PMT

SAUDI ARABIAN OIL COMPANY

SS

SS

SM

SM

INTRODUCTION



1.1 

Purpose



1.2 

Facilities Overview



2. 

INSTRUMENT NAMEPLATES



2.1 

Documentation



2.2 

Field Mounted Instruments



2.3 

Panel Mounted Instruments



2.4 

Nameplate Details



APPENDIX A - NAMEPLATE TYPES



APPENDIX B - APPLICABLE DOCUMENTS



B

C

16/12/13

1. 

31/01/14

10-01506-0001 ISSUED FOR CLIENT E-RREVIEW

10-01506-0001 ISSUED FOR PROJECT PROPOSAL

SS SM A

REV. NO.

DATE

21/11/13

JO/EWO

DESCRIPTION

10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW

ENG’G CERT

TABLE OF CONTENTS

DISCIPLINE ENGINEER ________________ DATE ___________ PROJECT ENGINEER ________________ DATE ___________ CERTIFIED ________________ DATE ___________

CONSTRUCTION AGENCY ________________ DATE ___________ OPERATIONS

________

CONTROL NUMBER

DATE _____________ (DCC)NO. _______________________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION CERTIFICATE

THIS INDICATES THAT REV. NO. ____________

BY: ______________

DATE ___________

PROJECT SPECIFICATION INSTRUMENT NAMEPLATE SPECIFICATION

DWG.TYPE

PP-965029_Rev C Instrument Nameplate Specification

INDEX

DRAWING NO.

B37

J

PP-965029

SHT. NO.

REV. NO.

2 OF 6

C

DOC

KHURAIS AL CRUDE INCREMENT - 300 MBCD KHURAIS

PLANT .NO

SAUDI ARABIA

JO / EWO: 10-01506 - 0001

DOC CLASS

DSN:3283

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPRNS

Saudi Aramco 2616-ENG (10/2002)

SS

1.

INTRODUCTION

1.1

Purpose The purpose of this Specification together with Project documents is to describe the technical requirements for Instrument Nameplates for the Khurais AL Crude Increment Project.

SM

SS SM

SM

SS

ENG’G CERT

PMT

SAUDI ARABIAN OIL COMPANY

Facilities Overview The purpose of the facilities is to increase the Arab Light (AL) crude oil production capacity of Khurais field from 1,200 MBCD to 1,500 MBCD. The Khurais Central Producing Facilities (KhCPF) will be expanded to process additional 300 MBCD of dry AL crude.

10-01506-0001 ISSUED FOR PROJECT PROPOSAL 31/01/14 C

10-01506-0001 ISSUED FOR CLIENT E-RREVIEW 16/12/13 B

JO/EWO DATE

21/11/13

REV. NO.

A

DESCRIPTION

10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW

1.2

The project will design and install a fifth Crude Train at KhCPF to produce the additional AL crude oil. The additional gas from the new oil train will require installation of a third Gas Train with molecular sieve dehydrators. Additionally, the scope will include installation of combined cycle 140 MW Cogeneration facilities, expansion of existing Seawater Injection Facilities with two additional seawater pumps. Off plot scope includes installation of 48”, 145 km Seawater supply line from Ain Dar to KhCPF along with Ain Dar pumping station additional Booster pump expansion. Also, Shedgum Gas Plant Slug Catcher modification will be required to accommodate the full flow of Khurais Sour Gas along with the Uthmaniyah Gas Plant Swing Flow. Additionally, two new residential buildings will be required along with all plant major electric and non-electric utility systems and security infrastructure expansion required to support operation of the proposed facilities at KhCPF and the residential area.

DISCIPLINE ENGINEER ________________

In addition to the 300 MBCD train in KhCPF, a Satellite Gas and Oil Plant (GOSP) is required to be situated between Abu Jifan and Mazalij fields.

DATE ___________ PROJECT ENGINEER ________________ DATE ___________

2.

INSTRUMENT NAMEPLATES

2.1

Documentation

CERTIFIED

Where nameplates are required for Instrument identification a Nameplate List shall be produced as per SA-2504 “List of Nameplates for Local Mounted Instruments”. The nameplate List shall detail the text required to be engraved for each nameplate.

________________ DATE ___________

CONSTRUCTION AGENCY ________________

Separate drawings shall be prepared in accordance with Library Drawing DD-950025 to cover nameplates required for instruments as follows:

DATE ___________ OPERATIONS

________

CONTROL NUMBER

DATE _____________ (DCC)NO. _______________________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION CERTIFICATE

THIS INDICATES THAT REV. NO. ____________

BY: ______________

DATE ___________



Control room panel mounted instruments;



Rack mounted instruments;



Local panel mounted instruments;



Local mounted instruments;



Annunciator.

PROJECT SPECIFICATION INSTRUMENT NAMEPLATE SPECIFICATION

DWG.TYPE

PP-965029_Rev C Instrument Nameplate Specification

INDEX

DRAWING NO.

B37

J

PP-965029

SHT. NO.

REV. NO.

3 OF 6

C

DOC

KHURAIS AL CRUDE INCREMENT - 300 MBCD KHURAIS

PLANT .NO

SAUDI ARABIA

JO / EWO: 10-01506 - 0001

DOC CLASS

DSN:3283

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPRNS

Saudi Aramco 2616-ENG (10/2002)

PMT

SAUDI ARABIAN OIL COMPANY

SS

SS

SS

SM

SM

SM

ENG’G CERT

2.2

Field Mounted Instruments Every item of field instrumentation for which a tag number is allocated shall be provided with an engraved nameplate. This nameplate will be in addition to any manufacturer's wired-on tags or maker's nameplates as per project specification PP-965018 “Instrument Installation”.

10-01506-0001 ISSUED FOR PROJECT PROPOSAL

Nameplates for individual instruments shall be installed adjacent to the instrument such that if the instrument is removed for maintenance its original location can be easily identified to assist in reinstallation. 2.3

Panel Mounted Instruments As per SAES-J-005 Instruments mounted in Control Room Console, Panel, Rack or Local Panel - Panel mounted instruments shall be provided with two nameplates, one on the front and one on the back; rack mounted instruments shall have front mounted nameplates only. The front nameplate shall show service description and tag (mark) number including plant and instrument number. In case of multipoint instruments, this information shall be shown for each point.

2.4

Nameplate Details Nameplate ‘details’ can be seen in Library Drawing DD-950025 “Nameplate Details for Instrument Boards”.

31/01/14

10-01506-0001 ISSUED FOR CLIENT E-RREVIEW

Details 031A and 031B shall be fabricated from 1/8” thick BakeliteLaminated black core with white surface-dull finish.

C

16/12/13 B

A

REV. NO.

DATE

21/11/13

JO/EWO

DESCRIPTION

10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW

Nameplates shall be attached to RTD/thermocouple head chain and show tag (mark) number only.

DISCIPLINE ENGINEER

The dimensions of 031A shall be 1 7/16” x 3” and lettering shall be 3/16” high with a maximum of 21 characters on the top and bottom lines and 18 on the middle line.

________________ DATE ___________ PROJECT ENGINEER

See Nameplate 031A in Appendix A

________________

The dimensions of 031B shall be 3 1/4” x 5” and the lettering shall be 1/4” with a maximum of 23 characters per line or 1/8” high with a maximum of 38 characters per line.

DATE ___________ CERTIFIED ________________ DATE ___________

See Nameplate 031B in Appendix A Nameplates shall be fixed using stainless steel screws.

CONSTRUCTION AGENCY ________________ DATE ___________ OPERATIONS

________

CONTROL NUMBER

DATE _____________ (DCC)NO. _______________________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION CERTIFICATE

THIS INDICATES THAT REV. NO. ____________

BY: ______________

DATE ___________

PROJECT SPECIFICATION INSTRUMENT NAMEPLATE SPECIFICATION

DWG.TYPE

PP-965029_Rev C Instrument Nameplate Specification

INDEX

DRAWING NO.

B37

J

PP-965029

SHT. NO.

REV. NO.

4 OF 6

C

DOC

KHURAIS AL CRUDE INCREMENT - 300 MBCD KHURAIS

PLANT .NO

SAUDI ARABIA

JO / EWO: 10-01506 - 0001

DOC CLASS

DSN:3283

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPRNS

Saudi Aramco 2616-ENG (10/2002)

REVISION CERTIFICATE

(DCC)NO. _______________________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

THIS INDICATES THAT REV. NO. ____________

16/12/13 31/01/14

B C

DATE 21/11/13

A

REV. NO.

SM SM

10-01506-0001 ISSUED FOR PROJECT PROPOSAL

SS

SS

SS

ENG’G CERT

10-01506-0001 ISSUED FOR CLIENT E-RREVIEW

DESCRIPTION SM

JO/EWO 10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW

PMT

OPRNS

SAUDI ARABIAN OIL COMPANY

APPENDIX A - NAMEPLATE TYPES

Nameplate 031A

Nameplate 031B

DISCIPLINE ENGINEER

DATE ___________ ________________

PROJECT ENGINEER

DATE ___________ ________________

________________ CERTIFIED

DATE ___________

CONSTRUCTION AGENCY

DATE ___________ ________________

OPERATIONS

List of Materials

DATE ___________

________

PROJECT SPECIFICATION

INSTRUMENT NAMEPLATE SPECIFICATION

KHURAIS

PP-965029_Rev C Instrument Nameplate Specification

DWG.TYPE

DOC

KHURAIS AL CRUDE INCREMENT - 300 MBCD

SAUDI ARABIA

PLANT .NO

INDEX

DRAWING NO.

B37

J

PP-965029

JO / EWO: 10-01506 - 0001

SHT. NO.

REV. NO.

5 OF 6

C

DOC CLASS

DSN:3283

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DATE _____________

BY: ______________

CONTROL NUMBER

EDSD VERIFICATION

Saudi Aramco 2616-ENG (10/2002)

PMT

SAUDI ARABIAN OIL COMPANY

SS

SS

SS

SM

SM

SM

ENG’G CERT

APPENDIX B - APPLICABLE DOCUMENTS PROJECT STANDARDS Number

Description

PP-965018

Instrument Installation Specification

10-01506-0001 ISSUED FOR PROJECT PROPOSAL

Number

Description

SAES-J-005

Instrumentation Drawings and Forms

SAUDI ARAMCO LIBRARY DRAWINGS Number

Description

DD-950025.001/002

Nameplates Details for Instrument Boards

C

31/01/14

10-01506-0001 ISSUED FOR CLIENT E-RREVIEW 16/12/13 B

A

REV. NO.

DATE

21/11/13

JO/EWO

DESCRIPTION

10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW

SAUDI ARAMCO ENGINEERING STANDARDS

DISCIPLINE ENGINEER ________________ DATE ___________ PROJECT ENGINEER ________________ DATE ___________ CERTIFIED ________________ DATE ___________

CONSTRUCTION AGENCY ________________ DATE ___________ OPERATIONS

________

CONTROL NUMBER

DATE _____________ (DCC)NO. _______________________________

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD VERIFICATION

REVISION CERTIFICATE

THIS INDICATES THAT REV. NO. ____________

BY: ______________

DATE ___________

PROJECT SPECIFICATION INSTRUMENT NAMEPLATE SPECIFICATION

DWG.TYPE

PP-965029_Rev C Instrument Nameplate Specification

INDEX

DRAWING NO.

B37

J

PP-965029

SHT. NO.

REV. NO.

6 OF 6

C

DOC

KHURAIS AL CRUDE INCREMENT - 300 MBCD KHURAIS

PLANT .NO

SAUDI ARABIA

JO / EWO: 10-01506 - 0001

DOC CLASS

DSN:3283

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

OPRNS

Saudi Aramco 2616-ENG (10/2002)