OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

41578/A/0001/UK/En

PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Offshore Construction Specialists (OCS) 20 Toh Guan Road CJ GLS Building #07-02 Singapore 608839 Tel: +65 6567-9080 Fax: +65 6567-8082 Web: http://www.offshore-ocs.com/index.html Contact Information Contact

Company Position

Email Address.

Keith Jackson

Managing and Technical Director

[email protected]

Seto Jian William Wijaya Loke Kah Poh Rakul Remanan Henry Chuy Alastair Wong Fery Wijaya

Operations Manager Project Manager Project Manager Engineering Manager Subcontracts & Procurement Manager Senior Project Engineer Project Engineer

[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT TABLE OF CONTENTS 1. 

INTRODUCTION .................................................................................................................................... 3 

2. 

OCS ORGANISATION CHART ............................................................................................................ 4 

3. 

TYPICAL PRECOMMISSIONING ORGANISATION CHART................................................................ 6 

4. 

PIPELINE PRECOMMISSIONING ACTIVITIES .................................................................................... 7 

5. 

SAFETY AND SAFE WORKING PRACTICES. ..................................................................................... 7 

6. 

ENGINEERING AND PROCEDURES. ..................................................................................................8 

7. 

PROCUREMENT. .................................................................................................................................. 8 

8. 

FABRICATION. ...................................................................................................................................... 8 

9. 

PIPELINE FLOODING, CLEANING AND GAUGING. .......................................................................... 8 

10. 

PIPELINE INTELLIGENT AND CALLIPER PIGGING. .......................................................................... 8 

11. 

PIPELINE HYDROTESTING ................................................................................................................. 8 

12. 

PIPELINE BULK DEWATERING ........................................................................................................... 8 

13. 

PIPELINE AIR DRYING. ........................................................................................................................ 8 

14. 

PIPELINE VACUUM DRYING ............................................................................................................... 8 

15. 

NITROGEN PACKING ........................................................................................................................... 8 

16. 

EXISTING AND PAST CLIENTS ........................................................................................................... 9 

17. 

COMPLETED PROJECTS ................................................................................................................... 10 

18. 

EQUIPMENT DATA SHEETS .............................................................................................................. 18 

19. 

ISO CERTIFICATION........................................................................................................................... 37 

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 2 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

1.

INTRODUCTION

Offshore Construction Specialists (OCS) was formed in 2007 from a core group of marine construction engineers to provide construction management, engineering and strategic support equipment services primarily to the offshore oil and gas sector. Our key personnel come from previous careers at J.Ray McDermott in the marine operations department. Our managing and technical director Mr Keith Jackson worked for 17 years in the group the last 5 years as the marine division manager. As a matter of policy under Mr Jackson J.Ray McDermott would execute work peripheral to that being undertaken by the major work vessel (normally executed using third party subcontractors) using in-house resources. Pipeline pre-commissioning, pre and post trenching, flexible flowline / umbilical lay are examples of work that was routinely carried out in-house and not subcontracted. One of the main reasons for doing this was that it prevented the activities of the subcontractor impinging on the work of the high cost marine spread. The work was always planned with maximum operational synergy in mind In JRM large pipeline pre-commissioning projects such as the 650 km West Natuna gas gathering pipeline network and many other major projects were planned and executed in-house. OCS has taken the model developed in JRM and applied it to our own activities. Our equipment is managed and operated by people who come from the same background as the main marine contractor. We help the marine contractor plan the work such that the pre-commissioning has the least impact on operations. We are proactive in highlighting potential issues and ensuring both parties win. Our engineering capabilities are very sophisticated and significantly more advanced than our competitors. OCS has now completed a range of pre-commissioning projects for many different customers with great success. OCS is certified by Nata for pipeline hydrotesting which is the preeminent qualification for pre-commissioning contractors. The OCS organisation has also been qualified to IS0 9001 since 2009. Our in-house equipment spread has grown significantly and is described in detail in this document. OCS is equipped to handle the full range of pre-commissioning activities including flooding, cleaning, gauging, hydrotesting, dewatering, drying and nitrogen packing. We work with established intelligent and caliper pig suppliers to complement our service. We have established long term relationships with key Singapore and overseas vendors. OCS is equipped to handle large projects or discrete project elements depending on the specific needs of the customer. The company has grown steadily since incorporation and now employs 60 personnel of whom 30 are civil/structural and mechanical engineers working with our pre-commissioning technicians. The company office in Toh Guan Rd, Singapore has been leased until 2014 and has room for additional expansion. The office can accommodate customer representatives for liaison as necessary.

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 3 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 2.

OCS ORGANISATION CHART

KEY PERSONNEL CONTACTS

Keith Jackson

Managing and Technical Director

[email protected]

Seto Jian William Wijaya Loke Kah Poh Rakul Remanan Henry Chuy Alastair Wong Fery Wijaya

Operations Manager Project Manager Project Manager Engineering Manager Subcontracts & Procurement Manager Senior Project Engineer Project Engineer

[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 4 of 37

OCS ORGANISATION CHART

KEITH JACKSON MANAGING & TECHNICAL DIRECTOR

PROJECT & CONSTRUCTION MANAGEMENT

EQUIPMENT MANAGEMENT

WILLIAM WIJAYA EQUIPMENT MANAGER

KP LOKE PROJECT MANAGER

OPERATIONS

ADMINISTRATION

NG BEE KIM ACCOUNTS, HR & ADMIN LEAD

SETO JIAN OPERATIONS MANAGER

TOOLAYA R IT ENGINEER

*ADMINITRATION

FIELD CONSTRUCTION OPERATIONS PLANT & EQUIPMENT

JAW LE E&M COORDINATOR

STRATEGIC EQUIPMENT TEAM

SAYED DEDY PRE-COMM ENGINEER

RONI GROUTING SUPERVISOR

KRISBEL BUDIMAN ZACK INDRA IDHAM TECHNICIANS MECHANICS

REMARK:

FIELD CONSTRUCTION SUPERVISION TEAM

JAMES CARROLL FIELD SUPERINTENDENT

JAMIE JACOBSEN LEON COAD DAVID WOOD FIELD FOREMANS

OPERATIONS

ALASTAIR WONG SNR PROJECT ENGINEER/ PRE-COMM MANAGER FERY WIJAYA PROJECT MANAGER

CONSTRUCTION ENGINEERING

RAKULREMANAN ENGINEERING MANAGER

DRAFTING BODIE MALLET SETTHA Y. IVAN CHAI (OPERATIONS/ SNR. FIELD ENGINEER)

ADI CAHYA AARON LIAN TRACY EE ZHONG ZHIYUAN DAVID SHAW CHEAH WIN LOONG CHATCHAI W. SEAN SIA TIN WEI DANIEL CAO FIELD ENGINEERS

ENGINEERING

CHANIN SRIYAPORN SNR. DRAFTING

ARYO PRAKOSO SNR. DRAFTSMAN

RAMIL ZAPANTA VINOTH KUMAR DRAFTSMAN

JULIANNE OOI HR ADMINISTRATOR

LENI TALAVERA RECEPTIONIST CUM ADMIN CLERK

TRACY TEE URISA L DOCUMENT CONTROLLER

PROCUREMENT & SUBCONTRACTS

CHUY CHUN FEI SUBCONTRACTS & PROCUREMENT MANAGER MONICA ZHANG ACCOUNTANT

GILBERT GREJALDO ACCOUNT EXECUTIVE

JOYCE LIM SUBCONTRACT / PROCUREMENT ADMINISTRATOR

CHARLESTAN BUYER / EXPEDITOR

PRAVIN THORAT SENIOR STRUCTURAL ENGINEER SUDHAKAR ANDY K. PRIYA PANJIROSA ZIA AL AKBAR STRUCTURAL ENGINEERS

HERYANTHO Y L TAUFAN S. SAINUL ABID SAVOY AMITH PRASAD NAVAL ARCHITECT

UDAY SARATHY MOHAN CHAND SENIOR PIPELINE ENGINEER

*ADMINITRATION SUPPORT TEAM: TRACY & URISA

PRE QUALIFICATION

ACCOUNTS

Offshore Construction Specialists Pte Ltd.

Page 5 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

3.

TYPICAL PRECOMMISSIONING ORGANISATION CHART

OCS Pre-commissioning Team offshore CLIENT

KP LOKE WILLIAM WIJAYA PROJECT  MANAGERS RAKUL  REMANAN ENGINEERING  MANAGER

ALASTAIR WONG

HENRY CHUY

FERY WIJAYA

SUBCONTRACTS &  PROCUREMENT  MANAGER

PROJECT  ENGINEERS

PRAVIN THORAT

JOYCE LIM

HERY LEMBANG

EXPEDITOR/ BUYER

SUDHAKAR  SUBRAMANIAM UDAYSARATHY MOHAN ZIA AKBAR TAUFAN SIREGAR PRIYA PANJIROSA AMITH PRASAD SAVOY SAINUL ABID CONSTRUCTION  SUPPORT  ENGINEERS

SAYED DEDY  MAHDI ADI CAHYA

CHARLES TAN BUYER/ SUBCONTRACTS  EXECUTIVE

BODIE MALLET SETTHA Y. IVAN CHAI CHONG CHIA YAN AARON LIAN DAVID SHAW CHEAH WIN  LOONG CHATCHAI SEAN SIA

CHANIN  SRIYAPORN

FIELD ENGINEERS

ARYO PAKOSO RAMIL ZAPANTA VINOTH DRAFTING

ONSHORE OFFSHORE Note* : Project Managers, Project Engineers & Pre-commissioning Engineers will be selected from the personnel pool shown for each categary.

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 6 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 4.

PIPELINE PRECOMMISSIONING ACTIVITIES

OCS experience embraces the full range of pipeline pre-commissioning activities from the initial flooding, cleaning, gauging and hydrotesting to dewatering, drying and nitrogen purging and packing. Specific activities undertaken by OCS:

No.

Description

1

Flooding, Cleaning and Gauging.

2

Calliper and Intelligent Pigging.

2

Hydrotesting

3

Dewatering/ Swabbing

4

Air Drying

5

Vacuum Drying

6

Nitrogen Purging

7

Nitrogen Packing

OCS provides a cradle to grave pipeline pre-commissioning services including complete engineering, procurement, fabrication and execution services. Our in-house inventory is extensive and our personnel are well trained.

5.

SAFETY AND SAFE WORKING PRACTICES

OCS is acutely aware of the dangers involved in the marine construction industry in general and in

pipeline pre-commissioning particularly where high pressure water and air and heavy equipment, chemicals etc combine to create a range of potential hazards if not managed properly. All OCS activities on specific projects are the subject of hazids and risk assessments to ensure levels of risk are reduced to as low as reasonably practical. These risk assessments are ideally attended by the main contractor and the ultimate client. Other specific safety and operational measures that are taken: i) ii) iii) iv) v) vi)

All OCS personnel have appropriate Bosiet offshore sea survival training OCS technicians are Nata qualified and well trained for their specific duties All OCS equipment is provided with a specific safety passport. Offshore hazardous areas are barricaded as required and unauthorized personnel are excluded. All installation aids are properly engineered and subject to structural checks by the OCS CSE group. Appropriate Hazchem sheets are posted in areas where chemicals are in use.

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 7 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 6.

ENGINEERING AND PROCEDURES

OCS prepares project specific engineering and procedures for each job undertaken. What sets OCS apart from other pre-commissioning contractors is our engineering skills base which means that all structural, mechanical, hydrodynamic and aerodynamic considerations are addressed inhouse. OCS procedures will address: i) ii) iii) iv) v) vi) vii) viii) ix) x) xi) xii)

Project specific procurement requirements. Equipment specification requirements and preparations. Designs of Pig launchers and receivers for Flooding, Cleaning and Gauging. Designs of Hydrotest heads. Designs of Pig Launchers and Receivers for Dewatering and Drying. Pig Requirements and Designations. Intelligent and Calliper Pigging requirements. Chemical injection requirements. Hydrotesting pressurization, strength and leak tests. Bulk Dewatering. Drying Procedures using Air or Vacuum drying techniques. Nitrogen Packing.

7.

PIPELINE

PLEASE

PRE-COMMISSIONING

REFER

TO

APPENDIX

PROCEDURES 1

8.

FABRICATION

9.

PIPELINE FLOODING, CLEANING AND GAUGING

10. PIPELINE INTELLIGENT AND CALLIPER PIGGING 11. PIPELINE HYDROTESTING 12. PIPELINE BULK DEWATERING 13. PIPELINE AIR DRYING 14. PIPELINE VACUUM DRYING 15. NITROGEN PACKING

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 8 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 8 EXISTING AND PAST CLIENTS OCS has built up a significant customer base during four (4) years of operations. OCS past and present clients are listed below. References can be provided on request.

No.

Client Name

1

Star Petroleum ( Indonesia)

2

HESS ( Indonesia)

3

Asia Petroleum Developments (Salamander) ( Indonesia)

4

Kangean Energy ( Indonesia)

5

NuCoastal ( Thailand)

6

Chevron (Thailand)

7

EMAS ( Singapore)

8

Larsen & Toubro ( Malaysia/ India)

9

SapurasAcergy ( Malaysia)

10

TLO SapuraCrest ( Malaysia)

11

Heerema (Holland)

12

NorCe ( Singapore)

13

Offshore Marine Contractors

14

Vietsovpetro (VSP) (Vietnam)

15

Timas Suplindo ( Indonesia)

16

Nippon Steel (Indonesia)

17

Newfield Peninsula Malaysia ( Malaysia)

18

Franklin Offshore ( Singapore)

19

M3 Energy ( Malaysia)

20

Sarku ( Malaysia)

21

Hako Offshore ( Singapore)

22

Global Industries ( Malaysia)

23

Sea Drill ( Singapore)

24

Origin Energy (Australia)

25

Swiber ( Singapore)

26

Galoc ( Philipines)

27

GFI ( Thailand)

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 9 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 9. COMPLETED PROJECTS Pipeline Dia (“)

Length (km)

10”

0.8

6” Flexible

EOCP EMAS offshore Construction and Production

Scope Of Work

Location

0.1

Flood, Clean, Gauge and Hydrotest/Leak test

Gulf of Thailand

6 “ Spool 6” Flexible

0.7

Leak Test

65km off North West Coast of Palawan Island

Nexus

PLEM & Startup Heads

-

Leak Test

Singapore

Year

Project Title

Client

2007

GFI

EOCP EMAS offshore Construction and Production

2008

Galoc Development Project

2008 Nexus AustraliaBass Strait

2009

Asia Petroleum Development (APD) – Glagah Kambuna Field Development

PT Timas

14 “

42

Flood, Clean, Gauge and Hydrotest

From the Kambuna platform offshore North Sumatera to a landfall Northeast of Medan

2009

Star Petroleum Kakap Field Redevelopment

PT Timas

10”

11.2

6”

2

Flood, Clean, Gauge and Hydrotest

6”

2.3

Kakap Field located in the Indonesian West Natuna Sea

2009

M3nergy JDA Sdn Bhd/ CarigaliPTTEPI-JDA Block B-17

Franklin Offshore

11” Flexible

0.24

Leak Test

Offshore Malaysia

2010

HESS Ujung Pangkah Development

PT Timas

6”

5.5

12”

5.5

16”

5.5

Flood, Clean, Gauge, Hydrotest, Dewater, Air & Vacuum Dry and Nitrogen Packing

Ujung Pangkah, Gresik in Surabaya Indonesia

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 10 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

Pipeline Dia (“)

Length (km)

PT Timas

18” 20” 20”

Kodeco Project

PT Timas

Chevron

EMAS

Year

Project Title

Client

2011

Kangean Energy Indonesia Limited – TSB Development

2011

2011

(Thailand)

2011

TSB Kangean

Scope Of Work

Location

25 5.5 5.5

Flood, Clean, Gauge and Hydrotest, Dewater, Dry and Nitrogen Packing

Bali Sea, approximately 120km from Pagerubgan Island

6”

7 km & 6km

Flood, Clean, Gauge and Hydrotest

Java Sea

10”

35 km & 35 km

Flood, Clean, Gauge and Hydrotest

Gulf Of Thailand

25.745 km & 5.2km

Flood, Clean, Gauge and Hydrotest, Dewater, Dry and Nitrogen Packing

Java Sea

16”

PT Timas

18” 20”

2012

Bawal

PT Timas

14”

40 km

Flood, Clean, Gauge and Hydrotest

Natuna Sea

2012

Bien Dong

DOF Subsea

6” flexible

400m

LeakTest

Vietnam

2013

Zawtika

L&T

18”

11.3 km & 9.7km

Flood, Clean, Gauge and Hydrotest

Myanmar

18” 2013

PTTEP Bongkot Riser Replacement

DOF Subsea

6”

80m

LeakTest

Gulf Of Thailand

2013

Pertamina EP MOL Project

Leighton Offshore

12”

28km

Flood, Clean, Gauge, Hydrotest and Dewater

Java Sea

2012

Pertamina UL Project

PT Timas

12”

12 km

Flood, Clean, Gauge and Hydrotest

Java Sea

PT Timas

20’ / 14”

500m/3.3 km

Flood, Clean, Gauge, Hydrotest

Java Sea

2012

Pertamina EP L-Parigi

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 11 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

2014

Petronas Ketapang

PT Timas

12”

111 km

Flood, Clean, Gauge, Hydrotest, Dewater, Dry, N2 Pack.

2014

Petronas Ketapang

PT Timas

8/12”/16”

700 m each

Flood, Clean, Gauge, Hydrotest, .

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 12 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT GFI (Thailand) Pigging and Hydrotesting Photos (Nov 2007 to Jan 2008)

Flexible Riser Leak For M3nergy JDA Sdn Bhd / Carigali-PTTEPI - JDA Block B-17, Offshore Malaysia. ( Sep 2009) Photos

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 13 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Star Energy (KAKAP) Pipeline Project– Pigging & Hydrotest (Oct 2009) Photos

Asia Petroleum Development (APD) Pigging and Hydrotesting. - Glagah Kambuna Field Development Project (Mar 2009) Photos

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 14 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT HESS (UJUNG PANGKAH) Pipeline Project– Pigging, Hydrotest, Dewatering, Drying & N2 Pack (Jan – Feb 2010) Photos

Chevron Thailand Project Pigging & Hydrotest (Jan – July 2010) Photos

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 15 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Kangean Project Pigging, Hydrotest, Dewatering, Air drying and N2 packing (Aug- Nov 2011) Photos

Kodeco Project Pigging & Hydrotest (Oct - Dec 2011) Photos

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 16 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT Zawtika Project, 2013 Pigging & Hydrotest Photos

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 17 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 18. EQUIPMENT DATA SHEETS OCS operates a comprehensive range of pre-commissioning equipment. Each piece of equipment has it own equipment passport which is maintained from project to project. This helps ensure that only appropriately maintained equipment is supplied to projects. A sample of our equipment passport is included below.

7.1.

FLOODING PUMP SERIES 1 FLOODING PUMP

- 03 Nos.

Capacity

320 Cu.m / Hr

Maximum Head

171 meters

Engine Make

Detroit Diesel 8V-92TA 450BHP

Pump Make

SLD 280-43 3

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 18 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 19 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 20 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

7.2.

FEED PUMP FLOODING PUMP

- 02 Nos.

Capacity

1590 Cu.m / Hr

Maximum Head

25 meters

Engine Make

Detroit Diesel 8V-92TA 450BHP

Pump Make

SLOW350-380B

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 21 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 22 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 23 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.3.

DIESEL DRIVEN FLOODING / JETTING PUMP SERIES 2 (HIGH PERFORMANCE) FLOODING PUMP

- 02 Nos.

Capacity

335 Cu.m / Hr

Maximum Head

260 meters

Engine Make

Detroit Diesel 12V-149TI 1130BHP

Pump Make

250SLD 450-60 4

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 24 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 25 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 26 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.4.

DIESEL DRIVEN HIGH PRESSURE PUMP SERIES 2 (HIGH PERFORMANCE)

HIGH PRESSURE DISEL DRIVEN PUMP

- 01 Nos.

Capacity

180 liters / Minute

Maximum Pressure

7250 psig

Engine Make

Johndeere 160kw 6 cylinder diesel engine

Pump Make

Woma 2502 P40

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 27 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 28 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.5.

HIGH PRESSURE DISEL DRIVEN PUMP SERIES 1

HIGH PRESSURE DISEL DRIVEN PUMP

- 01 Nos.

Capacity

35-37 liters / Minute

Maximum Pressure

8000 psig

Engine Make

Isuzu 50 HP-4 cylinder (turbocharged & water cooled)

Pump Make

Den-Jet CD 40-550

7.6.

HIGH PRESSURE AIR DRIVEN PUMP

HIGH PRESSURE AIR DRIVEN PUMP

- 01 Nos.

Capacity

20 liters / Minute

Maximum Pressure

7,500 psig

Maximum Air Supply Pressure

125 psig

Pump Make

Haskel Model TP600-GSF-60

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 29 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT HIGH PRESSURE AIR DRIVEN PUMP

- 04 Nos.

Capacity

4 liters / Minute

Maximum Pressure

600 psig

Maximum Air Supply Pressure

120 psig

Pump Make

Hydraulics International HI Model 5L-SS-60

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 30 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.7.

DEAD WEIGHT TESTER

DEAD WEIGHT TESTER + WEIGHT SET

- 02 Nos.

Make

DH –BUDENBERG MODEL 580 DX

Range

0-700 bar

Accuracy

0.025 %

Least Count

0.069 bar

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 31 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.8.

PRESSURE/TEMPERATURE RECORDER PRESSURE RECORDER

- 03 Nos.

Make

BARTON

Range

0-5000 psi

Accuracy

± 1 % FS

TEMPERATURE RECORDER

- 02 Nos.

Make

SCOTECH

Range

0-50o C

Accuracy

± 1 % FS

PRESSURE-TEMPERATURE DUAL RECORDER

- 02 Nos.

Make

BARTON

Range

0-5000 psi/0-100o C

Accuracy

± 1 % FS

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 32 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT

7.9.

8 X 10 FT BREAK TANK (18 Cu.m Capacity) - 01 Nos

For storage and introducing freshwater slug during pigging/ dewatering of pipelines

PRE QUALIFICATION

Offshore Construction Specialists Pte Ltd.

Page 33 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.10.

VACUUM PUMP VACUUM PUMP Capacity Booster Make Pump Make

- 01 Nos. 1020 Cu.m / Hr Edwards mechanical booster Model EH1200, Hydrokinetic Drive Edwards high vacuum pump Serial 220. EIM 275

7.11. PRESSURE TRANSDUCER & READOUT) - 03 Nos. Type Make/ Range

750C, ABSOLUTE PRESSURE TRANSDUCER MKS 10 MILLIBAR , 100 MILLIBAR , 1000 MILLIBAR

Accuracy/ Input/ Output

1% OF FULL SCALE +13 TO +32 VDCINPUT, 0-10VDC O/P

- 02 Nos. Type

DIGITAL SUPPLY AND READOUT

Make/ Range

MKS

Input Power

PRE QUALIFICATION

220VAC

Offshore Construction Specialists Pte Ltd.

Page 34 of 37

OFFSHORE CONSTRUCTION SPECIALISTS PIPELINE PRE-COMMISSIONING PRE-QUALIFICATION DOCUMENT 7.12. HEATED REGENERATIVE DESICCANT AIR DRYER & AIR COOLED AFTER COOLER Regenerative compressed air dryer use desiccant to absorb water vapour from the compressed airstream. In the twin tower design, one tower dries the air from the After-cooler while the dessicant in the other tower is being regenerated to provide continuous operation. A heater is added to heat the purge air. It not only benefits the regeneration effect but also decreases regeneration purge loss. Desiccant: activated alumina + molecular sieve Purge air: