Production Planning & Control_ALL

August 4, 2017 | Author: api-3704742 | Category: Multiple Choice, Inventory, Six Sigma, Procurement, Scheduling (Production Processes)
Share Embed Donate


Short Description

Production Planning & Control_ALL...

Description

P P C 3rd SEMESTER OPERATIONS (PGDBA) True/False Question: XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN and ZN. Correct Answer: True Your Answer True Multiple Choice Single Answers Question: Forecast is based on:Correct Answer: Past data Your Answer Competitor's market share Select the Blank Question: Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer: Updating Your Answer Design Multiple Choice Single Answers Question: For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted:Correct Answer: Production Planning Control Your Answer Production Planning Control True/False Question: CPM marks critical activities. Correct Answer: True Your Answer True Select The Blank Question: A shop order may combine more than one ________ requiring identical items. Correct Answer: Work order Your Answer Sales order Multiple Choice Single Answer Question: What are the customer's expectation from the supplier? Correct Answer: Consistent good quality of products Your Answer Consistent good quality of products Select The Blank Question: ________ inventories help to balance company's supply with market demand. Correct Answer: Finished goods Your Answer WIP Select The Blank Question: Short term forecasts are for ________.

Correct Answer: Material Planning Your Answer Cash flow management

Multiple Choice Single Answer Question: For process planning following is one of the basic document used :Correct Answer: Operation Layout Your Answer Process Layout Multiple Choice Single Answer Question: Scheduled start of an operation is authorized by issuing a document called :Correct Answer: Job card Your Answer Route card Multiple Choice Multiple Answer Question: SOS Analysis involves following type of items :Correct Answer: Seasonal items available only for a limited period. , Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. , Machine spare parts Multiple Choice Multiple Answer Question: The basic procedure of assignment technique is designed to solve problems wherein :Correct Answer: Number of tasks equal to number of facilities. , The objective function is minimization. , There are no restrictions in allocation Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost of machine should be taken into consideration. True/False Question: There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product. Correct Answer: True Your Answer True True/False Question: In LOB, the regular progress checks the future effect of any current delays and indicates degree of urgency for corrective action. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are

PAGE NO: 1 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

as follows. Find the sequence for 5 jobs that will minimize total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4 Correct Answer: 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. True/False Question: When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult. Correct Answer: True Your Answer True

Question: The data regarding maximum run out between centers pertains to :Correct Answer: Process planning Your Answer Raw material data True/False Question: Lead time information is required for determination of safety stock. Correct Answer: False Your Answer True Select The Blank Question: Americans like to use the word 'inventory' whereas for same context British use the term________. Correct Answer: Stock Your Answer Stock

Match The Following Question: Correct Answer:Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Extra material requirement Machining allowance in handling

Extra material requirementMaterial loss

Spoilage allowance requirement of spares

Process rejection Quantity to meet

Select The Blank Question: ________ is required for machine set ups as well as regular production. Correct Answer: Performance standard Your Answer Machine design data Multiple Choice Single Answer Question: If a product is required within 20 days and the product can be made available in 10 days, the Critical ratio would be :Correct Answer: 2 Your Answer 0.5 Multiple Choice Single Answer Question: A subcontractor is :Correct Answer: Another form acting as a supplier Your Answer Manufacturer of specialized products on whom the buyer is dependent for 100% of requirement of main assembly

Multiple Choice Multiple Answer Question: SDE analysis is employed by the purchase department for :Correct Answer: Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. Your Answer Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. , Contract buying for some of 'easy' items. True/False Question: Labour efficiency factor is applied after capacity requirement of equipment is calculated. Correct Answer: False Your Answer True Multiple Choice Multiple Answer Question: PERT terminology uses words like :Correct Answer: Network diagram , Events , Slack Your Answer Network diagram , Events True/False Question: The LOB technique is most appropriate for assembly operations involving number of distinct components. Correct Answer: True Your Answer True True/False Question: Transit time for manufactured items should be considered only when it is insignificant. Correct Answer: False Your Answer True

Multiple Choice Single Answer Select The Blank

PAGE NO: 2 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: A progress card normally contains ________ squares. Correct Answer: Less than 25 Your Answer More than 50

Multiple Choice Multiple Answer Question: Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :Correct Answer: Tool breakage , Job split up , Change in priorities Your Answer Tool breakage , Job split up , Store inventory Multiple Choice Single Answer Question: One of the following is not an task of progressing :Correct Answer: Ensuring supply of material and issue of documents to manufacturing shops Your Answer Expediting to rush up remaining operations of the delays jobs Multiple Choice Single Answer Question: Production output in night shift is :Correct Answer: Less than I shift production Your Answer More than I shift production Multiple Choice Multiple Answer Question: The minimum requirements for application software for line balancing are as follows :Correct Answer: 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Your Answer 1 Gb hard Disk free memory , Windows or equivalent operating system. Multiple Choice Single Answer Question: The work measurement and time study belong to the following school of management :Correct Answer: Scientific School of management Your Answer Functional School of management Multiple Choice Multiple Answer Question: Before planning subcontracting points to be considered are :Correct Answer: Whether overtime can be given , One more shift can be started Your Answer Whether overtime can be given , One more shift can be started , Set up time can be reduced Multiple Choice Multiple Answer Question: The main requirements of re-order level system are as follows :-

Correct Answer: Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Your Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Multiple Choice Multiple Answer Question: The following are salient features of the fixed order quantity system :Correct Answer: Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time. Your Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Percent cumulative cost of item is taken into consideration. Select The Blank Question: ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under these circumstances, the firm would take a decision to ________. Correct Answer: Make at home Your Answer Buy from outside Multiple Choice Multiple Answer Question: Following difficulties are faced by SDE analysis :Correct Answer: More delivery period , Geographical location of supplier , Reliability of suppliers Your Answer More delivery period , Reliability of suppliers , Excise duty Select The Blank Question: For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer: Free Your Answer Net True/False Question: Route sheets for custom built job is prepared for each new order received.

PAGE NO: 3 OF 17

Correct Answer: Your Answer True

True

P P C 3rd SEMESTER OPERATIONS (PGDBA)

memory or wastes computer stationary while preparing stores ledger. Correct Answer: MNG Analysis Your Answer SOS Analysis

Match The Following Question: Correct Answer:Your Answer Order quantity Factor influencing process planningCompare alternative processes Machine capacity chart Dimensional accuracy purpose machines with special toolings

Multiple Choice Single Answer Question: Why customer is called the king? Correct Answer: Customer's orders gives us work Your Answer Gives satisfaction to workers

General

Mass production Special purpose machines Break even analysis Standard elemental time data Compare alternative processes Factor influencing process planning

Multiple Choice Multiple Answer Question: Following are some of the common standard cutting tools :Correct Answer: Cutting saw , Inserts , Reamers Your Answer Form tool , Inserts , Reamers Multiple Choice Single Answer Question: The Carrying cost is stated in terms of :Correct Answer: Per item per year Your Answer Per order Select The Blank Question: The definitive statement of policy stating when to procure and how much to procure usually to ensure that the sum of all costs associated with ________ are minimised is called Inventory policy. Correct Answer: Inventory Your Answer Buying Select The Blank Question: Buying for C quantities should be made in ________ quantities . Correct Answer: Large Your Answer Medium Select The Blank Question: In the assignment model, the________ is formed between jobs and machines. Correct Answer: Matrix Your Answer Matrix Select The Blank Question: ________ analysis mainly helps to identify nonexisting items for which store keeps bin cards, wastes computer

Multiple Choice Single Answer Question: Negative value of critical ratio :Correct Answer: Is meaningless Your Answer Indicates excess of scheduled delivery period Multiple Choice Multiple Answer Question: The main characteristics of batch production are :Correct Answer: Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process True/False Question: If lead time available is 11days and lead time required is 10 days, the critical ratio would be 1.10. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: What are the factor affecting decision about centralized planning system? Correct Answer: Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive Your Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive True/False Question: In continuous or process production , only one product is manufactured. Correct Answer: True Your Answer True True/False Question: The make-or-buy decision becomes necessary when the current source of supply is not able to supply the material in accordance with buyer's quality requirements. Correct Answer: True Your Answer True True/False

PAGE NO: 4 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: Work measurement function is attached to line management. Correct Answer: False Your Answer True

Multiple Choice Single Answer Question: Placement of purchase orders in case of 'A' type of items is usually :Correct Answer: Frequent Your Answer Frequent Match The Following Question: Correct Answer:Your Answer Economic order quantity Quantity at which there is neither overstocking nor under stocking. Quantity at which there is neither overstocking nor under stocking. Carrying cost Cost of 'holding' the material in store of transportation [carrying] of material

Cost

Procurement cost Administrative cost for procurement of procurement of material

Cost

Inventory cost Sum of carrying and inventory cost Sum of carrying and inventory cost

True/False Question: To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the second machine must be smaller than or equal to the smallest time of any job on first machine or third machine. Correct Answer: True Your Answer False True/False Question: Systematic procedures must be set in the operating functions prior to installation of PPC in the firm. Correct Answer: True Your Answer True

Multiple Choice Single Answer Question: Which factor influence plan for meeting seasonal or occasional increase in demand? Correct Answer: Subcontracting Your Answer Subcontracting Multiple Choice Single Answer Question: Which of the following is the function of Production Planning? Correct Answer: Process planning and scheduling Your Answer Progressing Select The Blank Question: Because of uncertainty of activity timings, PERT acquired a shape of ________ model. Correct Answer: Probabilistic Your Answer Statistical True/False Question: Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer: False Your Answer True True/False Question: Job schedule is a chart showing work ahead of each machine with respect to time. Correct Answer: False Your Answer True Match The Following Question: Correct Answer:Your Answer Tooling cost

Jigs and Fixtures Jigs and Fixtures

Opportunity costsMonitory value sacrificed in rejection of giving opportunity to do a business

Cost

Incremental cost Vary with decision to make or buy Vary with decision to make or buy Select The Blank Question: Time waste is the earliest of all wastes and yet the________ to correct because it does not litter the floor. Correct Answer: Hazards Your Answer Big hazard Multiple Choice Single Answer Question: If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer: 4 months Your Answer 1.2 Months

Labour cost benefits

Wages and other benefits Wages and other

Multiple Choice Single Answer Question: The goods are manufactured as per customer's definite order in case of :Correct Answer: Job production Your Answer Batch production

PAGE NO: 5 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) Multiple Choice Multiple Answer Question: The commonly used network techniques other than PERT and CPM are as follows :Correct Answer: MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ] Your Answer MIS [ Management Information Systems ] Multiple Choice Multiple Answer Question: To minimize total throughout time we are required to minimize :Correct Answer: Queuing , Idle time , Inventory Your Answer Queuing , Idle time Multiple Choice Multiple Answer Question: Following conditions are required to be fulfilled for processing n jobs through 2 machines :Correct Answer: The jobs are ready to be processed before the period under consideration begins . , Transient time to move a job from one machine to the another is negligible. , In process inventory is allowed. Your Answer The jobs are ready to be processed before the period under consideration begins . , In process inventory is allowed. Select The Blank Question: An inventory control technique based on selective approach to stock items is called ________ analysis. Correct Answer: Pareto's Your Answer Pareto's Multiple Choice Multiple Answer Question: While communicating to customer on delays in delivery following information should be given :Correct Answer: Information on identification of job , Reasons for delays , Revised date of delivery Your Answer Reasons for delays , Revised date of delivery Select The Blank Question: CPM is ________ oriented system. Correct Answer: Activity Your Answer Activity Multiple Choice Single Answer Question: One of the following is not consumable tool :Correct Answer: Arbors Your Answer Arbors True/False Question: LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning].

Correct Answer: Your Answer False

True

Select The Blank Question: ________ is required when expediting fails to bring deviated plan to its actual path. Correct Answer: Replanning Your Answer Replanning Multiple Choice Multiple Answer Question: The process of contraction or compression involves extra cost because extra money is required to be spent on factors such as :Correct Answer: Overtime engagement of workforce , Purchase of additional machinery , Use of better materials Your Answer Overtime engagement of workforce , Purchase of additional machinery , Purchase of stationary of good quality Multiple Choice Single Answer Question: In job production one single product is manufactured while a batch of group of products is turned out at a time under a system of :Correct Answer: Batch production Your Answer Process production Multiple Choice Multiple Answer Question: The 'F' group of GOLF analysis involves following requirements :Correct Answer: Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers Multiple Choice Single Answer Question: The production system characterized by complex set of activities that must be performed in a particular order within a given period and within an estimated expenditure is known as :Correct Answer: Project production Your Answer Project production Multiple Choice Single Answer Question: Proper Production Planning and Control can reduce cost in :Correct Answer: Overtime cost Your Answer Overtime cost Select The Blank Question: ________ is the specific instant of time that marks start and end of activity. Correct Answer: Event Your Answer Event

PAGE NO: 6 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Select The Blank Question: Overlapping of operations help to ________ manufacturing time. Correct Answer: Reduce Your Answer Reduce

Multiple Choice Multiple Answer Question: "Difficult" items have following attributes :Correct Answer: Available indigenously but are not easy to procure , Items which come from longer distance , Items which are difficult to manufacture Your Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items having complex specifications Multiple Choice Multiple Answer Question: They are type of analytical estimate :Correct Answer: Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Curve fitting Select The Blank Question: The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer: Scheduler Your Answer Production engineer Multiple Choice Multiple Answer Question: The network analysis involves following works :Correct Answer: Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Your Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Multiple Choice Single Answer Question: The assembly work content [ Wi ] of the i'th station having n work stations is given by :Correct Answer: å Wi from i=1 to n Your Answer å Wi from i=1 to n Multiple Choice Multiple Answer Question: Essentials of good forecasts are :Correct Answer: Stability , Fairly accurate , Economical to generate Your Answer Stability , Fairly accurate , Economical to generate

True/False Question: The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer: True Your Answer True Select The Blank Question: ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer: 6 Lacs Your Answer 6 Lacs LIST OF ATTEMPTED QUESTION:S AND ANSWERS Multiple Choice Multiple Answer Question: If actual demand far exceeds forecast, it will result into :Correct Answer: Better utilization of equipment , Project margin , Higher material purchase Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question: To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer: Load Your Answer Load Multiple Choice Single Answer Question: LOB technique was developed by US navy in the year :Correct Answer: 1958 Your Answer 1958 True/False Question: In continuous or process production , only one product is manufactured. Correct Answer: True Your Answer True Select The Blank Question: ________reflects impact of money tied up in inventory. Correct Answer: Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question: Methods for recording actual progress of work for shop orders are :Correct Answer: Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card

PAGE NO: 7 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Select The Blank Question: A progress card is the most ________ method of recording of progress of work. Correct Answer: Convenient Your Answer Convenient

Multiple Choice Multiple Answer Question: Following are some of the common standard cutting tools :Correct Answer: Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers Multiple Choice Multiple Answer Question: Tooling cost comprises the cost of :Correct Answer: Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question: The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer: IV-I-II-V-III Your Answer I-II-III-IV-V Select The Blank Question: ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. Correct Answer: Order preparation time Your Answer Queue time True/False Question: PERT basically does not demarcate between critical and non-critical activities. Correct Answer: True Your Answer True Multiple Choice Single Answer Question: The assignment method is also called as :Correct Answer: Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question: Outside operations cost involves expenses such as :Correct Answer: Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question: The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer: Foreman's Your Answer Foreman's

Multiple Choice Multiple Answer Question: The 'F' group of GOLF analysis involves following requirements :Correct Answer: Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question: Correct Answer: Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning Multiple Choice Multiple Answer Question: The tooling data is prepared in respect of following measuring instruments :Correct Answer: Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits Multiple Choice Multiple Answer Question: In replenishment system, the fixed order quantity system is also called by following names :Correct Answer: Fixed order system , Min-max system , Reorder point system Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer Question: How you will Judge the failure of production planning and control department? Correct Answer: Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question: In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer: Parabolic Your Answer Inverse True/False

PAGE NO: 8 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours. Correct Answer: False Your Answer True

Multiple Choice Single Answer Question: If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer: 4 months Your Answer 4 months Multiple Choice Single Answer Question: The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer: D. Konig Your Answer Charles simony Multiple Choice Single Answer Question: So far as possible, number of activities should be :Correct Answer: Limited Your Answer Limited True/False Question: Production Planning and Control makes the supervisor ineffective. Correct Answer: True Your Answer False Multiple Choice Single Answer Question: Unit of loading and scheduling depends on following factor :Correct Answer: Operating cycle Your Answer Unit of capacity True/False Question: The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: Load charts are used for following :Correct Answer: To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Select The Blank Question: ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer: 6 Lacs Your Answer 6 Lacs

Select The Blank Question: An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer: Two Your Answer Pair Multiple Choice Multiple Answer Question: They are type of analytical estimate :Correct Answer: Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Multiple Choice Single Answer Question: For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer: Production Planning Control Your Answer Production True/False Question: Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer: False Your Answer True True/False Question: Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer: False Your Answer True Multiple Choice Single Answer Question: Value Analysis conducted in 'C' type of material is usually :Correct Answer: Minimum Your Answer Minimum True/False Question: Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer: True Your Answer True True/False Question: In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer: False Your Answer True Select The Blank Question: For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer: Free Your Answer Net

PAGE NO: 9 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) Multiple Choice Single Answer Question: What are the customer's expectation from the supplier? Correct Answer: Consistent good quality of products Your Answer Consistent good quality of products

Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available. LIST OF ATTEMPTED QUESTION:S AND ANSWERS

Match The Following Question: Correct Answer: Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares

Multiple Choice Multiple Answer Question: Following are the factors which influence tool life :Correct Answer: Operators efficiency , Type of tool , Material it is required to operate upon Your Answer Operators efficiency , Type of tool , Material it is required to operate upon

Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection Multiple Choice Single Answer Question: Why customer is called the king? Correct Answer: Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question: PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer: Timely availability of material, manpower Your Answer Timely availability of material, manpower Select The Blank Question: Generally for ________ flow system, Heuristic method is preferred. Correct Answer: Intermittent Your Answer Continuous Select The Blank Question: In control board________ compartment contains copy of work orders/shop orders of the item to be processed next on the machine. Correct Answer: Middle Your Answer Bottom True/False Question: Work measurement function is attached to line management. Correct Answer: False Your Answer True Multiple Choice Multiple Answer Question: The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer: Tools and plants are available , Technical know how is available , Competent persons are present

Multiple Choice Single Answer Question: The document which incorporates details of process planning for a job is called :Correct Answer: Route Sheet Your Answer Route Sheet Multiple Choice Multiple Answer Question: CPM terminology uses words like Correct Answer: Arrow diagram , Nodes , Float Your Answer Arrow diagram , Nodes Select The Blank Question: Forecasting is function of ________. Correct Answer: Marketing department Your Answer Planning in charge Select The Blank Question: Johnsons method of scheduling can be used when operation sequence involve ________ machines. Correct Answer: Two Your Answer Two Select The Blank Question: Good quality and ________are the two main requirements to secure maximum business from a customer. Correct Answer: Competitive rates Your Answer Competitive rates Select The Blank Question: Sum of queue, transit, order preparation and manufacturing times is known as ________ Correct Answer: Total Lead Time Your Answer Total Lead Time True/False

PAGE NO: 10 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: To conduct FSN analysis we require, last date of receipt or last date of issue whichever is later and period. Correct Answer: True Your Answer True

Multiple Choice Multiple Answer Question: Overtime can be avoided in many ways and they are :Correct Answer: Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Your Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown

Multiple Choice Single Answer Question: Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer: By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department True/False Question: Fluctuation due to changes in season are called cyclical fluctuation. Correct Answer: False Your Answer False

Multiple Choice Multiple Answer Question: Material control function embraces a following techniques :Correct Answer: Make -or -buy decision , Pareto's analysis , Replenishment system Your Answer Make -or -buy decision , Pareto's analysis , Replenishment system

True/False Question: Flexibility and product variety are not interrelated with each other. Correct Answer: False Your Answer True

True/False Question: Work measurement is not useful for choosing between two alternate methods of production. Correct Answer: False Your Answer False

True/False Question: Overlapping of operations help to reduce manufacturing time. Correct Answer: True Your Answer True

Multiple Choice Multiple Answer Question: Process Sheet contains following information :Correct Answer: Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

Select The Blank Question: The LOB technique is made more accurate and fast by using ________. Correct Answer: Computers Your Answer Reduction techniques

True/False Question: More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer: True Your Answer True Select The Blank Question: Classification of items on basis of their capital lock up is called ________ analysis. Correct Answer: XYZ Your Answer XYZ Select The Blank Question: Purchase section must keep ________posted on the progress of purchase orders and expected delays. Correct Answer: P.P.C. Your Answer P.P.C.

True/False Question: Overtime is undesirable since it increases manufacturing cost of the product. Correct Answer: True Your Answer False Multiple Choice Multiple Answer Question: The essential features of batch production are :Correct Answer: General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Your Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Multiple Choice Single Answer Question: The sourcing of vendors in case of 'B' type of items is :Correct Answer: Medium

PAGE NO: 11 OF 17

Your Answer

Few

P P C 3rd SEMESTER OPERATIONS (PGDBA) Your Answer

Multiple Choice Single Answer Question: Dispatcher withdraws required quantity of material from stores using following document :Correct Answer: Stores issue order Your Answer Bill of material Multiple Choice Multiple Answer Question: In a mass production assembly shop following work measurement techniques are used :Correct Answer: Time study , Work sampling , Production study Your Answer Time study , Work sampling , Production study , Analytical estimating Multiple Choice Multiple Answer Question: SDE analysis is based on problems of procurement namely :Correct Answer: Non-availability , Scarcity , Longer lead time Your Answer Non-availability , Scarcity , Longer lead time True/False Question: Line balancing is a simulation technique. Correct Answer: False Your Answer False Multiple Choice Multiple Answer Question: The line of balance is a device for planning and monitoring progress of :Correct Answer: Purchase order execution , Project execution , Targeted programs Your Answer Purchase order execution , Project execution , Targeted programs Select The Blank Question: Sales persons decides ________. Correct Answer: Synthetic forecast Your Answer Current sales True/False Question: Material control Card is a document for record of issues of material and receipt of unused material by production shop. Correct Answer: False Your Answer False Multiple Choice Single Answer Question: Work measurement is limited to measuring :Correct Answer: Productive & non productive time

Only product related activities

Match The Following Question: Correct Answer:Your Answer Move order Transport material from and to required work centers Transport material from and to required work centers Materials Order Allocation of material required in connection with shop order Allocation of material required in connection with shop order Work Order Bird's eye view of production programme Bird's eye view of production programme Production Order Reserve material required in connection with sales order Reserve material required in connection with sales order

Multiple Choice Multiple Answer Question: The software for line balancing should have following features :Correct Answer: Easy to operate , Easy to install , Easy to upgrade Your Answer Easy to operate , Easy to install , Unmanaged code should be available Multiple Choice Single Answer Question: Man hours is commonly used unit of measurement for scheduling purposes in following industry :Correct Answer: Engineering Your Answer Engineering Multiple Choice Multiple Answer Question: Customer plays very important role due to the following reasons :Correct Answer: Gives us work , Dividends to share holders , Gets business from new customers Your Answer Gives us work , Dividends to share holders , Gets business from new customers Multiple Choice Single Answer Question: The 4X4 assignment problem involve following job-machine operations :Correct Answer: 24 Your Answer 24 Multiple Choice Single Answer Question: The best of scientific tools available for scheduling is :Correct Answer: CPA [ critical path analysis ] Your Answer Gantt Chart

PAGE NO: 12 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) Multiple Choice Multiple Answer Question: Work measurement is responsibility of :Correct Answer: PPC , Industrial Engineering , Production department Your Answer PPC , Industrial Engineering Match The Following Question: Correct Answer:Your Answer Long production run Flow production

Mass and Flow production Mass and

Complex activities to be performed in a particular order within a give time & estimate. Project production Project production One or few units manufactured as per customers requirement Jobbing Production Jobbing Production Short production run

Multiple Choice Multiple Answer Question: Smoothing performs following activities:Correct Answer: Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach Your Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach True/False Question: As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer: True Your Answer True Select The Blank Question: Value analysis of ________ class items is usually inadvisable. Correct Answer: C Your Answer C

Batch Production Batch Production

Multiple Choice Single Answer Question: Value Analysis conducted in 'C' type of material is usually :Correct Answer: Minimum Your Answer Minimum

True/False Question: PPC system in the organisation is to be tailor made. Correct Answer: True Your Answer True

LIST OF ATTEMPTED QUESTION:S AND ANSWERS Multiple Choice Multiple Answer Question: Some of significant features of HML analysis are :Correct Answer: To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases , Not to take consumption into account Your Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases Multiple Choice Single Answer Question: What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer: Failure to provide proper tools and control on work in progress on shop floor Your Answer Failure to provide proper tools and control on work in progress on shop floor Multiple Choice Single Answer Question: The administrative expenses towards the procurement of materials is called :Correct Answer: Procurement cost Your Answer Administrative cost

True/False Question: Performance benchmarking does not involves comparison of financial ratios at the aggregate level. Correct Answer: False Your Answer False Multiple Choice Single Answer Question: Setup time includes :Correct Answer: Internal setup time & External setup time Your Answer Internal setup time & External setup time Multiple Choice Single Answer Question: Participants of the groups for quality circles should be decided by :Correct Answer: Employees coming together by their own enthusiasm Your Answer Employees coming together by their own enthusiasm Multiple Choice Single Answer

PAGE NO: 13 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: Check sheet are also used as :Correct Answer: Data gathering & interpretation tool Your Answer Data gathering & interpretation tool Multiple Choice Single Answer Question: SMED means :Correct Answer: Single minute exchange of dies Your Answer Single minute exchange of dies

Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many" Parato analysis is technique of identifying vital causes by Arranging data according to the descending order of their frequency of occurrence Arranging data according to the descending order of their frequency of occurrence Parato diagram is a Bar graph with height or value drawn by Arranging data in descending order Magnitude of defects

Match The Following Question: Correct Answer:Your Answer Productivity performance measurement Cost of quality

Turnover employee

Financial performance measurement Sales of the months

Sales of the months

Customer satisfaction measurement Customer complaints per period Customer complaints per period Staff attitude measurementEmployee satisfaction index Employee satisfaction index

Select The Blank Question: ________ is an effect due to the muda of defect. Correct Answer: Wear & tear of parts while disassembling Your Answer Poor production planning & control Select The Blank Question: If some defective parts are discovered by the subsequent process they should be returned to the ________ to prevent reoccurrence. Correct Answer: Preceding process Your Answer Return to stores Multiple Choice Multiple Answer Question: The results oriented efforts of the quality circle should also include :Correct Answer: Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities Match The Following Question: Correct Answer:Your Answer

Multiple Choice Multiple Answer Question: Few steps in construction in Radar chart are :Correct Answer: Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre Select The Blank Question: 5 S audit result is discussed in ________ meeting. Correct Answer: Monthly Your Answer Monthly True/False Question: Fishbone analysis is used both in analysis & planning. Correct Answer: True Your Answer False Multiple Choice Single Answer Question: One Green Belt may head a team of :Correct Answer: 20 employees Your Answer 20 employees Multiple Choice Multiple Answer Question: Role of champions are :Correct Answer: Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation

Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect

PAGE NO: 14 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Multiple Choice Multiple Answer Question: To draw control charts, sample must be representative of homogeneous segment of production for which :Correct Answer: The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Your Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Multiple Choice Single Answer Question: Failure mode and effect analysis (FMEA) establish Correct Answer: Process failure and minimize frequency Your Answer Process failure and minimize frequency Multiple Choice Multiple Answer Question: What are the steps in deciding the benchmarking partner? Correct Answer: Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Multiple Choice Single Answer Question: One Master Black Belt may head a team of :Correct Answer: 15-20 Black Belts Your Answer 15-20 Black Belts Multiple Choice Single Answer Question: Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :Correct Answer: Main competitor Your Answer Main competitor Multiple Choice Single Answer Question: Implication of Quality problem is:Correct Answer: Gap in performance Your Answer Gap in performance

Select The Blank Question: Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart. Correct Answer: c-chart Your Answer c-chart True/False

Question: Non-availability of files /document in time is a problem to be addressed by office TPM. Correct Answer: True Your Answer True Multiple Choice Single Answer Question: Check sheet is easy to use because it is :Correct Answer: Simplest tool Your Answer Simplest tool Multiple Choice Single Answer Question: Benchmarking helps to identify the gap between the current performance of the organization and the :Correct Answer: Performance of the best organization Your Answer Performance of the best organization True/False Question: Flow chart is pictorial representation of the steps in production control. Correct Answer: False Your Answer True Multiple Choice Multiple Answer Question: Breakdown problem may be stratified by :Correct Answer: Sections , Machines , Type of breakdown (e.g mech. Or electrical) Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical) Select The Blank Question: A control chart to exhibit counted data on number of defect is called ________. Correct Answer: c-chart Your Answer c-chart Select The Blank Question: Procedure for implementation of TPM consists of ________ numbers of steps. Correct Answer: 12 Your Answer 8 Select The Blank Question: Capability index Cp = ________ Correct Answer: Specification width/process width Your Answer Specification width/process width Multiple Choice Single Answer Question: Pareto's analysis underlines & operates philosophy of :Correct Answer: Vital few = trivial many Your Answer Vital few = trivial many

PAGE NO: 15 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) True/False Question: Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer: True Your Answer True

Correct Answer: Prevention type Poka-Yoke , Detection type Poka-Yoke Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke Multiple Choice Single Answer Question: Quality problem solving tool is used to :Correct Answer: Improve quality Your Answer Save time

Multiple Choice Multiple Answer Question: To reduce clamping & declamping time, following actions are desirable :Correct Answer: Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device

True/False Question: Along with problem solving tools experience and judgment is also used. Correct Answer: True Your Answer False

Select The Blank Question: Benchmarking allows exchange of ________ between the benchmarking partners. Correct Answer: Information Your Answer Information

Select The Blank Question: JIT advocates the philosophy at elimination of waste from system which occurs due to ________. Correct Answer: Over Production Your Answer Over Production

Multiple Choice Multiple Answer Question: TQM can never flourish if the staff are:Correct Answer: Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses

True/False Question: Without measuring initial performance, target can't be set. Correct Answer: True Your Answer False

True/False Question: In bar graph each bar is of same height. Correct Answer: False Your Answer False Multiple Choice Multiple Answer Question: During SMED implementation, primary study consists of :Correct Answer: Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis True/False Question: Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: Types of Poka-Yoke are :-

Multiple Choice Multiple Answer Question: An erratic patterns falling above & below the control limits indicates :Correct Answer: Defect in materials , Frequent adjustment of machines , Poorly trained operators Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators True/False Question: Sample size for the construction of p-chart are larger than X bar-R chart. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: Histogram is an important diagnostic tool. Analysis of the histogram gives :Correct Answer: It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around

PAGE NO: 16 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

correct average & within specific limits , A bird's eye view of the variation Multiple Choice Single Answer Question: Productivity improves by :Correct Answer: Voluntary participants of everyone Your Answer Voluntary participants of everyone

PAGE NO: 17 OF 17

Production Planning & Control_8 LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN and ZN. Correct Answer True Your Answer True Multiple Choice Single Answer Question Forecast is based on :Correct Answer Past data Your Answer Competitor's market share Select The Blank Question Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer Updating Your Answer Design Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer Production Planning Control True/False Question Correct Answer Your Answer

CPM marks critical activities. True True

Select The Blank Question A shop order may combine more than one ________ requiring identical items. Page 1

Correct Answer Your Answer

Production Planning & Control_8 Work order Sales order

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer Consistent good quality of products Select The Blank Question ________ inventories help to balance company's supply with market demand. Correct Answer Finished goods Your Answer WIP Select The Blank Question Correct Answer Your Answer

Short term forecasts are for ________. Material Planning Cash flow management

Multiple Choice Single Answer Question For process planning following is one of the basic document used :Correct Answer Operation Layout Your Answer Process Layout Multiple Choice Single Answer Question Scheduled start of an operation is authorized by issuing a document called :Correct Answer Job card Your Answer Route card Multiple Choice Multiple Answer Question SOS Analysis involves following type of items :Correct Answer Seasonal items available only for a limited period. , Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. Page 2

Production Planning & Control_8 Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. , Machine spare parts Multiple Choice Multiple Answer Question The basic procedure of assignment technique is designed to solve problems wherein :Correct Answer Number of tasks equal to number of facilities. , The objective function is minimization. , There are no restrictions in allocation Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost of machine should be taken into consideration. True/False Question There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product. Correct Answer True Your Answer True True/False Question In LOB, the regular progress checks the future effect of any current delays and indicates degree of urgency for corrective action. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are as follows.Find the sequence for 5 jobs that will minimize total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4 Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. True/False Page 3

Production Planning & Control_8 Question When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult. Correct Answer True Your Answer True Match The Following Question Correct Answer

Your Answer

End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares material requirement

Extra

Machining allowance in handling

Material loss

Extra material requirement

Spoilage allowance Process rejection spares

Quantity to meet requirement of

Select The Blank Question ________ is required for machine set ups as well as regular production. Correct Answer Performance standard Your Answer Machine design data Multiple Choice Single Answer Question If a product is required within 20 days and the product can be made available in 10 days, the Critical ratio would be :Correct Answer 2 Your Answer 0.5 Multiple Choice Single Answer Question A subcontractor is :Correct Answer Another form acting as a supplier Your Answer Manufacturer of specialized products on whom the Page 4

Production Planning & Control_8 buyer is dependent for 100% of requirement of main assembly Multiple Choice Single Answer Question The data regarding maximum run out between centers pertains to :Correct Answer Process planning Your Answer Raw material data True/False Question safety stock. Correct Answer Your Answer

Lead time information is required for determination of False True

Select The Blank Question Americans like to use the word 'inventory' whereas for same context British use the term________. Correct Answer Stock Your Answer Stock Multiple Choice Multiple Answer Question SDE analysis is employed by the purchase department for :Correct Answer Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. Your Answer Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. , Contract buying for some of 'easy' items. True/False Question Labour efficiency factor is applied after capacity requirement of equipment is calculated. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question PERT terminology uses words like :Page 5

Correct Answer Your Answer

Production Planning & Control_8 Network diagram , Events , Slack Network diagram , Events

True/False Question The LOB technique is most appropriate for assembly operations involving number of distinct components. Correct Answer True Your Answer True True/False Question Transit time for manufactured items should be considered only when it is insignificant. Correct Answer False Your Answer True Select The Blank Question Correct Answer Your Answer

A progress card normally contains ________ squares. Less than 25 More than 50

Multiple Choice Multiple Answer Question Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :Correct Answer Tool breakage , Job split up , Change in priorities Your Answer Tool breakage , Job split up , Store inventory Multiple Choice Single Answer Question One of the following is not an task of progressing :Correct Answer Ensuring supply of material and issue of documents to manufacturing shops Your Answer Expediting to rush up remaining operations of the delays jobs Multiple Choice Single Answer Question Production output in night shift is :Correct Answer Less than I shift production Page 6

Your Answer

Production Planning & Control_8 More than I shift production

Multiple Choice Multiple Answer Question The minimum requirements for application software for line balancing are as follows :Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Your Answer 1 Gb hard Disk free memory , Windows or equivalent operating system. Multiple Choice Single Answer Question The work measurement and time study belong to the following school of management :Correct Answer Scientific School of management Your Answer Functional School of management Multiple Choice Multiple Answer Question Before planning subcontracting points to be considered are :Correct Answer Whether overtime can be given , One more shift can be started Your Answer Whether overtime can be given , One more shift can be started , Set up time can be reduced Multiple Choice Multiple Answer Question The main requirements of re-order level system are as follows :Correct Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Your Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Page 7

Production Planning & Control_8 Multiple Choice Multiple Answer Question The following are salient features of the fixed order quantity system :Correct Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time. Your Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Percent cumulative cost of item is taken into consideration. Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under these circumstances, the firm would take a decision to ________. Correct Answer Make at home Your Answer Buy from outside Multiple Choice Multiple Answer Question Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers Your Answer More delivery period , Reliability of suppliers , Excise duty Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Your Answer Net True/False Question Route sheets for custom built job is prepared for each new order received. Page 8

Correct Answer Your Answer

Production Planning & Control_8 True True

Match The Following Question Correct Answer

Your Answer

Order quantity Factor influencing process planning alternative processes

Compare

Machine capacity chart Dimensional accuracy purpose machines with special toolings

General

Mass production

Special purpose machines

Break even analysis

Standard elemental time data Compare alternative processes Factor influencing process planning

Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer Form tool , Inserts , Reamers Multiple Choice Single Answer Question The Carrying cost is stated in terms of :Correct Answer Per item per year Your Answer Per order Select The Blank Question The definitive statement of policy stating when to procure and how much to procure usually to ensure that the sum of all costs associated with ________ are minimised is called Inventory policy. Correct Answer Inventory Your Answer Buying Select The Blank Page 9

Question quantities . Correct Answer Your Answer

Production Planning & Control_8 Buying for C quantities should be made in ________ Large Medium

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer Matrix Select The Blank Question ________ analysis mainly helps to identify non-existing items for which store keeps bin cards, wastes computer memory or wastes computer stationary while preparing stores ledger. Correct Answer MNG Analysis Your Answer SOS Analysis Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer Gives satisfaction to workers Multiple Choice Single Answer Question Negative value of critical ratio :Correct Answer Is meaningless Your Answer Indicates excess of scheduled delivery period Multiple Choice Multiple Answer Question The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Page 10

Production Planning & Control_8 True/False Question If lead time available is 11days and lead time required is 10 days, the critical ratio would be 1.10. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question What are the factor affecting decision about centralized planning system? Correct Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive Your Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive True/False Question manufactured. Correct Answer Your Answer

In continuous or process production , only one product is True True

True/False Question The make-or-buy decision becomes necessary when the current source of supply is not able to supply the material in accordance with buyer's quality requirements. Correct Answer True Your Answer True True/False Question management. Correct Answer Your Answer

Work measurement function is attached to line False True

Multiple Choice Single Answer Question Placement of purchase orders in case of 'A' type of items Page 11

Production Planning & Control_8 is usually :Correct Answer Your Answer

Frequent Frequent

Match The Following Question Correct Answer

Your Answer

Economic order quantity Quantity at which there is neither overstocking nor under stocking. Quantity at which there is neither overstocking nor under stocking. Carrying cost Cost of 'holding' the material in store transportation [carrying] of material

Cost of

Procurement cost Administrative cost for procurement procurement of material

Cost of

Inventory cost Sum of carrying and inventory cost carrying and inventory cost

Sum of

True/False Question To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the second machine must be smaller than or equal to the smallest time of any job on first machine or third machine. Correct Answer True Your Answer False True/False Question Systematic procedures must be set in the operating functions prior to installation of PPC in the firm. Correct Answer True Your Answer True Select The Blank Question Time waste is the earliest of all wastes and yet the________ to correct because it does not litter the floor. Correct Answer Hazards Page 12

Your Answer

Production Planning & Control_8 Big hazard

Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer 1.2 Months Multiple Choice Single Answer Question Which factor influence plan for meeting seasonal or occasional increase in demand? Correct Answer Subcontracting Your Answer Subcontracting Multiple Choice Single Answer Question Which of the following is the function of Production Planning? Correct Answer Process planning and scheduling Your Answer Progressing Select The Blank Question Because of uncertainty of activity timings, PERT acquired a shape of ________ model. Correct Answer Probabilistic Your Answer Statistical True/False Question Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False Your Answer True True/False Question Job schedule is a chart showing work ahead of each machine with respect to time. Correct Answer False Page 13

Your Answer

Production Planning & Control_8 True

Match The Following Question Correct Answer Tooling cost

Your Answer

Jigs and Fixtures

Jigs and Fixtures

Opportunity costs Monitory value sacrificed in rejection opportunity to do a business

Cost of giving

Incremental cost Vary with decision to make or buy decision to make or buy

Vary with

Labour cost benefits

Wages and other benefits

Wages and other

Multiple Choice Single Answer Question The goods are manufactured as per customer's definite order in case of :Correct Answer Job production Your Answer Batch production Multiple Choice Multiple Answer Question The commonly used network techniques other than PERT and CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ] Your Answer MIS [ Management Information Systems ] Multiple Choice Multiple Answer Question To minimize total throughout time we are required to minimize :Correct Answer Queuing , Idle time , Inventory Your Answer Queuing , Idle time Multiple Choice Multiple Answer Page 14

Production Planning & Control_8 Question Following conditions are required to be fulfilled for processing n jobs through 2 machines :Correct Answer The jobs are ready to be processed before the period under consideration begins . , Transient time to move a job from one machine to the another is negligible. , In process inventory is allowed. Your Answer The jobs are ready to be processed before the period under consideration begins . , In process inventory is allowed. Select The Blank Question An inventory control technique based on selective approach to stock items is called ________ analysis. Correct Answer Pareto's Your Answer Pareto's Multiple Choice Multiple Answer Question While communicating to customer on delays in delivery following information should be given :Correct Answer Information on identification of job , Reasons for delays , Revised date of delivery Your Answer Reasons for delays , Revised date of delivery Select The Blank Question Correct Answer Your Answer

CPM is ________ oriented system. Activity Activity

Multiple Choice Single Answer Question One of the following is not consumable tool :Correct Answer Arbors Your Answer Arbors True/False Question LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning]. Correct Answer True Your Answer False Page 15

Production Planning & Control_8 Select The Blank Question ________ is required when expediting fails to bring deviated plan to its actual path. Correct Answer Replanning Your Answer Replanning Multiple Choice Multiple Answer Question The process of contraction or compression involves extra cost because extra money is required to be spent on factors such as :Correct Answer Overtime engagement of workforce , Purchase of additional machinery , Use of better materials Your Answer Overtime engagement of workforce , Purchase of additional machinery , Purchase of stationary of good quality Multiple Choice Single Answer Question In job production one single product is manufactured while a batch of group of products is turned out at a time under a system of :Correct Answer Batch production Your Answer Process production Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers Multiple Choice Single Answer Question The production system characterized by complex set of activities that must be performed in a particular order within a given period and within an estimated expenditure is known as :Correct Answer Project production Your Answer Project production Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost Page 16

Production Planning & Control_8 in :Correct Answer Your Answer

Overtime cost Overtime cost

Select The Blank Question ________ is the specific instant of time that marks start and end of activity. Correct Answer Event Your Answer Event Select The Blank Question Overlapping of operations help to ________ manufacturing time. Correct Answer Reduce Your Answer Reduce Multiple Choice Multiple Answer Question "Difficult" items have following attributes :Correct Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items which are difficult to manufacture Your Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items having complex specifications Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer

Moving average , Curve fitting

Select The Blank Question The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer Scheduler Your Answer Production engineer Page 17

Production Planning & Control_8 Multiple Choice Multiple Answer Question The network analysis involves following works :Correct Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Your Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Multiple Choice Single Answer Question The assembly work content [ Wi ] of the i'th station having n work stations is given by :Correct Answer å Wi from i=1 to n Your Answer å Wi from i=1 to n Multiple Choice Multiple Answer Question Essentials of good forecasts are :Correct Answer Stability , Fairly accurate , Economical to generate Your Answer Stability , Fairly accurate , Economical to generate True/False Question The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer True Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer 6 Lacs LIST OF ATTEMPTED QUESTIONS AND ANSWERS Page 18

Production Planning & Control_8 Multiple Choice Multiple Answer Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material purchase Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer Load Your Answer Load Multiple Choice Single Answer Question LOB technique was developed by US navy in the year :Correct Answer 1958 Your Answer 1958 True/False Question In continuous or process production , only one product is manufactured. Correct Answer True Your Answer True Select The Blank Question ________reflects impact of money tied up in inventory. Correct Answer Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card Select The Blank Question A progress card is the most ________ method of recording of progress of work. Correct Answer Convenient Your Answer Convenient Page 19

Production Planning & Control_8 Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers Multiple Choice Multiple Answer Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer IV-I-II-V-III Your Answer I-II-III-IV-V Select The Blank Question ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. Correct Answer Order preparation time Your Answer Queue time True/False Question PERT basically does not demarcate between critical and non-critical activities. Correct Answer True Your Answer True Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question Outside operations cost involves expenses such as :Page 20

Production Planning & Control_8 Correct Answer Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer Foreman's Your Answer Foreman's Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question Correct Answer Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning Multiple Choice Multiple Answer Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits Multiple Choice Multiple Answer Question In replenishment system, the fixed order quantity system is also called by following names :Correct Answer Fixed order system , Min-max system , Re-order point system Page 21

Production Planning & Control_8 Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer Question How you will Judge the failure of production planning and control department? Correct Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic Your Answer Inverse True/False Question Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours. Correct Answer False Your Answer True Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer 4 months Multiple Choice Single Answer Question The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer D. Konig Your Answer Charles simony Multiple Choice Single Answer Question So far as possible, number of activities should be :Correct Answer Limited Your Answer Limited True/False Question Production Planning and Control makes the supervisor ineffective. Page 22

Production Planning & Control_8 Correct Answer True Your Answer False Multiple Choice Single Answer Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle Your Answer Unit of capacity True/False Question The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer 6 Lacs Select The Blank Question An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer Two Your Answer Pair Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Page 23

Production Planning & Control_8 Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer Production True/False Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer False Your Answer True True/False Question Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False Your Answer True Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer Minimum True/False Question Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer True True/False Question In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer False Your Answer True Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Page 24

Production Planning & Control_8 Your Answer Net Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer Consistent good quality of products Match The Following Question Correct Answer Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer Timely availability of material, manpower Your Answer Timely availability of material, manpower Select The Blank Question Generally for ________ flow system, Heuristic method is preferred. Correct Answer Intermittent Your Answer Continuous Select The Blank Question In control board________ compartment contains copy of work Page 25

Production Planning & Control_8 orders/shop orders of the item to be processed next on the machine. Correct Answer Middle Your Answer Bottom True/False Question Work measurement function is attached to line management. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer Tools and plants are available , Technical know how is available , Competent persons are present Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available. LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Following are the factors which influence tool life :Correct Answer Operators efficiency , Type of tool , Material it is required to operate upon Your Answer Operators efficiency , Type of tool , Material it is required to operate upon Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called :Correct Answer Route Sheet Your Answer Route Sheet Multiple Choice Multiple Answer Question CPM terminology uses words like Correct Answer Arrow diagram , Nodes , Float Your Answer Arrow diagram , Nodes Page 26

Production Planning & Control_8 Select The Blank Question Correct Answer Your Answer

Forecasting is function of ________. Marketing department Planning in charge

Select The Blank Question Johnsons method of scheduling can be used when operation sequence involve ________ machines. Correct Answer Two Your Answer Two Select The Blank Question Good quality and ________are the two main requirements to secure maximum business from a customer. Correct Answer Competitive rates Your Answer Competitive rates Select The Blank Question Sum of queue, transit, order preparation and manufacturing times is known as ________ Correct Answer Total Lead Time Your Answer Total Lead Time True/False Question To conduct FSN analysis we require, last date of receipt or last date of issue whichever is later and period. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Overtime can be avoided in many ways and they are :Correct Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Your Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Page 27

Production Planning & Control_8 Multiple Choice Multiple Answer Question Material control function embraces a following techniques :Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system Your Answer Make -or -buy decision , Pareto's analysis , Replenishment system True/False Question Work measurement is not useful for choosing between two alternate methods of production. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Process Sheet contains following information :Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour True/False Question More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer True Your Answer True Select The Blank Question Classification of items on basis of their capital lock up is called ________ analysis. Correct Answer XYZ Your Answer XYZ Select The Blank Question Purchase section must keep ________posted on the progress of purchase orders and expected delays. Page 28

Correct Answer Your Answer

Production Planning & Control_8 P.P.C. P.P.C.

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department True/False Question fluctuation. Correct Answer Your Answer True/False Question each other. Correct Answer Your Answer True/False Question time. Correct Answer Your Answer Select The Blank Question using ________. Correct Answer Your Answer

Fluctuation due to changes in season are called cyclical False False

Flexibility and product variety are not inter-related with False True

Overlapping of operations help to reduce manufacturing True True

The LOB technique is made more accurate and fast by Computers Reduction techniques

True/False Page 29

Production Planning & Control_8 Question Overtime is undesirable since it increases manufacturing cost of the product. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question The essential features of batch production are :Correct Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Your Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium Your Answer Few Multiple Choice Single Answer Question Dispatcher withdraws required quantity of material from stores using following document :Correct Answer Stores issue order Your Answer Bill of material Multiple Choice Multiple Answer Question In a mass production assembly shop following work measurement techniques are used :Correct Answer Time study , Work sampling , Production study Your Answer Time study , Work sampling , Production study , Analytical estimating Multiple Choice Multiple Answer Question SDE analysis is based on problems of procurement namely :Correct Answer Non-availability , Scarcity , Longer lead time Your Answer Non-availability , Scarcity , Longer lead time Page 30

Production Planning & Control_8 True/False Question Correct Answer Your Answer

Line balancing is a simulation technique. False False

Multiple Choice Multiple Answer Question The line of balance is a device for planning and monitoring progress of :Correct Answer Purchase order execution , Project execution , Targeted programs Your Answer Purchase order execution , Project execution , Targeted programs Select The Blank Question Correct Answer Your Answer

Sales persons decides ________. Synthetic forecast Current sales

True/False Question Material control Card is a document for record of issues of material and receipt of unused material by production shop. Correct Answer False Your Answer False Multiple Choice Single Answer Question Work measurement is limited to measuring :Correct Answer Productive & non productive time Your Answer Only product related activities Match The Following Question Correct Answer

Your Answer

Move order Transport material from and to required work centers Transport material from and to required work centers Materials Order Allocation of material required in connection with shop order Allocation of material required in connection with shop order Page 31

Production Planning & Control_8 Work Order Bird's eye view of production programme Bird's eye view of production programme Production Order Reserve material required in connection with sales order Reserve material required in connection with sales order

Multiple Choice Multiple Answer Question The software for line balancing should have following features :Correct Answer Easy to operate , Easy to install , Easy to upgrade Your Answer Easy to operate , Easy to install , Unmanaged code should be available Multiple Choice Single Answer Question Man hours is commonly used unit of measurement for scheduling purposes in following industry :Correct Answer Engineering Your Answer Engineering Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers Your Answer Gives us work , Dividends to share holders , Gets business from new customers Multiple Choice Single Answer Question The 4X4 assignment problem involve following job-machine operations :Correct Answer 24 Your Answer 24 Multiple Choice Single Answer Question The best of scientific tools available for scheduling is :Page 32

Correct Answer Your Answer

Production Planning & Control_8 CPA [ critical path analysis ] Gantt Chart

Multiple Choice Multiple Answer Question Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department Your Answer PPC , Industrial Engineering Match The Following Question Correct Answer

Your Answer

Long production run Mass and Flow production production

Mass and Flow

Complex activities to be performed in a particular order within a give time & estimate. Project production Project production One or few units manufactured as per customers requirement Jobbing Production Jobbing Production Short production run

Batch Production

Batch Production

Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer Minimum Multiple Choice Multiple Answer Question Some of significant features of HML analysis are :Correct Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases , Not to take consumption into account Your Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases Page 33

Production Planning & Control_8 Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Failure to provide proper tools and control on work in progress on shop floor Your Answer Failure to provide proper tools and control on work in progress on shop floor Multiple Choice Single Answer Question The administrative expenses towards the procurement of materials is called :Correct Answer Procurement cost Your Answer Administrative cost Multiple Choice Multiple Answer Question Smoothing performs following activities:Correct Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach Your Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach True/False Question As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer True Your Answer True Select The Blank Question inadvisable. Correct Answer Your Answer True/False Question Correct Answer

Value analysis of ________ class items is usually C C

PPC system in the organisation is to be tailor made. True Page 34

Your Answer

Production Planning & Control_8 True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Performance benchmarking does not involves comparison of financial ratios at the aggregate level. Correct Answer False Your Answer False Multiple Choice Single Answer Question Setup time includes :Correct Answer Internal setup time & External setup time Your Answer Internal setup time & External setup time Multiple Choice Single Answer Question Participants of the groups for quality circles should be decided by :Correct Answer Employees coming together by their own enthusiasm Your Answer Employees coming together by their own enthusiasm Multiple Choice Single Answer Question Check sheet are also used as :Correct Answer Data gathering & interpretation tool Your Answer Data gathering & interpretation tool Multiple Choice Single Answer Question SMED means :Correct Answer Single minute exchange of dies Your Answer Single minute exchange of dies Match The Following Question Correct Answer

Your Answer Page 35

Production Planning & Control_8 Productivity performance measurement Turnover employee Cost of quality Financial performance measurement months

Sales of the months Sales of the

Customer satisfaction measurement Customer complaints per period

Customer complaints per period

Staff attitude measurement satisfaction index

Select The Blank Question Correct Answer Your Answer

Employee satisfaction index

Employee

________ is an effect due to the muda of defect. Wear & tear of parts while disassembling Poor production planning & control

Select The Blank Question If some defective parts are discovered by the subsequent process they should be returned to the ________ to prevent reoccurrence. Correct Answer Preceding process Your Answer Return to stores Multiple Choice Multiple Answer Question The results oriented efforts of the quality circle should also include :Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities Match The Following Question Correct Answer

Your Answer

Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect Page 36

Production Planning & Control_8 Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many" Parato analysis is technique of identifying vital causes by Arranging data according to the descending order of their frequency of occurrence Arranging data according to the descending order of their frequency of occurrence Parato diagram is a Bar graph with height or value drawn by Arranging data in descending order Magnitude of defects

Multiple Choice Multiple Answer Question Few steps in construction in Radar chart are :Correct Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre Select The Blank Question Correct Answer Your Answer

5 S audit result is discussed in ________ meeting. Monthly Monthly

True/False Question Correct Answer Your Answer

Fishbone analysis is used both in analysis & planning. True False

Multiple Choice Single Answer Question One Green Belt may head a team of :Page 37

Correct Answer Your Answer

Production Planning & Control_8 20 employees 20 employees

Multiple Choice Multiple Answer Question Role of champions are :Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation Multiple Choice Multiple Answer Question To draw control charts, sample must be representative of homogeneous segment of production for which :Correct Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Your Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Multiple Choice Single Answer Question Failure mode and effect analysis (FMEA) establish Correct Answer Process failure and minimize frequency Your Answer Process failure and minimize frequency Multiple Choice Multiple Answer Question What are the steps in deciding the benchmarking partner? Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Multiple Choice Single Answer Question One Master Black Belt may head a team of :Page 38

Correct Answer Your Answer

Production Planning & Control_8 15-20 Black Belts 15-20 Black Belts

Multiple Choice Single Answer Question Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :Correct Answer Main competitor Your Answer Main competitor Multiple Choice Single Answer Question Implication of Quality problem is:Correct Answer Gap in performance Your Answer Gap in performance Select The Blank Question Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart. Correct Answer c-chart Your Answer c-chart True/False Question Non-availability of files /document in time is a problem to be addressed by office TPM. Correct Answer True Your Answer True Multiple Choice Single Answer Question Check sheet is easy to use because it is :Correct Answer Simplest tool Your Answer Simplest tool Multiple Choice Single Answer Question Benchmarking helps to identify the gap between the current performance of the organization and the :Correct Answer Performance of the best organization Your Answer Performance of the best organization Page 39

Production Planning & Control_8 True/False Question Flow chart is pictorial representation of the steps in production control. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Breakdown problem may be stratified by :Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical) Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical) Select The Blank Question A control chart to exhibit counted data on number of defect is called ________. Correct Answer c-chart Your Answer c-chart Select The Blank Question Procedure for implementation of TPM consists of ________ numbers of steps. Correct Answer 12 Your Answer 8 Select The Blank Question Correct Answer Your Answer

Capability index Cp = ________ Specification width/process width Specification width/process width

Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :Correct Answer Vital few = trivial many Your Answer Vital few = trivial many Page 40

Production Planning & Control_8 True/False Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question To reduce clamping & declamping time, following actions are desirable :Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Select The Blank Question Benchmarking allows exchange of ________ between the benchmarking partners. Correct Answer Information Your Answer Information Multiple Choice Multiple Answer Question TQM can never flourish if the staff are:Correct Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses True/False Question Correct Answer Your Answer

In bar graph each bar is of same height. False False

Multiple Choice Multiple Answer Question During SMED implementation, primary study consists of :Page 41

Production Planning & Control_8 Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis True/False Question Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Types of Poka-Yoke are :Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke Multiple Choice Single Answer Question Quality problem solving tool is used to :Correct Answer Improve quality Your Answer Save time True/False Question Along with problem solving tools experience and judgment is also used. Correct Answer True Your Answer False Select The Blank Question JIT advocates the philosophy at elimination of waste from system which occurs due to ________. Correct Answer Over Production Your Answer Over Production True/False Question set.

Without measuring initial performance, target can't be Page 42

Correct Answer Your Answer

Production Planning & Control_8 True False

Multiple Choice Multiple Answer Question An erratic patterns falling above & below the control limits indicates :Correct Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators True/False Question Sample size for the construction of p-chart are larger than X bar-R chart. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation Multiple Choice Single Answer Question Productivity improves by :Correct Answer Voluntary participants of everyone Your Answer Voluntary participants of everyone N

Page 43

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question The activities such as preparation of estimates of tools, gauges, measuring instruments, follow up with tool room, periodic replenishment are grouped under :Correct Answer Tool controls Your Answer

Tool controls

Multiple Choice Single Answer Question Break light is essential for an automobile from safety point of view. However, the vehicle can be driven even in absence of break light. Thus break light can be categorized as :Correct Answer Essential Your Answer

Essential

Multiple Choice Single Answer Question Given a decision for designing a line layout, major problem is subdividing a work so that smooth flow can result. The subdivision process is called :Correct Answer Line balancing Your Answer

Line of balance

True/False Question

As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer

Consistent good quality of products

Select The Blank Question Labour efficiency depends upon ________ Correct Answer Training and experience Your Answer

Training and experience

Match The Following Question

Correct Answer

Your Answer

Work element

Smallest portion of work identified Smallest portion of work identified during the breakdown analysis of during the breakdown analysis of the job. the job.

Production line

Arrangement of workstations where each workman performs a

Arrangement of workstations where each workman performs a pre-

3rd Sem Operations – Production Planning and Control

1

pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Work Station

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Station work content

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer

By proper coordination between shop floor, stores and buying department

Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer

Matrix

True/False Question

To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of operations. Each job must be processed first on machine A and then on machine B in a fixed sequence AB. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Let us suppose that activity P & Q can not start until activity R& S are completed. Activities P &Q are therefore :Correct Answer Succeeding Your Answer

Preceding

Multiple Choice Multiple Answer Question What is meant by production control? Correct Answer Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule Your Answer Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule 3rd Sem Operations – Production Planning and Control

2

Multiple Choice Multiple Answer Question The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database Your Answer

Algorithms , Program code , Database

Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer

Hungarian Method

True/False Question

A buyer has little or no control over a lead time.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Customer's orders gives us work

Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Failure to provide proper tools and control on work in progress on shop floor Your Answer

Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single Answer Question The sourcing of vendors in case of 'C' type of items is :Correct Answer Few Your Answer

Few

Multiple Choice Multiple Answer Question The features of program plan are as follows :Correct Answer Each row of activities is associated with one component of final assembly. , Final completion date is zero , Time scale runs from right to left Your Answer Time scale runs from right to left , Program plan is prepared in form of mathematical model. , Final completion date is zero Multiple Choice Multiple Answer Question Failure to identify accumulated load on a given machine at a given time and identify periods available for allocation of future orders leads to 3rd Sem Operations – Production Planning and Control

3

Correct Answer Delays in delivery , High overtime payment , Broken promises Your Answer

Delays in delivery , High overtime payment , Higher rejections/rework

True/False Question

A manufacturing firm in the present days have virtually no control on their profits

Correct Answer False Your Answer

True

Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers Your Answer

Gives us work , Dividends to share holders , Gets business from new customers , Set the wheel of our production rolling

True/False Question

If customers orders often get completed ahead of the schedule, it is a sign of good scheduling. Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost Your Answer

Overtime cost

Multiple Choice Multiple Answer Question Subcontracting department works under :Correct Answer Planning , Purchase , Production Your Answer

Planning , Purchase , Production

Select The Blank Question Given total work content as 370 and maximum allowable cycle time to be 90 seconds, the theoretical number of work stations would be ________. Correct Answer 4.11 Your Answer

4.11

Select The Blank Question Orders with ________ slack time remaining per operation are run first. Correct Answer Shortest Your Answer

Shortest

3rd Sem Operations – Production Planning and Control

4

Multiple Choice Single Answer Question If total lead time of certain item is 30 days and lead time of operations completed is 6 days, the lead time required [ LTR ] would be :Correct Answer 24 Your Answer

24

Select The Blank Question The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer Scheduler Your Answer

Industrial engineer

Select The Blank Question At each ________, work is performed on a product either by adding parts or by completing assembly operations. Correct Answer Work station Your Answer

Work station

Multiple Choice Single Answer Question Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box Your Answer

Placed in a tray/box

True/False Question

PERT finds applications where resources [ men, materials and money ] are always made available as and when required. Correct Answer True Your Answer

True

Select The Blank Question Rational figure on utilization index can be obtained by carrying out ________ study. Correct Answer Work- sampling Your Answer

Work- sampling

True/False Question

EOQ is that quantity at which price paid by buyer is minimum.

Correct Answer False Your Answer

True

Multiple Choice Single Answer 3rd Sem Operations – Production Planning and Control

5

Question

Keeping available time per day constant, if the desired production rate per day is to be doubled ,cycle time will be reduced by :Correct Answer 0.5 Your Answer

0.5

Multiple Choice Multiple Answer Question To prepare load chart following job related information should be collected :Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand Your Answer

Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Select The Blank Question Job production requires ________ capital investment. Correct Answer Lowest Your Answer

Largest

Multiple Choice Multiple Answer Question The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision Your Answer

Continuous flow of material , Low skilled labour , Easy supervision

Select The Blank Question ________ represents productive time of the job. Correct Answer Manufacturing time Your Answer

Manufacturing time

Multiple Choice Multiple Answer Question CPM terminology uses words like Correct Answer Arrow diagram , Nodes , Float Your Answer

Arrow diagram , Nodes , Float

Multiple Choice Single Answer Question The Follow up required for early delivery in case of 'B' types of items is usually :Correct Answer Periodic Your Answer

Periodic

Match The Following Question

Correct Answer

Your Answer

3rd Sem Operations – Production Planning and Control

6

Job splitting

Dividing job in more than one lot

Dividing job in more than one lot

Change in priority

Shift equipment/workmen to delayed jobs

Shift equipment/workmen to delayed jobs

Alternate routing

Processing on costlier machine

Running jobs on one machine sequentially

Overlapping

Running jobs simultaneously on more than one machine

Running jobs simultaneously on more than one machine

Multiple Choice Single Answer Question The event is graphically represented by :Correct Answer Circle Your Answer

Circle

Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium Your Answer

Medium

Select The Blank Question ________ analysis is based on consumption figures of an item. Correct Answer FSN Your Answer

ABC

True/False Question

Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer

True

True/False Question

More than one subcontractor should be developed for each subcontracted operation/Job.

Correct Answer True Your Answer

True

2nd Copy LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material purchase 3rd Sem Operations – Production Planning and Control

7

Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer Load Your Answer Load Multiple Choice Single Answer Question LOB technique was developed by US navy in the year :Correct Answer 1958 Your Answer 1958 True/False Question In continuous or process production , only one product is manufactured. Correct Answer True Your Answer True Select The Blank Question ________reflects impact of money tied up in inventory. Correct Answer Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card Select The Blank Question A progress card is the most ________ method of recording of progress of work. Correct Answer Convenient Your Answer Convenient Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools : Correct Answer Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers Multiple Choice Multiple Answer Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer IV-I-II-V-III Your Answer I-II-III-IV-V Select The Blank Question ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. 3rd Sem Operations – Production Planning and Control

8

Correct Answer Order preparation time Your Answer Queue time True/False Question PERT basically does not demarcate between critical and non-critical activities. Correct Answer True Your Answer True Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer Foreman's Your Answer Foreman's Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question Correct Answer Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning Multiple Choice Multiple Answer Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits Multiple Choice Multiple Answer Question In replenishment system, the fixed order quantity system is also called by following names :Correct Answer Fixed order system , Min-max system , Re-order point system Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer 3rd Sem Operations – Production Planning and Control

9

Question How you will Judge the failure of production planning and control department? Correct Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question In Cost Vs Quantity plot, the total inventory Cost curve is : Correct Answer Parabolic Your Answer Inverse True/False Question Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours. Correct Answer False Your Answer True Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer 4 months Multiple Choice Single Answer Question The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer D. Konig Your Answer Charles simony Multiple Choice Single Answer Question So far as possible, number of activities should be :Correct Answer Limited Your Answer Limited True/False Question Production Planning and Control makes the supervisor ineffective. Correct Answer True Your Answer False Multiple Choice Single Answer Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle Your Answer Unit of capacity True/False Question The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads 3rd Sem Operations – Production Planning and Control

10

Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer 6 Lacs Select The Blank Question An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer Two Your Answer Pair Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer Production True/False Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer False Your Answer True True/False Question Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False Your Answer True Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer Minimum True/False Question Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer True True/False Question In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer False Your Answer True Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free 3rd Sem Operations – Production Planning and Control

11

Your Answer

Net

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer Consistent good quality of products Match The Following Question Correct Answer Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer Timely availability of material, manpower Your Answer Timely availability of material, manpower Select The Blank Question Generally for ________ flow system, Heuristic method is preferred. Correct Answer Intermittent Your Answer Continuous Select The Blank Question In control board________ compartment contains copy of work orders/shop orders of the item to be processed next on the machine. Correct Answer Middle Your Answer Bottom True/False Question Work measurement function is attached to line management. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer Tools and plants are available , Technical know how is available , Competent persons are present Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available. 3rd Copy

3rd Sem Operations – Production Planning and Control

12

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Which is the most appropriate type of alliance which the new companies often overestimate? Correct Answer Joint-venture Your Answer

Joint-venture

True/False Question

The financial structure is not one of the five channels of corporate governance.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question The different types of motivators would be Correct Answer Positive , External , Financial Your Answer

Positive , Financial

Multiple Choice Multiple Answer Question The different components of EQ would be Correct Answer Self-awareness , Emotional management , empathy Your Answer

Self-awareness , Emotional management , empathy

Multiple Choice Multiple Answer Question Most Indian business houses go for restructuring exercise, through, Correct Answer Demerger , Merger , Takeover Your Answer

Competitor , Merger , Takeover

Multiple Choice Single Answer Question What is that the consultant must be able to recognise about the client's future needs ? Correct Answer Vision Your Answer

Vision

Multiple Choice Single Answer Question Which among the following is a component of planning ? Correct Answer Rules Your Answer

Rules

Multiple Choice Multiple Answer 3rd Sem Operations – Production Planning and Control

13

Question

The external environmental factors that influence management are

Correct Answer Economic , Political , Technological Your Answer

Economic , Political

Multiple Choice Single Answer Question Who said, “Management is the creation and maintenance of internal environment in an enterprise, where individuals working in groups can perform efficiently and effectively towards the attainment of gr Correct Answer Koontz & O ‘Donell Your Answer

Koontz & O ‘Donell

Select The Blank Question The service sector has expanded because of the virtual stagnation of the________sector. Correct Answer agricultural Your Answer

agricultural

True/False Question

Professional management signifies separation of ownership and management.

Correct Answer True Your Answer

False

Multiple Choice Multiple Answer Question The functions of the board of directors are Correct Answer succession planning , establishing performance standards , determination of board policies Your Answer

succession planning , establishing performance standards , determination of board policies

Select The Blank Question A rule governing Indian companies states that policy holder's funds must be________only in India. Correct Answer invested Your Answer

invested

Multiple Choice Multiple Answer Question Any morale improvement programme of management must embrace the following rules. Correct Answer Respect individual , Be fair and just , Encourage initiative Your Answer

Respect individual , Be fair and just , Encourage initiative

True/False Question

W.Edward Deming introduced quality control in Japan.

3rd Sem Operations – Production Planning and Control

14

Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question EQ is born largely in the neurotransmitters if the brains limbic system that governs Correct Answer drives , impulses , feelings Your Answer

impulses , feelings , drives

Multiple Choice Single Answer Question There are six methods of giving orders, like mutual effort, open order, volunteers the other three are Correct Answer Command, power, suggestion Your Answer

Command, request, suggestion

Select The Blank Question Services need efficient________, transport roads and power just as much as industry and agriculture. Correct Answer telecom Your Answer

system

True/False Question

Management consultants do not assist implementation.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question Features of direction would be Correct Answer Pervasive function , Communication , Continuous process Your Answer

Pervasive function , Communication , Continuous process

Select The Blank Question ________ says you are the product of your past and you are bound by past activities. Correct Answer Law of destiny Your Answer

Law of destiny

True/False Question

Morale is the sum total of various physical qualities.

Correct Answer False Your Answer

False

3rd Sem Operations – Production Planning and Control

15

Multiple Choice Single Answer Question The philosophy of Vedanta is compared to which animal in the dream of the person, who wakes the dreamer and makes you realise your self discovered reality. Correct Answer Lion Your Answer

Lion

Multiple Choice Single Answer Question Who said, “Management is a multiple organ that manages a business, manages a manager and manages workers and work”? Correct Answer Peter Drucker Your Answer

Peter Drucker

Multiple Choice Single Answer Question One of the internal environment factors that influences management is Correct Answer Place Your Answer

Place

Select The Blank Question Latest approach signifies organization has a part of ________ system. Correct Answer Social Your Answer

Social

Multiple Choice Single Answer Question Which among the following is a general management challenge in the insurance sector? Correct Answer Training Your Answer

Training

True/False Question

Learning organizations should imitate a task force.

Correct Answer True Your Answer

True

Multiple Choice Single Answer Question If SBU's are formed, managers tend to be closer to Correct Answer customers Your Answer

customers

Match The Following

3rd Sem Operations – Production Planning and Control

16

Question

Correct Answer

Organization as a structure of authority

This is created out of responsibility This is created out of responsibility and accountability structure and accountability structure

Organization as an establishment

This is regarded as the physical aspect of an enterprise

Organization as a corporate citizen This is regarded as the social aspect of an organization Organization as a relationship

Your Answer

This is regarded as the physical aspect of an enterprise This is regarded as the social aspect of an organization

This is more related with the formal This is more related with the formal and informal relationships and informal relationships

Select The Blank Question The statement "We sell for Less" is deliberately ambiguous, it raises the question; 'Less than what', this is called as, ________ to communication. Correct Answer Semantic barrier Your Answer

Semantic barrier

Select The Blank Question Events are occurrences designed for ________ interests. Correct Answer marketing Your Answer

marketing

Select The Blank Question One of the earlier users of this strategic business unit was ________. Correct Answer General Electrical Co. Your Answer

General Electrical Co.

True/False Question

Vision without mission is incomplete and mission without vision is meaningless.

Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Who said, “Management is management of Men, Money, Machinery Materials and Information?” Correct Answer Anonymous Your Answer

Anonymous

Multiple Choice Multiple Answer Question Organizing is defined in different ways, viz. Correct Answer Process , Relationship , Corporate citizen Your Answer

Process , Relationship , Corporate citizen

3rd Sem Operations – Production Planning and Control

17

Match The Following Question

Correct Answer

W.Edward Deming

Introduced quality control in Japan Introduced quality control in Japan

Henry Fayol

Referred to as 'The father of modern management theory'

Referred to as 'The father of modern management theory'

Federick W.Taylor

Referred to as 'The father of scientific management'

Referred to as 'The father of scientific management'

Vilfredo Pareto

Referred to as 'The father of the social systems approach' to organization and management

Referred to as 'The father of the social systems approach' to organization and management

Your Answer

True/False Question

Focus on savings and high bargaining interests of the consumer is an obstacle in retail development in India. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Limitation of control are Correct Answer external factors , fixing of responsibility , variation and its causes Your Answer

external factors , fixing of responsibility , variation and its causes

Multiple Choice Single Answer Question How many forces of competition are there according to Michael E. Porter? Correct Answer Five Your Answer

Five

Multiple Choice Multiple Answer Question Multiple Choice Multiple Response Correct Answer Loyalty , Devotion Your Answer

Loyalty , Devotion

Multiple Choice Single Answer Question What is essential for the management to get things done in the organization? Correct Answer Delegation Your Answer True/False Question

Delegation

The larger the organisation, the more easier is the control process with respect to overall results.

3rd Sem Operations – Production Planning and Control

18

Correct Answer False Your Answer

False

True/False Question

Ethics of statute tries to explore the traits which help the person to lead a life that is satisfying from an ethical point of view. Correct Answer False Your Answer

True

Multiple Choice Single Answer Question What articulates the long-term goals of an enterprise ? Correct Answer Vission Statement Your Answer

Vission Statement

Select The Blank Question Control, like other elements of management process has to be ________ and not an emergency operation Correct Answer continuous Your Answer

corrective

Multiple Choice Single Answer Question Which is the technique where the completion of all tasks is checked in the order planned in the time scheduled is known as Correct Answer Critical path method Your Answer

Critical path method

4th Copy LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Gita has nothing to do with leadership in management

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question Future of Insurance sector would be Correct Answer new players nationalized Your Answer new players nationalized

taking over the market , improved customer service , strong hold of players taking over the market , improved customer service , strong hold of players

Multiple Choice Multiple Answer Question Key ethical principles include the following: 3rd Sem Operations – Production Planning and Control

19

Correct Answer Caring and compassion , Being fair and open minded , Fulfilling commitments Your Answer

Caring and compassion , Being fair and open minded , Fulfilling commitments

Multiple Choice Single Answer Question What is that which poses a major problem to the organizers of events? Correct Answer Taxes Your Answer

Taxes

Multiple Choice Single Answer Question One of the internal environmental factors that influences management is Correct Answer place Your Answer

place

Match The Following Question

Correct Answer

Your Answer

Company's checklist before making a call to the consultant

Never give up control and look up to consultants as God

Never give up control and look up to consultants as God

Need of consultants

Consultants are responsible for providing information to those individuals who fail to respond to changes in outside environment

Consultants are responsible for providing information to those individuals who fail to respond to changes in outside environment

Role of consultants

Conduct diagnosis to redefine problem

Conduct diagnosis to redefine problem

Rule for becoming successful consultant

Evolve abundant negotiating skills, be adaptable and flexible

Evolve abundant negotiating skills, be adaptable and flexible

Select The Blank Question Management as a discipline is the function of________. Correct Answer creativity Your Answer

creativity

Multiple Choice Single Answer Question Name the type of the supervisor who takes care of the number being produced today. Correct Answer Speed Boss Your Answer

True/False Question

Speed Boss

Posture' and Observance' are not included under the 'yogic' exercises

Correct Answer False Your Answer

False

3rd Sem Operations – Production Planning and Control

20

Multiple Choice Multiple Answer Question Under principle of effective communication what should be fully understood by all concerned. Correct Answer tasks , policies , responsibilities Your Answer

tasks , policies , responsibilities

Multiple Choice Multiple Answer Question Under McKinsey's 7 S model, the soft S's are: Correct Answer Style , Staff , Skills Your Answer

True/False Question

Style , Staff , Skills

Communication in industry is a phase both of organisation and moral building.

Correct Answer True Your Answer

True

Multiple Choice Single Answer Question The person who does not limit the interactions and decisions just to logical approach, but continuously encourages his team members to think non -logically is Correct Answer Leader Your Answer

True/False Question

Mediator

Before 1990, Global players were allowed to enter and operate in Indian Market.

Correct Answer False Your Answer

False

Multiple Choice Single Answer Question One of the external environment factors that influences Management is Correct Answer Legal Your Answer

Legal

Multiple Choice Single Answer Question A business unit must meet specific criteria, if it wants to be called an SBU. These are Correct Answer Definable group of competitors Your Answer

True/False Question

Definable group of competitors

Programme should not be closely integrated with objectives but to be developed

3rd Sem Operations – Production Planning and Control

21

from year to year. Correct Answer False Your Answer

False

Match The Following Question

Correct Answer

Philosophy of scientific management

Development of each man to his Development of each man to his capacity and ability capacity and ability

Six industrial activities

Technical, commercial, financial, Technical, commercial, financial, accounting, security accounting, security management management

Five management functions

Planning, organizing, commanding, co-ordination, control

Planning, organizing, commanding, co-ordination, control

Four supervisors at implementation department

Gang boss, speed boss, repair boss, inspector

Gang boss, speed boss, repair boss, inspector

Your Answer

Select The Blank Question Direction is a ________ function performed by all the managers at all levels of the organisation. Correct Answer managerial Your Answer

managerial

Multiple Choice Multiple Answer Question Ethical concepts include: Correct Answer Ethical subjectivism , Consequentialism , Ethics of Virtue Your Answer

Ethical subjectivism , Consequentialism , Ethics of Virtue

Select The Blank Question The process of control is complete only when the organisation take ________ action. Correct Answer corrective Your Answer

corrective

Multiple Choice Single Answer Question What is the reason that Indian Business houses were not able to take courageous decisions. Correct Answer stagger or stumbling self-confidence Your Answer

stagger or stumbling self-confidence

Multiple Choice Single Answer Question Management is Correct Answer Creative 3rd Sem Operations – Production Planning and Control

22

Your Answer

Creative

Multiple Choice Single Answer Question In which type of equilibrium, the man is compared to a cone resting on its base Correct Answer Perfect equilibrium Your Answer

True/False Question

Perfect equilibrium

A strategy is a ploy or a past course of action.

Correct Answer False Your Answer

False

Select The Blank Question Brands are associated with lifestyles and people's________. Correct Answer aspirations Your Answer

aspirations

Multiple Choice Multiple Answer Question The factors measuring the morale of the workers and ascertain whether it is increasing or diminishing can be listed as Correct Answer Grievances , Absenteeism , No. of accidents Your Answer

Absenteeism , Grievances

True/False Question

An organization consists of individuals in which their formal roles and structural positions bring them closer. Correct Answer True Your Answer

True

Select The Blank Question Planning, organizing and controlling demand effective ________ at all stages if they are to be successful. Correct Answer decision making Your Answer

decision making

Multiple Choice Single Answer Question Name the industrial activity where 'Buying, selling and exchanging takes place'. Correct Answer Commercial Your Answer

Commercial

3rd Sem Operations – Production Planning and Control

23

Multiple Choice Multiple Answer Question The general management challenges faced by the service sector are Correct Answer Communicating the concept , Differentiating factors , Revenue model Your Answer

Communicating the concept , Differentiating factors , Revenue model

True/False Question

Every manager in an organisation gives direction to his subordinates a s a superior and receives direction as subordinate from his superior. Correct Answer True Your Answer

True

Select The Blank Question A superior should always establish a ________ control so that his subordinates report to him periodically. Correct Answer Feedback Your Answer

Feedback

Select The Blank Question Span of control is also referred to as the span of ________. Correct Answer Supervision Your Answer

Supervision

Select The Blank Question Actuary is one who specializes in the________of insurance. Correct Answer mathematics Your Answer

mathematics

Select The Blank Question ________ is the reason for the rising importance of empathy for business leaders. Correct Answer Globalisation Your Answer

Globalisation

Select The Blank Question Different rates are levied by different states for ________ tax. Correct Answer entertainment Your Answer

entertainment

Multiple Choice Multiple Answer Question Functional authority works only when,

3rd Sem Operations – Production Planning and Control

24

Correct Answer Assignment is clarified , The subordinates are allowed to participate , Feedback control is established Your Answer Assignment is clarified , The subordinates are allowed to participate , Feedback control is established Select The Blank Question ________ provide all types of help required to make the busin ess more efficient and profitable. Correct Answer Consultants Your Answer

True/False Question

Consultants

Business families have started spending more on research and development.

Correct Answer True Your Answer

True

Multiple Choice Single Answer Question State the barriers to delegation of authority? Correct Answer Over-confidence Your Answer

Over-confidence

Multiple Choice Single Answer Question "The structure of consumer demand in India is like an iceberg". What is the rationale behind this statement? Correct Answer we see only parts of ready potential on the surface Your Answer

we see only parts of consumers on the surface

True/False Question

Direction initiates at the bottom level in the organisation and follows to top through the hierarchy. Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question The potential external opportunities faced by an organization are Correct Answer additional customer groups , faster market groups , falling trade barriers Your Answer

additional customer groups , faster market groups , falling trade barriers

Multiple Choice Multiple Answer Question Advantages of delegation of authority would be: Correct Answer Prompt decision making , Opportunity to subordinates to grow and develop , Satisfaction to subordinates in terms of recognition

3rd Sem Operations – Production Planning and Control

25

Your Answer

Prompt decision making , Opportunity to subordinates to grow and develop , Satisfaction to subordinates in terms of recognition

Multiple Choice Multiple Answer Question Certain important motivational techniques are Correct Answer Monetary incentives , Job-based techniques , MBO techniques Your Answer

Security technique , Monetary incentives , Job-based techniques

Multiple Choice Multiple Answer Question What type of skills does management require? Correct Answer conceptual , human relations , technical Your Answer

th

5

conceptual , human relations , technical

Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN and ZN. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Forecast is based on :Correct Answer Past data Your Answer

Competitor's market share

Select The Blank Question Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer Updating Your Answer

Design

Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer

Production Planning Control

True/False Question

CPM marks critical activities.

3rd Sem Operations – Production Planning and Control

26

Correct Answer True Your Answer

True

Select The Blank Question A shop order may combine more than one ________ requiring identical items. Correct Answer Work order Your Answer

Sales order

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer

Consistent good quality of products

Select The Blank Question ________ inventories help to balance company's supply with market demand. Correct Answer Finished goods Your Answer

WIP

Select The Blank Question Short term forecasts are for ________. Correct Answer Material Planning Your Answer

Cash flow management

Multiple Choice Single Answer Question For process planning following is one of the basic document used :Correct Answer Operation Layout Your Answer

Process Layout

Multiple Choice Single Answer Question Scheduled start of an operation is authorized by issuing a document called :Correct Answer Job card Your Answer

Route card

Multiple Choice Multiple Answer Question SOS Analysis involves following type of items :Correct Answer Seasonal items available only for a limited period. , Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. , Machine spare parts 3rd Sem Operations – Production Planning and Control

27

Multiple Choice Multiple Answer Question The basic procedure of assignment technique is designed to solve problems wherein :Correct Answer Number of tasks equal to number of facilities. , The objective function is minimization. , There are no restrictions in allocation Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost of machine should be taken into consideration. True/False Question

There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product. Correct Answer True Your Answer

True

True/False Question

In LOB, the regular progress checks the future effect of any current delays and indicates degree of urgency for corrective action. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are as follows.Find the sequence for 5 jobs that will minimize total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4 Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. Your Answer

Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.

True/False Question

When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult. Correct Answer True Your Answer

True

Match The Following Question

Correct Answer

Your Answer

End piece allowance

Material insufficient to produce one Material insufficient to produce one piece piece

Stock allowance

Quantity to meet requirement of spares

Extra material requirement

Machining allowance

Extra material requirement

Material loss in handling

Spoilage allowance

Process rejection

Quantity to meet requirement of spares

Select The Blank 3rd Sem Operations – Production Planning and Control

28

Question

________ is required for machine set ups as well as regular production.

Correct Answer Performance standard Your Answer

Machine design data

Multiple Choice Single Answer Question If a product is required within 20 days and the product can be made available in 10 days, the Critical ratio would be :Correct Answer 2 Your Answer

0.5

Multiple Choice Single Answer Question A subcontractor is :Correct Answer Another form acting as a supplier Your Answer

Manufacturer of specialized products on whom the buyer is dependent for 100% of requirement of main assembly

Multiple Choice Single Answer Question The data regarding maximum run out between centers pertains to :Correct Answer Process planning Your Answer

Raw material data

True/False Question

Lead time information is required for determination of safety stock.

Correct Answer False Your Answer

True

Select The Blank Question Americans like to use the word 'inventory' whereas for same context British use the term________. Correct Answer Stock Your Answer

Stock

Multiple Choice Multiple Answer Question SDE analysis is employed by the purchase department for :Correct Answer Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. Your Answer Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. , Contract buying for some of 'easy' items. True/False Question

Labour efficiency factor is applied after capacity requirement of equipment is calculated.

Correct Answer False 3rd Sem Operations – Production Planning and Control

29

Your Answer

True

Multiple Choice Multiple Answer Question PERT terminology uses words like :Correct Answer Network diagram , Events , Slack Your Answer

Network diagram , Events

True/False Question

The LOB technique is most appropriate for assembly operations involving number of distinct components. Correct Answer True Your Answer

True

True/False Question

Transit time for manufactured items should be considered only when it is insignificant.

Correct Answer False Your Answer

True

Select The Blank Question A progress card normally contains ________ squares. Correct Answer Less than 25 Your Answer

More than 50

Multiple Choice Multiple Answer Question Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :Correct Answer Tool breakage , Job split up , Change in priorities Your Answer

Tool breakage , Job split up , Store inventory

Multiple Choice Single Answer Question One of the following is not an task of progressing :Correct Answer Ensuring supply of material and issue of documents to manufacturing shops Your Answer

Expediting to rush up remaining operations of the delays jobs

Multiple Choice Single Answer Question Production output in night shift is :Correct Answer Less than I shift production Your Answer

More than I shift production

Multiple Choice Multiple Answer 3rd Sem Operations – Production Planning and Control

30

Question

The minimum requirements for application software for line balancing are as follows :-

Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Your Answer

1 Gb hard Disk free memory , Windows or equivalent operating system.

Multiple Choice Single Answer Question The work measurement and time study belong to the following school of management :Correct Answer Scientific School of management Your Answer

Functional School of management

Multiple Choice Multiple Answer Question Before planning subcontracting points to be considered are :Correct Answer Whether overtime can be given , One more shift can be started Your Answer

Whether overtime can be given , One more shift can be started , Set up time can be reduced

Multiple Choice Multiple Answer Question The main requirements of re-order level system are as follows :Correct Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Your Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Multiple Choice Multiple Answer Question The following are salient features of the fixed order quantity system :Correct Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time. Your Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Percent cumulative cost of item is taken into consideration. Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under these circumstances, the firm would take a decision to ________. Correct Answer Make at home Your Answer

Buy from outside

Multiple Choice Multiple Answer Question Following difficulties are faced by SDE analysis :-

3rd Sem Operations – Production Planning and Control

31

Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers Your Answer

More delivery period , Reliability of suppliers , Excise duty

Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Your Answer

Net

True/False Question

Route sheets for custom built job is prepared for each new order received.

Correct Answer True Your Answer

True

Match The Following Question

Correct Answer

Your Answer

Order quantity

Factor influencing process planning

Compare alternative processes

Machine capacity chart

Dimensional accuracy

General purpose machines with special toolings

Mass production

Special purpose machines

Break even analysis

Standard elemental time data

Compare alternative processes

Factor influencing process planning

Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer

Form tool , Inserts , Reamers

Multiple Choice Single Answer Question The Carrying cost is stated in terms of :Correct Answer Per item per year Your Answer

Per order

Select The Blank Question The definitive statement of policy stating when to procure and how much to procure usually to ensure that the sum of all costs associated with ________ are minimised is called Inventory policy. Correct Answer Inventory Your Answer

Buying

3rd Sem Operations – Production Planning and Control

32

Select The Blank Question Buying for C quantities should be made in ________ quantities . Correct Answer Large Your Answer

th

6

Medium

Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer

Matrix

Select The Blank Question ________ analysis mainly helps to identify non-existing items for which store keeps bin cards, wastes computer memory or wastes computer stationary while preparing stores ledger. Correct Answer MNG Analysis Your Answer

SOS Analysis

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Gives satisfaction to workers

Multiple Choice Single Answer Question Negative value of critical ratio :Correct Answer Is meaningless Your Answer

Indicates excess of scheduled delivery period

Multiple Choice Multiple Answer Question The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process True/False Question

If lead time available is 11days and lead time required is 10 days, the critical ratio would be 1.10. Correct Answer True

3rd Sem Operations – Production Planning and Control

33

Your Answer

True

Multiple Choice Multiple Answer Question What are the factor affecting decision about centralized planning system? Correct Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive Your Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive True/False Question

In continuous or process production , only one product is manufactured.

Correct Answer True Your Answer

True

True/False Question

The make-or-buy decision becomes necessary when the current source of supply is not able to supply the material in accordance with buyer's quality requirements. Correct Answer True Your Answer

True

True/False Question

Work measurement function is attached to line management.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Placement of purchase orders in case of 'A' type of items is usually :Correct Answer Frequent Your Answer

Frequent

Match The Following Question

Correct Answer

Your Answer

Economic order quantity

Quantity at which there is neither overstocking nor under stocking.

Quantity at which there is neither overstocking nor under stocking.

Carrying cost

Cost of 'holding' the material in store

Cost of transportation [carrying] of material

Procurement cost

Administrative cost for procurement Cost of procurement of material

Inventory cost

Sum of carrying and inventory cost Sum of carrying and inventory cost

True/False Question

To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the second machine must be smaller than or equal to the smallest time of any job on first

3rd Sem Operations – Production Planning and Control

34

machine or third machine. Correct Answer True Your Answer

False

True/False Question

Systematic procedures must be set in the operating functions prior to installation of PPC in the firm. Correct Answer True Your Answer

True

Select The Blank Question Time waste is the earliest of all wastes and yet the________ to correct because it does not litter the floor. Correct Answer Hazards Your Answer

Big hazard

Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer

1.2 Months

Multiple Choice Single Answer Question Which factor influence plan for meeting seasonal or occasional increase in demand? Correct Answer Subcontracting Your Answer

Subcontracting

Multiple Choice Single Answer Question Which of the following is the function of Production Planning? Correct Answer Process planning and scheduling Your Answer

Progressing

Select The Blank Question Because of uncertainty of activity timings, PERT acquired a shape of ________ model. Correct Answer Probabilistic Your Answer

Statistical

True/False Question

Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False 3rd Sem Operations – Production Planning and Control

35

Your Answer

True

True/False Question

Job schedule is a chart showing work ahead of each machine with respect to time.

Correct Answer False Your Answer

True

Match The Following Question

Correct Answer

Your Answer

Tooling cost

Jigs and Fixtures

Jigs and Fixtures

Opportunity costs

Monitory value sacrificed in rejection

Cost of giving opportunity to do a business

Incremental cost

Vary with decision to make or buy

Vary with decision to make or buy

Labour cost

Wages and other benefits

Wages and other benefits

Multiple Choice Single Answer Question The goods are manufactured as per customer's definite order in case of :Correct Answer Job production Your Answer

Batch production

Multiple Choice Multiple Answer Question The commonly used network techniques other than PERT and CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ] Your Answer MIS [ Management Information Systems ] Multiple Choice Multiple Answer Question To minimize total throughout time we are required to minimize :Correct Answer Queuing , Idle time , Inventory Your Answer

Queuing , Idle time

Multiple Choice Multiple Answer Question Following conditions are required to be fulfilled for processing n jobs through 2 machines :Correct Answer The jobs are ready to be processed before the period under consideration begins . , Transient time to move a job from one machine to the another is negligible. , In process inventory is allowed. Your Answer The jobs are ready to be processed before the period under consideration begins . , In process inventory is allowed. Select The Blank 3rd Sem Operations – Production Planning and Control

36

Question

An inventory control technique based on selective approach to stock items is called ________ analysis. Correct Answer Pareto's Your Answer

Pareto's

Multiple Choice Multiple Answer Question While communicating to customer on delays in delivery following information should be given :Correct Answer Information on identification of job , Reasons for delays , Revised date of delivery Your Answer

Reasons for delays , Revised date of delivery

Select The Blank Question CPM is ________ oriented system. Correct Answer Activity Your Answer

Activity

Multiple Choice Single Answer Question One of the following is not consumable tool :Correct Answer Arbors Your Answer

Arbors

True/False Question

LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning]. Correct Answer True Your Answer

False

Select The Blank Question ________ is required when expediting fails to bring deviated plan to its actual path. Correct Answer Replanning Your Answer

Replanning

Multiple Choice Multiple Answer Question The process of contraction or compression involves extra cost because extra money is required to be spent on factors such as :Correct Answer Overtime engagement of workforce , Purchase of additional machinery , Use of better materials Your Answer Overtime engagement of workforce , Purchase of additional machinery , Purchase of stationary of good quality Multiple Choice Single Answer Question In job production one single product is manufactured while a batch of group of products is turned out at a time under a system of :-

3rd Sem Operations – Production Planning and Control

37

Correct Answer Batch production Your Answer

Process production

Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers Multiple Choice Single Answer Question The production system characterized by complex set of activities that must be performed in a particular order within a given period and within an estimated expenditure is known as :Correct Answer Project production Your Answer

Project production

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost Your Answer

Overtime cost

Select The Blank Question ________ is the specific instant of time that marks start and end of activity. Correct Answer Event Your Answer

Event

Select The Blank Question Overlapping of operations help to ________ manufacturing time. Correct Answer Reduce Your Answer

Reduce

Multiple Choice Multiple Answer Question "Difficult" items have following attributes :Correct Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items which are difficult to manufacture Your Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items having complex specifications Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer

Moving average , Curve fitting

3rd Sem Operations – Production Planning and Control

38

Select The Blank Question The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer Scheduler Your Answer

Production engineer

Multiple Choice Multiple Answer Question The network analysis involves following works :Correct Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Your Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Multiple Choice Single Answer Question The assembly work content [ Wi ] of the i'th station having n work stations is given by :Correct Answer å Wi from i=1 to n Your Answer

å Wi from i=1 to n

Multiple Choice Multiple Answer Question Essentials of good forecasts are :Correct Answer Stability , Fairly accurate , Economical to generate Your Answer

Stability , Fairly accurate , Economical to generate

True/False Question

The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer

True

Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer

6 Lacs

7th Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer 3rd Sem Operations – Production Planning and Control

39

Question

Following are the factors which influence tool life :-

Correct Answer Operators efficiency , Type of tool , Material it is required to operate upon Your Answer

Operators efficiency , Type of tool , Material it is required to operate upon

Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called :Correct Answer Route Sheet Your Answer

Route Sheet

Multiple Choice Multiple Answer Question CPM terminology uses words like Correct Answer Arrow diagram , Nodes , Float Your Answer

Arrow diagram , Nodes

Select The Blank Question Forecasting is function of ________. Correct Answer Marketing department Your Answer

Planning in charge

Select The Blank Question Johnsons method of scheduling can be used when operation sequence involve ________ machines. Correct Answer Two Your Answer

Two

Select The Blank Question Good quality and ________are the two main requirements to secure maximum business from a customer. Correct Answer Competitive rates Your Answer

Competitive rates

Select The Blank Question Sum of queue, transit, order preparation and manufacturing times is known as ________ Correct Answer Total Lead Time Your Answer

Total Lead Time

True/False Question

To conduct FSN analysis we require, last date of receipt or last date of issue whichever is later and period. Correct Answer True

3rd Sem Operations – Production Planning and Control

40

Your Answer

True

Multiple Choice Multiple Answer Question Overtime can be avoided in many ways and they are :Correct Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Your Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Multiple Choice Multiple Answer Question Material control function embraces a following techniques :Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system Your Answer

Make -or -buy decision , Pareto's analysis , Replenishment system

True/False Question

Work measurement is not useful for choosing between two alternate methods of production. Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question Process Sheet contains following information :Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer

Material Specification , Sequence of operation , Skill of Labour

True/False Question

More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer True Your Answer

True

Select The Blank Question Classification of items on basis of their capital lock up is called ________ analysis. Correct Answer XYZ Your Answer

XYZ

Select The Blank Question Purchase section must keep ________posted on the progress of purchase orders and expected delays. Correct Answer P.P.C. Your Answer

P.P.C.

3rd Sem Operations – Production Planning and Control

41

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer

By proper coordination between shop floor, stores and buying department

True/False Question

Fluctuation due to changes in season are called cyclical fluctuation.

Correct Answer False Your Answer

False

True/False Question

Flexibility and product variety are not inter-related with each other.

Correct Answer False Your Answer

True

True/False Question

Overlapping of operations help to reduce manufacturing time.

Correct Answer True Your Answer

True

Select The Blank Question The LOB technique is made more accurate and fast by using ________. Correct Answer Computers Your Answer

Reduction techniques

True/False Question

Overtime is undesirable since it increases manufacturing cost of the product.

Correct Answer True Your Answer

False

Multiple Choice Multiple Answer Question The essential features of batch production are :Correct Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Your Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :-

3rd Sem Operations – Production Planning and Control

42

Correct Answer Medium Your Answer

Few

Multiple Choice Single Answer Question Dispatcher withdraws required quantity of material from stores using following document :Correct Answer Stores issue order Your Answer

Bill of material

Multiple Choice Multiple Answer Question In a mass production assembly shop following work measurement techniques are used :Correct Answer Time study , Work sampling , Production study Your Answer

Time study , Work sampling , Production study , Analytical estimating

Multiple Choice Multiple Answer Question SDE analysis is based on problems of procurement namely :Correct Answer Non-availability , Scarcity , Longer lead time Your Answer

Non-availability , Scarcity , Longer lead time

True/False Question

Line balancing is a simulation technique.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question The line of balance is a device for planning and monitoring progress of :Correct Answer Purchase order execution , Project execution , Targeted programs Your Answer

Purchase order execution , Project execution , Targeted programs

Select The Blank Question Sales persons decides ________. Correct Answer Synthetic forecast Your Answer

Current sales

True/False Question

Material control Card is a document for record of issues of material and receipt of unused material by production shop. Correct Answer False Your Answer

False

3rd Sem Operations – Production Planning and Control

43

Multiple Choice Single Answer Question Work measurement is limited to measuring :Correct Answer Productive & non productive time Your Answer

Only product related activities

Match The Following Question

Correct Answer

Your Answer

Move order

Transport material from and to required work centers

Transport material from and to required work centers

Materials Order

Allocation of material required in Allocation of material required in connection with shop order connection with shop order

Work Order

Bird's eye view of production programme

Bird's eye view of production programme

Production Order

Reserve material required in connection with sales order

Reserve material required in connection with sales order

Multiple Choice Multiple Answer Question The software for line balancing should have following features :Correct Answer Easy to operate , Easy to install , Easy to upgrade Your Answer

Easy to operate , Easy to install , Unmanaged code should be available

Multiple Choice Single Answer Question Man hours is commonly used unit of measurement for scheduling purposes in following industry :Correct Answer Engineering Your Answer

Engineering

Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers Your Answer

Gives us work , Dividends to share holders , Gets business from new customers

Multiple Choice Single Answer Question The 4X4 assignment problem involve following job-machine operations :Correct Answer 24 Your Answer

24

Multiple Choice Single Answer Question The best of scientific tools available for scheduling is :Correct Answer CPA [ critical path analysis ] 3rd Sem Operations – Production Planning and Control

44

Your Answer

Gantt Chart

Multiple Choice Multiple Answer Question Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department Your Answer

PPC , Industrial Engineering

Match The Following Question

Correct Answer

Your Answer

Long production run

Mass and Flow production

Mass and Flow production

Complex activities to be performed in a particular order within a give time & estimate.

Project production

Project production

One or few units manufactured as per customers requirement

Jobbing Production

Jobbing Production

Short production run

Batch Production

Batch Production

Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer

Minimum

Multiple Choice Multiple Answer Question Some of significant features of HML analysis are :Correct Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases , Not to take consumption into account Your Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Failure to provide proper tools and control on work in progress on shop floor Your Answer

Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single Answer Question The administrative expenses towards the procurement of materials is called :Correct Answer Procurement cost Your Answer

Administrative cost

Multiple Choice Multiple Answer 3rd Sem Operations – Production Planning and Control

45

Question

Smoothing performs following activities:-

Correct Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach Your Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach True/False Question

As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer True Your Answer

True

Select The Blank Question Value analysis of ________ class items is usually inadvisable. Correct Answer C Your Answer

C

True/False Question

PPC system in the organisation is to be tailor made.

Correct Answer True Your Answer

True

3rd Sem Operations – Production Planning and Control

46

9) a) Draw a flow chart to explain the procedure to schedule ‘n’ jobs on two machines: Ans: The following are the ten steps involved to schedule ‘n’ jobs on two machines: Step 1) Prepare list of the jobs to be processed on the two machines. Step 2) Estimate processing time for each job on each machine. Step 3) Construct a job array, called sequencing matrix. To construct the matrix the jobs to be processed are recorded row head wise, the machines to be employed to process the jobs are recorded column head wise and the processing time of each job is recorded against the under the respective machine. Step 4) Scan the job array and identify the smallest processing time. Step 5) If the smallest time appears: i.

On the first machine, A, assign the corresponding jobs as close to the beginning of the job sequence as possible. ii. On the second machine, schedule the corresponding job as close to the end of the job sequence as possible. iii. If there is a tie of minima for both machines i.e., if the smallest element occurs on both machines, (one minimal element on each machine), select among the tied up jobs the one with the smallest time on the first machine and schedule it as early in the job sequence as possible. iv. If the tie of the minima occurs among the elements of the first machine, select among the tied up jobs the one with the smallest time on the second machine and schedule it as early in the job sequence as possible. v. If the tie for the minima occurs among the elements in the second machine, select among the tied up jobs the one with the smallest time on the first machine and schedule it as late in the sequence as possible. Step 6) Delete from the array the jobs scheduled and its corresponding processing times. Step 7) Repeat steps 4, 5, 6 and 7 for remaining processing times, placing the jobs next to first or next to last until all jobs are scheduled. Step 8) Calculate the total elapsed time to process all jobs through the two machines. Step 9) Calculate the idle time for machines A and B.

Fig: Flow chart for”n jobs: 2 machines” sequencing model START Construct a sequencing matrix with n jobs and two machines (A & B)

Scrutinize processing time of all jobs on both machines and select the smallest time

Does the smallest time occur on first machine?

No

Yes Schedule the job corresponding to the smallest time as close to the beginning of the job sequence as possible.

Delete the job scheduled and its corresponding processing times

No

Have all jobs been scheduled?

Yes Calculate start and finish time of each job on machine A

Calculate start and finish time of each job on machine B

Determine total elapsed time to process all jobs though two machines

Calculate idle time of each machine

STOP

Schedule the job corresponding to the smallest time as close to the end of the job sequence as possible

b) Five jobs A, B, C, D and E are required to be processed on two machines M1 and M2. Each job has to be processed on machine M1 and then on machine M2. The order of the completion of jobs has no significance. The processing time hours for five jobs on the two machines is as under: Job Machine

A

B

C

D

E

Machine #1

4

17

14

9

11

Machine #2

5

7

12

2

6

Ans: The smallest time in the job array is 2 hours and it appears for the first stage. The corresponding job D therefore is scheduled last and its entry is made in the last cell of the sequencing bar. D Delete the corresponding job schedule leaves us 4 jobs in the array. The next smallest time is 4 hrs and it occurs on the job A which is present in the sequence of Machine #1. Therefore the entry is made in the first cell of the sequencing bar. A

D

Deleting the job schedule leaves us with 3 more entries in the array. The next smallest time is 6 and is present in the job E, which is present in the sequence of Machine #2. Therefore the entry is made in the last but one cell of the bar. A

E

D

Deleting the job schedule leaves us with 2 more entries in the array. The next smallest time is 7 and is present in the job B, which is present in the sequence of Machine #2. Therefore the entry is made in the 3rd cell of the bar. A

B

E

D

Since the last job is left unscheduled, it is therefore placed in the empty cell: Therefore the optimum sequence, therefore is A, C, B, E & D A

C

B

E

D

2. What is Production Planning and Control? What are its key functions? How does PPC contribute to the two basic objectives namely “long term growth of business” and “Profit of the company”? Ans: Introduction: Production Planning is a centralized activity (normally conducted in the office) and includes such functions as order preparation, material control, process planning, tools control and scheduling. Production control, on the contrary, a diffused activity (usually conducted in the shops) and includes such functions as dispatching, progressing and expediting. Functions of Production Planning & Control: Control Functions 1) Order Preparation includes activities like making of work orders, converting work orders into shop orders, preparing auxiliary orders, and releasing such orders to shops to authorize manufacturing activity. 2) Materials control concerns preparation of materials estimates indenting non-stick materials, ascertaining availability of materials purchased to stock, continual follow-up with purchase and store for timely receipt of materials, advising store to allocate required quantities of available materials (alternatively on their receipt) against specific shop orders. 3) Processing Planning or Routing concerns fixation of method of manufacture operations and their sequence, machine tools for each operation, jigs and fixtures, measuring instruments and gauges etc to enable shops to produce goods of the right quality at the lowest cost. 4) Tools Controls concerns preparation of estimates of cutting tools (Standard as well as non-standard tools), gauges and measuring instruments including jigs & fixtures, indenting non-stock tooling, follow-up with tool room for timely manufacture of jigs & fixtures, periodical replenishment of wornout-non-consumable tooling (e.g. work aborts, collets, copying masters, Allen keys, spanners. etc.)

Optional Functions 1. Cost Estimation concerns preparation of pre-production cost estimates to be used by sales department for quotation purposes. (Alternatively this function may be assigned to costing department or industrial engineering dept) 2. Work Measurement concerns fixation of time to be allowed to a qualified workman to carryout a specified task, under specified conditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like time study, analytical estimating etc (Alternatively, work measurement work may be assigned to industrial engineering dept.) 3. Sub Contract concerns off-loading of work on outside vendors for economic reasons or to augment existing manufacturing facilities. Sub-contract work alternatively may be handled by Materials/Purchase Dept. 4. Capacity Planning concerns estimation of requirements of men and machines as the basics of decision making to meet the firm’s increased volume of business (Some companies prefer to assign this function to engineering dept)

5) Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job, coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules or regular items.

5) Demand Forecasting concerns making projection of company’s product market, though, long term forecasts are given by sales department but short term forecasts required for materials planning, machines loading, subcontracting etc, may be prepared by PPC departments.

6) Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to be concerned department as their authority to perform the work according to the predetermined schedule. 7) Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress against the plan. 8) Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devising cures from time to time to keep rate of production in line with the schedule communicating possible failure in delivery commitments to sales department. b) Long term Growth of business and Profit of the Company: Long term growth of business and profitability are the two basic objectives of an organization. For long term growth, the company must have enough orders and for enough orders it must have large number of satisfied customers. Five essentials to achieve customers’ satisfaction are: 1) 2) 3) 4) 5)

Timely delivery Advance communication in case of expected late shipments Short lead time in emergency Consistent and good quality of products Competitive price.

Good production planning and control is necessary to meet these essentials of customers’ satisfaction. Good PPC system is also necessary to minimize waiting time costs, overtime costs, inventory costs and other manufacturing overheads. Goods PPC system helps to improve utilization or resources morale of the employees.

3) (a) How does Production Planning differ from Production Control? Ans: Production Planning: It is the determination, acquisition and arrangement of all facilities necessary for future production of items. In other words, production planning is essentially a pre-production activity, associated with the design of the production system. Production Control: It is the corollary to short term production planning or scheduling and is quite simply concerned with the implementation of production schedules. Production Planning Versus Production Control PLANNING (Planning the Work) 1) Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines and their process capabilities, drawing and operational layouts etc. 2) Planning is seeing that requirements-tools, machines, men, instructions, authorizations and the like-well be available at the right time and in the right quantities and are of proper quality. 3) Planning involves preparation of load charts and fitting various work orders into uncommitted time available on the company’s facilities (men or machines). 4) Planning involves preparation of all necessary forms and paper work 5) Planning involves designing suitable feedback as to what may happen. 6) Planning involves forward thinking as to the remedial action to be taken if the job fails behind schedule. Planning therefore, is a centralized activity (in the office) and includes such function as materials control, tools control, preprocess planning and scheduling.

CONTROL (Working the plan) 1) Control involves dissemination of data, preparation of reports regarding output, machine and labour utilization, labour efficiency, percentage defectives etc. 2) Control is seeing that the requirements are actually made available at the right place in the right quantities. 3) Control involves actual seeing that the jobs are started and completed as per schedule prepared by scheduling cell of the PPC. 4) Control involves actual issue of forms and paper work. 5) Control involves keeping track of what is happening and collecting information as to what has happened. 6) Control involves suggesting remedial action when the job is falling behind schedule. Control is thus a diffused activity (in the shops) and includes functions such as dispatching, progressing and expediting.

(b) What type of information is necessary for efficient functioning of PPC department? Which department in the organization originates this information? Ans: Introduction: The efficiency of Production Planning and Control department depends upon the information it gets from other departments and the accuracy of such information. To prepare load and schedule chat, it must know the preventive maintenance schedule. To give realistic delivery date, it must know the work content of each job. Production Planning and Control department generally requires the following information: Information Concerning

Details

1. Production programme.

1. Quantity to be manufactured. 2. Delivery date.

2. Production materials

1. Kind and quality of material. 2. Quantity of material required 3.Stock on hand and reservations 4. Lead time required for procurement. 1. Standard and special tooling

3. Tooling 4. Quality Standards

5. Operation Methods.

1. 2. 3. 4.

Dimensional requirements. Finish requirements Tolerance requirements Hardness desired.

1. Operations and their sequence. 2. Machine tool for each indicated operation 3. Jigs and fixtures needed 4. Speeds & Feeds.

Source

Department originating indicated Information

Sales order or Order Acceptance

Sales

Drawings/Bill of Material Stock Cards

Drawing Office Stores Purchase

Tool Card P.P.C Drawings Customer’s feedback Process sheets Capacity charts

Drawing office Sales Department PPC PPC

Experience Route sheets

PPC

6. Path of Materials.

1 List of Operations and their Sequence 2.Alternatives possible

7. Operation time.

1. Setup time and standard time for each operation

Work Measurement data

8. Scheduling

1. Starting and finishing dates.

Machine Load & Scheduled charts

P.P.C

9. Progress of Work.

1. Work Completed as on date.

Daily production reports/Time ticket/Perforated slips

Production

Plan layout Industrial Engineering

4) How do the following management decisions influence design of the PPC system? (i) Plan for meeting occasional increase in demand. (ii) Status of the PPC department in the organization (iii)Degree of centralization (iv)Internal structure of PPC department. Ans: PLANNING MEETING SEASONAL OR OCCASIONAL INCREASE IN DEMAND: This influences greatly the production planning and control system which the company should have. Alternatives available to the company and associated activities are as under: i)

Having factors of production for the peak demand and utilizing extra capacity to manufacture products of non-seasonal nature or taking up subcontract work etc. Having factors of production for the least demand and meeting requirements of extra capacity by overtime or by holiday working or by hiring capacity or by sub-contracting etc. Production planning and control and the purchasing function under such a situation assumes very important role in the company.

ii)

STATUS OF THE PPC DEPARTMENT IN THE COMPANY: The status of PPC department in the company depends upon the company’s manufacturing processes. If the work is highly repetitive and the number of workmen is not very large, the work of planning may be performed directly by the line staff, there being thus no formal PPC department in the company. And in manufacturing units where plant and machinery is laid out as per sequence of operations and there is little difference in machine capacity for different products, the PPC may be sub-division of the manufacturing department. In firms, where either the product variety is very large or where machine capacities are different for different products, or where plant and machinery is laid out as per function in different departments not related to each other, PPC should be set up as an independent department with the head of the department responsible to the managing director, General manager, or works manager, depending upon the magnitude and complexity of the planning functions and the size of the firm. DEGREE OF CENTRALISATION: Degree of centralization implies extent to which planning activities are performed by PPC. Two systems in general are available: i) ii)

Centralized Planning where the functions of production planning is controlled centrally by staff specialist (s). Decentralized Planning where planning is carried out by line executiveforemen-who direct normal work in their respective departments.

Both types of planning, centralized as well as decentralized planning, have their relative advantages and disadvantages, the centralized planning takes away the burden of planning from the line staff thus leaving free to handle men and machines more effectively. Decentralized planning gives line staff sense of participation and opportunity to use their experience but it takes away lot of their valuable time in performing planning functions The trend today is towards the blend of “Centralized” and “Decentralized” system, called semi-centralized planning. It combines the merits of both the systems and it especially gives better results in a large industrial complex. Under semi-centralized planning, the scheduling of operations within the pre-fixed period and allotment of work to men and machines is done by line staff while overall coordination of materials ordering, sub-contract work planning, progressing and follow-up, capacity planning man power planning, maintenance planning etc, is done centrally by the staff specialists. THE INTERNAL STRUCTURE OF THE PPC DEPARTMENT Internal structure implies the functions to be assigned to PPC which depends on the nature of industry the size of the company and the management policies. Different companies assign different functions to the PPC department. It is common practice to assign following functions to PPC department: i) ii) iii) iv)

Order Preparation. Materials Control Tools Control Process planning

v) vi) vii) viii)

Scheduling Dispatching Progressing Expediting.

Few companies assign following four areas to PPC department: i) Cost Estimation iii) Sub-Contracting ii) Work Measurement iv) Capacity planning The functions actually to be assigned depend on the size of the company. This aspect also considers assigning of various functions of production control to different cells which again depends on the size of the company. In a medium or large sized industry there may be following important cells in PPC department: i) ii) iii) iv) v)

Materials Control Cell Tools Control Cell Process Planning Cell Scheduling Cell Dispatching Cell

vi) vii) viii) ix)

Progressing Cell Cost Estimation Cell Sub-Contract Cell Work Measurement Cell

Each cell may be headed by a senior engineer and supported by planning assistant(s) and clerk(s).

A representative production planning and control department of a medium size firm is illustrative in the following figure.

General Manager

Development Department

Order Preparation

Factory Production

Material Control

Process Planning

Production Planning & Control

Tools Control

Inspection & Quality Control

Scheduling

Plant Maintenance

Dispatching

6) (a) “Data given on the process sheet can be put to lot many uses in the organization” Discuss. Ans: Introduction: Process planning is the process of establishing the shortest and most economical path that each part is to follow from the point it is received as raw materials until it leaves as furnished part or a finished product. Process planning indicates operations to be performed and their sequence; specified the machine tool for each indicated operation; shows the necessary tooling (jigs and fixtures, cutting tools, cams and templates, measuring instruments, and gauges) for each indicated operation; gives manufacturing data such as speeds and feeds; sometimes the specifications of the skill for each operation. The document which incorporates this vital information is called process sheet or route sheet. Text: The information contained in the process sheet can be put to a variety of uses: (i) Scheduling: The scheduling cell of PPC can obtain for each operation the set-up and the processing time. This information helps them to prepare load and schedule charts (ii) Materials Movement: The Shop supervisor and the dispatch clerk can know where the jobs require to be sent for the next operation.

Progressing

(iii) Cost Reduction and Cost Control: A process sheet gives an idea of the tooling (standard tools, jigs and fixtures, templates, gauges and measuring instruments) which could be arranged prior to the starting of the operation. This cuts down setup time and reduces labour cost and overheads. (iv)Costing: Costing group can use the information to determine pre and post production cost of each component. (v) Method of Working: Method study engineer without going on the shop floor can know as to how presently the part is being manufactured. (vi)Requirement of manpower and machines: Set up times and processing times given in different route sheets may be consolidated machine wise into total manhours or machine-hours required to enable the management to take decisions concerning requirements of manpower and machines. (vii) Shop efficiency: Operation wise time data given in the process sheet is also helpful to the shop personnel to know whether the shop performance is in line with the expected performance. (b) A Small pump shaft is to be manufactured from a round bar on four machines in a workshop. It is first cut to length on a power hack-saw which can produce 12 pieces per hour. The cut pieces are then “faced to length” and “centered” on a special facing and centering machine. Once this machine is set-up (taking 30 minutes), the operator can complete 30 pieces per hour. Faced and centered pieces are next moved to the copying lathe. It takes 45 minutes to set up the copying lathe and 3 minutes to turn each piece. The final operation is cutting of the keyways on a special purpose key-way milling machine. It takes 8.50 minutes to cut hey-way on each piece. 8.0 minutes are required to set-up the hack-saw and 10 minutes to set-up the key-way milling machines. After cutting the key-ways the parts are debarred and inspected. Draw up a process sheet for the manufacture of this part. Though tooling and gauges do not require to be indicated yet their relative position on the process sheet should be shown. Sol:

PTO

Part Name: Pump Shaft Part No. : P0401125

PROCESS SHEET

Set Up Time

Op. No.

Operation Description

Machine

Tooling Set up Std min

1

Cutting it to Length

Power Hack Saw

12

80

60

2

Faced to length & Center

Spiral Machine

30

30

60

3

Copying Lathe

Lathe Machine

45

3

4

Cutting Keyways

Key way milling Machine

10

8.50

REVISION Prepared by (Signature & Date)

Checked by (Signature & Date)

DATE: KALLURI ENGINEERS HYDERABAD - 500070.

7 (a) Why is it necessary to record the progress of work? What different methods are available to collect information? Ans: Introduction: Progressing is the process of checking actual performance against the production plan and reporting exceptional deviations to the concerned authorities for the corrective action. Progressing function consists in keeping a watch on flow of materials, recognition of delays and interruptions, taking steps to rush up the remaining operations and communicating possible delays to the customer (wherever necessary) It is sometimes argued that progressing is only a substitute for poor planning. Should a driver take his hands off the steering wheel because the road is straight? Should a pilot divert his attention from the control board because the weather is fine? No! They can’t do this, similarly, progressing is required even if the material control and process planning functions are discharged satisfactorily, scheduling is done properly, manufacturing orders are released. There are usually a number of factors which tend to push the schedules off the mark. Some of the notable ones are as under:      

Delay in receipt of material from vendor(s) Excessive absenteeism (more than the normal) Machines breakdowns Excessive spoilage Errors in drawings Strikes and acts of Gods.

The need for progressing is also created when the customers do the follow up on their own to know the status of their orders.

Methods to collect information: (i) Physical Count (ii) Daily production report (iii) Job Card (iv) Perforated route sheet (v) Detachable sheet (b) Explain with a diagram any two methods to collect data on progress of work. Ans: Daily Production Report: It is prepared by the supervisor, this is another method of obtaining feedback. A daily production report contains fixed space to record:       

Operator’s Name and Token number Machine on which he worked Time spend Quantity produced Quantity checked by the patrolling inspector Results of the inspection Idle time and its reasons.

This report may be prepared either by the shop supervisor or the patrolling inspector and is collected at the end of the shift or the next day by the progress clerk of the PPC department. This method is best suited for large workshop having a process type of layout producing number of non-standard parts.

DAILY PRODUCTION REPORT Machi ne

Operator’s Name Code

Part Name & No.

507

A.R. Yande

Double Gear: 29 teeth Cam Shaft Gear (Op. No. 80) Idler Gear

508

-do-

509

Manjit

208/1

R. B. Kale

208/2

-do-

SECTION DATE SHIFT

Hours Worked

: : :

Gear Shop 12.11.04 First Shift

First Inspection Tole Qty. OK OK Rej Code

From To 7AM 3.30 PM

Qty. produc ed 78

20

20

-

-

7AM

3.30 PM

42

18

17

1

E

7AM

3.30 PM

60

15

15

-

G

½ Hr

Axle Shaft (Op. No. 90)

7AM

3.30PM

20

20

-

-

-

Agro Control Shaft (Op. 120)

7AM

3.30PM

6

2

2

G

1 Hr

34 6

Idle Hours _ ½ Hr

Perforated route sheet: It is a useful method of production feed back/collecting data on progress of work. The route sheet for each job carries part number, product or assembly number it is in, list of operations to be performed, and the necessary information. The route sheet is handed over to the supervisor or is tied to the product. As soon as each operation is completed, the operator or the supervisor signs the lower portion of the route sheet, detaches it, and returns to the progress section for their analysis. This method is suitable for tool rooms, jobbing shops or workshops producing one or few numbers of a component.

SHOP ORDER OP. NO. NO. 2002 130 2002 120 2002 110 2002 100 2002 90 2002 80 2002 70 2002 60 2002 50 2002 40 2002 30 2002 20 2002 10

OPERATION DESCRIPTION Inspect Grind Chamfer Thread Grind Grind OD Grind total length Grind bore and face Heat treat Inspect Cut keyway Finish blank Rough blank Drill 50 hole Saw off

DATE OF SIGN COMPLETIION

Fig: Perforated route sheet for manufacture of a thread roll 10 (a) What are the steps involved in solving an assignment problem. Ans: Introduction: Hungarian method is the most efficient method for solving an assignment problem involving minimum objective. Though its standard procedure is for balanced problems, minimization problem, free from restrictive, but it can be applied to even special situations by adopting additional steps.

Basic Principles: The Hungarian method is based on the following properties: (i) If a constant element is added or subtracted from every element of any row or column in the given cost matrix, an assignment that minimizes the total cost in the original matrix also minimizes the total cost in the revised matrix. (ii) In an assignment matrix, solution having zero total cost is the optimal solution. Assumptions: (i) Each facility is capable of performing each task (ii) Tasks differ in their work contents and facility in their capabilities (iii)Only one task can be assigned to each facility (iv)As only one task can be assigned to each facility, the assignment matrix must be of n x n size. (In case the matrix is not square, dummy rows or columns, equal to the difference, are added). Procedural steps to solve standard assignment problems: A standard assignment problem is a balanced assignment problem (i.e., number of tasks equal number of facilities), incorporates no restriction in allocation and involved minimization objective, Hungarian method to solve such problem requires following steps: Step 1: Express the problem into n x n assignment matrix Step 2: Select the smallest element in each row and subtract it from every element of that row. Step 3: Select the smallest element in each column of the reduced matrix obtained from step 2 and subtract it from every element of that column. Step 4: Cover all zero elements by minimum number of straight lines (horizontal and vertical lines only). If the number of lines drawn is equal to n(number of rows/columns), the solution is optimal and proceed to Step 7. if the number of lines drawn is smaller than n, go to step 5. Step 5: Select the smallest uncovered element (i.e., smallest element not covered by the lines), subtract it from all uncovered elements including itself, and add it to the elements covered twice (i.e. elements located at the intersection of any two lines), and reproduce other elements (i.e. elements through which only one line passes) as they are. Step 6: Repeat steps 4 and 5 until an optimal solution is obtained.

Step 7: Given the optimal solution make the job assignments as follows: (a) Examine the rows one by one starting with the first row until a row with an exclusive zero (i.e. row with exactly one zero) is found. Mark the zero by enclosing it in a square indicating assignment of the task to the facility. Cross out all zeroes (if any) in the column as they cannot be used to make other assignments. (b) Examine next the columns for any mutual exclusive zero and mark each as above, crossing out the remaining zeroes in that row. (c) Repeat steps (a) and (b) successfully until either of the following conditions occur: i. All zeros have been marked / crossed and each row contains one marked zero. This means that the optimal solution has reached. ii. All zeros have not been marked / crossed. The remaining unmarked zeros lie at least two in each row and column. This means that more than one optimal solution exists. (b) A drawing office incharge has four tasks and equal number of draught men. His estimate of time for each job – draught men combination is given (in hours) in the following matrix: Draughtmen Processing time (Hours) Jobs

D1

D2

D3

D4

J1

25

25

20

15

J2

35

20

15

20

J3

25

15

20

18

J4

30

10

25

20

Find out the optimal assignment. Sol: Step1: “Express the problem into n x n assignment matrix”. This step has already done in the case problem. Step2. “Subtract the smallest element in each row from every element in its row so as to obtain atleast one zero in each row.” st

nd

rd

th

15, 15, 15 & 10 are the smallest in 1 , 2 , 3 and 4 rows respectively. Subtraction of the smallest element in the row from every element in its row gives rise to an assignment matrix shown in the following table.

