Medium Voltage Distribution Maintenance Guide  Guide I 2013

Premset 15 kVShielded compactSolid modular vacuum switchgear switchgear with Insulation System

 

Premset Maintenance Guide

Schneider Electric Services, by your side all day long Installation & Commissioning Because without these, you increase the risk of start-up delays and premature equipment failure.

Technical training Having well-trained well-trained employees is key to the long-term health of your electrical distribution equipment.

On-demand maintenance You need to adopt the right best practices and minimise downtime, while working with limited budgetary and maintenance resources resources..

Modernisation  Ageing, outdated equipment equipment can be mod modernised, ernised, drama dramatically tically impro improving ving its performance and lifetime, as well as achieving compliance with current regulations.

End-of-life Dispose of outdated equipment in a way that’s both green and transparent.

Installation assessment For a comprehensive assessment and a clear analysis of the results.

Maintenance Services Contracts To prevent such issues, these contracts can focus on predictive and preventive maintenance that is specifically tailored to your site and processes.

End-of-life recycling Schneider Electric Services has an operational subsidiary allowing you to recycle your medium voltage switchgear.

To learn more do not hesitate to visit our site Services/Electrical Distribution Services: www.schneider-electric.com

1

 

Premset Maintenance Guide

Premset, designed for a long service life

Premset Maintenance & Service program: 1. Reduction of total cost of ownership and easy budget control • Optimized maintenance program according to the installation environment and operation conditions • Total budget control through services agreement 2. Improved availability & “best in class” life time of equipment • Preventive maintenance adapted to local operation conditions will ensure extended life time of the equipment • Specific predictive maintenance program, linked with the high technology design of Premset, will help to know and act before any serious failure occurs (diagnostic of metallic painting, le diagnostic of ageing & circuit breaker …) These programs will contribute to the reduction of down time and critical loss and to the improved safety & security 3. Peace of mind due to our reactivity commitment • Through our services agreement, we assure a total peace of mind: even a failure occurs, our Field Services Engineers will go on site within the defined time in the agreement to fix the issue and change parts if needed.

Corrective maintenance Emergency On-Site intervention • Guarantee Expert intervention on your site in a lead time which is defined by a mutual agreement. • Diagnose problems, evaluate a solution and prepare the fixing. Emergency spare parts delivery • Spare parts delivery lead time guaranteed.

Preventive maintenance Preventive maintenan maintenance ce

Premset MV main circuit

Core unit (encapsuled Vacuum Vacuum interrupter + earthing switch tank)

Metallisation check-up to ensure earth continuity

Busbar + cable connection

Earth continuity check-up

Mechanism

Mechanism

Recommended: - every 5 years (ideal conditions) - every 3 years (standard conditions) - every 2 years (agressive conditions) 1. Check open/close/charging open/close/charging 2. Check humidity & corrosion status of the mechanism

LV parts

 Auxiliary contacts contacts

Check the continuity continuity of the contacts in different states

Coil & electrical operation

Test tripping chain

Protection relays

Refer to maintenance manual of VIP/Sepam or other relay

Other electronic devices

Flair & PS100: battery check

Shielded

Metallisation check-up to ensure earth continuity

CTs & VTs

• The entire MV circuit of Premset is insensitive to harsh environment thanks to Shielded Solid Insulation. For LV parts, it is similar to current Air Insulate Insulated d Switchgear module. • No specific tools are required for preventive maintenance of Premset. • Mechanical parts are surface-trea surface-treated ted to prevent corrosion.

2

 

Contents

3

 

Premset Maintenance Guide

5

General 

Operations to be performed  Power circuits and control mechanisms

7

Low Voltage auxiliary circuits

8

Recommended frequency  Normal operating conditions

9

Specific stress conditions

11

Emergency spare parts

13

 Appendice

4

 

Premset Maintenance Guide

General

   0    2    0    0    0    1    M    P

Warning Preventive maintenance operations must be carried out regularly on medium-volta medium-voltage ge equipment. Technicians trained to work on this type of equipment are required. Two skills are essential: • electrical qualifications • knowledge of the equipment to be maintained. This document does not apply to protection relays. Please refer to the maintenance documents specific to each type of switchgear used. If necessary, you can also contact your Product, Country, Services agent.

Electrical qualifications Only employees with appropriate electrical qualifications will be allowed to carry out these maintenance operations.

5

 

Premset Maintenance Guide

General

Intervention level Different skill levels have been established to define the persons who are capable of working on medium-voltage equipment:

Level  1 Regular maintenance. The maintenance operations to be carried out on the equipment are generally described in the instruction handbook. Minor preventive maintenance operations not requiring disassembly and standard repairs that require one part to be replaced with another provided for this purpose, performed by an operator’s accredited technician according to the manufacturer’s maintenance instructions instructions..

Level  2 Operations requiring simple procedures and/or support equipment (integrated into devices or external) that is easy to use and implement.

Level  3 Preventive maintenance operations, operations, such as general adjustment, identification and troubleshooting, repairs requiring the replacement of one component or functional troubleshooting, unit with another or minor mechanical repairs, carried out by a specialised technician using the tools, adjusting and measuring instruments specified in the manufacturer’s maintenance instructions. instructions.

Level  4 Operations whose procedures involve knowledge of a particular technique or technology and/or how to use specialised support equipment.  All important corrective corrective or preventive maintenanc maintenance e operations carried out by the manufacturer’s after-sales services. Operations that may affect switchgear performance.

Level  5 Operations whose procedures involve know-how, requiring the use of particular techniques or technologies, industrial processes or support equipment. Equipment will generally have to be returned to the factory; this applies only to moving parts.

Training Schneider Electric offers a wide choice of training courses on operating or maintaining its equipment. Level 3-4-5 operations require training on the equipment.

This training programme is delivered in our training centres by Schneider Electric’s accredited skilled staff. Training

6

 

Operations to be performed

Premset Maintenance Guide

Power circuits & Control mechanisms Dust, impacts, aggressive atmosphere, insufficient or excessive lubrication may adversely affect the mechanical operation of a device.

Operations The necessity for an installation to run continuously generally means that the power devices are seldom operated.  Although the ageing process of a device may be accelerated accelerated if it is used too frequently, mechanical mechanical malfunctions may occur if it is not operated for  a long period of time. Regular operation is necessary to maintain the original performance of each operating unit. Interlocking with keys or padlocks must be fully tested to check that they are working correctly.

   7    9    5    0    0    1      M    P

7

 

Premset Maintenance Guide

Operations to be performed Low Voltage Voltage auxiliary circuits

Auxiliary wiring It is used to transmit orders to the various control units of the device and retrieve its states.  A degraded connection or insulating insulating material may prevent the device from operating or cause unwanted tripping. Auxiliary wiring must be checked and replaced at regular intervals, if necessary, especially in the event of vibrations, a high ambient temperature or corrosive atmospheres.

Signalling contacts The contacts indicating the position of the circuit breaker, earthing switch, voltage transformer truck and ready-to-operate circuit breaker allow the operator to view the states and to act accordingly. Any incorrect signalling can lead to device control errors that may endanger the operators. Contact failure (worn contacts, loose terminals) may be the result of vibrations, corrosion or abnormal overheating; preventive maintenance must ensure good continuity (or non-continuity) non-continuity) of the contact in the different states.

Protection relay  An electrical fault on the installation is detected detected by the relay which orders the circuit breaker to open in order to ensure that the equipment and operators are protected. Electronic components and cards are sensitive to the environment (ambient temperature, humid and corrosive atmosphere) and to harsh operating conditions (magnetic fields, vibrations, etc.). To ensure safe operation, the following must be checked at regular intervals intervals:: • the tripping chain, • the intervention times according to fault current levels. Refer to the documents specific to the protection relay used.

The equipment must be switched off 

Do not walk on the parts, assemblies and areas identified by this pictogram

8

 

Premset Maintenance Guide

Recommended frequency 3 to 5 years Normal operating conditions

programme must be carried out on the cubicles as soon as they are commissioned The maintenance programme and then every five years at most; the maintenance operator must have the required skill level (see the description in the table below). These operations are applicable for the environmen environmental tal and operating conditions that meet the normal service conditions, in accordance with IEC 60694 for indoor switchgear.

Ambient air temperature • Less than or equal to 40°C. • Less than or equal to 35°C, on average over 24 hours. • Greater than or equal to - 25°C 25°C..

Altitude • Less than or equal to 3000 m. • Above 3000 m, a derating coefficient will be applied (please consult us).

Ambience No dust, smoke, salt, corrosive or flammable gas and vapour (clean industrial air).

