ACTIVITIES OF COMMISSIONING
Air Leakage Test Hydro Test Commissionin Commissioning g Checkpoints Equipments Trial Run Refractory Dry Out Chemical Cleaning Boiler Safety Protection Checking
ACTIVITIES OF COMMISSIONING
Grid Air pressure Drop Study Control Instrumentation Checking Boiler Light up & Coal Firing Steam Blowing Safety Valves Floating Steam Dumping Synchronization
ACTIVITIES OF COMMISSIONING
Auto loop commissioning Reliable Test run Performance test run
Air Leakage Test Pressure parts The aim of air leak test is to ensure that erection of the pressure parts is completed and no major leaks are there.
Air leak test is conducted by introducing air into the boiler pressure parts at a pressure of approximately 7 - 8ksc
Air Leakage Test Non Pressure parts The purpose of air leak test of air, gas ducting & ESP is to ensure leakage proof in ducts, welding joints, flange joints to ensure efficient operation of fans, boiler
Hydro Test All the pressure parts of the boiler, which are subjected
to
high
operating
pressure
during
operation, should be checked to ensure that they withstand the high pressure so hydraulic test is conducted
Commissioning Checkpoints Checklist have to be prepared for all equipments and all activities.
After completion of equipments erection, check points to be made and the trial run of equipments shall commence
Equipments Trial Run No-load trial & load trials of following equipments are completed after fulfilling the commissioning checkpoints
ID fan
PA fan
SA fan
Feed pumps
Loop seal blower Fuel feeders
Refractory Dry Out In a boiler furnace, during the phase of erection refractory is laid in many areas like furnace, second pass areas, cyclones, bed ash cooler etc,
Refractory drying is to be carried out by utilizing either light oil or gas
Chemical Cleaning During the process of erection, there might be entrainment of unwanted material like rust, dirt, mill scale etc.
The internal surfaces of a boiler where demineralized water of high purity is to be evaporated, should be maintained free of all material which come in the way of efficient heat transfer and thus effect generation.
Chemical Cleaning The cleaning procedures aim to removal of rust, dirt, sand and also any foreign material entrained in the contour.
The cleaning can be achieved by an alkali boil out or alkali flushing and acid cleaning.
Boiler Safety Protection Checking Check
the
following
equipments
are
having
interlocks
ID fan-I & I vs. loop seal blower loop seal blower delivery damper open vs. loop seal blower
IID Fan vs. SA Fan ID Fan vs. PA Fan
Boiler Safety Protection Checking Check
the
following
equipments
interlocks
PA Fan vs. Fuel Feeders Drum Level very LOW vs. MFT Deaerator Level Low vs. Feed pump Drum level Very High vs. Turbine Furnace pressure Very high vs. MFT
are
having
Boiler Safety Protection Checking Check
the
following
equipments
interlocks
Furnace pressure Very low vs. MFT
are
having
Grid Air pressure Drop Study Grid air pressure drop study is nothing but finding out the pressure drop across grid nozzle at different air flows
The pressure drop values measured in grid pressure drop study are used to find out the bed height when the boiler is in running condition. i.e. at a particular air flow
Control Instrumentation Checking Before boiler light-up, all control instruments have to be checked i.e. to ensure whether the remote operation of all equipments is in proper condition
Boiler Light up & Coal Firing Start – up sequence
Steam Blowing The objective of steam blowing is to remove dirts, loose material, cutting bars etc, that
might have been
entrapped in Super Heaters, Steam piping, re-heaters during manufacture, storage, erection at site.
Failure to remove the debris may result in damage to turbine blades, valves etc
Safety Valves Floating The objective of the Testing Schedule is to test the safety valves by actually floating and ensuring that safety valves lift at recommended values.
Steam Dumping Steam dumping is nothing but allowing steam from re-heater through MSL and by by-passing the HP turbine the steam is send to re-heater via HRH line and from re-heater it is send to condenser via CRH line by by-passing IP turbine and LP turbine.
During initial commissioning steam dumping is done to achieve steam purity.
Steam Dumping Till achieving purity, the steam can be allowed to drain from CEP O/L to open drain. After achieving purity it can be taken to close circuit.
Synchronization After completion of all activities synchronization of the unit shall commence
Synchronization
is
nothing
but
matching
the
generator frequency with grid frequency using syncro-scope
Reliable test Run Reliability run is Seven (7) days of Continuous Power Plant operation at various loads in which 72 hrs at full load and 2 hrs at 110% MCR capacity to be demonstrated.
During this period two tripping allowed
and
after
tripping
of the plant is plant
to
synchronization within 4 hrs to be demonstrated,
be
Performance test Run Boiler performance test run is conducted
For understanding the current level of performance of the boiler,
For
any
trouble
shooting
of
the
performance deviations
For proving the performance guarantees