Draughtmen Processing time (Hours) Jobs

D1

D2

D3

D4

J1

10

10

5

0

J2

20

5

0

5

J3

10

0

5

3

J4

20

0

15

10

Step 3. Subtract the smallest element in each column of assignment matrix obtained in step 2 from every element in its column. This step gives rise to yet another assignment matrix…

Draughtmen Processing time (Hours) D1

D2

D3

D4

J1

0

10

5

0

J2

10

5

0

5

J3

0

0

5

3

J4

10

0

15

10

Jobs

Connect all zeros in the assignment matrix obtained in step 3 by minimum number of straight lines. Min 4 straight lines are required to connect all zeros. Step 4. (a) “Examine the rows one by one, starting with the first row until with an exclusive zero (i.e. row with exactly one zero) is found. Mark the zero by enclosing it in a square indicating assignment of the task to the facility. Cross out all zeros in the same column as they cannot be used to make other assignments. (b) Examine next the columns for any mutual exclusive zero and mark each as above, crossing the remaining zeros in that row. Here… 1) Row J1 has two exclusive zeros which occur at Junction J1 D1 and J1 D4 hence the allocation of task J1 is postponed for the time being. 2) Row J2 has 1 exclusive zero which occurs at junction J2 D3 hence Job J2 is assigned to D3. 3) Row J3 has two exclusive zeros which occur at Junction J3 D1 and J3 D2 hence the allocation of task J1 is postponed for the time being. 4) Row J4 has 1 exclusive zero which occurs at junction J4 D2 hence Job J2 is assigned to D2. 5) With the allocation of J2 and J4 we have 2 jobs left out unassigned. Looking at the matrix again, we see that the Under J3 there are 2 zeros out of which the position D2 is already assigned to J4 and cannot be reassigned to J1 as this is a

mutual exclusive zero assignment matrix. So the only position left out is J3D1. Hence the job J3 is assigned to D1. 6) With the allocation of Job J3 to D1 we are left out with J1. Considering the exclusive assignment matrix. The Job J1 can only be assigned to D4. Hence J1D4. So the Optimal assignment matrix is the following

Jobs

Draught Men Processing Time

J1

D4

15

J2

D3

15

J3

D1

25

J4

D2

10

Total Processing Time:

65 Hours

11 (a) what is critical ratio scheduling? What advantages does this technique have over other technique? Ans: Introduction: Critical ratio scheduling is a technique for establishing and maintaining priorities among the jobs-be it in a production control department for the purpose of scheduling or expending in a purchase department for the purpose of “Purchase order follow up” or in any other department of the company. The technique utilities concept of ratios called Critical ratios which provide time relationship between when a product/part/material is required and when it can be made available/supplied. Definition: A Critical ratio in its simplest form, may be stated as the ration of “time when a product is required“to the “time when the product can be supplied”. I.e. Critical Ratio =

Time when a product is required Time when the product can be supplied

For E.g., Critical Ratio = The Product is required in 20 days. The product can be made available in 10 days =

2.

A critical ratio of 2 implies that the time available to deliver the product is twice the time required to manufacture the product, similarly, a critical ratio of ½ will mean that the time available to deliver the product is half of the time required to manufacture the product. This also suggests that the processing time must be reduced to half of the normal expected time otherwise the product will not be delivered on time. Interpretation of critical ratios: Critical ratios have the following significance: A critical ratio of (i)

Greater than one means that there is sufficient time and job can be completed ahead of the schedule.

(ii)

Equal to one implies that job is just on schedule and requires to be closely watched.

(iii)

Less than one suggests that the job is critical and needs to be expedited to complete it on schedule.

In general, the smaller the critical ratio, the more critical the job is from delivery point of view. Advantages: This technique of critical ratio scheduling helps to:  Determine the relative job priorities for scheduling.  Make automatic adjustment in the shop schedule when there are changes in demand and job progress.  Reduce dependence on expeditors since a properly designed critical ratio system, coupled with necessary progress reporting, identifies critical jobs.  Compare both stock and made to order jobs on a common basis.  Prevent crises in scheduling of production  Exercise control by exception. Critical ratio scheduling, when applied to activities of production control department helps in establishing and maintaining priorities among the jobs and when applied to purchase follow up on pending orders. The technique helps to identify components/parts/ materials which require expediting of their pending quantities from their suppliers.

The technique utilizes the concept of ratios called critical ratios which provide a time relationship between a product / part /material is required and when it can be made available / supplied.

(b) Write few typical critical ratios and explain what they signify? Ans: 1) A total of 20 work orders completed over last one quarter were analyzed and following data on ineffective timer per operation (days) was obtained: 2.0 0.8 3.2 4.9

2.5 1.20 5.80 2.06

6.0 3.5 3.4 1.6

3.0 2.7 4.9 0.6

2.8 1.8 2.3 0.9

Calculate (i) (ii)

The average time per operation the component stayed on the shop floor due to waiting queuing, hunting, job splitting, change in priorities, power failure, machine break down etc. What total lead time should be considered for component with the following details?

Batch quantity = Total set up time = Total processing time = No. of operations = Average labour efficiency = against performance standards

300 no.s 12 hrs 18 min 5 80 %

N.B: The Company works two shifts per day, each shift of 8 hrs duration. Sol: (a) Expected ineffective time per operation is EIT

=

N ∑ 1

X i,

P(Xi)

The computational process is given in the table below:

Range of ineffective time per operation (days)

Mid value

Frequency Tally Total

Relative frequency

Probability P(Xi) that ineffective time per operation shall be Xi

Xi

Marks

Upto 1

.5

///

3

0.15

0.15

0.075

1 –2

1.5

////

4

0.20

0.20

0.300

2 –3

2.5

////// 7

0.35

0.35

0.875

3 –4

3.5

//

2

0.10

0.10

0.350

4 –5

4.5

//

2

0.10

0.10

0.450

5-6

5.5

//

2

0.10

0.10

0.550

20

Xi .P (Xi)

Total: 2.600

Therefore, expected value of ineffective time per operation = 2.60 days

(b) Total Lead time is given by the formula TLT

+

N ∑ 1

(W + T)

+

N ∑ 1

=

P

S+QR HXE

= =

Order preparation time = 7 days (assumed) Expected value of ineffective time per operation x No. of Operations 2.60 x 5 13 days Transit time between operations x No. of operations 0 (Transit time assumed to be insufficient)

Where, P W

T

= = = =

And N ∑ 1

S+QR HXE

=

12 +

18 / 60 X 16 X 0.80

=

7.97 days

13

+

300

Therefore, TKT

=

7

+

=

28 days.

7.97

2) National Engineering Company utilizes critical-ratio-scheduling technique for the purpose of scheduling and expediting. The status of few made-tostock items is given in the table below.

S.No

Stock-on hand

Safety stock

Average daily consumption

Average lead time remaining (to complete remaining operations) (days)

1 2 3 4

1320 480 520 785

840 120 80 235

60 30 40 50

4 15 10 30

Calculate critical ratio for each of the items and decide on the action to be taken. Sol: Critical Ratio =

Lead time available (LTA) Lead time required (LTR)

For made to stock items LTA

=

LTR

=

(Stock on hand) – (Safety stock) Average daily consumption Lead time required to the complete remaining operations

=

This has been given in the problem

Critical ratios for above items have been calculated in the table below:

S.No

Lead time available (LTA

Lead Time required

Critical ratio

1

1320 - 840 / 60

= 8

4

8 / 4 = 2.00

2

480 - 120 / 30

= 12

15

12 / 15 = 0.80

3

520 - 80 / 40

= 11

10

11 / 10 = 1.10

4

785 - 235 / 50

= 11

30

11 / 30 = 0.37

From the above critical ratios, we can conclude that progress of item (i) (ii) (iii) (iv)

At serial 1 is more than satisfactory. The item is likely to get completed on time and not much of attention is required to be paid to it. At serial 2 is unsatisfactory. The item has become critical either because its consumption has risen above its average or the job has been delayed. In any case, its progress must be accelerated to avoid potential stock out. At serial 3 is just satisfactory. The item needs to be closely monitored At serial 4 is extremely critical. Every possible avenue should be explored to expedite the remaining operations.

12 (a) What are make or buy decisions? What costs are considered while finding the cost to make and cost to buy? Ans: Introduction: Make or buy decisions generally concern items required to the company’s own design. No firm can manufacture each and every item of its product. It is neither possible nor desirable. Items which do not form the company’s product line are always purchased from outside. An automobile firm for example requires to purchase raw materials, forgings, castings, tyres, tubes, bulbs, wires, bearings, automotive wheels, etc, from others. Similarly, an engineering firm needs to buy grinding wheels, oils and greases; tools etc., since the manufacture of these items require totally a different manufacturing process. Items which require specialized technical knowledge or procurement of special equipment are generally sub-contracted. A small firm for example normally gets its items heat-treated, surface coated (zinc plating, or galvanizing, or phosphating) from outside to get benefit of low price. The exclusion of the above categories of items leaves the firm with items which require to be manufactured to its design either at the home plant or to be purchased from outside

suppliers. The decision whether to make the item at the home plant or buy it from outside vendors is referred to as “make-or-buy” decision. Costs to be considered while making a make or buy decision: Cost analysis refers to the determination of cost to make the item and cost to buy it. A complete and correct assessment of the various elements of the cost is essential to make sound economic decisions. The following data needs to be collected and analysed. Particulars Raw materials Landed cost of the item being cub-contracted Weight of raw materials/ Casting/forgings Weight of finished component Present utilization of company’s facilities Methods of manufacture (Route sheet) Set up times and operational times Machine hour cost and labour hour cost

Departments originating the information Purchase Purchase or sub-contracting Purchase/Production Planning & Control Production Planning & Control Production Planning & Control Production Planning & Control Industrial Engineering Costing/Industrial Engineering / Sales/Finance

The analysis is based on annual requirements of components against the following elements: (a) Raw Material: The raw material cost consists of cost of raw materials less value recovered during to the sale of scrap like turnings, borings, end pieces etc. The raw material cost is considered towards the cost to make. However, if the raw material is supplied to the vendor free of cost, the cost of such materials also required to be considered towards cost to purchase. (b) Labour cost: Labour cost implies the wages and costs of other benefits (Provident fund, E.S.I., bonus, gratuity etc.) payable to the workmen engaged on the job. This cost however, requires to be considered only when additional labour force needs to be employed while production capacity is available. (c) Tooling cost: Jigs and fixtures generally require to be made if the item is to be machined at the home plant. The jigs and fixtures once made maintain their accuracy only for certain quantity, say “n” pieces, after which again a new set of jigs and fixtures require to be made. The cost of tooling thus requires to be amortized over “n” pieces and the annual cost of such tooling requires to be added to “cost to make”. At times, when an item is purchased from outside vendors, certain special cutting tools (broaches, hobs, shaping cutters etc.) and jigs and fixtures require to be

supplied to the vendor free of cost. The cost of such tooling, therefore, requires to be considered separately as tooling cost towards “cost-to-buy” (d) Overhead cost: the bulk of cost associated with a make or buy decision is the cost of production capacity. This is the area where most often mistakes are made. These costly errors can be avoided by keeping a single fact in mind that the costs which influence make or buy decisions are just the incremental costs the costs which will be incurred if the part currently made is purchased or vice versa. (e) Recoupment cost: Recoupment cost implies the setup costs (if the item is to be manufactured at the home plant) or the procurement cost (if the item is to be purchased). Set-up cost is the “preparation cost” of the machines and it varies depending upon the number of production runs in a year. The procurement cost is the cost of raising a purchase order and processing the deliveries from the vendor(s) and it varies depending upon the frequency of receipts of the item from the vendor(s). (f) Outside operations cost: The item manufactured at the home plant may require sub-contracting of certain operations such as rough blanking, heat treatment, plating etc. The cost of such operations requires to be considered separately towards “cost to make” (g) Purchase cost: Purchase cost includes the price given to the vendor, packing and forwarding, excise, sales tax, transport cost, control etc. (h) Capacity cost: Capacity cost implies the cost of capacity rendered idle if the item currently being manufactured is purchased. Such a cost requires to be added to “cost to buy”. 1. “Production Planning and Control department is called the nerve center of a production unit” Discuss. Ans: Introduction: Good production planning and control system is a must for a firm to enable it to make reliable promises and then to stick to them. It is also essential to devise methods which will ensure selection of right equipment, right tooling and enable the shop to make the job in the simplest but in the fool proof way. The following costs can be controlled / avoided through better production, planning and control, which make it the nerve center of a production unit. (a)Waiting time: “Time waste is the easiest of all wastes and yet the hardest to correct because it does not litter the floor” remarked Henry Ford once. This statement is as true as death. Excessive waiting time is really a big hazard – a big expense. A closer look around the department can enable us to spot some of these time leaks. We will find some of our workmen waiting at that tool crib. Some may be waiting for raw materials. Other may be waiting for the tools to be sharpened. Yet there may be

some waiting for prints and instructions for the next job. These little time leaks, if considered in isolation, do no mean much but too many of these can certainly add to a large amount, may be larger than few big ones. To reduce waiting time, each supervisor must know as to when the job in hand must be completed and when next job should get started so that necessary tools. Gauges, prints, materials, etc. for the next job can be kept ready. (b) Hunting Time: “An Operative in an engineering concern spends more than 2% of his time in wandering or looking for the things he needs to do the jobs” we will find them sharing their tools with other operators. Lot of operative’s time is wasted in searching for straps, clamps, bolts, nuts and washers.” We can reduce this ineffective time by fixing right place for everything and providing our men a set of everything they need well in advance of starting of the job. Good production planning and control can convert some of these time leaks into useful production hours. (c) Stalling: “Workers usually try to coincide the end of their jobs with the end of the day by stretching the jobs in hand”. A worker usually tends to delay the completion of job so that he does not need to start a fresh job towards the end of the day. “why start now, I wont be able to finish it in my shift” is the commonest attitude among our workmen. We can somewhat avoid this by setting the system where by each workman knows when he is expected to complete the job-in-hand and what is his next work assignment. Scientific scheduling can do this! (d) Interrupted workloads: “Unplanned over lapping of operations lead to idle machines and job split-ups”. Interrupted work from the previous operation not only results in partial utilization of the next machine but also seriously undermine morale of the shop. Careful production planning can prevent such unnecessary losses of time. (e) Costly overtime: “Poor planning is the common cause of overtime.” Prolonged overtime is not merely the extra strain on the finance of the company but means much more. Excessive overtime and hence extra time earnings make the workers accustomed to a new standard of living and any action on the part of the management to reduce or discontinue overtime is disliked by the workers. It is just not palatable to them. The mere knowledge that the company intends to do away with the overtime make the workers slow down their pace and thus the company is forced to overtime working. It then becomes a vicious circle and once caught in it the company cannot come out of it. The result is of anybody’s guess. The workers go on getting overtime day after day and month after month and thus worsening the already worsened situation. The overall effect is thus the lowering of efficiency – firstly because of accumulation of fatigue and secondly because of slackering of pace to get overtime. The need for overtime arises due to:  Unrealistic delivery dates without there being any leeway for unforeseeable.  Acceptance of too many rush orders.  Frequent delays in receipt of materials  Excessive machine breakdowns

 Lack of qualified workers  Insufficient manpower or machines. The majority of the causes cited above can be avoided by proper planning (f) Unproductive time of the machines: “Productivity of factors of production to a large extent depends on the quality of supervision”. The prime responsibility of the supervisory staff is to ensure that the company’s machines work for maximum time and the loss of time due to different reasons is kept at minimum. The production time of the machines is lost due to weaknesses in one or more of the following supervisory functions:  Operators’ unauthorized absenteeism and the failure of the supervisor to make substitute arrangement  Enforced idle time of the machine for want of smooth movement of materials on the shop floor  Lack of effective supervision which cause idle time of the machines since operators merely shop around, visit unnecessarily places of personal needs, steal longer tea breaks, resume work 5-10 min late in the beginning of the shift and after lunch break and close work 10-15 min prior to lunch break and the end of the shift.  Idle time of the machines due to delayed action by the supervisor to trace defects to the source and stoppage of the machines by the workmen until then.  Wastage in factors of production enumerated above occurs not only because of poor quality of supervision but also when the supervisory staff gets burdened with routine functions namely materials planning, tools planning, movement of materials on the shop floor, machine loading, expediting etc. PPC relieves supervisory staff from clerical functions and thereby enable them to spend more time for training of workmen, proper allocation of work to workmen, trouble shooting and maintaining shop discipline. (g) Higher overhead costs: Since production planning anc control relieves supervisory staff from a number of clerical responsibilities, they get more time for training of workmen, troubleshooting, maintaining shop discipline and improvising methods of work. At the same time they can handle more workmen and more machines, which reduce supervisory overheads. (h) Poor labour efficiency: “Workmen who get accustomed to working intermittently never work continuously”. This is no exaggeration. It is a fact based on human physiology and it holds good not only for workmen but also for supervisory personnel. Many a times in large companies, jobs get delayed due to irregular deliveries of materials, interruptions from the supervisors, improper loading and scheduling, lack of sufficient volume of work etc. and as a result workmen are either rendered idle or are utilized for part of the time. And if such delays are frequent, workmen get accustomed to partial working and thus the efficiency of the shop floor suffer a set back. They even do not work continuously when sufficient work is available.

PPC can prevent such a situation by exercising better control on availability of tools and materials monitoring a close control on work-in-progress on the shop floor, reallocating jobs from other machines by shifting idle operators to other machines, changing the route, ensuring smooth movement of materials from and into the different shops, and reporting cases of idle time of men and machines to enable the scheduler to release new jobs. (i) Investment in inventories: Good production planning and control can help the firm to ensure continuity in production with minimum inventory investment. Stock outs and higher inventory investment result if the requirements of materials are not indented on time and also if materials on receipt are not allowed properly to the work orders as per job priorities. Shop personnel can neither do forward planning of materials nor can they keep track of receipts and issues of materials. Only a centralized agency such as PPC can co-ordinate the activities of shops, stores department and the buying department. Timely deliveries

Quick feedback on job status

Lower capital investment

Better availability

Better co-ordination between production, sales & stores.

PRODUCTION PLANNING & CONTROL

Effective supervision

Better job satisfaction

Cost reduction & cost control

Effective utilization of factors of production

Good return on investment

Fig: Effect of production planning and control on the firm’s operations (j) Lowered morale: A department plagues by rush orders, broken deliveries, uneven work loads, frequent revisions in process, costly overtime, excessive machine breakdowns and the like can hardly be expected to have good morale. An integrated approach to production, planning and control can go a long way to eliminate or atleast minimize the occurrences of the above mentioned losses. Certainly production, planning and control is the nerve center of a production unit.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question The commonly used network techniques other than PERT and CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ] Your Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ] Multiple Choice Single Answer Question In an unbalanced assignment, the tasks can be balanced by adding :Correct Answer Dummy tasks Your Answer

Dummy tasks

Multiple Choice Single Answer Question One of the causes of inability to meet delivery date originally promised :Correct Answer Lack of availability of material in time Your Answer

Lack of availability of material in time

Multiple Choice Multiple Answer Question The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision Your Answer Continuous flow of material , Low skilled labour , Easy supervision Multiple Choice Multiple Answer Question In a mass production assembly shop following work measurement techniques are used :Correct Answer Time study , Work sampling , Production study Your Answer

Time study , Work sampling , Production study

Multiple Choice Single Answer Question As the quantity increases, the procurement cost :Correct Answer Reduces Your Answer

Reduces

True/False Question

Fluctuation due to changes in season are called cyclical fluctuation. Correct Answer False Your Answer

True

True/False Question

A type items are always vital under VED analysis.

Correct Answer False Your Answer

False

Select The Blank Question Random fluctuation is considered for deciding ________. Correct Answer Analytical estimate Your Answer

Seasonal fluctuation

True/False Question

In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer False Your Answer

False

Select The Blank Question If Kwh consumption per 100 pieces is 8.01 and cost/kwh is Rs 0.80 the cost of power over the year for 40000 pieces with 2000 numbers rejection would be Rs ________. Correct Answer 2692 Your Answer

2692

Select The Blank Question At each ________, work is performed on a product either by adding parts or by completing assembly operations. Correct Answer Work station Your Answer

Work station

Multiple Choice Multiple Answer Question To operate fixed order quantity system, following parameters are required to be fixed:-

Correct Answer Standard reorder quantity , Minimum stock , Re-order point Your Answer

Minimum stock , Re-order point , Standard reorder quantity

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Customer's orders gives us work

Select The Blank Question A progress card normally contains ________ squares. Correct Answer Less than 25 Your Answer

Less than 25

Select The Blank Question ________ models of OR serve as an ideal aid for determining optimal sequence of jobs. Correct Answer Sequencing Your Answer

Sequencing

Multiple Choice Single Answer Question Ordering of raw material is based on :Correct Answer Sales forecast Your Answer

Sales forecast

Select The Blank Question Heuristics approach gave very good results when Wester and Kilbridge applied it to ________ assembly line. Correct Answer TV Your Answer

Car

Multiple Choice Single Answer Question What can be the consequence of inefficient working of department like sales? Correct Answer Failure on delivery date to customer Your Answer True/False

Failure on delivery date to customer

Question

In PERT, use of dummy activities is not much essential.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department Your Answer

PPC , Industrial Engineering , Production department

Select The Blank Question The batch production requires ________ capital investment as compared to job production. Correct Answer High Your Answer

High

Select The Blank Question Time waste is the earliest of all wastes and yet the________ to correct because it does not litter the floor. Correct Answer Hazards Your Answer

Hazards

True/False Question

To solve "n jobs - 2 machines" sequencing problem, it is assumed that each machine can perform only one type of operation and can undertake only one job at a time. Correct Answer True Your Answer

True

True/False Question

PERT is suitable in defense projects and R&D where activity times can not be really predicted. Correct Answer True Your Answer

True/False Question

True

In precedence diagram the length of arrow has very high degree of significance. Correct Answer False

Your Answer

True

Multiple Choice Single Answer Question Earliest possible occurrence time [ I.e. stray time ] of activity [ies ] emanating from the event is represented by :Correct Answer Earliest event time Your Answer

Earliest event time

Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer

Moving average , Exponential smothering , Curve fitting

Multiple Choice Single Answer Question The production system characterized by complex set of activities that must be performed in a particular order within a given period and within an estimated expenditure is known as :Correct Answer Project production Your Answer

Project production

Match The Following Question

Correct Answer

Your Answer

Time taken by each job at Processing time each machine

Processing time

Time between starting of Elapsed time first job and completion of last job

Elapsed time

Number of stages the job Number of machines has to pass

Number of machines

Time during which the machine is standstill

Idle time

Idle time

Select The Blank Question In the assignment model, the measure of effectiveness of each job for each machine can be represented by means of ________. Correct Answer Matrix Your Answer

Matrix

Multiple Choice Single Answer

Question

The ROI of the company can be increased by :-

Correct Answer Increasing profit & decreasing inventory Your Answer

Increasing investment/sales ratio

Multiple Choice Multiple Answer Question The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database Your Answer

Algorithms , Program code , Database

Multiple Choice Multiple Answer Question Some of significant characteristics of fixed order quantity system under replenishment systems are as follows :Correct Answer Safety stock is kept to take care of increase in demand during lead time as well as to meet demand when lead time is extended. , Re-order level equals safety stock plus average consumption during lead time , Average inventory equals safety stock plus half of reorder quantity. Your Answer Safety stock is kept to take care of increase in demand during lead time as well as to meet demand when lead time is extended. , Re-order level equals safety stock plus average consumption during lead time , Average inventory equals safety stock plus half of reorder quantity. Multiple Choice Multiple Answer Question Important considerations in scheduling are :Correct Answer Degree of centralization , Relative job priority , Load chart Your Answer

Degree of centralization , Relative job priority , Load chart

Multiple Choice Multiple Answer Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating Your Answer

Progress card , Display board , Network updating

Select The Blank Question The unit cost of manufacturing is largest in case of ________. Correct Answer Job production Your Answer

Job production

Match The Following Question

Correct Answer

Your Answer

HML Analysis

Price orientation

Price orientation

SDE Analysis

Procurement difficulties

Procurement difficulties

ABC analysis

Usage value

Usage value

VED Analysis

Criticality

Criticality

True/False Question

The non-mathematical rationale of the assignment method is one of minimizing opportunity costs. Correct Answer True Your Answer

False

True/False Question

Moving average method lags behind the latest trend.

Correct Answer True Your Answer

True

True/False Question

The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer

False

Multiple Choice Multiple Answer Question Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers Your Answer More delivery period , Geographical location of supplier , Reliability of suppliers Multiple Choice Single Answer Question The work measurement and time study belong to the school of management which was pioneered by :Correct Answer Fedric Winslow Taylor Your Answer

Fedric Winslow Taylor

Multiple Choice Single Answer Question Stock of finished goods are based on :Correct Answer Sales forecast Your Answer

Sales forecast

Multiple Choice Single Answer Question The data in respect of spindle nose pertains to :Correct Answer Tooling Your Answer

Raw material data

Multiple Choice Multiple Answer Question In linear programming method of line balancing, there are three types of constraints namely :Correct Answer Cycle time constraint , Step or task constraint , Precedence constraints Your Answer Cycle time constraint , Step or task constraint , Precedence constraints Select The Blank Question Buying for C quantities should be made in ________ quantities . Correct Answer Large Your Answer

Large

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium Your Answer

Minimum

Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer

Matrix

Select The Blank Question Production Planning and Control department acts as a link between company's sales and ________ department. Correct Answer Manufacturing Your Answer

Manufacturing

Select The Blank Question ________ is used for planning capacity. Correct Answer Standard Time Your Answer

Standard Time

Select The Blank Question Being capable to adjust their production facilities shortly just after change in demand for products and without incurring heavy expenses, greater flexibility in production is provided by ________. Correct Answer Job & batch production Your Answer

Continuous production

True/False Question

PERT uses linear programming and probability concepts for planning and controlling activities. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost Your Answer

Overtime cost

Multiple Choice Single Answer Question Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box Your Answer

Placed in a tray/box

Select The Blank Question The effectiveness of sequencing model technique ________ if the company has backlog of orders. Correct Answer Increases Your Answer

Decreases

Multiple Choice Multiple Answer Question Computerisation of line balancing involve following requirements :Correct Answer System software , Application software , User friendly interface Your Answer

System software , Application software , User friendly interface

True/False Question

Curve fitting method of statistical forecasting uses curve line approach. Correct Answer False Your Answer

False

True/False Question

If set up time for four operations involved is 2 ,1.5, 2 , 2.5 hours respectively, total set up time would be 10 hours. Correct Answer False Your Answer

False

Match The Following Question

Correct Answer

Your Answer

Bought out materials

Maintenance, repair,

Maintenance, repair,

required for production process but do not become part of finished product.

operating [MRO] inventories

operating [MRO] inventories

Finished goods, ready for Finished goods inventory sale to customer

Finished goods inventory

Idle resource of any kind having economic value

Inventory

Inventory

Raw materials, parts, Production inventory components required to produced finished product

Production inventory

Select The Blank Question Rational figure on utilization index can be obtained by carrying out ________ study. Correct Answer Work- sampling Your Answer

Work- sampling

Multiple Choice Single Answer Question The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer D. Konig Your Answer

D. Konig

Multiple Choice Multiple Answer Question The minimum requirements for application software for line balancing are as follows :Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Your Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Multiple Choice Multiple Answer Question A firm has 6 jobs to be processed on three machines A,B and C in the order ABC. The processing time of each job is given in the table below:- Find the idle time on different machines . Job Processing time [ hours ] Machine A Machine B Machine C J1 25 16 20 J2 26 20 19 J3 24 17 18 J4 22 20 21 J5 24 21 17 J6 28 18 13 Correct Answer 74 , 31 , 58 Your Answer

31 , 58 , 60

Multiple Choice Multiple Answer Question PERT terminology uses words like :-

Correct Answer Network diagram , Events , Slack Your Answer

Network diagram , Events , Slack

Multiple Choice Single Answer Question The most common assembly line is a moving conveyor that passes a series of workstations in a uniform time interval called :Correct Answer Cycle time Your Answer

Cycle time

True/False Question

The make-or-buy decision is not related with profit of the factory.

Correct Answer False Your Answer

True

Select The Blank Question Generally for ________ flow system, Heuristic method is preferred. Correct Answer Intermittent Your Answer

Intermittent

Multiple Choice Single Answer Question Document raised by sales department to authorise activities of PPC department for items manufactured to customers order is called :Correct Answer Order Acceptance Your Answer

Order Acceptance

Multiple Choice Multiple Answer Question What factors affect the status of PPC department in the company for achieving informal status? Correct Answer Manufacturing Process , Work is highly repetitive , Number of workmen is not very large Your Answer Manufacturing Process , Work is highly repetitive , Number of workmen is not very large True/False Question

Increase in inventory carrying cost increases EOQ.

Correct Answer False

Your Answer

False

True/False Question

Progressing is only a substitute for poor planning.