Humidity • Average relative humidity over 24 hours < 95%,. • Average relative humidity over 1 month < 90%. • Average vapour pressure over 24 hours < 2.2 kPa. • Average vapour pressure over 1 month < 1.8 kPa.

9

 

Recommended frequency

Premset Maintenance Guide

3 to 5 years Normal operating conditions Check

Frequency (year)

Tools

Intervention level

COM(1) 3 to 5

Power do down

Approximate Reference intervention document time

Cubicle S Sw witchboard

(2)

Switchgear 

Visually check the general condition of the cubicle (front panel, control unit, box, frame)





-

1-4

-

-

15 min

Core unit (encapsulated vacuum interrupter + earthing switch tank): metallisation checkup to ensure earth continuity





-

4



-

15 min

Busbar + cable connection: earth continuity checkup





-

4

-



15 min

• •

• •

-

1-4

-

15 min

-

1-4

• •

-

15 min

-

-

1-4



• •

-

1-4

• •

• •

-

1-4

-

1-4

Power circuit

Control mechanisms Open / Close the main switch manually and electrically Open / Close the earthing switch manually Check humidity & corrosion status of mechanism Operate the key-operated interlocks

• •

-

15 min



30 min

• •

• •

1h

Control and signalling auxiliaries Check that the auxiliary wiring is uninterrupted and the appearance of the insulating material Check the tripping chain

30 min - 1 h

(1)

 Commissioning   Visual checks + open/close every year  " - ": no tool needed  " • " : operation to be made

(2)

10

 

Premset Maintenance Guide

Recommended frequency 6 months - 2 years Specific stress conditions*

programme must be carried out on the cubicles as soon as they are commissioned The maintenance programme and then every three years at most; the maintenance operator must have the required skill level. The operating conditions in certain fields of activity require the maintenance programme to be carried out under normal conditions to be complemen complemented ted for the impact of atmospheric pollutants to be taken into account. Pollution: SO2 = sulphur dioxide, H2S = hydrogen sulphide.

* Specific stress conditions: corrosive atmosphere/solid pollution/heavy electrical stress (short circuit, high switching frequency, high humidity, low-high temperature,...)

These types of atmospheric pollutants are mainly found in heavy industry, such as refineries, the iron and steel industry, paper mills, the petrochemical industry, etc. When these pollutants are combined with humidity, they are highly corrosive for the parts used in our equipment: • bare copper, silvering for electrical contacts, • control mechanisms.

11

 

Recommended frequency

Premset Maintenance Guide

6 months - 2 years Specific stress conditions* Check

Frequency (year)

Tools

Intervention level

COM(1) 3 to 5

Power do down

Approximate Reference intervention document time

Cubicle S Sw witchboard

(2)

Switchgear 

Visually check the general condition of the cubicle (front panel, control unit, box, frame)





-

1-4

-

-

15 min

Core unit (encapsulated vacuum interrupter + earthing switch tank): metallisation checkup to ensure earth continuity





-

4



-

15 min

Busbar + cable connection: earth continuity checkup





-

4

-



15 min

• •

• •

-

1-4

-

15 min

-

1-4

• •

-

15 min

-

-

1-4



• •

-

1-4

• •

• •

-

1-4

-

1-4

Power circuit

Control mechanisms Open / Close the main switch manually and electrically Open / Close the earthing switch manually Check humidity & corrosion status of mechanism Operate the key-operated interlocks

• •

-

15 min



30 min

• •

• •

1h

Control and signalling auxiliaries Check that the auxiliary wiring is uninterrupted and the appearance of the insulating material Check the tripping chain

30 min - 1 h

(1)

 Commissioning   Visual checks + open/close every year  " - ": no tool needed  " • " : operation to be made

(2)

* Specific stress conditions: conditions: corrosive atmosphere/solid atmosphere/solid pollution/heavy electrical stress (short circuit, high switching frequency, high humidity, low-high temperature,...)

12

 

Premset Maintenance Guide

Appendice Emergency spare parts

Spare parts

Commercial reference

Motor Block Motor Block 24-30 VDC Motor Block 48-60 VAC/DC Motor Block 100-130 VAC/DC Motor Block 200-250 VAC/DC

P7M12001 P7M12002 P7M12003 P7M12004

Trip coil MX1&2/XF Shut Shut Shut Shut

trip/close coil MX/XF 24-30 VDC trip/close coil MX/XF 48-60 VAC/DC trip/close coil MX/XF 100-130VAC/DC trip/close coil MX/XF 200-250VAC/DC

P7M12005 P7M12006 P7M12007 P7M12008

Replace closing coil MN Undervoltage coil Undervoltage coil Undervoltage coil Undervoltage coil

24-30 VDC 48-60 VAC/DC 100-130 VAC/DC 200-250 VAC/DC

P7M12012 P7M12013 P7M12014 P7M12015

Micro switch 2 switches for interlock and wiring 1 switch for interlock and wiring 1 switch for malt and wiring

P7M12009 P7M12010 P7M12011

Replace SC100 SC100A 24V-60V SC100E 110-250V SC110A 24V-60V avec com SC110E 110-250V avec com

EMS58560 EMS58561 EMS58563 EMS58564

Action  A

R

Who M

1

2





















• •











3

4

5

Mitop Low energy shunt trip Mitop

P7M13001

 Aux. Contacts Main switch switch and/or Earthing Earthing switch BLOCK OF 4 OF CONTACTS WIRE AUXILIARY TERMINAL BLOCK FOR FIXE

47887 47074

Voltage presence indicator/detector  indicator/detector  VPIS 3KV VPIS-VO 3KV VPIS 6,6KV VPIS-VO 6,6KV VPIS 15KV VPIS-VO 15KV VDS 3-7,2 KV L1 long (M06A CB) VDS 3-7,2 KV L2 short VDS 12-24 KV L1 long (M06A CB) VDS 12-24 KV L2 short

VPI62403 VPI62413 VPI62404 VPI62414 VPI62406 VPI62416 P7M14008 P7M14009 P7M14010 P7M14011

Live cable interlock Electrical d de evice LCI 24-30VDC ffo or Live Cable Interlock Electrical device LC I 48-60 VAC //D D C for Live C a ab ble Interlock Electrical device 100-130 VAC/DC for Live Cable Interlock Electrical device 200-250 VAC/DC for Live Cable Interlock Elec Electr tron onic ic de devi vice ce ES ESL1 L100 00A A 24 24-4 -48V 8VDC DC for for LCI LCI Li Live ve Cabl Cable e Inte Interl rloc ock k Electroni Elect ronic c device device ESL100E ESL100E 110-2 110-250V 50VAC/DC AC/DC for for LCI Li Live ve Cable Cable Int Interloc erlock k Cable box door interlock

P7M12016 P7M12017 P7M12018 P7M12019 P7 P7M1 M120 2020 20 P7M12021 P7M12021

Interlock main SW and ESW cable box door

P7M17020

Fuse VT protection M06A

tdb

Power supply PS100 Long life battery - 12V - 24A.h Long life battery - 12V - 38A.h

EMS58582 EMS58583

Flair 22D battery

tdb

VIP battery

tdb

Busbars Set of 3 straight (flat) busbars Set of 3 offset (bent) busbars

P7M17001 P7M17002

Caps 3 Caps with short stud 3 Caps with medium stud 3 VPIS Caps with short stud

P7M17003 P7M17004 P7M17006

VT connection 3 Flexible links for VT

P7M17026

Busbar Installation 1 tube of silicone grease 1 cleaning wipe

51191816f0 AAV27065

Operating handle

P7M17022







• •

• •

• • •

• •



















 A: Adapatation Adapatation - R: Replacement - M:Modification / 1: 1: final customer - 2: certified Premset Premset installer - 3: local Equipment unit unit - 4: Schneider Electric After After Sales Service team - 5: factory return

13

 

   d   e   v   r   e   e   s   r   s    t    h   g    i   r    l    l    A      S    A    S   s   e    i   r    t   s   u    d   n    I   c    i   r    t   c   e    l    E   r   e    d    i   e   n    h   c    S    ©

Schneider Electric Industries SAS

 As the standards, standards, specifications specifications and designs change from time to to time, please ask ask for

35, rue Joseph Monier CS30323 F - 92505 Rueil-Malmaison cedex (France)

confirmation of the information given in this this publication.

RCS Nanterre 954 503 439 Share capital: €896,313,776 www.schneider-electric.com

NRJED313586EN

This document has been printed on ecological paper  Design: SYNTHESE ECA, Schneider Electric Industries Industries SAS Photos: Schneider Electric Industries SAS

11-2013

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF