Piston service letter.pdf

January 28, 2018 | Author: Pranab | Category: Piston, Nut (Hardware), Screw, Vehicle Parts, Manufactured Goods
Share Embed Donate


Short Description

Download Piston service letter.pdf...

Description

Engine & Machinery Division 1000, Bangeojinsunhwan-doro Dong-gu, Ulsan, Korea 682-792

Tel No. +82 52 202 7313 24/7 Hot line +1 212 845 9803 Fax No +82 52 202 7581 E-mail: [email protected]

Service Letter Date : March 11, 2014 Ref. No. : HHI-HSM-SL-14-004 Design history of Piston for H21/32(P) and H25/33(P) Dear Sirs, We have improved the Piston design continuously to ensure the tightening condition between Piston crown and skirt. There are 5 kinds of different Piston design for H21/32(P) and 4 kinds of design for H25/33(P). So, please refer to attached Technical circular and to be kept the right instruction book at a conspicuous place onboard so that the Pistons can be overhauled properly. We hope that above is of service to you. Faithfully yours,

Y. J. Hu, General Manager Engine & Machinery Customer Service Dep’t Engine & Machinery Division Tel. : + 82 52 202 7313 Fax : + 82 52 202 7581 24/7 Hot line : + 1 212 845 9803 E-mail: [email protected] Hi-Service : http://cs.hyundai-engine.com 1/1

Attachment: 1. Technical circular (DESIGN HISTORY OF PISTON) [The end]

2/1

TECHNICAL CIRCULAR

SUBJECT: DESIGN HISTORY OF PISTON

TYPE: H21/32(P), H25/33(P)

Ref. No.: TEC2014/K2D0 - 001 Date: 28th Jan. 2014

Page 1 of 6

TECHNICAL CIRCULAR

Ref. No.: TEC2014/K2D0 - 001

[ BACKGROUND ] Piston for HiMSEN engine has been improved continuously to ensure the tightening connection between piston crown and skirt. This technical circular shows the design history of piston complete for HiMSEN H21/32(P) and H25/33(P) to help customers’ easier understanding.

[ HISTORY OF MANUAL ] 1. H21/32(P) Connection

Manual (Latest)

Tightening Torque Remark

Type

Washer

Drawing & Part List

Maintenance Procedure

Pre-tightening (Loosen)

Tightening

Test Torque

1 Bolt

Thrust piece

A31100-1B

M31100-1B

130 Nm

45 Nm - 60°

130 Nm

4 Stud

Pressure Washer

A31100-2C

M31100-2E

40 Nm

20 Nm - 60°

45 Nm

Pressure Washer

A31100-3A

M31100-3B

60 Nm

20 Nm - 60°

70 Nm

Nordlock Washer

A31100-4B

M31100-4C

60 Nm

40 Nm - 60°

100 Nm

Nordlock Washer

A31100-5A

M31100-5A

30 / 60 Nm

25 Nm - 90°

100 Nm

Standard for new project (Stationary)

2 Stud

2 Bolt

Standard for new project (Marine Genset & Propulsion)

Figure 1. Shape of Piston Type(H21/32) – 1 Bolt / 4 Stud / 2 Stud / 2 Bolt Page 2 of 6 ENGINE & MACHINERY DIVISION Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: [email protected]

TECHNICAL CIRCULAR

Ref. No.: TEC2014/K2D0 - 001

2. H25/33(P) Connection

Manual

Tightening Torque Remark

Type

Washer

Drawing & Part List

Maintenance Procedure

Pre-tightening (Loosen)

Tightening

Test Torque

4 Bolt

Thrust piece

C31100-1B

M31100-1C

90 Nm

30 Nm - 60°

90 Nm

Pressure Washer

C31100-2A

M31100-2B

30 / 70 Nm

30 Nm - 60°

90 Nm

Nordlock Washer

C31100-3A

M31100-3B

30 / 70 Nm

30/70Nm 60°

150 Nm

Nordlock Washer

C31100-4A

M31100-4A

30 / 60 Nm

50 Nm - 90°

160 Nm

Standard for new project (Stationary & Propulsion)

2 Stud

2 Bolt

Standard for new project (Marine Genset)

Figure 2. Shape of Piston Type(H25/33) – 4 Bolt / 2 Stud / 2 Bolt

[ CONSIDERATION OF COMPATIBILITY ] As the shapes of piston bowls of all piston types are same, there is nothing changed except for slightly different piston mass in the engine-generator system. (Maximum deviation of mass is 3.9% for H21/32 case with 4 Stud type and 2 Bolt type.)

Page 3 of 6 ENGINE & MACHINERY DIVISION Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: [email protected]

TECHNICAL CIRCULAR

Ref. No.: TEC2014/K2D0 - 001

According to the analysis shown on Table.1 and Fig.2 for the effect of a piston weight unbalance on the dynamic stability of the engine-generator system in terms of natural frequencies, engine dynamic load and engine vibration, the variations were very small and could be neglected. Table 1. Summary of Variation Analysis – 7H21/32

Figure 2. Analysis Result of Effect of Piston Weight Unbalance

Page 4 of 6 ENGINE & MACHINERY DIVISION Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: [email protected]

TECHNICAL CIRCULAR

Ref. No.: TEC2014/K2D0 - 001

Figure 2 (continued). Analysis Result of Effect of Piston Weight Unbalance

Therefore, engine operation with combination of other types of piston completes will not cause any problem and is allowed for 7H21/32.

Page 5 of 6 ENGINE & MACHINERY DIVISION Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: [email protected]

TECHNICAL CIRCULAR

Ref. No.: TEC2014/K2D0 - 001

In case of other engine types such as 5H, 6H, 8H, 9H21/32 and all H25/33 are also acceptable to use different types of piston completes in same engine according to this analysis result because it was performed at 7H21/32 with 4 Stud and 2 Bolt piston types which is worst case of unbalance condition on the dynamic stability, so it can cover other cases of mass deviation.

Attachment: 1. Manual sheets for H21/32 1) 1 Bolt : A31100-1B / M31100-1B 2) 4 Stud : A31100-2C / M31100-2E 3) 2 Stud (Pressure Washer) : A31100-3A / M31100-3B 4) 2 Stud (Nordlock Washer) : A31100-4B / M31100-4C 5) 2 Bolt : A31100-5A / M31100-5A

2. Manual sheets for H25/33 1) 4 Bolt : C31100-1B / M31100-1C 2) 2 Stud (Pressure Washer) : C31100-2A / M31100-2B 3) 2 Stud (Nordlock Washer) : C31100-3A / M31100-3B 4) 2 Bolt : C31100-4A / M31100-4A

[The end]

Yours sincerely,

___________________________ Y. S. Ryoo / General Manager HiMSEN Medium Bore D&D Dep’t

Page 6 of 6 ENGINE & MACHINERY DIVISION Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: [email protected]

Page

H21/32 Piston Assembly

Assembly Drawing & Part List

㋒›⼺ ⍊Ở᮪ᝂ

☆ᝓᅚ ᦥ ᬖ㈞ ᠿᗳ

1/1

Section No.

Rev.

A31100

1B

G 111

114

151 152 153

113 112 110 120

130

A32000

Part List Item No.

Description

Q’ty / Cyl.

Weight (kg)

Remarks / See Note

110

Piston complete

1

24.66

Item no. 111~114

111

Piston crown

1

6.33

112

Piston skirt

1

18.0

113

Thrust piece

1

114

Bolt

1

120

Piston pin complete

1

9.5

130

Retaining ring

2

0.04

151

Compression ring – top

1

0.21

୔ GOE CK36 TOP GROOVE 1

152

Compression ring – 2nd

1

0.18

୔ GOE TOP GROOVE 2

153

Oil scraper ring

1

0.11

୔ GOE GROOVE 3

୔ Marking on piston rings G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.08/HSYG

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

Section No.

Page

1/4 Rev.

M31100

1B

G #

#

㋒›⼺# ㋖# ᦥ# ᝗⓮# ᬚ㌊#

Dismantling a Piston Pin and Piston Rings

41

1.

51

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ⍪❚# ᮪ᗳ⍦Ẳ# ᬚ㌊ ㋲ၺ1+# # # # #M31000 # # # # # # # ⓮G “㋒›⼺઒# ⱺົ゛# ᗲቲ⓮# ᬚ㌊# ”G

shaft from the engine.

ᬖᬚⓚ# ⧎☆㋮₃⁲⎺1,#

OSee “Dismounting of a piston and connecting rod ”

⑊᦮␿# ❖எᜒ# ㋒›⼺# ⸂ᔒ⑊⍦# Ẻ⯮㋮੶/# ⸂ᖞ┎⍦#

G G PG G G G G G P inG G G G G GM31000 2.

᝺ၾၺ1# ⑊᦮# ❖எ# =#

61

Dismount the piston together with connecting rod

onto a crane.

91.170

91.170

Lifting jig :

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ┧⍛႖⍦Ẳ# ቺ⍊⏂ ᝆ# 㑚/# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ⓮# ▧㋿᠊ⓚ# ᠿ╂# ⻢┊᮪#

Install lifting jig on the piston crown, and hook up

3.

Lift up the piston together with connecting rod shaft from working stand, and slow down the joint

Ꭶဪ# ⒶṂ㋲# ☛ᛮ⒚⍦# ☆₂›ᖓਢ# ๊ᖺ# ༩ဪၺ1# #

faces of connecting rod shaft on the wooden table

#

or the likes carefully.

#

91.170

# # # # # # # # # # # # # #

Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#

# 71

எᝒ# 4઒# য┊# ㋒›⼺# ㋖# ⃾⸊ᝓⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ#

4.

as shown in fig. 1.

Ṃ␿㋮⎂# ᬚ㌊㋲ၺ1# ㊢ᔒ┊⍊# =# #

81

91.240

㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⹲⍦Ẳ# ㋒›⼺# ㋖ⓚ# ᦮႖ᦿ㌻ ⓒᗲ# ᳧⋚๎ၺ1#

Dismantle circlips for piston pin by means of plier

Plier :

5.

91.240

Take out the piston pin to the opposite side during lifting the piston.

# # #

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.08/HSYG

Page

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

2/4

Section No.

Rev.

M31100

1B

G 

# 9

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ᬚ㌊㋲ၺ1# ㊢ᔒ┊⍊# =# #

6.

91.250

Dismantle piston rings by means of plier. Plier :

91.250 Be sure to use the plier for piston ring.

᦮ቲ⁲# ㋒›⼺# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㌊⌒#

Otherwise, piston rings may damage.

㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ᝗⍦# ἦṗ┊# ṳ௎# ᾮ# ┞⁋ၞ ၺ1#

:

;

⎆ἢ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ᪎# ⾊▗ᣒⓚ# ㋒›⼺઒# ㋒›⼺#

7.

᝗# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ௾෭┊# ၼ⋚

piston ring grooves, and clean all the parts

๎ၺ1# #

carefully.

㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖ

8.

Inspect the piston for any abnormal marks carefully.

Ṃ㋲ၺ1# <

Remove burned carbon deposits from piston and

㋒›⼺# ㋖઒# ἢၾᬖ# ᬖ⁲ᜒ# ▦ਖ㋲ၺ1#

9.

Inspect the piston pin and the small end bush. (See “Small end bush overhaul” in

+# # # # # M32130 # # # # # # # # # ⓮# “ἢၾᬖ# ᬖ⁲⓮# ᬚ㌊2▦ਖ# ”# ᬖᬚ

M32130 )

ⓚ# ⧎☆㋮₃⁲⎺1,#

㋒›⼺# ᪒ぎ# ┎┻ফᅚ⓮# ▦ਖ#

Inspection of Piston Bolt Tension

41

1.

எᝒ# 5⏖# য┊# ㋒›⼺# ᪒ぎᜒ# ⼶⸂# ›ゾພᗲ# ㈖⍊๎#

dismount piston crown as shown in fig. 2.

㑚# ㋒›⼺⓮# ⸂ᔒ⑊ⓚ# ᬚᝂ㋲ၺ1#

皦畲 枪砮嘎 : 51

91.810

Loosen piston bolt by using a torque spanner and

᪒ぎ⓮# ฮṂṆ# ᦥ# ▧⪟᠊ⓚ# “ᡆᝂ⳪ቲ# ㄮ┊›ぎ# Jq#

91.810

Torque spanner :

(昦痣斲檗)

2.

(Optional)

Coat thread and contact surface of bolt with

soxv”ᗲ# ᦪᜎ# 㑚⍦# ㋒›⼺# ᪒ぎᜒ# 463# Qp⓮# ⼶⸂ᗲ#

“Molycote-paste Gn plus”, and then tighten the bolt

⩊੆㋲ၺ1#

with a torque of 130 Nm.

# # # # # # # # # # # # # # # ᪒ぎ⓮# ௎┊খ# :916# pp# ┊㋮┊᠊# ㋒›⼺# ᪒ぎᜒ# ╂Ṃ␿㋶# ᾮ# ┞⁋ၞၺ1#

If only the length of bolt is less than 76.3 mm, reuse the piston bolt.

       

M8

    

Fig.2 Cross section of piston complete +㋒›⼺# ၾ᠊ᅚ,#

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.08/HSYG

Page

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

3/4

Section No.

Rev.

M31100

1B

G 61

᪒ぎᜒ# ၺ⁲# ㈖੶# า# 㑚# 78# Qp⓮# ⼶⸂ᗲ# ၺ⁲# ☆

3. Loosen the bolt again, and tighten the bolt with a torque of 45 Nm.

┎ၺ1# 71

⬪খ▗ⓒᗲ# 93㖡ᜒ# ც# ☆┎ၺ1#

4.

Continue tighten the piston bolt by additional 60ȋ .

# Make sure that the bolt is not rotated

᪒ぎဪ# ⁲㍮# ⼶⸂# 463# Qpᜒ# ▗␿㋮⎂# ც#

by application of test torque 130 Nm to tightening

┊ṗ# ☆⎂❖❖# ⋠⋚⌒# ㋿ၞၺ1# #

direction.

#

If the bolts can turn any more, replace

# # # # # # # # # # # # # # # ᪒ぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊/# Ṟᗲ⑊# ᪒

by new one.

ぎᗲ# ૦⩊㋮₃⁲⎺1#

㋒›⼺# ㋖# ᦥ# ᝗⓮# ☆ᝓ#

Assembling of Piston Pin and Piston Rings

41

1.

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ☆ᝓ㋮ெ# ▚/# ㋒›⼺#

Coat the surface of piston pin and small end bush

㋖⓮# ㇲ᠊# ᦥ# ἢၾᬖ# ᬖ⁲⍦# ௾෭㋲# ⎺┒ⓚ# ᦪᜎ# 㑚#

with clean lubricating oil before assembling piston

㋒›⼺# ㋖ⓚ# ᬖ⁲# ἣⓒᗲ# ฒ③# ູဪၺ1#

and connecting rod shaft, and then mount piston pin into small end bush.

#

Make sure that the mark “E” on the

㋒›⼺# ṗᬖ⍦# ㇲ⁲ᆲ# “H”# ᝞⸂ᜒ# ᧆெ⮷ⓚ#

top of the piston should be positioned in exhaust

㌻㋮ᅚᗳ# ㋲# 㑚# ☆ᝓ㌊⌒# ㋿ၞၺ1# #

side.

#

51

㋒›⼺# ㋖␿# Ẳ⸊ᝓⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ┻

2.

Mount circlips for piston pin by means of plier.

⦿㋲ၺ1# ㊢ᔒ┊⍊# =# #

61

91.240

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ⸂ᖞ┎ⓚ# Ṃ␿㋮⎂#

Plier :

3.

91.240

Lift up the piston together with connecting rod

ቺ⍊# ⏂ᝆၺ1#

shaft by means of a crane.

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ㋒›⼺# ᝗# 4.

Mount piston rings into its grooves by means of

㏞⍦# ☆ᝓ㋲ၺ#

the plier.

# 71

㊢ᔒ┊⍊# =# #

91.250

Plier :

91.250

# # # # # # # # # # # # # # # ㋒›⼺# ᝗⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ᝞⸂ᜒ# ㏫┎㋲# 㑚/# ᝞⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# # # # # # # # # # # # # # # গ# ㋒›⼺# ᝗⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ ᅚᗳ# ᧆ⯮⁲⸺₃⁲⎺1#

“Top” mark of piston rings should be assembled in upper side of groove. The end gap of each piston ring should be arranged in 120ȋ in relation to each other.

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.08/HSYG

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

Section No.

M31100

Page

4/4 Rev.

1B

G 81

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ㋒›⼺# ᝗# 5.

Mount piston rings into its grooves by means of the

㏞⍦# ☆ᝓ㋲ၺ#

plier.

㊢ᔒ┊⍊# =# #

91.250

Plier :

91.250

#

91

ၺ1#

:1

6. Inspect the piston rings for wear carefully as

எᝒ# 6઒# য┊# ㋒›⼺# ᝗┊# ᝞ᠾᆮ⍞ဪ❖ᜒ# ㏫┎㋲

shown in fig. 3.

G09200

G09200

# # # # # # # # # # # # # # ㋒›⼺# ᝗┊# ᝞ᠾ# ▲㋲⯮ᜒ# ⪞઒㋮⎖ਆฮ# ㋒

If piston rings exceed the wear limit

›⼺# ᝗⍦# ᯚ▫ṗ▗┎# 㓷❧┊# ┞ၺ᠊/# Ṟ# ᬖ㈞ⓒᗲ# ૦⩊㋮₃

and/or if the piston has any abnormal mark, then

⁲⎺1#

replace by new one.

7. Mount the piston together with connecting rod

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ# ┒⩊ᜒ# ⍪❚⍦# ⹧╂㋲ ၺ1#

shaft into the engine.

+# # # # # M31000 # # # # # # # # # ⓮# “㋒›⼺઒# ⱺົ゛# ᗲቲᜒ# ⁺ᝆც#

(See “Mounting of a piston and connecting rod into

ᔒ┊ພ⍦# ☆ᝓ# ”# ᬖᬚⓚ# ⧎☆㋮₃⁲⎺1,#

the cylinder liner” in

M31000 )

G G

Fig.3 The maximum vertical clearance of piston rings +㋒›⼺# ᝗⓮# ⫲႖# ᾮ❗# ぞṞ,#

୔ Marking on piston rings 1) 1st ring: GOE CK36 TOP GROOVE 1 2) 2nd ring: GOE or GOE TOP GROOVE 2 3) Oil scraper ring: GOE or GOE GROOVE 3

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.08/HSYG

Page

H21/32 Piston Assembly

Assembly Drawing & Part List

㋒›⼺ ⍊Ở᮪ᝂ

☆ᝓᅚ ᦥ ᬖ㈞ ᝂ›ぎ

1/1

Section No.

Rev.

A31100

2C

G 113

111

110

151 152

117

153

116

114 112

115

120

130

M32000

Part List Item No.

Description

Q’ty/Cyl.

Weight (kg)

Remarks / See Note

110

Piston complete

1

24.27

Item no. 111~117

111

Piston crown

1

8.15

112

Piston skirt

1

15.85

113

Stud bolt

4

0.04

114

Pressure washer

4

0.01

115

Hexagon nut

4

0.02

116

O-ring

1

117

Spring pin

1

120

Piston pin complete

1

9.5

130

Retaining ring

2

0.04

151

Compression ring – top

1

0.21

୔ GOE CK36 TOP GROOVE 1

152

Compression ring – 2nd

1

0.17

୔ GOE TOP GROOVE 2

153

Oil scraper ring

1

0.11

୔ GOE GROOVE 3

୔ Marking on piston rings G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.07/HSYG

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

Section No.

Page

1/4 Rev.

M31100

2E

G #

#

㋒›⼺# ㋖# ᦥ# ᝗⓮# ᬚ㌊#

Dismantling a Piston Pin and Piston Rings

41

1.

51

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ⍪❚# ᮪ᗳ⍦Ẳ# ᬚ㌊ ㋲ၺ1+# # # # #M31000 # # # # # # # ⓮G “㋒›⼺઒# ⱺົ゛# ᗲቲ⓮# ᬚ㌊# ”G

shaft from the engine.

ᬖᬚⓚ# ⧎☆㋮₃⁲⎺1,#

OSee “Dismounting of a piston and connecting rod ”

⑊᦮␿# ❖எᜒ# ㋒›⼺# ⸂ᔒ⑊⍦# Ẻ⯮㋮੶/# ⸂ᖞ┎⍦#

G G PG G G G G G P inG G G G G GM31000 2.

᝺ၾၺ1# ⑊᦮# ❖எ# =#

61

Dismount the piston together with connecting rod

onto a crane.

91.170

91.170

Lifting jig :

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ┧⍛႖⍦Ẳ# ቺ⍊⏂ ᝆ# 㑚/# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ⓮# ▧㋿᠊ⓚ# ᠿ╂# ⻢┊᮪#

Install lifting jig on the piston crown, and hook up

3.

Lift up the piston together with connecting rod shaft from working stand, and slow down the joint

Ꭶဪ# ⒶṂ㋲# ☛ᛮ⒚⍦# ☆₂›ᖓਢ# ๊ᖺ# ༩ဪၺ1# #

faces of connecting rod shaft on the wooden table

#

or the likes carefully.

#

91.170

# # # # # # # # # # # # # #

Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#

# 71

எᝒ# 4઒# য┊# ㋒›⼺# ㋖# ⃾⸊ᝓⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ#

4.

as shown in fig. 1.

Ṃ␿㋮⎂# ᬚ㌊㋲ၺ1# ㊢ᔒ┊⍊# =# #

81

91.240

㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⹲⍦Ẳ# ㋒›⼺# ㋖ⓚ# ᦮႖ᦿ㌻ ⓒᗲ# ᳧⋚๎ၺ1#

Dismantle circlips for piston pin by means of plier

Plier :

5.

91.240

Take out the piston pin to the opposite side during lifting the piston.

# # #

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.07/HSYG

Page

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

2/4

Section No.

Rev.

M31100

2E

G 

# 9

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ᬚ㌊㋲ၺ1# ㊢ᔒ┊⍊# =# #

6.

91.250

Dismantle piston rings by means of plier. Plier :

91.250 Be sure to use the plier for piston ring.

᦮ቲ⁲# ㋒›⼺# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㌊⌒#

Otherwise, piston rings may damage.

㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ᝗⍦# ἦṗ┊# ṳ௎# ᾮ# ┞⁋ၞ ၺ1#

:

;

⎆ἢ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ᪎# ⾊▗ᣒⓚ# ㋒›⼺઒# ㋒›⼺#

7.

᝗# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ௾෭┊# ၼ⋚

piston ring grooves, and clean all the parts

๎ၺ1# #

carefully.

㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖ

8.

Inspect the piston for any abnormal marks carefully.

Ṃ㋲ၺ1# <

Remove burned carbon deposits from piston and

㋒›⼺# ㋖઒# ἢၾᬖ# ᬖ⁲ᜒ# ▦ਖ㋲ၺ1#

9.

Inspect the piston pin and the small end bush. (See “Small end bush overhaul” in

+# # # # # M32130 # # # # # # # # # ⓮# “ἢၾᬖ# ᬖ⁲⓮# ᬚ㌊2▦ਖ# ”# ᬖᬚ

M32130 )

ⓚ# ⧎☆㋮₃⁲⎺1,#

㋒›⼺# ᪒ぎ# ┎┻# ▦ਖ#

Inspection of Piston Bolt Tension

41

1.

எᝒ# 5⏖# য┊# ㋒›⼺# ›⻆ቲᜒ# ⼶⸂# ›ゾພᗲ# ㈖⍊

dismount piston skirt as shown in fig. 2.

๎# 㑚# ㋒›⼺⓮# ›ⱺぎᜒ# ᬚᝂ㋲ၺ1#

皦畲 枪砮嘎 : 51

91.810

91.810

Torque spanner :

(昦痣斲檗)

›⻆ቲ⓮# ฮṂṆ# ᦥ# ▧⪟᠊ⓚ# “ᡆᝂ⳪ぎ# ㄮ┊›ぎ#

Loosen piston stud by using a torque spanner and

2.

(Optional)

Coat thread and contact surface of stud with

J0q# soxv# ru# J0q”ⓒᗲ# ᦪᜎ# 㑚⍦# ㋒›⼺# ›⻆ቲᜒ#

“Molycote-paste G-n plus or G-n”, and then tighten

58# Qp⓮# ⼶⸂ᗲ# ႖গẶᦿ㌻ⓒᗲ# ⸂ᔒ⑊⍦# ☆ᝓ㋲ၺ1#

the stud with a torque of 25 Nm to assemble to crown diagonally.

# # # # # # # # # # # # # # # # ›⻆ቲ⓮# ௎┊খ# ;716# pp# ┊㋮┊᠊# ㋒›⼺# ›⻆ቲᜒ# ╂Ṃ␿㋶# ᾮ# ┞⁋ၞၺ1#

If only the length of stud is less than 84.3 mm, reuse the piston stud.

      

M8

    

Fig.2 Cross section of piston complete +㋒›⼺# ၾ᠊ᅚ,#

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.07/HSYG

Page

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

3/4

Section No.

Rev.

M31100

2E

G 61

›⻆ቲ⓮# ฮṂṆ⍦# ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᦪᜊ੶# ㋒

71

81

3.

Coat thread of studs with molycote-paste and

›⼺# ›ⱺぎᜒ# ⸂ᔒ⑊⍦# ☆ᝓ㋲ၺ1# ⏖Ṻ⓮# ⌧᠊⍦ᅚ#

assemble piston skirt to crown. Before assembling

ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᅚㆂ㋮⎂# ☆ᝓ㋲ၺ1#

washers, coat contact surface with molycote-paste.

ພぎᜒ# ႖গẶ# ᦿ㌻ⓒᗲ# 73# Qp⓮# ⼶⸂ᗲ# ☆┚# 㑚#

4. Tighten the nuts with a torque of 40 Nm, loosen

ၺ⁲# ㈖੶# ›⻆ቲᜒ# 58# Qp⓮# ⼶⸂ᗲ# ၺ⁲# ☆⎂Ẳ#

the nuts again, and tighten the stud bolt with a

㏫┎㋲ၺ1#

torque of 25 Nm for checking.

ພぎᜒ# 53Qp# গগ# ⩊੆㋲# 㑚# ⬪খ▗ⓒᗲ# 93㖡ᜒ#

5. Continue tighten the nuts with a torque of 20 Nm each by each and turn the nuts additional 60ȋ .

ც# ☆┎ၺ1#

Make sure that the nut is not rotated

ພぎဪ# ⁲㍮# ⼶⸂# 78#Qpᜒ# ▗␿㋮⎂# ც# ┊

by application of test torque 45 Nm to tightening

ṗ# ☆⎂❖❖# ⋠⋚⌒# ㋿ၞၺ1# #

direction.

#

If the nuts can turn any more, replace

# # # # # # # # # # # # # # # ພぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊/# Ṟᗲ⑊# ›

by new ones(stud & nut).

⻆ቲ⏖# ພぎᗲ# ૦⩊㋮₃⁲⎺1#

㋒›⼺# ㋖# ᦥ# ᝗⓮# ☆ᝓ#

Assembling of Piston Pin and Piston Rings

41

1.

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ☆ᝓ㋮ெ# ▚/# ㋒›⼺#

Coat the surface of piston pin and small end bush

㋖⓮# ㇲ᠊# ᦥ# ἢၾᬖ# ᬖ⁲⍦# ௾෭㋲# ⎺┒ⓚ# ᦪᜎ# 㑚#

with clean lubricating oil before assembling piston

㋒›⼺# ㋖ⓚ# ᬖ⁲# ἣⓒᗲ# ฒ③# ູဪၺ1#

and connecting rod shaft, and then mount piston pin into small end bush.

#

Make sure that the mark “E” on the

㋒›⼺# ṗᬖ⍦# ㇲ⁲ᆲ# “H”# ᝞⸂ᜒ# ᧆெ⮷ⓚ#

top of the piston should be positioned in exhaust

㌻㋮ᅚᗳ# ㋲# 㑚# ☆ᝓ㌊⌒# ㋿ၞၺ1# #

side.

#

51

㋒›⼺# ㋖␿# Ẳ⸊ᝓⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ┻

2.

Mount circlips for piston pin by means of plier.

⦿㋲ၺ1# ㊢ᔒ┊⍊# =# #

61

91.240

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ⸂ᖞ┎ⓚ# Ṃ␿㋮⎂#

Plier :

3.

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ㋒›⼺# ᝗#

4.

Mount piston rings into its grooves by means of the plier.

㏞⍦# ☆ᝓ㋲ၺ# ㊢ᔒ┊⍊# =# #

Lift up the piston together with connecting rod shaft by means of a crane.

ቺ⍊# ⏂ᝆၺ1# 71

91.240

91.250

Plier :

91.250

# # # # # # # # # # # # # # # ㋒›⼺# ᝗⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ᝞⸂ᜒ# ㏫┎㋲# 㑚/# ᝞⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# # # # # # # # # # # # # # # গ# ㋒›⼺# ᝗⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ ᅚᗳ# ᧆ⯮⁲⸺₃⁲⎺1#

“Top” mark of piston rings should be assembled in upper side of groove. The end gap of each piston ring should be arranged in 120ȋ in relation to each other.

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.07/HSYG

Page

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

4/4

Section No.

Rev.

M31100

2E

G 81

4. Mount piston rings into its grooves by means of

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ㋒›⼺# ᝗#

the plier.

㏞⍦# ☆ᝓ㋲ၺ# ㊢ᔒ┊⍊# =# #

91.250

Plier :

91.250

#

“Top” mark of piston rings should be

# # # # # # # # # # # # # # ㋒›⼺# ᝗⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ᝞⸂ᜒ#

assembled in upper side of groove.

㏫┎㋲# 㑚/# ᝞⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1#

The end gap of each piston ring should

# # # # # # # # # # # # # # গ# ㋒›⼺# ᝗⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ

be arranged in 120ȋ in relation to each other.

ᅚᗳ# ᧆ⯮⁲⸺₃⁲⎺1# #

91

ၺ1#

:1

6.

எᝒ# 6઒# য┊# ㋒›⼺# ᝗┊# ᝞ᠾᆮ⍞ဪ❖ᜒ# ㏫┎㋲

Inspect the piston rings for wear carefully as shown in fig. 3.

G09200

G09200

# # # # # # # # # # # # # # ㋒›⼺# ᝗┊# ᝞ᠾ# ▲㋲⯮ᜒ# ⪞઒㋮⎖ਆฮ# ㋒

If piston rings exceed the wear limit

›⼺# ᝗⍦# ᯚ▫ṗ▗┎# 㓷❧┊# ┞ၺ᠊/# Ṟ# ᬖ㈞ⓒᗲ# ૦⩊㋮₃

and/or if the piston has any abnormal mark, then

⁲⎺1#

replace by new one.

7.

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ# ┒⩊ᜒ# ⍪❚⍦# ⹧╂㋲

Mount the piston together with connecting rod

ၺ1#

shaft into the engine.

+# # # # # M31000 # # # # # # # # # ⓮# “㋒›⼺઒# ⱺົ゛# ᗲቲᜒ# ⁺ᝆც#

(See “Mounting of a piston and connecting rod into

ᔒ┊ພ⍦# ☆ᝓ# ”# ᬖᬚⓚ# ⧎☆㋮₃⁲⎺1,#

the cylinder liner” in

M31000 )

G G

Fig.3 The maximum vertical clearance of piston rings +㋒›⼺# ᝗⓮# ⫲႖# ᾮ❗# ぞṞ,#

୔ Marking on piston rings 1) 1st ring: GOE CK36 TOP GROOVE 1 2) 2nd ring: GOE or GOE TOP GROOVE 2 3) Oil scraper ring: GOE or GOE GROOVE 3

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.07/HSYG

Page

H21/32 Piston Assembly

Assembly Drawing & Part List

㋒›⼺ ⍊Ở᮪ᝂ

☆ᝓᅚ ᦥ ᬖ㈞ ᝂ›ぎ

1/1

Section No.

Rev.

A31100

3A

G 111

113

110

117

116

151 152 153

114 115 120

112

130

M32000

Part List Item No.

Description

Q’ty/Cyl.

Weight (kg)

Remarks / See Note

110

Piston complete

1

24.1

Item no. 111~117

111

Piston crown

1

6.72

112

Piston skirt

1

17.07

113

Stud bolt

2

0.08

114

Pressure washer

2

0.01

115

Hexagon nut

2

0.03

116

O-ring

1

117

Spring pin

1

120

Piston pin complete

1

9.5

130

Retaining ring

2

0.04

151

Compression ring – top

1

0.21

୔ GOE CK36 TOP GROOVE 1

152

Compression ring – 2nd

1

0.17

୔ GOE TOP GROOVE 2

153

Oil scraper ring

1

0.11

୔ GOE GROOVE 3

୔ Marking on piston rings G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

07.08/HSYG

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

Section No.

Page

1/4 Rev.

M31100

3B

G #

#

㋒›⼺# ㋖# ᦥ# ᝗⓮# ᬚ㌊#

Dismantling a Piston Pin and Piston Rings

41

1.

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ⍪❚# ᮪ᗳ⍦Ẳ# ᬚ㌊

Dismount the piston together with connecting rod

㋲ၺ1#

shaft from the engine.

+# # # # # #M31000 # # # # # # # # # ⓮G “㋒›⼺઒# ⱺົ゛# ᗲቲ⓮# ᬚ㌊# ”G ᬖ

OSee “Dismounting of a piston and connecting rod ”

ᬚⓚ# ⧎☆㋮₃⁲⎺1,#

G G PG G G G G G PG inG G G G G GM31000

# 51

L0᪒ぎᜒ# ㋒›⼺# ⸂ᔒ⑊⍦# Ẻ⯮㋮੶/# ⸂ᖞ┎⍦# ᝺ႂ

2.

a crane.

⋚# ⏂ᝆၺ1# 61

Install I-bolt on the piston crown, and hook up onto

㋒›⼺઒# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ┧⍛႖⍦Ẳ# ቺ⍊⏂

3.

Lift up the piston together with connecting rod

ᝆ# 㑚/# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ⓮# ▧㋿᠊ⓚ# ᠿ╂# ⻢┊᮪#

shaft from working stand, and slow down the joint

Ꭶဪ# ⒶṂ㋲# ☛ᛮ⒚⍦# ☆₂›ᖓਢ# ๊ᖺ# ༩ဪၺ1#

faces of connecting rod shaft on the wooden table or the likes carefully.

# # # # # # # # # # # # # # # # # #

Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#

# 71

எᝒ# 4઒# য┊# ㋒›⼺# ㋖# ⃾⸊ᝓⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ#

4.

as shown in fig. 1.

Ṃ␿㋮⎂# ᬚ㌊㋲ၺ1# ㊢ᔒ┊⍊# =# #

81

91.240

㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⹲⍦Ẳ# ㋒›⼺# ㋖ⓚ# ᦮႖ᦿ㌻ ⓒᗲ# ᳧⋚๎ၺ1#

Dismantle circlips for piston pin by means of plier

Plier :

5.

91.240

Take out the piston pin to the opposite side during lifting the piston.

#

G HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division

08.08/PMUG

Page

H21/32 Piston Assembly

Maintenance Procedure

㋒›⼺ ⍊Ở᮪ᝂ

▫ᯚ▦ਖ ▞⦾

2/4

Section No.

Rev.

M31100

3B

G 91

㋒›⼺# ᝗ⓚ# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㋮⎂# ᬚ㌊㋲ၺ1# ㊢ᔒ┊⍊# =# #

6.

99.010

Dismantle piston rings by means of plier. Plier :

91.250 Be sure to use the plier for piston ring.

᦮ቲ⁲# ㋒›⼺# ▚␿# ㊢ᔒ┊⍊ᜒ# Ṃ␿㌊⌒#

Otherwise, piston rings may damage.

㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ᝗⍦# ἦṗ┊# ṳ௎# ᾮ# ┞⁋ၞ ၺ1#

:1

;1

⎆ἢ# ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ᪎# ⾊▗ᣒⓚ# ㋒›⼺઒# ㋒›⼺#

7.

᝗# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ௾෭┊# ၼ⋚๎

piston ring grooves, and clean all the parts

ၺ1# #

carefully.

㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖṂ

8.

Inspect the piston for any abnormal marks carefully.

㋲ၺ1#
View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF