Philippines Rider Digest 2015

July 10, 2017 | Author: Romen Real | Category: Metro Manila, Concrete, Wall, Basement, Stairs
Share Embed Donate


Short Description

Riders Digest Philippines 2015...

Description

Riders Digest Philippines 2015 A compilation of cost data and related information on the Construction Industry in the Philippines. Compiled by:

Rider Levett Bucknall Philippines, Inc. A proud member of Rider Levett Bucknall Group Main Office: Building 3, Corazon Clemena Compound, #54 Danny Floro Street, Bagong Ilog, Pasig City, 1600, Philippines T: +63 2 687 1075 / 470 0642 F: +63 2 570 4025 E: [email protected], [email protected] Cebu Office: Suite 602, PDI Condominium, Archbishop Reyes Avenue cor. J.Panis Street, Banilad, Cebu City, 6014, Philippines T: +63 32 268 0072 E: [email protected] Davao Office: 6th Floor, Units 15 & 19, Metro Lifestyle Complex, cor. F. Torres St. and E. Jacinto Extension, Davao CIty, 8000, Philippines T: +63 82 222 5315 M: +63 917 550 7013 E: [email protected] Cagayan de Oro Office 308 Sto. Thomas St., Sta. Cecilia Village, Gusa, Cagayan de Oro City, 9000, Philippines M: +63 998 573 2107 E: [email protected] While Rider Levett Bucknall Philippines has endeavoured to ensure the accuracy of the information contained herein, it does not warrant its adequacy or completeness and expressly disclaims any liability for any errors in, or omissions from this Digest. Rider Levett Bucknall Philippines, Inc. shall not be held liable for any damages; loss; expenses or costs whatsoever or howsoever arising out of, or in connection with the use of the Digest. The Digest is provided for general information only and should not be construed as cost, legal, tax, or any other professional advice. Professional advice should be sought when utilizing any information in this publication to verify its applicability to specific construction requirements and circumstances. This Digest may not, in any medium, be reproduced, published, altered or otherwise used in whole or in part in any manner without the prior written consent of Rider Levett Bucknall Philippines, Inc. Cost information in this publication is indicative and for general guidance only. Most prices and rates are as at 4th Quarter of 2014, while some are as at 3rd Quarter of 2014, and expressed in Philippines Peso unless otherwise stated. References to legislative provisions and regulations are as at 31 December 2014. Changes after these dates cannot be reflected.

Sixth Edition 2015 © Rider Levett Bucknall Philippines, Inc.

Contents Disclaimer and Contact Information Table of Contents Message from the Chairman and President Quality Policy Statement Certificate for ISO – 9001: 2008



i ii vi viii ix

17

Building Services (as of 4th Quarter 2014)

21

Definition (Building Services)

23

Office Fit-Out, Workstations

25

Office Refurbishment

25

Hotel Fit-Out

26

Estimating Data

28

Philippine Construction Trends

2

Number of Construction Projects by Type

3

Reinforcements Ratios

29

3

Average Construction Payment Drawdown Vertical Transport Services

31

Distribution of New Construction Projects by Region Value of Construction By Type of Building

International Construction

4

36

Number and Value of Residential Construction

Building Costs

37

Number and Value of NonResidential Construction By Type

5

Construction Market Activity Cycle

41

Philippine Construction Cost Data

6

Sector Data

42

Definition of Terminologies

7

Philippine Construction Information

44

Building Construction Prices

9

Building for Ecologically Responsive Design Excellence (B.E.R.D.E.)

45

LEED® Green Builing Rating System

52

External Works Construction Elements

4

11 11

Construction Materials Wholesale Price Index 15

ii

Summary of Current Regional Daily Minimum Wages Rates

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

33

iii

Contents Development Data Measurement of Building Areas Government System Implemented for Private And Public Construction

