UNIVERSIDAD AUTONOMA “TOMAS FRI  FACULTAD DE INGENIERIA CIVIL CARRERA DE INGENIERIA CIVIL

TAREA # 3 CIV-216 MATERIA: 

MATE MA TERI RIAL ALES ES DE CO CONS NSTR TRUC UCCI CIO O

DOCENTE: ING . MIRKO GUTIERREZ   AUXILIAR:UNIV.MARCO ANTONIO VERA RIO  AUXILIAR:UNIV. ESTUDIANTE:UNIV. RODRIGO TERRAZAS A GRUPO:B

FECHA: 22/04/2020

 

POTOSÍ-BOLIVIA

 

 

S” 

 

 

MIJO

 

2. COMPUTO METRICOS AC ACTI TIVI VIDA DAD: D: Re Repl plan ante teo o ESQUEMA

a(m) 101.6

UNIDAD b(m)

c(m)

N° VECES AREA (M2)

1.6

m2 VOLUMETRIA 162.56

162.56

  TOTAL

2. COMPUTO METRICOS ACTI TIVI VIDA DAD: D: Ex Exca cava vaci cion on AC ESQUEMA a(m) 1.6 100

b(m) 1.6 0.6

  UN UNIDAD c(m) N° VECES AREA (M2) 1.4 21 0.5 1

m3 VOLUMETRIA 75.264 30 105.264

  TOTAL

2. COMPUTO METRICOS ACTI TIVI VIDA DAD: D: Za Zapa pata tass AC ESQUEMA a(m) 1.6

b(m) 1.6

  UN UNIDAD c(m) N° VECES AREA (M2) 0.4 21

m3 VOLUMETRIA 21.504

21.504

  TOTAL

2. COMPUTO METRICOS ACTI TIVI VIDA DAD: D: Co Colu lumn mnas as AC ESQUEMA

a(m)

0.3

  UN UNIDAD b(m)

0.3

c(m)

4

N° VECES AREA (M2) 21

  TOTAL

2. COMPUTO METRICOS ACTI TIVI VIDA DAD: D: Re Rell llen eno o AC ESQUEMA a(m) 1.6

b(m)

c(m) 1.6

UNIDAD N° VECES AREA (M2) 1 21

m3 VOLUMETRIA

7.56

7.56

m3 VOLUMETRIA 53.76 0

  TOTAL

53.76

2. COMPUTO METRICOS

 

ACTI TIVI VIDA DAD: D: Cimi Cimien ento toss AC ESQUEMA a(m) 0.5

b(m) 0.6

  UN UNIDAD c(m) N° VECES AREA (M2) 4.7 20

m3 VOLUMETRIA 28.2

28.2

  TOTAL

2. COMPUTO METRICOS ACT ACTIV IVID IDAD: AD: Sob Sobre reci cimi mien ento toss ESQUEMA a(m) b(m) 0.5 0.3

  UN UNIDAD c(m) N° VECES AREA (M2) 4.7 20

m3 VOLUMETRIA 14.1

14.1

  TOTAL

2. COMPUTO METRICOS ACTI ACTIVID VIDAD: AD: Imp Imperm ermeab eabili ilizac zacion ion de sob sobrec recimi imient entos os   UN UNIDAD ESQUEMA a(m) b(m) c(m) N° VECES AREA (M2) 0.3 4.7 20

m2 VOLUMETRIA 28.2

28.2

  TOTAL

2. COMPUTO METRICOS CTIIVIDAD AD:: Mur Muro ACT ESQUEMA a(m)

b(m) 2.1

  UN UNIDAD N° VECES AREA (M2) 20

c(m) 4.7

  TOTAL

2. COMPUTO METRICOS ACT CTIIVIDAD AD:: Viga ESQUEMA a(m) 0.4

b(m) 0.25

  UN UNIDAD N° VECES AREA (M2)

c(m) 4.7

20

m2 VOLUMETRIA 197.4

197.4

m3 VOLUMETRIA 9.4

  TOTAL

 

162.56 105.264 21.504 7.56 53.76 28.2 14.1 28.2 197.4 9.4

9.4

 

 PRECIOS UNITARIOS 

Actividad: Replanteo Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

cal hilo

kg pza

madera

 p2

TOTAL 2.- MANO DE OBRA topografo alarife

3.- EQUIPO MAQUINARIA HERRAMIENTA

hr hr

   

estacion total

hr

 

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

 

Actividad:Excavacion

Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

TOTAL 2.- MANO DE OBRA albañil  peon

3.- EQUIPO MAQUINARIA HERRAMIENTA

hr hr 

 

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Zapatas Moneda: Bolivianos

Descripción

Und.

 

1.-  MATERIALES E INSUMOS Cemento

kg

arena

m3 m3 lt kg

grava H2O

acero

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

3.- EQUIPO MAQUINARIA HERRAMIENTA Mescladora Vibradora

hr hr

 

   

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ

4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Columna Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

Cemento arena

kg m3

grava acero madera

m3 lt kg p2

clavo

kg

alambre

kg

H2O

 

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

3.- EQUIPO MAQUINARIA HERRAMIENTA Mescladora

hr

Vibradora

hr

 

   

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA

7.-  8.9.-

MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Relleno Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

Tierra

m3

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

 

 

3.- EQUIPO MAQUINARIA HERRAMIENTA vibrocompactadora

hr

 

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA

9.-

UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Cimientos Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

Cemento arena

kg m3

grava

m3 Lt m3

H2O  piedra

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

3.- EQUIPO MAQUINARIA HERRAMIENTA mezcladora vibradora

hr hr

 

   

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ

 

4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Sobrecimientos Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

Cemento arena

kg m3

grava

m3 Lt m3 p2 kg kg

H2O  piedra madera clavo alambre

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

3.- EQUIPO MAQUINARIA HERRAMIENTA mezcladora vibradora

hr hr

 

   

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL

 

12.- 

Actividad:Impermeabilizacion de sobrecimientos Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

 platico

m2

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

 

3.- EQUIPO MAQUINARIA HERRAMIENTA

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Muro Moneda: Bolivianos

 

Descripción 1.-  MATERIALES E INSUMOS

Und.

ladrillo Cemento

pza kg

arena fina

m3 Lt

H2O

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

3.- EQUIPO MAQUINARIA HERRAMIENTA mezcladora

hr

 

 

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA

9.- UTILIDAD - % AL COSTO DIRECTO 10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

Actividad:Viga Moneda: Bolivianos

Descripción 1.-  MATERIALES E INSUMOS

Und.

Cemento arena

kg m3

grava

m3 lt kg

H2O

acero

 

madera clavo alambre

p2 kg kg

TOTAL 2.- MANO DE OBRA albañil  peon

hr hr 

3.- EQUIPO MAQUINARIA HERRAMIENTA Mescladora Vibradora

hr hr

 

   

HERRAMIENTAS HERRAMIENTA S - % A LA MANO DE OBRA DIRECTA

TOTAL EQUIPO MAQ 4.5.6.7.-  8.9.-

GASTOS GENERALES - % AL COSTO DIRECTO BENEFICIOS SOCIALES - % A LA MANO DE OBRA DIRECTA MANO DE OBRA INDIRECTA - % A LA MANO DE OBRA DIRECTA IMPUESTO AL VALOR AGREGADO - % A LA MANO DE OBRA UTILIDAD - % AL COSTO DIRECTO

10.-  11.- IMPUESTO A LAS TRANSACCIONES - % AL SUBTOTAL GENERAL 12.- 

 

 

Unidad: m2

Rendimiento

 

Costo

Precio Parcial

0 .1 0 0 .0 5

1 .2 0 2 0 .0 0

0 .1 2 1 .0 0

0 .1 0

1 0 .0 0

1 .0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ATERIALES E INSUMOS

2.12

0 .5 0 0 .5 0

2 5 .0 0 1 2 .0 0

12.50 6 .0 0 0.00 0.00

TOTAL MANO DE OBRA 0 .3 0

1 0 .0 0

5.00%

 

INARIA HERRAMIENTA COSTO DIRECTO

18.50 3 .0 0 0.00 0.00 0 .9 3 3.93

10.00%

24.55 2 .4 5

60.00%

11.10

0.00% 14.94% 10.00%

0 .0 0 2 .7 6 2 .4 5

44.66

SUBTOTAL 3.09%

43.32 1 .3 4

265.15 1,628.06

PRECIO UNITARIO

44.66

3,795.54 289.89 971.19

 

1,950.05

Unidad: m3

36.55 405.78 5,397.45

Rendimiento

Costo

Precio Parcial 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

 

ATERIALES E INSUMOS 4 .0 0 4 .0 0

0.00

2 0 .0 0 1 2 .0 0

80.00 48.00 0.00 0.00

TOTAL MANO DE OBRA

128.00 0.00 0.00

5.00%

 

INARIA HERRAMIENTA COSTO DIRECTO 10.00% 60.00% 0.00% 14.94% 10.00%

0.00 6 .4 0 6.40 134.40 13.44 76.80 0 .0 0 19.12 13.44

SUBTOTAL 3.09%

257.20 7 .9 5

PRECIO UNITARIO

265.15

Unidad: m3

Rendimiento

Costo

Precio Parcial

 

 

323.10 0 .3 9 5

1 .2 0 120.75

387.72 47.70

0 .5 0 1 129.24 5 7 .9 8

120.75 0 .0 0 1 0 .0 0

60.50 0 .0 0 579.80 0.00 0.00 0.00 0.00 0.00

ATERIALES E INSUMOS

1,075.71

4 .0 0 4 .0 0

2 0 .0 0 1 2 .0 0

80.00 48.00 0.00 0.00

TOTAL MANO DE OBRA

128.00

1 .0 0 0 .5 0

2 0 .0 0 1 2 .0 0 5.00%

 

INARIA HERRAMIENTA COSTO DIRECTO

20.00 6 .0 0 0.00 6 .4 0 32.40

10.00% 60.00%

1,236.11 123.61 76.80

0.00% 14.94% 10.00%

0 .0 0 19.12 123.61

SUBTOTAL

1,579.26 48.80

3.09%

PRECIO UNITARIO

1,628.06

Unidad: m3

Rendimiento

Costo

Precio Parcial

323.10 0 .3 9 5

1 .2 0 120.75

387.72 47.70

0 .5 0 1 129.24 156.59 7 2 .6 0 1 .0 0

120.75 0 .0 0 1 0 .0 0 1 0 .0 0 2 0 .0 0

60.50 0 .0 0 1,565.90 726.00 20.00

1 .0 0

2 0 .0 0

20.00 0.00 0.00

ATERIALES E INSUMOS

2,827.81

 

 

4 .0 0 4 .0 0

2 0 .0 0 1 2 .0 0

80.00 48.00 0.00 0.00

TOTAL MANO DE OBRA

128.00

1 .0 0 0 .5 0

 

2 0 .0 0 1 2 .0 0

20.00 6 .0 0 0.00

5.00%

6 .4 0 32.40

INARIA HERRAMIENTA COSTO DIRECTO 10.00% 60.00% 0.00% 14.94% 10.00%

SUBTOTAL

2,988.21 298.82 76.80 0 .0 0 19.12 298.82

3.09%

3,681.78 113.77

PRECIO UNITARIO

3,795.54

Unidad: m3

Rendimiento

Costo

1 .1 0

Precio Parcial 0 .0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

 

ATERIALES E INSUMOS 4 .0 0 4 .0 0

2 0 .0 0 1 2 .0 0

0.00 80.00 48.00

 

0.00 0.00

TOTAL MANO DE OBRA 1 .0 0

2 0 .0 0

5.00%

 

INARIA HERRAMIENTA COSTO DIRECTO

128.00 20.00 0.00 0.00 6 .4 0 26.40

10.00% 60.00% 0.00%

154.40 15.44 76.80 0 .0 0

14.94% 10.00%

19.12 15.44

SUBTOTAL 3.09%

281.20 8 .6 9

PRECIO UNITARIO

289.89

Unidad: m3

Rendimiento

 

Costo

176.52 0 .2 2

1 .2 0 120.75

211.82 26.08

0 .2 7 7 0 .6 1 0 .5 0

120.75 0 .0 0 120.00

33.09 0 .0 0 59.40 0.00 0.00 0.00 0.00 0.00

ATERIALES E INSUMOS

330.39

8 .0 0 8 .0 0

2 0 .0 0 1 2 .0 0

160.00 96.00 0.00 0.00

TOTAL MANO DE OBRA

256.00

1 .0 0 0 .5 0

 

Precio Parcial

2 0 .0 0 1 2 .0 0 5.00%

20.00 6 .0 0 0.00 12.80

INARIA HERRAMIENTA

38.80

COSTO DIRECTO

625.19 62.52 153.60 0 .0 0 38.25 62.52

 

10.00% 60.00% 0.00% 14.94% 10.00%

SUBTOTAL 3.09%

942.08 29.11

PRECIO UNITARIO

971.19

Unidad: m3

Rendimiento

Costo

Precio Parcial

 

176.52 0 .2 2

1 .2 0 120.75

211.82 26.08

0 .2 7 7 0 .6 1 0 .5 0 3 2 .2 6 1 .0 0 1 .0 0

120.75 0 .0 0 120.00 1 0 .0 0 2 0 .0 0 2 0 .0 0

33.09 0 .0 0 59.40 322.60 20.00 20.00 0.00 0.00

ATERIALES E INSUMOS

692.99

1 6 .0 0 1 6 .0 0

2 0 .0 0 1 2 .0 0

320.00 192.00 0.00 0.00

TOTAL MANO DE OBRA

512.00

1 .0 0 0 .5 0

2 0 .0 0 1 2 .0 0 5.00%

 

INARIA HERRAMIENTA COSTO DIRECTO 10.00% 60.00% 0.00% 14.94% 10.00%

SUBTOTAL

20.00 6 .0 0 0.00 25.60 51.60 1,256.59 125.66 307.20 0 .0 0 76.49 125.66

3.09%

1,891.60 58.45

PRECIO UNITARIO

1,950.05

 

Unidad: m2

Rendimiento 1 .1 0

Precio Parcial

Costo 2 .5 0

2 .7 5

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

 

ATERIALES E INSUMOS 0 .5 0 0 .5 0

 

2.75

2 0 .0 0 1 2 .0 0

10.00 6 .0 0 0.00 0.00

TOTAL MANO DE OBRA

16.00

5.00%

0.00 0.00 0.00 0 .8 0

INARIA HERRAMIENTA

0.80

COSTO DIRECTO

19.55 1 .9 6 9 .6 0 0 .0 0 2 .3 9 1 .9 6

10.00% 60.00% 0.00% 14.94% 10.00%

SUBTOTAL 3.09%

35.45 1 .1 0

PRECIO UNITARIO

36.55

Unidad: m2

 

Rendimiento

Precio Parcial

Costo

2 7 .0 9 2 .0 0

3 .0 0 1 .2 0

81.28 2 .4 0

0 .1 0 1 0 .0 0

100.00 0 .0 0

10.00 0 .0 0 0.00

0.00 0.00 0.00 0.00 0.00

 

ATERIALES E INSUMOS 4 .0 0 4 .0 0

2 0 .0 0 1 2 .0 0

80.00 48.00 0.00 0.00

TOTAL MANO DE OBRA

128.00

1 .0 0

2 0 .0 0

5.00%

 

93.68

INARIA HERRAMIENTA COSTO DIRECTO

20.00 0.00 0.00 6 .4 0 26.40

10.00% 60.00% 0.00% 14.94% 10.00%

248.08 24.81 76.80 0 .0 0 19.12 24.81

SUBTOTAL

393.62

3.09%

12.16 405.78

PRECIO UNITARIO

Unidad: m3

Rendimiento

Costo

Precio Parcial

323.10 0 .3 9 5

1 .2 0 120.75

387.72 47.70

0 .5 0 1 129.24 123.18

1,220.75 0 .0 0 1 0 .0 0

611.60 0 .0 0 1,231.81

102.19 2 .0 0 2 .0 0

1 0 .0 0 2 0 .0 0 2 0 .0 0

1,021.90 40.00 40.00

 

0.00 0.00

 

ATERIALES E INSUMOS 4 .0 0 4 .0 0

2 0 .0 0 1 2 .0 0

3,380.72 80.00 48.00 0.00 0.00

TOTAL MANO DE OBRA 2 4 .0 0 2 4 .0 0

2 0 .0 0 1 2 .0 0 5.00%

 

INARIA HERRAMIENTA COSTO DIRECTO 10.00% 60.00% 0.00% 14.94% 10.00%

SUBTOTAL

 

128.00 480.00 288.00 0.00 6 .4 0 774.40 4,283.12 428.31 76.80 0 .0 0 19.12 428.31

3.09%

5,235.67 161.78

PRECIO UNITARIO

5,397.45

 ZAPATAS DOSIFICACION:: 1 : 2.2 : 3.1 - 0.4 DOSIFICACION H2O + c + a + g = Ho V_H2O + Vc +Va +Vg = 1 PE = W/V V = W/ PE   → WH2O/PEH2O + Wc/Pec +Wg/Peg = 1.025 De la dosifcacion: W = Wc Wa = Wc*2,2 Wg =Wc*3,1 → A/C = WH2O/Wc = 0.4 Relacion A/C 0,4*Wc/PEH2O + Wc/PEc + 2,2Wc/PEa + 3,1Wc/PEg = 1.025 PEc = 3150 kg/m3 PEa = 1800 kg/m3 Peg = 2000 kg/m3 Resolviendo la ecucion: Wc= 293.72 kg/m3 Cemento 293.72 kg/m3 Arena 646.19 kg/m3 Grava 910.54 kg/m3 Agua 117.49 kg/m3 Cambiando Unidades Cemento 293.72 kg/m3 Arena 0.359 m3/m3 Grava 0.455 m3/m3 Agua 117.49 Lt/m3 10% perdida Rend_Cemento 323.10 kkg g/m3 Rend_Arena 0.395 m3/m3 Rend_Grava 0.501 m3/m3

Rend_Agua

N° 1 2

Patllas = Recubrimieno = esquema

20 5 ϴ (mm) 16 16

COLUMNAS

ESQUEMAS DE ENCONFRADOS Listones 2x3"

129.238 LLtt/m3 cm cm a (m) 0.2 0.2

b (m) 1.5 1.5

c (m) 0.2 0.2

 

tablas 2 cm (espezor) Puntales f5" (callapos)

Patllas= Recubrimieno= N° 1 2 3

40 cm 2.5 2.5 cm Esquema

ᵩ(mm) 16 12 6

a (m) 0.4 0.4 0.25

b (m) 4.325 4.325 0.25

CIMIENTO Dosifccion: Dosif ccion: 1 : 2.2 : 3.1 - 0.4 - 45% piedra 45% hormigon 55% H2O + c + a + g = Ho V_H2O + Vc +Va +Vg = 1*0,55 → PE = W/V V = W/ PE   WH2O/PEH2O + Wc/Pec +Wg/Peg = 1.025*0,5 De la dosifcacion:

Relacion

A/C

W = Wc Wa = Wc*2,2 Wg =Wc*3,1 A/C = WH2O/Wc = 0.4

0,4*Wc/PEH2O + Wc/PEc + 2,2Wc/PEa + 3,1 PEc = 3150 kg/m3 PEa = 1800 kg/m3 Peg = 2000 kg/m3

 

Resolviendo la ecucion:

Wc= Cemento Arena Grava Agua

160.47 kkg g/m3 160.47 kkg g/m3 353.04 kkg g/m3 497.47 kg kg/m3 64.19 kg kg/m3

piedra

0.45 m3/m3

Cemento Arena Grava Agua piedra

160.47 kkg g/m3 0.196 m3 m3/m3 0.249 m m3 3/m3 64.19 Lt Lt/m3 0.45 m3/m3

Rend_Cemento Rend_Arena Rend_Grava Rend_Agua Rend_piedra

176.52 kg/m3 0.216 m3 m 3/m3 0.274 m3 m 3/m3 70.608 LLtt/m3 0.495 m3 m 3/m3

Cambiando Unidades

SOBRECIMIENTO Dosifccion: Dosif ccion: 1 : 2.2 : 3.1 - 0.4 - 45%

Rend_Cemento Rend_Arena

176.520 kg kg/m3 0.216 m3/m3

Rend_Grava Rend_Agua Rend_piedra

0.274 m3/m3 70.608 Lt Lt/m3 0.495 m3/m3

 

MURO APAREJO DE MUROS EN SOGA Ladrillo

25x15x10

Nº LADRILLOS HORIZONTAL= Nº LADRILLOS VERTICAL=  R=

3.70 8.33

30.86 pza/m2 10% perdidas 27.0935955 pza/m2 Rend_ladrillos=

VIGA DOSIFICACION:: 1 : 2.2 : 3.1 - 0.4 DOSIFICACION

 

Rend_Cemento Rend_Arena Rend_Grava Rend_Agua Patllas sup= Patllas in = Recubrimieno = N° 1 2 3 4 5

323.095 kg kg/m3 0.395 m3/m3 0.501 m3/m3 129.238 LLtt/m3

30 cm 10 cm 2.5 2.5 cm Esquema

ᵩ(mm) 16 20 10 16 6

a (m) 0.1 0.3 2.2 0.3 0.35

b (m) 5 1.7 1.7 0.2

 

WH2O = 0,4*Wc  

long 1.90 1.90

Num 9 9

L. oal (m) 17.1 17.1

A (cm^2) 2.01 2.01

V (m^3) 0.0034 0.0034

PE_As Peso (kg) Vol_H (m^3) 7850 26.99 1.02 7850 26.99 53.98 1.02 ∑ 52.71 f 10% perdidas Rend 57.98 =

 

Rend_Cemento Rend_Arena Rend_Grava Rend_Agua L1= 0.44 m L2= 4 m L3= 4 m L4= 2.31 m V1= 25.95 p2 V2= 20.31 p2 V3= 23.02 p2 V4= Vol_oal= Vol_Ho= R=

323.10 kg/m3 0.39 m3 m3/m3 0.50 m m3 3/m3 129.24 LLtt/m3

p2 2 14198..5820 p 0.36 m3 330.00 p2/m3 5 usos R`= 66.000 66.0 00 p2/m3 p2/m3 10%perdidas Rend_m 72.60 72.6 0 p2/m3 p2/m3

c (m) 0.05

Long. (m) 4.725 4.725 1.1

N° veces 4 4 19

L. Toltal (m) Area (cm2) 18.9 2.011 18.9 1.131 20.9 0.283

Vol (m3) 0.0038 0.0021 0.0006

PE_As 7850 7850 7850



Peso(kg) 29.83 16.78 4.639 51.25 f=

10% perdida Rend

 

→ WH2O = 0,4*Wc c/PEg = 0,56  

 

10% perdidas

L1= L2= L3= L4= L5= V1= V2= V3= V4= V5= Vol_oal= Vol_Ho= R=

0.5 m 0.71 m 0.34 m 0.50 m 5.00 m 18.02 p2 25.48 p2 6.13 p2 18.02 p2 42.32 p2 109.97 p2 0.75 m3 146.62 p2/m3 5 usos R`= 29.324 29.3 24 p2/m3 p2/m3 10%perdidas Rend_m 32.26 32.2 6 p2/m3 p2/m3

 

e_ e_mo mor rer ero= o= 2 cm

0.15

L1= L2= L3= L4= L5= L6= L7= V1= V2= V3= V4= V5= V6= V7= Vol_oal= Vol_Ho=

0.4 0.46 0.85 0.60 2.03 5.00 5.00 14.41 16.64 15.35 21.71 119.69 33.86 10.58 232.25 0.5

m m m m m m m p2 p2 p2 p2 p2

p2 m3

 

R=

464.49 p2/m3 5 usos 92.899 92.8 99 p2/m3 p2/m3 R`= 10%perdidas 102.19 102. 19 p2/m3 p2/m3 Rend_m

c (m)

Long. (m)

N° veces

0.1

5.2 2 2.2 2 1.2

3 2 2 3 35

0.05

L. Toltal (m) Area (cm2) 15.6 4 4.4 6 42

2.01 3.14 0.79 2.011 0.283

Vol (m3)

PE_As

0.0031 0.0013 0.0003 0.0012 0.0012

7850 7850 7850 7850 7850

Peso(kg)



24.62 9.86 2.71 9.47 9.322 55.99 f=

10% perdida Rend

 

kg/m^3 kg/m^3

 

Vol_H(m3) 0.36 0.36 142.36 142. 36 kg/m^3 kg/m^3  

156.59 156. 59 kg/m^3 kg/m^3

 

Vol_H(m3)

0.5

0.50 111.98 111. 98 kg/m^3 kg/m^3  

123.18 123. 18 kg/m^3 kg/m^3

 

4. PRESUPUESTO ACTIVIDAD

UNIDAD

COMPUTO METRICO

replanteo excavacion

m2 m3

162.56 105.264

zapatas columnas relleno cimientos sobreciomientos impermeabilizacion de sobrecimientos muro viga

m3 m3 m3 m3 m3 m2 m2 m3

21.504 7.56 53.76 28.2 14.1 28.2 197.4 9.4

PRECIO UNITARIO

PRECIO PARCIAL

44.66 7259.34814 265.15 27910.8316 1628.06 3795.54 289.89 971.19 1950.05 36.55 405.78 5397.45 PRES PRESUP UPUE UEST STO O

35009.7304 28694.3166 15584.6143 27387.4552 27495.749 1030.59205 80101.5654 50736.0753 30 3012 1210 10.2 .278 78

 

5. CANTIDAD DE MATERIAL ACTIVIDAD

Replanteo

MATERIAL cal hilo madera

COLUMNAS

SOBRECIMIENTOS

0 0 0

Cemento arena grava H2O acero Cemento arena

kg m3 m3 lt kg kg m3

grava H2O acero madera clavo alambre Tierra

m3 lt kg p2 kg kg m3

0.1 0.05 0.1 0 0 0 323.1 0.395 0.501 129.238 57.98 323.1 0.395

Cemento arena grava

kg m3 m3

0.501 129.238 156.59 72.6 1 1 1.1 0 0 176.52 0.216 0.274

H2O piedra Cemento arena grava H2O piedra

Lt m3 kg m3 m3 Lt m3

70.608 0.495 176.52 0.216 0.274 70.608 0.495

RELLENO

CIMIENTOS

RENDIMIENTO

kg pza p2 0 0 0

EXCAVACION

ZAPATAS

UNIDAD

0 0

0 0

COMPUTO METRICO 162.56

105.264

21.504

7.56

53.76

28.2

14.1

SUBTOTAL 16.256 8.128 16.256 0 0 0 6947.94 8.49 10.77 2779.13 1246.80 2442.64 2.99 3.79 977.04 1183.82 548.86 7.56 7.56 59.136 0 0 4977.86 6.09 7.73 1991.15 13.96 2488.93 3.05 3.86 995.57 6.98