Procedure Checklist for Fm200 Installation

June 14, 2016 | Author: Jibril Lamai | Category: N/A
Share Embed Donate


Short Description

Download Procedure Checklist for Fm200 Installation...

Description

PROCEDURE CHECKLIST FOR FM200 INSTALLATION SITE:

ROOM:

1. Smoke ionization detector integrity test 2. Sounder/flasher triggers 3. Smoke optical detector integrity test 4. 24Vdc fire bell triggers 5. After 30sec 24V is read on the auxiliary port of the activator 6. Breaking the MCP triggers the sounder/flasher 7. Gas cylinder normally charged 8. Installations neatly done System checklist integrity completed. Remarks: …………………………………………………………………………………… …………………………………………………………………………………… …………………………………………………………….. CLIENT SUBCON

CONTRACTOR

Company: ………………………….

……………………………

…………………………. Staff Name:………………………..

……………………………

……………………….. Sign/Date:………………………….

……………………………

………………………….

Hello Bola, Ijebu Ode BSC Status is as follows 1. BSC offline commisioning has been done for 400TRX 2. Transmission link between BSC (B4015) and backbone (B5993) have been established 3. Currently the circuit between BSC-B4015 and lekki datacenter is being connected and loopback being done to determine the E1's 4. Remaining Abis cables are being terminated

..

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF