Configuration Document (Production Planning)
Submitted to
Turbo Energy Ltd
By
Wipro Ltd. Version 1.0
Project Configuration Document (Production Planning)
DOCUMENT INFORMATION Project Name Focus
Document Name Configuration Manual - PP
Author
Document Location
R.Karthik
File Name and Path Created Last Edited Number of Pages
DOCUMENT HISTORY Versio n
Document Name
Date
1
Configuratio n Manual PP
19-07-2012
Author
Chang e Contro l
Reviewed BY
DOCUMENT APPROVAL Name
Vinoth/Karthik
Role PP ConsultantWipro Ltd.
Kamesh
BPO Head
Mr. Anandh Anbazhagan
Project ManagerWipro Ltd. TEL Project Manager
Mr. Vinod Kannan .M Mr. Sivarama Subramanian
Wipro Limited.
Date
Signature
TEL Project Head
Page 2 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 3 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) TABLE OF CONTENTS 1
INTRODUCTION................................................................................6 1.1 1.2
Document Objectives........ ................ ................ ................ ................................................6 ........................................6 Document Structure..........................................................................6 Target Audience....... 1.3 ............... ................ ................ ................ ................ .......................................6 ...............................6 2 SCOPE OF THE DOCUMENT.................................................................7 3
PRODUCTION........ ................ ................ ................ ................ ................ ...........................................7 ...................................7 3.1
Basic Data......................................................................................7
3.1.1 Bill of Material.. Material...... ........ ........ ........ ........ ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ......... ............ ............ .........7 ...7 4.1.1.1 4.1.1 .1 Control Control Data Data for Bills of Materia Material....... l.............. ............... ............... .............. .............. .............. ............... ............... ..................7 ...........7 3.1.1.1.1 3.1.1 .1.1 Define Modification Modification Parameters... Parameters........... ............... .............. .............. .............. ............... ............... ..........................7 ...................7 3.1.1.1.2 3.1.1 .1.2 Define default values........... values................... ............... .............. .............. .............. ............... ............... .............. ............................8 .....................8 3.1.1.2 General Data...............................................................................................................10 3.1.1.2.1 3.1.1 .2.1 BOM Usage........ Usage............... .............. .............. ............... ............... .............. .............. .............. ............... ............... ............................ ......................10 .10 3.1.1.2.2 Define material types allowed for BOM header................................................ header...................................... ..........12 12 3.1.1.3 Item Data....................................................................................................................13 3.1.1.3.1 3.1.1 .3.1 Define Item categories.. categories......... .............. ............... ............... .............. .............. .............. ............... ............... ..........................13 ...................13 3.1.1.3.2 3.1.1 .3.2 Define Allowed Allowed materi material al types for for BOM items..... items............ .............. ....................................14 .............................14 3.1.2 Work center... center...... ....... ....... ....... ........ ....... ....... ....... ....... ........ ....... ....... ........ ....... ....... .......... ............ ............ ........... .........15 ....15 3.1.2.1 General Data...............................................................................................................15 3.1.2.1.1 Define work center category...................................... category................................................................. .................................. ............ ..... 15 3.1.2.1.2 3.1.2 .1.2 Define task list usage........ usage............... .............. ............... ............... .............. .............. .............. ............... ..............................16 ......................16 3.1.2.1.3 3.1.2 .1.3 Standard Standard Value......... Value................ .............. .............. .............. ............... ............... .............. .............. ......................................17 ...............................17 3.1.3 Routing.. Routing...... ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... .....22 .22 3.1.3.1 Control data................................................................................................................22 3.1.3.1.1 Define number range for routings......................................................... routings................................. ............................... ............ ..... 22 3.1.3.2 General data................................................................................................................23 3.1.3.2.1 Define material type assignment............................................................. assignment............................. ....................................... .......... ...23 23 3.1.3.2.2 Define routing statuses............................................................ statuses........................ .............................................................. .......................... 24 3.1.3.2.3 Define task List usage.................................. usage...................................................................... .................................................. ................. ...24 24 3.1.3.2.4 Configure planner group........................................ group....................................................................... ..................................... ............ ...... 25 3.1.3.3 Operation data.............................................................................................................26
3.1.3.3.1 3.1.3 .3.1 Define Define control contro l key.......... key... .............. ............... ............... .............. .............. ............... ............... .................. ...............................26 ....................26 3.1.3.3.2 reduction strategy.................................... strategy....................................................................... ......................................... ........... ..... 28 3.1.3.3.3 Define Wage Group......................................................................... Group..................................... ............................................. ................ ........30 .30 3.1.3.3.4 Define Suitability..................................................................... Suitability................................. ......................................................... ......................... .... 31 3.1.3.3.5 Define Type of Standard Value Determination............................................. Determination................................ ................. ....32 32 3.1.3.4 Routing selection........................................................................................................33 3.1.3.4.1 Define user selection................................................................... selection............................... ......................................................... ......................33 .33 3.1.3.4.2 Select automatically............................................................................. automatically......................................... ............................................. ............. .... 33 3.1.4 3.1 .4 Pro Produc ductio tion n resour resources ces and tools. tools.... ...... ...... ..... ..... ...... ...... ..... ..... ...... ...... ...... ...... ...... ...... ...... ...... ...... ...... .....34 ..34 3.1.4.1 General data................................................................................................................34 3.1.4.1.1 3.1.4 .1.1 Define PRT status........ status................ ............... .............. .............. .............. ............... ............... .............. .............. ...........................34 ....................34 3.1.4.1.2 3.1.4 .1.2 Define PRT group key........... key.................. ............... ............... .............. .............. .............. ............... ............................ ........................35 ....35
3.2
Material Requirement Planning..........................................................36
3.2.1
Wipro Limited.
Plant Plant parameters parameters.... ....... ....... ........ ....... ....... ....... ....... ........ ....... ....... ........ ....... ......... ............ ............ ........... ........... .......36 .36
Page 4 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.2.1.1 Carry out overall maintenance of plant parameters.....................................................36 3.2.2 MRP groups.... groups........ ........ ........ ........ ........ ........ ........ ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ........ ........... ........41 ..41 3.2.2.1 Define MRP group for each material type...................................................................41 3.2.3 Number ranges... ranges....... ........ ....... ....... ........ ....... ....... ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ......... ........... ......43 43 3.2.3.1 Define number ranges for planning run.......................................................................43 3.2.4 Master Master data. data..... ....... ....... ........ ....... ....... ........ ....... ....... ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ......... ........... ......47 47 3.2.4.1 Define MRP controller................................................................................................47 3.2.4.2 Define missing parts MRP controller..........................................................................48 3.2.4.3 Check MRP types.......................................................................................................49 3.2.4.4 Define special procurement type.................................................................................51 3.2.5 Planning.. Planning...... ........ ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ....... ........ .......... ............ ........... ........... ............ ........53 ..53 3.2.5.1 MRP Calculation.........................................................................................................53 3.2.5.1.1 3.2.5 .1.1 Define Planning Planning Horizon.......... Horizon................. ............... ............... .............. .............. .............. ................................. .............................53 ...53 3.2.5.1.2 Define Planning Time Fence and Roll Forward Period.....................................54 Period................................ .....54 3.2.5.1.3 3.2.5 .1.3 Stocks........ Stocks............... .............. .............. .............. ............... ............... .............. .............. .............. ............... ............... ...............................55 ........................55 3.2.5.1.4 Define Rescheduling Check.................................... Check....................................................................... ......................................... .......56 .56 3.2.5.1.5 Define Error Processing in the Planning Run.................................................... Run.................................... ................60 60 3.2.5.2 Lot-Size Calculation...................................................................................................61 3.2.5.2.1 Check Lot-Sizing Procedure............................................................... Procedure........................................ .............................. ............. .......61 .61 3.2.5.3 Scheduling and Capacity Parameters..........................................................................63 3.2.5.3.1 3.2.5 .3.1 Define Floats Floats (Scheduling (Scheduling Margin Key)...... Key).............. ............... .............. .............. ...............................63 ........................63 3.2.5.3.2 Determining the Basic Dates..................................................... Dates......................... ............................ 65 3.2.5.3.3 3.2.5 .3.3 Parameters Define schedulin schefor duling g parameters parameters for planned planne d orders........... orders.................. .............. ...........................66 ....................66 3.2.5.4 Procurement Proposals................................................................................................67 3.2.5.4.1 Define External Procurement...................................... Procurement..................................................................... ..................................... .......67 .67
3.3
Shop floor control...........................................................................70
3.3.1 Master Master Data... Data....... ........ ....... ....... ........ ....... ....... ....... ....... ........ ....... ....... ........ ....... ......... ............ ............ ........... ........... .......70 .70 3.3.1.1 Order...........................................................................................................................70 3.3.1.1.1 3.3.1 .1.1 Define Order Types.......... Types................. .............. .............. ............... ............... .............. .............. .....................................70 ..............................70 3.3.1.1.2 3.3.1 .1.2 Define order order type-depend type-dependent ent parameters.... parameters........... .............. ............... .......................... ................................73 ..............73 3.3.1.1.3 Define number ranges for orders...................................................................... orders.................................... ...................................78 .78 3.3.1.1.4 Define number ranges for confirmations........................................................... confirmations....................................... ....................79 79 3.3.1.1.5 3.3.1 .1.5 Define number number ranges ranges for reservations.... reservations........... .............. .............. ............... ....................................80 ............................80 3.3.1.1.6 Define number ranges for operations...................................................... operations.................................. ........................... .......... ...81 81 3.3.1.2 Define production scheduling profile..........................................................................83 3.3.2 Operations. Operations..... ........ ........ ........ ........ ....... ....... ....... ....... ........ ....... ....... ........ ....... ....... ........ ....... ........ ........... ............ ...........86 .....86
3.3.2.1 Task List Selection......................................................................................................86 3.3.2.1.1 Select Automatically...................................... Automatically.......................................................................... ................................................. ............... ..86 86 3.3.2.1.2 3.3.2 .1.2 Define Default Default Values.............. Values..................... .............. .............. ............... ............... .............. ....................................88 .............................88 3.3.2.2 Bill of Material Selection............................................................................................90 3.3.2.2.1 3.3.2 .2.1 Define Priorities Priorities for BOM Usages........... Usages................... ............... .............. .............. .............. ............... .....................90 .............90 3.3.2.2.2 3.3.2 .2.2 Define Application Applications....... s.............. ............... ............... .............. .............. .............. ............... ............... .............. .........................91 ..................91 3.3.2.3 Availability Check......................................................................................................93 3.3.2.3.1 3.3.2 .3.1 Define Checking Checking Group........ Group............... .............. .............. .............. ............... ............... .............. .............. ..........................94 ...................94 3.3.2.3.2 Define Checking Rule..................................................................... Rule................................. ..................................................... ..................95 .95 3.3.2.3.3 3.3.2 .3.3 Define Scope of Check........... Check.................. ............... ............... .............. .............. .............. ............... ...............................96 .......................96 3.3.2.3.4 3.3.2 .3.4 Define Checking Checking Control..... Control............ .............. .............. ............... ............... .............. .............. .............. ...........................98 ....................98 3.3.2.3.5 Define Checking Rule for Backorder Processing........................................ Processing.......................... ..................100 ....100 3.3.2.4 Scheduling................................................................................................................101 3.3.2.4.1 Define Scheduling Parameters for Production Orders.....................................101 Orders......................... ............101 Wipro Limited.
Page 5 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.3.2.4.2 3.3.2.4.2 3.3.2.4.3 3.3.2 .4.3 3.3.2.4.4 3.3.2 .4.4 3.3.2.4.5 3.3.2 .4.5 3.3.2.4.6 3.3.2.4.7 3.3.2 .4.7
Specify Specify Scheduling Scheduling Type........... Type.................. .............. .............. ............... ............... .............. .............. ..........................104 ...................104 Define Time Units.......... Units................. ............... ............... .............. .............. ............... ............... ....................................105 .............................105 Define Formula Formula Parameters....... Parameters.............. .............. ............... ............... .............. .................... .................................107 ....................107 Define Formulas.......... Formulas................. ............... ............... .............. .............. .............. ............... ............... ................................108 .........................108 Define Standard Value Keys................................................................. Keys............................. ............................................ ..........110 ..110 Define Key Key for Performan Performance ce Efficiency Efficiency Rate....... Rate.............. .............. ...................................111 ............................111
3.3.2.4.8 3.3.2 .4.8 Define Define Move Schedulin Scheduling g Margin Key.. ............... .............. .............. .............. ................................... ................................113 ....113 3.3.2 3.3.2.4.9 .4.9 Time Matrix.......... Matrix..Key.......... ............... .............. .............. .............. ............... ............... .............. .........................115 ..................115 3.3.2.4.10 Define Reduction Strategies.................................................................. Strategies............................... ........................................... ........117 117 3.3.2.5 Confirmation.............................................................................................................118 3.3.2.5.1 Define Confirmation Parameters.................................................................. Parameters.............................. .......................................118 ...118 3.3.2.5.2 Confirmation Parameters for Collective Confirmation/Fast Entry........ Entry.............. ..........122 ....122
4
SAP NOTES AND PATCHES ..............................................................123
Wipro Limited.
Page 6 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
1 INTRODUCTION 1.1
Document Objectives
The objective of this document is to provide configuration details of the SAP PP module implemented and to enable the application system administrator(s) / authorized users in maintaining the system. system. It is recommended that not not more than 2 key users be identified as the application application system system administra administrators. tors. It is also recommended recommended that this document document be a controlled copy in the hands of the target audience. Neither this documentation nor any part of it may be copied or reproduced in any form or by any means or translated into another language, without the prior consent of Wipro Ltd.
1.2
Document Structure
This his docu docume ment nt is br broa oadl dly y di divi vide ded d into into thre threee main main se sect ctio ions ns na name mely ly,, the the sc scop opee of implementation, the proposed Organization Structure and the configuration details. The configuration details have been broken down into following heads:
1.3
Purpose
Description and Configuration Values
IMG Navigation Path
Recommendations(If any) Target Audience
The application system administrators who will be maintaining the (PP-module) system intend to use this document. It may be noted that the document is consistent with the system settings on the date of document (Date on the Title Page). It is the responsibility of the application system administrators to keep this document updated and consistent with any further configuration done.
Wipro Limited.
Page 7 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
2 SCOP SCOPE E OF THE THE DOCU OCUMENT ENT The document contains the configuration details of the Production Planning module for Company code – 1000. As part of business process mapping following configuration has been carried out in this module.
3 PRODUCTION 3.1
Basic Data
3.1.1 4.1.1.1
Bill of Material Control Data for Bills of Material
In this step, you define central modification parameters and default values for your BOM management system. These settings apply to all BOM categories (for example, material BOMs, document structures, and equipment BOMs). 3.1.1.1.1
Define Modification Parameters
Purpose of Configuration Modification Modificati on parameter parameterss are generally generally one-time one-time settings settings for BOM management, management, which should not be changed after started using BOMs productively. In the standard system, default values are defined. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Bill of Materials Control Data for Bill of Materials Define Modification Parameters.
Transaction Code
OS27
On change view “Modification Parameters for BOMs”: Details screen the relevant options are selected.
Wipro Limited.
Page 8 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made. Recommendation Use the standard default settings.
3.1.1.1.2
Wipro Limited.
Define default values
Page 9 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration In this step the following default values for maintaining bills of material are defined. Base quantity This is proposed when creating a BOM. The component quantities in the BOM items are based on the base quantity. quantity. BOM status The BOM status is used to control activities in related application areas. This default BOM status is proposed by the system when creating a bill of material. The size unit (mm) This is the default value for the size unit, which is proposed by the system in variable-size items if items if you do not enter a unit. The variable-size item unit (pieces) This unit of measure for the number of variable-size items is proposed by the system when you maintain variable-size items. items. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Bill of Materials Control Data for Bill of Materials Define Default values
Transaction Code
OS28
On change view “Default values for BOMs”: Details screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Wipro Limited.
Page 10 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Recommendation Use the default value for the variable-size item unit. It is not advised to change this parameter.
3.1.1.2 General Data 3.1.1.2.1
BOM Usage
3.1.1.2.1.1 Define BOM Usage Purpose of Configuration
When hen BOM BOM usa sag ge is defin efined ed the the co con nfi fig gura rati tio on of the the item item statu tatuss is def efin ined ed.. The item status is made up of a number of indicators in the BOM item (for example, "relevant to production", "relevant to engineering/design", and so on). The item status controls how the BOM item is processed in related application areas. Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Customizing Implementation Guide Production Basic Data Bi Bill ll of Mater Materia ials ls Gene Genera rall Data Data BO BOM M Usag Usagee Define BOM usage OS20
On change view “Define BOM usage”: Details screen the relevant options are selected.
Wipro Limited.
Page 11 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Standard SAP settings Maintained as Recommended by SAP. No changes made.
Recommendation Adapt the predefined BOM usages to your requirements or define new BOM usages. 3.1.1.2.1.2 3.1.1.2 .1.2 Define Default Default valued valued for the item item status. status.
Purpose of Configuration
In this step the default values for the various item status status indicators indicators for each BOM usage can usage can be defined. These values are proposed as defaults when you create new BOM items. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Bi Bill ll of Mater Materia ials ls Gene Genera rall Data Data BO BOM M Usag Usagee Define Default values for the item status.
Transaction Code
OS21
On change view “Define Default values for the item status.”: Details screen the relevant options are selected.
Wipro Limited.
Page 12 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.1.1.2.2
Define material types allowed for BOM header.
Purpose of Configuration In this step the material types in types in conjunction conjunction with BOM usages are usages are allowed for the BOM header material are specified. Generic entry is made in the fields for the BOM usage and the material type. This means, for example, that you can enter an "*" instead of a specific BOM usage. This stands for all possible BOM usages. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Da ta Bill of Materia Materials ls General General Data Data Define Material types allowed for BOM header.
Transaction Code
OS24
On change view “Define Material types allowed for BOM header.” Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Wipro Limited.
Page 13 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.1.1.3 Item Data 3.1.1.3.1
Define Item categories
Purpose of Configuration When BOM item is entered item category must be assigned to the item. The item category defines the attributes and functions of a BOM item. It controls field and screen selection for detail screens in BOM maintenance. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Bill of Materials Item data Define item categories.
Transaction Code
OS13
On change view “Define item categories”: Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.1.1.3.2
Define Allowed material types types for BOM items.
Purpose of Configuration In this step which material types types is allowed with which BOM usages are usages are defined and which material types for BOM headers for creating BOM items (material items) are defined. Below the navigation path access the SAP IMG transaction
Wipro Limited.
Page 14 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) IMG Menu
SAP Customizing Implementation Guide Production Basic Data Bi Bill ll of Mate Materi rial alss Item dat data Define Define Allowed Allowed material types for BOM items.
Transaction Code
OS14
On change view “Material types allowed in BOM Items”: Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Recommendation If BOM usages defined in the standard SAP System are used then standard settings defined can be used.
3.1.2 3.1. 2 Work cen center ter 3.1.2.1 General Data 3.1.2.1.1
Define work center category
Purpose of Configuration The work center category determines the data that can be maintained in a work center and, center and, therefore, the functions (for example, costing or scheduling) for which the work center can be used. Each work center category is assigned to the applications (for example, production, plant maintenance or quality management) whose menus allow you to t o maintain work centers with this category.
Wipro Limited.
Page 15 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Each work center category has a number of screens assigned to it which the system displays when work centers of this category are displayed. The screens contain groups of fields (for example, scheduling data). Depending on the work center category, you can make field selections on these screens (for example, defining required entry fields). Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data ata Work Work cent center er General General data data Define work center category.
Transaction Code
OP40
On change view “Parameters”: Overview screen the relevant options are selected.
3.1.2.1.2
Define task list usage
Purpose of Configuration
Wipro Limited.
Page 16 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) In this IMG activity, the task lists l ists in which a work center or center or production resource/tool resource/tool used used may be specified. For example, work centers can categorized into maintenance work centers or inspection work centers according to their relevance and their usage in maintenance plans or inspection plans. You can also allow multiple, cross-application uses in any combination. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Work center General data Define task list usage.
Transaction Code
OP45
On change view “Task list usage”: Overview screen the relevant options are selected.
Wipro Limited.
Page 17 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.2.1.3
Standard Value
3.1.2.1 3.1 .2.1.3. .3.1 1 Define Define parameter parameters s
Purpose of Configuration In this menu option parameters must be defined. These parameters should be allocated to the standard value keys. Meaning should be assigned to these standard values. The most common standard values are setup time or time or machine time per unit under certain circumstances; you also have to make further standard values such as labor time or cleanout times available for planning. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Work Work cen cente terr Gener eneral al data data Stan Standa dard rd va valu luee Define parameters
Transaction Code
OP7B
On change view “Parameters”: Overview screen the relevant options are selected.
Wipro Limited.
Page 18 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 19 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Recommendation Should select mnemonic identification codes if want to use the parameters later in i n the formula definition. 3.1.2.1.3.2 Define Standard value key
Purpose of Configuration In this step standard value key is defined. The standard value key determines the meaning of the six standard values in the operation. The SAP System assigns a parameter ID to the standard values of the operation and the work in network activities. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Work Work cen cente terr Gener eneral al data data Stan Standa dard rd va valu luee Define Standard value key.
Transaction Code
OP19
On change view “Standard value key formula”: Overview screen the relevant options are selected.
Wipro Limited.
Page 20 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 21 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.3 Rout 3.1.3 Routing ing 3.1.3.1 Control data 3.1.3.1.1
Define number range for routings
Purpose of Configuration To create a routing, the system requires a unique group number. Routings can be created with or without a group. If you do not enter e nter a group, the system assigns a group to the task list. The internal group number is within the number range you define in this step Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing Control Data Define number ranges for routings
Transaction Code
OP62
On change view “Number ranges for routings”: Details screen the relevant options are selected.
Wipro Limited.
Page 22 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.3.2 General data 3.1.3.2.1
Define material material type type assignment assignment
Purpose of Configuration In this step, material types are assigned to task list types types.. If a material type is type is not assigned to a task list type, routings cannot be created for materials of this type. Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Customizing Implementation Guide Production Basic Data Rou Routi ting ng Gene Genera rall data data Define Define materi material al type type assignment. OP50
On change view “Assignment of material types”: Overview screen the relevant options are selected.
Wipro Limited.
Page 23 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Recommendation SAP recommends using the assignments contained in the standard SAP system. Only make new assignments if the standard assignments do not cover all needs. 3.1.3.2.2
Define routing statuses
Purpose of Configuration The status determines the work areas in which a routing can be used. More specifically, the status controls the following functions:
release for usage in orders or for reference in other task lists (reference operation sets
or reference rate routings) release for costing
automatic consistency check before the routing is saved
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing General data Define Routing statuses.
Transaction Code
OP46
On change view “Task list status”: Overview screen the relevant options are selected. Wipro Limited.
Page 24 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.1.3.2.3
Define task List usage
Purpose of Configuration Task list usage is used to assign routings to various work areas. Therefore several task lists with various usages for the production of a material can be created. In work orders, you can assign order types to types to usages. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing General data Define Task list usage.
Transaction Code
NIL
On change view “Usage”: Overview screen the relevant options are selected.
Wipro Limited.
Page 25 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.3.2.4
Configure planner group
Purpose of Configuration A planner group is a group of people responsible for the maintenance of routings. Planner group can be used as a selection criterion for task list l ist Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing General data Configure Planner Group.
Transaction Code
NIL
On change view “Maintenance planner group”: Overview screen the relevant options are selected.
Wipro Limited.
Page 26 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.3.3 Operation data 3.1.3.3.1
Define control key
Purpose of Configuration
In this step control key of key of an operation is defined. The control key specifies:
The business functions functions carried out with an operation operation
How the SAP System processes an operation
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing operation data Define control key.
Transaction Code
OP67
On change view “Control key for operations”: Overview screen the relevant options are selected.
Wipro Limited.
Page 27 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 28 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.3.3.2
Define reduction strategy
Purpose of Configuration Reduction strategy should be specified to be used when the reduction measures are carried out on operations. Scheduling reduces Scheduling reduces the lead-time automatically lead-time automatically if the basic dates given are not adhered to, that is if the scheduled dates lie outside the basic dates. In this work step, you also define the reduction levels. The reduction takes place level by level no further than the level that you have specified in the control parameters.
Wipro Limited.
Page 29 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing operation data Define Reduction strategy.
Transaction Code
OPJS
On change view “Reduction strategy”: Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Wipro Limited.
Page 30 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.1.3.3.3
Define Wage Group
Purpose of Configuration In this step wage groups for operations and work centers is defined. By assigning an operation or a work center to a wage group you can evaluate the work to be performed in the operation from a job evaluation point of view (for instance suitable for unskilled labor or requiring special training). When you confirm the operation, you enter the wage group that was actually used. In the standard system the wage group does not affect payroll accounting in the ERP system.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing operation data Defin Definee wage wage group.
Transaction Code
NIL
On change view “Wage groups”: Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.1.3.3.4
Wipro Limited.
Define Suitability
Page 31 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration In this menu option, the suitability required in a plant for carrying out certain tasks is defined. Example Suitability for a task can be:
Certificates
Courses of study
Short-term training
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing operation data Define Suitability.
Transaction Code
NIL
On change view “Wage groups”: Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.1.3.3.5 Wipro Limited.
Define Type of Standard Value Determination Page 32 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration The type of standard value calculation specifies how the standard values of an operation are calculated (for example, using CAPP). Types of standard value calculation for each plant can be defined. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing operation data Define Type of Standard Value Determination
Transaction Code
NIL
On change view “Standard Value Determination”: Overview screen the relevant options are selected.
3.1.3.4 Routing selection 3.1.3.4.1 Wipro Limited.
Define user selection Page 33 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration Selection of task list by the user can be allowed using this setting. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing Routing selection Define user selection
Transaction Code
OPJS
On change view “Selection via user exit”: Details screen the relevant options are selected.
3.1.3.4.2
Select automatically
Purpose of Configuration Selection of task list by the user can be allowed using this setting. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data Routing Routing selection Select automatically
Transaction Code
OPEB
On change view “Automatic selection”: Overview screen the relevant options are selected.
Wipro Limited.
Page 34 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.1.4 Production r resources esources and tools 3.1.4.1 General data 3.1.4.1.1
Define PRT status
Purpose of Configuration In this menu option PRT status is defined. This status controls the usage of production resources/tools.. resources/tools Depending on its status, a production resource/tool can be released for various tasks in PRT maintenance. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data PRT General data Define PRT status.
Transaction Code
NIL
On change view “Status PRT master”: Overview screen the relevant options are selected.
Wipro Limited.
Page 35 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.1.4.1.2
Define PRT group key
Purpose of Configuration With this key, production resources/tools resources/tools can be combined into groups. groups. PRT group group key can be used to set up match codes or use it for informational purposes in printing. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Basic Data PRT General data Define PRT Group key.
Transaction Code
NIL
On change view “Key for Grouping of production resources/Tools”: resources/Tools”: Overview screen the relevant options are selected.
Wipro Limited.
Page 36 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.2
Material Requirement Planning
3.3 3.3.1 Plant parameter parameters s 3.3.1.1 Carry out overall maintenance of plant parameters. Purpose of Configuration In this step all plant parameters for the material requirements planning can be specified. In addition, you receive an overview of the maintenance statuses of statuses of the individual MRP parameters on plant level. When specifying the plant parameters the following options are available.
creating the MRP parameters for a new plant
deleting the MRP parameters for a plant
maintaining individual MRP parameters
copying the MRP parameters of a plant already maintained into a new plant
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Material requirement planning Plant parameters carry out overall maintenance of plant parameters.
Transaction Code
OPPQ
On change view “Maintain plant parameters”: screen the relevant options are selected.
Wipro Limited.
Page 37 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 38 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Number ranges for planned order
Wipro Limited.
Page 39 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Number range for reservation
Number range for purchase requisitions
Number range for MRP lists
Number range for simulative dependent requirement
Checking rule for updating backorders
Wipro Limited.
Page 40 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Checking rule for reporting.
Run time statistics
Grouping periods
Wipro Limited.
Page 41 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Calculation of days’ supply
Planning horizon for plant
3.3.2 MRP gro 3.3.2 groups ups 3.3.2.1 Define MRP group for each material type
Purpose of Configuration Wipro Limited.
Page 42 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) In this step, MRP groups per material type is defined. This method of maintaining the MRP group should be used if the control parameters or the planning strategies specially refer to material types. If MRP groups have been maintained that specifically refer to material types, the appropriate MRP type is automatically proposed in the material master record (MRP 1 screen).
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Ma Mater terial ial requir requireme ement nt planni planning ng MRP MRP grou groups ps define MRP group for each material type. t ype.
Transaction Code
NIL
On change view “Default MRP group per material type”: Overview screen the relevant options are selected.
3.3.3 3.3. 3 Numb Number er ranges 3.3.3.1 Define number ranges for planning run
Purpose of Configuration Wipro Limited.
Page 43 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Number ranges and ranges and intervals for the documents created during this step in i n the planning run.. run These documents include:
planned orders for orders for operative planning planned orders for long-term planning (simulative planning)
dependent requirements and requirements and reservations
purchase requisitions
MRP lists
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Mate Material rial requirement requirement planning planning Nu Numbe mberr ranges ranges Define number ranges for planning run.
Transaction Code
OM12
On change view “Number ranges for planning run”: screen the relevant options are selected.
Wipro Limited.
Page 44 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 45 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 46 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 47 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.3.3.2 Master data 3.3.3.3 Define MRP controller
Purpose of Configuration In this step the number number that is assigned to the MRP controller controller is defined. The MRP controller is a person or a group of persons responsible for monitoring material availability. You can use the number entered here, for example, to select the planning results per MRP controller. Every material that material that is relevant to the planning run must be assigned an MRP controller number in the material master record
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Material requirement planning Master data Define MRP controllers
Transaction Code
NIL
On change view “MRP controllers”: Overview screen the relevant options are selected.
Wipro Limited.
Page 48 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.3.3.4 Define missing parts MRP controller.
Wipro Limited.
Page 49 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Purpose of Configuration In this step, MRP controllers for the processing of missing parts (backorder processing) can be specified. Here, the system also displays which MRP controller was recorded as "mail receiver" if a goods receipt was posted for a missing part.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Ma Mate teri rial al requ requir irem emen entt plan planni ning ng Master data Define Missing parts MRP controllers
Transaction Code
NIL
On change view “Missing parts MRP controller”: Overview screen the relevant options are selected.
3.3.3.5 Check MRP types
Purpose of Configuration Assign the procedure to be used to plan a material and to control which MRP parameters can be maintained for the material in the material master record. You enter the MRP type in the material master record
Below the navigation path access the SAP IMG transaction Wipro Limited.
Page 50 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Material requirement planning Mas Master ter data Check MRP types.
Transaction Code
NIL
On change view “MRP types”: Overview screen the relevant options are selected.
Wipro Limited.
Page 51 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.3.3.6 Define special procurement type
Purpose of Configuration In this step, special procurement key is defined which as well as the procurement type control the procurement and storage of a material. The special procurement type always refers to a procurement type.
Below the navigation path access the SAP IMG transaction Wipro Limited.
Page 52 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Ma Mate teri rial al requ requir irem emen entt plan planni ning ng Master data Define special procurement type.
Transaction Code
NIL
On change view “Special procurement”: Overview screen the relevant options are selected.
Wipro Limited.
Page 53 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.3.3.7 Planning
In this step necessary settings required for the planning run run and and the planned orders of orders of material requirements planning is made. 3.3.3.8 MRP Calculation
In this step settings required for the MRP calculation is made. 3.3.3.8.1
Define Planning Horizon
Purpose of Configuration In this step planning horizon is defined. This planning horizon specifies the period for the "Net change planning in the planning horizon". In this kind of net change planning, only those materials that have undergone a change that is relevant to MRP within the planning horizon are included in i n the planning run. Such materials receive a net change planning indicator in the planning file.
Wipro Limited.
Page 54 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Below the navigation path access the SAP IMG transaction SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Materia iall requirement planning planning MRP
IMG Menu
Transaction Code
Calculation OMDX
Define Planning Horizon
On change view “Planning horizon for plant. ” Details screen the relevant options are selected.
Recommendation The length of the planning horizon should include at least the following:
the period in which sales orders are orders are received
the delivery periods
the total lead times of the materials
3.3.3.8.2
Define Planning Time Fence and Roll Forward Period
Purpose of Configuration
In this step, planning time fence and the roll forward period.
Planning time fence Planning time fence can be used to define a period during which the MRP list is to be protect pro tected ed from from any automa automatic tic change changes. s. In this this period period,, no order order propos proposals als are automatical autom atically ly changed changed or created created - depending depending on the fixing type maintained maintained in the
Wipro Limited.
Page 55 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) MRP type. Thus, the MRP controller can controller can check the planned order within order within this period (dates and capacities) before the planning result effects the lower BOM levels.
Roll forward period To automatically update master before plan, you can forward set the system firmed planned orders that were the scheduled the roll period so canthat be deleted during the planning run. With this function, all planned orders, for which there are no longer any requirements, are deleted.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Materia iall requirement planning planning MRP Calculation Calcu lation Define Planning Time Fence and Roll Forward Period
Transaction Code
NIL
On change view “Planning Time fence”: Overview screen the relevant options are selected.
3.3.3.8.3
Stocks
3.3.3.8.3.1 3.3.3.8 .3.1 Define Safety Safety Stock Availability Availability
Wipro Limited.
Page 56 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Purpose of Configuration In this step, you define the percentage of the safety stock to be available for planning. This function is used to avoid a situation where order proposals are created unnecessarily by the system to cover small shortage quantities. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Materia iall requirement planning planning MRP Calculation Stocks Define Safety Stock Availability
Transaction Code
NIL
On change view “Safety stock availability”: Overview screen the relevant options are selected.
3.3.3.8.4
Define Rescheduling Check
Purpose of Configuration The rescheduling period represents the period in which the system checks whether the existing dates of the receipt elements that are no longer allowed to be changed automatically still suit the requirements situation. If the dates of these elements are no longer suitable, the system creates the following exception messages depending messages depending on the requirements situation:
Wipro Limited.
Page 57 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Materia iall requirement planning planning MRP Calculation Define Rescheduling Check
Transaction Code
OMDW
On change view “Plant Rescheduling”: Overview screen the relevant options are selected.
Wipro Limited.
Page 58 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 59 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 60 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Recommendation In joint production it is not possible to reschedule receipt elements at will, because the goods receipt depends on the planning run for another material. For this reason, it is best to use a very small rescheduling horizon. 3.3.3.8.5
Define Error Processing in the Planning Run
Purpose of Configuration In this step how the system is to proceed if errors occur during the planning run is run is specified. To do this, you specify the following: Planning run
o
Maximum number of purchase order proposals per date If you have selected a fixed or maximum lot size, size, the number of purchase order proposals created during the planning run is determined in lot sizing. If more purchase order proposals are created during the planning run than the upper up per limit limit specif specified ied here, here, the planni planning ng run run is termin terminate ated d for the materi material al in question and a termination message appears. message appears.
o
Substitute MRP controller for MRP If the system cannot determine the correct MRP controller when carrying out the planning run, it will then refer to the substitute MRP controller. If the system cannot determine an MRP controller during termination of the planning run, it will record the substitute MRP controller in the MRP document. These documents are found in the collective display of the MRP list - by selecting according to the substitute MRP controller.
Delete planning file entry If the planni planning ng run run was terminat terminated ed for a pa parti rticul cular ar materi material, al, the entry entry us usual ually ly remains in the planning file. This ensures that the material will be included in the next planning run. The MRP controller can select all terminated materials in the collective display of the MRP lists to correct the problem. In this step, you can set the system so that it deletes the planning file entry for certain termination situations and the material is excluded from the planning run if this situation, which means the error message, occurs. The material will then only be re-included in the planning run when it undergoes another change and the change is relevant to MRP, or when the MRP controller executes regenerative planning. Existing MRP lists for this material are not deleted. They can only be deleted by the MRP controller manually or by the appropriate report.
Below the navigation path access the SAP IMG transaction
Wipro Limited.
Page 61 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Materia iall requirement planning planning MRP Calculation Define Error Processing in the Planning Run
Transaction Code
OMDY
On change view “Error Handling in planning run”: Overview screen the relevant options are selected.
3.3.3.9 Lot-Size Calculation 3.3.3.9.1
Check Lot-Sizing Procedure
Purpose of Configuration You use the lot-sizing procedure to procedure to determine how the system is to calculate the reorder quantity in the planning run. run. A lot size defining size defining the lot-sizing procedure is assigned to every material master record applicable to materials planning. The lot size is defined in Customizing by the combination of the lot-sizing procedure and the lot-sizing indicator.
Wipro Limited.
Page 62 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Ma Mate teri rial al requ requir irem emen entt plan planni ning ng planning Lot-Size Calculation Check Lot-Sizing Procedure
Transaction Code
OMI4
On change view “MRP Lot Sizing procedure”: Details screen the relevant options are selected.
Wipro Limited.
Page 63 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Recommendation SAP recommends that you use the lot-sizing procedures in the standard system. 3.3.3.10 Scheduling and Capacity Paramete Parameters rs 3.3.3.10.1
Define Floats (Scheduling Margin Key)
Purpose of Configuration In this step the floats for determining the basic dates of the planned orders is specified. The floats are allocated to the material via the release period key key in in the material master record.
Below the navigation path access the SAP IMG transaction Wipro Limited.
Page 64 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Material requirement planning Planning Scheduling and Capacity Parameters Define Floats (Scheduling Margin Key)
Transaction Code
NIL
On change view “Floats for scheduling”: Overview screen the relevant options are selected.
Recommendation The opening period should reflect the processing time the MRP controller needs to convert planned orders into purchase requisitions or production orders. The opening period should be at least as long as the t he interval between two MRP intervals, so that all planned orders can be taken into account during the conversion.
3.3.3.10.2
Wipro Limited.
Parameters for Determining the Basic Dates
Page 65 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration If this indicator is set, the system will only use the backward scheduling procedure for calculating the basic dates, even if the start date ends up in the past. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Material requirement planning Planning Scheduling and Capacity Capa city Parameters Parameters Parameters for Determining the Basic Dates
Transaction Code
NIL
On change view “Order proposals in the past”: Overview screen the relevant options are selected.
3.3.3.10.3
Wipro Limited.
Define scheduling parameters for planned orders
Page 66 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration In this step the parameters for scheduling planned orders for each plant, order type and production scheduler is defined. This comprises the following settings:
scheduling levels (detailed-, production-rate and rough-cut scheduling)
date adjustment when deadlines are exceeded
scheduling control for detailed scheduling
reduction
scheduling parameters for planning scenarios for long-term planning/simulation
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Production Material requirement planning Planning Scheduling and Capa Ca pacit city y Para Parame meter terss Define Define schedu schedulin ling g parame parameter terss for planned orders
Transaction Code
OPU5
On change view “Scheduling planned orders”: Overview screen scr een the relevant options are selected.
Wipro Limited.
Page 67 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part
thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.3.3.11 Procurement Proposals
3.3.3.11.1
Define External Procurement
Purpose of Configuration In this IMG activity, you define the default values for materials that are procured externally and that are relevant to MRP. You maintain the goods receipt processing time for Purchasing as well as the purchasing group. The purchasing group that is maintained here is only taken into account in the planning run if run if no purchasing group was maintained for the material in the material master record.
Wipro Limited.
Page 68 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Cust SAP Custom omiz izin ing g Impl Implem emen enta tati tion on Guid Guidee Material rial requirement requirement planning Pla Planni nning ng Mate Proposals Define External Procurement
Transaction Code
OMDT
Production Procurement
On change view “Default values purchasing/MRP”: purchasing/MRP”: Overview screen the relevant options are selected.
Wipro Limited.
Page 69 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4
Shop floor control
Wipro Limited.
Page 70 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.1.1 Master Data 3.4.1.2 Order 3.4.1.2.1
Define Order Types
Purpose of Configuration An order type contains control information information that you need for managing orders. Every order should be assigned to an order type. The order category (= 10, production order) in this step is a fixed setting and cannot be changed. The order categories are predefined in the SAP System and characterize the technical properties of the orders. Other order categories are, for example, process order and network. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Floor Control Ma Maste sterr Data Data Order Define Order Types
Transaction Code
OPJH
On change view “Maintain production order types”: Overview screen the relevant options are selected.
Wipro Limited.
Page 71 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 72 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 73 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.1.2.2
Define order type-dependent type-dependent parameters
Purpose of Configuration In this step the parameters that are valid for each order type and plant is defined. Whether production versions are selected automatically or manually is decided. The task list application is predefined as 'P'. However, you can also specify an additional task list application. The routing selection ID defines, for example, the ranking order for routing selection. Routing selection defines whether routings are to be selected and if so, how (manually or automatically) and whether reference operation sets can also be selected. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Floor Control Ma Maste sterr Data Data Order Define Order Type dependent parameters.
Transaction Code
OPL8
On change view “Order Type dependent parameters.” Overview screen the relevant options are selected.
Wipro Limited.
Page 74 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 75 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 76 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 77 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
.
Wipro Limited.
Page 78 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.1.2.3
Define number ranges for orders
Purpose of Configuration In this menu option option number ranges for for orders are defined. Within a client, client, every order is uniquely identified by an order. Each order is assigned to a number range group via group via its order type. type. You can assign several order types to the same number range, that is to the same number interval. There are two different types of number assignment: assignment:
Internal number assignment The SAP System automatically assigns a sequential number when an order is created from the number range specified by the user.
External number assignment
Number is specified from the allotted number interval when an order is created.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Master Data Order Define number ranges for orders.
Transaction Code
CO82
On change view “Maintain Intervals”: Order screen the relevant options are selected.
Wipro Limited.
Page 79 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.1.2.4
Define number ranges for confirmations
Purpose of Configuration In this menu option the number ranges for ranges for confirmations is confirmations is defined. Every operation is uniquely identified in the production order order by by an operation number number within a client. client. Enter this number when order is confirmed. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Master Data Order Define number ranges for Confirmations.
Transaction Code
CO80
On change view “Maintain Intervals: NR-Confirmation no”: Details screen the relevant options are selected.
Wipro Limited.
Page 80 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
\
3.4.1.2.5
Define number ranges for reservations
Purpose of Configuration In this menu option number ranges for reservations is defined. All components in the production order are identified by a reservation number assigned per order, and a sequential counter. The allocation to a number range is carried out via the object type "Production order" and the object "Reservation".
Below the navigation path access the SAP IMG transaction
Wipro Limited.
Page 81 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Master Data Order Define number ranges for reservations.
Transaction Code
CO83
On change view “Maintain “Maintain Intervals: MRES/DREQ”: MRES/DREQ”: screen the relevant options options are selected.
3.4.1.2.6
Define number ranges for operations
Purpose of Configuration In this menu option the number ranges for the operations of an order is defined. All operations and sequences in the production order are identified by an order task list number (assigned per order) and a sequential counter.
Wipro Limited.
Page 82 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document,
in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Number ranges are assigned per order category (that is production order, maintenance order). Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Master Data Order Define number ranges for operations.
Transaction Code
CO81
On change view “Maintain intervals: plan number-order”: Details screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 83 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.1.3 Define production scheduling profile
Purpose of Configuration In a production scheduling profile the following functions can be carried out.
Specify that certain business transactions or processes are to be carried out in parallel in a production or process order
o
Order release at the time the order is opened
o
Generation of document link from the material master when the order is opened
o
Generation of document link from a BOM when the order is opened
o
Printing at the time of order release
o
Scheduling upon order release
o
Generation of document link from the material master upon order release
o
Generation of document link from a BOM upon order release
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Maste terr Data Data Define Define productio production n scheduling profile.
Transaction Code
OPKP
On change view “Production scheduling profile”: Overview screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 84 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 85 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 86 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2 Oper 3.4.2 Operatio ations ns 3.4.2.1 Task List Selection 3.4.2.1.1
Select Automatically
Purpose of Configuration In thisthe menu optionID. the selection criteria for the automatic planned selection of alternatives using selection Several selection priorities for every selection ID can be defined. Selection criteria to these priorities in each case should be allocated. An alternative routing is searched for during the automatic planned selection of alternatives that corresponds to the selection criteria. Selection criteria are, for example:
Routing type
Task list usage
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 87 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Routing status
Below the navigation path access the SAP IMG transaction SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide
IMG Menu
Shop Shop Fl Floo oorr Cont Contro roll Select Automatically Transaction Code
Opera Op eratio tions ns
Produ Pro duct ctio ion n
Task Task List List Selectio Selection n
OPJF
On change view “Automatic selection”: Overview screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.4.2.1.2
Define Default Values
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 88 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Purpose of Configuration In this step, data is contained in an operation that is automatically created during order creation is specified. Within order creation, you can determine that an operation is created automatically if no routing exists for the material to be produced or no routing can be selected. The automatically created operation should contain the following data, for example:
control key The control key specifies how an operation is processed (for example, whether it is scheduled, costed, etc.)
operation number
operation short text
material group (only for external processing) work center where the operation is carried out
Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Op Opera eratio tions ns Task Task List List Selectio Selection n Define Default Values
OPJG
On change view “Default values for generation of operations”: Overview screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 89 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 90 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.2.2 Bill of Material Selection
In this section, you specify the process used to automatically select an alternative BOM during order creation. A material can have several bills of material with varying BOM usages. In the case of a multiple BOM, a bill of material of a particular BOM usage may have several alternatives. 3.4.2.2.1
Define Priorities for BOM Usages
Purpose of Configuration In this menu option different sequences of priorities of BOM usages can be specified. Every process relating to automatic alternative determination is represented via an application. Among other things, a selection ID is calculated via this application. The selection ID conceals a certain sequence of priorities of BOM usages. Note
When specifying the selection ID, you must know the required applications.
If you use only one BOM usage, you must define a selection ID with priority 1.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Operations Bill of material Selection Define Priorities for BOM Usages
Transaction Code
OPJI
On change view “Order of priority for BOM usages”: Overview screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 91 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.4.2.2.2
Define Applications
Purpose of Configuration In this menu option the processes relating to automatic alternative determination is determination is defined. Every process is represented via an application. This application is needed in order to explode a BOM during order creation. The alternative determination is controlled both by the application and the settings in the material master. In the material master, you can specify in the field "Alternative selection" whether you want an alternative to be selected according to one of the following parameters:
order quantity
date
production version
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 92 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Operations Bill of material Selection Define Applications
Transaction Code
OPJM
On change view “Application-Specific Criteria for Alternative Determination”: Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 93 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made.
3.4.2.3 Availability Check
In this section, you make the settings which are important for checking the availability of material components in a production order. To carry out a material availability check checking group and a checking rule is needed. Allocate the checking group to the individual material in the material master. Specify the checking rule for each application. Together, the checking group and checking rule determine the scope of the check
3.4.2.3.1
Define Checking Group
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 94 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Purpose of Configuration In this step checking groups are defined. Allocate each material which should be checked for availability availabilit y to a checking group. You can allocate the material in the material master. The checking group groups together materials checked according to the same criteria. Materials can be grouped according to material type and/or MRP type, for example. Checking group can also be used to control whether
the quantities confirmed in the availability check are to be locked During the check the normal ATP quantity or the cumulated ATP quantity is to be used.
Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Op Opera eratio tions ns Availabili Availability ty Che Check ck Define Checking Group
OVZ2
On change view “Availability check control”: Overview Screen the relevant options are selected.
Standard SAP settings Maintained as Recommended by SAP. No changes made.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 95 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.2.3.2
Define Checking Rule
Purpose of Configuration In this step checking rules for the following applications are defined:
Sales and distribution
MRP
Production order processing
Maintenance order processing
Service processing
Inventory management
Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Op Opera eratio tions ns Availabili Availability ty Che Check ck Define Checking Rule.
NIL
On change view “Checking rule”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 96 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made
3.4.2.3.3
Define Scope of Check
Purpose of Configuration
In this menu option the check scope can be defined. Checking group and checking rule together specify the scope of the check. You can specify the following:
which elements relevant to MRP (inward goods movements/outward goods movements) are taken into account (for example, purchase requisition, purchase order, planned order)
which stock categories are taken into account
whether replenishment lead time is checked
Below the navigation path access the SAP IMG transaction Wipro Limited. © Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited.
Page 97 of 124
You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
IMG Menu
Transaction Code
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Op Opera eratio tions ns Availabili Availability ty Che Check ck Define Scope of check.
OPJJ
On change view “Availability check control”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 98 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2.3.4
Define Checking Control
Purpose of Configuration
In this activity the checking control is defined. The checking rule together with the checking group specifies the scope of the check. You can make the checking rule as well as the actual check itself dependent on the following parameters:
plant
order type
operation
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 99 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) The operation can have the following characteristics: o
order created
o
release(d) order
Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Op Opera eratio tions ns Availabili Availability ty Che Check ck Define checking rule
OPJK
On change view “Order control”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 100 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2.3.5
Define Checking Rule for Backorder Processing
Purpose of Configuration
In this menu option the checking rule per plant for backorder handling can be determined. The checking rule determines the scope of check for backorder handling.
Below the navigation path access the SAP IMG transaction
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 101 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Op Opera eratio tions ns Availabili Availability ty Che Check ck Define checking rule for Backorder processing.
IMG Menu
Transaction Code
NIL
On change view “Checking rule for updating Backorders”: Overview Screen the relevant options are selected.
Recommendation Use the same checking rule for backorder handling as done for availability checks. 3.4.2.4 Scheduling 3.4.2.4.1
Define Scheduling Scheduling Parameters for Production Orders Orders
Purpose of Configuration In this step for each plant, order type and production scheduler the parameters for scheduling production orders is defined. This comprises maintaining
scheduling levels (detailed, production-rate and rough-cut scheduling)
date adjustment when dates are exceeded
date control for detailed scheduling
reduction
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 102 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Ope Operat ration ionss Sche Schedul duling ing Define scheduling parameters for production orders.
Transaction Code
OPU3
On change view “Specify scheduling parameters”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 103 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 104 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.2.4.2
Specify Scheduling Type
Purpose of Configuration
In this step scheduling type is defined, which determines how the SAP System should carry out scheduling. There are the following options:
Forwards
Backwards
No scheduling
"Today" scheduling
Basic dates with times (only for process orders)
Scheduling type can be saved in the control data for scheduling depending on the order type. It is then proposed by the SAP system when an order is created.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Opera Operatio tions ns Sched Scheduli uling ng Specify Scheduling Type
Transaction Code
OPJN
On change view “Scheduling Types”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 105 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made Recommendation Scheduling types are predefined in the SAP standard package. It is recommend to work with these predefined scheduling types.
3.4.2.4.3
Define Time Units
Purpose of Configuration In this step the time units (for example, second, minute, decade, etc.) required for scheduling are defined. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Operations Scheduling Define time units
Transaction Code
OPJO
On change view “Units of measurement”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 106 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 107 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.2.4.4
Define Formula Parameters Parameters
Purpose of Configuration In this step parameters required is defined.
maintain standard value keys define formulas (for example, for scheduling, costing or calculating standard values with CAPP)
Parameters are identified by parameter IDs.
Below the navigation path access the SAP IMG transaction IMG Menu
Transaction Code
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Oper Operati ations ons Schedu Schedulin ling g Define Formula parameters OP7B
On change view “Parameters”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 108 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2.4.5
Define Formulas
Purpose of Configuration Formula defined in menu options are defined in the following areas
Capacity planning
Scheduling
Costing
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Shop Shop Fl Floo oor r Cont Contro roll Formula parameters
Transaction Code
Oper Operati ations ons
Produ Pro duct ctio ion n
Schedu Schedulin ling g
Define
OPK3
On change view “Formula definition”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 109 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 110 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2.4.6
Define Standard Value Keys Keys
Purpose of Configuration In this menu option standard value keys are maintained. The standard value key determines the meaning of the standard values. It is used to assign parameter IDs to the six standard values of operations and the work in network activities. These parameter keys determine the following:
the key word displayed for the standard value on the screen, for example, setup, machine, labor, tear down the dimension (for example, time, quantity, volume) of the standard value
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Oper Operati ations ons Schedu Schedulin ling g Define standard value key.
Transaction Code
OPJQ
On change view “Standard value key formula”: Overview Screen the relevant options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 111 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2.4.7
Define Key Key for Performance Performance Efficiency Efficiency Rate Rate
Purpose of Configuration In this menu option performance efficiency rate is created. Performance efficiency rate is used to define the relationship between the actual work done by an employee and the fictional, average work done. Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 112 of 124
This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Efficiency rate is taken into account in scheduling, capacity planning and costing. Efficiency rate is used to correct standard values in values in the operation according to the work which you actually expect to be done. You can use the efficiency rate key to
combine the same values for the efficiency at several work centers
maintain various values for the efficiency rate depending on the date
If necessary, maintain different efficiency rates for scheduling and for costing.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Floor Control Operations Scheduling Define Key for performance efficiency rate.
Transaction Code
OPJY
On chang changee view view “Key “Key for perfor performan mance ce effici efficienc ency y rate.” rate.” Overvi Overview ew Screen Screen the releva relevant nt options are selected.
Wipro Limited. © Wipro Limited, 2012, All Rights Reserved.
Page 113 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made
3.4.2.4.8
Define Scheduling Margin Margin Key Key
Purpose of Configuration In this menu option time floats for order scheduling as scheduling as well as the release period for order release are specified. The following floats are defined:
float before production This is the time between the order start date and the scheduled start date.
float after production This is the time between the order finish date and the scheduled finish date.
The release date is calculated by adding the release period. The order release is carried out on this date. Via the release period key you can specify the following for each material:
Wipro Limited.
Page 114 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
float before production
float after production
release period
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Oper Operati ations ons Schedu Schedulin ling g Define Scheduling Margin Key
Transaction Code
NIL
On change change view view “Margi “Margins ns for schedu schedulin ling.” g.” Overvi Overview ew Screen Screen the releva relevant nt optio options ns are selected.
Wipro Limited.
Page 115 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.2.4.9
Define Move Time Matrix
Purpose of Configuration
In this location group and the move time matrix defined. In the group move time matrix you canmenu maintain the planned values for the move timeare within a location as well as between two location groups. For each entry minimum and a normal move time can be maintained. In the case of a reduction scheduling reduction scheduling is carried out with the minimum move ttime. ime. Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Oper Operati ations ons Schedu Schedulin ling g Define Move Time Matrix
Transaction Code
OPJR
On change view “Location groups.” Overview Screen the relevant options are selected.
On change view “Transport time matrix.” Overview Screen the relevant options are selected.
Wipro Limited.
Page 116 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 117 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) 3.4.2.4.10
Define Reduction Strategies
Purpose of Configuration In this step reduction strategy is specified to be used when the reduction measures are carriedare outnot onadhered operations. Scheduling reduces Scheduling thedates lead-time automatically lead-time automatically the basic dates given to, that is if the reduces scheduled lie outside the basic if dates. In this work step, you also define the reduction levels. The reduction takes place level by level no further than the level that you have specified in the control parameters. Reduction strategy in every operation can be specified.
Reduction strategies You use the reduction strategies to determine how the operation lead time can be reduced step by step. You can enter a reduction strategy in every operation.
Reduction levels You can define up to six reduction levels for each reduction strategy. For every reduction level you can enter what is to be reduced and by how much.
The SAP system carried out reduction step by step no further than the reduction level specified in the scheduling parameters.
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Shop Fl Floo oorr Cont Contro roll Oper Operati ations ons Schedu Schedulin ling g Define Reduction Strategies
Transaction Code
OPJS
On change view “Reduction strategy.” Overview Screen the relevant options are selected.
Wipro Limited.
Page 118 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
On change view “Reduction Levels.” Overview Screen the relevant options are selected.
3.4.2.5 Confirmation
3.4.2.5.1
Define Confirmation Paramete Parameters rs
Purpose of Configuration In this step the confirmation parameters for each plant and order type is defined.
Wipro Limited.
Page 119 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning) Below the navigation path access the SAP IMG transaction IMG Menu
SAP Custo Customiz mizing ing Implem Implement entati ation on Guide Guide Pro Produ duct ctio ion n Shop Sho p Floor Floor Contro Controll Operati Operations ons Confirma Confirmation tion Define confirmation parameters.
Transaction Code
OPK4
On change view “Parameters for order confirmation.” Overview Screen the relevant options are selected.
Wipro Limited.
Page 120 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 121 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Wipro Limited.
Page 122 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
3.4.2.5.2
Confirmation Parameters for Collective Confirmation/Fast Entry
Purpose of Configuration In this work each confirmation type and type and category is category is defined. The following can be proposed in collective confirmation.
how quantities are to be proposed
how activities are to be proposed
whether confirmations are identified by the order number or the confirmation number
Below the navigation path access the SAP IMG transaction IMG Menu
SAP Customizing Implementation Guide Production Shop Floorr Control Floo Control Operation Operationss Confirmatio Confirmation n Confirmation Parameters for Collective Confirmation/Fast Confirmation/Fast Entry
Transaction Code
OPKI
On change view “Confirmation as collective transaction.” Overview Screen the relevant options are selected.
Wipro Limited.
Page 123 of 124
© Wipro Limited, 2012, All Rights Reserved. This document is proprietary to Wipro InfoTech, a division of Wipro Limited. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute any material from this document, in any form or by any means, nor may you modify or create derivative derivative works based on the text of any file, or any part thereof for public, private or commercial use, without prior written permission from Wipro Limited.
Project Configuration Document (Production Planning)
Standard SAP settings Maintained as Recommended by SAP. No changes made
4 SAP SAP NO NOTES TES AND PAT PATCHES CHES Not Applicable
Wipro Limited.
Page 124 of 124