists, 4.5-6.0m

no

hours

5.50

5.80

7.30

0.1818

0.1724

0.1370

Ceiling Joists, under 3m

no

hours

12.80

14.00

14.70

0.0781

0.0714

0.0680

Ceiling Joists, 3.0-4.5m

no

hours

10.80

12.10

12.60

0.0926

0.0826

0.0794

Ceiling Joists, 4.5-6.0m

no

hours

9.60

10.80

11.10

0.1042

0.0926

0.0901

Ceiling Joists, Notch to Beams

no

hours

20.00

25.00

28.50

0.0500

0.0400

0.0351

Ceiling Joists, Pack Joist Ends

no

hours

20.10

23.80

26.30

0.0498

0.0420

0.0380

Ceiling Joists, Nailing Joists together

m

hours

-

23.00

-

-

0.0435

-

Ceiling Joists, Bolting Joists Together

m

hours

-

12.60

-

-

0.0794

-

Floor Boards, Butt Jointed

m2

hours

-

1.70

-

-

0.5882

-

Floor Boards, T&G Boards, under 75mm wide

m2

hours

-

3.40

-

-

0.2941

-

Floor Boards, T&G Boards, 75-100mm wide

m2

hours

-

3.80

-

-

0.2632

-

Floor Boards, T&G Boards, 100-125mm wide

m2

hours

-

4.20

-

-

0.2381

-

Floor Boards, T&G Boards, 125-150mm wide

m2

hours

-

5.50

-

-

0.1818

-

Plywood Sheeting, Butt Jointed, nailed

m2

hours

-

9.10

10.20

-

0.1099

0.0980

Plywood Sheeting, Butt Jointed, screwed

m2

hours

-

4.10

4.80

-

0.2439

0.2083

Plywood Sheeting, T&G Jointed, nailed

m2

hours

-

8.30

9.10

-

0.1205

0.1099

Plywood Sheeting, T&G Jointed, screwed

m2

hours

-

4.00

4.60

-

0.2500

0.2174

Chipboard Sheeting, Butt Jointed, nailed

m2

hours

-

10.00

11.50

-

0.1000

0.0870

Chipboard Sheeting, Butt Jointed, screwed

m2

hours

-

5.10

5.80

-

0.1961

0.1724

Chipboard Sheeting, T&G Jointed, nailed

m2

hours

-

9.30

9.10

-

0.1075

0.1099

Chipboard Sheeting, T&G Jointed, screwed

m2

hours

-

5.50

5.90

-

0.1818

0.1695

m2

hours

-

1.80

-

0.5556

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average 0.7143

Fast

1.0000

Slow -

Average 1.40

Fast 1.00

-

0.4348

-

-

0.10

-

-

3.3333

-

Carpentry & Joinery Formwork to Soffit of Manhole

-

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Formwork to Walls of Manhole

m2

hours

0.0893

0.0704

0.0495

Formwork to Road Edges, straight

m

hours

-

7.70

-

-

0.1299

-

Formwork to Road Edges, curves

m

hours

-

6.20

-

-

0.1613

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average 11.20

Fast 14.20

Slow 20.20

Average

Fast

Bulk Excavation Excavation Bulking Factor, Sand/Soil

%

-

15.00

-

-

-

Excavation Bulking Factor, Gravel

%

-

33.00

-

20.00

-

-

-

Excavation Bulking Factor, Clay/Chalk

%

-

40.00

-

-

-

-

Excavation Bulking Factor, Boulder Clay

%

-

45.00

-

-

-

-

Excavation Bulking Factor, Rock

%

-

60.00

-

-

-

-

Spoil Weight, Rock

Tonnes/m3

-

2.50

-

-

-

-

Spoil Weight, Concrete

Tonnes/m3

-

2.40

-

-

-

-

Spoil Weight, Landfill/CDG

Tonnes/m3

-

1.90

-

-

-

-

Spoil Weight, Sand

Tonnes/m3

-

1.80

-

-

-

-

Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle

m3

hours

30.00

48.00

59.00

0.0333

0.0208

0.0169

Crane Mounted Clamshell Grab, 2.0m3 bucket 2.9min lift cycle

m3

hours

25.00

33.00

41.00

0.0400

0.0303

0.0244

Crane Mounted Clamshell Grab, 2.5m3 bucket 2.9min lift cycle

m3

hours

34.00

42.00

52.00

0.0294

0.0238

0.0192

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

m3

hours

6.90

8.70

10.20

0.1449

0.1149

0.0980

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

m3

hours

23.40

28.60

33.40

0.0427

0.0350

0.0299

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

m3

hours

45.50

50.00

58.00

0.0220

0.0200

0.0172

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

m3

hours

5.60

7.10

8.20

0.1786

0.1408

0.1220

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

m3

hours

20.50

25.00

29.00

0.0488

0.0400

0.0345

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

m3

hours

36.80

40.00

46.00

0.0272

0.0250

0.0217

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

m3

hours

5.60

7.10

8.30

0.1786

0.1408

0.1205

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

m3

hours

20.50

25.00

28.70

0.0488

0.0400

0.0348

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

m3

hours

37.00

40.00

46.00

0.0270

0.0250

0.0217

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

m3

hours

4.50

6.10

7.20

0.2222

0.1639

0.1389

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

m3

hours

17.90

22.20

25.00

0.0559

0.0450

0.0400

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

m3

hours

25.70

28.60

32.90

0.0389

0.0350

0.0304

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Concrete Slabs, unreinforced 50-150mm

m3

hours

0.3125

-

0.5263

3.20

-

1.90

Concrete Slabs, unreinforced 150-300mm

m3

hours

0.1818

0.2439

0.2703

5.50

4.10

3.70

Concrete Slabs, reinforced 50-150mm

m3

hours

0.1923

-

0.2564

5.20

-

3.90

Concrete Slabs, reinforced 150-300mm

m3

hours

0.1099

0.1613

0.2128

9.10

6.20

4.70

Concrete Walls, unreinforced

m3

hours

0.2128

0.2564

0.3226

4.70

3.90

3.10

Concrete Walls, reinforced

m3

hours

0.1786

0.2128

0.2564

5.60

4.70

3.90

Concrete Foundations, unreinforced

m3

hours

0.2778

0.3030

0.3333

3.60

3.30

3.00

Concrete Foundations, reinforced

m3

hours

0.1852

0.1961

0.2083

5.40

5.10

4.80

Concrete Beams

m3

hours

0.1333

0.1538

0.1786

7.50

6.50

5.60

Concrete Columns

m3

hours

0.1087

0.1220

0.1370

9.20

8.20

7.30

Tarmac paving 20-50mm thick

m3

hours

0.5263

0.5882

0.6667

1.90

1.70

1.50

Tarmac paving 50-100mm thick

m3

hours

0.4762

-

0.6250

2.10

-

1.60

Tarmac paving 100-150mm thick

m3

hours

0.4762

-

0.5882

2.10

-

1.70

Tarmac roadway 150mm thick

m3

hours

-

0.2778

-

Brickwork, walls and columns

m3

hours

0.4167

0.5556

0.7692

2.40

1.80

1.30

Brickwork, foundations

m3

hours

0.3704

0.4762

0.6667

2.70

2.10

1.50

0.50

1.10

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Breaking Out

-

3.60

-

Barrette Piles Rule of Thumb, overall rate by Mill

no

hours

2.0000

0.9091

0.8333

cage

hours

-

0.2500

-

Concreting barrette panels

m3

hours

40.00

50.00

55.00

Trimming top of barrette panels

no

days

-

0.4167

-

Concrete Testing, Coring Test

no

days

0.2500

0.2857

0.5000

Concrete Testing, Sonic Logging Test

no

days

-

1.4286

-

Fabricate reinforcement cages

-

4.00 0.0250

-

-

0.0200 2.40

4.00

1.20 0.0182 -

3.50 0.70

2.00 -

PRODUCTION RATES

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works

m3

hours

6.40

8.00

9.40

0.1563

0.1250

0.1064

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works

m3

hours

5.50

6.90

8.10

0.1818

0.1449

0.1235

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works

m3

hours

5.20

6.50

7.90

0.1923

0.1538

0.1266

Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works

m3

hours

4.70

5.90

8.20

0.2128

0.1695

0.1220

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works

m3

hours

12.60

15.40

18.90

0.0794

0.0649

0.0529

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works

m3

hours

11.70

14.30

16.70

0.0855

0.0699

0.0599

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works

m3

hours

10.90

13.30

15.60

0.0917

0.0752

0.0641

Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works

m3

hours

9.70

11.80

14.00

0.1031

0.0847

0.0714

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works

m3

hours

18.20

20.00

23.00

0.0549

0.0500

0.0435

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works

m3

hours

16.50

18.10

20.00

0.0606

0.0552

0.0500

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works

m3

hours

15.40

16.70

19.30

0.0649

0.0599

0.0518

Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works

m3

hours

13.30

15.40

17.70

0.0752

0.0649

0.0565

Uncased Anchors, 10m long

no

days

-

2.00

-

-

0.5000

-

Top Cased Anchors, 15m long

no

days

-

1.00

-

-

1.0000

-

Anchors stressing

no

days

-

2.20

-

-

0.4545

-

Cycle Time, 5-20m deep

no

days

0.1250

0.2500

0.2500

8.00

4.00

Cycle Time, 20-40m deep

no

days

0.1000

0.1250

-

10.00

8.00

-

Cycle Time, 40-70m deep

no

days

0.0400

0.1000

-

25.00

10.00

-

Cycle Time, 70-90m deep

no

days

0.0222

0.0400

-

45.00

25.00

-

Cycle Time, 90-135m deep

no

days

0.0167

0.0222

-

60.00

45.00

-

2.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Basement Excavation

Bell Ground Anchors

Bored Piling

Move piling setup to next location

hours

-

4.00

Excave shaft by grab, general fill/uppr levels

m

hours

-

3.50

-

-

0.2857

-

Excave shaft by grab, sand/minor rubble

m

hours

-

2.10

-

-

0.4762

-

PRODUCTION RATES

ITEM NO.

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Slow

Excave shaft by grab, marinve/aluvium

m

hours

-

2.50

-

-

0.4000

-

Excave shaft by grab/RCD, CDT

m

hours

-

0.50

-

-

2.0000

-

Excave shaft by grab/RCD, CDG 200/gravel

m

hours

-

0.50

-

-

2.0000

-

Excave shaft by RCD/Chisel, corestones

m

hours

-

0.50

-

-

2.0000

-

Excave Rock Socket by RCD, grade IV/V rock

m

hours

-

0.20

0.30

-

5.0000

3.3333

Excave Rock Socket by RCD, grade II/III rock

m

hours

-

0.10

0.20

-

10.0000

5.0000

Excave Rock Socket by RCD, tendering rate

m

hours

-

0.10

-

-

10.0000

-

Add/remove RCD plant

hours

-

-

-

-

2.00

-

Add/remove RCD drill string/drill bit

hours

-

-

-

-

5.00

-

-

1.2500

-

DESCRIPTION

REMARKS Average

Fast

Slow

Average

Fast

Remove Obstruction, above water hand hammers

m

hours

-

0.80

-

Remove Obstruction, below water heavy chisel

m

hours

-

0.50

-

-

2.0000

-

hours

-

-

-

60.00

53.00

50.00

Concrete Plug, RCD off/tremmie/concrete/cure/RCD on Install air lift tremmie tube Fabricate reinforcement cages Install reinforcement cages

hours

-

-

-

-

5.00

-

cage

hours

-

0.4000

-

-

2.50

-

no

hours

-

0.5000

-

-

2.00

-

Shaft cleaning, air lifting after excavation

hours

-

-

-

-

8.0

-

Shaft cleaning, air lifting after cage installed

hours

-

-

-

-

2.0

-

Shaft concreting/extract casing 5-70m deep

hours

-

-

-

-

12.0

-

Shaft concreting/extract casing 70-95m deep

hours

-

-

-

-

14.0

-

Shaft concreting/extract casing 95-135m deep

hours

-

-

-

-

48.0

-

Concrete curing prior to remove telescopic casing

hours

-

-

-

-

72.0

-

Concrete Testing, Coring Test

m

hours

-

3.20

2.20

-

0.3125

Concrete Testing, Sonic Logging Test

no

hours

-

0.4000

-

-

2.50

-

0.4545

Concrete Testing, Vibration Test

no

hours

-

0.1538

-

-

6.50

-

Introduction to Costing

1.1 Introduction Cost is important to all industry. Costs can be divided into two general classes; absolute costs and relative costs. Absolute cost measures the loss in value of assets. Relative cost involves a comparison between the chosen course of action and the course of action that was rejected. This cost of the alternative action - the action not taken - is often

The accountant is primarily concerned with the absolute cost. However, the forest engineer, the planner, the manager needs to be concerned with the alternative cost - the cost of the lost opportunity. Management has to be able to make comparisons between the policy that should be chosen and the policy that should be rejected. Such

Cost data are, of course, essential to the technique of cost prediction. However, the form in which much cost data are recorded limits accurate cost prediction to the field of comparable situations only. This limitation of accurate cost prediction may not be serious in industries where the production environment changes little from month to month or

1.2 Basic Classification of Costs Costs are divided into two types: variable costs, and fixed costs. Variable costs vary per unit of production. For example, they may be the cost per cubic meter of wood yarded, per cubic meter of dirt excavated, etc. Fixed costs, on the other hand, are incurred only once and as additional units of production are produced, the unit costs fall.

1.3 Total Cost and Unit-Cost Formulas As harvesting operations become more complicated and involve both fixed and variable costs, there usually is more than one way to accomplish a given task. It may be possible to change the quantity of one or both types of cost, and thus to arrive at a minimum total cost. Mathematically, the relationship existing between volume of production and

Total cost = fixed cost + variable cost × output

In symbols using the first letters of the cost elements and N for the output or number of units of production, these simple formulas are C = F + NV

UC = F/N + V

1.4 Breakeven Analysis

A breakeven analysis determines the point at which one method becomes superior to another method of accomplishing some task or objective. Breakeven analysis is a common and important part of cost control.

One illustration of a breakeven analysis would be to compare two methods of road construction for a road that involves a limited amount of cut-and-fill earthwork. It would be possible to do the earthwork by hand or by bulldozer. If the manual method were adopted, the fixed costs would be low or non-existent. Payment would be done on a daily

Figure 1.1 Breakeven Example for Excavation.

If, on a set of coordinates, cost in dollars is plotted on the vertical axis and units of production on the horizontal axis, we can indicate fixed cost for any process by a horizontal line parallel to the x-axis. If variable cost per unit output is constant, then the total cost for any number of units of production will be the sum of the fixed cost and the variable

1.5 Minimum Cost Analyses

A similar, but different problem is the determination of the point of minimum total cost. Instead of balancing two methods with different fixed and variable costs, the aim is to bring the sum of two costs to a minimum. We will assume a clearing crew of 20 men is clearing road right-of-way and the following facts are available:

1. Men are paid at the rate of $0.40 per hour.

2. Time is measured from the time of leaving camp to the time of return.

3. Total walking time per man is increasing at the rate of 15 minutes per day.

4. The cost to move the camp is $50.

If the camp is moved each day, no time is lost walking, but the camp cost is $50 per day. If the camp is not moved, on the second day 15 crew-minutes are lost or $2.00. On the third day, the total walking time has increased 30 minutes, the fourth day, 45 minutes, and so on. How often should the camp be moved assuming all other things are

TABLE 1.1 Average daily total camp cost as the sum of the cost of walking time plus the cost of moving camp.

Days camp remained in location

1

Average daily Average daily Average total cost of cost of camp cost walking time moving camp 0 50 50

2

1

25

26

3

2

16.67

18.67

4

3

12.5

15.5

5

4

10

14

6

5

8.33

13.33

7

6

7.14

13.14

8

7

6.25

13.25

9

8

5.56

13.56

10

9

5

14

We see the average daily cost of walking time increasing linearly and the average cost of moving camp decreasing as the number of days the camp remains in one location increases. The minimum cost is obtained for leaving the camp in location 7 days (Figure 1.2). This minimum cost point should only be used as a guideline as all other things are

Figure 1.2 Costs for Camp Location Example.

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil

m3

hours

14.50

20.00

25.60

0.0690

0.0500

0.0391

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds

m3

hours

15.20

20.40

25.60

0.0658

0.0490

0.0391

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk

m3

hours

12.30

18.50

23.20

0.0813

0.0541

0.0431

Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay

m3

hours

11.20

16.90

21.30

0.0893

0.0592

0.0469

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil

m3

hours

25.40

30.30

35.70

0.0394

0.0330

0.0280

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds

m3

hours

25.60

31.30

37.00

0.0391

0.0319

0.0270

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk

m3

hours

22.50

27.80

33.30

0.0444

0.0360

0.0300

Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay

m3

hours

18.90

24.40

30.30

0.0529

0.0410

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Excavate and Remove

0.0330

Load Spoil to Barge, capacity 2,000m3

hours

-

-

-

-

8.00

-

Load Spoil to Barge, capacity 1,500m3

hours

-

-

-

-

6.50

-

Load Spoil to Barge, capacity 1,000m3

hours

-

-

-

-

5.50

-

m3

hours

-

260.00

-

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

m3

hours

5.60

7.10

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

m3

hours

4.80

6.10

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

m3

hours

4.80

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

m3

hours

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

m3

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

Spoil conveyor, 600mm belt, 150m/min

-

0.0038

-

8.20

0.1786

0.1408

0.1220

7.30

0.2083

0.1639

0.1370

6.10

7.10

0.2083

0.1639

0.1408

9.70

5.40

6.40

0.1031

0.1852

0.1563

hours

20.50

25.00

29.20

0.0488

0.0400

0.0342

m3

hours

18.20

22.20

26.00

0.0549

0.0450

0.0385

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

m3

hours

18.20

22.20

26.00

0.0549

0.0450

0.0385

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

m3

hours

17.00

20.00

23.40

0.0588

0.0500

0.0427

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

m3

hours

26.00

28.60

33.10

0.0385

0.0350

0.0302

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

m3

hours

26.30

28.60

33.20

0.0380

0.0350

0.0301

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

m3

hours

26.30

28.60

33.20

0.0380

0.0350

0.0301

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

m3

hours

22.70

25.00

28.80

0.0441

0.0400

0.0347

Excavate and Board Trench, 0.5-1.5m deep, < 2.0m wide

m2

hours

3.30

4.50

6.80

0.3030

0.2222

0.1471

Excavate and Board Trench, 1.5-3.0m deep, < 2.0m wide

m2

hours

3.00

4.20

6.50

0.3333

0.2381

0.1538

Excavate and Board Trench, 3.0-4.5m deep, < 2.0m wide

m2

hours

2.70

4.00

6.00

0.3704

0.2500

0.1667

Excavate and Board Trench, 0.5-1.5m deep, > 2.0m wide

m2

hours

6.60

7.10

8.80

0.1515

0.1408

0.1136

Excavate and Board Trench, 1.5-3.0m deep, > 2.0m wide

m2

hours

6.20

6.70

9.20

0.1613

0.1493

0.1087

Excavate and Board Trench, 3.0-4.5m deep, > 2.0m wide

m2

hours

5.80

6.20

10.50

0.1724

0.1613

0.0952

Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 5-50m to stockpile

m3

hours

13.90

20.40

25.00

0.0719

0.0490

0.0400

Crawler Shovel, 0.8m3 bucket, Sand/Soil, pushed 50-120m to stockpile

m3

hours

7.60

9.50

12.60

0.1316

0.1053

0.0794

Crawler Shovel, 0.8m3 bucket, Gravel, pushed 5-50m to stockpile

m3

hours

14.20

20.40

25.60

0.0704

0.0490

0.0391

Crawler Shovel, 0.8m3 bucket, Gravel, pushed 50-120m to stockpile

m3

hours

7.60

10.20

12.80

0.1316

0.0980

0.0781

Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 5-50m to stockpile

m3

hours

12.70

18.40

23.20

0.0787

0.0543

0.0431

Crawler Shovel, 0.8m3 bucket, Clay/Chalk, pushed 50-120m to stockpile

m3

hours

6.90

8.90

11.60

0.1449

0.1124

0.0862

Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 5-50m to stockpile

m3

hours

11.60

16.90

21.30

0.0862

0.0592

0.0469

Crawler Shovel, 0.8m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3

hours

6.30

8.20

10.40

0.1587

0.1220

0.0962

Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 5-50m to stockpile

m3

hours

23.80

28.50

35.70

0.0420

0.0351

0.0280

Crawler Shovel, 1.2m3 bucket, Sand/Soil, pushed 50-120m to stockpile

m3

hours

16.70

18.50

20.40

0.0599

0.0541

0.0490

Crawler Shovel, 1.2m3 bucket, Gravel, pushed 5-50m to stockpile

m3

hours

25.00

32.00

37.00

0.0400

0.0313

0.0270

Crawler Shovel, 1.2m3 bucket, Gravel, pushed 50-120m to stockpile

m3

hours

17.20

19.30

21.20

0.0581

0.0518

0.0472

Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 5-50m to stockpile

m3

hours

21.70

27.50

33.30

0.0461

0.0364

0.0300

Crawler Shovel, 1.2m3 bucket, Clay/Chalk, pushed 50-120m to stockpile

m3

hours

15.10

16.90

18.80

0.0662

0.0592

0.0532

Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 5-50m to stockpile

m3

hours

19.60

24.50

30.30

0.0510

0.0408

0.0330

Crawler Shovel, 1.2m3 bucket, Boulder Clay, pushed 50-120m to stockpile m3

hours

13.70

15.90

17.50

0.0730

0.0629

0.0571

Crawler Shovel, 0.6m3 bucket, 50-200m2, Sand/Soil

m3

hours

18.60

28.50

38.50

0.0538

0.0351

0.0260

Crawler Shovel, 0.6m3 bucket, over 200m2, Sand/Soil

m3

hours

24.40

37.20

50.00

0.0410

0.0269

0.0200

Trench Excavation

Spread and Level

55

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Crawler Shovel, 0.6m3 bucket, 50-200m2, Gravel

m3

hours

18.90

28.60

38.40

0.0529

0.0350

0.0260

Crawler Shovel, 0.6m3 bucket, over 200m2, Gravel

m3

hours

24.20

37.20

50.00

0.0413

0.0269

0.0200

Crawler Shovel, 0.6m3 bucket, 50-200m2, Hardcore

m3

hours

15.80

23.50

31.20

0.0633

0.0426

0.0321

Crawler Shovel, 0.6m3 bucket, over 200m2, Hardcore

m3

hours

19.20

29.60

40.00

0.0521

0.0338

0.0250

Crawler Shovel, 0.6m3 bucket, 50-200m2, Boulder Clay

m3

hours

17.20

26.40

35.70

0.0581

0.0379

0.0280

Crawler Shovel, 0.6m3 bucket, over 200m2, Boulder Clay

m3

hours

22.20

33.80

45.40

0.0450

0.0296

0.0220

Crawler Shovel, 1.2m3 bucket, 50-200m2, Sand/Soil

m3

hours

43.50

48.00

52.60

0.0230

0.0208

0.0190

Crawler Shovel, 1.2m3 bucket, over 200m2, Sand/Soil

m3

hours

55.50

61.10

66.70

0.0180

0.0164

0.0150

Crawler Shovel, 1.2m3 bucket, 50-200m2, Gravel

m3

hours

43.80

48.30

52.90

0.0228

0.0207

0.0189

Crawler Shovel, 1.2m3 bucket, over 200m2, Gravel

m3

hours

55.50

61.10

66.70

0.0180

0.0164

0.0150

Crawler Shovel, 1.2m3 bucket, 50-200m2, Hardcore

m3

hours

37.10

40.30

43.50

0.0270

0.0248

0.0230

Crawler Shovel, 1.2m3 bucket, over 200m2, Hardcore

m3

hours

47.60

51.60

55.60

0.0210

0.0194

0.0180

Crawler Shovel, 1.2m3 bucket, 50-200m2, Boulder Clay

m3

hours

43.80

45.70

47.60

0.0228

0.0219

0.0210

Crawler Shovel, 1.2m3 bucket, over 200m2, Boulder Clay

m3

hours

55.60

59.10

62.50

0.0180

0.0169

0.0160

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

m3

hours

6.70

8.40

9.90

0.1493

0.1190

0.1010

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

m3

hours

3.20

4.50

5.00

0.3125

0.2222

0.2000

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

m3

hours

3.30

4.10

5.20

0.3030

0.2439

0.1923

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

m3

hours

3.30

4.10

5.20

0.3030

0.2439

0.1923

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

m3

hours

8.20

10.00

11.70

0.1220

0.1000

0.0855

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

m3

hours

7.10

8.70

10.20

0.1408

0.1149

0.0980

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

m3

hours

6.50

8.30

9.40

0.1538

0.1205

0.1064

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

m3

hours

6.30

7.70

9.10

0.1587

0.1299

0.1099

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

m3

hours

12.20

13.30

15.40

0.0820

0.0752

0.0649

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

m3

hours

10.20

11.10

12.90

0.0980

0.0901

0.0775

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

m3

hours

9.70

10.50

12.10

0.1031

0.0952

0.0826

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

m3

hours

6.10

6.70

7.70

0.1639

0.1493

0.1299

mins

-

-

-

8.00

6.00

5.50

Excavation, non explosive chemical method, Class I Granite

m3

cycle

0.30

0.90

1.20

3.3333

1.1111

0.8333

Excavation, non explosive chemical method, Class II Granite

m3

cycle

2.00

2.60

2.90

0.5000

0.3846

0.3448

Excavation, non explosive chemical method, Class III Granite

m3

cycle

1.20

1.40

1.80

0.8333

0.7143

0.5556

20.00

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Small or Deep Excavation

Rock Tunnels Excavation, non explosive chemical method, cycle time

Bulk Excavation Excavation Bulking Factor, Sand/Soil

%

-

15.00

-

-

-

Excavation Bulking Factor, Gravel

%

-

33.00

-

-

-

-

Excavation Bulking Factor, Clay/Chalk

%

-

40.00

-

-

-

-

Excavation Bulking Factor, Boulder Clay

%

-

45.00

-

-

-

-

Excavation Bulking Factor, Rock

%

-

60.00

-

-

-

-

Spoil Weight, Rock

Tonnes/m3

-

2.50

-

-

-

-

Spoil Weight, Concrete

Tonnes/m3

-

2.40

-

-

-

-

Spoil Weight, Landfill/CDG

Tonnes/m3

-

1.90

-

-

-

-

Spoil Weight, Sand

Tonnes/m3

-

1.80

-

-

-

-

Rail Mounted Grab, 2.0m3 bucket 2.4min lift cycle

m3

hours

30.00

48.00

59.00

0.0333

0.0208

0.0169

Crane Mounted Clamshell Grab, 2.0m3 bucket 2.9min lift cycle

m3

hours

25.00

33.00

41.00

0.0400

0.0303

0.0244

Crane Mounted Clamshell Grab, 2.5m3 bucket 2.9min lift cycle

m3

hours

34.00

42.00

52.00

0.0294

0.0238

0.0192

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil

m3

hours

6.90

8.70

10.20

0.1449

0.1149

0.0980

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil

m3

hours

23.40

28.60

33.40

0.0427

0.0350

0.0299

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil

m3

hours

45.50

50.00

58.00

0.0220

0.0200

0.0172

56

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds

m3

hours

5.60

7.10

8.20

0.1786

0.1408

0.1220

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds

m3

hours

20.50

25.00

29.00

0.0488

0.0400

0.0345

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds

m3

hours

36.80

40.00

46.00

0.0272

0.0250

0.0217

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk

m3

hours

5.60

7.10

8.30

0.1786

0.1408

0.1205

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

m3

hours

20.50

25.00

28.70

0.0488

0.0400

0.0348

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk

m3

hours

37.00

40.00

46.00

0.0270

0.0250

0.0217

Hydraulic Excavator, 0.3m3 bucket, Hard Ground

m3

hours

4.50

6.10

7.20

0.2222

0.1639

0.1389

Hydraulic Excavator, 0.4m3 bucket, Hard Ground

m3

hours

17.90

22.20

25.00

0.0559

0.0450

0.0400

Hydraulic Excavator, 0.5m3 bucket, Hard Ground

m3

hours

25.70

28.60

32.90

0.0389

0.0350

0.0304

Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works

m3

hours

6.40

8.00

9.40

0.1563

0.1250

0.1064

Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works

m3

hours

5.50

6.90

8.10

0.1818

0.1449

0.1235

Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works

m3

hours

5.20

6.50

7.90

0.1923

0.1538

0.1266

Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works

m3

hours

4.70

5.90

8.20

0.2128

0.1695

0.1220

Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works

m3

hours

12.60

15.40

18.90

0.0794

0.0649

0.0529

Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works

m3

hours

11.70

14.30

16.70

0.0855

0.0699

0.0599

Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works

m3

hours

10.90

13.30

15.60

0.0917

0.0752

0.0641

Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works

m3

hours

9.70

11.80

14.00

0.1031

0.0847

0.0714

Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works

m3

hours

18.20

20.00

23.00

0.0549

0.0500

0.0435

Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works

m3

hours

16.50

18.10

20.00

0.0606

0.0552

0.0500

Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works

m3

hours

15.40

16.70

19.30

0.0649

0.0599

0.0518

Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works

m3

hours

13.30

15.40

17.70

0.0752

0.0649

0.0565

Metal KwikStage, 5 Boards with 2m lifts

m run

hours

11.10

11.90

12.50

0.0901

0.0840

0.0800

Metal KwikStage, 5 Boards with 3m lifts

m run

hours

9.10

10.00

10.50

0.1099

0.1000

0.0952

Metal KwikStage, House Scaffold with 3 lifts

m run

hours

2.80

3.20

3.80

0.3571

0.3125

0.2632

Metal Tube and Fittings, 5-6 Boards wide

m run

hours

3.20

3.70

4.60

0.3125

0.2703

0.2174

Tube and Fitting Platforms, 50-250m3

m3

hours

10.60

12.50

18.50

0.0943

0.0800

0.0541

Tube and Fitting Platforms, 250-1000m3

m3

hours

18.50

22.50

24.50

0.0541

0.0444

0.0408

Tube and Fitting Platforms, over 1000m3

m3

hours

24.50

30.00

33.50

0.0408

0.0333

0.0299

-

200.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Basement Excavation

Working Platforms

Tube and Fitting Platforms, striking

% x erect

-

200.00

-

Underpinning Concrete Pinning, 4th or 5th pin cycles

m

day

-

1.20

2.20

-

0.8333

0.4545

Brickwork Pinning, 1.0 brick thick

m2

hours

-

0.40

0.70

-

2.5000

1.4286

Brickwork Pinning, 1.5 brick thick

m2

hours

3.3333

-

Brickwork Pinning, 2.0 brick thick

m2

hours

Wedge and Pin Method, 102mm wall

m

Wedge and Pin Method, 215mm wall Wedge and Pin Method, 317mm wall

0.10

0.30

-

10.0000

-

0.20

-

-

5.0000

-

hours

-

0.80

-

-

1.2500

-

m

hours

-

0.70

-

-

1.4286

-

m

hours

-

0.50

-

-

2.0000

-

Erect and Setup 50m gib

days

-

-

-

-

11.00

Dismantle 50m gib

days

-

-

-

-

10.00

-

Tower Cranes

Lifting, Reinforcement Bins and Cages, 1st 15m lift Lifting, Reinforcement Bins and Cages, above 1st 15m lift Lifting, Crane Tracking Time

7.50

lift

mins

-

-

-

-

3.20

-

15m

mins

-

-

-

-

0.50

-

m

seconds

-

-

-

-

3.30

-

57

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

m

days

3.80

4.50

6.40

0.2632

0.2222

0.1563

m

days

1.80

2.50

3.40

0.5556

0.4000

0.2941

Shrubs and Bushes, dig up and removal

m2

hours

-

25.00

38.00

-

0.0400

0.0263

Turf, lifting and removal

m2

hours

-

2.90

-

-

0.3448

-

Trees, small sizes and shrubs

m2

hours

-

14.00

-

-

0.0714

-

Trees and Shrubs, 500mm - 900mm girth

no

hours

-

0.0556

-

-

18.00

-

Trees and Shrubs, 900mm - 1200mm girth

no

hours

-

0.0455

-

-

22.00

-

Trees and Shrubs, 1200mm - 1500mm girth

no

hours

-

0.0385

-

-

26.00

-

Hedges and Roots, 0.5-1.0m high

m

hours

-

0.90

-

-

1.1111

-

Hedges and Roots, 1.0-1.5m high

m

hours

-

0.80

-

-

1.2500

-

Hedges and Roots, 1.5-2.0m high

m

hours

-

0.60

-

-

1.6667

-

Vibro/Drop Hammer, 10m deep Sand

m

days

-

Vibro/Drop Hammer, 35m deep Sand

m

days

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Soil Mix Walls Three Auger Drill, cement and cure

Slurry Mix Walls Crane grab, cement/bentonite and sheet piles

Site Clearance

Sheet Piling

3.50

55.00

60.00

-

0.0182

0.0167

32.00

10.50

0.2857

0.0313

0.0952

-

12.00

-

4.00

3.00

Secant Piling Construct 30m dia cofferdam, 255 piles/concrete base

weeks

-

-

-

Rule of Thumb Site Investigation Pre Drilling

no.

days

Ground Excavation, Hydraulic Backhoe

m3

days

Bored Piling, 25-70m deep

no.

days

Formwork Fixing

0.2000 -

0.2500 50.00

0.1000

0.3333 -

0.1250

5.00 -

0.1667

10.00

0.0200 8.00

6.00

m2

days

-

12.00

-

-

0.0833

-

Reinforcement Fixing

Tonnes

days

-

0.70

-

-

1.4286

-

Concrete Placement

m3

days

-

16.00

-

-

0.0625

-

Scaffold Erection, Steel Falsework

m3

days

-

140.00

-

-

0.0071

-

Blockwork Laying

m2

days

-

7.00

-

-

0.1429

-

Plastering and Rendering

m2

days

-

12.00

-

-

0.0833

-

Blockwork Laying

m2

days

0.1429

0.0833

0.0571

Stonework Cladding

m2

days

-

5.10

-

-

0.1961

-

Window Glazing

m2

hours

-

1.50

-

-

0.6667

-

Granolithic Flooring

m2

hours

-

4.50

-

-

0.2222

-

Floor Screeding

m2

hours

-

4.50

-

-

0.2222

-

Floor Screeding

m2

days

-

60.00

-

-

0.0167

-

58

7.00

12.00

17.50

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

m2

hours

-

1.50

-

Drill 30m shaft

hours

-

-

-

-

7.00

-

Install strands/setup anchor

hours

-

-

-

-

6.00

-

Grout in strands

hours

-

-

-

-

2.00

-

DESCRIPTION

ITEM NO. Ceramic Wall Tiling

REMARKS Slow

Average

Fast

Slow

Average -

Fast

0.6667

-

Removable Anchors

NATM Tunnels Standard Advance Method, used on tunnels with max diameter

m

-

7.00

-

-

-

-

Half Face Advance Method, used on tunnels with max diameter

m

-

10.00

-

-

-

-

Double side Drift Advance Method, used on tunnels with diameter over

m

-

10.00

-

-

-

-

Double side Drift Advance Method, used on tunnels with diameter over

m

-

10.00

-

-

-

-

Excavation, London Clay, internal diameter under 7.0m

m

days

2.50

2.90

3.20

0.4000

0.3448

0.3125

Excavation, London Clay, internal diameter 7.0-10.0m

m

days

1.50

2.00

2.50

0.6667

0.5000

0.4000

Excavation, London Clay, internal diameter over 10.0m

m

days

1.00

1.30

1.5

1.0000

0.7692

-

Excavation, Woolwich/Reading Beds, internal diameter 2.0-7.0m

m

days

1.50

1.80

2.0

0.6667

0.5556

-

Excavation, Woolwich/Reading Beds, internal diameter 7.0-10.0m

m

days

-

1.50

-

-

0.6667

-

Excavation, Woolwich/Reading Beds, internal diameter over 10.0m

m

days

-

1.00

1.5

-

1.0000

-

Excavation, London Clay, Inclined Tunnels, diameter 2.0-7.0m

m

days

1.50

2.00

3.2

0.6667

0.5000

-

Excavation, London Clay, Inclined Tunnels, diameter 7.0-10.0m

m

days

0.50

1.00

2.2

2.0000

1.0000

-

Excavation, London Clay, Vertical Shafts, diameter 2.0-9.0m

m

days

1.00

1.50

2.2

1.0000

0.6667

-

Excavation, London Clay, Vertical Shafts, diameter 9.0-15.0m

m

days

0.50

1.00

2.6

2.0000

1.0000

-

m of circumf

days

0.80

1.00

1.2

1.2500

1.0000

-

Excavation, London Clay, Junction Excavation

m

days

0.20

-

-

5.0000

-

Mucking Capacity, 1 access with 2 crews

m3

days

190.00

225.00

279.0

0.0053

0.0044

-

Mucking Capacity, 1 access with 4 crews

m3

days

255.00

300.00

366.0

0.0039

0.0033

-

Mucking Capacity, 2 access with 4 crews

m3

days

382.00

450.00

549.0

0.0026

0.0022

-

Sprayed Secondary Lining, Tunnels, diameter under 6.5m

m

days

2.10

2.50

2.8

0.4762

0.4000

-

Sprayed Secondary Lining, Tunnels, diameter over 6.5m

m

days

1.50

2.00

2.4

0.6667

0.5000

-

Sprayed Secondary Lining, Inclined Tunnels, diameter under 6.5m

m

days

1.50

2.00

2.3

0.6667

0.5000

-

Sprayed Secondary Lining, Inclined Tunnels, diameter over 6.5m

m

days

1.00

1.50

1.9

1.0000

0.6667

-

Sprayed Secondary Lining, Vertical Shafts, diameter under 6.5m

m

days

1.80

2.00

2.5

0.5556

0.5000

-

Sprayed Secondary Lining, Vertical Shafts, diameter over 6.5m

m

days

2.20

2.50

3.1

0.4545

0.4000

-

Sprayed Secondary Lining, Circulation Halls, diameter under 11.0m

m

days

2.00

2.3

-

0.5000

-

Sprayed Secondary Lining, Intermediate Landing Tunnels with columns

m

days

1.70

2.00

2.1

0.5882

0.5000

-

Sprayed Secondary Lining, Intermediate Landing Tunnels without columns m

days

1.60

2.10

2.3

0.6250

0.4762

-

Sprayed Secondary Lining, Tunnel Junctions

m

days

-

0.20

0.3

-

5.0000

-

Insitu Permanent Lining, 12m bays, 350-400mm reinforced with PCV backingm

days

-

8.40

12.0

-

0.1190

-

-

25.00

-

-

-

-

Excavation, London Clay, Circulation Halls

Insitu Permanent Lining, extra over excavate/lining time to allow for permanent %lining

-

-

Excavate and Line Cycle Time , Running Tunnels

m

days

3.20

4.00

4.9

0.3125

0.2500

-

Excavate and Line Cycle Time, Station Access Adits

m

days

3.30

3.90

4.2

0.3030

0.2564

-

Excavate and Line Cycle Time, Concourse Tunnels

m

days

2.20

2.50

2.7

0.4545

0.4000

-

Excavate and Line Cycle Time, Escalator Tunnels

m

days

1.20

1.50

1.7

0.8333

0.6667

-

Site Hoarding, timber posts, plywood nailed to horizontal rails

m

hours

1.00

1.20

-

1.0000

0.8333

-

Post Erection, Timber / Metal, dig, erect, fix

no

hours

3.30

4.50

-

0.3030

0.2222

-

Post Erection, Concrete, dig, erect, fix

no

hours

3.20

4.00

-

0.3125

0.2500

-

Fence Erection, Chainlink, posts at 1.5m

m

hours

-

4.20

-

-

0.2381

-

Fence Erection, Chainlink, posts at 2.0m

m

hours

-

4.40

-

-

0.2273

-

Fence Erection, Chainlink, posts at 3.0m

m

hours

-

5.50

-

-

0.1818

-

Fence Erection, Chestnut Pailings, posts at 1.5m

m

hours

-

23.80

-

-

0.0420

-

Fencing Works

59

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Fence Erection, Chestnut Pailings, posts at 2.0m

m

hours

-

33.30

-

-

0.0300

-

Fence Erection, Chestnut Pailings, posts at 3.0m

m

hours

-

41.60

-

-

0.0240

-

Fence Erection, Barbed Wire, posts at 1.5m

m

hours

-

71.40

-

-

0.0140

-

Fence Erection, Barbed Wire, posts at 2.0m

m

hours

-

100.00

-

-

0.0100

-

Fence Erection, Barbed Wire, posts at 3.0m

m

hours

-

125.00

-

-

0.0080

-

Gate Erection, Chainlink on frame

no

hours

-

4.10

-

-

0.2439

-

Setup small 2 hole system

days

-

-

-

Setup large 15 hole system

days

-

-

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Dewatering 10.00 -

8.00 21.00

6.00 -

Calculate system times per pump

pump

days

-

0.4000

-

-

2.50

-

Setup Recharge System

pump

days

-

0.2857

-

-

3.50

-

-

2.50

-

Demolition Weight, Structural Steel

Tonnes

m3

Remove & Cart away, Ceramic Wall Tiles

m2

hours

-

0.4000

-

0.5000

0.4000

0.2941

Remove & Cart away, Wallpaper, 1 layer

m2

hours

-

8.70

Remove & Cart away, Wallpaper, 2 layers

m2

hours

-

7.10

-

-

0.1149

-

-

-

0.1408

Remove & Cart away, Wallpaper, 3 layers

m2

hours

-

5.70

-

-

-

0.1754

Remove & Cart away, Lathe and Plaster Ceilings

m2

hours

-

5.00

0.3125

0.2174

0.2000

Remove & Cart away, Plaster to Walls

m2

hours

Remove & Cart away, External Render

m2

hours

-

3.90

-

5.90

0.4762

0.3226

0.1695

-

0.2564

Remove & Cart away, Floor Screed

m2

hours

-

3.20

-

-

-

0.3125

Remove & Cart away, Concrete Paving

m2

hours

-

-

4.00

-

-

0.2500

Remove & Cart away, Brickwork Walls, 1.0 brick thick

m2

hours

-

-

1.30

-

-

0.7692

Remove & Cart away, Brickwork Walls, 0.5 brick thick

m2

-

hours

-

2.60

-

-

0.3846

Remove & Cart away, Brickwork Walls, Sand/Lime Mortar

-

100

hours

-

0.5556

-

-

1.80

-

Remove & Cart away, Fireplace and Hearth

no

hours

-

0.5263

-

-

1.90

-

Remove & Cart away, Floor Boards

m2

hours

-

6.20

-

-

0.1613

-

Remove & Cart away, Skirting, Architrave, Dado rail etc

m

hours

-

16.50

-

-

0.0606

-

Remove & Cart away, Staircase

no

hours

-

0.1370

-

-

7.30

-

Remove & Cart away, Windows, 0-1m2

no

hours

-

1.6667

-

-

0.60

-

Remove & Cart away, Windows 1-2m2

no

hours

-

1.2500

-

-

0.80

-

Remove & Cart away, Windows 2-3m2

no

hours

-

1.1111

-

-

0.90

-

Remove & Cart away, Doors

no

hours

-

3.3333

-

-

0.30

-

Remove & Cart away, Door Frame

no

hours

-

10.0000

-

-

0.10

-

Remove & Cart away, Floor and Ceiling Joists

m

hours

-

0.9091

-

-

1.10

-

Remove & Cart away, Wall Plates

m

hours

-

0.2564

-

-

3.90

-

Remove & Cart away, Iron Bath

no

hours

-

0.7143

-

-

1.40

-

Remove & Cart away, Wash Basin/Sink

no

hours

-

1.2500

-

-

0.80

-

Remove & Cart away, Pipework including brackets etc

m

hours

-

6.10

-

-

0.1639

-

Concrete Slabs, unreinforced 50-150mm

m3

hours

0.3125

-

0.5263

3.20

-

1.90

Concrete Slabs, unreinforced 150-300mm

m3

hours

0.1818

0.2439

0.2703

5.50

4.10

3.70

Concrete Slabs, reinforced 50-150mm

m3

hours

0.1923

-

0.2564

5.20

-

3.90

Concrete Slabs, reinforced 150-300mm

m3

hours

0.1099

0.1613

0.2128

9.10

6.20

4.70

Concrete Walls, unreinforced

m3

hours

0.2128

0.2564

0.3226

4.70

3.90

3.10

Concrete Walls, reinforced

m3

hours

0.1786

0.2128

0.2564

5.60

4.70

3.90

Concrete Foundations, unreinforced

m3

hours

0.2778

0.3030

0.3333

3.60

3.30

3.00

Concrete Foundations, reinforced

m3

hours

0.1852

0.1961

0.2083

5.40

5.10

4.80

Concrete Beams

m3

hours

0.1333

0.1538

0.1786

7.50

6.50

5.60

Concrete Columns

m3

hours

0.1087

0.1220

0.1370

9.20

8.20

7.30

2.00

2.50

3.20

4.60

2.10

3.10

3.40

Breaking Out

60

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Tarmac paving 20-50mm thick

m3

hours

0.5263

0.5882

0.6667

1.90

1.70

1.50

Tarmac paving 50-100mm thick

m3

hours

0.4762

-

0.6250

2.10

-

1.60

Tarmac paving 100-150mm thick

m3

hours

0.4762

-

0.5882

2.10

-

Tarmac roadway 150mm thick

m3

hours

-

0.2778

-

Brickwork, walls and columns

m3

hours

0.4167

0.5556

0.7692

2.40

1.80

1.30

Brickwork, foundations

m3

hours

0.3704

0.4762

0.6667

2.70

2.10

1.50

Pre Drilling, Rercussive or Rotary, soft deposits

m

hours

8.00

10.00

14.00

0.1250

0.1000

0.0714

Pre Drilling, Wash Boring, grade V/IV rock

m

hours

2.50

3.20

3.90

0.4000

0.3125

0.2564

Pre Drilling, Triple Tube Sampling, grade V/IV rock

m

hours

0.40

0.80

0.90

2.5000

1.2500

1.1111

Pre Drilling, Rotary, grade III/II rock

m

hours

0.20

0.50

0.70

5.0000

2.0000

1.4286

Pre Drilling, Triple Tube Sampling, grade III/II rock

m

hours

0.10

0.40

0.70

10.0000

2.5000

1.4286

Asphalt coatings, horizontal surfaces

m2

hours

3.50

4.20

5.80

0.2857

0.2381

0.1724

Asphalt coatings, vertical surfaces

m2

hours

1.20

1.70

2.20

0.8333

0.5882

0.4545

Bituminous Brushed application, 2 coats

m2

hours

4.80

5.00

6.30

0.2083

0.2000

0.1587

Bituminous Brushed application, 3 coats

m2

hours

3.30

3.50

4.40

0.3030

0.2857

0.2273

Bituminous Sheets, horizontal surfaces

m2

hours

3.80

4.00

4.80

0.2632

0.2500

0.2083

Bituminous Sheets, vertical surfaces

m2

hours

3.30

3.50

4.20

0.3030

0.2857

0.2381

Polythene Sheets, horizontal surfaces

m2

hours

-

0.0500

-

Bentonite Sheets, horizontal surfaces

m2

hours

31.30

0.0535

0.0400

0.0319

Bentonite Sheets, vertical surfaces

m2

hours

17.30

0.0893

0.0667

0.0578

Epoxy Based application, 1 coat

m2

hours

-

75.00

-

-

0.0133

-

Epoxy Based application, 2 coat

m2

hours

-

38.00

-

-

0.0263

-

FST Floating Track Slab, side restraints

m

days

9.60

-

-

0.1042

-

-

FST Floating Track Slab, resin pads

m

days

10.20

-

-

0.0980

-

-

FST Floating Track Slab, slab units

m

days

10.60

-

-

0.0943

-

-

PCBT - Pre-cast Concrete Block Track, in Bored Tunnels

m

days

17.10

41.00

-

0.0585

0.0244

-

PCBT - Pre-cast Concrete Block Track, in Cut and Cover Tunnels

m

days

-

35.00

-

-

0.0286

-

PCBT - Pre-cast Concrete Block Track, in Station Tunnels

m

days

-

35.00

-

-

0.0286

-

IST - Isolated Slab Track, in Bored Tunnels

m

days

-

20.00

-

-

0.0500

-

IST - Isolated Slab Track, in Cut and Cover Tunnels

m

days

-

34.00

-

-

0.0294

-

IST - Isolated Slab Track, in Station

m

days

-

29.00

-

-

0.0345

-

FST - Floating Slab Track, in Station

m

days

5.70

0.2778

0.2174

0.1754

Ballasted Track, in Mainline

m

days

115.00

0.0175

0.0141

0.0087

Ballasted Track, in Depot

m

days

-

0.0357

-

Non-Ballasted Track, in Depot

m

days

0.1176

0.0781

0.0575

Embedded / Paved Track, in Depot

m

days

-

71.00

-

-

0.0141

-

Heavy Maintenance / Train Wash Track, in Depot

m

days

-

29.00

-

-

0.0345

-

Maintenance Pit, in Depot

m

days

-

52.00

-

-

0.0192

-

Siding Trackwork, in Depot

m

days

-

38.00

-

-

0.0263

-

no

days

-

0.8333

-

-

1.2000

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

-

Fast

3.60

1.70 -

Site Investigation

Waterproofing

-

20.00 18.70

25.00

11.20

15.00

-

Trackwork

3.60

4.60

57.00

71.00

-

28.00 8.50

-

12.80

17.40

Structural Steelwork Simple Universal Beam Steel Bridge, erect support steel H frames

61

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

m

days

-

3.30

-

-

0.3030

-

Horizontal heavy duty strutting

no

days

-

0.5000

-

-

2.00

-

Diagonal heavy duty strutting

no

days

-

0.1667

-

-

6.00

-

-

DESCRIPTION

ITEM NO.

Simple Universal Beam Steel Bridge, erect 15m truss

REMARKS Slow

Average

Fast

Slow

Average

Fast

Steel Strutting

Reinforcement Ratios Pile Cap, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

14.80

-

-

-

Base Slab, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

13.20

14.10

-

-

-

Suspended Slab, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

20.60

25.60

-

-

-

Platform Slab, Concrete m3 x Ratio = Rebar Tonnes

% ratio

-

15.60

-

-

-

Columns, Concrete m3 x Ratio = Rebar Tonnes

% ratio

15.80

18.70

-

-

-

Walls, Concrete m3 x Ratio = Rebar Tonnes

% ratio

14.70

15.00

-

-

-

28.70 -

Reinforcement Slabs/Foundations, steelfixing, 6mm

tonne

hours

0.0248

0.0260

0.0274

40.30

38.40

36.50

Slabs/Foundations, steelfixing, 8mm

tonne

hours

0.0355

0.0372

0.0388

28.20

26.90

25.80

Slabs/Foundations, steelfixing, 10mm

tonne

hours

0.0444

0.0485

0.0498

22.50

20.60

20.10

Slabs/Foundations, steelfixing, 12mm

tonne

hours

0.0592

0.0613

0.0649

16.90

16.30

15.40

Slabs/Foundations, steelfixing, 16mm

tonne

hours

0.0833

0.0870

0.0917

12.00

11.50

10.90

Slabs/Foundations, steelfixing, 20mm

tonne

hours

0.1087

0.1163

0.1220

9.20

8.60

8.20

Slabs/Foundations, steelfixing, 25mm

tonne

hours

0.1449

0.1493

0.1538

6.90

6.70

6.50

Slabs/Foundations, steelfixing, 32mm

tonne

hours

0.1754

0.1818

0.1923

5.70

5.50

5.20

Slabs/Foundations, steelfixing, 40mm

tonne

hours

0.1887

0.1961

0.2041

5.30

5.10

4.90

Slabs/Foundations, steelfixing, 50mm

tonne

hours

0.1923

0.2041

0.2174

5.20

4.90

4.60

Beams/Columns, steelfixing, 6mm

tonne

hours

0.0181

0.0189

0.0198

55.40

52.80

50.60

Beams/Columns, steelfixing, 8mm

tonne

hours

0.0258

0.0270

0.0285

38.80

37.00

35.10

Beams/Columns, steelfixing, 10mm

tonne

hours

0.0339

#VALUE!

0.0372

29.50

28.4

26.90

Beams/Columns, steelfixing, 12mm

tonne

hours

0.0427

0.0446

0.0457

23.40

22.40

21.90

Beams/Columns, steelfixing, 16mm

tonne

hours

0.0602

0.0633

0.0662

16.60

15.80

15.10

Beams/Columns, steelfixing, 20mm

tonne

hours

0.0806

0.0840

0.0885

12.40

11.90

11.30

Beams/Columns, steelfixing, 25mm

tonne

hours

0.1010

0.1087

0.1149

9.90

9.20

8.70

Beams/Columns, steelfixing, 32mm

tonne

hours

0.1471

0.1515

0.1613

6.80

6.60

6.20

Beams/Columns, steelfixing, 40mm

tonne

hours

0.1639

0.1695

0.1786

6.10

5.90

5.60

Beams/Columns, steelfixing, 50mm

tonne

hours

0.1639

0.1695

0.1786

6.10

5.90

5.60

Walls, steelfixing, 6mm

tonne

hours

0.0243

0.0245

0.0256

41.20

40.80

39.10

Walls, steelfixing, 8mm

tonne

hours

0.0342

0.0350

0.0365

29.20

28.60

27.40

Walls, steelfixing, 10mm

tonne

hours

0.0441

0.0455

0.0472

22.70

22.00

21.20

Walls, steelfixing, 12mm

tonne

hours

0.0568

0.0578

0.0592

17.60

17.30

16.90

Walls, steelfixing, 16mm

tonne

hours

0.0806

0.0820

0.0847

12.40

12.20

11.80

Walls, steelfixing, 20mm

tonne

hours

0.1064

0.1087

0.1149

9.40

9.20

8.70

Walls, steelfixing, 25mm

tonne

hours

0.1351

0.1389

0.1429

7.40

7.20

7.00

Walls, steelfixing, 32mm

tonne

hours

0.1429

0.1471

0.1563

7.00

6.80

6.40

Walls, steelfixing, 40mm

tonne

hours

0.1563

0.1639

0.1695

6.40

6.10

5.90

Walls, steelfixing, 50mm

tonne

hours

0.1887

0.1961

0.2083

5.30

5.10

4.80

Staircases, steelfixing, 6mm

tonne

hours

0.0204

0.0208

0.0220

48.90

48.00

45.50

Staircases, steelfixing, 8mm

tonne

hours

0.0291

0.0298

0.0313

34.40

33.60

31.90

Staircases, steelfixing, 10mm

tonne

hours

0.0376

0.0388

0.0412

26.60

25.80

24.30

Staircases, steelfixing, 12mm

tonne

hours

0.0478

0.0490

0.0513

20.90

20.40

19.50

Staircases, steelfixing, 16mm

tonne

hours

0.0685

0.0694

0.0725

14.60

14.40

13.80

62

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Staircases, steelfixing, 20mm

tonne

hours

0.0885

0.0926

0.0952

11.30

10.80

10.50

Staircases, steelfixing, 25mm

tonne

hours

0.1163

0.1190

0.1220

8.60

8.40

8.20

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Post Tensioning Lag for Initial Stress Tensioning after 1st bay cast

hrs

-

-

-

-

48.00

-

Lag for Final Stress Tensioning after Initial Stress

hrs

-

-

-

-

120.00

-

Metal Decking Metal Decking, large areas

m2

days

-

70.00

-

-

0.0143

-

Metal Decking, small or complicated

m2

days

-

28.00

-

-

0.0357

-

Titanium Sheeted Roofs

m2

days

-

9.50

-

-

0.1053

-

Copper Roofs, flat work

m2

days

-

3.00

-

-

0.3333

-

Copper Roofs, sloping work

m2

days

-

2.70

-

-

0.3704

-

Zinc Roofs, flat work

m2

days

-

2.40

-

-

0.4167

-

Zinc Roofs, sloping work

m2

days

-

2.10

-

-

0.4762

-

Aluminium Roofs, flat work

m2

days

-

2.80

-

-

0.3571

-

Aluminium Roofs, sloping work

m2

days

-

1.90

-

-

0.5263

-

Lead Roofs, flat work

m2

days

-

2.50

-

-

0.4000

-

Lead Roofs, sloping work

m2

days

-

2.10

-

-

0.4762

-

Lead Roofs, dormer cheeks

m2

days

-

1.30

-

-

0.7692

-

Lead Roofs, flat gutters

m

days

-

88.00

-

-

0.0114

-

Lead Roofs, flat copings

m

days

-

76.00

-

-

0.0132

-

Lead Roofs, stepped gutters

m

days

-

3.50

-

-

0.2857

-

Lead Roofs, shaped copings

m

days

-

3.30

-

-

0.3030

-

Lead Roofs, cover step flashings

m

days

-

3.20

-

-

0.3125

-

Lead Roofs, rooflight flashings

no

days

-

0.80

-

-

1.2500

-

Lead Roofs, domed roof coverings

m2

days

-

0.70

-

-

1.4286

-

Land Drains, Concrete, butt jointed, under 150mm dia, 0-5m run

m

hours

-

11.60

-

-

0.0862

-

Land Drains, Concrete, butt jointed, under 150mm dia, 5-30m run

m

hours

-

14.10

-

-

0.0709

-

Land Drains, Concrete, butt jointed, under 150mm dia, over 30m run

m

hours

-

18.80

-

-

0.0532

-

Land Drains, Concrete, butt jointed, 150-225mm dia, 0-5m run

m

hours

-

8.40

-

-

0.1190

-

Land Drains, Concrete, butt jointed, 150-225mm dia, 5-30m run

m

hours

-

10.20

-

-

0.0980

-

Land Drains, Concrete, butt jointed, 150-225mm dia, over 30m run

m

hours

-

11.90

-

-

0.0840

-

Land Drains, Concrete, butt jointed, 225-300mm dia, 0-5m run

m

hours

-

5.40

-

-

0.1852

-

Land Drains, Concrete, butt jointed, 225-300mm dia, 5-30m run

m

hours

-

6.50

-

-

0.1538

-

Land Drains, Concrete, butt jointed, 225-300mm dia, over 30m run

m

hours

-

7.90

-

-

0.1266

-

Pilecaps, < 0.7m2

m2

hours

0.90

1.60

2.00

1.1111

0.6250

0.5000

Pilecaps, 0.7-2.5m2

m2

hours

1.60

2.00

2.30

0.6250

0.5000

0.4348

Pilecaps, 2.5-3.0m2

m2

hours

2.00

2.30

2.50

0.5000

0.4348

0.4000

Pilecaps, > 3.0m2

m2

hours

2.30

2.50

3.10

0.4348

0.4000

0.3226

Ground Beams, < 0.7m2

m2

hours

1.10

1.70

1.80

0.9091

0.5882

0.5556

Ground Beams, 0.7-1.5m2

m2

hours

1.70

1.80

2.50

0.5882

0.5556

0.4000

Ground Beams, 1.5-3.0m2

m2

hours

1.80

2.50

2.60

0.5556

0.4000

0.3846

Ground Beams, 3.0-5.0m2

m2

hours

2.50

2.60

3.50

0.4000

0.3846

0.2857

Elevated Plain Slab Soffit

m2

hours

0.60

0.80

1.20

1.6667

1.2500

0.8333

Beams, on erected falsework, width 100-200mm

m2

hours

0.90

1.00

1.10

1.1111

1.0000

0.9091

Beams, on erected falsework, width 200-300mm

m2

hours

1.00

1.10

1.30

1.0000

0.9091

0.7692

Land Drains

Formwork

63

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Beams, on erected falsework, width 300-500mm

m2

hours

1.20

1.30

1.50

0.8333

0.7692

0.6667

Beams, on erected falsework, width 500-750mm

m2

hours

1.50

1.60

1.80

0.6667

0.6250

0.5556

Beams, on erected falsework, width over 750mm

m2

hours

1.40

1.50

1.70

0.7143

0.6667

0.5882

Walls, Construct Kickers

m2

hours

5.30

7.10

10.00

0.1887

0.1408

0.1000

Walls, Fully Framed Formwork/Struts, 1.0-2.0m2

m2

hours

0.90

1.80

1.90

1.1111

0.5556

0.5263

Walls, Fully Framed Formwork/Struts, 2.0-5.0m2

m2

hours

1.00

2.20

2.50

1.0000

0.4545

0.4000

Walls, Fully Framed Formwork/Struts, over 5.0m2

m2

hours

1.20

2.50

2.90

0.8333

0.4000

0.3448

Walls, StoriForm Shutters, 1.0-3.0m2

m2

hours

1.00

1.40

2.00

1.0000

0.7143

0.5000

Walls, StoriForm Shutters, 3.0-5.0m2

m2

hours

1.90

2.30

3.30

0.5263

0.4348

0.3030

Walls, StoriForm Shutters, 5.0-10.0m2

m2

hours

2.30

2.80

3.50

0.4348

0.3571

0.2857

Walls, StoriForm Shutters, 10.0-15.0m2

m2

hours

3.20

4.50

4.00

0.3125

0.2222

0.2500

Walls, StoriForm Shutters, over 15.0m2

m2

hours

3.80

4.80

5.40

0.2632

0.2083

0.1852

Ground Slabs

m2

hours

1.00

1.50

1.80

1.0000

0.6667

0.5556

Columns, Construct Kickers, direct to slab

no

hours

3.20

4.10

5.40

0.3125

0.2439

0.1852

Columns, Construct Kickers, suspended from soffit slab

no

hours

1.20

2.80

3.20

0.8333

0.3571

0.3125

Columns, Square Sides, Timber Clamp/Prop, csa < 0.1m2

m2

hours

1.30

1.60

1.80

0.7692

0.6250

0.5556

Columns, Square Sides, Timber Clamp/Prop, csa 0.1-0.4m2

m2

hours

1.80

2.10

2.40

0.5556

0.4762

0.4167

Columns, Square Sides, Timber Clamp/Prop, csa over 0.4m2

m2

hours

2.00

2.30

2.50

0.5000

0.4348

0.4000

Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high

m2

hours

7.90

9.50

10.30

0.1266

0.1053

0.0971

Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high

m2

hours

6.90

7.50

8.30

0.1449

0.1333

0.1205

Columns, Square Sides, Steel Forms, 2.0 x 4.0 x 9.0m high

m2

hours

8.50

10.20

12.00

0.1176

0.0980

0.0833

Columns, Round Sides, Sacrificial Plastic Mould, 3.0-4.0m dia

m2

hours

3.50

4.50

6.00

0.2857

0.2222

0.1667

Columns, Round Sides, Steel Mould, 3.0-4.0m dia

m2

hours

5.20

6.50

7.50

0.1923

0.1538

0.1333

Columns, Sloping Column Heads, extra over rate

no

hours

0.40

0.29

-

Staircases, Stair Soffit, Sloping

m2

hours

0.70

0.80

1.00

Staircases, Stair Soffit, Flat Landing

m2

hours

0.80

0.90

1.20

Staircases, Wall Strings

m2

hours

0.40

0.60

-

Staircases, Open Strings

m2

hours

0.70

0.80

-

Staircases, Riser Boards fixed to strings

m2

hours

-

Staircases, Risers fixed to Strings

m2

hours

-

Waffle Flooring, 2.4m grid

m2

hours

Shaft Slip Forming

mm

hours

Table Form, Aluminum System, 400m2 bays

m2

hours

Table Form, H-Frame Steel Falsework, 400m2 bays

m2

hours

Tunnel Forms, Wall and Slab poured as one

m2

hours

Hollorib Decking, lay deck

m2

Hollorib Decking, shear connecting studs

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

-

Fast

Slow

Average

Fast

2.50

3.50

1.4286

1.2500

1.0000

1.2500

1.1111

0.8333

2.5000

1.6667

-

1.4286

1.2500

-

-

0.4000

0.3571

2.50

2.80

2.30

2.60

-

0.4348

0.3846

1.40

1.80

0.9091

0.7143

0.5556

300.00

500.00

-

0.0033

0.0020

2.10

3.20

3.80

0.4762

0.3125

0.2632

1.90

3.00

3.50

0.5263

0.3333

0.2857

-

15.60

17.50

-

0.0641

0.0571

hours

-

43.50

47.50

-

0.0230

0.0211

m2

hours

-

29.30

31.20

-

0.0341

0.0321

Stop Ends, no perforations

m2

hours

2.80

3.50

4.20

0.3571

0.2857

0.2381

Stop Ends, minor perforations

m2

hours

1.20

1.50

1.90

0.8333

0.6667

0.5263

Stop Ends, dense perforations

m2

hours

0.90

1.10

1.40

1.1111

0.9091

0.7143

Box Outs, 0.01-0.05m2

no

hours

7.60

8.20

9.10

0.1316

0.1220

0.1099

Box Outs, over 0.05m2

no

hours

3.10

3.90

4.50

0.3226

0.2564

0.2222

Dummy Frames, under 3.0m2

no

hours

4.50

6.20

7.10

0.2222

0.1613

0.1408

Dummy Frames, over 3.0m2

no

hours

3.10

3.70

4.50

0.3226

0.2703

0.2222

m

days

-

0.1408

-

Cutting in Concrete, small box

no

hours

7.10

9.50

12.50

0.1408

0.1053

0.0800

Cutting in Concrete, large box

no

hours

3.60

4.50

5.60

0.2778

0.2222

0.1786

Cutting in Brickwork, small box

no

hours

6.60

9.50

12.50

0.1515

0.1053

0.0800

Cutting in Brickwork, large box

no

hours

4.20

5.30

6.30

0.2381

0.1887

0.1587

Cutting in Lightweight Blockwork, small box

no

hours

20.00

23.00

25.00

0.0500

0.0435

0.0400

Cutting in Lightweight Blockwork, large box

no

hours

10.00

12.50

14.30

0.1000

0.0800

0.0699

1.10 -

Decking Simple Universal Beam Steel Bridge, concrete bridge deck, grano cover

-

7.10

-

Cutting Switchboxes

64

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Cutting in Heavyweight Blockwork, small box

no

hours

7.70

10.00

12.50

0.1299

0.1000

0.0800

Cutting in Heavyweight Blockwork, large box

no

hours

3.80

4.80

5.90

0.2632

0.2083

0.1695

Concrete, cutting by hand, < 25mm wide

m

hours

1.50

2.10

3.10

0.6667

0.4762

0.3226

Concrete, cutting by hand, 25-50mm wide

m

hours

1.20

1.60

2.50

0.8333

0.6250

0.4000

Concrete, cutting by hand, 50-75mm wide

m

hours

1.00

1.40

2.10

1.0000

0.7143

0.4762

Concrete, cutting by hand, 75-100mm wide

m

hours

0.90

1.20

1.80

1.1111

0.8333

0.5556

Concrete, cutting by machine, < 25mm wide

m

hours

3.10

4.00

5.80

0.3226

0.2500

0.1724

Concrete, cutting by machine, 25-50mm wide

m

hours

2.50

3.30

5.00

0.4000

0.3030

0.2000

Concrete, cutting by machine, 50-75mm wide

m

hours

2.10

2.90

4.20

0.4762

0.3448

0.2381

Concrete, cutting by machine, 75-100mm wide

m

hours

1.80

2.40

3.70

0.5556

0.4167

0.2703

Brickwork, cutting by hand, < 25mm wide

m

hours

2.10

2.70

4.10

0.4762

0.3704

0.2439

Brickwork, cutting by hand, 25-50mm wide

m

hours

1.60

2.30

3.50

0.6250

0.4348

0.2857

Brickwork, cutting by hand, 50-75mm wide

m

hours

1.40

1.90

2.80

0.7143

0.5263

0.3571

Brickwork, cutting by hand, 75-100mm wide

m

hours

1.20

1.60

2.50

0.8333

0.6250

0.4000

Brickwork, cutting by machine, < 25mm wide

m

hours

4.20

5.50

11.10

0.2381

0.1818

0.0901

Brickwork, cutting by machine, 25-50mm wide

m

hours

3.30

4.50

6.70

0.3030

0.2222

0.1493

Brickwork, cutting by machine, 50-75mm wide

m

hours

3.30

4.50

6.70

0.3030

0.2222

0.1493

Brickwork, cutting by machine, 75-100mm wide

m

hours

2.50

3.30

5.00

0.4000

0.3030

0.2000

Light Blockwork, cutting by hand, < 25mm wide

m

hours

3.80

5.00

7.70

0.2632

0.2000

0.1299

Light Blockwork, cutting by hand, 25-50mm wide

m

hours

3.20

4.20

6.30

0.3125

0.2381

0.1587

Light Blockwork, cutting by hand, 50-75mm wide

m

hours

2.60

3.40

5.30

0.3846

0.2941

0.1887

Light Blockwork, cutting by hand, 75-100mm wide

m

hours

2.30

3.10

4.50

0.4348

0.3226

0.2222

Light Blockwork, cutting by machine, < 25mm wide

m

hours

7.70

10.00

14.20

0.1299

0.1000

0.0704

Light Blockwork, cutting by machine, 25-50mm wide

m

hours

5.90

7.70

11.10

0.1695

0.1299

0.0901

Light Blockwork, cutting by machine, 50-75mm wide

m

hours

5.20

7.20

10.00

0.1923

0.1389

0.1000

Light Blockwork, cutting by machine, 75-100mm wide

m

hours

4.70

6.30

9.10

0.2128

0.1587

0.1099

Heavy Blockwork, cutting by hand, < 25mm wide

m

hours

1.90

2.60

3.80

0.5263

0.3846

0.2632

Heavy Blockwork, cutting by hand, 25-50mm wide

m

hours

1.60

2.10

3.20

0.6250

0.4762

0.3125

Heavy Blockwork, cutting by hand, 50-75mm wide

m

hours

1.30

1.80

2.70

0.7692

0.5556

0.3704

Heavy Blockwork, cutting by hand, 75-100mm wide

m

hours

1.20

1.50

2.30

0.8333

0.6667

0.4348

Heavy Blockwork, cutting by machine, < 25mm wide

m

hours

3.80

5.00

7.70

0.2632

0.2000

0.1299

Heavy Blockwork, cutting by machine, 25-50mm wide

m

hours

3.20

4.20

6.20

0.3125

0.2381

0.1613

Heavy Blockwork, cutting by machine, 50-75mm wide

m

hours

2.70

3.60

5.20

0.3704

0.2778

0.1923

Heavy Blockwork, cutting by machine, 75-100mm wide

m

hours

2.30

3.10

4.50

0.4348

0.3226

0.2222

Concrete Pile Caps, 50-300mm deep and 0.6m dia

no

hours

1.6667

-

3.3333

0.60

-

0.30

Concrete Pile Caps, 300-750mm deep and 0.6m dia

no

hours

0.6667

-

2.5000

1.50

-

0.40

Concrete Pile Caps, > 750mm deep and 0.6m dia

no

hours

0.5556

-

1.2500

1.80

-

0.80

Concrete Pile Caps, 50-300mm deep and 1.1m dia

no

hours

0.5263

-

1.2500

1.90

-

0.80

Concrete Pile Caps, 300-750mm deep and 1.1m dia

no

hours

0.4000

-

0.9091

2.50

-

1.10

Concrete Pile Caps, > 750mm deep and 1.1m dia

no

hours

0.2381

-

0.4348

4.20

-

2.30

Concrete Pile Caps, 50-300mm deep and 2.5m dia

no

hours

0.1087

-

0.1220

9.20

-

8.20

Concrete Pile Caps, 300-750mm deep and 2.5m dia

no

hours

0.0990

-

0.1053

10.10

-

9.50

Concrete Pile Caps, > 750mm deep and 2.5m dia

no

hours

0.0870

-

0.0980

11.50

-

10.20

Concrete, Cutting Slabs, 5-25m deep

m

hours

-

15.20

-

-

0.0658

-

Concrete, Cutting Slabs, 25-50m deep

m

hours

-

11.50

-

-

0.0870

-

Concrete, Cutting Slabs, 50-75m deep

m

hours

-

6.70

-

-

0.1493

-

Concrete, Cutting Holes, coring machine

m3

hours

-

0.20

-

-

5.0000

-

Concrete, Cutting Back to expose couplers 0.7m slab

m

days

-

2.50

-

-

0.4000

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Cutting Chases

Cutting Back

65

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Placing concrete, lorry based pump

m3

hours

30.00

40.00

50.00

0.0333

0.0250

0.0200

Hollorib Decking, concrete topping

m2

hours

85.00

100.00

120.00

0.0118

0.0100

0.0083

Hollorib Decking, concrete topping, incl PowerFloat

m2

hours

40.00

50.00

70.00

0.0250

0.0200

0.0143

Placing Concrete, By Wheelbarrow over 1-10m

m3

hours

2.10

2.30

2.50

0.4762

0.4348

0.4000

Placing Concrete, By Wheelbarrow over 10-20m

m3

hours

1.50

1.80

2.10

0.6667

0.5556

0.4762

Placing Concrete, By Wheelbarrow over 20-50m

m3

hours

0.80

1.10

1.50

1.2500

0.9091

0.6667

Placing Direct From Readymix Lorry, Mass Fill

m3

hours

2.80

3.10

3.30

0.3571

0.3226

0.3030

Placing Direct From Readymix Lorry, 50mm Blinding

m3

hours

1.30

1.60

-

0.7692

0.6250

Placing Direct From Readymix Lorry, Ground Beams

m3

hours

1.50

-

1.70

0.6667

-

0.5882

Placing Direct From Readymix Lorry, Pile Caps

m3

hours

1.00

1.50

2.30

1.0000

0.6667

0.4348

Placing Direct From Readymix Lorry, Duct Walls

m3

hours

-

0.80

1.10

-

1.2500

0.9091

Placing Direct From Readymix Lorry, Stub Columns

m3

hours

-

0.40

0.60

-

2.5000

1.6667

Placing Direct From Readymix Lorry, Ground Slab

m3

hours

2.30

2.60

0.4762

0.4348

0.3846

Placing Direct From Readymix Lorry,Drains Bed and Cover

m3

hours

0.90

1.00

-

1.1111

1.0000

Placing From Tower Crane, Pile Caps

m3

hours

1.20

1.40

1.60

0.8333

0.7143

0.6250

Placing From Tower Crane, Mass Fill

m3

hours

4.00

4.50

5.50

0.2500

0.2222

0.1818

Placing From Tower Crane, Slabs under 150mm thick

m3

hours

0.90

1.30

1.70

1.1111

0.7692

0.5882

Placing From Tower Crane, Slabs over 150mm thick

m3

hours

1.20

1.50

1.80

0.8333

0.6667

0.5556

Placing From Tower Crane, Trough/Coffered Slabs

m3

hours

0.90

1.10

1.20

1.1111

0.9091

0.8333

Placing From Tower Crane, Stairs and Landings

m3

hours

0.60

0.70

0.90

1.6667

1.4286

1.1111

Placing From Tower Crane, Blinding

m3

hours

0.80

1.00

1.10

1.2500

1.0000

0.9091

Placing From Tower Crane, Beams under 150mm thick

m3

hours

0.50

0.60

0.80

2.0000

1.6667

1.2500

Placing From Tower Crane, Beams over 150mm thick

m3

hours

0.60

0.80

1.00

1.6667

1.2500

1.0000

Placing From Tower Crane, Walls

m3

hours

0.60

1.10

1.50

1.6667

0.9091

0.6667

Placing From Tower Crane, Columns

m3

hours

0.40

0.50

0.60

2.5000

2.0000

1.6667

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Concrete Placement

-

2.10 -

Concrete Mixing Concrete Weight, 1m3

Tonnes

-

2.40

-

-

-

-

Readymix Lorry, Length

m

-

8.30

-

-

-

-

Readymix Lorry, Width

m

-

2.50

-

-

-

-

Readymix Lorry, Height

m

-

3.70

-

-

-

-

Readymix Lorry, Length

Tonnes

-

24.40

-

-

-

-

m

-

16.40

-

-

-

-

degrees

-

17.00

-

-

-

-

0.30

-

3.3333

-

210.00

0.0063

0.0056

0.0048

420.00

Readymix Lorry, Turning Circle Readymix Lorry, Allowable Access Ramp Gradient

20.00

Mixing Concrete, By Hand

m3

hours

Mixing Concrete, Single Drum Paddle Mixer

m3

hours

Mixing Concrete, Double Drum Paddle Mixer

m3

hours

0.0032

0.0027

0.0024

Mixing Concrete, Single Drum Plant Pan Mixer

m3

hours

-

120.00

-

-

0.0083

-

Mixing Concrete, Dry Mix Plant

m3

hours

-

90.00

-

-

0.0111

-

158.00

180.00

315.00

370.00

-

Barrette Piles Rule of Thumb, overall rate by Mill

no

hours

2.0000

0.9091

0.8333

cage

hours

-

0.2500

-

Concreting barrette panels

m3

hours

40.00

50.00

55.00

Trimming top of barrette panels

no

days

-

0.4167

-

Concrete Testing, Coring Test

no

days

0.2500

0.2857

0.5000

Concrete Testing, Sonic Logging Test

no

days

-

1.4286

-

Uncased Anchors, 10m long

no

days

-

2.00

-

-

0.5000

-

Top Cased Anchors, 15m long

no

days

-

1.00

-

-

1.0000

-

Anchors stressing

no

days

-

2.20

-

-

0.4545

-

Fabricate reinforcement cages

0.50 -

1.10 4.00

0.0250 -

0.0200 2.40

4.00 -

1.20 0.0182 -

3.50 0.70

2.00 -

Bell Ground Anchors

66

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Cycle Time, 5-20m deep

no

days

0.1250

0.2500

0.2500

8.00

4.00

Cycle Time, 20-40m deep

no

days

0.1000

0.1250

-

10.00

8.00

-

Cycle Time, 40-70m deep

no

days

0.0400

0.1000

-

25.00

10.00

-

Cycle Time, 70-90m deep

no

days

0.0222

0.0400

-

45.00

25.00

-

Cycle Time, 90-135m deep

no

days

0.0167

0.0222

-

60.00

45.00

-

2.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Bored Piling

Move piling setup to next location

hours

-

4.00

Excave shaft by grab, general fill/uppr levels

m

hours

-

3.50

-

-

0.2857

-

Excave shaft by grab, sand/minor rubble

m

hours

-

2.10

-

-

0.4762

-

Excave shaft by grab, marinve/aluvium

m

hours

-

2.50

-

-

0.4000

-

Excave shaft by grab/RCD, CDT

m

hours

-

0.50

-

-

2.0000

-

Excave shaft by grab/RCD, CDG 200/gravel

m

hours

-

0.50

-

-

2.0000

-

Excave shaft by RCD/Chisel, corestones

m

hours

-

0.50

-

-

2.0000

-

Excave Rock Socket by RCD, grade IV/V rock

m

hours

-

0.20

0.30

-

5.0000

3.3333

Excave Rock Socket by RCD, grade II/III rock

m

hours

-

0.10

0.20

-

10.0000

5.0000

Excave Rock Socket by RCD, tendering rate

m

hours

-

0.10

-

-

10.0000

-

Add/remove RCD plant

hours

-

-

-

-

2.00

-

Add/remove RCD drill string/drill bit

hours

-

-

-

-

5.00

-

Remove Obstruction, above water hand hammers

m

hours

-

0.80

-

-

1.2500

Remove Obstruction, below water heavy chisel

m

hours

-

0.50

-

-

2.0000

-

hours

-

-

-

60.00

53.00

50.00

Concrete Plug, RCD off/tremmie/concrete/cure/RCD on Install air lift tremmie tube

hours

-

-

-

-

5.00

-

cage

hours

-

0.4000

-

-

2.50

-

no

hours

-

0.5000

-

-

2.00

-

Shaft cleaning, air lifting after excavation

hours

-

-

-

-

8.0

-

Shaft cleaning, air lifting after cage installed

hours

-

-

-

-

2.0

-

Shaft concreting/extract casing 5-70m deep

hours

-

-

-

-

12.0

-

Shaft concreting/extract casing 70-95m deep

hours

-

-

-

-

14.0

-

Shaft concreting/extract casing 95-135m deep

hours

-

-

-

-

48.0

-

Concrete curing prior to remove telescopic casing

hours

-

-

-

-

72.0

-

Fabricate reinforcement cages Install reinforcement cages

Concrete Testing, Coring Test

m

hours

-

3.20

2.20

-

0.3125

Concrete Testing, Sonic Logging Test

no

hours

-

0.4000

-

-

2.50

-

0.4545

Concrete Testing, Vibration Test

no

hours

-

0.1538

-

-

6.50

-

Roof Trusses

no

hours

-

1.30

-

-

0.7692

-

Wall Plates

m

hours

-

2.70

-

-

0.3704

-

Roof Rafters

m

hours

-

1.20

-

-

0.8333

-

Ceiling Joists

m

hours

-

32.10

-

-

0.0312

-

Roof Carcass, Common Rafters, under 3m

no

hours

18.20

20.00

21.70

0.0549

0.0500

0.0461

Roof Carcass, Common Rafters, 3-6mm

no

hours

13.30

16.60

18.20

0.0752

0.0602

0.0549

Roof Carcass, Common Rafters, over 6m

no

hours

14.10

15.60

16.10

0.0709

0.0641

0.0621

Roof Carcass, Jack Rafters, under 3m

no

hours

18.80

20.10

21.70

0.0532

0.0498

0.0461

Roof Carcass, Jack Rafters, 3-6mm

no

hours

10.40

16.10

16.60

0.0962

0.0621

0.0602

Roof Carcass, Purlins, under 3m

no

hours

5.10

5.40

5.80

0.1961

0.1852

0.1724

Roof Carcass, Purlins, 3-6mm

no

hours

4.30

4.80

5.10

0.2326

0.2083

0.1961

Roof Carcass, Purlins, over 6m

no

hours

3.50

4.30

4.60

0.2857

0.2326

0.2174

Roof Carcass, Binders, under 3m

no

hours

5.70

6.60

7.60

0.1754

0.1515

0.1316

Roof Carcass, Binders, 3-6mm

no

hours

2.10

2.30

2.50

0.4762

0.4348

0.4000

Roof Carcass, Binders, over 6m

no

hours

1.30

1.50

1.60

0.7692

0.6667

0.6250

Roof Carcass, Hangers, under 3m

no

hours

8.20

9.00

9.60

0.1220

0.1111

0.1042

Timber Frames

67

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Roof Carcass, Collars under 3m

no

hours

7.60

8.00

9.10

0.1316

0.1250

0.1099

Roof Carcass, Collars 3-m

no

hours

6.50

7.40

8.30

0.1538

0.1351

0.1205

Roof Carcass, Ridge Boards under 3m

no

hours

12.00

13.10

15.30

0.0833

0.0763

0.0654

Roof Carcass, Cut Rafter Feet to line

no

hours

142.00

166.00

175.00

0.0070

0.0060

0.0057

Roof Soffits, Softwood, nailed

m

hours

-

9.20

-

-

0.1087

-

Roof Soffits, Softwood, screwed

m

hours

-

3.90

-

-

0.2564

-

Roof Soffits Asbestos, under 300mm nailed

m

hours

-

9.10

-

-

0.1099

-

Roof Soffits Asbestos, under 300mm screwed

m

hours

-

3.80

-

-

0.2632

-

Roof Soffits, Asbestos, over 300mm nailed

m

hours

-

3.50

-

-

0.2857

-

Roof Soffits, Asbestos, over 300mm screwed

m

hours

-

1.30

-

-

0.7692

-

Roof Facia Panels, Softwood

m

hours

5.10

7.20

9.30

0.1961

0.1389

0.1075

Roof Facia Panels, Asbestos

m

hours

1.30

2.50

3.90

0.7692

0.4000

0.2564

Roof Facia Panel Studding, nailed

m

hours

7.30

8.10

9.00

0.1370

0.1235

0.1111

Roof Facia Panel Studding, screwed

m

hours

4.60

5.20

5.80

0.2174

0.1923

0.1724

Roof Facia Panel Studding, bolted to beams

m

hours

5.40

5.90

6.60

0.1852

0.1695

0.1515

Roof Works, Fix Herringbone Strutting

m

hours

-

5.10

-

-

0.1961

-

Roof Works, Fix Firing Strips

m

hours

-

25.00

-

-

0.0400

-

Roof Works, Fix Drip/Tilt Filleting

m

hours

-

20.50

-

-

0.0488

-

Steel Frame and Roof Members

Tons

days

0.2941

-

0.2174

Wall Frame, Bow String Truss and Frame

Tons

days

-

1.60

-

-

0.6250

-

Roof Frame, Curved Truss and Frame

Tons

days

-

5.20

-

-

0.1923

-

Wall Frame, Glazed Frame and Atrium

Tons

days

-

0.30

-

-

3.3333

-

Slate Roofs, Welsh Slate 3-5mm

m2

days

-

18.00

-

-

0.0556

-

Slate Roofs, Cumbrian Slate 8-11mm

m2

days

-

8.50

-

-

0.1176

-

Slate Roofs, Asbestos Slates

m2

days

-

36.00

-

-

0.0278

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Steel Frames 3.40

-

4.60

Slates and Tiling

68

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Tiled Roofs, Concrete Tiles

m2

days

-

52.00

-

-

0.0192

-

Tiled Roofs, Clay Pan Tiles

m2

days

-

26.00

-

-

0.0385

-

PVC Sheeted Roofs, large areas

m2

days

-

50.00

-

-

0.0200

-

PVC Sheeted Roofs, small areas

m2

days

-

40.00

-

-

0.0250

-

Plastic Profiled Sheet Systems

m2

days

-

54.00

-

-

0.0185

-

Asphalt Roof in layers

m2

days

-

45.00

-

-

0.0222

-

Asbestos Sheets in layers

m2

days

-

39.00

-

-

0.0256

-

Felt Roofs, large areas

m2

days

-

52.00

-

-

0.0192

-

Felt Roofs, small or complicated

m2

days

-

35.00

-

-

0.0286

-

Felt Roofs, Gravel roof chippings

Tons

days

-

1.40

-

-

0.7143

-

Strip Existing Wallpaper (3 layers) & Prepare Walls

m2

hours

-

5.00

-

-

0.2000

-

Fix Wallpaper and lining paper

m2

hours

-

5.00

-

-

0.2000

-

Fix Vinyl and Washable paper

m2

hours

-

4.20

-

-

0.2381

-

Fix Ceiling Lining Paper

m2

hours

-

4.00

-

-

0.2500

-

Mosaic Tiling, 0.045x0.045m

no

hours

-

1.10

-

0.9091

0.6667

Clay, quarry Tiles, Window Cills, setout and level

m

hours

-

55.50

-

-

0.0180

-

Clay, quarry Tiles, Window Cills, fix, grout and clean

m2

hours

-

1.50

-

-

0.6667

-

Ceramic Tiles 150x150mm, Ledges/Upstands

no

hours

20.40

27.10

32.00

0.0490

0.0369

0.0313

Ceramic Tiles 150x150mm, Areas under 1.5m2 per room

m2

hours

0.90

1.00

1.20

1.1111

1.0000

0.8333

Ceramic Tiles 150x150mm, Areas of 1.5-2.5m2 per room

m2

hours

1.40

1.60

1.90

0.7143

0.6250

0.5263

Ceramic Tiles 150x150mm, Areas over 2.5m2 per room

m2

hours

1.50

1.70

2.10

0.6667

0.5882

0.4762

Ceramic Tiles 150x150mm, Extra Over for Cutting

no

hours

-

41.60

-

-

0.0240

-

Ceramic Tiles 108x108mm, Ledges/Upstands

no

hours

-

62.50

-

-

0.0160

-

Ceramic Tiles 108x108mm, Areas under 1.5m2 per room

m2

hours

1.00

1.30

1.50

1.0000

0.7692

0.6667

Ceramic Tiles 108x108mm, Areas of 1.5-2.5m2 per room

m2

hours

1.60

1.80

2.10

0.6250

0.5556

0.4762

Ceramic Tiles 108x108mm, Areas over 2.5m2 per room

m2

hours

1.70

1.90

2.20

0.5882

0.5263

0.4545

Ceramic Tiles 108x108mm, Extra Over for Cutting

no

hours

-

-

-

0.0080

-

Ceramic Tiles, Grouting Works

m2

hours

2.20

2.50

2.60

0.4545

0.4000

0.3846

Fix 0.5m2 Stones to Metal Support Frame

m2

days

5.60

7.00

7.80

0.1786

0.1429

0.1282

Fix 0.5-0.75m2 Stones to Metal Support Frame

m2

days

7.20

9.00

10.10

0.1389

0.1111

0.0990

Fix 0.75-1.0m2 Stones to Metal Support Frame

m2

days

6.90

8.70

9.70

0.1449

0.1149

0.1031

Fix Complex Stonework to Metal Support Frame

m2

days

-

0.5556

-

Fix Curved Stone Cladding

m2

days

9.20

0.1449

0.1250

0.1087

Fix Stone Edge Beams/Window Reveals

m2

days

-

2.30

3.20

-

0.4348

0.3125

Fix Stone Soffits

m2

days

-

4.00

-

0.2500

-

Stone Floors

m2

days

0.1449

0.0962

0.0820

Granite Wall Panels, First Fix

m2

hours

-

0.7692

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Sheeted Roofs

Flat and Layered Roofs

Wallpapering

Wall Finishes 1.50

125.00

Stonework

69

-

1.80 6.90

6.90 -

-

8.00

-

10.40 1.30

12.20 -

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

UNIT FOR QUANTITY

UNIT FOR TIME

m2

hours

-

1.10

Sand/Cement Floor Screed, 15-20mm thick

m2

hours

-

4.80

Sand/Cement Floor Screed, 20-30mm thick

m2

hours

-

4.60

Sand/Cement Floor Screed, 30-40mm thick

m2

hours

3.20

Sand/Cement Floor Screed, 40-50mm thick

m2

hours

2.00

Sand/Cement Floor Screed, 50-65mm thick

m2

hours

Sand/Cement Floor Screed, 65-100mm thick

m2

Fix/Setout Screed Battens

DESCRIPTION

ITEM NO.

Granite Wall Panels, Second Fix

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average

Fast

Slow

-

Average

Fast

-

0.9091

-

5.70

-

0.2083

0.1754

5.50

-

0.2174

0.1818

4.20

5.30

0.3125

0.2381

0.1887

3.80

5.20

0.5000

0.2632

0.1923

-

3.30

3.90

-

0.3030

0.2564

hours

-

3.00

3.60

-

0.3333

0.2778

m

hours

-

10.00

-

-

0.1000

-

Façade Cleaning, Water Jetting

m2

days

-

25.00

-

-

0.0400

-

Façade Cleaning, Acid Etching

m2

days

-

9.00

-

-

0.1111

-

Façade Cleaning, Grit Blasting

m2

days

-

12.00

-

-

0.0833

-

Cladding Restoration, Brickwork

m2

days

-

6.50

-

-

0.1538

-

Cladding Restoration, Stonework courses

m

days

-

20.00

-

-

0.0500

-

Large Wall Areas, applied in 2 coats

m2

hours

-

2.20

2.70

-

0.4545

0.3704

Small Wall Areas, applied in 2 coats

m2

hours

-

1.50

1.70

-

0.6667

0.5882

Narrow Widths, applied in 2 coats

m2

hours

-

1.20

1.40

-

0.8333

0.7143

Columns and Beams, applied in 2 coats

m2

hours

-

1.50

1.70

-

0.6667

0.5882

Staircase and Soffits, applied in 2 coats

m2

hours

-

1.40

-

0.7143

-

Browning (undercoat), Internal Walls under 2.5m high

m2

hours

2.20

2.80

3.10

0.4545

0.3571

0.3226

Browning (undercoat), Internal Walls over 2.5m high

m2

hours

2.10

2.60

2.80

0.4762

0.3846

0.3571

Browning (undercoat), Reveals and Columns less than 100mm wide

m2

hours

9.90

10.00

10.10

0.1010

0.1000

0.0990

Browning (undercoat), Reveals and Columns 100-200mm wide

m2

hours

5.20

5.40

6.40

0.1923

0.1852

0.1563

Browning (undercoat), Reveals and Columns 200-300mm wide

m2

hours

3.30

3.60

3.90

0.3030

0.2778

0.2564

Covings

m2

hours

-

0.2000

-

Skimming (topcoat), Internal Walls under 2.5m high

m2

hours

7.30

0.1639

0.1493

0.1370

Skimming (topcoat), Internal Walls over 2.5m high

m2

hours

5.50

6.10

6.70

0.1818

0.1639

0.1493

Skimming (topcoat), Reveals and Columns less than 100mm wide

m2

hours

12.60

13.80

15.40

0.0794

0.0725

0.0649

Skimming (topcoat), Reveals and Columns 100-200mm wide

m2

hours

7.70

8.30

9.80

0.1299

0.1205

0.1020

Skimming (topcoat), Reveals and Columns 200-300mm wide

m2

hours

4.50

5.00

5.50

0.2222

0.2000

0.1818

Plaster Board to Ceilings

m2

hours

3.20

4.50

5.50

0.3125

0.2222

0.1818

Plastering Ceilings, 1 Bonding, 1 Skimming

m2

hours

1.10

1.70

2.40

0.9091

0.5882

0.4167

Plastering Ceilings, Topcoat Skimming

m2

hours

2.70

3.20

5.40

0.3704

0.3125

0.1852

Boarding to Plaster dabs

m2

hours

3.60

4.00

5.50

0.2778

0.2500

0.1818

Boarding to Stud-work/Metal Lathes

m2

hours

4.00

5.00

6.70

0.2500

0.2000

0.1493

Boarding 12mm nailed to studding

m2

hours

-

12.50

-

-

0.0800

-

Boarding 19mm nailed to studding

m2

hours

-

16.50

-

-

0.0606

-

Tape, Jointing and Sanding

m

hours

-

10.00

-

-

0.10

-

Screeding

Restoration Works

Rendering

-

Plastering

-

5.00 6.10

-

6.70

Plasterboard

Partitioning 70

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Timber Studding

m

hours

5.90

6.20

6.80

0.1695

0.1613

0.1471

Metalwork System (MF) Studding

m2

hours

1.60

2.00

2.50

0.6250

0.5000

0.4000

Tape, Joint Sand and Top Coat Plasterboard

m2

hours

1.10

1.50

2.10

0.9091

0.6667

0.4762

Skimming to Plasterboards

m2

hours

5.50

6.10

6.70

0.1818

0.1639

0.1493

5mm Hardboard Paneling, excluding studding time

m2

hours

3.20

3.60

-

0.3125

0.2778

100mm Pine Paneling, excluding studding time

m2

hours

0.80

1.10

1.40

1.2500

0.9091

0.7143

Quality Hardwood Paneling, excluding studding time

m2

hours

0.30

0.50

0.60

3.3333

2.0000

1.6667

Fix 50mm Rocksil Insulation to cavities

m2

hours

17.80

20.20

-

0.0562

0.0495

Fix Timber Studding and Paramount Partitions

m2

hours

2.60

3.00

3.40

0.3846

0.3333

0.2941

Fix Timber Studding and Demountable Partitions

m2

hours

0.80

1.10

1.60

1.2500

0.9091

0.6250

Fix Timber Studding and Hills Duraboard Partitions

m2

hours

3.00

3.50

3.90

0.3333

0.2857

0.2564

Fix Timber Studding and Gyproc Laminated Partitions

m2

hours

2.20

2.60

2.90

0.4545

0.3846

0.3448

Stud Partitions, Butt Jointed, nailed

m

hours

5.90

7.30

9.10

0.1695

0.1370

0.1099

Stud Partitions, Butt Jointed, screwed

m

hours

3.50

4.60

5.80

0.2857

0.2174

0.1724

Stud Partitions, T&G Jointed, nailed

m

hours

2.90

3.60

4.80

0.3448

0.2778

0.2083

Stud Partitions, T&G Jointed, screwed

m

hours

2.10

2.80

3.70

0.4762

0.3571

0.2703

Stud Partitions, Fix Sole Plates

m

hours

-

11.10

-

-

0.0901

-

Stud Partitions, Fix Noggins

m

hours

-

16.60

-

-

0.0602

-

Stud Partitions, Drill 25-40mm Holes

no

hours

-

28.50

-

-

0.0351

-

Fix Toilet Partition System, Separation panels

no

hours

-

1.25

-

-

0.80

-

Fix Toilet Partition System, Wall Front Panels

no

hours

-

1.43

-

-

0.70

-

Fix Toilet Partition System, Separation Front Panels

no

hours

-

1.67

-

-

0.60

-

Fix Toilet Partition System, End Front Panels

no

hours

-

1.67

-

-

0.60

-

Fix Toilet Partition System, Hang Door to Panel

no

hours

-

2.50

-

-

0.40

-

Fix Toilet Partition System, Hand Door plugged to wall

no

hours

-

1.67

-

-

0.60

-

Fix Toilet Partition System, Fix Head Rails

no

hours

-

10.00

-

-

0.10

-

Prepare Walls

m2

hours

-

14.20

-

-

0.0704

-

Prepare Doors

m2

hours

-

12.50

-

-

0.0800

-

Prepare Door Frames

m

hours

-

25.00

-

-

0.0400

-

Burn Off / Heat Strip Paintwork

m2

hours

-

1.10

-

-

0.9091

-

Internal Timber, 1 coat primer before fixing, generally

m2

hours

-

6.70

-

-

0.1493

-

Internal Timber, 1 coat primer before fixing, timber lengths

m

hours

-

20.00

-

-

0.0500

-

Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss

m2

hours

-

1.70

2.10

-

0.5882

0.4762

Internal Timber, touchup primer, 1 undercoat, 1 coat gloss

m2

hours

-

3.10

3.80

-

0.3226

0.2632

Internal Timber, polyurethane varnish, 2 coats

m2

hours

-

3.30

-

-

0.3030

-

Internal Timber, polyurethane varnish, 3 coats

m2

hours

-

2.20

-

-

0.4545

-

Internal Timber, linseed oil to hardwood, 2 coats

m2

hours

-

3.60

-

-

0.2778

-

External Timber, windows and frames

m2

hours

-

2.40

-

-

0.4167

-

External Timber, knot, 1 primer, 2 undercoats, 1 coat gloss,

m2

hours

-

1.50

-

-

0.6667

-

External Timber, touchup primer, 2 undercoats, 1 coat gloss,

m2

hours

-

2.00

-

-

0.5000

-

External Timber, 2 coats wood preservative

m2

hours

-

4.00

-

-

0.2500

-

External Timber, 3 coats polyurethane varnish

m2

hours

-

2.00

-

-

0.5000

-

Internal Walls, 2 coats emulsion to plaster

m2

hours

-

8.00

-

-

0.1250

-

Internal Walls, 2 coats emulsion to brick/blockwork

m2

hours

-

6.00

-

-

0.1667

-

Internal Walls, 1 mist, 2 coats emulsion to plaster

m2

hours

-

6.00

-

-

0.1667

-

Internal Walls, 1 mist, 2 coats emulsion to brick/blockwork

m2

hours

-

4.50

-

-

0.2222

-

Internal Walls, 1 primer, 1 undercoat, 1 gloss to plaster

m2

hours

-

2.30

-

-

0.4348

-

Internal Walls, undercoat to door frame

m

hours

-

20.00

-

-

0.0500

-

Internal Walls, gloss to door frame

m

hours

-

16.50

-

-

0.0606

-

Internal Walls, undercoat to door

m2

hours

-

7.10

-

-

0.1408

-

Internal Walls, gloss to door

m2

hours

-

6.20

-

-

0.1613

-

External Walls, 2 coats sandtex to render/concrete

m2

hours

-

2.50

-

-

0.4000

-

External Walls, 2 coats sandtex to brick/blockwork

m2

hours

-

2.00

-

-

0.5000

-

External Walls, 1 sealer, 2 emulsion to render/concrete

m2

hours

-

2.00

-

-

0.5000

-

External Walls, 1 sealer, 2 emulsion to brick/blockwork

m2

hours

-

1.70

-

-

0.5882

-

Floors, epoxy paint

m2

hours

-

2.90

-

-

0.3448

-

Ceilings, emulsion paint, 2 coats

m2

hours

-

6.10

-

-

0.1639

-

Ceilings, emulsion paint, 3 coats

m2

hours

-

5.00

-

-

0.2000

-

Ceilings, textured paint

m2

hours

-

4.20

-

-

0.2381

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

-

-

Fast

Slow

Average

Fast

Painting

71

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Ceilings, artex finish

m2

hours

4.10

-

-

0.2439

-

Internal Steelwork, 1 primer, 1 undercoat, 1 gloss

m2

hours

1.30

2.40

-

0.7692

0.4167

-

External Steelwork, 1 primer, 2 undercoats, 1 gloss

m2

hours

0.90

1.70

-

1.1111

0.5882

-

Guttering Steelwork, 1 coat primer, 2 undercoats, 1 gloss

m

hours

-

2.50

-

-

0.4000

-

Top Soil, spread, level and prepare for turf or seeding

m2

hours

-

2.50

-

-

0.4000

-

Top Soil, rake in fertilizer for seeding

m2

hours

-

25.00

-

-

0.0400

-

Planting, Shrubs and Hedges, under 750mm high

no

hours

-

4.00

-

-

0.2500

-

Planting, Shrubs and Hedges, over 750mm high

no

hours

-

1.50

-

-

0.6667

-

Planting, Saplings, under 3.0m high

no

hours

-

1.70

-

-

0.5882

-

Turfing, including for minor preparations

m2

hours

-

16.80

-

-

0.0595

-

Concrete Slabs, laid on bedding, to slight falls

m2

hours

2.70

-

4.20

0.3704

-

0.2381

Concrete Slabs, laid on bedding, to steep falls

m2

hours

2.30

-

2.70

0.4348

-

0.3704

Concrete Slabs, laid in mortar, to slight falls

m2

hours

1.50

-

2.30

0.6667

-

0.4348

Concrete Slabs, laid in mortar, to steep falls

m2

hours

1.10

-

1.50

0.9091

-

0.6667

Concrete Slabs, laid on sand, to slight falls

m2

hours

1.70

-

2.80

0.5882

-

0.3571

Concrete Slabs, laid on sand, to steep falls

m2

hours

1.60

-

1.90

0.6250

-

0.5263

Cobble Stones, laid in mortar, no patterns

m2

hours

-

0.30

-

-

3.3333

-

Cobble Stones, laid in mortar, with patterns

m2

hours

-

0.20

-

-

5.0000

-

Artificial Stone, laid on sand, with patterns

m2

hours

-

2.50

-

-

0.4000

-

Brick Paviors, in mortar, straight joints

m2

hours

1.90

1.1111

0.7692

0.5263

Brick Paviors, in mortar, herringbone pattern

m2

hours

-

1.00

1.20

-

1.0000

0.8333

Gravel Paths, including preparation of sub-base

m2

hours

-

10.50

-

-

0.0952

-

Concrete Paths, 100mm thick, including preparation of sub-base

m2

hours

-

2.50

-

-

0.4000

-

Concrete Kerbs or Channels, laid straight

m

hours

-

6.20

-

-

0.1613

-

Concrete Kerbs or Channels, laid to 5m radius

m

hours

-

4.50

-

-

0.2222

-

Concrete Kerbs or Channels, laid to 10m radius

m

hours

-

5.00

-

-

0.2000

-

Concrete Kerbs or Channels, laid to 20m radius

m

hours

-

5.50

-

-

0.1818

-

Stone/Granite Kerbs or Channels, laid straight

m

hours

-

3.50

-

-

0.2857

-

Concrete Edging, laid straight

m

hours

-

7.70

-

-

0.1299

-

Concrete Edging, laid to 5m radius

m

hours

-

5.80

-

-

0.1724

-

Concrete Edging, laid to 10m radius

m

hours

-

6.20

-

-

0.1613

-

Concrete Edging, laid to 20m radius

m

hours

-

7.10

-

-

0.1408

-

Cutting and Fitting Ends, Concrete Kerbs

no

hours

-

6.60

-

-

0.1515

-

Cutting and Fitting Ends, Channels

no

hours

-

5.80

-

-

0.1724

-

Cutting and Fitting Ends, Concrete Edging

no

hours

-

8.30

-

-

0.1205

-

Granolithic Flooring

m2

hours

-

3.10

-

-

0.3226

-

Terrazzo Flooring, in-situ

m2

hours

-

3.60

-

-

0.2778

-

Terrazzo Flooring, pre-cast

m2

hours

-

4.60

5.10

-

0.2174

0.1961

Mosaic Tiling, 0.045x0.045m

m2

hours

-

1.50

2.20

-

0.6667

0.4545

Clay, quarry Tiles, small areas, much cutting

m2

hours

-

0.80

1.10

-

1.2500

0.9091

Clay, quarry Tiles, large areas, little cutting

m2

hours

-

2.20

2.80

-

0.4545

0.3571

Raised Floor System

m2

hours

-

2.60

-

0.3846

-

Linolium/Thermo-Plastic Flooring

m2

hours

-

3.10

5.00

-

0.3226

0.2000

Thermo-Plastic Floor Tiles

m2

hours

-

3.30

5.60

-

0.3030

0.1786

Wood Block Flooring, lay blocks

m2

hours

-

1.50

2.10

-

0.6667

0.4762

Wood Block Flooring, sand and polish

m2

hours

-

3.10

-

0.3226

-

Carpeting, Underlay & Gripper

m2

hours

-

5.60

6.10

-

0.1786

0.1639

Carpeting, Adhesive Fixing

m2

hours

-

3.50

4.20

-

0.2857

0.2381

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

-

Fast

Slow

Average

Fast

Landscaping

Kerbs & Paving

0.90

1.30

Floor Finishes

72

-

-

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Carpeting, Fully Fitted

m2

hours

-

2.00

2.80

-

0.5000

0.3571

Hardboard Sheeting Coverings, small areas

m2

hours

-

3.70

4.10

-

0.2703

0.2439

Hardboard Sheeting Coverings, large areas

m2

hours

-

6.60

7.20

-

0.1515

0.1389

Floor Sheeting Coverings, Lay Lino

m2

hours

-

9.50

10.50

-

0.1053

0.0952

Mastic Pointing to Frames

m

hours

-

9.50

-

-

0.1053

-

Fix Metal and Timber Windows After Wall Complete

m2

hours

-

2.00

-

-

0.5000

-

Window Glazing

m2

hours

-

1.30

-

-

0.7692

-

Window Glazing, Single Glazed Units

m2

hours

-

2.00

-

-

0.5000

-

Window Glazing, Double Glazed Units

m2

hours

-

1.30

-

-

0.7692

-

Thermalite Blockwork, under 100mm thick

m2

hours

1.80

2.50

3.20

0.5556

0.4000

0.3125

Thermalite Blockwork, under 100-150mm thick

m2

hours

1.40

1.90

2.50

0.7143

0.5263

0.4000

Thermalite Blockwork, over 150mm thick

m2

hours

1.20

1.60

2.10

0.8333

0.6250

0.4762

Lightweight Concrete Blockwork, under 100mm thick

m2

hours

1.50

2.20

2.90

0.6667

0.4545

0.3448

Lightweight Concrete Blockwork, under 100-150mm thick

m2

hours

1.40

1.90

2.10

0.7143

0.5263

0.4762

Lightweight Concrete Blockwork, over 150mm thick

m2

hours

1.20

1.60

2.00

0.8333

0.6250

0.5000

Heavyweight Concrete Blockwork, under 100mm thick

m2

hours

1.40

2.10

2.90

0.7143

0.4762

0.3448

Heavyweight Concrete Blockwork, under 100-150mm thick

m2

hours

1.20

1.60

2.10

0.8333

0.6250

0.4762

Heavyweight Concrete Blockwork, over 150mm thick

m2

hours

1.10

1.40

1.80

0.9091

0.7143

0.5556

Face Finish, Raked Out

m2

hours

-

71.40

-

-

0.0140

-

Face Finish, Bag Rubbed

m2

hours

-

29.40

-

-

0.0340

-

Face Finish, Flush Pointing

m2

hours

-

17.60

-

-

0.0568

-

Vertical Glazed Lights, 6m x 2.5m

m2

days

-

14.50

-

-

0.0690

-

Vertical Glazed Walls, large scale

m2

days

-

70.00

-

-

0.0143

-

Clerestory Frame/Glazing, 3m x 4m

m2

days

-

28.00

-

-

0.0357

-

Oriel Window Frame/Glazing, 4m x 2m

m2

days

-

35.00

-

-

0.0286

-

Glazed Curtain Wall, First Fix

m2

hours

-

1.20

-

-

0.8333

-

Glazed Curtain Wall, Second Fix

m2

hours

-

1.10

-

-

0.9091

-

High Quality Glazed Curtain Walling

m2

days

-

25.00

-

-

0.0400

-

Surface Finishing, Steel Float By Hand

m2

hours

9.20

13.90

25.00

0.1087

0.0719

0.0400

Surface Finishing, Wood Float By Hand

m2

hours

11.70

17.20

29.40

0.0855

0.0581

0.0340

Surface Finishing, Power Float

m2

hours

13.90

20.80

37.00

0.0719

0.0481

0.0270

Surface Finishing, Light Brush on Trowel

m2

hours

55.80

90.10

170.00

0.0179

0.0111

0.0059

Surface Finishing, Brush on Trowel Margin

m2

hours

28.80

48.50

85.00

0.0347

0.0206

0.0118

Surface Finishing, Sprayed By Pump, expose aggregate

m2

hours

65.00

95.00

145.00

0.0154

0.0105

0.0069

Surface Finishing, Wire Brush, expose aggregate

m2

hours

15.00

25.00

30.00

0.0667

0.0400

0.0333

Making Good Walls, prepare, shutter, pour

m2

hours

-

5.50

8.60

-

0.1818

0.1163

Making Good Columns, prepare, shutter, pour

m2

hours

-

2.80

6.90

-

0.3571

0.1449

Making Good Sides of Beams, prepare, shutter, pour

m2

hours

-

2.80

7.00

-

0.3571

0.1429

Making Good Slab Soffits, prepare, shutter, pour

m2

hours

-

4.20

5.50

-

0.2381

0.1818

Making Good Bolt Holes, prepare, shutter, pour

no/hr

hours

16.80

25.80

0.0676

0.0595

0.0388

Making Good Rubdown Precast Concrete, prepare, shutter, pour

m2

hours

-

0.0556

-

Making Good Scabble 3 head brush hammer, prepare, shutter, pour

m2

hours

0.0326

0.0168

0.0136

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Doors and Windows

Blockwork

Curtain Walling

Concrete Finishing

73

14.80 -

18.00 30.70

59.50

73.80

PRODUCTION RATES DESCRIPTION

ITEM NO.

UNIT FOR QUANTITY

UNIT FOR TIME

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average

Fast

Slow

Average

Fast

Commercial Kitchen Overall Installation for 100 persons or 50m2

wks

-

-

-

-

3.00

-

Overall Installation for 500 persons or 150m2

wks

-

-

-

-

5.00

-

Overall Installation for 1000 persons or 250m2

wks

-

-

-

-

8.00

-

Install Ovens, friers and large mixers etc

mandays

-

-

-

-

1.00

-

Install Sinks, bain maries and washers etc

mandays

-

-

-

-

2.00

-

Ceiling Finishes Suspended Ceilings, office situations

m2

hours

-

2.60

-

0.3846

0.2857

Suspended Ceilings, First Fix

m2

hours

-

0.70

-

3.50

-

1.4286

-

Suspended Ceilings, Second Fix

m2

hours

-

1.20

-

-

0.8333

-

Windows, Softwood, 3.0-7.0m2

no

hours

1.6667

2.5000

3.3333

0.60

0.40

Windows, Softwood, 7.0-10.0m2

no

hours

0.7692

1.1111

1.6667

1.30

0.90

Windows, Hardwood, 1.0-3.0m2

no

hours

2.5000

3.3333

-

0.40

0.30

Windows, Hardwood, 3.0-7.0m2

no

hours

1.4286

2.0000

2.5000

0.70

0.50

Windows, Hardwood, 7.0-10.0m2

no

hours

0.6250

0.8333

1.4286

1.60

1.20

Windows, Aluminum, 1.0-3.0m2

no

hours

5.0000

3.3333

-

0.20

0.30

Windows, Aluminum, 3.0-7.0m2

no

hours

2.0000

2.5000

3.3333

0.50

0.40

0.30

Windows, Aluminum, 7.0-10.0m2

no

hours

0.8333

1.2500

2.0000

1.20

0.80

0.50

Windows, Steel, 1.0-3.0m2

no

hours

2.5000

3.3333

5.0000

0.40

0.30

0.20

Windows, Steel, 3.0-7.0m2

no

hours

0.8333

1.6667

2.0000

1.20

0.60

0.50

Windows, Steel, 7.0-10.0m2

no

hours

0.7143

0.8333

1.0000

1.40

1.20

1.00

Window Boards, nailed

m

hours

-

3.3333

5.0000

-

0.30

0.20

Window Boards, screwed

m

hours

-

2.5000

3.3333

-

0.40

0.30

Mouldings, Softwood, Nailed

m

hours

-

6.30

8.50

-

0.1587

0.1176

Mouldings, Softwood, Screwed

m

hours

-

4.60

5.60

-

0.2174

0.1786

Mouldings, Softwood, Gun Nailed

m

hours

-

8.20

11.10

-

0.1220

0.0901

Mouldings, Hardwood, Nailed

m

hours

-

3.30

5.50

-

0.3030

0.1818

Mouldings, Hardwood, Screwed

m

hours

-

2.40

3.70

-

0.4167

0.2703

Mouldings, Hardwood, Gun Nailed

m

hours

-

8.50

11.30

-

0.1176

0.0885

Skirting, Aluminum, Screwed 150-300mm centres

m

hours

-

7.60

-

-

0.1316

-

Skirting, Aluminum, Screwed 300-450mm centres

m

hours

-

4.50

-

-

0.2222

-

Skirting, Plastic, Adhesive Fixing

m

hours

-

8.60

-

-

0.1163

-

Architrave Mouldings

m

hours

18.20

0.1053

0.0820

0.0549

door

hours

m

hours

25.00

0.0990

0.0592

0.0400

Glazed Bead Mouldings

m

hours

15.50

18.60

20.40

0.0645

0.0538

0.0490

Hanging Doors, Softwood, Single Pair Butts

no

hours

0.7692

1.1111

1.6667

1.30

0.90

0.60

Hanging Doors, Hardwood, Single Pair Butts

no

hours

0.5263

0.8333

1.1111

1.90

1.20

Cut Mortice to Receive Lock, Softwood

no

hours

-

5.0000

-

-

0.20

-

Cut Mortice to Receive Lock, Hardwood

no

hours

-

1.6667

-

-

0.60

-

Cut & Fix Formica Bath Panel

no

hours

-

2.5000

-

-

0.40

-

Kitchen Cupboards, Floor Units

no

hours

-

1.2500

1.6667

-

0.80

0.60

Kitchen Cupboards, Wall Units

no

hours

-

1.4286

2.0000

-

0.70

0.50

Kitchen Cupboards, Shelf Units

no

hours

-

-

1.4286

-

0.8

0.70

Staircase, pre-made, simple, straight flight

no

hours

0.5263

0.6667

0.9091

1.90

1.50

1.10

Staircase, pre-made, 2 straight flights, 1 landing

no

hours

0.2703

0.3448

0.3846

3.70

2.90

Staircase, pre-made, 2 straight flights, 2 landings

no

hours

-

0.1587

-

Staircase, Balustrades/Handrails, fix horizontal

no

hours

0.8333

1.6667

10.0000

1.20

0.60

0.10

Staircase, Balustrades/Handrails, fix raking

no

hours

1.1111

2.0000

3.3333

0.90

0.50

0.30

Staircase, Cut and Fix Newel to Walls

no

hours

1.1111

-

5.0000

0.90

-

0.20

Carpentry Final Fixing

Architrave, Fix to Doors Door Stop Mouldings

74

9.50 -

12.20 0.8333

10.10

16.90

-

-

-

0.30 0.60 0.40 0.70 -

1.20

6.30

-

0.90

2.60 -

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Windows, Softwood, 1.0-3.0m2

no

hours

Raised Flooring, metal system

m2

hours

Windows, Timber Frames for Bricklaying

no

hours

0.9091

2.0000

Windows, Drill, Screw & Plug extra over

no

hours

3.3333

10.0000

-

Door Frames, Softwood, 1.0-3.0m2

no

hours

-

5.0000

-

Door Frames, Softwood, 3.0-7.0m2

no

hours

2.0000

2.5000

-

0.50

Door Frames, Softwood, 7.0-10.0m2

no

hours

0.8333

1.2500

-

1.20

Door Frames, Hardwood, 1.0-3.0m2

no

hours

-

3.3333

-

Door Frames, Hardwood, 3.0-7.0m2

no

hours

1.6667

3.3333

-

Door Frames, Hardwood, 7.0-10.0m2

no

hours

0.7143

1.0000

-

Erect Water Tank Platform

no

hours

-

2.30

-

Fix Studding For Bath

m

hours

-

10.00

Cut Access Hatch

no

hours

-

0.30

Floor Joists, under 3m

no

hours

9.00

9.60

11.60

0.1111

0.1042

0.0862

Floor Joists, 3.0-4.5m

no

hours

6.80

7.20

9.70

0.1471

0.1389

0.1031

Floor Joists, 4.5-6.0m

no

hours

5.50

5.80

7.30

0.1818

0.1724

0.1370

Ceiling Joists, under 3m

no

hours

12.80

14.00

14.70

0.0781

0.0714

0.0680

Ceiling Joists, 3.0-4.5m

no

hours

10.80

12.10

12.60

0.0926

0.0826

0.0794

Ceiling Joists, 4.5-6.0m

no

hours

9.60

10.80

11.10

0.1042

0.0926

0.0901

Ceiling Joists, Notch to Beams

no

hours

20.00

25.00

28.50

0.0500

0.0400

0.0351

Ceiling Joists, Pack Joist Ends

no

hours

20.10

23.80

26.30

0.0498

0.0420

0.0380

Ceiling Joists, Nailing Joists together

m

hours

-

23.00

-

-

0.0435

-

Ceiling Joists, Bolting Joists Together

m

hours

-

12.60

-

-

0.0794

-

Floor Boards, Butt Jointed

m2

hours

-

1.70

-

-

0.5882

-

Floor Boards, T&G Boards, under 75mm wide

m2

hours

-

3.40

-

-

0.2941

-

Floor Boards, T&G Boards, 75-100mm wide

m2

hours

-

3.80

-

-

0.2632

-

Floor Boards, T&G Boards, 100-125mm wide

m2

hours

-

4.20

-

-

0.2381

-

Floor Boards, T&G Boards, 125-150mm wide

m2

hours

-

5.50

-

-

0.1818

-

Plywood Sheeting, Butt Jointed, nailed

m2

hours

-

9.10

10.20

-

0.1099

0.0980

Plywood Sheeting, Butt Jointed, screwed

m2

hours

-

4.10

4.80

-

0.2439

0.2083

Plywood Sheeting, T&G Jointed, nailed

m2

hours

-

8.30

9.10

-

0.1205

0.1099

Plywood Sheeting, T&G Jointed, screwed

m2

hours

-

4.00

4.60

-

0.2500

0.2174

Chipboard Sheeting, Butt Jointed, nailed

m2

hours

-

10.00

11.50

-

0.1000

0.0870

Chipboard Sheeting, Butt Jointed, screwed

m2

hours

-

5.10

5.80

-

0.1961

0.1724

Chipboard Sheeting, T&G Jointed, nailed

m2

hours

-

9.30

9.10

-

0.1075

0.1099

Chipboard Sheeting, T&G Jointed, screwed

m2

hours

-

5.50

5.90

-

0.1818

0.1695

Formwork to Soffit of Manhole

m2

hours

-

-

0.5556

-

Formwork to Walls of Manhole

m2

hours

20.20

0.0893

0.0704

0.0495

Formwork to Road Edges, straight

m

hours

-

7.70

-

-

0.1299

-

Formwork to Road Edges, curves

m

hours

-

6.20

-

-

0.1613

-

AC Install 2 no Service transformers, 6 men

days

-

-

-

-

12.00

-

AC Install 2 no Switchgear, 7 men

days

-

-

-

-

12.00

-

AC Install Associated Trays and ladders, 3 men

days

-

-

-

11.00

5.00

-

AC Cable Terminations in Tx and SWG Rooms, 3 men

days

-

-

-

12.00

6.00

-

DC Install Insulated Flooring in DC Room, 1 men

days

-

-

-

-

5.00

-

DC Install 1 set Rectifier Transformer and Rectifier, 7 men

days

-

-

-

-

1.00

-

DC Install Switchgear, 7 men

days

-

-

-

-

10.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

3.3333 -

Fast

5.0000 0.50

Slow -

Average 0.30

-

-

0.20

Fast -

2.0000

-

Carpentry Carcassing 10.0000

1.10

0.50

0.30

0.10

-

0.20

-

0.40

-

0.80

-

0.30

-

0.60

0.30

-

1.40

1.00

-

-

0.4348

-

-

-

0.10

-

-

-

3.3333

-

-

-

0.10

Carpentry & Joinery 1.80 11.20

-

14.20

Power Supply

75

PRODUCTION RATES DESCRIPTION

ITEM NO.

UNIT FOR QUANTITY

UNIT FOR TIME

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity) REMARKS

Slow

Average

Fast

Slow

Average

Fast

DC Primary Cable Terminations and Busduct, 18 men

days

-

-

-

12.0

9.00

-

DC Secondary Cable Terminations and Connections, 9 men

days

-

-

-

12.0

6.00

-

Trackside Cabling 33kV/Pilot Cables, 10 men

m run

Trackside Cabling Terminations, 6 men

days

2,100.00

-

-

0.0005

-

-

days

-

-

-

-

1.0

Railway Station 1st Fix

wks

-

-

-

-

38.0

-

Railway Station 2nd Fix

wks

-

-

-

-

16.0

-

Railway Station T&C

wks

-

-

-

-

8.0

-

Electrical System

Cable Installation, 1 cable laid in trench and protect

m

hours

-

6.20

-

-

0.1613

-

Cable Installation, 2 cable laid in trench and protect

m

hours

-

5.60

-

-

0.1786

-

Cable Installation, 5 cable laid in trench and protect

m

hours

-

4.30

-

-

0.2326

-

Cable Installation, 7 cable laid in trench and protect

m

hours

-

3.70

-

-

0.2703

-

Cable Installation, 8 cable laid in trench and protect

m

hours

-

3.50

-

-

0.2857

-

Cable Installation, 2 cable laid in trench and protect, 100mm dia

m

hours

-

1.80

-

-

0.5556

-

Cable Installation, 2 cable laid in trench and protect, 135mm dia

m

hours

-

1.60

-

-

0.6250

-

Cable Installation, 3 cable laid in trench and protect, 100mm dia

m

hours

-

1.00

1.50

-

1.0000

0.6667

Cable Installation, 6 cable laid in trench and protect, 100mm dia

m

hours

-

0.70

1.20

-

1.4286

0.8333

Cable Installation, 4 cable laid in trench and protect, 150mm dia

m

hours

1.20

3.10

1.4286

0.8333

0.3226

Cable Installation, 36 cable laid in trench and protect, 100mm dia

m

hours

-

0.20

-

-

5.0000

-

Cable Installation, 10 cable laid in trench and protect, 100mm dia

m

hours

-

0.50

-

-

2.0000

-

Cable Installation, 1 cable laid in trench and protect, 300mm dia

m

hours

-

1.30

-

-

0.7692

-

UPVC Downpipes, 75mm

m

hours

-

3.30

-

-

0.3030

-

UPVC Guttering, 75mm

m

hours

-

3.10

-

-

0.3226

-

UPVC RWP Fittings, 75mm

no

hours

-

3.10

-

-

0.3226

-

Cast Iron Downpipes, 75mm

m

hours

-

2.10

-

-

0.4762

-

Cast Iron Guttering, 75mm

m

hours

-

2.50

-

-

0.4000

-

Cast Iron RWP Fittings, 75mm

no

hours

-

2.20

-

-

0.4545

-

Aluminium Downpipes, 72mm

m

hours

-

2.50

-

-

0.4000

-

Aluminium Guttering, 72mm

m

hours

-

2.90

-

-

0.3448

-

Aluminium RWP Fittings, 72mm

no

hours

-

1.90

-

-

0.5263

-

Concrete Pre-Cast Manhole Units, 610 x 455 x 51 mm

no

hours

-

0.8333

-

-

1.20

-

Concrete Pre-Cast Manhole Units, 990 x 610 x 64 mm

no

hours

-

0.6250

-

-

1.60

-

Brickwork Manhole, 1.0 brick engineering

m2

hours

-

0.30

-

-

3.3333

-

Brickwork Manhole, 1.5 brick engineering

m2

hours

-

0.20

-

-

5.0000

-

Brickwork Manhole, 2.0 brick engineering

m2

hours

-

0.20

-

-

5.0000

-

Benching to Manhole, under 0.5m2

no

hours

-

1.1111

-

-

0.90

-

Benching to Manhole, 0.5-0.75m2

no

hours

-

0.8333

-

-

1.20

-

Benching to Manhole, 0.75-1.0m2

no

hours

-

0.5556

-

-

1.80

-

Brickwork Manhole, build in pipes, under 150mm dia

no

hours

-

10.0000

-

-

0.10

-

Brickwork Manhole, build in pipes, 150-225mm dia

no

hours

-

5.0000

-

-

0.20

-

Brickwork Manhole, build in pipes, over 225mm dia

no

hours

-

3.3333

-

-

0.30

-

Brickwork Manhole, build in cast iron covers

no

hours

0.30

0.60

1.20

Yard Gulleys, 75-150mm dia pipes, bed and level

no

hours

-

2.20

-

-

0.4545

-

Yard Gulleys, 150-225mm dia pipes, bed and level

no

hours

-

1.80

-

-

0.5556

-

Yard Gulleys, 225-300mm dia pipes, bed and level

no

hours

-

1.50

-

-

0.6667

-

Road Gulleys, 600mm deep, bed and level

no

hours

-

1.20

-

-

0.8333

-

Road Gulleys, 750mm deep, bed and level

no

hours

-

0.80

-

-

1.2500

-

Road Gulleys, 900mm deep, bed and level

no

hours

-

0.40

-

-

2.5000

-

0.70

Rainwater Works

Manholes and Gulleys

76

3.33

1.6667

0.83

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Road Gulleys, 1,200mm deep, bed and level

no

hours

-

0.30

-

-

3.3333

-

Road Gulleys, install gratings

no

hours

-

5.00

-

-

0.2000

-

PVC Manhole

no

minutes

-

0.0667

-

-

15.00

-

Hydraulic Lift, Install 2 to 3 storeys

floor

weeks

-

0.3333

-

-

3.00

-

Hydraulic Lift, Install 4 storeys and above

floor

weeks

-

0.5000

-

-

2.00

-

Hydraulic Lift, Testing allow 2 wks plus

floor

days

-

1.0000

-

-

1.00

-

Standard Lift, Manufacture, test and deliver

weeks

-

-

-

-

12.00

-

Non-Standard Lift, Manufacture, test and deliver

weeks

-

-

-

75.00

65.00

52.00

Truss type, Overall Installation (excl arch finishes)

wks

-

-

-

14.00

12.00

11.00

Truss type, Manufacture, test and deliver

wks

-

-

-

-

60.00

Truss type, Phase A assemble truss , position/level

wks

-

-

-

-

1.00

Truss type, Stop-Work for surrounding finishes

wks

-

-

-

Truss type, Phase B decking and glazing etc

wks

-

-

-

-

5.00

-

Truss type, Phase C performance testing

wks

-

-

-

-

2.00

-

Truss type, Phase D full load testing

wks

-

-

-

-

2.00

-

Truss type, Phase E final test and inspection

wks

-

-

-

-

2.00

-

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

Fast

Slow

Average

Fast

Lift Installation

Escalators

8.00

48.00 -

6.00

4.00

Drainage PVC Drainage, 1m pipes, 100-150mm dia, 0-5m run

m

hours

-

5.70

-

-

0.1754

-

PVC Drainage, 1m pipes, 100-150mm dia, 5-30m run

m

hours

-

8.10

-

-

0.1235

-

PVC Drainage, 1m pipes, 100-150mm dia, over 30m run

m

hours

-

9.50

-

-

0.1053

-

PVC Drainage, 3m pipes, 100-150mm dia, 0-5m run

m

hours

-

12.20

-

-

0.0820

-

PVC Drainage, 3m pipes, 100-150mm dia, 5-30m run

m

hours

-

15.20

-

-

0.0658

-

PVC Drainage, 3m pipes, 100-150mm dia, over 30m run

m

hours

-

18.20

-

-

0.0549

-

PVC Drainage, 6m pipes, 100-150mm dia, 0-5m run

m

hours

-

22.20

-

-

0.0450

-

PVC Drainage, 6m pipes, 100-150mm dia, 5-30m run

m

hours

-

27.70

-

-

0.0361

-

PVC Drainage, 6m pipes, 100-150mm dia, over 30m run

m

hours

-

33.30

-

-

0.0300

-

PVC Drainage, 3m pipes, 150-200mm dia, 5-30m run

m

hours

-

10.60

-

-

0.0943

-

PVC Drainage, 3m pipes, 150-200mm dia, over 30m run

m

hours

-

12.80

-

-

0.0781

-

PVC Drainage, 6m pipes, 150-200mm dia, 5-30m run

m

hours

-

21.20

-

-

0.0472

-

PVC Drainage, 6m pipes, 150-200mm dia, over 30m run

m

hours

-

25.60

-

-

0.0391

-

Stoneware Drainage, Cement/Sand Joints, 75mm dia, 0-5m run

m

hours

-

4.70

-

-

0.2128

-

Stoneware Drainage, Cement/Sand Joints, 75mm dia, 5-30m run

m

hours

-

5.50

-

-

0.1818

-

Stoneware Drainage, Cement/Sand Joints, 75mm dia, over 30m run

m

hours

-

6.60

-

-

0.1515

-

Stoneware Drainage, Cement/Sand Joints, 100mm dia, 0-5m run

m

hours

-

4.40

-

-

0.2273

-

Stoneware Drainage, Cement/Sand Joints, 100mm dia, 5-30m run

m

hours

-

5.00

-

-

0.2000

-

Stoneware Drainage, Cement/Sand Joints, 100mm dia, over 30m run

m

hours

-

6.20

-

-

0.1613

-

Stoneware Drainage, Cement/Sand Joints, 150mm dia, 0-5m run

m

hours

-

3.20

-

-

0.3125

-

Stoneware Drainage, Cement/Sand Joints, 150mm dia, 5-30m run

m

hours

-

3.80

-

-

0.2632

-

Stoneware Drainage, Cement/Sand Joints, 150mm dia, over 30m run

m

hours

-

4.50

-

-

0.2222

-

Stoneware Drainage, Cement/Sand Joints, 225mm dia, 0-5m run

m

hours

-

2.10

-

-

0.4762

-

Stoneware Drainage, Cement/Sand Joints, 225mm dia, 5-30m run

m

hours

-

2.60

-

-

0.3846

-

Stoneware Drainage, Cement/Sand Joints, 225mm dia, over 30m run

m

hours

-

3.10

-

-

0.3226

-

Stoneware Drainage, Cement/Sand Joints, 300mm dia, 0-5m run

m

hours

-

1.40

-

-

0.7143

-

Stoneware Drainage, Cement/Sand Joints, 300mm dia, 5-30m run

m

hours

-

1.70

-

-

0.5882

-

Stoneware Drainage, Cement/Sand Joints, 300mm dia, over 30m run

m

hours

-

2.40

-

-

0.4167

-

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 0-5m run

m

hours

-

1.10

-

-

0.9091

-

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, 5-30m run

m

hours

-

1.30

-

-

0.7692

-

Stoneware Drainage, Cement/Sand Joints, over 375mm dia, over 30m run

m

hours

-

1.60

-

-

0.6250

-

77

PRODUCTION RATES ITEM NO.

PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Stoneware Drainage, Flexible Joints, 75mm dia, 0-5m run

m

hours

-

8.30

-

-

0.1205

-

Stoneware Drainage, Flexible Joints, 75mm dia, 5-30m run

m

hours

-

10.00

-

-

0.1000

-

Stoneware Drainage, Flexible Joints, 75mm dia, over 30m run

m

hours

-

12.50

-

-

0.0800

-

Stoneware Drainage, Flexible Joints, 100mm dia, 0-5m run

m

hours

-

7.70

-

-

0.1299

-

Stoneware Drainage, Flexible Joints, 100mm dia, 5-30m run

m

hours

-

9.10

-

-

0.1099

-

Stoneware Drainage, Flexible Joints, 100mm dia, over 30m run

m

hours

-

10.00

-

-

0.1000

-

Stoneware Drainage, Flexible Joints, 150mm dia, 0-5m run

m

hours

-

5.20

-

-

0.1923

-

Stoneware Drainage, Flexible Joints, 150mm dia, 5-30m run

m

hours

-

6.20

-

-

0.1613

-

Stoneware Drainage, Flexible Joints, 150mm dia, over 30m run

m

hours

-

7.70

-

-

0.1299

-

Stoneware Drainage, Flexible Joints, 225mm dia, 0-5m run

m

hours

-

2.70

-

-

0.3704

-

Stoneware Drainage, Flexible Joints, 225mm dia, 5-30m run

m

hours

-

3.30

-

-

0.3030

-

Stoneware Drainage, Flexible Joints, 225mm dia, over 30m run

m

hours

-

4.00

-

-

0.2500

-

Stoneware Drainage, Flexible Joints, 300mm dia, 0-5m run

m

hours

-

1.70

-

-

0.5882

-

Stoneware Drainage, Flexible Joints, 300mm dia, 5-30m run

m

hours

-

2.10

-

-

0.4762

-

Stoneware Drainage, Flexible Joints, 300mm dia, over 30m run

m

hours

-

2.50

-

-

0.4000

-

Stoneware Drainage, Flexible Joints, over 375mm dia, 0-5m run

m

hours

-

1.40

-

-

0.7143

-

Stoneware Drainage, Flexible Joints, over 375mm dia, 5-30m run

m

hours

-

1.60

-

-

0.6250

-

Stoneware Drainage, Flexible Joints, over 375mm dia, over 30m run

m

hours

-

2.10

-

-

0.4762

-

PVC, Stoneware, Pitch Fibre & Concrete Joints

no

minutes

-

0.4167

-

-

2.40

-

Pitch Fibre Pipes, 75mm dia, 0-5m run

m

hours

-

9.10

-

-

0.1099

-

Pitch Fibre Pipes, 75mm dia, 5-30m run

m

hours

-

16.60

-

-

0.0602

-

Pitch Fibre Pipes, 75mm dia, over 30m run

m

hours

-

20.00

-

-

0.0500

-

Pitch Fibre Pipes, 100mm dia, 0-5m run

m

hours

-

9.10

-

-

0.1099

-

Pitch Fibre Pipes, 100mm dia, 5-30m run

m

hours

-

16.60

-

-

0.0602

-

Pitch Fibre Pipes, 100mm dia, over 30m run

m

hours

-

20.00

-

-

0.0500

-

Pitch Fibre Pipes, 150mm dia, 0-5m run

m

hours

-

6.60

-

-

0.1515

-

Pitch Fibre Pipes, 150mm dia, 5-30m run

m

hours

-

12.50

-

-

0.0800

-

Pitch Fibre Pipes, 150mm dia, over 30m run

m

hours

-

14.30

-

-

0.0699

-

Pitch Fibre Pipes, 200mm dia, 0-5m run

m

hours

-

6.20

-

-

0.1613

-

Pitch Fibre Pipes, 200mm dia, 5-30m run

m

hours

-

11.10

-

-

0.0901

-

Pitch Fibre Pipes, 200mm dia, over 30m run

m

hours

-

12.50

-

-

0.0800

-

Pitch Fibre Pipes, 225mm dia, 0-5m run

m

hours

-

5.80

-

-

0.1724

-

Pitch Fibre Pipes, 225mm dia, 5-30m run

m

hours

-

10.00

-

-

0.1000

-

Pitch Fibre Pipes, 225mm dia, over 30m run

m

hours

-

12.10

-

-

0.0826

-

Hepsleve Rubber Joint System, 75mm dia, 0-5m run

m

hours

-

12.50

-

-

0.0800

-

Hepsleve Rubber Joint System, 75mm dia, 5-30m run

m

hours

-

14.30

-

-

0.0699

-

Hepsleve Rubber Joint System, 75mm dia, over 30m run

m

hours

0.0893

0.0602

0.0332

Hepsleve Rubber Joint System, 100mm dia, 0-5m run

m

hours

-

10.00

-

-

0.1000

-

Hepsleve Rubber Joint System, 100mm dia, 5-30m run

m

hours

-

12.50

-

-

0.0800

-

Hepsleve Rubber Joint System, 100mm dia, over 30m run

m

hours

-

14.30

-

-

0.0699

-

Hepsleve Rubber Joint System, 150mm dia, 0-5m run

m

hours

-

7.10

-

-

0.1408

-

Hepsleve Rubber Joint System, 150mm dia, 5-30m run

m

hours

-

9.10

-

-

0.1099

-

Hepsleve Rubber Joint System, 150mm dia, over 30m run

m

hours

0.1205

0.1000

0.0725

Hepsleve Rubber Joint System, 225mm dia, 0-5m run

m

hours

-

6.80

-

-

0.1471

-

Hepsleve Rubber Joint System, 225mm dia, 5-30m run

m

hours

-

4.50

-

-

0.2222

-

Hepsleve Rubber Joint System, 225mm dia, over 30m run

m

hours

-

5.50

-

-

0.1818

-

Hepsleve Rubber Joint System, 300mm dia, 0-5m run

m

hours

-

2.50

-

-

0.4000

-

Hepsleve Rubber Joint System, 300mm dia, 5-30m run

m

hours

-

2.90

-

-

0.3448

-

Hepsleve Rubber Joint System, 300mm dia, over 30m run

m

hours

-

3.70

-

-

0.2703

-

Hepsleve Rubber Joint System, over 375mm dia, 0-5m run

m

hours

-

1.90

-

-

0.5263

-

Hepsleve Rubber Joint System, over 375mm dia, 5-30m run

m

hours

-

2.30

-

-

0.4348

-

Hepsleve Rubber Joint System, over 375mm dia, over 30m run

m

hours

-

2.70

-

-

0.3704

-

Concrete Pipes, 1.5m pipes, 375mm dia, 0-5m run

m

hours

-

2.80

-

-

0.3571

-

Concrete Pipes, 1.5m pipes, 375mm dia, 5-30m run

m

hours

-

3.40

-

-

0.2941

-

Concrete Pipes, 1.5m pipes, 375mm dia, over 30m run

m

hours

-

3.80

-

-

0.2632

-

Concrete Pipes, 1.5m pipes, 450mm dia, 0-5m run

m

hours

-

2.70

-

-

0.3704

-

Concrete Pipes, 1.5m pipes, 450mm dia, 5-30m run

m

hours

-

3.20

-

-

0.3125

-

Concrete Pipes, 1.5m pipes, 450mm dia, over 30m run

m

hours

-

3.60

-

-

0.2778

-

Concrete Pipes, 1.5m pipes, 525mm dia, 0-5m run

m

hours

-

2.50

-

-

0.4000

-

DESCRIPTION

78

REMARKS Slow

Average

11.20

8.30

Fast

16.60

30.10

10.00

13.80

Slow

Average

Fast

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Concrete Pipes, 1.5m pipes, 525mm dia, 5-30m run

m

hours

-

2.90

-

-

0.3448

-

Concrete Pipes, 1.5m pipes, 525mm dia, over 30m run

m

hours

-

3.40

-

-

0.2941

-

Concrete Pipes, 1.5m pipes, 600mm dia, 0-5m run

m

hours

-

2.40

-

-

0.4167

-

Concrete Pipes, 1.5m pipes, 600mm dia, 5-30m run

m

hours

-

2.70

-

-

0.3704

-

Concrete Pipes, 1.5m pipes, 600mm dia, over 30m run

m

hours

-

3.30

-

-

0.3030

-

Concrete Pipes, 1.5m pipes, 675mm dia, 0-5m run

m

hours

-

2.20

-

-

0.4545

-

Concrete Pipes, 1.5m pipes, 675mm dia, 5-30m run

m

hours

-

2.60

-

-

0.3846

-

Concrete Pipes, 1.5m pipes, 675mm dia, over 30m run

m

hours

-

2.90

-

-

0.3448

-

Concrete Pipes, 1.5m pipes, 750mm dia, 0-5m run

m

hours

-

1.10

-

-

0.9091

-

Concrete Pipes, 1.5m pipes, 750mm dia, 5-30m run

m

hours

-

2.40

-

-

0.4167

-

Concrete Pipes, 1.5m pipes, 750mm dia, over 30m run

m

hours

-

2.50

-

-

0.4000

-

Concrete Pipes, 1.5m pipes, 1,050mm dia

m

days

-

2.90

4.20

-

0.3448

0.2381

Concrete Pipes, 1.5m pipes, 1,500mm dia

m

days

-

2.50

3.80

-

0.4000

0.2632

Concrete Pipes, 1.5m pipes, 1,800mm dia

m

days

-

2.10

2.60

-

0.4762

0.3846

Concrete Pipes, 2.5m pipes, 375mm dia, 0-5m run

m

hours

-

3.60

-

-

0.2778

-

Concrete Pipes, 2.5m pipes, 375mm dia, 5-30m run

m

hours

-

4.30

-

-

0.2326

-

Concrete Pipes, 2.5m pipes, 375mm dia, over 30m run

m

hours

-

5.00

-

0.2000

0.1250

Concrete Pipes, 2.5m pipes, 450mm dia, 0-5m run

m

hours

-

3.40

-

-

0.2941

-

Concrete Pipes, 2.5m pipes, 450mm dia, 5-30m run

m

hours

-

4.10

-

-

0.2439

-

Concrete Pipes, 2.5m pipes, 450mm dia, over 30m run

m

hours

-

4.50

-

0.2222

0.1111

Concrete Pipes, 2.5m pipes, 525mm dia, 0-5m run

m

hours

-

3.30

-

-

0.3030

-

Concrete Pipes, 2.5m pipes, 525mm dia, 5-30m run

m

hours

-

3.80

-

-

0.2632

-

Concrete Pipes, 2.5m pipes, 525mm dia, over 30m run

m

hours

-

4.10

-

-

0.2439

-

Concrete Pipes, 2.5m pipes, 600mm dia, 0-5m run

m

hours

-

3.00

-

-

0.3333

-

Concrete Pipes, 2.5m pipes, 600mm dia, 5-30m run

m

hours

-

3.50

-

-

0.2857

-

Concrete Pipes, 2.5m pipes, 600mm dia, over 30m run

m

hours

-

4.00

-

-

0.2500

-

Concrete Pipes, 2.5m pipes, 675mm dia, 0-5m run

m

hours

-

2.80

-

-

0.3571

-

Concrete Pipes, 2.5m pipes, 675mm dia, 5-30m run

m

hours

-

3.30

-

-

0.3030

-

Concrete Pipes, 2.5m pipes, 675mm dia, over 30m run

m

hours

-

3.70

-

-

0.2703

-

Concrete Pipes, 2.5m pipes, 750mm dia, 0-5m run

m

hours

-

2.60

-

-

0.3846

-

Concrete Pipes, 2.5m pipes, 750mm dia, 5-30m run

m

hours

-

3.10

-

-

0.3226

-

Concrete Pipes, 2.5m pipes, 750mm dia, over 30m run

m

hours

-

3.60

-

-

0.2778

-

Lay Shingle Around Pipework, under 150mm dia

m

hours

-

7.00

-

-

0.1429

-

Lay Shingle Around Pipework, over 150mm dia

m

hours

0.2500

0.1818

0.1111

Concrete Road surfacing, Kerbs or Side Haunches

m3

hours

0.40

-

2.5000

-

Concrete Road surfacing, 150mm thick

m2

hours

12.50

-

0.0800

-

Concrete Road surfacing, 200mm thick

m2

hours

7.70

-

0.1299

-

Concrete Road surfacing, 300mm thick

m2

hours

6.70

-

0.1493

-

Spread & Compact Production = 30m3/hr

m3

hours

30.00

-

0.0333

-

Trimming Production = 250m2/hr

m2

hours

250.00

-

0.0040

-

Spread & Compact Production = 50m3/hr

m3

hours

50.00

-

0.0200

-

Trimming Production = 350m2/hr

m2

hours

350.00

-

0.0029

-

Deep Vibroflot, 3m centres

m3

hours

330.00

380.00

465.00

0.0030

0.0026

0.0022

Vibro-Roller, Sand

m2

hours

28.50

31.20

45.20

0.0351

0.0321

0.0221

DESCRIPTION

ITEM NO.

REMARKS Slow

Average

4.00

5.50

Fast

Slow

8.00

9.00

9.00

Average

Fast

Concrete Road surfacing

Basecourse Production Rates Urban environment:

Rural environment:

Ground Compaction

79

PRODUCTION RATES PRODUCTION RATES (Qty per Time)

PRODUCTION RATES (Time per Quantity)

UNIT FOR QUANTITY

UNIT FOR TIME

Vibro-Roller, Soil

m2

hours

-

58.80

-

-

0.0170

-

Vibro-Roller, Clay

m2

hours

-

55.60

-

-

0.0180

-

Vibro-Roller, Hardcore

m2

hours

-

38.40

-

-

0.0260

-

Vibro-Roller, Ash

m2

hours

-

57.80

-

-

0.0173

-

DESCRIPTION

ITEM NO.

80

REMARKS Slow

Average

Fast

Slow

Average

Fast

PRODUCTION RATES DESCRIPTION

ITEM NO.

PAGE NO.

1.0

Excavate and Remove

1

2.0

Trench Excavation

1

3.0

Spread and Level

1

4.0

Small or Deep Excavation

2

5.0

Rock Tunnels

2

6.0

Bulk Excavation

2

7.0

Basement Excavation

3

8.0

Working Platforms

3

9.0

Underpinning

3

10.0

Tower Cranes

3

11.0

Soil Mix Walls

4

12.0

Slurry Mix Walls

4

13.0

Site Clearance

4

14.0

Sheet Piling

4

15.0

Secant Piling

4

16.0

Rule of Thumb

4

17.0

Removable Anchors

5

18.0

NATM Tunnels

5

19.0

Fencing Works

5

20.0

Dewatering

6

21.0

Demolition

6

22.0

Breaking Out

6

23.0

Site Investigation

7

24.0

Waterproofing

7

25.0

Trackwork

7

26.0

Structural Steelwork

7

27.0

Steel Strutting

8

28.0

Reinforcement Ratios

8

29.0

Reinforcement

8

30.0

Post Tensioning

9

31.0

Metal Decking

9

32.0

Land Drains

9

33.0

Formwork

9

34.0

Decking

10

35.0

Cutting Switchboxes

10

36.0

Cutting Chases

11

37.0

Cutting Back

11

38.0

Concrete Placement

12

39.0

Concrete Mixing

12

40.0

Barrette Piles

12

41.0

Bell Ground Anchors

12

42.0

Bored Piling

13

43.0

Timber Frames

13

44.0

Steel Frames

14

81 of 84

PRODUCTION RATES DESCRIPTION

ITEM NO.

PAGE NO.

45.0

Slates and Tiling

14

46.0

Sheeted Roofs

15

47.0

Flat and Layered Roofs

15

48.0

Wallpapering

15

49.0

Wall Finishes

15

50.0

Stonework

15

51.0

Screeding

16

52.0

Restoration Works

16

53.0

Rendering

16

54.0

Plastering

16

55.0

Plasterboard

16

56.0

Partitioning

16

57.0

Painting

17

58.0

Landscaping

18

59.0

Kerbs & Paving

18

60.0

Floor Finishes

18

61.0

Doors and Windows

19

62.0

Blockwork

19

63.0

Curtain Walling

19

64.0

Concrete Finishing

19

65.0

Commercial Kitchen

20

66.0

Ceiling Finishes

20

67.0

Carpentry Final Fixing

20

68.0

Carpentry Carcassing

21

69.0

Carpentry & Joinery

21

70.0

Power Supply

21

71.0

Electrical System

22

72.0

Rainwater Works

22

73.0

Manholes and Gulleys

22

74.0

Lift Installation

23

75.0

Escalators

23

76.0

Drainage

23

77.0

Concrete Road surfacing

25

78.0

Basecourse Production Rates

25

79.0

Ground Compaction

25

82 of 84

PRODUCTION RATES Table of Contents DESCRIPTION

ITEM NO.

PAGE NO.

1.0

Barrette Piles

12

2.0

Basecourse Production Rates

25

3.0

Basement Excavation

3

4.0

Bell Ground Anchors

12

5.0

Blockwork

19

6.0

Bored Piling

13

7.0

Breaking Out

6

8.0

Bulk Excavation

2

9.0

Carpentry & Joinery

21

10.0

Carpentry Carcassing

21

11.0

Carpentry Final Fixing

20

12.0

Ceiling Finishes

20

13.0

Commercial Kitchen

20

14.0

Concrete Finishing

19

15.0

Concrete Mixing

12

16.0

Concrete Placement

12

17.0

Concrete Road surfacing

25

18.0

Curtain Walling

19

19.0

Cutting Back

11

20.0

Cutting Chases

11

21.0

Cutting Switchboxes

10

22.0

Decking

10

23.0

Demolition

6

24.0

Dewatering

6

25.0

Doors and Windows

19

26.0

Drainage

23

27.0

Electrical System

22

28.0

Escalators

23

1.0

Excavate and Remove

1

2.0

Fencing Works

5

3.0

Flat and Layered Roofs

15

4.0

Floor Finishes

18

5.0

Formwork

9

6.0

Ground Compaction

25

7.0

Kerbs & Paving

18

8.0

Land Drains

9

9.0

Landscaping

18

10.0

Lift Installation

23

11.0

Manholes and Gulleys

22

12.0

Metal Decking

9

13.0

NATM Tunnels

5

14.0

Painting

17

15.0

Partitioning

16

16.0

Plasterboard

16

83 of 84

PRODUCTION RATES Table of Contents DESCRIPTION

ITEM NO.

PAGE NO.

17.0

Plastering

16

18.0

Post Tensioning

9

19.0

Power Supply

21

20.0

Rainwater Works

22

21.0

Reinforcement

8

22.0

Reinforcement Ratios

8

23.0

Removable Anchors

5

24.0

Rendering

16

25.0

Restoration Works

16

26.0

Rock Tunnels

2

27.0

Rule of Thumb

4

28.0

Screeding

16

29.0

Secant Piling

4

30.0

Sheet Piling

4

31.0

Sheeted Roofs

15

32.0

Site Clearance

4

33.0

Site Investigation

7

34.0

Slates and Tiling

14

35.0

Slurry Mix Walls

4

36.0

Small or Deep Excavation

2

37.0

Soil Mix Walls

4

38.0

Spread and Level

1

39.0

Steel Frames

14

40.0

Steel Strutting

8

41.0

Stonework

15

42.0

Structural Steelwork

7

43.0

Timber Frames

13

44.0

Tower Cranes

3

45.0

Trackwork

7

46.0

Trench Excavation

1

47.0

Underpinning

3

48.0

Wall Finishes

15

49.0

Wallpapering

15

50.0

Waterproofing

7

51.0

Working Platforms

3