C.B.R 6 -7% (borrow soil to replace in-situ soil of C.B.R 3%)
200 mm
168350
Construction of Shoulders
Sub-Grade Waterproofing
10
Sub-grade
C.B.R 6 -7% (borrow soil to replace in-situ soil of C.B.R 3%)
100 mm
233100
Sub-grade
13
Waterproofing of Well prepared ground supporting subgrade
Waterproofing of shoulders & sides
15
Total
Notes: 1 2 3 4
425 mm
3190238
PRED SoR Dharwad Division Zone-1 is refered for item rates. Road width considered 9 meters. Carraige width considered 3.75 meters. Stabilized base & shoulder considered from Drain to Drain.
E FOR CONSTRUCTING RURAL ROAD Soil CBR
3%
Length
1 Km
Package
KN-05-72
Technology Provider
Zydex Industries
Contractor
Mr. Hari Babu
Zydex Proposed Design
Zydex material component
Spec
Thickness/ Dosage
Cost
Cost (Rupees) 0
Product
0
Quantity (Kgs) 0
NA
0
Zycotherm modified SDBC with 5% Bitumen content
25 mm
838125
10
14420
ZT
N.A
0
0
0
0
NIL
1 Kg Terraprime + 200 ltr water + 100 Kg CSS1
1 Kg/sqm
114167
13
16667
TP
1 Kg Terraprime diluted in 500 ltr water
2 ltr/sqm
20000
16
20000
TP
NA
0
0
0
0
NIL
NIL
N.A
0
0
0
0
NIL
N.A
0
0
0
0
NIL
1 Kg Terrasil + 0.5 kg Zycobond diluted in 600 ltr water (spray application on semi compacted layer)
5 ltr/sqm
69375
75
60000
TS
38
9375
ZB
Stones grafting in stabilize soil (nominal size of 13.2 mm)
0.05 cum/sqm
162000
0
0
0.5 Kg Terrasil/CUM + 0.25 Kg of Zycobond/CUM to stabilize of in-situ soil (CBR >3%)
200 mm
900900
900
720000
TS
450
112500
ZB
NA
0
0
0
0
1 Kg Terrasil diluted in 300 ltr water
3 ltr/sqm
72000
90
72000
C.B.R 6 -7% (borrow soil to replace in-situ soil of C.B.R 3%)
150 mm
349650
0
0
TS
1 Kg Terrasil diluted in 300 ltr water
1 Kg Terrasil + 0.5 kg Zycobond diluted in 600 ltr water