Mukasurat 1 dari 4 NO. KONTRAK :
PKNS/IP/KP/KON-07/2010
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24’ x 65’) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN Tajuk
:
Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan ~ Kerja-kerja Cerucuk
Item
Description
BQ Reference
Contract Unit
As Per Quotation
Rate Qty
Amount
Qty
Specification and General Labour Clauses :For description of materials, workmanship and general labour applicable to this Bill , see "Specification" (Part F) PILING WORKS PREAMBLES Note:The contractor shall note that all precast concrete piles shall be obtained from an approved manufacturer. Piling equipment used shall be of the hammer type or other approved by the Authority and to the approval of the S.O. The pay length for supply of the concrete piles shall be measured from toe to cut off level. The pay length for driving shall be measured from toe to commencing ground level. The rate for pay length of the pile shall be deemed to include whether the pile is driven in singly or cluster , shoeing , pointing and wastages. The rates shall also deemed to include for piling on flat or sloping ground including all the necessary modifications to piling frame to accomodate stiff or any gradient of slope. A
B
C
Allow for the provision of mobilisation for all necessary piling equipment, plant, tools and ancillary equipment to site and handling, assembling and removal off site upon completion of the work, etc.
No
Allow for moving and handling piling equipment etc. about the site as often and whenever necesssary including all idling times and all necessary excavation and filling with crusher run to form a firm working platform etc.
Item
Allow for welding machine to site and handling, assembling and removal off site upon completion of the work, etc.
Item
TOTAL CARRIED FORWARD
25,000.00
2
-
Mukasurat 2 dari 4 NO. KONTRAK :
PKNS/IP/KP/KON-07/2010
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24’ x 65’) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN Tajuk
Item
:
Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan Kerja-kerja Tambahan - Kerja-kerja Cerucuk
Description
BQ Reference
Contract Unit
As Per Quotation
Rate Qty
TOTAL BROUGHT FORWARD
Amount
Qty -
The following in Main Building:The following in approved precast concrete Grade 45 pile including all reinforcement, jointing plates, etc. :A
Supply only 150mm x 150mm initial pile in 6.00m length
m
35.00
4,416
B
Supply only 150mm x 150mm extension pile in 3.00m length
m
45.00
978
Supply only 150mm x 150mm extension pile in 6.00m length
m
35.00
3,924
Handle, transport and pitch 150mm x 150mm initial piles in 6.00m length
No
12.00
736
Handle, transport and pitch 150mm x 150mm extension piles in 3.00m length
No
12.00
326
Handle, transport and pitch 150mm x 150mm extension piles in 6.00m length
No
12.00
654
Drive only 150mm x 150mm precast concrete piles not exceeding 10.00m deep
m
8.50
6,790
H
Ditto exceeding 10.00m and not exceeding 13.00m deep
m
8.50
827
J
Do exceeding 13.00m and not exceeding 16.00m deep
m
8.50
425
K
Do exceeding 16.00m and not exceeding 19.00m deep
m
8.50
172
L
Labour and material for welding extension joint for 150mm x 150mm precast concrete piles including all necessary mild steel plate with fillet welded to manufacturer's specification
No
15.00
723
No
20.00
No
50.00
C
D
E
F
G
M
N
Cut off and hack off top of 150mm x 150mm precast concrete piles by means of pneumatic tools down to the required cut off level and bent steel reinforcement for tying with new reinforcement for casting into pilecaps including all necessary cutting off excess length of reinforcement Mild steel 'X' pointed shoe welded to mild steel plate for 150mm x 150mm pile
737
TOTAL CARRIED FORWARD
-
Mukasurat 3 dari 4 NO. KONTRAK :
PKNS/IP/KP/KON-07/2010
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24’ x 65’) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN Tajuk
Item
:
Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan Kerja-kerja Tambahan - Kerja-kerja Cerucuk
Description
BQ Reference
Contract Unit
Qty
TOTAL BROUGHT FORWARD A
B
C
D
No
8,500.00
1
Integrity test for 150mm x 150mm pile using pile driving analyser (PDA) at random. The point to be tested shall be decided by the S.O. in conjunction with Engineer. The test shall be carried out by specialist to the approved of S.O.
No
2,000.00
14
Allow for dolly of pile as per requested by the Engineer / S.O.
No
50.00
Allow for carried out trial driven points and to be tested at every block all as per Engineer's Drawings
No
100.00
Allow for the provision of mobilisation for all necessary piling equipment, plant, tools and ancillary equipment to site and handling, assembling and removal off site upon completion of the work, etc.
Item
Allow for moving and handling piling equipment etc. about the site as often and whenever necesssary including all idling times and all necessary excavation and filling with crusher run to form a firm working platform etc.
Item
G
Supply only 150mm x 150mm initial pile in 6.00m length
m
35.00
H
Supply only 150mm x 150mm extension pile in 6.00m length
m
35.00
Handle, transport and pitch 150mm x 150mm initial piles in 6.00m length
No
12.00
Handle, transport and pitch 150mm x 150mm extension piles in 6.00m length
No
12.00
Drive only 150mm x 150mm precast concrete piles not exceeding 10.00m deep
m
8.50
Ditto exceeding 10.00m but not exceeding 13.00m deep
m
8.50
J
K
L
M
Qty
Provide all necessary equipment for carrying out maintain load test on 150mm x 150mm precast concrete piles up to twice working load (100kN per working load)
The following in approved precast concrete Grade 40 pile including all reinforcement, jointing plates, etc. :-
F
Amount -
The following in TNB Substation:-
E
As Per Quotation
Rate
50
TOTAL CARRIED FORWARD
-
Mukasurat 4 dari 4 NO. KONTRAK :
PKNS/IP/KP/KON-07/2010
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24’ x 65’) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN Tajuk
:
Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan Kerja-kerja Tambahan - Kerja-kerja Cerucuk
Item
BQ Reference
Description
Contract Unit
Qty
TOTAL BROUGHT FORWARD A
B
C
D
No
15.00
Mild steel 'X' pointed shoe welded to mild steel plate for 150mm x 150mm pile
No
50.00
Provide all necessary equipment for carrying out maintain load test on 150mm x 150mm precast concrete piles up to twice working load (100kN per working load)
No
8,500.00
Integrity test for 150mm x 150mm pile using pile driving analyser (PDA) at random. The point to be tested shall be decided by the S.O. in conjunction with Engineer. The test shall be carried out by specialist to the approved of S.O.
No
2,000.00
E
Allow for As-built drawings and measurement of piling density
Item
F
Allow for setting out of piling works
Item
G
Allow for idling time during maintain load test of the 50 trial pile
Item
Disediakan Oleh :
Disemak Oleh :
Amount
Qty -
Labour and material for welding extension joint for 150mm x 150mm precast concrete piles including all necessary mild steel plate with fillet welded to manufacturer's specification
JUMLAH DIBAWA KE LAMPIRAN `A'
As Per Quotation
Rate
-
Disahkan Oleh :
.
JURUKUR BAHAN
PRINSIPAL JURUKUR BAHAN
PENOLONG JURUTERA KANAN
Lampiran A Mukasurat 1 dari 4
NGLE CHAMBER), SERTA HSAN
As Per Quotation Amount
50,000.00
20,000.00
15,000.00
85,000.00
Lampiran A Mukasurat 2 dari 4
NGLE CHAMBER), SERTA HSAN
As Per Quotation Amount 85,000.00
154,560.00
44,010.00
137,340.00
8,832.00
3,912.00
7,848.00
57,715.00 7,029.50 3,612.50 1,462.00
10,845.00
-
36,850.00
559,016.00 Lampiran A Mukasurat 3 dari 4
NGLE CHAMBER), SERTA HSAN
As Per Quotation Amount 559,016.00
8,500.00
28,000.00
-
5,000.00
-
-
-
-
-
-
600,516.00 Lampiran A Mukasurat 4 dari 4
NGLE CHAMBER), SERTA HSAN
As Per Quotation Amount 600,516.00
-
-
-
-
-
15,000.00 25,000.00
640,516.00 420000 220,516
G JURUTERA KANAN
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE DATE
21/05/12 22/05/12 22/05/12 24/05/12 24/05/12
22/05/12 22/05/12 22/05/12
22/05/12 22/05/12 22/05/12 22/05/12
22/05/12 22/05/12 22/05/12
23/05/12 23/05/12 23/05/12
23/05/12 23/05/12 23/05/12
23/05/12 23/05/12 23/05/12 23/05/12
22/05/12 22/05/12 22/05/12
:
DATE RECEIVED
24/05/12
24/05/12
24/05/12
24/05/12
24/05/12
24/05/12
24/05/12
24/05/12
BLOCK
A
B
C
D
E
F
G
H
PILE POSITIO N
47 3 31 48 49
13 33 68
4 37 66 94
14 42 80
3 58 87
13 60 80
4 31 58 95
12 35 58
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24’ X 65’) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN. 150 MM X 150 MM RC PILE (40 NOS. TRIAL POINTS) SUPLLY INITIAL 6M 3M no no
SUPPLY EXTENSION 6M 3M no no
HANDLE 6M 3M no no
DRIVEN PENT
< 10M m
10 - 13 m
13 - 16 m
1.00 1.00 1.00 1.00 1.00 5.00
-
1.00 1.00 2.00
4.00 1.00 1.00 2.00 1.00 9.00
1.00 1.00 1.00 2.00 2.00 7.00
4.00 1.00 1.00 2.00 1.00 9.00 Average
16.00 8.00 8.00 15.10 13.00 60.10 12.02
10.00 8.00 8.00 10.00 10.00 46.00
3.00
3.00
3.00 3.00 9.00
2.10
1.00 1.00 1.00 3.00
-
-
2.00 2.00 2.00 6.00
1.00 1.00 1.00 3.00
2.00 2.00 2.00 6.00 Average
11.00 9.10 9.20 29.30 9.77
10.00 9.10 9.20 28.30
1.00
1.00 1.00 1.00 1.00 4.00
-
-
2.00 2.00 2.00 6.00
1.00 1.00 1.00 1.00 4.00
2.00 2.00 2.00 6.00 Average
9.10 10.00 9.10 5.10 33.30 8.33
9.10 10.00 9.10 5.10 33.30
-
1.00 1.00 1.00 3.00
-
-
2.00 3.00 3.00 8.00
1.00 1.00 1.00 3.00
2.00 3.00 3.00 8.00 Average
11.20 13.10 12.10 36.40 12.13
10.00 10.00 10.00 30.00
1.20 3.00 2.10 6.30
1.00 1.00 1.00 3.00
-
-
1.00 2.00 3.00 6.00
1.00 1.00 1.00 3.00
1.00 2.00 3.00 6.00 Average
8.20 10.20 13.20 31.60 10.53
8.20 10.00 10.00 28.20
0.20 3.00 3.20
1.00 1.00 1.00 3.00
-
-
2.00 2.00 2.00 6.00
1.00 1.00 1.00 3.00
2.00 2.00 2.00 6.00 Average
10.20 11.20 10.10 31.50 10.50
10.00 10.00 10.00 30.00
0.20 1.20 0.10 1.50
1.00 1.00 1.00 1.00 4.00
-
-
3.00 3.00 2.00 2.00 10.00
1.00 1.00 1.00 1.00 4.00
3.00 3.00 2.00 2.00 10.00 Average
13.00 13.10 10.10 11.10 47.30 11.83
10.00 10.00 10.00 10.00 40.00
3.00 3.00 0.10 1.10 7.20
1.00 1.00 1.00 3.00
-
-
2.00 1.00 3.00
1.00 1.00 1.00 3.00
2.00 1.00 3.00 Average
10.00 8.10 5.20 23.30 7.77
10.00 8.10 5.20 23.30
1.00
-
5.10
-
-
16 - 19 m
-
-
-
19 - 22 m
-
-
-
22 - 25 m
-
-
-
25 - 28 m
-
-
-
28 - 31 m
0.20 0.20
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SHOE no
-
-
4.00 1.00 1.00 3.00 1.00 10.00
1.00 1.00 1.00 1.00 1.00 5.00
-
11.00 9.10 9.20 29.30
-
2.00 2.00 2.00 6.00
1.00 1.00 1.00 3.00
-
9.10 10.00 9.10 5.10 33.30
-
2.00 2.00 2.00 6.00
1.00 1.00 1.00 1.00 4.00
-
11.20 13.10 12.10 36.40
-
2.00 3.00 3.00 8.00
1.00 1.00 1.00 3.00
-
8.20 10.20 13.20 31.60
-
1.00 2.00 3.00 6.00
1.00 1.00 1.00 3.00
-
10.20 11.20 10.10 31.50
-
2.00 2.00 2.00 6.00
1.00 1.00 1.00 3.00
-
13.00 13.10 10.10 11.10 47.30
-
3.00 3.00 2.00 2.00 10.00
1.00 1.00 1.00 1.00 4.00
-
2.00 1.00
-
10.00 8.10 5.20 23.30
1.00 1.00 1.00 3.00
0.10
0.10
WELD JOINTS no
16.00 8.00 8.00 15.10 13.00 60.10
0.10 0.10
m
Check m
3.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE RECEIVED 22/05/12 24/05/12 22/05/12 22/05/12 DATE
21/05/12 21/05/12 21/05/12
23/05/12 23/05/12 23/05/12
24/05/12 24/05/12 24/05/12
24/05/12
24/05/12
28/05/12
BLOCK I
PILE POSITIO N 50 6 22
J
4 38 58
K
9 41 67
L
32 47 2
TOTAL FOR 40 NOS TRIAL POINTS
SUPPLY
INITIAL EXTENSION
HANDLE
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24’ X 65’) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN. 150 MM X 150 MM RC PILE (40 NOS. TRIAL POINTS) SUPLLY INITIAL 6M 3M 1.00 1.00 1.00 3.00 -
SUPPLY EXTENSION 6M 3M 1.00 1.00 1.00 3.00
HANDLE 6M 3M 1.00 1.00 1.00 1.00 1.00 1.00 3.00 3.00 Average
DRIVEN PENT 7.20 6.00 6.20 19.40 6.47
< 10M 7.20 6.00 6.20 19.40
10 - 13
-
13 - 16
-
16 - 19
-
19 - 22
-
22 - 25
-
25 - 28
-
-
7.20 6.00 6.20 19.40
Check -
WELD JOINTS 1.00 1.00 1.00 3.00
-
8.10 9.20 12.10 29.40
-
1.00 2.00 3.00 6.00
1.00 1.00 1.00 3.00
-
17.00 14.10 12.10 43.20
-
4.00 3.00 3.00 10.00
1.00 1.00 1.00 3.00
-
3.00 1.00 4.00 8.00
1.00 1.00 1.00 3.00
-
82.00
40.00
28 - 31
1.00 1.00 1.00 3.00
-
-
1.00 2.00 3.00 6.00
1.00 1.00 1.00 3.00
1.00 2.00 3.00 6.00 Average
8.10 9.20 12.10 29.40 9.80
8.10 9.20 10.00 27.30
2.10 2.10
1.00 1.00 1.00 3.00
-
-
4.00 3.00 3.00 10.00
1.00 1.00 1.00 3.00
4.00 3.00 3.00 10.00 Average
17.00 14.10 12.10 43.20 14.40
10.00 10.00 10.00 30.00
3.00 3.00 2.10 8.10
1.00 1.00 1.00 3.00
-
1.00 1.00
3.00 4.00 7.00
1.00 2.00 1.00 4.00
3.00 4.00 7.00 Average
12.10 11.00 15.10 38.20 12.73
10.00 10.00 10.00 30.00
2.10 1.00 3.00 6.10
2.10 2.10
-
-
-
-
-
12.10 11.00 15.10 38.20
40.00
-
3.00
80.00
43.00
80.00 Average
423.00 10.58
365.80
44.50
11.70
1.00
-
-
-
-
423.00
240.00 18.00 240.00 258.00 240.00
258.00 240.00
6M 3M 6M 3M 6M 3M
40.00 3.00 80.00 43.00 80.00
-
-
3.00 1.10
1.00
4.10
1.00
-
-
-
-
-
-
SHOE 1.00 1.00 1.00 3.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
21/05/12 22/05/12
DATE RECEIVED
24/05/12
PILE BLOCK POSITIO N
A
22/05/12 24/05/12 24/05/12
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24’ X 65’) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN. 150 MM X 150 MM RC PILE SUPLLY INITIAL 6M 3M no no
47 3
1.00 1.00
-
31 48
1.00 1.00
-
49
1.00 5.00
SUPPLY EXTENSION 6M 3M no no
-
HANDLE 6M 3M no no
24/05/12
11/06/12
21/06/12
B
1.00 1.00
4.00 1.00
16.00 8.00
10.00 8.00
1.00
1.00 2.00
1.00 2.00
1.00 2.00
8.00 15.10
-
1.00
1.00
2.00
1.00
-
2.00
9.00
7.00
9.00
24/05/12
C
22/05/12 22/05/12 11/06/12
21/06/12
3.00
3.00
8.00 10.00
3.00
2.10
13.00
10.00
3.00
60.10
46.00
9.00
1.00
5.10
-
-
-
-
-
m
Check m
WELD JOINTS no
SHOE no
16.00 8.00
-
4.00 1.00
8.00 15.10
-
1.00 3.00
13.00
-
2.00
1.00 1.00
60.10
-
11.00
5.00
1.00 1.00
1.00 1.00 1.00
12.02
13
1.00
-
-
2.00
1.00
2.00
11.00
10.00
11.00
-
2.00
33 68
1.00 1.00
-
-
2.00 2.00
1.00 1.00
2.00 2.00
9.10 9.20
9.10 9.20
9.10 9.20
-
2.00 2.00
49
1.00
-
-
1.00
1.00
1.00
9.60
9.60
9.60
-
1.00
1.00 1.00
4.00
-
-
7.00
4.00
7.00
38.90
37.90
38.90
-
7.00
4.00
Average
22/05/12 22/05/12
< 10M 10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31 m m m m m m m m
4.00 1.00
Average
22/05/12 22/05/12 22/05/12
DRIVEN PENT
1.00
-
-
-
-
-
-
9.73
4 37
1.00 1.00
-
-
2.00 2.00
1.00 1.00
2.00 2.00
9.10 10.00
9.10 10.00
9.10 10.00
-
2.00 2.00
1.00 1.00
66 94 29
1.00 1.00 1.00
-
-
2.00 1.00
1.00 1.00 1.00
2.00 1.00
9.10 5.10 8.60
9.10 5.10 8.60
9.10 5.10 8.60
-
2.00 1.00
1.00 1.00
5.00
-
-
7.00
5.00
7.00
41.90
41.90
41.90
-
7.00
5.00
Average
-
-
-
-
-
-
-
1.00
8.38
14
1.00
-
-
2.00
1.00
2.00
11.20
10.00
1.20
11.20
-
2.00
42
1.00
-
-
3.00
1.00
3.00
13.10
10.00
3.00
0.10
13.10
-
3.00
1.00 1.00
11/6/2012
56
1.00
-
-
3.00
1.00
3.00
14.00
10.00
3.00
1.00
14.00
-
2.00
1.00
22/05/12
80
1.00
-
-
3.00
1.00
3.00
12.10
10.00
2.10
12.10
-
3.00
1.00
4.00
-
-
11.00
4.00
11.00
50.40
40.00
9.30
50.40
-
10.00
4.00
Average
12.60
8.20 11.60 10.20
-
1.00 1.00 2.00
13.20
-
3.00
1.00 1.00 1.00 1.00
43.20
-
7.00
4.00
22/05/12 22/05/12
23/05/12 11/6/2012 23/05/12 23/05/12
24/05/12
24/05/12
D
E
13 32 58
1.00 1.00 1.00
-
87
1.00
-
4.00
-
1.00 1.00
1.10
1.00 2.00
1.00 2.00 1.00
1.00 2.00
8.20 11.60 10.20
8.20 10.00 10.00
1.60 0.20
3.00
1.00
3.00
13.20
10.00
3.00
0.20
6.00
5.00
6.00
43.20
38.20
4.80
0.20
-
-
-
-
-
-
-
-
-
-
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
DATE RECEIVED
PILE BLOCK POSITIO N
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24’ X 65’) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN. 150 MM X 150 MM RC PILE SUPLLY INITIAL 6M 3M
