RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

Sec. I

BH-T2 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF Reference

n   Qu   Ap  0.5DN  Pd Nq    KPdi tanAsi   CAS i 1  

Length of Pile below Ground Level Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer 2 m Depth t/m3 t/m 3.40 4 4 0.850 0.78 I 1 5 0.780 1.95 I 2.5 7.5 0.780 4.80 I 6 13.5 0.800 2.76 II 3 16.5 0.920 1.38 II 1.5 18 0.920 2.40 III 3 21 0.800 7.14 IV 7 28 1.020 3.06 IV 3 31 1.020 0.41 V 0.5 31.5 0.820

L D γ Nq Nγ Ap k Pdi Pd Φ Pdi 2

t/m 1.70 3.79 5.16 8.53 12.31 14.38 15.07 15.07 15.07 15.07

As 2

m 15.08 3.77 9.42 22.62 11.31 5.65 11.31 26.39 11.31 1.88

31.5 1.2 0.820 35.00 37.77 0 1.1310 1 15 15.1

= = = = = = = = = = = =

15.1 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 33 0 33

0 0 0 0 0 0 0 33 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

617.55 276.71 0 161.31 617.55 438.02 1055.57 2.5 422.23

(As per IS2911 Part I/Sec 2)

m m 3

t/m

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 258.26 0.00 18.45 276.71

(As per GIR)

C

α

α x C x As

0 0 2.2 2.2 6 6 6 0 13

0 0 0.7 0.7 0.4 0.4 0.4 0 0.3

0.00 0.00 14.51 34.83 27.14 13.57 27.14 0.00 44.11 0.00 161.31

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

2.00 2.00 9.00 9.00 9.00 20.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 29.0 m

RAIL VIKAS NIGAM LIMITED

Project

Calculations for

Decipline Cal. By Chkd. By

VERTICAL CAPACITY OF PILE SUMMARY SHEET

MGC File CAL 104 / Rev D-1 22/03/13 AKD Date 22/03/13 MSP Date

Sec. Table: 1

PILE DIA.

=

1.2 m

COL = 6

7

2.5 m bgl

1

2

3

4

5

8

9

10

Pier No.

Nearest Influencing Boreholes

Critical Borehole

Ground Level (m)

Pile Tip Level (m)

P 01

ABH-1

ABH-1

P 02

ABH-1

ABH-1

P 03

ABH-1, BH-T2

BH-T2

+ 4.46

- 27.04

31.50

29.00

-40.00

8.50

422

P 04

BH-T2

BH-T2

+ 4.46

- 27.04

31.50

29.00

-40.00

8.50

422

P 05

BH-T1

BH-T1

+ 3.90

- 21.60

25.50

23.00

-28.00

2.50

403

P 06

BH-T1

BH-T1

+ 3.90

- 21.60

25.50

23.00

-28.00

2.50

403

P 07

BH-T1, ABH-2

-

P 08

ABH-2, ABH-3

ABH-2

P 09

ABH-3

ABH-3

P 10

ABH-3, BH-T3

BH-T3

+ 3.30

- 27.20

30.50

28.00

-33.50

3.00

428

P 11

BH-T3

BH-T3

+ 3.30

- 27.20

30.50

28.00

-33.50

3.00

428

P 12

BH-T3, BH-T4

BH-T4

P 13

BH-T4

BH-T4

+ 3.42

- 26.58

30.00

27.50

-50.00

20.00

481

P 14

BH-T4

BH-T4

+ 3.42

- 26.58

30.00

27.50

-50.00

20.00

481

P 15

ABH-4

ABH-4

P 16

ABH-4

ABH-4

P 17

ABH-5

ABH-5

P 18

ABH-5, ABH-6

ABH-5

P 19

ABH-6

ABH-6

P 20

ABH-6, BH-T5

-

P 21

BH-T5

BH-T5

+ 5.69

- 27.81

33.50

31.00

-50.00

16.50

428

P 22

BH-T5, ABH-7

BH-T5

+ 5.69

- 27.81

33.50

31.00

-50.00

16.50

428

P 23

ABH-7

ABH-7

P 24

ABH-7

ABH-7

P 25

ABH-8

ABH-8

P 26

ABH-8

ABH-8

P 27

ABH-8

ABH-8

P 28

BH-T6

BH-T6

+ 6.54

- 23.47

30.00

27.50

-50.00

20.00

447

P 29

BH-T6

BH-T6

+ 6.54

- 23.47

30.00

27.50

-50.00

20.00

447

P 30

BH-T6

BH-T6

+ 6.54

- 23.47

30.00

27.50

-50.00

20.00

447

P 31

ABH-9

ABH-9

P 32

ABH-9

ABH-9

P 33

ABH-10

ABH-10

P 34

ABH-10

ABH-10

11

End of Available Pile Pile Sand Layer Sand Working Recommended termination termination / Clay Layer layer Load Vertical Working depth below depth below Start Level below Pile Capacity (t) Load (t) EGL, (m) COL, (m) (m) Toe (m)

Borehole Investigation in Progress

400.00

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress 400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

RAIL VIKAS NIGAM LIMITED

Project

Calculations for

Decipline Cal. By Chkd. By

VERTICAL CAPACITY OF PILE SUMMARY SHEET

MGC File CAL 104 / Rev D-1 22/03/13 AKD Date 22/03/13 MSP Date

Sec. Table: 1

PILE DIA.

=

1.2 m

COL = 6

7

2.5 m bgl

1

2

3

4

5

8

9

10

11

Pier No.

Nearest Influencing Boreholes

Critical Borehole

Ground Level (m)

Pile Tip Level (m)

P 35

BH-T13

BH-T13

+ 7.98

- 37.02

45.00

42.50

-50.45

5.45

437

P 36

BH-T13, ABH-11

BH-T13

+ 7.98

- 37.02

45.00

42.50

-50.45

5.45

437

P 37

ABH-11

ABH-11

P 38

ABH-11

ABH-11

P 39

ABH-12

ABH-12

P 40

ABH-12

ABH-12

P 41

ABH-13

ABH-13

P 42

ABH-13

ABH-13

P 43

ABH-14

ABH-14

P 44

ABH-14

ABH-14

P 45

ABH-14, ABH-15

-

P 46

ABH-15

ABH-15

P 47

ABH-15

ABH-15

P 48

ABH-16

ABH-16

P 49

ABH-16

ABH-16

P 50

ABH-16

ABH-16

P 51

ABH-16, BH-C18

-

P 52

BH-C18

BH-C18

+ 8.20

- 24.80

33.00

30.50

-36.00

3.00

405

P 53

BH-C18

BH-C18

+ 8.20

- 24.80

33.00

30.50

-36.00

3.00

405

P 54

BH-C18, ABH-17

-

P 55

BH-C18, ABH-17

ABH-17

P 56

ABH-17

ABH-17

P 57

ABH-17

ABH-17

P 58

ABH-17, BH-C17

-

P 59

BH-C17

BH-C17

4.50

411

400.00

P 60

BH-C17, ABH-18

-

P 61

ABH-18

ABH-18

P 62

BH-C16

BH-C16

3.10

435

400.00

P 63

BH-C16, ABH-19

-

P 64

ABH-19

ABH-19

P 65

ABH-19, ABH-20

-

P 66

ABH-20

ABH-20

P 67

ABH-20, ABH-21

-

P 68

ABH-21

ABH-21

P 69

ABH-21,BH-C15

BH-C15

+ 11.80

- 34.70

46.50

44.00

-50.10

3.60

430

P 70

BH-C15

BH-C15

+ 11.80

- 34.70

46.50

44.00

-50.10

3.60

430

P 71

BH-C14, BH-C15

BH-C15

+ 11.80

- 34.70

46.50

44.00

-50.10

3.60

430

P 72

BH-C14

BH-C14

+ 10.40

- 34.10

44.50

42.00

-47.00

2.50

461

P 73

BH-C14

BH-C14

+ 10.40

- 34.10

44.50

42.00

-47.00

2.50

461

P 74

ABH-22

ABH-22

P 75

BH-C13, ABH-22

-

End of Available Pile Pile Sand Layer Sand Working Recommended termination termination / Clay Layer layer Load Vertical Working depth below depth below Start Level below Pile Capacity (t) Load (t) EGL, (m) COL, (m) (m) Toe (m)

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

+ 9.40

- 32.60

42.00

39.50

-46.50

Borehole Investigation in Progress + 11.30

- 35.70

47.00

44.50

-50.10

Borehole Investigation in Progress

400.00

400.00

Borehole Investigation in Progress

RAIL VIKAS NIGAM LIMITED

Project

Calculations for

Decipline Cal. By Chkd. By

VERTICAL CAPACITY OF PILE SUMMARY SHEET

MGC File CAL 104 / Rev D-1 22/03/13 AKD Date 22/03/13 MSP Date

Sec. Table: 1

PILE DIA.

=

1.2 m

COL = 6

7

2.5 m bgl

1

2

3

4

5

8

9

10

11

Pier No.

Nearest Influencing Boreholes

Critical Borehole

Ground Level (m)

Pile Tip Level (m)

P 76

BH-C13

BH-C13

+ 8.80

- 31.20

40.00

37.50

-46.50

6.50

458

P 77

BH-C13

BH-C13

+ 8.80

- 31.20

40.00

37.50

-46.50

6.50

458

P 78

BH-C12

BH-C12

+ 9.00

- 30.50

39.50

37.00

-42.00

2.50

416

P 79

BH-C10

BH-C10

P 80

BH-C10

BH-C10

P 81

BH-C9

BH-C9

P 82

BH-C9

BH-C9

P 83

BH-C6

BH-C6

P 84

BH-C6

BH-C6

P 85

BH-C4, BH-C5

BH-C4

+ 5.00

- 25.00

30.00

27.50

-33.50

3.50

436

P 86

BH-C4

BH-C4

+ 5.00

- 25.00

30.00

27.50

-33.50

3.50

436

P 87

ABH-23, BH-C4

ABH-23

P 88

ABH-23

ABH-23

P 89

BH-C3

BH-C3

+ 5.70

- 24.30

30.00

27.50

-33.00

3.00

408

P 90

BH-C3

BH-C3

+ 5.70

- 24.30

30.00

27.50

-33.00

3.00

408

P 91

BH-C3, ABH-24

ABH-24

P 92

ABH-24

ABH-24

P 93

BH-C19, ABH-24

-

P 94

BH-C19, BH-C2

BH-C19

+ 4.60

- 25.40

30.00

27.50

3.00

443

400.00

P 95

BH-C2

BH-C2

+ 5.50

- 24.50

30.00

27.50

-33.00

3.00

457

400.00

P 96

BH-C1, BH-C2

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 97

BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 98

BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 99

BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 100

BH-20, BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 101

BH-C20

BH-C20

P 102

BH-C20

BH-C20

P 103

BH-C20, ABH-25

-

P 104

ABH-25

ABH-25

P 105

ABH-25

ABH-25

P 106

ABH-25, BH-C21

-

P 107

BH-C21

BH-C21

P 108

BH-C21

BH-C21

P 109

BH-C21, ABH-26

-

P 110

ABH-26

ABH-26

P 111

ABH-26

ABH-26

P 112

ABH-26, ABH-27

-

P 113

ABH-27

ABH-27

End of Available Pile Pile Sand Layer Sand Working Recommended termination termination / Clay Layer layer Load Vertical Working depth below depth below Start Level below Pile Capacity (t) Load (t) EGL, (m) COL, (m) (m) Toe (m)

400.00

400.00

Bridge

Bridge

Bridge

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

-33.00

Borehole Investigation in Progress

400.00

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-T1 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N25.5q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer 2 m Depth t/m3 t/m 4.10 5 5 0.820 1.23 I 1.5 6.5 0.820 2.00 II 2.5 9 0.800 2.55 II 3 12 0.850 2.76 III 3 15 0.920 2.88 III 3 18 0.960 0.48 III 0.5 18.5 0.960 5.95 IV 7 25.5 0.850

γ Nq Nγ Ap k Pdi Pd Φ Pdi 2

t/m 2.05 4.72 6.33 8.61 11.26 14.08 15.52 15.52

As 2

m 18.85 5.65 9.42 11.31 11.31 11.31 1.88 26.39

0.850 35.00 37.77 0 1.1310 1 15 15.5

= = = = = = = = = =

15.5 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

636.13 265.97 0 106.09 636.13 372.07 1008.20 2.5 403.28

(As per IS2911 Part I/Sec 2)

3

t/m

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 265.97 265.97

(As per GIR)

C

α

α x C x As

0 2.25 1.8 1.8 5.8 5.8 5.8

0 0.7 0.7 0.7 0.5 0.5 0.5

0.00 8.91 11.88 14.25 32.80 32.80 5.47 0.00 106.09

Corrected N Value (As per ODC Clause - 7.17a )

2.00 2.00 2.00 7.00 7.00 7.00

(As per ODC Clause - 7.17a )

% T T T T T T T T

2.5 m 23.0 m

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-T2 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N31.5q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer 2 m Depth t/m3 t/m 3.40 4 4 0.850 0.78 I 1 5 0.780 1.95 I 2.5 7.5 0.780 4.80 I 6 13.5 0.800 2.76 II 3 16.5 0.920 1.38 II 1.5 18 0.920 2.40 III 3 21 0.800 7.14 IV 7 28 1.020 3.06 IV 3 31 1.020 0.41 V 0.5 31.5 0.820

γ Nq Nγ Ap k Pdi Pd Φ Pdi 2

t/m 1.70 3.79 5.16 8.53 12.31 14.38 15.07 15.07 15.07 15.07

As 2

m 15.08 3.77 9.42 22.62 11.31 5.65 11.31 26.39 11.31 1.88

0.820 35.00 37.77 0 1.1310 1 15 15.1

= = = = = = = = = =

15.1 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 33 0 33

0 0 0 0 0 0 0 33 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

617.55 276.71 0 161.31 617.55 438.02 1055.57 2.5 422.23

(As per IS2911 Part I/Sec 2)

3

t/m

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 258.26 0.00 18.45 276.71

(As per GIR)

C

α

α x C x As

0 0 2.2 2.2 6 6 6 0 13

0 0 0.7 0.7 0.4 0.4 0.4 0 0.3

0.00 0.00 14.51 34.83 27.14 13.57 27.14 0.00 44.11 0.00 161.31

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

2.00 2.00 9.00 9.00 9.00 20.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 29.0 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-T3 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30.5q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer 2 m Depth t/m3 t/m 1.20 1.5 1.5 0.800 2.80 I 3.5 5 0.800 1.17 I 1.5 6.5 0.780 2.34 I 3 9.5 0.780 2.46 I 3 12.5 0.820 4.29 II 5.5 18 0.780 2.85 II 3 21 0.950 5.23 III 5.5 26.5 0.950 3.36 IV 4 30.5 0.840

γ Nq Nγ Ap k Pdi Pd Φ Pdi 2

t/m 0.60 2.60 4.59 6.34 8.74 12.12 14.26 14.26 14.26

As 2

m 5.65 13.19 5.65 11.31 11.31 20.73 11.31 20.73 15.08

0.840 35.00 37.77 0 1.1310 1 15 14.3

= = = = = = = = = =

14.3 33.00

Φ

δ

tanδ

0 0 0 0 0 31 31 0 33

0 0 0 0 0 31 31 0 33

0.00 0.00 0.00 0.00 0.00 0.60 0.60 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

586.00 387.49 0 95.28 586.00 482.77 1068.77 2.5 427.51

(As per IS2911 Part I/Sec 2)

3

t/m

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 150.94 96.90 0.00 139.65 387.49

(As per GIR)

C

α

α x C x As

0 0 2.3 2.3 2.3 0 0 8

0 0 0.7 0.7 0.7 0 0 0.3

0.00 0.00 9.10 18.21 18.21 0.00 0.00 49.76 0.00 95.28

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

3.00 3.00 3.00

21.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 28 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-T4 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer 2 m Depth t/m3 t/m 0.60 0.75 0.75 0.800 3.40 I 4.25 5 0.800 3.12 I 4 9 0.780 3.74 I 4.5 13.5 0.830 3.74 II 4.5 18 0.830 10.08 II 12 30 0.840

γ Nq Nγ Ap k Pdi Pd Φ Pdi 2

t/m 0.30 2.30 5.56 8.99 12.72 14.59

As 2

m 2.83 16.02 15.08 16.96 16.96 45.24

0.840 35.00 37.77 0 1.1310 1 15 14.6

= = = = = = = = = =

14.6 33.00

Φ

δ

tanδ

0 0 0 0 30 33

0 0 0 0 30 33

0.00 0.00 0.00 0.00 0.58 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

599.06 553.24 0 49.67 599.06 602.91 1201.97 2.5 480.79

(As per IS2911 Part I/Sec 2)

3

t/m

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 124.61 428.63 553.24

(As per GIR)

C

α

α x C x As

0 0 3.1 3.1 0 0

0 0 0.5 0.5 0 0

0.00 0.00 23.37 26.30 0.00 0.00 49.67

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 27.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

Sec. I

BH-T5 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF Reference

  Qu   Ap  0.5DN  Pd Nq    KPdi tanAsi   CAS i 1   n

Length of Pile below Ground Level Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 0.00 2.5 2.5 0.000 2.05 I 2.5 5 0.820 2.46 I 3 8 0.820 2.46 I 3 11 0.820 3.28 II 4 15 0.820 2.85 III 3 18 0.950 2.76 III 3 21 0.920 9.13 IV 11 32 0.830

L D γ Nq Nγ Ap k

Pdi Pd Φ Pdi

As

2

2

t/m 0.00 1.03 3.28 5.74 8.61 11.68 13.10 13.10

m 9.42 9.42 11.31 11.31 15.08 11.31 11.31 41.47

32.0 1.2 0.830 35.00 37.77 0 1.1310 1 15 13.1

= = = = = = = = = = = =

Φ

δ

0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 33

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

m m

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m 13.1 t/m2 33.00 deg Σ K x Pdi x tanδ tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 352.79 0.65 352.79

539.82 352.79 0 177.19 539.82 529.97 1069.80 2.5 427.92

(As per IS2911 Part I/Sec 2)

(As per GIR)

C

α

α x C x As

Corrected N Value

0 0 3.3 3.3 10 10 9

0 0 0.5 0.5 0.5 0.3 0.3

0.00 0.00 18.66 18.66 75.40 33.93 30.54 0.00 177.19

4.00 4.00 4.00 14.00 14.00

(As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 29.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-T6 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer 2 m Depth t/m3 t/m 4.10 5 5 0.820 0.81 I 1 6 0.810 3.69 II 4.5 10.5 0.820 2.46 II 3 13.5 0.820 2.05 II 2.5 16 0.820 0.91 II 0.5 16.5 1.820 1.32 II 1.5 18 0.880 0.88 II 1 19 0.880 9.90 III 11 30 0.900

γ Nq Nγ Ap k Pdi Pdi Φ Pdi 2

t/m 2.05 4.51 6.76 9.83 12.09 13.57 13.77 15.34 15.34

As 2

m 18.85 3.77 16.96 11.31 9.42 1.88 5.65 3.77 41.47

0.900 35.00 37.77 0 1.1310 1 15 15.3

= = = = = = = = = =

15.3 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

630.29 413.11 0 73.32 630.29 486.44 1116.72 2.5 446.69

(As per IS2911 Part I/Sec 2)

3

t/m

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 413.11 413.11 % T T T T T T T T

2.5 m 27.5 m

(As per GIR)

C

α

α x C x As

0 3.5 2.3 2.3 2.3 6.5 6.5 2.5 0

0 0.5 0.5 0.5 0.5 0.4 0.4 0.4 0

0.00 6.60 19.51 13.01 10.84 4.90 14.70 3.77 0.00 73.32

Corrected N Value (As per ODC Clause - 7.17a )

4.00 4.00 4.00 4.00 11.00 11.00 11.00

(As per ODC Clause - 7.17a )

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-T13 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N45.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.80 3.5 3.5 0.800 1.22 I 1.5 5 0.810 0.82 I 1 6 0.820 2.46 I 3 9 0.820 2.40 I 3 12 0.800 1.60 I 2 14 0.800 3.44 II 4 18 0.860 25.22 II 26 44 0.970 0.82 II 1 45 0.820

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.40 3.41 4.43 6.07 8.50 10.50 13.02 14.74 14.74

m2 13.19 5.65 3.77 11.31 11.31 7.54 15.08 98.02 3.77

0.820 35.00 37.77 0 1.1310 1 15 14.7

= = = = = = = = = =

14.7 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

604.29 36.07 0 452.28 604.29 488.35 1092.64 2.5 437.06

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.07 36.07

(As per GIR)

C

α

α x C x As

0 0 3.7 3.7 3.7 3.7 5.5 12.4 0

0 0 0.5 0.5 0.5 0.5 0.3 0.3 0

0.00 0.00 6.97 20.92 20.92 13.95 24.88 364.63 0.00 452.28

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00 4.00 4.00 13.00 13.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 42.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C1 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N29.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 3.81 4.5 4.5 0.846 0.31 I 0.5 5 0.629 4.40 II 7 12 0.629 3.88 IIIA 4 16 0.969 1.89 IIIB 2 18 0.946 2.96 IIIB 3 21 0.986 7.24 IV 7.5 28.5 0.965 0.51 IV 0.5 29 1.020

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.90 3.96 6.32 10.46 13.35 14.29 14.29 14.29

m2 16.96 1.88 26.39 15.08 7.54 11.31 28.27 1.88

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity Pile Cut Off level from GL Length of Pile below Cut-off Level Level

1.020 35.00 37.77 0 1.1310 1 15 14.3

= = = = = = = = = =

14.3 33.00

Φ

δ

tanδ

0 0 0 0 0 0 33 33

0 0 0 0 0 0 33 33

0.00 0.00 0.00 0.00 0.00 0.00 0.65 0.65

= = = = = = = = = = =

591.90 279.93 0 153.44 591.90 433.36 1025.26 2.5 410.10

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 262.43 17.50 279.93

(As per GIR)

C

α

α x C x As

0 0 2.2 9 7.5 10.5 0 0

0 0 0.5 0.4 0.4 0.4 0 0

0.00 0.00 29.03 54.29 22.62 47.50 0.00 0.00 153.44

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

5.00 12.00 13.00 13.00

T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 26.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C2 Rev. D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.00 2.5 2.5 0.800 2.11 I 2.5 5 0.843 0.84 I 1 6 0.843 2.93 II 4.5 10.5 0.650 2.62 IIIA 3 13.5 0.872 1.47 IIIA 1.5 15 0.978 2.42 IIIB 3 18 0.805 6.04 IIIB 7.5 25.5 0.805 4.34 IV 4.5 30 0.965

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.00 3.05 4.53 6.41 9.18 11.23 13.17 14.37 14.37

m2 9.42 9.42 3.77 16.96 11.31 5.65 11.31 28.27 16.96

0.965 35.00 37.77 0 1.1310 1 15 14.4

= = = = = = = = = =

14.4 33.00

Φ

δ

tanδ

0 0 0 0 0 0 30 30 33

0 0 0 0 0 0 30 30 33

0.00 0.00 0.00 0.00 0.00 0.00 0.58 0.58 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

593.69 478.96 0 69.25 593.69 548.21 1141.91 2.5 456.76

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 85.97 234.64 158.35 478.96 % T T T T T T T T

2.5 m 27.5 m

(As per GIR)

C

α

α x C x As

0 0 2.9 2.2 6.65 6.65 0 0 0

0 0 0.5 0.5 0.4 0.4 0 0 0

0.00 0.00 5.47 18.66 30.08 15.04 0.00 0.00 0.00 69.25

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00 11.00 11.00

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C3 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.00 2.5 2.5 0.800 2.10 I 2.5 5 0.840 1.68 I 2 7 0.840 3.98 II 5.5 12.5 0.723 3.76 IIIA 4 16.5 0.940 1.44 IIIB 1.5 18 0.960 2.88 IIIB 3 21 0.960 4.64 IIIB 4.5 25.5 1.030 4.59 IV 4.5 30 1.020

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.00 3.05 4.94 7.77 11.64 14.24 14.96 14.96 14.96

m2 9.42 9.42 7.54 20.73 15.08 5.65 11.31 16.96 16.96

1.020 35.00 37.77 0 1.1310 1 15 15.0

= = = = = = = = = =

15.0 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

618.18 164.77 0 237.17 618.18 401.94 1020.12 2.5 408.05

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 164.77 164.77

(As per GIR)

C

α

α x C x As

0 0 2.9 2.6 6.6 8.5 8.5 15 0

0 0 0.5 0.5 0.4 0.4 0.4 0.4 0

0.00 0.00 10.93 26.95 39.81 19.23 38.45 101.79 0.00 237.17

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00 8.00 11.00 11.00 11.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 27.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C4 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.00 2.5 2.5 0.800 2.10 I 2.5 5 0.840 0.84 I 1 6 0.840 5.07 II 7 13 0.724 3.35 IIIA 3.5 16.5 0.958 1.43 IIIB 1.5 18 0.950 1.43 IIIB 1.5 19.5 0.950 1.55 IIIB 1.5 21 1.030 9.09 IV 9 30 1.010

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.00 3.05 4.52 7.47 11.68 14.07 14.79 14.79 14.79

m2 9.42 9.42 3.77 26.39 13.19 5.65 5.65 5.65 33.93

1.010 35.00 37.77 0 1.1310 1 15 14.8

= = = = = = = = = =

14.8 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

611.18 325.79 0 152.98 611.18 478.78 1089.95 2.5 435.98

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 325.79 325.79

(As per GIR)

