Thickness of Plank = Thickness of Topping = Spacing of Lattice Girder =
65 mm 75 mm 600 mm
gf L.L =
Thickness of Slab, t =
1.6 140 mm
2
250 N/mm
Grade of Steel Steel Shear = Loadings:
Finishes :
0 kN/m
2
Others :
0 kN/m
2
M&E:
0.3 kN/m
2
Imposed Load :
2.5 kN/m
2
S.D.L
L.L
Design: Case : 1
Lifting case Dynamic Factor for Lifitng =
1.5 2
Self Wt of Plank =
1.56 kN/m
Factored Self Wt =
2.34 kN/m
2
From Analysis, Refer Appendix 1 Moment Top
MTOP =
2.2 kNm
Moment Bottom
Mbottom =
1.5 kNm
Diameter of Lattice Top bar, φt =
10 mm
Diameter of Lattice bottom bar, φ b =
6 mm
Diameter of Slab Top bar, φ ts =
8 mm
Diameter of Slab bottom bar, φbs =
10 mm
Diameter of Slab distribution bar, φ bds =
8 mm
Diameter of Diagonal bar, φds =
Lever arm of Lattice Girder, Z =
6 mm 48 m m
Ast TOP Lattice Girder =
63.25 mm
2
Ast bottom Lattice Girder =
43.125 mm
2
Shear,V = Force in Diagonal bar=
3.5 kN 2.97 2.97 kN
Ast Shear Area Girder = Area of diagonal Lattice bar= per interface area cross section
Use T10 bar Use T6 bar
( inclined at 45 degree) 10.3 mm
2
USE
0.28 Use R6 bar
Summary : 10 m m 6 mm 6 mm
Lattice Girder top bar = Lattice Girder bottom bar = Lattice Diagonal bar = Case : 2
Final Case 3.36 kN/m
2
SDL =
0.3 kN/m
2
IL=
2.5 kN/m
2
9.12 kN/m
2
Self Wt of Slab =
Factored Design Load = Effective Depth of Slab = Lever arm of slab = Span =
4/5/2017
Done by : Alex
110 110.00 .00 mm 104.50 mm 4200.00 mm
From Analysis, Refer Appendix 2
Page 1 of 2
6 bar size
PJPT Project : RSKU Kundang
Date :
Subject : 4.2m Long Precast Plank
Ref
4/5/2017
Done by : Alex
Calculations
Remarks
Moment Top
MTOP =
20.1 kNm
Moment Bottom
Mbottom =
14.9 kNm 2
Ast TOP First Internal Support =
365.00 mm /m
Ast BOTTOM End Span =
275.00 mm /m
2
Spacing=
100
Spacing=
100
2
Ast Provided Top= Ast Provided Bottom=
505.00 mm /m 2 785.00 mm /m
Ast Minimum=
182.00 mm /m
2
Spacing=
200
Deflection Check: Tension Modification factor =
1.96
Basic Value=
20
Allowable Deflection= Actual Deflection=
39.2 38.18
Deflection Pass
Summary : Provide Top Steel T8@100 @ Support Provide Bottom Steel T10@100 @ Mid Span Provide Distribution steel T8@200 Case : 3
Construction stage
2
Number of Props=
2
Self Wt of Plank =
1.56 kN/m
Self Wt of Topping =
1.875 kN/m
Total Dead Load =
3.435 kN/m
Construction load =
1.5 kN/m
2 2 2
From Analysis, Refer Appendix 3 Moment Top
MTOP =
1.4 kNm
Moment Bottom
Mbottom =
1.3 kNm
Ast TOP First Internal Support =
2
45.00 mm /m 2
Ast BOTTOM End Span =
40.00 mm /m
Ast Provided Top=
78.50 mm /m
Ast Provided Bottom=
2
2
815.00 mm /m
Result :
Length of Plank= 4.2m Number of propping propping = 2 Lattice Girder Top bar = T10 bar. Lattice Girder Bottom bar = 2T6 bar. Lattice Diagonal bar =R6 bar. Provide Bottom Steel Reinforcement T10 - 100C/C. Provide Top Steel Reinforcement T8 - 100C/C. Provide Distribution Reinforcement T8 - 200C/C.