SUPPLY EXTENSION 6M 3M
HANDLE 6M 3M
DRIVEN PENT
Average
23/05/12 11/6/2012
24/05/12
F
23/05/12 23/05/12
13 31
1.00 1.00
-
60 80
1.00 1.00
-
4.00
-
1.00 1.00
WELD JOINTS
SHOE
10.80
2.00 -
1.00 2.00
2.00 -
10.20 10.00
10.00 10.00
0.20
10.20 10.00
-
2.00 1.00
2.00 2.00
1.00 1.00
2.00 2.00
11.20 10.10
10.00 10.00
1.20 0.10
11.20 10.10
-
2.00 2.00
1.00 1.00 1.00
6.00
5.00
6.00
41.50
40.00
1.50
41.50
-
7.00
4.00
13.00 13.10
-
3.00 3.00
Average
22/05/12 22/05/12
Check
< 10M 10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
-
-
-
-
-
-
1.00
10.38
4 31
1.00 1.00
-
-
3.00 3.00
1.00 1.00
3.00 3.00
13.00 13.10
10.00 10.00
3.00 3.00
22/05/12 11/6/2012
58 78
1.00 1.00
-
-
2.00 2.00
1.00 1.00
2.00 2.00
10.10 11.30
10.00 10.00
0.10 1.30
10.10 11.30
-
2.00
1.00 1.00 1.00
22/05/12
95
1.00
-
-
2.00
1.00
2.00
11.10
10.00
1.10
11.10
-
2.00
1.00 1.00
5.00
-
-
12.00
5.00
12.00
58.60
50.00
8.50
58.60
-
10.00
5.00
Average
11.72
1.00 1.00
22/05/12
24/05/12
24/05/12
G
H
0.10
0.10
-
-
-
-
-
12
1.00
-
-
2.00
1.00
2.00
10.00
10.00
10.00
-
2.00
11/6/2012 22/05/12
29 35
1.00 1.00
-
-
1.00 1.00
1.00 1.00
1.00 1.00
8.00 8.10
8.00 8.10
8.00 8.10
-
1.00 1.00
22/05/12
58
1.00
-
-
5.20
5.20
5.20
-
4.00
-
-
31.30
31.30
31.30
-
4.00
4.00
4.00
1.00 4.00
4.00 Average
22/05/12 22/05/12
24/05/12
I
22/05/12 11/6/2012
24/05/12
J
-
-
-
-
-
-
7.83
50 6
1.00 1.00
-
-
1.00 1.00
1.00 1.00
1.00 1.00
7.20 6.00
7.20 6.00
7.20 6.00
-
1.00 1.00
1.00 1.00
22 35
1.00 1.00
-
-
1.00 1.00
1.00 1.00
1.00 1.00
6.20 8.30
6.20 8.30
6.20 8.30
-
1.00 3.00
1.00 1.00
4.00
-
-
4.00
4.00
4.00
27.70
27.70
27.70
-
6.00
4.00
8.10 9.20 12.10
-
1.00 2.00 3.00
1.00 1.00 1.00
29.40
-
6.00
3.00
Average
22/5/2012 22/5/2012 22/5/2012
-
1.00 1.00
4 38 58
1.00 1.00 1.00
-
-
1.00 2.00 3.00
1.00 1.00 1.00
3.00
-
-
6.00
3.00
-
1.00 2.00 3.00
8.10 9.20 12.10
8.10 9.20 10.00
2.10
6.00
29.40
27.30
2.10
Average
-
-
-
-
-
-
6.93
9.80
-
-
-
-
-
-
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE 23/05/12
DATE RECEIVED 24/05/12
MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24’ X 65’) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN.
PILE BLOCK POSITIO N K 9
150 MM X 150 MM RC PILE SUPLLY INITIAL 6M 3M 1.00 -
SUPPLY EXTENSION 6M 3M 4.00
HANDLE 6M 3M 1.00 4.00
DRIVEN PENT 17.00
< 10M 10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31 10.00 3.00 3.00 1.00
11/6/2012 23/05/12
27 41
1.00 1.00
-
-
4.00 3.00
1.00 1.00
4.00 3.00
17.70 14.10
10.00 10.00
3.00 3.00
23/05/12
67
1.00
-
-
3.00
1.00
3.00
12.10
10.00
2.10
4.00
-
-
14.00
4.00
14.00
60.90
40.00
11.10
Average
15.23
23/05/12 23/05/12
28/05/12
L
23/05/12 11/6/2012
32
1.00
-
47 2
1.00 1.00
-
22
1.00
-
4.00
-
TOTAL FOR 50 NOS TRIAL POINTS
SUPPLY
HANDLE
50.00
-
1.00 1.00
5.00
INITIAL
6M 3M
50.00 -
300.00 -
EXTENSION
6M 3M
5.00 95.00
30.00 285.00
6M 3M
55.00 95.00
330.00 285.00
3.00 1.10
7.10
1.70
2.70
-
-
-
-
17.00
Check -
WELD JOINTS 4.00
SHOE 1.00 1.00
17.70 14.10
-
4.00 3.00
12.10
-
3.00
1.00 1.00
60.90
-
14.00
4.00
1.00 1.00
3.00
1.00
3.00
12.10
10.00
2.10
12.10
-
3.00
4.00
2.00 1.00
4.00
11.00 15.10
10.00 10.00
1.00 3.00
11.00 15.10
-
1.00 4.00
2.00
1.00
2.00
9.60
9.60
9.60
-
2.00
1.00 1.00
9.00
5.00
9.00
47.80
39.60
6.10
2.10
459.90
53.40
15.70
95.00
330.00 285.00
55.00
Average
11.95
95.00
531.70
Average
10.63
2.10
-
2.70
-
-
-
-
47.80
-
10.00
4.00
-
-
-
-
531.70
-
99.00
50.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
PILE POSITIO N
DATE RECEIVED
BLOCK
150 MM X 150 MM RC PILE SUPLLY INITIAL
SUPPLY EXTENSION
HANDLE
DRIVEN
6M
3M
6M
3M
6M
3M
no
no
no
no
no
no
PENT
< 10M m
10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31 m
m
m
m
m
m
m
m
Check
WELD JOINTS
SHOE
m
no
no
1
-
-
-
-
2 3 4
-
-
-
-
-
-
5 6
-
-
-
-
-
-
7 8
-
-
-
-
-
-
9 10
-
-
-
-
-
-
11 12
-
-
-
-
-
-
13
-
-
-
-
-
-
14
-
-
-
-
-
-
15
-
-
-
-
16
-
-
-
-
17
-
-
-
-
-
-
18
-
-
-
-
-
-
1.00
-
25/7/13
U13
19 20
25/7/13 25/7/13
U13 U13
21 22
1.00 1.00
25/7/13 25/7/13
U13 U13
23 24
1.00 1.00
25/7/13
U13
25 26
1.00
-
1.00
2.00 -
-
11.70
10.00
1.70
11.70 -
-
1.00
1.00
25/7/13 25/7/13
U13
27 28 29
1.00 1.00
-
1.00 1.00
2.00 2.00 -
-
11.10 11.10
10.00 10.00
1.10 1.10
11.10 11.10 -
-
1.00 1.00
1.00
25/7/13
U13 U13 U13
30 31
1.00 1.00
-
1.00 1.00
2.00 2.00
-
11.70 11.70
10.00 10.00
1.70 1.70
11.70 11.70
-
1.00 1.00
1.00
25/7/13 25/7/13 25/7/13
32 33
1.00 1.00
-
1.00 1.00
2.00 2.00
-
11.40 10.50
10.00 10.00
1.40 0.50
11.40 10.50
-
1.00 1.00
U13
34 35 36
1.00 1.00
-
1.00 1.00
2.00 2.00 -
-
10.80 11.10
10.00 10.00
0.80 1.10
10.80 11.10 -
-
1.00 1.00
25/7/13 25/7/13
U13 U13
37 38
1.00 1.00
-
25/7/13 25/7/13
U13 U13
39 40
1.00 1.00
-
25/7/13 25/7/13
U13
U13 U13
41 42 25/7/13 25/7/13 25/7/13
U13
25/7/13
-
2.00
-
11.10
10.00
1.00 1.00
2.00 2.00
-
11.10 11.06
1.00 1.00
2.00 2.00
-
2.00
-
43 44 45
1.00 1.00 1.00
-
U13 U13 U13
46 47
26/7/13 26/7/13 26/7/13
U13
26/7/13
25/7/13 25/7/13
1.00
1.10
11.10
-
1.00
1.00
10.00 10.00
1.10 1.06
11.10 11.06
-
1.00 1.00
1.00 1.00
10.15 9.87
10.00 9.87
0.15
10.15 9.87
-
1.00 1.00
1.00 1.00
1.00
1.00 1.00 1.00 1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
9.00 8.40
9.00 8.40
9.00 8.40
-
1.00 1.00
1.00 1.00
1.00
1.00 3.00
1.00 -
8.10 9.00
8.10 9.00
8.10 9.00
-
1.00 2.00
1.00 1.00
-
-
-
-
2.00 2.00 2.00
-
10.50 11.88 11.92
10.00 10.00 10.00
0.50 1.88 1.92
10.50 11.88 11.92
-
1.00 1.00 1.00
1.00
-
1.00 1.00 1.00
1.00 1.00
-
1.00 1.00
2.00 2.00
-
11.59 12.00
10.00 10.00
1.59 2.00
11.59 12.00
-
1.00 1.00
48 49
1.00
-
1.00
2.00 -
-
11.58
10.00
1.58
11.58 -
-
1.00
1.00 1.00 1.00
50 51 52
1.00 1.00 1.00
-
1.00 1.00 1.00
2.00 2.00 2.00
-
12.00 12.00 12.00
10.00 10.00 10.00
2.00 2.00 2.00
12.00 12.00 12.00
-
1.00 1.00 1.00
1.00
U13 U13 U13
53
1.00
-
1.00
2.00
-
11.40
10.00
1.40
11.40
-
1.00
1.00
U13 U13
1.00 1.00
1.00 1.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
PILE POSITIO N
26/7/13 26/7/13
DATE RECEIVED
BLOCK
150 MM X 150 MM RC PILE SUPLLY INITIAL 6M
3M
SUPPLY EXTENSION 6M
3M
HANDLE 6M
54 55
1.00 1.00
-
56 57
1.00 1.00
-
1.00 1.00
2.00 2.00
U13
58 59 60
1.00 1.00
-
1.00 1.00
2.00 2.00 -
26/7/13 26/7/13
U13 U13
61 62
1.00 1.00
-
1.00 1.00
26/7/13 26/7/13
U13 U13
63 64
1.00 1.00
-
26/7/13 26/7/13 26/7/13 26/7/13
U13 U13 U13 U13 U13
65
1
27/7/13 27/7/13 27/7/13 26/7/13
U12 U12 U12 U12 U12 U12
-
-
1.00 1.00 -
38.00
27/7/13 27/7/13
1.00 1.00
32.00
7.00
-
1.00 1.00
2.00 2.00 1.00 1.00 70.00
-
1.00 1.00 -
< 10M 9.00 9.00
11.92 11.61
10.00 10.00
11.64 13.50
1.00 1.00
1.92 1.61
11.92 11.61
-
1.00 1.00
10.00 10.00
1.64 3.00
11.64 13.50 -
-
1.00 2.00
12.00 12.00
10.00 10.00
2.00 2.00
12.00 12.00
-
1.00 1.00
1.00 1.00
9.00 5.40
9.00 5.40
9.00 5.40
-
1.00
1.00 1.00
39.00
38.00
1.00
0.50
-
7.00
410.82
Average
10.81
366.77
43.55
0.50
19.50 18.00
10.00 10.00
3.00 3.00
3.00 3.00
3.00 2.00
1.00
-
2.00
3.00
-
17.60
10.00
3.00
3.00
5
1.00
-
2.00
3.00
-
18.00
10.00
3.00
6
1.00
-
2.00
3.00
-
18.00
10.00
3.00
7
1.00
-
1.00
15.00
10.00
3.00
2.00
-
1.00
2.00
3.00
2.00
18.00
-
2.00
3.00
2.00
18.00
-
2.00
15.00
-
2.00
1.00 1.00 1.00
-
-
1.00
-
1.00
1.00
2.00
1.00
13.80
10.00
3.00
0.80
1.00 1.00
-
2.00 2.00
1.00 1.00
3.00 3.00
1.00 1.00
21.00 21.00
10.00 10.00
3.00 3.00
3.00 3.00
3.00 3.00
27/7/13 27/7/13
U12 U12
12 13
1.00 1.00
-
2.00 2.00
3.00 3.00
-
16.50 17.10
10.00 10.00
3.00 3.00
3.00 3.00
27/7/13 26/7/13
U12 U12
14 15
1.00 1.00
-
2.00 2.00
3.00 3.00
-
16.40 17.70
10.00 10.00
3.00 3.00
27/7/13 26/7/13
U12
16 17
1.00 1.00
-
2.00 1.00
22/7/13
U12
18 19 20
1.00
-
2.00 -
23/7/13 23/7/13
-
2.00
1.00
21.00 21.00
-
3.00 3.00
1.00 1.00
0.50 1.10
16.50 17.10
-
2.00 2.00
1.00 1.00
3.00 3.00
0.40 1.70
16.40 17.70
-
2.00 2.00
1.00 1.00
18.00 18.00
-
2.00 3.00
1.00
20.70 -
-
3.00
1.00
1.00
2.00
18.00 18.00
10.00 10.00
3.00 3.00
3.00 3.00
2.00 2.00
3.00 -
1.00 -
20.70
10.00
3.00
3.00
3.00
-
2.00 2.00
1.70
-
1.00
-
23 24
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.39 16.50
10.00 10.00
3.00 3.00
3.00 3.00
1.39 0.50
17.39 16.50
-
2.00 2.00
U12 U12
25 26 27
1.00 1.00 1.00
-
2.00 2.00 2.00
3.00 3.00 3.00
-
17.40 16.80 18.00
10.00 10.00 10.00
3.00 3.00 3.00
3.00 3.00 3.00
1.40 0.80 2.00
17.40 16.80 18.00
-
2.00 2.00 2.00
24/7/13
U12
28 29
1.00
-
2.00
3.00
-
18.00
10.00
3.00
3.00
2.00
18.00
-
2.00
1.00
23/7/13 23/7/13
30 31
1.00 1.00
-
2.00 2.00
3.00 3.00
-
18.00 17.10
10.00 10.00
3.00 3.00
3.00 3.00
2.00 1.10
18.00 17.10
-
2.00 2.00
23/17/13
U12 U12 U12
23/7/13 23/7/13
U12 U12
32 33
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.40 17.40
10.00 10.00
3.00 3.00
3.00 3.00
1.40 1.40
17.40 17.40
-
2.00 2.00
1.00 1.00 1.00
1.00
3.00 2.00
3.00
3.00
0.50
10.00
2.60
-
1.00 1.00
12.60
16.50 12.60
2.00
1.00
2.00 1.00
10.00
U12
-
16.50
24/7/13
34 35 36
2.00
1.00
23/7/13 23/7/13
U12 U12 U12
37 38
1.00 1.00
-
2.00 2.00
18.00 18.00
10.00 10.00
3.00 3.00
3.00 3.00
2.00 2.00
18.00 18.00
-
2.00 2.00
39
1.00
-
1.00
13.80
10.00
3.00
0.80
13.80
-
2.00
1.00 1.00 1.00
23/7/13 23/7/13 24/7/13
24/7/13
U12
1.00 1.00
13.80
3.00 2.00
-
-
-
9
-
0.50
-
17.60
10 11
-
410.82
-
1.60
U12 U12
21
-
1.00
3.00 2.00
U12
1.00
-
1.00 1.00
-
27/7/13 27/7/13
2.00
-
1.00 1.00 1.00
19.50 18.00
26/7/13
U12
-
-
4
2.00
-
-
2.00 2.00
1.00
SHOE
-
-
-
WELD JOINTS
9.00 9.00
-
1.00 -
Check
10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
1.00 1.00
-
3.00 3.00
1.00 1.00
PENT 9.00 9.00
2 3
8
1.00
DRIVEN
3M
U12 U12
1.00
3.00 3.00 1.00
2.00
1.00 1.00
1.00 1.00 1.00 1.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
PILE POSITIO N
24/7/13 24/7/13 24/7/13 24/7/13
24/7/13 24/7/13
DATE RECEIVED
BLOCK U12 U12 U12 U12
SUPLLY INITIAL 6M
3M
SUPPLY EXTENSION 6M
3M
HANDLE 6M
DRIVEN
3M
40 41
1.00 1.00
-
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
PENT 13.43 13.67
42 43
1.00 1.00
-
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
13.93 14.10
< 10M 10.00 10.00 10.00 10.00
10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31 3.00 0.43 3.00 0.67 3.00 3.00
0.93 1.10
Check
WELD JOINTS
13.43 13.67
-
2.00 2.00
13.93 14.10
-
2.00 2.00
44 45 46
-
-
-
-
-
-
47 48
-
-
-
-
-
-
49 50
-
-
-
-
-
-
51 52
-
-
-
-
-
-
53 54
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.03 17.70
10.00 10.00
3.00 3.00
3.00 3.00
1.03 1.70
17.03 17.70
-
2.00 2.00
55
1.00
-
2.00
3.00
-
18.00
10.00
3.00
3.00
2.00
18.00
-
2.00
U12 U12 U12
56
1.00
-
2.00
3.00
-
16.50
10.00
3.00
3.00
0.50
16.50
-
2.00
57
1.00
-
2.00
3.00
-
18.00
10.00
3.00
3.00
2.00
18.00
-
2.00
58
1.00
-
2.00
-
0.50
59
1.00
24/7/13
U12 U12
60
1.00
24/7/13 24/7/13
U12 U12
61 62
24/7/13
U12
63
24/7/13 24/7/13 24/7/13 24/7/13 24/7/13
U12
150 MM X 150 MM RC PILE
U12 U12
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00
16.50
10.00
3.00
3.00
16.50
-
2.00
1.00
1.00
2.00
1.00
15.00
10.00
3.00
2.00
15.00
-
2.00
-
1.00
1.00
2.00
1.00
15.00
10.00
3.00
2.00
15.00
-
2.00
1.00 1.00
1.00 1.00
-
2.00 2.00
3.00 3.00
-
18.00 17.35
10.00 10.00
3.00 3.00
3.00 3.00
2.00 1.35
18.00 17.35
-
2.00 2.00
1.00 1.00
1.00
-
2.00
3.00
-
18.00
10.00
3.00
3.00
2.00
18.00
-
2.00
1.00
46.00
-
81.00
460.00
137.60
118.73
58.87
781.40
-
97.00
46.00
10.00
3.00
3.00
2.00
18.00
-
3.00
1.00
-
U7
1
1.00
-
3/7/2013
U7
2 3
1.00
-
6/7/2013
U7
6/7/2013
U7
4 5
1.00 1.00
-
6/7/2013
U7
6/7/2013
U7
6/7/2013
U7
6 7 8
1.00 1.00 1.00
6/7/2013
U7
6/7/2013 3/7/2013
U7 U7
9 10
3/7/2013 3/7/2013
U7 U7
3/7/2013 3/7/2013
3/7/2013
2.00
3.00
SHOE
16.00
1.00
127.00
3.00
16.00
781.40
Average
16.99
1.00
18.00
6.20
-
-
-
2.00
3.00
-
17.10
10.00
3.00
3.00
1.10
17.10
2.00
1.00
2.00 2.00
3.00 3.00
-
18.00 18.00
10.00 10.00
3.00 3.00
3.00 3.00
2.00 2.00
18.00 18.00
-
2.00 2.00
1.00
-
2.00 2.00 2.00
3.00 3.00 3.00
-
18.00 18.00 16.80
10.00 10.00 10.00
3.00 3.00 3.00
3.00 3.00 3.00
2.00 2.00 0.80
18.00 18.00 16.80
-
2.00 2.00 2.00
1.00
1.00 1.00
-
2.00 2.00
3.00 3.00
-
18.00 16.38
10.00 10.00
3.00 3.00
3.00 3.00
2.00 0.38
18.00 16.38
-
2.00 2.00
1.00
11 12
1.00 1.00
-
2.00 2.00
1.00
3.00 3.00
1.00
17.00 19.80
10.00 10.00
3.00 3.00
3.00 3.00
1.00 3.00
0.80
17.00 19.80
-
2.00 3.00
U7 U7
13 14 15
1.00 1.00 1.00
-
2.00 2.00 2.00
1.00 1.00 1.00
3.00 3.00 3.00
1.00 1.00 1.00
20.10 19.71 19.20
10.00 10.00 10.00
3.00 3.00 3.00
3.00 3.00 3.00
3.00 3.00 3.00
1.10 0.71 0.20
20.10 19.71 19.20
-
3.00 2.00 3.00
6/7/2013 6/7/2013
U7 U7
16 17
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.70 18.00
10.00 10.00
3.00 3.00
3.00 3.00
1.70 2.00
17.70 18.00
-
2.00 2.00
1.00 1.00
6/7/2013 6/7/2013 6/7/2013
U7 U7 U7
18 19
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.70 18.00
10.00 10.00
3.00 3.00
3.00 3.00
1.70 2.00
17.70 18.00
-
2.00 2.00
U7 U7
1.00 1.00
-
2.00 2.00
1.00
3.00 3.00
-
6/7/2013 6/7/2013
20 21
1.00
17.70 19.20
10.00 10.00
3.00 3.00
3.00 3.00
1.70 3.00
17.70 19.20
-
2.00 3.00
1.00 1.00 1.00
6/7/2013 8/7/2013
U7 U7
22 23 24
1.00 1.00 1.00
-
2.00 2.00 2.00
1.00 1.00 1.00
3.00 3.00 3.00
1.00 1.00 1.00
18.90 19.50 18.60
10.00 10.00 10.00
3.00 3.00 3.00
3.00 3.00 3.00
2.90 3.00 2.60
0.50
18.90 19.50 18.60
-
3.00 3.00 3.00
8/7/2013 3/7/2013
U7 U7
25 26
1.00 1.00
-
2.00 2.00
1.00 1.00
3.00 3.00
1.00 1.00
19.50 19.80
10.00 10.00
3.00 3.00
3.00 3.00
3.00 3.00
0.50 0.80
19.50 19.80
-
3.00 3.00
27
-
-
-
0.20
-
-
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
PILE POSITIO N
DATE RECEIVED
BLOCK
150 MM X 150 MM RC PILE SUPLLY INITIAL 6M
3M
SUPPLY EXTENSION 6M
3M
HANDLE 6M
DRIVEN
3M
28 29
1.00 1.00
-
2.00 2.00
1.00 1.00
3.00 3.00
1.00 1.00
PENT 19.80 19.80
30 31
1.00 1.00
-
2.00 2.00
1.00 1.00
3.00 3.00
1.00 1.00
19.80 19.75
10.00 10.00
3.00 3.00
3.00 3.00
3.00 3.00
U7 U7
32 33 34
1.00 1.00 1.00
-
2.00 2.00 2.00
1.00 1.00 1.00
3.00 3.00 3.00
1.00 1.00 1.00
19.50 19.20 18.78
10.00 10.00 10.00
3.00 3.00 3.00
3.00 3.00 3.00
6/7/2013 6/7/2013
U7 U7
35 36
1.00 1.00
-
2.00 2.00
1.00
3.00 3.00
1.00 -
18.76 17.10
10.00 10.00
3.00 3.00
6/7/2013 6/7/2013
U7 U7
37 38
1.00 1.00
-
2.00 2.00
17.40 16.90
10.00 10.00
3.00 3.00
3/7/2013 3/7/2013 3/7/2013
U7 U7 U7
3/7/2013 6/7/2013
U7 U7
6/7/2013 6/7/2013
3.00 3.00
-
< 10M 10.00 10.00
10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31 3.00 3.00 3.00 0.80 3.00 3.00 3.00 0.80
Check
WELD JOINTS
SHOE
19.80 19.80
-
3.00 3.00
0.80 0.75
19.80 19.75
-
3.00 3.00
3.00 3.00 2.00
0.50 0.20 0.78
19.50 19.20 18.78
-
3.00 3.00 3.00
3.00 3.00
2.00 1.10
0.76
18.76 17.10
-
3.00 2.00
1.00 1.00
3.00 3.00
1.40 0.90
17.40 16.90
-
2.00 2.00
1.00 1.00
39 40
-
-
-
-
-
41 42
-
-
-
-
-
1.00 1.00 1.00 1.00 1.00 1.00 1.00
8/7/2013
U7
43
1.00
-
2.00
1.00
3.00
1.00
18.60
10.00
3.00
3.00
2.00
0.60
18.60
-
3.00
2.00
8/7/2013 8/7/2013 8/7/2013
U7 U7 U7
44
1.00
-
2.00
1.00
3.00
1.00
18.60
10.00
3.00
3.00
2.00
0.60
18.60
-
3.00
45
1.00
-
2.00
3.00
-
17.93
10.00
3.00
3.00
1.93
17.93
-
2.00
46
1.00
-
2.00
3.00
-
16.60
10.00
3.00
3.00
0.60
16.60
-
2.00
1.00 1.00 1.00
8/7/2013 8/7/2013
U7 U7
47
1.00
-
2.00
3.00
-
17.10
10.00
3.00
3.00
1.10
17.10
-
2.00
48
1.00
-
2.00
3.00
-
16.41
10.00
3.00
3.00
0.41
16.41
-
2.00
1.00 1.00
49 50
-
-
-
-
-
8/7/2013 8/7/2013
U7 U7
51 52
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.61 17.57
10.00 10.00
3.00 3.00
3.00 3.00
1.61 1.57
17.61 17.57
-
2.00 2.00
1.00 1.00
8/7/2013 8/7/2013
U7 U7
53 54
1.00 1.00
-
2.00 2.00
3.00 3.00
-
17.60 18.00
10.00 10.00
3.00 3.00
3.00 3.00
1.60 2.00
17.60 18.00
-
2.00 2.00
1.00 1.00
6/7/2013
U7
55 56
-
-
-
-
-
57 58 59
-
-
-
-
-
60
1.00
-
2.00
47.00
-
94.00
3.00 21.00
141.00
-
17.40
10.00
3.00
3.00
1.40
21.00
858.90
470.00
141.00
141.00
95.50
Average
18.27
11.40
-
-
-
17.40
-
2.00
1.00
858.90
-
114.00
48.00
1.00 1.00
1
1.00
-
2.00
-
3.00
-
15.49
10.00
3.00
2.49
15.49
-
2.00
2 3
1.00 1.00
-
2.00 2.00
-
3.00 3.00
-
15.60 15.60
10.00 10.00
3.00 3.00
2.60 2.60
15.60 15.60
-
2.00 2.00
U9
4 5 6
1.00 1.00
-
1.00 2.00
1.00 -
2.00 3.00 -
1.00 -
15.00 15.90
10.00 10.00
3.00 3.00
2.00 2.90
15.00 15.90 -
-
2.00 2.00
3/7/2013 4/7/2013
U9 U9
7 8
1.00 1.00
-
2.00 1.00
1.00
3.00 2.00
1.00
14.67 15.00
10.00 10.00
3.00 3.00
1.67 2.00
14.67 15.00
-
2.00 2.00
1.00 1.00
3/7/2013 3/7/2013
U9 U9
9 10
1.00
-
1.00
10.34
10.00
0.34
10.34
-
1.00
-
1.00
1.00 1.00
5/7/2013
U9 U9
10.80 -
U9 U9
16.80 15.60 15.25
-
2.00 2.00 2.00
1.00
5/7/2013 5/7/2013 5/7/2013 4/7/2013 4/7/2013
U9 U9 U9
20.10 15.00
-
3.00 2.00
15.00
-
2.00
1.00 1.00 1.00
5/7/2013 5/7/2013
U9 U9
5/7/2013 4/7/2013
U9 U9
4/7/2013
-
2.00
-
11 12
1.00
-
1.00
-
2.00 -
-
10.80
10.00
0.80
13 14 15
1.00 1.00 1.00
-
2.00 2.00 2.00
-
3.00 3.00 3.00
-
16.80 15.60 15.25
10.00 10.00 10.00
3.00 3.00 3.00
3.00 2.60 2.25
0.80
16 17
1.00 1.00
-
2.00 1.00
1.00 1.00
3.00 2.00
1.00 1.00
20.10 15.00
10.00 10.00
3.00 3.00
3.00 2.00
3.00
18
1.00
-
1.00
1.00
2.00
1.00
15.00
10.00
3.00
2.00
-
1.10
1.00 1.00 1.00
1.00 1.00
SUMMARY OF PILING RECORD PROJECT TITLE
:
PILE SIZE
:
DATE
PILE POSITIO N
DATE RECEIVED
BLOCK
150 MM X 150 MM RC PILE SUPLLY INITIAL 6M
3M
SUPPLY EXTENSION 6M
3M
HANDLE 6M
19 20
1.00 1.00
-
1.00 1.00
21 22
1.00 1.00
-
2.00 2.00
U9 U9
23 24 25
1.00 1.00 1.00
-
2.00 1.00 2.00
5/7/2013 5/7/2013
U9 U9
26 27
1.00 1.00
-
2.00 2.00
5/7/2013 5/7/2013 5/7/2013
U9 U9 U9
28 29
1.00 1.00
-
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
5/7/2013 4/7/2013
U9 U9
30 31
1.00 1.00
-
1.00 2.00
1.00 -
2.00 3.00
4/7/2013 4/7/2013
U9 U9
32 33
1.00 1.00
-
1.00 1.00
1.00 1.00
34
1.00
-
1.00
4/7/2013 3/7/2013 3/7/2013
U9 U9 U9
35
1.00
-
36
1.00
-
37
1.00
3/7/2013 3/7/2013
U9 U9
38
1.00
39
3/7/2013 5/7/2013
U9 U9
5/7/2013 5/7/2013
10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31 3.00 2.00 3.00 2.00
14.40 15.60
10.00 10.00
3.00 3.00
15.60 14.60 14.70
10.00 10.00 10.00
15.30 15.58
Check
WELD JOINTS
SHOE
2.00 2.00
1.40 2.60
14.40 15.60
-
2.00 2.00
3.00 3.00 3.00
2.60 1.60 1.70
15.60 14.60 14.70
-
2.00 2.00 2.00
10.00 10.00
3.00 3.00
2.30 2.58
15.30 15.58
-
2.00 2.00
1.00 1.00
15.00 14.60
10.00 10.00
3.00 3.00
2.00 1.60
15.00 14.60
-
2.00 2.00
1.00 -
15.00 14.70
10.00 10.00
3.00 3.00
2.00 1.70
15.00 14.70
-
2.00 2.00
1.00 1.00 1.00
2.00 2.00
1.00 1.00
14.33 14.40
10.00 10.00
3.00 3.00
1.33 1.40
14.33 14.40
-
2.00 2.00
1.00
2.00
1.00
14.70
10.00
3.00
1.70
14.70
-
2.00
1.00
1.00
2.00
1.00
14.24
10.00
3.00
1.24
14.24
-
2.00
1.00
1.00
2.00
1.00
13.05
10.00
3.00
0.05
13.05
-
2.00
-
1.00
1.00
2.00
1.00
13.12
10.00
3.00
0.12
13.12
-
2.00
-
2.00
13.80
10.00
3.00
0.80
13.80
-
2.00
1.00
-
1.00
1.00
2.00
1.00
13.48
10.00
3.00
0.48
13.48
-
2.00
1.00 1.00
40 41
1.00 1.00
-
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
13.80 14.40
10.00 10.00
3.00 3.00
0.80 1.40
13.80 14.40
-
2.00 2.00
1.00 1.00
U9 U9
42 43
1.00 1.00
-
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
14.32 14.53
10.00 10.00
3.00 3.00
1.32 1.53
14.32 14.53
-
2.00 2.00
1.00 1.00
5/7/2013 4/7/2013
U9 U9
44 45
1.00 1.00
-
2.00 2.00
3.00 3.00
-
14.40 15.60
10.00 10.00
3.00 3.00
1.40 2.60
14.40 15.60
-
2.00 2.00
1.00 1.00
4/7/2013
U9 U9
46 47
1.00 1.00
-
2.00 2.00
3.00 3.00
-
14.70 15.60
10.00 10.00
3.00 3.00
1.70 2.60
14.70 15.60
-
2.00 2.00
1.00
4/7/2013 3/7/2013
U9 U9
3/7/2013
U9
1.00 1.00 1.00
-
2.00 2.00 2.00
-
3.00 3.00 3.00
-
14.40 14.40 14.38
10.00 10.00 10.00
3.00 3.00 3.00
1.40 1.40 1.38
14.40 14.40 14.38
-
2.00 2.00 2.00
1.00
3/7/2013
48 49 50
5/7/2013
U9 U9 U9
1.00 1.00
-
2.00 2.00
-
3.00 3.00
-
15.30 15.75
10.00 10.00
3.00 3.00
2.30 2.75
15.30 15.75
-
2.00 2.00
1.00
5/7/2013 4/7/2013
51 52
4/7/2013 4/7/2013
U9 U9
53 54
1.00 1.00
-
1.00 2.00
-
2.00 3.00
-
14.50 15.50
10.00 10.00
3.00 3.00
1.50 2.50
14.50 15.50
-
1.00 2.00
55
1.00
-
2.00
3.00
-
15.30
10.00
3.00
2.30
15.30
-
2.00
1.00 1.00
6/7/2013
U9
57
1.00
-
1.00
14.51
10.00
3.00
1.51
14.51
-
2.00
1.00
6/7/2013 6/7/2013 6/7/2013
U9 U9 U9
58
1.00
-
2.00
3.00
-
16.50
10.00
3.00
3.00
0.50
16.50
-
2.00
59
1.00
2.00
3.00
-
16.50
10.00
3.00
3.00
0.50
16.50
-
2.00
60
1.00
-
2.00
3.00
-
17.10
10.00
3.00
3.00
1.10
17.10
-
2.00
1.00 1.00 1.00
56.00
-
87.00
23.00
833.84
560.00
163.14
103.70
5.90
1.10
-
-
-
833.84
-
110.00
56.00
Average
14.89
6,789.97
826.69
424.63
171.67
18.70
-
-
-
8,231.66
-
723.00
737.00
4/7/2013 4/7/2013
U9 U9
3/7/2013 3/7/2013
56
TOTAL FOR 179 PILE POINTS
1.00 -
-
-
736.00
-
3.00 3.00 3.00 2.00 3.00 3.00 3.00
3.00
-
654.00
1.00
23.00
326.00
2.00
143.00
###
1.00 1.00
< 10M 10.00 10.00
-
U9 U9 U9
2.00 2.00
PENT 15.00 15.00
15.00 15.00
4/7/2013 4/7/2013 4/7/2013
1.00 1.00
DRIVEN
3M
1.00 -
-
1.00
326.00 Average
SUPPLY
HANDLE
INITIAL
6M
736.00
###
EXTENSION
3M 6M
654.00
###
3M 6M
326.00 ###
978.00 ###
### 978.00
-
8,231.66 11.18
1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00
-