Download Pr-w-1102.21-4012-001 Rev 0 Welding Procedure Specification for Piping and Pipeline (Wps)-Sw(1)...
Description
PTT PUBLIC COMPANY LIMITED
RATCHABURI WORLD COGENERATION COMPANY LIMITED
GAS PIPELINE AND GAS METERING AND REGULATING STATION PROJECT
DOCUMENT TITLE:
WELDING PROCEDURE SPECIFICATION FOR PIPING AND PIPELINE (WPS)
DOCUMENT NO.:
PR-W-1102.21-4012-001
REVISION:
REVIEW STAMP
0
COMMENTS
E. Work may proceed. F. Work may proceed. Submit “for Construction” Documents. G. Revise and Resubmit. Work may proceed Subject to incorporation of changes indicated. H. Revise and Resubmit. Work may not proceed. I. Review not required. Work may proceed. Acceptance in any of these categories shall be in no way relieve the Contractor/Supplier of its responsibility for the due and proper performance of the Work in accordance with the Contract/Purchase Order. Name: Sign: Date:
0
02/04/13
Issued for Construction
WS
JR
NP
A
29/01/13
Issued for Approval
WS
JR
NP
Rev.
Date
Description
Prepared By
Checked By
Approved By
CONTRACTOR:
CONSULTANT:
SIAM RAJATHANEE JOINT VENTURE
UNITY ENGINEERING AND CONSULTANCY SERVICES CO.,LTD.
WELDING PROCEDURE SPECIFICATION FOR PIPING AND PIPELINE (WPS)
GAS PIPELINE AND GAS METERING AND REGULATING STATION PROJECT Document No.
PR-W-1102.21-4012-001
Rev. 0
Page 2 of 42
DOCUMENT CHANGE RECORD Rev
Date
Prepared/ Revised
Reviewed By
Approved By
Description
By A
29/01/13
WS
JR
NP
Issued for Approval
0
02/04/13
WS
JR
NP
Issued for Construction
PR-W-1102.21-4012-001 Rev.0 (WELDING PROCEDURE SPECIFICATION FOR PIPING AND PIPELINE (WPS))
WELDING PROCEDURE SPECIFICATION FOR PIPING AND PIPELINE (WPS)
GAS PIPELINE AND GAS METERING ANDREGULATING STATION PROJECT Document No.
PR-W-1102.21-4012-001
Rev. 0
Page 3 of 20
TABLE OF CONTENT ARTICLE
PAGE
1.0
General ................................................................................................................................................... 4
2.0
Scope of Work ........................................................................................................................................ 4
WPS No. 1 and 2 WPS No. 1 and 2 WPS No. 1 and 2 WPS No. 1 and 2 WPS No. 1 and 2 WPS No. 1 and 2 WPS No. 1 and 2
ATTACHMENT .................................................................................................................................................. 20 PTT Welding Procedure Specification (SP-W-000-01 Rev.0)................................................................. 20
PR-W-1102.21-4012-001 Rev.0 (WELDING PROCEDURE SPECIFICATION FOR PIPING AND PIPELINE (WPS))
WELDING PROCEDURE SPECIFICATION FOR PIPING AND PIPELINE (WPS)
1.0
GAS PIPELINE AND GAS METERING ANDREGULATING STATION PROJECT Document No.
PR-W-1102.21-4012-001
Rev. 0
Page 4 of 20
General This Welding Procedure Specification had been duplicated from PTT welding procedure specification which established and qualified by PTT PLC. And proposed for construction, maintenance, modification and repairing all of PTT gas pipeline and station.
2.0
Scope of Work This welding procedure specification is proposed for all welding work of Gas Pipeline And Gas Metering and Regulating Station Project if essential variables as describes in API 1104 are not changed then this procedure should applied without the need for requalification.
3.0
Reference API 1104 SP-W-000-07 Rev.0 SP-W-1102.21-010-003
4.0
standard for welding of pipelines and related facilities PTT Welding Procedure Specification (WPS) Onshore Pipeline Automatic and Manual Welding
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.