4.1 Develop Project Charter

4.2 Develop Project Management Plan

4.3 Direct and Manage Project Work

4.4 Manage Project Knowledge

4.5 Monitor and Control Project Work

4.6 Perform Integrated Change Control

4.7 Close Project or Phase

Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Guide)  – Fifth Edition, Project Management Institute, Inc., 2013, Figure 4-12, Page 100.

5.2 Collect Requirements

Project Management Institute, A Guide to the Project Management Bo dy of Knowledge, PMBOK(® Guide) – Guide)  – Fifth Edition, Project Management Institute, Inc., 2013, Figure 5-4, Page 111.

5.3 Define Scope

5.4 Create WBS

5.5 Validate Scope

5.6 Control Scope

6.1 Plan Schedule Management

7.1 Plan Cost Management

7.4 Control Costs

Interpretation of EVM

Schedule

Performance Measures SV>0 & SVI>1.0

CV >0 & CPI > 1.0

Cost

CV = 0 & CPI = 1.0

CV < 0 & CPI < 1.0

Ahead Of Schedule Under Budget Ahead Of Schedule On Budget

Ahead Of Schedule Over Budget

SV=0 & SVI=1.0

On Schedule Under Budget

On Schedule On Budget On Schedule Over Budget

SV