C

α

α x C x As

0 0 2.9 2.5 8 8 8 15 0

0 0 0.7 0.5 0.4 0.4 0.4 0.4 0

0.00 0.00 7.65 32.99 42.22 18.10 18.10 33.93 0.00 152.98

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

3.00 5.00 11.00 12.00 12.00 12.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 27.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C12 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N39.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.40 3 3 0.800 1.71 I 2 5 0.853 5.12 II 6 11 0.853 3.31 IIIA 5 16 0.661 1.85 IIIA 2 18 0.927 11.12 IIIB 12 30 0.927 1.46 IIIB 1.5 31.5 0.970 4.64 IIIB 4.5 36 1.030 3.03 IV 3 39 1.010

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.20 3.25 6.67 10.88 13.46 14.38 14.38 14.38 14.38

m2 11.31 7.54 22.62 18.85 7.54 45.24 5.65 16.96 11.31

1.010 35.00 37.77 0 1.1310 1 15 14.4

= = = = = = = = = =

14.4 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

595.22 105.64 0 338.16 595.22 443.80 1039.02 2.5 415.61

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 105.64 105.64 % T T T T T T T T

2.5 m 36.5 m

(As per GIR)

C

α

α x C x As

0 0 3.4 2.2 5.9 5.9 9.5 15 0

0 0 0.5 0.5 0.5 0.5 0.4 0.4 0

0.00 0.00 38.45 20.73 22.24 133.45 21.49 101.79 0.00 338.16

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00 4.00 4.00 10.00 10.00

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C13 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N40.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 3.60 4.5 4.5 0.800 0.44 I 0.5 5 0.870 3.05 I 3.5 8.5 0.870 2.21 I 2.5 11 0.885 2.15 II 3 14 0.715 3.84 IIIA 4 18 0.959 12.95 IIIA 13.5 31.5 0.959 4.34 IIIB 4.5 36 0.965 1.55 IIIB 1.5 37.5 1.030 2.50 IV 2.5 40 1.000

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.80 3.82 5.56 8.19 10.37 13.36 15.27 15.27 15.27 15.27

m2 16.96 1.88 13.19 9.42 11.31 15.08 50.89 16.96 5.65 9.42

1.000 35.00 37.77 0 1.1310 1 15 15.3

= = = = = = = = = =

15.3 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

630.22 93.48 0 421.48 630.22 514.96 1145.18 2.5 458.07

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 93.48 93.48 % T T T T T T T T

2.5 m 37.5 m

(As per GIR)

C

α

α x C x As

0 0 4.2 4.2 2.6 7.6 7.6 12 12 0

0 0 0.5 0.5 0.5 0.5 0.5 0.4 0.4 0

0.00 0.00 27.71 19.79 14.70 57.30 193.40 81.43 27.14 0.00 421.48

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

6.00 7.00 5.00 6.00 6.00 9.00 9.00

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

BH-C14 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N42.5q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 4.80 6 6 0.800 2.52 I 3 9 0.839 2.71 I 3 12 0.902 2.10 II 3 15 0.700 2.63 IIIA 3 18 0.877 3.07 IIIA 3.5 21.5 0.877 9.72 IIIA 10.5 32 0.926 2.87 IIIA 3 35 0.956 2.88 IIIB 3 38 0.959 1.55 IIIB 1.5 39.5 1.030 2.94 IV 3 42.5 0.980

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 2.40 6.06 8.67 11.07 13.44 14.75 14.75 14.75 14.75 14.75 14.75

m2 22.62 11.31 11.31 11.31 11.31 13.19 39.58 11.31 11.31 5.65 11.31

0.980 35.00 37.77 0 1.1310 1 15 14.8

= = = = = = = = = =

14.8 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity

= = = = = = = = = =

Pile Cut Off level from GL Length of Pile below Cut-off Level Level

= =

609.14 108.36 0 434.11 609.14 542.47 1151.61 2.5 460.64

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.36 108.36

(As per GIR)

C

α

α x C x As

0 3.8 3.8 2 3.8 8.5 8.5 8.5 12 12 0

0 0.5 0.5 0.7 0.5 0.5 0.5 0.5 0.4 0.4 0

0.00 21.49 21.49 15.83 21.49 56.08 168.23 48.07 54.29 27.14 0.00 434.11

Corrected N Value (As per ODC Clause - 7.17a )

5.00 7.00 3.00 7.00 7.00 7.00 7.00 9.00 9.00

(As per ODC Clause - 7.17a )

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 40.0 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC BPH MSP

FILE NO. DATE DATE

Sec. I

BH-C15 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF Reference

  Q   Ap  0.5DN  Pd Nq    KPdi tanAsi   CAS i 1   n

u Level Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.40 3 3 0.800 1.67 I 2 5 0.833 3.33 I 4 9 0.833 5.38 I 6 15 0.896 2.15 II 3 18 0.716 1.07 II 1.5 19.5 0.716 5.66 IIIA 6 25.5 0.943 13.08 IIIA 13.5 39 0.969 4.32 IIIB 4.5 43.5 0.960 1.55 IIIB 1.5 45 1.030 1.47 IV 1.5 46.5 0.980

L D γ Nq Nγ Ap k

Pdi Pd Φ Pdi

As

2

2

t/m 1.20 3.23 5.73 10.09 13.85 14.92 14.92 14.92 14.92 14.92 14.92

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity Pile Cut Off level from GL Length of Pile below Cut-off Level Level

m 11.31 7.54 15.08 22.62 11.31 5.65 22.62 50.89 16.96 5.65 5.65

46.5 1.2 0.980 35.00 37.77 0 1.1310 1 15 14.9

= = = = = = = = = = = =

Φ

δ

0 0 0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 0 0 33

= = = = = = = = = = =

(As per IS2911 Part I/Sec 2)

m m

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

t/m 14.9 t/m2 33.00 deg Σ K x Pdi x tanδ tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.80 0.65 54.80 615.79 T 54.80 T 0 T 405.44 T 615.79 T 460.23 T 1076.02 T 2.5 430.41 T 2.5 m 44.0 m

(As per ODC Clause - 7.17a )

2

(As per GIR)

C

α

α x C x As

Corrected N Value

0 0 3.8 3.8 2.5 2.5 7.3 7.3 12 12 0

0 0 0.5 0.5 0.5 0.5 0.5 0.4 0.3 0.3 0

0.00 0.00 28.65 42.98 14.14 7.07 82.56 148.61 61.07 20.36 0.00 405.44

4.00 6.00 5.00 5.00 6.00 6.00 9.00 9.00

(As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC BPH MSP

FILE NO. DATE DATE

BH-C16 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N47.5q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 6.00 7.5 7.5 0.800 5.11 I 6 13.5 0.851 1.42 I 1.5 15 0.944 2.25 II 3 18 0.750 1.88 II 2.5 20.5 0.750 1.78 IIIA 2 22.5 0.890 11.47 IIIA 12 34.5 0.956 5.88 IIIA 6 40.5 0.980 6.18 IIIB 6 46.5 1.030 0.92 IV 1 47.5 0.920

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 3.00 8.55 11.81 13.65 14.77 14.77 14.77 14.77 14.77 14.77

m2 28.27 22.62 5.65 11.31 9.42 7.54 45.24 22.62 22.62 3.77

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity Pile Cut Off level from GL Length of Pile below Cut-off Level Level

0.920 35.00 37.77 0 1.1310 1 15 14.8

= = = = = = = = = =

14.8 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

= = = = = = = = = = = =

608.32 36.16 0 444.10 608.32 480.26 1088.58 2.5 435.43

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.16 36.16

(As per GIR)

C

α

α x C x As

0 5.3 5.3 2.8 2.8 11.2 11.2 11.2 15 0

0 0.4 0.4 0.5 0.5 0.3 0.3 0.3 0.3 0.3

0.00 47.95 11.99 15.83 13.19 25.33 152.00 76.00 101.79 0.00 444.10

Corrected N Value (As per ODC Clause - 7.17a )

7.00 7.00 4.00 4.00 9.00 9.00 9.00 22.00

% T T T T T T T (As per IS2911 Part I/Sec 2)

T

2.5 m 45.0 m

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC BPH MSP

FILE NO. DATE DATE

BH-C17 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N42.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 3.60 4.5 4.5 0.800 0.41 I 0.5 5 0.821 4.52 I 5.5 10.5 0.821 4.06 I 4.5 15 0.903 2.29 II 3 18 0.762 8.43 IIIA 9 27 0.937 5.84 IIIA 6 33 0.973 7.58 IIIB 7.5 40.5 1.011 1.50 IV 1.5 42 1.000

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.80 3.81 6.27 10.56 13.73 14.88 14.88 14.88 14.88

m2 16.96 1.88 20.73 16.96 11.31 33.93 22.62 28.27 5.65

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity Pile Cut Off level from GL Length of Pile below Cut-off Level Level

1.000 35.00 37.77 0 1.1310 1 15 14.9

= = = = = = = = = =

14.9 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 0 33

0 0 0 0 0 0 0 0 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65

= = = = = = = = = = = =

614.46 54.63 0 357.39 614.46 412.02 1026.48 2.5 410.59

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.63 54.63

(As per GIR)

C

α

α x C x As

0 0 3.6 3.6 2.8 7.6 7.6 12 0

0 0 0.5 0.5 0.5 0.4 0.4 0.3 0

0.00 0.00 37.32 30.54 15.83 103.14 68.76 101.79 0.00 357.39

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00 4.00 7.00 7.00 9.00

% T T T T T T T T

2.5 m 39.5 m (As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC BPH MSP

FILE NO. DATE DATE

BH-C18 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N33.5q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.40 3 3 0.800 1.68 I 2 5 0.839 3.36 I 4 9 0.839 2.77 I 3 12 0.922 3.06 II 4 16 0.766 1.82 IIIA 2 18 0.911 0.91 IIIA 1 19 0.911 1.92 IIIA 2 21 0.961 7.45 IIIB 7.5 28.5 0.993 4.50 IV 5 33.5 0.900

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.20 3.24 5.76 8.82 11.73 14.18 15.09 15.09 15.09 15.09

m2 11.31 7.54 15.08 11.31 15.08 7.54 3.77 7.54 28.27 18.85

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity Pile Cut Off level from GL Length of Pile below Cut-off Level Level

0.900 32.00 35.22 0 1.1310 1 15 15.1

= = = = = = = = = =

15.1 32.50

Φ

δ

tanδ

0 0 0 0 0 0 0 0 0 32.5

0 0 0 0 0 0 0 0 0 32.5

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.64

= = = = = = = = = = = =

567.49 181.16 0 262.76 567.49 443.92 1011.41 2.5 404.56

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.16 181.16

(As per GIR)

C

α

α x C x As

0 0 4.4 4.4 2.9 7 7 7 11.5 0

0 0 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0

0.00 0.00 33.18 24.88 21.87 21.11 10.56 21.11 130.06 0.00 262.76

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

6.00 6.00 4.00 8.00 8.00 8.00 10.00

% T T T T T T T T

2.5 m 31.0 m

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC BPH MSP

FILE NO. DATE DATE

BH-C19 Rev.D-1 3/22/2013 SHEET 3/22/2013 OF

Sec. I

Reference

  Q   A  0.5DNL   Pd N30.0q m   KPdi tanAsi   CAS = i 1 1.2 m   D = n

u Level p Length of Pile below Ground Dia of Pile Effective Unit weight of soil at Pile Tip Bearing Capacity Factor Bearing Capacity Factor Depth of Pile Cap Area of Pile Earth Pressure Coefficient Overburden Considered for a depth of Overburden Overburden Angle of Internal Friction at toe d*γsub Depth Overal γsub layer m Depth t/m3 t/m2 2.40 3 3 0.800 1.70 I 2 5 0.851 2.13 I 2.5 7.5 0.851 2.70 II 4.5 12 0.600 3.64 IIIA 4 16 0.909 1.91 IIIB 2 18 0.953 0.95 IIIB 1 19 0.953 0.93 IV 1 20 0.927 3.80 IV 4 24 0.950 6.00 IV 6 30 1.000

γ Nq Nγ Ap k Pdi Pd Φ Pdi

As

t/m2 1.20 3.25 5.17 7.58 10.75 13.52 14.47 14.47 14.47 14.47

m2 11.31 7.54 9.42 16.96 15.08 7.54 3.77 3.77 15.08 22.62

End Bearing Component for Sand layer Friction Bearing Component for Sand layer End Bearing Resistance for Clay Layer Friction Bearing Resistance for Clay Layer Total End Bearing Resistance Total Friction Bearing Resistance Total Bearing Resistance including both cohessive & granular soils Factor of safety Safe Bearing Capacity Pile Cut Off level from GL Length of Pile below Cut-off Level Level

1.000 35.00 37.77 0 1.1310 1 15 14.5

= = = = = = = = = =

14.5 33.00

Φ

δ

tanδ

0 0 0 0 0 0 0 31 33 33

0 0 0 0 0 0 0 31 33 33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 0.65 0.65

= = = = = = = = = = = =

598.47 387.07 0 121.66 598.47 508.73 1107.20 2.5 442.88

(As per IS2911 Part I/Sec 2)

t/m3

m m2 (As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

2

t/m t/m2 deg Σ K x Pdi x tan (δ) x Asi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.78 141.72 212.58 387.07

(As per GIR)

C

α

α x C x As

0 0 2.6 2.4 5.1 8.3 8.3 0 0 0

0 0 0.7 0.7 0.5 0.4 0.4 0 0 0

0.00 0.00 17.15 28.50 38.45 25.03 12.52 0.00 0.00 0.00 121.66

Corrected N Value (As per ODC Clause - 7.17a ) (As per ODC Clause - 7.17a )

4.00 4.00 6.00 10.00 10.00

% T T T T T T T T

2.5 m 27.5 m

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar. Description Cal By

LATERAL CAPACITY OF PILES

Checked By

MGC AKD MSP

FILE NO. DATE DATE

Sec. II

3/22/2013 3/22/2013

SHEET OF

Reference fck fy d E I

Grade of Concrete of Pile Grade of Steel of Pile Dia of Pile Young's Modulus of Pile Material Moment of Inertia of Pile Cross Section UNCONFINED COMPRESSIVE STRENGTH

Depth of Fixity For Piles Embedded in Dense Sand

R4

Free Length of Pile in Soil

EI K2

For Free Head Piles Hence, Length of Fixity for a free head pile For Fixed Head Piles Hence, Length of Fixity for a fixed head pile

Pile Head Deflection/Lateral Capacity of Pile Lateral Capacity of Pile (load in kg reqd for 0.5cm deflection) For a free head pile For a fixed head pile

Y Y 

QL1  L f 3EI Q L1  L f 12 EI

 

35 500 1.2 295804.0 10178760 0.61

N/mm2 N/mm2 m

K2

= = = = = = =

R

=

569.72 cm

L1 L1 R Lf R Lf

= =

0 cm 0.00

kg/cm2 cm4

28.58 kg/cm2

=

1.6

=

911.56 cm

Lf R Lf

=

1.95

=

1110.96 cm

Y

=

0.5 cm

3

Q (free head)

3

Q (fixed head)

=

5.96 T

=

13.18 T

The K2 value has been considered from table 2 , Appendix C of IS 2911 Part 1 Sec 2 1979. The code is silent for K2 value at UCS = 0.40 to 1 hence linear interpretation has been done

(From Table-2 of IS:2911 (Part-1/Sec-2))

From Fig. 2 of Appendix-C of IS:2911 (Part-1 / Sec-2)

ANNEXURE - 1 SOIL REPORT BORE HOLE DAT

ANNEXURE - 4 TEST PILE DESIGN

ANNEXURE - 2 GEOTECH PROFILE OF BORELOGS

ANNEXURE - 5 GA & RC DRAWING OF TEST PILE

CAPACITY CALCULATIONS

ANNEXURE - 3 TYPICAL LOAD ON PILE CALCULATION