Correct Answer False Your Answer

True

Multiple Choice Multiple Answer Question Detachable Card contain following information :Correct Answer Quantity produced , Operation , Date of completion Your Answer

Quantity produced , Operation , Date of completion

Multiple Choice Multiple Answer Question Weaknesses of PPC department can be studied on following grounds :Correct Answer Failures in delivery commitment , Cancellation of orders , Complaints from customers Your Answer Failures in delivery commitment , Cancellation of orders , Complaints from customers Multiple Choice Single Answer Question Activity R can not start unless activities P & Q are completed . And activity S can not start unless activity Q is over [ I.e. activity P may not be even over ]. Activity R is therefore succedding to activity P & Q while activity S is succeeding to activity :Correct Answer Q Your Answer

Q

Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer

4 months

Multiple Choice Multiple Answer Question Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :Correct Answer Tool breakage , Job split up , Change in priorities Your Answer

Tool breakage , Job split up , Change in priorities

True/False Question

Stores issue order for an item is prepared as soon as the route sheet is ready. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Time study is useful method of measurement for :Correct Answer Short cycle time operations Your Answer

Long cycle time operations

Match The Following Question

Correct Answer

Your Answer

Index method

Loading and allocation of different jobs on different machines

Loading and allocation of different jobs on different machines

Critical Path Analysis

Schedule of activities of project

Schedule of activities of project

Jonsons method

Optimal job sequence for 2 machines n jobs

Schedule using priority numbers

Critical Ratio Scheduling

Establishing priorities among jobs

Establishing priorities among jobs

Select The Blank Question In check list approach, ________ rating indicates that existing PPC system requires some major improvements in indicated areas. Correct Answer Fair Your Answer

Fair

Multiple Choice Multiple Answer Question Because of following reasons there are limitations in forwarding quotation against sales enquiry :Correct Answer The lot is not as per EOQ , Tools / plants required to execute order are not available. , The item is not within the manufacturing range of a company Your Answer The lot is not as per EOQ , Tools / plants required to execute order are not available. , The item is not within the manufacturing range of a company Multiple Choice Multiple Answer

Question

Following are the factors which influence tool life :-

Correct Answer Type of tool , Material it is required to operate upon , Operators efficiency Your Answer Type of tool , Material it is required to operate upon , Operators efficiency True/False Question

C type items would never be vital under VED analysis.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question The Hungarian method is based on following assumptions :Correct Answer Tasks differ in their work contents and facility differ in their capabilities. , Only one task can be assigned to each facility. , As only one task can be assigned to each facility, the matrix must be of nXn order. Your Answer Tasks differ in their work contents and facility differ in their capabilities. , Only one task can be assigned to each facility. , As only one task can be assigned to each facility, the matrix must be of nXn order. Multiple Choice Single Answer Question The ratio between "time when a product is required" and " time when the product is supplied " is known as :Correct Answer Critical ratio Your Answer

Critical ratio

Select The Blank Question ________ inventories help to balance company's supply with market demand. Correct Answer Finished goods Your Answer

Finished goods

True/False Question

In order to complete a project on time, each critical activity need not be completed in time. Correct Answer False Your Answer

False

Multiple Choice Single Answer

Question

Production output in night shift is :-

Correct Answer Less than I shift production Your Answer

Less than I shift production

Select The Blank Question ________reflects impact of money tied up in inventory. Correct Answer Inventory turnover Your Answer

Inventory turnover

Multiple Choice Multiple Answer Question The line of balance is a device for planning and monitoring progress of :Correct Answer Purchase order execution , Project execution , Targeted programs Your Answer Purchase order execution , Project execution , Targeted programs Select The Blank Question Forecasting is function of ________. Correct Answer Marketing department Your Answer

Chief Executive officer

True/False Question

The Heuristics approach has a base of binary number theory.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question What shall be the consequence of acceptance of frequent rush orders by sales department? Correct Answer Delivery failure Your Answer

Disturbed scheduling

PRODUCTION PLANNING AND CONTROL

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Find EOQ in Rs from the following data :-Annual consumption = 20, 000 units, Ordering and receiving cost of material = Rs 20 per order, Annual carrying cost or storage cost = 10% of unit cost of material, Cost of material = Rs 50. Correct Answer 20000 Your Answer

20000

Multiple Choice Single Answer Question Tools control is :Correct Answer Set of techniques for providing required tooling Your Answer

Set of techniques for providing required tooling

Multiple Choice Multiple Answer Question The line of balance is a device for planning and monitoring progress of :Correct Answer Purchase order execution , Project execution , Targeted programs Your Answer

Purchase order execution , Project execution , Targeted programs

Select The Blank Question ________ analysis mainly helps to identify non-existing items for which store keeps bin cards, wastes computer memory or wastes computer stationary while preparing stores ledger. Correct Answer MNG Analysis Your Answer

MNG Analysis

Select The Blank Question Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer Updating Your Answer

Updating

Select The Blank Question If number of work stations is 8 and work content of all stations is 32 , the cycle time would be ________.

Correct Answer 4 Your Answer

4

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Customer's orders gives us work

Multiple Choice Multiple Answer Question The check list approach comprises of following parameters :Correct Answer Each department head concerned with efficiency of PPC function is given a set of questions to be answered. , The department head has to answer in "Yes/no" format only , Each "Yes" answer gives one negative score Your Answer Each department head concerned with efficiency of PPC function is given a set of questions to be answered. , The department head has to answer in "Yes/no" format only , In remark column details are to be furnished . Match The Following Question

Correct Answer

Your Answer

Time taken by each job at each machine

Processing time

Processing time

Time between starting of first job and completion of last job

Elapsed time

Elapsed time

Number of stages the job has to pass

Number of machines

Number of machines

Time during which the machine is standstill

Idle time

Idle time

True/False Question

To solve "n jobs - 2 machines" sequencing problem, it is assumed that each machine can perform only one type of operation and can undertake only one job at a time. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question If Assignment model is to be applied to 5 jobs, number of machines required would be :-

Correct Answer 5 Your Answer

5

Select The Blank Question Given the following data :- procurement cost per order = Rs 30 ; frequency of ordering per year =4 ; number of suppliers = 3 . Form the above data, total procurement cost would be Rs ________. Correct Answer 360 Your Answer

360

Multiple Choice Multiple Answer Question If actual demand is much lower than forecasted sale :Correct Answer Inventory will increase , Machine utilization will drop , Absolute project will reduce Your Answer Inventory will increase , Machine utilization will drop , Absolute project will reduce Multiple Choice Multiple Answer Question The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Match The Following Question

Correct Answer

Your Answer

Economic order quantity

Quantity at which there is neither overstocking nor under stocking.

Quantity at which there is neither overstocking nor under stocking.

Carrying cost

Cost of 'holding' the material Cost of 'holding' the material in store in store

Procurement cost

Administrative cost for procurement

Cost of procurement of material

Inventory cost

Sum of carrying and inventory cost

Sum of carrying and inventory cost

Multiple Choice Multiple Answer Question The Hungarian method is based on following assumptions :Correct Answer Tasks differ in their work contents and facility differ in their capabilities. , Only one task can be assigned to each facility. , As only one task can be assigned to each facility, the matrix must be of nXn order. Your Answer Tasks differ in their work contents and facility differ in their capabilities. , Only one task can be assigned to each facility. , As only one task can

be assigned to each facility, the matrix must be of nXn order. Multiple Choice Multiple Answer Question The essential features of batch production are :Correct Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Your Answer General purpose machines and process type layout , Flexibility of production schedule Multiple Choice Single Answer Question The works such as preparation of machine loads, fixation of calendar dates of various operations, coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedule are categorized under :Correct Answer Scheduling Your Answer

Process planning

Multiple Choice Multiple Answer Question In case of overloading actions to be considered include following :Correct Answer Subcontracting , Hiring capacity , Overtime working Your Answer

Subcontracting , Hiring capacity , Overtime working

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer

Consistent good quality of products

Select The Blank Question In an unbalanced assignment matrix, the columns can be balanced by adding ________. Correct Answer Dummy columns Your Answer

Dummy rows

True/False Question

Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department True/False Question

Exponential smoothening is weighted average method.

Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question The labour cost comprises of :Correct Answer Provident Fund , ESI , Bonus Your Answer

Provident Fund , ESI , Bonus

Multiple Choice Single Answer Question The ratio between "time when a product is required" and " time when the product is supplied " is known as :Correct Answer Critical ratio Your Answer

Critical ratio

True/False Question

LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning]. Correct Answer True Your Answer

True

True/False Question

Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers

Your Answer

More delivery period , Geographical location of supplier , Reliability of suppliers

Select The Blank Question Complexity of dispatcher's work varies with the type of ________. Correct Answer Manufacture Your Answer

Manufacture

Select The Blank Question The ________ makes scheduling process simpler but does not provide economy in manufacture. Correct Answer First-come-first scheduled Your Answer

Johnson's rule

Multiple Choice Single Answer Question Installed capacity means :Correct Answer Cumulative capacity of all locations Your Answer

Capacity at one location

Multiple Choice Single Answer Question Forecast is :Correct Answer Short termed and Long termed Your Answer

Short termed and Long termed

Multiple Choice Multiple Answer Question Steps involved in process planning include the following :Correct Answer Enlist feature influencing selection of manufacturing process , Prepare sequence of basic operation , Write down route sheet Your Answer Enlist feature influencing selection of manufacturing process , Prepare sequence of basic operation , Write down route sheet Multiple Choice Multiple Answer Question Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :Correct Answer Tool breakage , Job split up , Change in priorities Your Answer True/False

Tool breakage , Job split up , Change in priorities

Question

In assignment matrix, it is a must to determine adjoint of the matrix.

Correct Answer False Your Answer

False

Multiple Choice Single Answer Question Such spares which are required for a system but the system can continue to work in absence of such spares are categorized as :Correct Answer Essential Your Answer

Desirable

True/False Question

Mere communication to customer expressing inability to meet delivery commitment and reasons for delays is not enough. Correct Answer True Your Answer

True

Select The Blank Question Process plan is the process of establishing the ________ and most economical path that each part is to follow from raw material stage to finished product stage. Correct Answer Shortest Your Answer

Shortest

Multiple Choice Multiple Answer Question In SDE analysis, the responsibility of buyers is fixed as follows :Correct Answer Senior buyers may be given the responsibility of 'S' and 'D' , Items in 'E' are handled by junior buyers , Items in 'E' are handled directly by the storekeeper Your Answer Senior buyers may be given the responsibility of 'S' and 'D' , Items in 'E' are handled directly by the storekeeper True/False Question

PERT does not help in decision making.

Correct Answer False Your Answer

False

True/False Question

Curve fitting method of statistical forecasting uses curve line approach.

Correct Answer False Your Answer

True

Select The Blank Question Heuristics approach gave very good results when Wester and Kilbridge applied it to ________ assembly line. Correct Answer TV Your Answer

TV

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost Your Answer

Overtime cost

Multiple Choice Single Answer Question The term Stock allowance in context of Lot Size refers to the quantity that may be required to meet the requirement of spares for the following period :Correct Answer Specified period Your Answer

One month

True/False Question

Work measurement function is attached to line management.

Correct Answer False Your Answer

True

Select The Blank Question ________ is the sum of set up time and run time. Correct Answer Manufacturing time Your Answer

Manufacturing time

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question The activities such as preparation of estimates of tools, gauges,

measuring instruments, follow up with tool room, periodic replenishment are grouped under :Correct Answer Tool controls Your Answer

Tool controls

Multiple Choice Single Answer Question Break light is essential for an automobile from safety point of view. However, the vehicle can be driven even in absence of break light. Thus break light can be categorized as :Correct Answer Essential Your Answer

Essential

Multiple Choice Single Answer Question Given a decision for designing a line layout, major problem is subdividing a work so that smooth flow can result. The subdivision process is called :Correct Answer Line balancing Your Answer

Line of balance

True/False Question

As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer

Consistent good quality of products

Select The Blank Question Labour efficiency depends upon ________ Correct Answer Training and experience Your Answer

Training and experience

Match The Following Question

Correct Answer

Your Answer

Work element

Smallest portion of work identified during the breakdown analysis of the job.

Smallest portion of work identified during the breakdown analysis of the job.

Production line

Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Work Station

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Station work content

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer

Matrix

True/False Question

To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of operations. Each job must be processed first on machine A and then on machine B in a fixed sequence AB. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Let us suppose that activity P & Q can not start until activity R& S are completed. Activities P &Q are therefore :-

Correct Answer Succeeding Your Answer

Preceding

Multiple Choice Multiple Answer Question What is meant by production control? Correct Answer Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule Your Answer Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule Multiple Choice Multiple Answer Question The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database Your Answer

Algorithms , Program code , Database

Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer

Hungarian Method

True/False Question

A buyer has little or no control over a lead time.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Customer's orders gives us work

Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Failure to provide proper tools and control on work in progress on shop

floor Your Answer

Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single Answer Question The sourcing of vendors in case of 'C' type of items is :Correct Answer Few Your Answer

Few

Multiple Choice Multiple Answer Question The features of program plan are as follows :Correct Answer Each row of activities is associated with one component of final assembly. , Final completion date is zero , Time scale runs from right to left Your Answer Time scale runs from right to left , Program plan is prepared in form of mathematical model. , Final completion date is zero Multiple Choice Multiple Answer Question Failure to identify accumulated load on a given machine at a given time and identify periods available for allocation of future orders leads to Correct Answer Delays in delivery , High overtime payment , Broken promises Your Answer

Delays in delivery , High overtime payment , Higher rejections/rework

True/False Question

A manufacturing firm in the present days have virtually no control on their profits Correct Answer False Your Answer

True

Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers Your Answer Gives us work , Dividends to share holders , Gets business from new customers , Set the wheel of our production rolling True/False Question

If customers orders often get completed ahead of the schedule, it is a sign of good scheduling. Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost Your Answer

Overtime cost

Multiple Choice Multiple Answer Question Subcontracting department works under :Correct Answer Planning , Purchase , Production Your Answer

Planning , Purchase , Production

Select The Blank Question Given total work content as 370 and maximum allowable cycle time to be 90 seconds, the theoretical number of work stations would be ________. Correct Answer 4.11 Your Answer

4.11

Select The Blank Question Orders with ________ slack time remaining per operation are run first. Correct Answer Shortest Your Answer

Shortest

Multiple Choice Single Answer Question If total lead time of certain item is 30 days and lead time of operations completed is 6 days, the lead time required [ LTR ] would be :Correct Answer 24 Your Answer

24

Select The Blank Question The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer Scheduler Your Answer

Industrial engineer

Select The Blank

Question

At each ________, work is performed on a product either by adding parts or by completing assembly operations. Correct Answer Work station Your Answer

Work station

Multiple Choice Single Answer Question Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box Your Answer

Placed in a tray/box

True/False Question

PERT finds applications where resources [ men, materials and money ] are always made available as and when required. Correct Answer True Your Answer

True

Select The Blank Question Rational figure on utilization index can be obtained by carrying out ________ study. Correct Answer Work- sampling Your Answer

Work- sampling

True/False Question

EOQ is that quantity at which price paid by buyer is minimum.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Keeping available time per day constant, if the desired production rate per day is to be doubled ,cycle time will be reduced by :Correct Answer 0.5 Your Answer

0.5

Multiple Choice Multiple Answer Question To prepare load chart following job related information should be collected :Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Your Answer

Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Select The Blank Question Job production requires ________ capital investment. Correct Answer Lowest Your Answer

Largest

Multiple Choice Multiple Answer Question The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision Your Answer

Continuous flow of material , Low skilled labour , Easy supervision

Select The Blank Question ________ represents productive time of the job. Correct Answer Manufacturing time Your Answer

Manufacturing time

Multiple Choice Multiple Answer Question CPM terminology uses words like Correct Answer Arrow diagram , Nodes , Float Your Answer

Arrow diagram , Nodes , Float

Multiple Choice Single Answer Question The Follow up required for early delivery in case of 'B' types of items is usually :Correct Answer Periodic Your Answer

Periodic

Match The Following Question

Correct Answer

Your Answer

Job splitting

Dividing job in more than one lot

Dividing job in more than one lot

Change in priority

Shift equipment/workmen to Shift equipment/workmen to delayed jobs delayed jobs

Alternate routing

Processing on costlier machine

Running jobs on one machine sequentially

Overlapping

Running jobs simultaneously Running jobs simultaneously on more than one machine on more than one machine

Multiple Choice Single Answer Question The event is graphically represented by :Correct Answer Circle Your Answer

Circle

Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium Your Answer

Medium

Select The Blank Question ________ analysis is based on consumption figures of an item. Correct Answer FSN Your Answer

ABC

True/False Question

Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer

True

True/False Question

More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer True Your Answer

True

2nd Copy LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material purchase

Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer Load Your Answer Load Multiple Choice Single Answer Question LOB technique was developed by US navy in the year :Correct Answer 1958 Your Answer 1958 True/False Question In continuous or process production , only one product is manufactured. Correct Answer True Your Answer True Select The Blank Question ________reflects impact of money tied up in inventory. Correct Answer Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card Select The Blank Question A progress card is the most ________ method of recording of progress of work. Correct Answer Convenient Your Answer Convenient Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers Multiple Choice Multiple Answer Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer IV-I-II-V-III

Your Answer

I-II-III-IV-V

Select The Blank Question ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. Correct Answer Order preparation time Your Answer Queue time True/False Question PERT basically does not demarcate between critical and non-critical activities. Correct Answer True Your Answer True Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer Foreman's Your Answer Foreman's Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question Correct Answer Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning

Multiple Choice Multiple Answer Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits

Multiple Choice Multiple Answer Question In replenishment system, the fixed order quantity system is also called by following names :Correct Answer Fixed order system , Min-max system , Re-order point system Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer Question How you will Judge the failure of production planning and control department? Correct Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic Your Answer Inverse True/False Question Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours. Correct Answer False Your Answer True Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer 4 months Multiple Choice Single Answer Question The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer D. Konig Your Answer Charles simony Multiple Choice Single Answer Question So far as possible, number of activities should be :Correct Answer Limited Your Answer Limited True/False Question Production Planning and Control makes the supervisor ineffective. Correct Answer True Your Answer False Multiple Choice Single Answer Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle Your Answer Unit of capacity

True/False Question The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer 6 Lacs Select The Blank Question An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer Two Your Answer Pair Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer Production True/False Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer False Your Answer True True/False Question Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False Your Answer True Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer Minimum

True/False Question Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer True True/False Question In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer False Your Answer True Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Your Answer Net Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer Consistent good quality of products Match The Following Question Correct Answer Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer Timely availability of material, manpower Your Answer Timely availability of material, manpower Select The Blank Question Generally for ________ flow system, Heuristic method is preferred. Correct Answer Intermittent Your Answer Continuous

Select The Blank Question In control board________ compartment contains copy of work orders/shop orders of the item to be processed next on the machine. Correct Answer Middle Your Answer Bottom True/False Question Work measurement function is attached to line management. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer Tools and plants are available , Technical know how is available , Competent persons are present Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question The activities such as preparation of estimates of tools, gauges, measuring instruments, follow up with tool room, periodic replenishment are grouped under :Correct Answer Tool controls Your Answer

Tool controls

Multiple Choice Single Answer Question Break light is essential for an automobile from safety point of view. However, the vehicle can be driven even in absence of break light. Thus break light can be categorized as :Correct Answer Essential Your Answer

Essential

Multiple Choice Single Answer Question Given a decision for designing a line layout, major problem is subdividing a work so that smooth flow can result. The subdivision process is called :Correct Answer Line balancing Your Answer True/False

Line of balance

Question

As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer

Consistent good quality of products

Select The Blank Question Labour efficiency depends upon ________ Correct Answer Training and experience Your Answer

Training and experience

Match The Following Question

Correct Answer

Your Answer

Work element

Smallest portion of work identified during the breakdown analysis of the job.

Smallest portion of work identified during the breakdown analysis of the job.

Production line

Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Work Station

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Station work content

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Multiple Choice Single Answer

Question

Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer

Matrix

True/False Question

To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of operations. Each job must be processed first on machine A and then on machine B in a fixed sequence AB. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Let us suppose that activity P & Q can not start until activity R& S are completed. Activities P &Q are therefore :Correct Answer Succeeding Your Answer

Preceding

Multiple Choice Multiple Answer Question What is meant by production control? Correct Answer Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule Your Answer Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule Multiple Choice Multiple Answer Question The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database Your Answer

Algorithms , Program code , Database

Multiple Choice Single Answer

Question

The assignment method is also called as :-

Correct Answer Hungarian Method Your Answer

Hungarian Method

True/False Question

A buyer has little or no control over a lead time.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Customer's orders gives us work

Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Failure to provide proper tools and control on work in progress on shop floor Your Answer Failure to provide proper tools and control on work in progress on shop floor Multiple Choice Single Answer Question The sourcing of vendors in case of 'C' type of items is :Correct Answer Few Your Answer

Few

Multiple Choice Multiple Answer Question The features of program plan are as follows :Correct Answer Each row of activities is associated with one component of final assembly. , Final completion date is zero , Time scale runs from right to left Your Answer Time scale runs from right to left , Program plan is prepared in form of mathematical model. , Final completion date is zero Multiple Choice Multiple Answer Question Failure to identify accumulated load on a given machine at a given time and identify periods available for allocation of future orders leads to Correct Answer Delays in delivery , High overtime payment , Broken promises

Your Answer

Delays in delivery , High overtime payment , Higher rejections/rework

True/False Question

A manufacturing firm in the present days have virtually no control on their profits Correct Answer False Your Answer

True

Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers Your Answer Gives us work , Dividends to share holders , Gets business from new customers , Set the wheel of our production rolling True/False Question

If customers orders often get completed ahead of the schedule, it is a sign of good scheduling. Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost Your Answer

Overtime cost

Multiple Choice Multiple Answer Question Subcontracting department works under :Correct Answer Planning , Purchase , Production Your Answer

Planning , Purchase , Production

Select The Blank Question Given total work content as 370 and maximum allowable cycle time to be 90 seconds, the theoretical number of work stations would be ________. Correct Answer 4.11 Your Answer

4.11

Select The Blank

Question

Orders with ________ slack time remaining per operation are run first.

Correct Answer Shortest Your Answer

Shortest

Multiple Choice Single Answer Question If total lead time of certain item is 30 days and lead time of operations completed is 6 days, the lead time required [ LTR ] would be :Correct Answer 24 Your Answer

24

Select The Blank Question The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer Scheduler Your Answer

Industrial engineer

Select The Blank Question At each ________, work is performed on a product either by adding parts or by completing assembly operations. Correct Answer Work station Your Answer

Work station

Multiple Choice Single Answer Question Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box Your Answer

Placed in a tray/box

True/False Question

PERT finds applications where resources [ men, materials and money ] are always made available as and when required. Correct Answer True Your Answer

True

Select The Blank Question Rational figure on utilization index can be obtained by carrying out ________ study. Correct Answer Work- sampling

Your Answer

Work- sampling

True/False Question

EOQ is that quantity at which price paid by buyer is minimum.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Keeping available time per day constant, if the desired production rate per day is to be doubled ,cycle time will be reduced by :Correct Answer 0.5 Your Answer

0.5

Multiple Choice Multiple Answer Question To prepare load chart following job related information should be collected :Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand Your Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand Select The Blank Question Job production requires ________ capital investment. Correct Answer Lowest Your Answer

Largest

Multiple Choice Multiple Answer Question The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision Your Answer

Continuous flow of material , Low skilled labour , Easy supervision

Select The Blank Question ________ represents productive time of the job. Correct Answer Manufacturing time Your Answer

Manufacturing time

Multiple Choice Multiple Answer

Question

CPM terminology uses words like

Correct Answer Arrow diagram , Nodes , Float Your Answer

Arrow diagram , Nodes , Float

Multiple Choice Single Answer Question The Follow up required for early delivery in case of 'B' types of items is usually :Correct Answer Periodic Your Answer

Periodic

Match The Following Question

Correct Answer

Your Answer

Job splitting

Dividing job in more than one lot

Dividing job in more than one lot

Change in priority

Shift equipment/workmen to Shift equipment/workmen to delayed jobs delayed jobs

Alternate routing

Processing on costlier machine

Overlapping

Running jobs simultaneously Running jobs simultaneously on more than one machine on more than one machine

Running jobs on one machine sequentially

Multiple Choice Single Answer Question The event is graphically represented by :Correct Answer Circle Your Answer

Circle

Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium Your Answer

Medium

Select The Blank Question ________ analysis is based on consumption figures of an item. Correct Answer FSN Your Answer True/False

ABC

Question

Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer

True

True/False Question

More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer True Your Answer

True

Production Planning & Control assgn :03: Abhra Multiple Choice Single Answer Question The activities such as preparation of estimates of tools, gauges, measuring instruments, follow up with tool room, periodic replenishment are grouped under :Correct Tool controls Answer Your Answer Tool controls

Multiple Choice Single Answer Question Break light is essential for an automobile from safety point of view. However, the vehicle can be driven even in absence of break light. Thus break light can be categorized as :Correct Essential Answer Your Answer Essential

Multiple Choice Single Answer Question Given a decision for designing a line layout, major problem is subdividing a work so that smooth flow can result. The subdivision process is called :Correct Line balancing Answer Your Answer Line of balance

True/False Question Correct Answer Your Answer

As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. True True

Multiple Choice Single Answer Question What are the customer's expectation from the supplier?

Correct Answer Your Answer

Consistent good quality of products Consistent good quality of products

Select The Blank Question Labour efficiency depends upon ________ Correct Answer Your Answer

Training and experience Training and experience

Match The Following Question

Correct Answer

Your Answer

Work element

Smallest portion of work identified Smallest portion of work identified during the breakdown analysis of during the breakdown analysis of the job. the job.

Production line

Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.

Work Station

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.

Station work content

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Time required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer Your Answer

By proper coordination between shop floor, stores and buying department By proper coordination between shop floor, stores and buying department

Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Your Answer

Matrix Matrix

True/False Question Correct Answer Your Answer

To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of operations. Each job must be processed first on machine A and then on machine B in a fixed sequence AB. True True

Multiple Choice Single Answer Question Let us suppose that activity P & Q can not start until activity R& S are completed. Activities P &Q are therefore :Correct Succeeding Answer Your Answer Preceding

Multiple Choice Multiple Answer Question What is meant by production control? Correct Answer Your Answer

Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule Control is seeing that the requirements are made available at the right place and right quantities , Reporting back the progress to the production planning , Control involves suggesting action when the jobs is falling behind schedule

Multiple Choice Multiple Answer Question The software for CPA would require the following parameters:Correct Answer Your Answer

Algorithms , Program code , Database Algorithms , Program code , Database

Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Your Answer

True/False Question Correct Answer Your Answer

Hungarian Method Hungarian Method

A buyer has little or no control over a lead time. False True

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Your Answer

Customer's orders gives us work Customer's orders gives us work

Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Your Answer

Failure to provide proper tools and control on work in progress on shop floor Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single Answer Question The sourcing of vendors in case of 'C' type of items is :Correct Answer Your Answer

Few Few

Multiple Choice Multiple Answer Question The features of program plan are as follows :Correct Answer Your Answer

Each row of activities is associated with one component of final assembly. , Final completion date is zero , Time scale runs from right to left Time scale runs from right to left , Program plan is prepared in form of mathematical model. , Final completion date is zero

Multiple Choice Multiple Answer Question Failure to identify accumulated load on a given machine at a given time and identify periods available for allocation of future orders leads to Correct Delays in delivery , High overtime payment , Broken promises Answer Your Answer Delays in delivery , High overtime payment , Higher rejections/rework

True/False Question Correct Answer Your Answer

A manufacturing firm in the present days have virtually no control on their profits False True

Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer

Gives us work , Dividends to share holders , Gets business from new customers

Your Answer

True/False Question Correct Answer Your Answer

Gives us work , Dividends to share holders , Gets business from new customers , Set the wheel of our production rolling

If customers orders often get completed ahead of the schedule, it is a sign of good scheduling. False True

Multiple Choice Single Answer Question Proper Production Planning and Control can reduce cost in :Correct Answer Your Answer

Overtime cost Overtime cost

Multiple Choice Multiple Answer Question Subcontracting department works under :Correct Answer Your Answer

Planning , Purchase , Production Planning , Purchase , Production

Select The Blank Question Given total work content as 370 and maximum allowable cycle time to be 90 seconds, the theoretical number of work stations would be ________. Correct 4.11 Answer Your Answer 4.11

Select The Blank Question Orders with ________ slack time remaining per operation are run first. Correct Answer Your Answer

Shortest Shortest

Multiple Choice Single Answer Question If total lead time of certain item is 30 days and lead time of operations completed is 6 days, the lead time required [ LTR ] would be :Correct 24 Answer Your Answer 24

Select The Blank

Question Correct Answer Your Answer

The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Scheduler Industrial engineer

Select The Blank Question At each ________, work is performed on a product either by adding parts or by completing assembly operations. Correct Work station Answer Your Answer Work station

Multiple Choice Single Answer Question Detachable ticket, after filling in required information is :Correct Answer Your Answer

True/False Question Correct Answer Your Answer

Placed in a tray/box Placed in a tray/box

PERT finds applications where resources [ men, materials and money ] are always made available as and when required. True True

Select The Blank Question Rational figure on utilization index can be obtained by carrying out ________ study. Correct Answer Your Answer

True/False Question Correct Answer Your Answer

Work- sampling Work- sampling

EOQ is that quantity at which price paid by buyer is minimum. False True

Multiple Choice Single Answer Question Keeping available time per day constant, if the desired production rate per day is to be doubled ,cycle time will be reduced by :Correct 0.5

Answer Your Answer

0.5

Multiple Choice Multiple Answer Question To prepare load chart following job related information should be collected :Correct Answer Your Answer

Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Select The Blank Question Job production requires ________ capital investment. Correct Answer Your Answer

Lowest Largest

Multiple Choice Multiple Answer Question The main characteristics of mass and flow production are :Correct Answer Your Answer

Continuous flow of material , Low skilled labour , Easy supervision Continuous flow of material , Low skilled labour , Easy supervision

Select The Blank Question ________ represents productive time of the job. Correct Answer Your Answer

Manufacturing time Manufacturing time

Multiple Choice Multiple Answer Question CPM terminology uses words like Correct Answer Your Answer

Arrow diagram , Nodes , Float Arrow diagram , Nodes , Float

Multiple Choice Single Answer Question The Follow up required for early delivery in case of 'B' types of items is usually :Correct Answer Your Answer

Periodic Periodic

Match The Following Question

Correct Answer

Your Answer

Job splitting

Dividing job in more than one lot

Dividing job in more than one lot

Change in priority

Shift equipment/workmen to delayed jobs

Shift equipment/workmen to delayed jobs

Alternate routing

Processing on costlier machine

Running jobs on one machine sequentially

Overlapping

Running jobs simultaneously on more than one machine

Running jobs simultaneously on more than one machine

Multiple Choice Single Answer Question The event is graphically represented by :Correct Answer Your Answer

Circle Circle

Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Your Answer

Medium Medium

Select The Blank Question ________ analysis is based on consumption figures of an item. Correct Answer Your Answer

True/False Question Correct Answer Your Answer

True/False Question Correct Answer Your Answer

FSN ABC

Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. True True

More than one subcontractor should be developed for each subcontracted operation/Job. True True

Production Planning & Control assgn:04: Sameer Multiple Choice Multiple Answer Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material purchase Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer Load Your Answer Load Multiple Choice Single Answer Question LOB technique was developed by US navy in the year :Correct Answer 1958 Your Answer 1958 True/False Question In continuous or process production , only one product is manufactured. Correct Answer True Your Answer True Select The Blank Question ________reflects impact of money tied up in inventory. Correct Answer Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card Select The Blank Question A progress card is the most ________ method of recording of progress of work. Correct Answer Convenient Your Answer Convenient Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers Multiple Choice Multiple Answer Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The

operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer IV-I-II-V-III Your Answer I-II-III-IV-V Select The Blank Question ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. Correct Answer Order preparation time Your Answer Queue time True/False Question PERT basically does not demarcate between critical and non-critical activities. Correct Answer True Your Answer True Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer Foreman's Your Answer Foreman's Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question Correct Answer Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning

Multiple Choice Multiple Answer Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits Multiple Choice Multiple Answer Question In replenishment system, the fixed order quantity system is also called by following names :Correct Answer Fixed order system , Min-max system , Re-order point system Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer Question How you will Judge the failure of production planning and control department? Correct Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic Your Answer Inverse True/False Question Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours. Correct Answer False Your Answer True Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer 4 months Multiple Choice Single Answer Question The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer D. Konig Your Answer Charles simony Multiple Choice Single Answer Question So far as possible, number of activities should be :Correct Answer Limited Your Answer Limited True/False Question Production Planning and Control makes the supervisor ineffective. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle Your Answer Unit of capacity True/False Question The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer 6 Lacs Select The Blank Question An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer Two Your Answer Pair Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer Production True/False Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer False Your Answer True True/False Question Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False

Your Answer

True

Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually : Correct Answer Minimum Your Answer Minimum True/False Question Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer True True/False Question In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer False Your Answer True Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Your Answer Net Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer Consistent good quality of products Match The Following Question Correct Answer Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer Timely availability of material, manpower Your Answer Timely availability of material, manpower

Select The Blank Question Generally for ________ flow system, Heuristic method is preferred. Correct Answer Intermittent Your Answer Continuous Select The Blank Question In control board________ compartment contains copy of work orders/shop orders of the item to be processed next on the machine. Correct Answer Middle Your Answer Bottom True/False Question Work measurement function is attached to line management. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer Tools and plants are available , Technical know how is available , Competent persons are present Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available.

P P C 3rd SEMESTER OPERATIONS (PGDBA) True/False Question: XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN and ZN. Correct Answer: True Your Answer True Multiple Choice Single Answers Question: Forecast is based on:Correct Answer: Past data Your Answer Competitor's market share Select the Blank Question: Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer: Updating Your Answer Design Multiple Choice Single Answers Question: For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted:Correct Answer: Production Planning Control Your Answer Production Planning Control True/False Question: CPM marks critical activities. Correct Answer: True Your Answer True Select The Blank Question: A shop order may combine more than one ________ requiring identical items. Correct Answer: Work order Your Answer Sales order Multiple Choice Single Answer Question: What are the customer's expectation from the supplier? Correct Answer: Consistent good quality of products Your Answer Consistent good quality of products Select The Blank Question: ________ inventories help to balance company's supply with market demand. Correct Answer: Finished goods Your Answer WIP Select The Blank Question: Short term forecasts are for ________.

Correct Answer: Material Planning Your Answer Cash flow management

Multiple Choice Single Answer Question: For process planning following is one of the basic document used :Correct Answer: Operation Layout Your Answer Process Layout Multiple Choice Single Answer Question: Scheduled start of an operation is authorized by issuing a document called :Correct Answer: Job card Your Answer Route card Multiple Choice Multiple Answer Question: SOS Analysis involves following type of items :Correct Answer: Seasonal items available only for a limited period. , Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. , Machine spare parts Multiple Choice Multiple Answer Question: The basic procedure of assignment technique is designed to solve problems wherein :Correct Answer: Number of tasks equal to number of facilities. , The objective function is minimization. , There are no restrictions in allocation Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost of machine should be taken into consideration. True/False Question: There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product. Correct Answer: True Your Answer True True/False Question: In LOB, the regular progress checks the future effect of any current delays and indicates degree of urgency for corrective action. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are

PAGE NO: 1 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

as follows. Find the sequence for 5 jobs that will minimize total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4 Correct Answer: 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. True/False Question: When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult. Correct Answer: True Your Answer True

Question: The data regarding maximum run out between centers pertains to :Correct Answer: Process planning Your Answer Raw material data True/False Question: Lead time information is required for determination of safety stock. Correct Answer: False Your Answer True Select The Blank Question: Americans like to use the word 'inventory' whereas for same context British use the term________. Correct Answer: Stock Your Answer Stock

Match The Following Question: Correct Answer:Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Extra material requirement Machining allowance in handling

Extra material requirementMaterial loss

Spoilage allowance requirement of spares

Process rejection Quantity to meet

Select The Blank Question: ________ is required for machine set ups as well as regular production. Correct Answer: Performance standard Your Answer Machine design data Multiple Choice Single Answer Question: If a product is required within 20 days and the product can be made available in 10 days, the Critical ratio would be :Correct Answer: 2 Your Answer 0.5 Multiple Choice Single Answer Question: A subcontractor is :Correct Answer: Another form acting as a supplier Your Answer Manufacturer of specialized products on whom the buyer is dependent for 100% of requirement of main assembly

Multiple Choice Multiple Answer Question: SDE analysis is employed by the purchase department for :Correct Answer: Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. Your Answer Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. , Contract buying for some of 'easy' items. True/False Question: Labour efficiency factor is applied after capacity requirement of equipment is calculated. Correct Answer: False Your Answer True Multiple Choice Multiple Answer Question: PERT terminology uses words like :Correct Answer: Network diagram , Events , Slack Your Answer Network diagram , Events True/False Question: The LOB technique is most appropriate for assembly operations involving number of distinct components. Correct Answer: True Your Answer True True/False Question: Transit time for manufactured items should be considered only when it is insignificant. Correct Answer: False Your Answer True

Multiple Choice Single Answer Select The Blank

PAGE NO: 2 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: A progress card normally contains ________ squares. Correct Answer: Less than 25 Your Answer More than 50

Multiple Choice Multiple Answer Question: Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :Correct Answer: Tool breakage , Job split up , Change in priorities Your Answer Tool breakage , Job split up , Store inventory Multiple Choice Single Answer Question: One of the following is not an task of progressing :Correct Answer: Ensuring supply of material and issue of documents to manufacturing shops Your Answer Expediting to rush up remaining operations of the delays jobs Multiple Choice Single Answer Question: Production output in night shift is :Correct Answer: Less than I shift production Your Answer More than I shift production Multiple Choice Multiple Answer Question: The minimum requirements for application software for line balancing are as follows :Correct Answer: 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Your Answer 1 Gb hard Disk free memory , Windows or equivalent operating system. Multiple Choice Single Answer Question: The work measurement and time study belong to the following school of management :Correct Answer: Scientific School of management Your Answer Functional School of management Multiple Choice Multiple Answer Question: Before planning subcontracting points to be considered are :Correct Answer: Whether overtime can be given , One more shift can be started Your Answer Whether overtime can be given , One more shift can be started , Set up time can be reduced Multiple Choice Multiple Answer Question: The main requirements of re-order level system are as follows :-

Correct Answer: Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Your Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Multiple Choice Multiple Answer Question: The following are salient features of the fixed order quantity system :Correct Answer: Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time. Your Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Percent cumulative cost of item is taken into consideration. Select The Blank Question: ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under these circumstances, the firm would take a decision to ________. Correct Answer: Make at home Your Answer Buy from outside Multiple Choice Multiple Answer Question: Following difficulties are faced by SDE analysis :Correct Answer: More delivery period , Geographical location of supplier , Reliability of suppliers Your Answer More delivery period , Reliability of suppliers , Excise duty Select The Blank Question: For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer: Free Your Answer Net True/False Question: Route sheets for custom built job is prepared for each new order received.

PAGE NO: 3 OF 17

Correct Answer: Your Answer True

True

P P C 3rd SEMESTER OPERATIONS (PGDBA)

memory or wastes computer stationary while preparing stores ledger. Correct Answer: MNG Analysis Your Answer SOS Analysis

Match The Following Question: Correct Answer:Your Answer Order quantity Factor influencing process planningCompare alternative processes Machine capacity chart Dimensional accuracy purpose machines with special toolings

Multiple Choice Single Answer Question: Why customer is called the king? Correct Answer: Customer's orders gives us work Your Answer Gives satisfaction to workers

General

Mass production Special purpose machines Break even analysis Standard elemental time data Compare alternative processes Factor influencing process planning

Multiple Choice Multiple Answer Question: Following are some of the common standard cutting tools :Correct Answer: Cutting saw , Inserts , Reamers Your Answer Form tool , Inserts , Reamers Multiple Choice Single Answer Question: The Carrying cost is stated in terms of :Correct Answer: Per item per year Your Answer Per order Select The Blank Question: The definitive statement of policy stating when to procure and how much to procure usually to ensure that the sum of all costs associated with ________ are minimised is called Inventory policy. Correct Answer: Inventory Your Answer Buying Select The Blank Question: Buying for C quantities should be made in ________ quantities . Correct Answer: Large Your Answer Medium Select The Blank Question: In the assignment model, the________ is formed between jobs and machines. Correct Answer: Matrix Your Answer Matrix Select The Blank Question: ________ analysis mainly helps to identify nonexisting items for which store keeps bin cards, wastes computer

Multiple Choice Single Answer Question: Negative value of critical ratio :Correct Answer: Is meaningless Your Answer Indicates excess of scheduled delivery period Multiple Choice Multiple Answer Question: The main characteristics of batch production are :Correct Answer: Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process True/False Question: If lead time available is 11days and lead time required is 10 days, the critical ratio would be 1.10. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: What are the factor affecting decision about centralized planning system? Correct Answer: Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive Your Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive True/False Question: In continuous or process production , only one product is manufactured. Correct Answer: True Your Answer True True/False Question: The make-or-buy decision becomes necessary when the current source of supply is not able to supply the material in accordance with buyer's quality requirements. Correct Answer: True Your Answer True True/False

PAGE NO: 4 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: Work measurement function is attached to line management. Correct Answer: False Your Answer True

Multiple Choice Single Answer Question: Placement of purchase orders in case of 'A' type of items is usually :Correct Answer: Frequent Your Answer Frequent Match The Following Question: Correct Answer:Your Answer Economic order quantity Quantity at which there is neither overstocking nor under stocking. Quantity at which there is neither overstocking nor under stocking. Carrying cost Cost of 'holding' the material in store of transportation [carrying] of material

Cost

Procurement cost Administrative cost for procurement of procurement of material

Cost

Inventory cost Sum of carrying and inventory cost Sum of carrying and inventory cost

True/False Question: To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the second machine must be smaller than or equal to the smallest time of any job on first machine or third machine. Correct Answer: True Your Answer False True/False Question: Systematic procedures must be set in the operating functions prior to installation of PPC in the firm. Correct Answer: True Your Answer True

Multiple Choice Single Answer Question: Which factor influence plan for meeting seasonal or occasional increase in demand? Correct Answer: Subcontracting Your Answer Subcontracting Multiple Choice Single Answer Question: Which of the following is the function of Production Planning? Correct Answer: Process planning and scheduling Your Answer Progressing Select The Blank Question: Because of uncertainty of activity timings, PERT acquired a shape of ________ model. Correct Answer: Probabilistic Your Answer Statistical True/False Question: Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer: False Your Answer True True/False Question: Job schedule is a chart showing work ahead of each machine with respect to time. Correct Answer: False Your Answer True Match The Following Question: Correct Answer:Your Answer Tooling cost

Jigs and Fixtures Jigs and Fixtures

Opportunity costsMonitory value sacrificed in rejection of giving opportunity to do a business

Cost

Incremental cost Vary with decision to make or buy Vary with decision to make or buy Select The Blank Question: Time waste is the earliest of all wastes and yet the________ to correct because it does not litter the floor. Correct Answer: Hazards Your Answer Big hazard Multiple Choice Single Answer Question: If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer: 4 months Your Answer 1.2 Months

Labour cost benefits

Wages and other benefits Wages and other

Multiple Choice Single Answer Question: The goods are manufactured as per customer's definite order in case of :Correct Answer: Job production Your Answer Batch production

PAGE NO: 5 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) Multiple Choice Multiple Answer Question: The commonly used network techniques other than PERT and CPM are as follows :Correct Answer: MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ] Your Answer MIS [ Management Information Systems ] Multiple Choice Multiple Answer Question: To minimize total throughout time we are required to minimize :Correct Answer: Queuing , Idle time , Inventory Your Answer Queuing , Idle time Multiple Choice Multiple Answer Question: Following conditions are required to be fulfilled for processing n jobs through 2 machines :Correct Answer: The jobs are ready to be processed before the period under consideration begins . , Transient time to move a job from one machine to the another is negligible. , In process inventory is allowed. Your Answer The jobs are ready to be processed before the period under consideration begins . , In process inventory is allowed. Select The Blank Question: An inventory control technique based on selective approach to stock items is called ________ analysis. Correct Answer: Pareto's Your Answer Pareto's Multiple Choice Multiple Answer Question: While communicating to customer on delays in delivery following information should be given :Correct Answer: Information on identification of job , Reasons for delays , Revised date of delivery Your Answer Reasons for delays , Revised date of delivery Select The Blank Question: CPM is ________ oriented system. Correct Answer: Activity Your Answer Activity Multiple Choice Single Answer Question: One of the following is not consumable tool :Correct Answer: Arbors Your Answer Arbors True/False Question: LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning].

Correct Answer: Your Answer False

True

Select The Blank Question: ________ is required when expediting fails to bring deviated plan to its actual path. Correct Answer: Replanning Your Answer Replanning Multiple Choice Multiple Answer Question: The process of contraction or compression involves extra cost because extra money is required to be spent on factors such as :Correct Answer: Overtime engagement of workforce , Purchase of additional machinery , Use of better materials Your Answer Overtime engagement of workforce , Purchase of additional machinery , Purchase of stationary of good quality Multiple Choice Single Answer Question: In job production one single product is manufactured while a batch of group of products is turned out at a time under a system of :Correct Answer: Batch production Your Answer Process production Multiple Choice Multiple Answer Question: The 'F' group of GOLF analysis involves following requirements :Correct Answer: Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers Multiple Choice Single Answer Question: The production system characterized by complex set of activities that must be performed in a particular order within a given period and within an estimated expenditure is known as :Correct Answer: Project production Your Answer Project production Multiple Choice Single Answer Question: Proper Production Planning and Control can reduce cost in :Correct Answer: Overtime cost Your Answer Overtime cost Select The Blank Question: ________ is the specific instant of time that marks start and end of activity. Correct Answer: Event Your Answer Event

PAGE NO: 6 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Select The Blank Question: Overlapping of operations help to ________ manufacturing time. Correct Answer: Reduce Your Answer Reduce

Multiple Choice Multiple Answer Question: "Difficult" items have following attributes :Correct Answer: Available indigenously but are not easy to procure , Items which come from longer distance , Items which are difficult to manufacture Your Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items having complex specifications Multiple Choice Multiple Answer Question: They are type of analytical estimate :Correct Answer: Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Curve fitting Select The Blank Question: The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer: Scheduler Your Answer Production engineer Multiple Choice Multiple Answer Question: The network analysis involves following works :Correct Answer: Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Your Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Multiple Choice Single Answer Question: The assembly work content [ Wi ] of the i'th station having n work stations is given by :Correct Answer: å Wi from i=1 to n Your Answer å Wi from i=1 to n Multiple Choice Multiple Answer Question: Essentials of good forecasts are :Correct Answer: Stability , Fairly accurate , Economical to generate Your Answer Stability , Fairly accurate , Economical to generate

True/False Question: The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer: True Your Answer True Select The Blank Question: ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer: 6 Lacs Your Answer 6 Lacs LIST OF ATTEMPTED QUESTION:S AND ANSWERS Multiple Choice Multiple Answer Question: If actual demand far exceeds forecast, it will result into :Correct Answer: Better utilization of equipment , Project margin , Higher material purchase Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question: To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer: Load Your Answer Load Multiple Choice Single Answer Question: LOB technique was developed by US navy in the year :Correct Answer: 1958 Your Answer 1958 True/False Question: In continuous or process production , only one product is manufactured. Correct Answer: True Your Answer True Select The Blank Question: ________reflects impact of money tied up in inventory. Correct Answer: Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question: Methods for recording actual progress of work for shop orders are :Correct Answer: Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card

PAGE NO: 7 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Select The Blank Question: A progress card is the most ________ method of recording of progress of work. Correct Answer: Convenient Your Answer Convenient

Multiple Choice Multiple Answer Question: Following are some of the common standard cutting tools :Correct Answer: Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers Multiple Choice Multiple Answer Question: Tooling cost comprises the cost of :Correct Answer: Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question: The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer: IV-I-II-V-III Your Answer I-II-III-IV-V Select The Blank Question: ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. Correct Answer: Order preparation time Your Answer Queue time True/False Question: PERT basically does not demarcate between critical and non-critical activities. Correct Answer: True Your Answer True Multiple Choice Single Answer Question: The assignment method is also called as :Correct Answer: Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question: Outside operations cost involves expenses such as :Correct Answer: Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question: The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer: Foreman's Your Answer Foreman's

Multiple Choice Multiple Answer Question: The 'F' group of GOLF analysis involves following requirements :Correct Answer: Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question: Correct Answer: Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning Multiple Choice Multiple Answer Question: The tooling data is prepared in respect of following measuring instruments :Correct Answer: Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits Multiple Choice Multiple Answer Question: In replenishment system, the fixed order quantity system is also called by following names :Correct Answer: Fixed order system , Min-max system , Reorder point system Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer Question: How you will Judge the failure of production planning and control department? Correct Answer: Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question: In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer: Parabolic Your Answer Inverse True/False

PAGE NO: 8 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours. Correct Answer: False Your Answer True

Multiple Choice Single Answer Question: If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer: 4 months Your Answer 4 months Multiple Choice Single Answer Question: The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer: D. Konig Your Answer Charles simony Multiple Choice Single Answer Question: So far as possible, number of activities should be :Correct Answer: Limited Your Answer Limited True/False Question: Production Planning and Control makes the supervisor ineffective. Correct Answer: True Your Answer False Multiple Choice Single Answer Question: Unit of loading and scheduling depends on following factor :Correct Answer: Operating cycle Your Answer Unit of capacity True/False Question: The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: Load charts are used for following :Correct Answer: To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Select The Blank Question: ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer: 6 Lacs Your Answer 6 Lacs

Select The Blank Question: An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer: Two Your Answer Pair Multiple Choice Multiple Answer Question: They are type of analytical estimate :Correct Answer: Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Multiple Choice Single Answer Question: For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer: Production Planning Control Your Answer Production True/False Question: Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer: False Your Answer True True/False Question: Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer: False Your Answer True Multiple Choice Single Answer Question: Value Analysis conducted in 'C' type of material is usually :Correct Answer: Minimum Your Answer Minimum True/False Question: Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer: True Your Answer True True/False Question: In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer: False Your Answer True Select The Blank Question: For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer: Free Your Answer Net

PAGE NO: 9 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) Multiple Choice Single Answer Question: What are the customer's expectation from the supplier? Correct Answer: Consistent good quality of products Your Answer Consistent good quality of products

Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available. LIST OF ATTEMPTED QUESTION:S AND ANSWERS

Match The Following Question: Correct Answer: Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares

Multiple Choice Multiple Answer Question: Following are the factors which influence tool life :Correct Answer: Operators efficiency , Type of tool , Material it is required to operate upon Your Answer Operators efficiency , Type of tool , Material it is required to operate upon

Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection Multiple Choice Single Answer Question: Why customer is called the king? Correct Answer: Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question: PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer: Timely availability of material, manpower Your Answer Timely availability of material, manpower Select The Blank Question: Generally for ________ flow system, Heuristic method is preferred. Correct Answer: Intermittent Your Answer Continuous Select The Blank Question: In control board________ compartment contains copy of work orders/shop orders of the item to be processed next on the machine. Correct Answer: Middle Your Answer Bottom True/False Question: Work measurement function is attached to line management. Correct Answer: False Your Answer True Multiple Choice Multiple Answer Question: The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer: Tools and plants are available , Technical know how is available , Competent persons are present

Multiple Choice Single Answer Question: The document which incorporates details of process planning for a job is called :Correct Answer: Route Sheet Your Answer Route Sheet Multiple Choice Multiple Answer Question: CPM terminology uses words like Correct Answer: Arrow diagram , Nodes , Float Your Answer Arrow diagram , Nodes Select The Blank Question: Forecasting is function of ________. Correct Answer: Marketing department Your Answer Planning in charge Select The Blank Question: Johnsons method of scheduling can be used when operation sequence involve ________ machines. Correct Answer: Two Your Answer Two Select The Blank Question: Good quality and ________are the two main requirements to secure maximum business from a customer. Correct Answer: Competitive rates Your Answer Competitive rates Select The Blank Question: Sum of queue, transit, order preparation and manufacturing times is known as ________ Correct Answer: Total Lead Time Your Answer Total Lead Time True/False

PAGE NO: 10 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: To conduct FSN analysis we require, last date of receipt or last date of issue whichever is later and period. Correct Answer: True Your Answer True

Multiple Choice Multiple Answer Question: Overtime can be avoided in many ways and they are :Correct Answer: Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Your Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown

Multiple Choice Single Answer Question: Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer: By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department True/False Question: Fluctuation due to changes in season are called cyclical fluctuation. Correct Answer: False Your Answer False

Multiple Choice Multiple Answer Question: Material control function embraces a following techniques :Correct Answer: Make -or -buy decision , Pareto's analysis , Replenishment system Your Answer Make -or -buy decision , Pareto's analysis , Replenishment system

True/False Question: Flexibility and product variety are not interrelated with each other. Correct Answer: False Your Answer True

True/False Question: Work measurement is not useful for choosing between two alternate methods of production. Correct Answer: False Your Answer False

True/False Question: Overlapping of operations help to reduce manufacturing time. Correct Answer: True Your Answer True

Multiple Choice Multiple Answer Question: Process Sheet contains following information :Correct Answer: Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

Select The Blank Question: The LOB technique is made more accurate and fast by using ________. Correct Answer: Computers Your Answer Reduction techniques

True/False Question: More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer: True Your Answer True Select The Blank Question: Classification of items on basis of their capital lock up is called ________ analysis. Correct Answer: XYZ Your Answer XYZ Select The Blank Question: Purchase section must keep ________posted on the progress of purchase orders and expected delays. Correct Answer: P.P.C. Your Answer P.P.C.

True/False Question: Overtime is undesirable since it increases manufacturing cost of the product. Correct Answer: True Your Answer False Multiple Choice Multiple Answer Question: The essential features of batch production are :Correct Answer: General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Your Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Multiple Choice Single Answer Question: The sourcing of vendors in case of 'B' type of items is :Correct Answer: Medium

PAGE NO: 11 OF 17

Your Answer

Few

P P C 3rd SEMESTER OPERATIONS (PGDBA) Your Answer

Multiple Choice Single Answer Question: Dispatcher withdraws required quantity of material from stores using following document :Correct Answer: Stores issue order Your Answer Bill of material Multiple Choice Multiple Answer Question: In a mass production assembly shop following work measurement techniques are used :Correct Answer: Time study , Work sampling , Production study Your Answer Time study , Work sampling , Production study , Analytical estimating Multiple Choice Multiple Answer Question: SDE analysis is based on problems of procurement namely :Correct Answer: Non-availability , Scarcity , Longer lead time Your Answer Non-availability , Scarcity , Longer lead time True/False Question: Line balancing is a simulation technique. Correct Answer: False Your Answer False Multiple Choice Multiple Answer Question: The line of balance is a device for planning and monitoring progress of :Correct Answer: Purchase order execution , Project execution , Targeted programs Your Answer Purchase order execution , Project execution , Targeted programs Select The Blank Question: Sales persons decides ________. Correct Answer: Synthetic forecast Your Answer Current sales True/False Question: Material control Card is a document for record of issues of material and receipt of unused material by production shop. Correct Answer: False Your Answer False Multiple Choice Single Answer Question: Work measurement is limited to measuring :Correct Answer: Productive & non productive time

Only product related activities

Match The Following Question: Correct Answer:Your Answer Move order Transport material from and to required work centers Transport material from and to required work centers Materials Order Allocation of material required in connection with shop order Allocation of material required in connection with shop order Work Order Bird's eye view of production programme Bird's eye view of production programme Production Order Reserve material required in connection with sales order Reserve material required in connection with sales order

Multiple Choice Multiple Answer Question: The software for line balancing should have following features :Correct Answer: Easy to operate , Easy to install , Easy to upgrade Your Answer Easy to operate , Easy to install , Unmanaged code should be available Multiple Choice Single Answer Question: Man hours is commonly used unit of measurement for scheduling purposes in following industry :Correct Answer: Engineering Your Answer Engineering Multiple Choice Multiple Answer Question: Customer plays very important role due to the following reasons :Correct Answer: Gives us work , Dividends to share holders , Gets business from new customers Your Answer Gives us work , Dividends to share holders , Gets business from new customers Multiple Choice Single Answer Question: The 4X4 assignment problem involve following job-machine operations :Correct Answer: 24 Your Answer 24 Multiple Choice Single Answer Question: The best of scientific tools available for scheduling is :Correct Answer: CPA [ critical path analysis ] Your Answer Gantt Chart

PAGE NO: 12 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) Multiple Choice Multiple Answer Question: Work measurement is responsibility of :Correct Answer: PPC , Industrial Engineering , Production department Your Answer PPC , Industrial Engineering Match The Following Question: Correct Answer:Your Answer Long production run Flow production

Mass and Flow production Mass and

Complex activities to be performed in a particular order within a give time & estimate. Project production Project production One or few units manufactured as per customers requirement Jobbing Production Jobbing Production Short production run

Multiple Choice Multiple Answer Question: Smoothing performs following activities:Correct Answer: Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach Your Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach True/False Question: As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer: True Your Answer True Select The Blank Question: Value analysis of ________ class items is usually inadvisable. Correct Answer: C Your Answer C

Batch Production Batch Production

Multiple Choice Single Answer Question: Value Analysis conducted in 'C' type of material is usually :Correct Answer: Minimum Your Answer Minimum

True/False Question: PPC system in the organisation is to be tailor made. Correct Answer: True Your Answer True

LIST OF ATTEMPTED QUESTION:S AND ANSWERS Multiple Choice Multiple Answer Question: Some of significant features of HML analysis are :Correct Answer: To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases , Not to take consumption into account Your Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases Multiple Choice Single Answer Question: What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer: Failure to provide proper tools and control on work in progress on shop floor Your Answer Failure to provide proper tools and control on work in progress on shop floor Multiple Choice Single Answer Question: The administrative expenses towards the procurement of materials is called :Correct Answer: Procurement cost Your Answer Administrative cost

True/False Question: Performance benchmarking does not involves comparison of financial ratios at the aggregate level. Correct Answer: False Your Answer False Multiple Choice Single Answer Question: Setup time includes :Correct Answer: Internal setup time & External setup time Your Answer Internal setup time & External setup time Multiple Choice Single Answer Question: Participants of the groups for quality circles should be decided by :Correct Answer: Employees coming together by their own enthusiasm Your Answer Employees coming together by their own enthusiasm Multiple Choice Single Answer

PAGE NO: 13 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Question: Check sheet are also used as :Correct Answer: Data gathering & interpretation tool Your Answer Data gathering & interpretation tool Multiple Choice Single Answer Question: SMED means :Correct Answer: Single minute exchange of dies Your Answer Single minute exchange of dies

Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many" Parato analysis is technique of identifying vital causes by Arranging data according to the descending order of their frequency of occurrence Arranging data according to the descending order of their frequency of occurrence Parato diagram is a Bar graph with height or value drawn by Arranging data in descending order Magnitude of defects

Match The Following Question: Correct Answer:Your Answer Productivity performance measurement Cost of quality

Turnover employee

Financial performance measurement Sales of the months

Sales of the months

Customer satisfaction measurement Customer complaints per period Customer complaints per period Staff attitude measurementEmployee satisfaction index Employee satisfaction index

Select The Blank Question: ________ is an effect due to the muda of defect. Correct Answer: Wear & tear of parts while disassembling Your Answer Poor production planning & control Select The Blank Question: If some defective parts are discovered by the subsequent process they should be returned to the ________ to prevent reoccurrence. Correct Answer: Preceding process Your Answer Return to stores Multiple Choice Multiple Answer Question: The results oriented efforts of the quality circle should also include :Correct Answer: Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities Match The Following Question: Correct Answer:Your Answer

Multiple Choice Multiple Answer Question: Few steps in construction in Radar chart are :Correct Answer: Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre Select The Blank Question: 5 S audit result is discussed in ________ meeting. Correct Answer: Monthly Your Answer Monthly True/False Question: Fishbone analysis is used both in analysis & planning. Correct Answer: True Your Answer False Multiple Choice Single Answer Question: One Green Belt may head a team of :Correct Answer: 20 employees Your Answer 20 employees Multiple Choice Multiple Answer Question: Role of champions are :Correct Answer: Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation

Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect

PAGE NO: 14 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

Multiple Choice Multiple Answer Question: To draw control charts, sample must be representative of homogeneous segment of production for which :Correct Answer: The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Your Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Multiple Choice Single Answer Question: Failure mode and effect analysis (FMEA) establish Correct Answer: Process failure and minimize frequency Your Answer Process failure and minimize frequency Multiple Choice Multiple Answer Question: What are the steps in deciding the benchmarking partner? Correct Answer: Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Multiple Choice Single Answer Question: One Master Black Belt may head a team of :Correct Answer: 15-20 Black Belts Your Answer 15-20 Black Belts Multiple Choice Single Answer Question: Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :Correct Answer: Main competitor Your Answer Main competitor Multiple Choice Single Answer Question: Implication of Quality problem is:Correct Answer: Gap in performance Your Answer Gap in performance

Select The Blank Question: Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart. Correct Answer: c-chart Your Answer c-chart True/False

Question: Non-availability of files /document in time is a problem to be addressed by office TPM. Correct Answer: True Your Answer True Multiple Choice Single Answer Question: Check sheet is easy to use because it is :Correct Answer: Simplest tool Your Answer Simplest tool Multiple Choice Single Answer Question: Benchmarking helps to identify the gap between the current performance of the organization and the :Correct Answer: Performance of the best organization Your Answer Performance of the best organization True/False Question: Flow chart is pictorial representation of the steps in production control. Correct Answer: False Your Answer True Multiple Choice Multiple Answer Question: Breakdown problem may be stratified by :Correct Answer: Sections , Machines , Type of breakdown (e.g mech. Or electrical) Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical) Select The Blank Question: A control chart to exhibit counted data on number of defect is called ________. Correct Answer: c-chart Your Answer c-chart Select The Blank Question: Procedure for implementation of TPM consists of ________ numbers of steps. Correct Answer: 12 Your Answer 8 Select The Blank Question: Capability index Cp = ________ Correct Answer: Specification width/process width Your Answer Specification width/process width Multiple Choice Single Answer Question: Pareto's analysis underlines & operates philosophy of :Correct Answer: Vital few = trivial many Your Answer Vital few = trivial many

PAGE NO: 15 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA) True/False Question: Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer: True Your Answer True

Correct Answer: Prevention type Poka-Yoke , Detection type Poka-Yoke Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke Multiple Choice Single Answer Question: Quality problem solving tool is used to :Correct Answer: Improve quality Your Answer Save time

Multiple Choice Multiple Answer Question: To reduce clamping & declamping time, following actions are desirable :Correct Answer: Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device

True/False Question: Along with problem solving tools experience and judgment is also used. Correct Answer: True Your Answer False

Select The Blank Question: Benchmarking allows exchange of ________ between the benchmarking partners. Correct Answer: Information Your Answer Information

Select The Blank Question: JIT advocates the philosophy at elimination of waste from system which occurs due to ________. Correct Answer: Over Production Your Answer Over Production

Multiple Choice Multiple Answer Question: TQM can never flourish if the staff are:Correct Answer: Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses

True/False Question: Without measuring initial performance, target can't be set. Correct Answer: True Your Answer False

True/False Question: In bar graph each bar is of same height. Correct Answer: False Your Answer False Multiple Choice Multiple Answer Question: During SMED implementation, primary study consists of :Correct Answer: Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis True/False Question: Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: Types of Poka-Yoke are :-

Multiple Choice Multiple Answer Question: An erratic patterns falling above & below the control limits indicates :Correct Answer: Defect in materials , Frequent adjustment of machines , Poorly trained operators Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators True/False Question: Sample size for the construction of p-chart are larger than X bar-R chart. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: Histogram is an important diagnostic tool. Analysis of the histogram gives :Correct Answer: It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around

PAGE NO: 16 OF 17

P P C 3rd SEMESTER OPERATIONS (PGDBA)

correct average & within specific limits , A bird's eye view of the variation Multiple Choice Single Answer Question: Productivity improves by :Correct Answer: Voluntary participants of everyone Your Answer Voluntary participants of everyone

PAGE NO: 17 OF 17

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

XYZ when combined with FSN analysis helps to classify nonmoving items into XN , YN and ZN. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question Forecast is based on :Correct Answer Past data Your Answer

Competitor's market share

Select The Blank Question Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer Updating Your Answer

Design

Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer

Production Planning Control

True/False Question

CPM marks critical activities.

Correct Answer True Your Answer

True

Select The Blank Question A shop order may combine more than one ________ requiring identical items. Correct Answer Work order Your Answer

Sales order

Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer

Consistent good quality of products

Select The Blank Question ________ inventories help to balance company's supply with market demand. Correct Answer Finished goods Your Answer

WIP

Select The Blank Question Short term forecasts are for ________. Correct Answer Material Planning Your Answer

Cash flow management

Multiple Choice Single Answer Question For process planning following is one of the basic document used :Correct Answer Operation Layout Your Answer

Process Layout

Multiple Choice Single Answer Question Scheduled start of an operation is authorized by issuing a document called :Correct Answer Job card Your Answer

Route card

Multiple Choice Multiple Answer Question SOS Analysis involves following type of items :Correct Answer Seasonal items available only for a limited period. , Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. , Machine spare parts Multiple Choice Multiple Answer Question The basic procedure of assignment technique is designed to solve problems wherein :-

Correct Answer Number of tasks equal to number of facilities. , The objective function is minimization. , There are no restrictions in allocation Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost of machine should be taken into consideration. True/False Question

There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product. Correct Answer True Your Answer

True

True/False Question

In LOB, the regular progress checks the future effect of any current delays and indicates degree of urgency for corrective action. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are as follows.Find the sequence for 5 jobs that will minimize total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4 Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively. True/False Question

When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult. Correct Answer True Your Answer

True

Match The Following Question

Correct Answer

Your Answer

End piece allowance

Material insufficient to produce one piece

Material insufficient to produce one piece

Stock allowance

Quantity to meet requirement of spares

Extra material requirement

Machining allowance

Extra material requirement Material loss in handling

Spoilage allowance

Process rejection

Quantity to meet requirement of spares

Select The Blank Question ________ is required for machine set ups as well as regular production. Correct Answer Performance standard Your Answer

Machine design data

Multiple Choice Single Answer Question If a product is required within 20 days and the product can be made available in 10 days, the Critical ratio would be :Correct Answer 2 Your Answer

0.5

Multiple Choice Single Answer Question A subcontractor is :Correct Answer Another form acting as a supplier Your Answer

Manufacturer of specialized products on whom the buyer is dependent for 100% of requirement of main assembly

Multiple Choice Single Answer Question The data regarding maximum run out between centers pertains to :Correct Answer Process planning Your Answer

Raw material data

True/False Question

Lead time information is required for determination of safety stock. Correct Answer False Your Answer

True

Select The Blank Question Americans like to use the word 'inventory' whereas for same context British use the term________. Correct Answer Stock Your Answer

Stock

Multiple Choice Multiple Answer Question SDE analysis is employed by the purchase department for :Correct Answer Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. Your Answer Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. , Contract buying for some of 'easy' items. True/False Question

Labour efficiency factor is applied after capacity requirement of equipment is calculated. Correct Answer False Your Answer

True

Multiple Choice Multiple Answer Question PERT terminology uses words like :Correct Answer Network diagram , Events , Slack Your Answer

Network diagram , Events

True/False Question

The LOB technique is most appropriate for assembly operations involving number of distinct components. Correct Answer True Your Answer

True

True/False Question

Transit time for manufactured items should be considered only when it is insignificant. Correct Answer False Your Answer

True

Select The Blank Question A progress card normally contains ________ squares. Correct Answer Less than 25 Your Answer

More than 50

Multiple Choice Multiple Answer Question Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an

extra time :Correct Answer Tool breakage , Job split up , Change in priorities Your Answer

Tool breakage , Job split up , Store inventory

Multiple Choice Single Answer Question One of the following is not an task of progressing :Correct Answer Ensuring supply of material and issue of documents to manufacturing shops Your Answer Expediting to rush up remaining operations of the delays jobs Multiple Choice Single Answer Question Production output in night shift is :Correct Answer Less than I shift production Your Answer

More than I shift production

Multiple Choice Multiple Answer Question The minimum requirements for application software for line balancing are as follows :Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system. Your Answer 1 Gb hard Disk free memory , Windows or equivalent operating system. Multiple Choice Single Answer Question The work measurement and time study belong to the following school of management :Correct Answer Scientific School of management Your Answer

Functional School of management

Multiple Choice Multiple Answer Question Before planning subcontracting points to be considered are :Correct Answer Whether overtime can be given , One more shift can be started Your Answer

Whether overtime can be given , One more shift can be started , Set up time can be reduced

Multiple Choice Multiple Answer Question The main requirements of re-order level system are as follows :Correct Answer Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for

Your Answer

the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock. Incoming materials and materials returned from shop must be deposited in appropriate bins and their stock cards must be posted for "goods receipt report" and "material return note" for the quantities received physically . , Items should be issued in correct quantities. , The balance on the stock cards should be periodically tallied with physical stock.

Multiple Choice Multiple Answer Question The following are salient features of the fixed order quantity system :Correct Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time. Your Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Percent cumulative cost of item is taken into consideration. Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under these circumstances, the firm would take a decision to ________. Correct Answer Make at home Your Answer

Buy from outside

Multiple Choice Multiple Answer Question Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers Your Answer More delivery period , Reliability of suppliers , Excise duty Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Your Answer True/False Question

Net

Route sheets for custom built job is prepared for each new order received.

Correct Answer True Your Answer

True

Match The Following Question

Correct Answer

Your Answer

Order quantity

Factor influencing process Compare alternative planning processes

Machine capacity chart

Dimensional accuracy

Mass production

Special purpose machines Break even analysis

Standard elemental time data

Compare alternative processes

General purpose machines with special toolings

Factor influencing process planning

Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer

Form tool , Inserts , Reamers

Multiple Choice Single Answer Question The Carrying cost is stated in terms of :Correct Answer Per item per year Your Answer

Per order

Select The Blank Question The definitive statement of policy stating when to procure and how much to procure usually to ensure that the sum of all costs associated with ________ are minimised is called Inventory policy. Correct Answer Inventory Your Answer

Buying

Select The Blank Question Buying for C quantities should be made in ________ quantities . Correct Answer Large Your Answer

Medium

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question In the assignment model, the________ is formed between jobs and machines. Correct Answer Matrix Your Answer

Matrix

Select The Blank Question ________ analysis mainly helps to identify non-existing items for which store keeps bin cards, wastes computer memory or wastes computer stationary while preparing stores ledger. Correct Answer MNG Analysis Your Answer

SOS Analysis

Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer

Gives satisfaction to workers

Multiple Choice Single Answer Question Negative value of critical ratio :Correct Answer Is meaningless Your Answer

Indicates excess of scheduled delivery period

Multiple Choice Multiple Answer Question The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific process True/False Question

If lead time available is 11days and lead time required is 10 days, the critical ratio would be 1.10. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question What are the factor affecting decision about centralized planning system? Correct Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive Your Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is less repetitive True/False Question

In continuous or process production , only one product is manufactured. Correct Answer True Your Answer

True

True/False Question

The make-or-buy decision becomes necessary when the current source of supply is not able to supply the material in accordance with buyer's quality requirements. Correct Answer True Your Answer

True

True/False Question

Work measurement function is attached to line management.

Correct Answer False Your Answer

True

Multiple Choice Single Answer Question Placement of purchase orders in case of 'A' type of items is usually :Correct Answer Frequent Your Answer

Frequent

Match The Following Question

Correct Answer

Your Answer

Economic order quantity

Quantity at which there is Quantity at which there is neither overstocking nor neither overstocking nor under stocking. under stocking.

Carrying cost

Cost of 'holding' the material in store

Cost of transportation [carrying] of material

Procurement cost

Administrative cost for procurement

Cost of procurement of material

Inventory cost

Sum of carrying and inventory cost

Sum of carrying and inventory cost

True/False Question

To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the second machine must be smaller than or equal to the smallest time of any job on first machine or third machine. Correct Answer True Your Answer

False

True/False Question

Systematic procedures must be set in the operating functions prior to installation of PPC in the firm. Correct Answer True Your Answer

True

Select The Blank Question Time waste is the earliest of all wastes and yet the________ to correct because it does not litter the floor. Correct Answer Hazards Your Answer

Big hazard

Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer

1.2 Months

Multiple Choice Single Answer Question Which factor influence plan for meeting seasonal or occasional increase in demand? Correct Answer Subcontracting Your Answer

Subcontracting

Multiple Choice Single Answer Question Which of the following is the function of Production Planning? Correct Answer Process planning and scheduling Your Answer

Progressing

Select The Blank Question Because of uncertainty of activity timings, PERT acquired a shape of ________ model. Correct Answer Probabilistic Your Answer

Statistical

True/False Question

Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False Your Answer

True

True/False Question

Job schedule is a chart showing work ahead of each machine with respect to time. Correct Answer False Your Answer

True

Match The Following Question

Correct Answer

Your Answer

Tooling cost

Jigs and Fixtures

Jigs and Fixtures

Opportunity costs

Monitory value sacrificed in rejection

Cost of giving opportunity to do a business

Incremental cost

Vary with decision to make or buy

Vary with decision to make or buy

Labour cost

Wages and other benefits Wages and other benefits

Multiple Choice Single Answer Question The goods are manufactured as per customer's definite order in case of :Correct Answer Job production Your Answer

Batch production

Multiple Choice Multiple Answer Question The commonly used network techniques other than PERT and CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ]

Your Answer

MIS [ Management Information Systems ]

Multiple Choice Multiple Answer Question To minimize total throughout time we are required to minimize :Correct Answer Queuing , Idle time , Inventory Your Answer

Queuing , Idle time

Multiple Choice Multiple Answer Question Following conditions are required to be fulfilled for processing n jobs through 2 machines :Correct Answer The jobs are ready to be processed before the period under consideration begins . , Transient time to move a job from one machine to the another is negligible. , In process inventory is allowed. Your Answer The jobs are ready to be processed before the period under consideration begins . , In process inventory is allowed. Select The Blank Question An inventory control technique based on selective approach to stock items is called ________ analysis. Correct Answer Pareto's Your Answer

Pareto's

Multiple Choice Multiple Answer Question While communicating to customer on delays in delivery following information should be given :Correct Answer Information on identification of job , Reasons for delays , Revised date of delivery Your Answer Reasons for delays , Revised date of delivery Select The Blank Question CPM is ________ oriented system. Correct Answer Activity Your Answer

Activity

Multiple Choice Single Answer Question One of the following is not consumable tool :Correct Answer Arbors Your Answer

Arbors

True/False Question

LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning]. Correct Answer True Your Answer

False

Select The Blank Question ________ is required when expediting fails to bring deviated plan to its actual path. Correct Answer Replanning Your Answer

Replanning

Multiple Choice Multiple Answer Question The process of contraction or compression involves extra cost because extra money is required to be spent on factors such as :Correct Answer Overtime engagement of workforce , Purchase of additional machinery , Use of better materials Your Answer Overtime engagement of workforce , Purchase of additional machinery , Purchase of stationary of good quality Multiple Choice Single Answer Question In job production one single product is manufactured while a batch of group of products is turned out at a time under a system of :Correct Answer Batch production Your Answer

Process production

Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers Multiple Choice Single Answer Question The production system characterized by complex set of activities that must be performed in a particular order within a given period and within an estimated expenditure is known as :Correct Answer Project production Your Answer

Project production

Multiple Choice Single Answer

Question

Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost Your Answer

Overtime cost

Select The Blank Question ________ is the specific instant of time that marks start and end of activity. Correct Answer Event Your Answer

Event

Select The Blank Question Overlapping of operations help to ________ manufacturing time. Correct Answer Reduce Your Answer

Reduce

Multiple Choice Multiple Answer Question "Difficult" items have following attributes :Correct Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items which are difficult to manufacture Your Answer Available indigenously but are not easy to procure , Items which come from longer distance , Items having complex specifications Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer

Moving average , Curve fitting

Select The Blank Question The performance standard is required by ________ to determine individual machine capacity for the purpose of machine loading and assigning machine hours and man hours . Correct Answer Scheduler Your Answer

Production engineer

Multiple Choice Multiple Answer Question The network analysis involves following works :Correct Answer Obtaining a work breakdown structure to a set of individual jobs

Your Answer

which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources. Obtaining a work breakdown structure to a set of individual jobs which are arranged in a logical network. , Estimation of job duration , Scheduling to discover which jobs control completion of project and reallocation of resources.

Multiple Choice Single Answer Question The assembly work content [ Wi ] of the i'th station having n work stations is given by :Correct Answer å Wi from i=1 to n Your Answer

å Wi from i=1 to n

Multiple Choice Multiple Answer Question Essentials of good forecasts are :Correct Answer Stability , Fairly accurate , Economical to generate Your Answer

Stability , Fairly accurate , Economical to generate

True/False Question

The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer

True

Select The Blank Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer

6 Lacs

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material purchase Your Answer Higher material purchase , Increase in labour productivity , Better utilization of equipment , Project margin Select The Blank Question To know the accumulated ________ for a given machine at a given time Load charts are necessary. Correct Answer Load Your Answer Load Multiple Choice Single Answer Question LOB technique was developed by US navy in the year :Correct Answer 1958 Your Answer 1958 True/False Question In continuous or process production , only one product is manufactured. Correct Answer True Your Answer True Select The Blank Question ________reflects impact of money tied up in inventory. Correct Answer Inventory turnover Your Answer Inventory turnover Multiple Choice Multiple Answer Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating Your Answer Progress card , Display board , Network updating , Job card Select The Blank Question A progress card is the most ________ method of recording of progress of work. Correct Answer Convenient Your Answer Convenient Multiple Choice Multiple Answer Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers Your Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple Answer Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits Your Answer Gigs , Fixtures , Drill bits , Stationary Multiple Choice Single Answer Question The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours. Correct Answer IV-I-II-V-III Your Answer I-II-III-IV-V Select The Blank Question ________ represents the time that elapses between the receipt of requirement of job until the job is adopted in the production control department. Correct Answer Order preparation time Your Answer Queue time True/False Question PERT basically does not demarcate between critical and non-critical activities. Correct Answer True Your Answer True Multiple Choice Single Answer Question The assignment method is also called as :Correct Answer Hungarian Method Your Answer Analytical Method Multiple Choice Multiple Answer Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating Your Answer Heat treatment , Plating , Inventory control , Rough blanking Select The Blank Question The correct fitting of orders with capacity considerably lessens ________ burden of control. Correct Answer Foreman's Your Answer Foreman's Multiple Choice Multiple Answer Question The 'F' group of GOLF analysis involves following requirements :-

Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port clearance , Account in foreign bank Match The Following Question Correct Answer Your Answer Order quantity Factor influencing process planning Break even analysis Machine capacity chart Dimensional accuracy Dimensional accuracy Mass production Special purpose machines Special purpose machines Standard elemental time data Compare alternative processes Factor influencing process planning Multiple Choice Multiple Answer Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits Multiple Choice Multiple Answer Question In replenishment system, the fixed order quantity system is also called by following names :Correct Answer Fixed order system , Min-max system , Re-order point system Your Answer Fixed order system , Min-max system , Re-order point system , Lead time system Multiple Choice Multiple Answer Question How you will Judge the failure of production planning and control department? Correct Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime Your Answer Frequent broken delivery promises , Underutilization of men, machines , Excessive overtime , Better coordination with other section Multiple Choice Single Answer Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic Your Answer Inverse True/False Question Given stock in hand = 1320 units, safety stock=840 units and average daily consumption = 60 units, the lead time available would be 10 hours.

Correct Answer False Your Answer True Multiple Choice Single Answer Question If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time. Correct Answer 4 months Your Answer 4 months Multiple Choice Single Answer Question The assignment algorithm was developed by a Hungarian mathematician named :Correct Answer D. Konig Your Answer Charles simony Multiple Choice Single Answer Question So far as possible, number of activities should be :Correct Answer Limited Your Answer Limited True/False Question Production Planning and Control makes the supervisor ineffective. Correct Answer True Your Answer False Multiple Choice Single Answer Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle Your Answer Unit of capacity True/False Question The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Your Answer Improving supply of material , To know the accumulated load on a given machine at a given time , Identify periods available for allocation in future to orders , Matching orders and loads Select The Blank

Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would be Rs ________. Correct Answer 6 Lacs Your Answer 6 Lacs Select The Blank Question An inventory control system in which stock of item is physically or conceptually divided into ________ bins is calledTwo bin system. Correct Answer Two Your Answer Pair Multiple Choice Multiple Answer Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys Multiple Choice Single Answer Question For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control Your Answer Production True/False Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation. Correct Answer False Your Answer True True/False Question Scientific inventory control system requires to be followed for machine aid, work aid and inspection aid :Correct Answer False Your Answer True Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer Minimum True/False Question Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended. Correct Answer True Your Answer True

True/False Question In assignment matrix, it is a must to determine Jacobean of the determinant. Correct Answer False Your Answer True Select The Blank Question For replenishment action for stock items which are reserved by PPC, the stores work out ________ stock which equals the stock on hand less stock reserved. Correct Answer Free Your Answer Net Multiple Choice Single Answer Question What are the customer's expectation from the supplier? Correct Answer Consistent good quality of products Your Answer Consistent good quality of products Match The Following Question Correct Answer Your Answer End piece allowance Material insufficient to produce one piece Material insufficient to produce one piece Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of spares Machining allowance Extra material requirement Extra material requirement Spoilage allowance Process rejection Process rejection Multiple Choice Single Answer Question Why customer is called the king? Correct Answer Customer's orders gives us work Your Answer Customer's orders gives us work Multiple Choice Single Answer Question PPC is expected to have good inter-departmental relationships to achieve the production targets. Which is the most important factor that shall affect production targets? Correct Answer Timely availability of material, manpower Your Answer Timely availability of material, manpower Select The Blank Question Generally for ________ flow system, Heuristic method is preferred. Correct Answer Intermittent

Your Answer Continuous Select The Blank Question In control board________ compartment contains copy of work orders/shop orders of the item to be processed next on the machine. Correct Answer Middle Your Answer Bottom True/False Question Work measurement function is attached to line management. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question The technical feasibility of sales enquiry is carried out on the following grounds :Correct Answer Tools and plants are available , Technical know how is available , Competent persons are present Your Answer Tools and plants are available , Technical know how is available , Competent persons are present , Cost data of raw material is available.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Following are the factors which influence tool life :Correct Answer Operators efficiency , Type of tool , Material it is required to operate upon Your Answer Operators efficiency , Type of tool , Material it is required to operate upon Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called :Correct Answer Route Sheet Your Answer

Route Sheet

Multiple Choice Multiple Answer Question CPM terminology uses words like Correct Answer Arrow diagram , Nodes , Float Your Answer

Arrow diagram , Nodes

Select The Blank Question Forecasting is function of ________. Correct Answer Marketing department Your Answer

Planning in charge

Select The Blank Question Johnsons method of scheduling can be used when operation sequence involve ________ machines. Correct Answer Two Your Answer

Two

Select The Blank Question Good quality and ________are the two main requirements to secure maximum business from a customer. Correct Answer Competitive rates Your Answer

Competitive rates

Select The Blank Question Sum of queue, transit, order preparation and manufacturing times is known as ________ Correct Answer Total Lead Time Your Answer

Total Lead Time

True/False Question

To conduct FSN analysis we require, last date of receipt or last date of issue whichever is later and period. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Overtime can be avoided in many ways and they are :Correct Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Your Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdown Multiple Choice Multiple Answer Question Material control function embraces a following techniques :Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system Your Answer

Make -or -buy decision , Pareto's analysis , Replenishment system

True/False Question

Work measurement is not useful for choosing between two alternate methods of production. Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question Process Sheet contains following information :Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer

Material Specification , Sequence of operation , Skill of Labour

True/False Question

More than one subcontractor should be developed for each subcontracted operation/Job. Correct Answer True Your Answer

True

Select The Blank Question Classification of items on basis of their capital lock up is called ________ analysis. Correct Answer XYZ Your Answer

XYZ

Select The Blank Question Purchase section must keep ________posted on the progress of purchase orders and expected delays. Correct Answer P.P.C. Your Answer

P.P.C.

Multiple Choice Single Answer Question Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department Your Answer By proper coordination between shop floor, stores and buying department True/False Question

Fluctuation due to changes in season are called cyclical fluctuation.

Correct Answer False Your Answer

False

True/False Question

Flexibility and product variety are not inter-related with each other.

Correct Answer False Your Answer

True

True/False Question

Overlapping of operations help to reduce manufacturing time.

Correct Answer True Your Answer

True

Select The Blank Question The LOB technique is made more accurate and fast by using ________. Correct Answer Computers Your Answer

Reduction techniques

True/False Question

Overtime is undesirable since it increases manufacturing cost of the product. Correct Answer True Your Answer

False

Multiple Choice Multiple Answer

Question

The essential features of batch production are :-

Correct Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Your Answer General purpose machines and process type layout , Manual materials handling , Flexibility of production schedule Multiple Choice Single Answer Question The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium Your Answer

Few

Multiple Choice Single Answer Question Dispatcher withdraws required quantity of material from stores using following document :Correct Answer Stores issue order Your Answer

Bill of material

Multiple Choice Multiple Answer Question In a mass production assembly shop following work measurement techniques are used :Correct Answer Time study , Work sampling , Production study Your Answer

Time study , Work sampling , Production study , Analytical estimating

Multiple Choice Multiple Answer Question SDE analysis is based on problems of procurement namely :Correct Answer Non-availability , Scarcity , Longer lead time Your Answer

Non-availability , Scarcity , Longer lead time

True/False Question

Line balancing is a simulation technique.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question The line of balance is a device for planning and monitoring progress of :Correct Answer Purchase order execution , Project execution , Targeted programs Your Answer

Purchase order execution , Project execution , Targeted programs

Select The Blank Question Sales persons decides ________.

Correct Answer Synthetic forecast Your Answer

Current sales

True/False Question

Material control Card is a document for record of issues of material and receipt of unused material by production shop. Correct Answer False Your Answer

False

Multiple Choice Single Answer Question Work measurement is limited to measuring :Correct Answer Productive & non productive time Your Answer

Only product related activities

Match The Following Question

Correct Answer

Your Answer

Move order

Transport material from and Transport material from and to required work centers to required work centers

Materials Order

Allocation of material Allocation of material required in connection with required in connection with shop order shop order

Work Order

Bird's eye view of production programme

Bird's eye view of production programme

Production Order

Reserve material required in connection with sales order

Reserve material required in connection with sales order

Multiple Choice Multiple Answer Question The software for line balancing should have following features :Correct Answer Easy to operate , Easy to install , Easy to upgrade Your Answer

Easy to operate , Easy to install , Unmanaged code should be available

Multiple Choice Single Answer Question Man hours is commonly used unit of measurement for scheduling purposes in following industry :Correct Answer Engineering Your Answer

Engineering

Multiple Choice Multiple Answer Question Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from

new customers Your Answer

Gives us work , Dividends to share holders , Gets business from new customers

Multiple Choice Single Answer Question The 4X4 assignment problem involve following job-machine operations :Correct Answer 24 Your Answer

24

Multiple Choice Single Answer Question The best of scientific tools available for scheduling is :Correct Answer CPA [ critical path analysis ] Your Answer

Gantt Chart

Multiple Choice Multiple Answer Question Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department Your Answer

PPC , Industrial Engineering

Match The Following Question

Correct Answer

Long production run

Mass and Flow production Mass and Flow production

Complex activities to be performed in a particular order within a give time & estimate.

Project production

Project production

One or few units manufactured as per customers requirement

Jobbing Production

Jobbing Production

Short production run

Batch Production

Batch Production

Your Answer

Multiple Choice Single Answer Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum Your Answer

Minimum

Multiple Choice Multiple Answer Question Some of significant features of HML analysis are :-

Correct Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases , Not to take consumption into account Your Answer To evolve buying policies to control purchases , To delegate authorities to different buyers to make petty cash purchases Multiple Choice Single Answer Question What is the reasons for poor labour efficiency attributed by inefficient P.P.C.? Correct Answer Failure to provide proper tools and control on work in progress on shop floor Your Answer Failure to provide proper tools and control on work in progress on shop floor Multiple Choice Single Answer Question The administrative expenses towards the procurement of materials is called :Correct Answer Procurement cost Your Answer

Administrative cost

Multiple Choice Multiple Answer Question Smoothing performs following activities:Correct Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach Your Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approach True/False Question

As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors. Correct Answer True Your Answer

True

Select The Blank Question Value analysis of ________ class items is usually inadvisable. Correct Answer C Your Answer

C

True/False Question

PPC system in the organisation is to be tailor made.

Correct Answer True Your Answer

True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Performance benchmarking does not involves comparison of financial ratios at the aggregate level. Correct Answer False Your Answer

False

Multiple Choice Single Answer Question Setup time includes :Correct Answer Internal setup time & External setup time Your Answer

Internal setup time & External setup time

Multiple Choice Single Answer Question Participants of the groups for quality circles should be decided by :Correct Answer Employees coming together by their own enthusiasm Your Answer

Employees coming together by their own enthusiasm

Multiple Choice Single Answer Question Check sheet are also used as :Correct Answer Data gathering & interpretation tool Your Answer

Data gathering & interpretation tool

Multiple Choice Single Answer Question SMED means :Correct Answer Single minute exchange of dies Your Answer

Single minute exchange of dies

Match The Following Question

Correct Answer

Your Answer

Productivity performance Turnover employee measurement

Cost of quality

Financial performance measurement

Sales of the months

Sales of the months

Customer satisfaction measurement

Customer complaints per period

Customer complaints per period

Sem – 3rd

Techniques for Operations Efficiency

1

Staff attitude measurement

Employee satisfaction index

Employee satisfaction index

Select The Blank Question ________ is an effect due to the muda of defect. Correct Answer Wear & tear of parts while disassembling Your Answer

Poor production planning & control

Select The Blank Question If some defective parts are discovered by the subsequent process they should be returned to the ________ to prevent reoccurrence. Correct Answer Preceding process Your Answer

Return to stores

Multiple Choice Multiple Answer Question The results oriented efforts of the quality circle should also include :Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities Match The Following Question Parato diagram always indicates

Correct Answer

Your Answer

Magnitude of defects

Philosophy of 20% of the activity causes 80% of the effect

Parato analysis underlines Philosophy of "vital & operates on few:trivial many"

Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes by

Arranging data according to the descending order of their frequency of occurrence

Arranging data according to the descending order of their frequency of occurrence

Parato diagram is a Bar Arranging data in graph with height or value descending order drawn by

Magnitude of defects

Multiple Choice Multiple Answer Question Few steps in construction in Radar chart are :Correct Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of

Sem – 3rd

Techniques for Operations Efficiency

2

Your Answer

levels required , Draw concentric circles from each gradiation using 'o' point as centre Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre

Select The Blank Question 5 S audit result is discussed in ________ meeting. Correct Answer Monthly Your Answer

Monthly

True/False Question

Fishbone analysis is used both in analysis & planning.

Correct Answer True Your Answer

False

Multiple Choice Single Answer Question One Green Belt may head a team of :Correct Answer 20 employees Your Answer

20 employees

Multiple Choice Multiple Answer Question Role of champions are :Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation Multiple Choice Multiple Answer Question To draw control charts, sample must be representative of homogeneous segment of production for which :Correct Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Your Answer The items of the sample should be from the same machine setting , The items should be of the same batch , Items should be made from the same raw material batch Multiple Choice Single Answer

Sem – 3rd

Techniques for Operations Efficiency

3

Question

Failure mode and effect analysis (FMEA) establish

Correct Answer Process failure and minimize frequency Your Answer

Process failure and minimize frequency

Multiple Choice Multiple Answer Question What are the steps in deciding the benchmarking partner? Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Multiple Choice Single Answer Question One Master Black Belt may head a team of :Correct Answer 15-20 Black Belts Your Answer

15-20 Black Belts

Multiple Choice Single Answer Question Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :Correct Answer Main competitor Your Answer

Main competitor

Multiple Choice Single Answer Question Implication of Quality problem is:Correct Answer Gap in performance Your Answer

Gap in performance

Select The Blank Question Number of defects in an individual component, like gear, shaft, wheel etc can be monitored through ________ type of control chart. Correct Answer c-chart Your Answer

c-chart

True/False Question

Non-availability of files /document in time is a problem to be addressed by office TPM. Correct Answer True

Sem – 3rd

Techniques for Operations Efficiency

4

Your Answer

True

Multiple Choice Single Answer Question Check sheet is easy to use because it is :Correct Answer Simplest tool Your Answer

Simplest tool

Multiple Choice Single Answer Question Benchmarking helps to identify the gap between the current performance of the organization and the :Correct Answer Performance of the best organization Your Answer

Performance of the best organization

True/False Question

Flow chart is pictorial representation of the steps in production control. Correct Answer False Your Answer

True

Multiple Choice Multiple Answer Question Breakdown problem may be stratified by :Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical) Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical) Select The Blank Question A control chart to exhibit counted data on number of defect is called ________. Correct Answer c-chart Your Answer

c-chart

Select The Blank Question Procedure for implementation of TPM consists of ________ numbers of steps. Correct Answer 12 Your Answer

8

Select The Blank Question Capability index Cp = ________ Correct Answer Specification width/process width

Sem – 3rd

Techniques for Operations Efficiency

5

Your Answer

Specification width/process width

Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :Correct Answer Vital few = trivial many Your Answer

Vital few = trivial many

True/False Question

Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question To reduce clamping & declamping time, following actions are desirable :Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Select The Blank Question Benchmarking allows exchange of ________ between the benchmarking partners. Correct Answer Information Your Answer

Information

Multiple Choice Multiple Answer Question TQM can never flourish if the staff are:Correct Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses True/False Question

In bar graph each bar is of same height.

Correct Answer False Your Answer

False

Multiple Choice Multiple Answer Question During SMED implementation, primary study consists of :-

Sem – 3rd

Techniques for Operations Efficiency

6

Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis True/False Question

Daily work management can also be extended to non manufacturing areas like procurement, QA, HRD etc. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Types of Poka-Yoke are :Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke Your Answer

Prevention type Poka-Yoke , Detection type Poka-Yoke

Multiple Choice Single Answer Question Quality problem solving tool is used to :Correct Answer Improve quality Your Answer

Save time

True/False Question

Along with problem solving tools experience and judgment is also used. Correct Answer True Your Answer

False

Select The Blank Question JIT advocates the philosophy at elimination of waste from system which occurs due to ________. Correct Answer Over Production Your Answer

Over Production

True/False Question

Without measuring initial performance, target can't be set.

Correct Answer True Your Answer

False

Multiple Choice Multiple Answer Question An erratic patterns falling above & below the control limits indicates :Sem – 3rd

Techniques for Operations Efficiency

7

Correct Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators True/False Question

Sample size for the construction of p-chart are larger than X barR chart. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation Multiple Choice Single Answer Question Productivity improves by :Correct Answer Voluntary participants of everyone Your Answer

Sem – 3rd

Voluntary participants of everyone

Techniques for Operations Efficiency

8

View more...