64

Middle East

108

Europe

109

Caribbean

110

Americas/Canada

111

Miscellaneous

116

Conversion Factors Calculation Formulae

117

Foreign Exchange Rate

120

IDD Country Codes and Time Differences

121

Infrastructure

68

Philippine Infrastructure Information

69

Definition of Terminologies

74

Construction Cost Data

78

Average Infrastructure Construction Payment Drawdown

84

Public-Private Partnership

85

Variants of PPP Project Agreements

88

Philippine Regular Holidays and Special (Non-Working) Holidays

122

Infrastructure Related Government Agencies and Offices

91

Abridged Business terms

123

Construction Regulations

92

Calendar Contact Information

129

Professional Services

94

Cost Consultancy

95

Project Management

96

Special Services

96

International Offices

98

Oceania

99

119

131

102

Asia

iv

60

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

v

message from the chairman and president Rider Levett Bucknall Philippines, Inc. proudly presents to you the sixth Philippine edition of “Riders Digest,” a compilation of cost data and related information in the Philippine Construction Industry. Rider Levett Bucknall Philippines is a member of the Rider Hunt, Levett & Bailey, and Bucknall Austin Group now RIDER LEVETT BUCKNALL (RLB), an independent global property and construction practice with 120 offices in 80 different countries covering four Continents namely OCEANIA, which covers all of Australia and New Zealand; ASIA, which covers The Philippines, China, Hong Kong, Indonesia, Japan, Korea, Malaysia, Singapore, Taiwan, Thailand and Vietnam; EMEA, which covers Europe and Middle East; and NORTH AMERICA which covers Phoenix, Boston, Chicago, Denver, Honolulu, New Jersey, Las Vegas, Los Angeles, Florida, Portland Oregon, San Francisco, Seattle, and Washington DC together with Canada. Our group employs over 3,500 people in its offices across the world, integrating local knowledge and expertise with access to the global network to provide the best and most up-to-date service our clients deserve. Our open communication and interaction between offices transform to greater experience across every sector in the Construction Industry. The Philippine office is now operating in its 25th year, having commenced our operation in 1989. We have provided our Quantity Surveying and Project/Construction Management Services on over 700 projects in The Philippines, from Office Towers, Residential Condominiums, Hotels, Residential Estates, Industrial Development Plants, Institutional Schools, Ports and Harbors, Roads and Bridges, Airports and Airports Buildings, Commercial Centers, Hospitals, BPOs, and Land Development Works. We have also served a number of overseas projects within the Pacific Rim including Guam, Saipan, Palau, Hawai, Australia, Malaysia, Vietnam, and as far as the Middle East, Pakistan, and Syria.

sustainable and competitive advantage to our clients through the passion of our people and our focus on integrity, professionalism, innovation, team work, and client satisfaction. We have adopted our core values, together with our global network and in-depth knowledge, making Rider Levett Bucknall Philippines, Inc. truly unique and consistent in providing quality services to our client. Our combined experience and expertise enables us to provide excellent and efficient services. We protect our integrity, optimize the use of resources, and create maximum performance and value throughout the life cycle of every project we handle. Rider Levett Bucknall Philippines, Inc. is committed to developing tools and techniques that help our clients save costs while getting their desired results, not only at present, but also in the future. The entire RIDER LEVETT BUCKNALL Group ensures that a significant fund is allocated for research and development programs, uses the latest technology, and develops training to maintain quality staff performance. The publication of our Riders Digest and International Report on Construction Market Intelligence from our global network of offices will continue to be beneficial by providing professional input, expert advise, and value added services to our clients. As key resources in the International Construction Industry, these will prioritize benchmarking of construction services throughout the International market. Rider Levett Bucknall Philippines hopes that you find this publication informative and useful, aiding in the successful completion of your construction needs.

Corazon Clemena Ballard Chairman & President Rider Levett Bucknall Philippines, Inc.

Our corporate vision is to be the leading global practice in our respective market and deliver

vi

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

vii

viii

quality policy statement

iso certificate

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

ix

Philippine Construction Trends Number of Construction Projects by Type Distribution of New Construction Projects by Region Value of Construction By Type of Building Number and Value of Residential Construction Number and Value of Non-Residential Construction By Type

PHILIPPINE CONSTRUCTION TRENDS Number of Construction Projects by Type Third Quarter 2014 TYPE

Number

Additions

1,333

Non-Residential

3,832

Alterations and Repairs

3,849

Residential

20,602

TOTAL:

29,616

Value of Construction Projects by Type Third Quarter 2014 100 80 60 40 20

4.5%

Additions

12.9%

Non-Residential

69.6%

Residential

13.0%

0

Type of Construction

Residential

NonResidential

Additions

Alterations and Repairs

Value in Billions of Pesos

44.2

88.5

2.6

5.4

Alterations and Repairs

Number and Value of Residential Construction Third Quarter 2014 Distribution of Construction Projects by Region Third Quarter 2014

CAR = 848 (2.9%)

Total: PhP44.2B

Total: 20,602 25,000

50,000,000

20,000

40,000,000

15,000

30,000,000

10,000

20,000,000

5,000

10,000,000

Region II = 859 (2.9%)

Region 1 = 1,585 (5.4%) Region III = 3,389 (11.4%)

Region IVA = 6,881 (23.2%)

Region IVB = 437 (1.5%)

NCR = 3,256 (11.0%)

Region V = 640 (2.2%)

0

0 Region VI = 1,400 (4.7%)

Region VIII = 944 (3.2%)

Region VII = 2,507 (8.5%)

Region X = 2,023 (6.8%)

Region IX= 1,006 (3.4%)

CARAGA = 336 (1.1%)

Region XI = 2,782 (9.4%) ARMM = 10 (0.03%)

Number of Residential Construction

Value of Residential Construction

All other types of residential construction

1,067 (5.2%)

24,737,980 (55.9%)

Apartment/ Accessoria

2,365 (11.5%)

5,282,337 (12.0%)

Single

17,170 (83.3%)

14,214,957 (32.1%)

Region XII = 713 (2.4%)

Note: Latest data from the Philippines Statistics Authority. Retrieved February 2015.

3

Type

© Rider Levett Bucknall Philippines, Inc. 2015

Note: Latest data from the Philippines Statistics Authority. Retrieved February 2015.

© Rider Levett Bucknall Philippines, Inc. 2015

4

PHILIPPINE CONSTRUCTION TRENDS Number and Value of Non-Residential Construction by Type, Third Quarter 2014 Number 2500

Philippine Construction Cost Data

Total: 3,832

2000

Definition of Terminologies

1500

Building Construction Prices 1000

External Works

500 0 Type of NonResidential Construction

Commercial Institutional

Number

2,441

726

Industrial

Agricultural

Others

426

164

75

Value (in billion pesos) 80

Construction Elements Construction Materials Wholesale Price Index Summary of Current Regional Daily Minimum Wages Rates Building Services (as of 4th Quarter 2014) Definition (Building Services)

70

Total: PhP88.5 billion

60

Office Fit-Out, Workstations

50

Office Refurbishment

40

Hotel Fit-Out

30 20 10 0 Type of NonResidential Construction

Commercial Institutional

Value (in billion pesos)

76.7

4.5

Industrial

Agricultural

Others

6.4

0.4

0.4

Note: Latest data from the Philippines Statistics Authority. Retrieved February 2015.

5

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines 2015

6

PHILIPPINE CONSTRUCTION COST DATA Definition of Terminologies Central Business District (CBD) The Central Business District is within the Metro Manila cities of the Philippines. It consists of seven planning areas, namely Makati City, Global CityTaguig, Quezon City, Pasig City, Mandaluyong City, San Juan, and Manila. It is the prime area of all the commercial and financial activities in the region and includes developments from nearby provinces around the perimeter of Metro Manila. Construction Floor Area (CFA) CFA is the area of all building enclosed covered spaces measured to the outside face of the external walls, including covered basement and above ground car park, areas. Gross Floor Area (GFA) GFA is the sum of fully enclosed covered areas and the unenclosed covered areas of the building for purposes of planning submissions (refer to Page 88: Measurement of Building Areas – Gross Floor Area for more information). Net Lettable Area (NLA) NLA is the total tenancy area designated for rentable purposes. Building Works Building Works include substructure (piling, foundation, and basement), super-structure, architectural works, finishes and fittings, external works, site works, preliminaries, attendance, and other builder’s work in connection with services. Building services Building Services include mechanical services, inlcluding heating, air conditioning, mechanical, ventilation, fire protection system, sanitary, and plumbing; and electrical services, which include electrical installation, vertical transportation, and building management systems. Exclusions; Special equipment – Chutes, incinerators, compactors, pneumatic refuse disposal system, facade maintenance equipment, engineered smoke control systems etc., IT services – high speed cables etc.

7

© Rider Levett Bucknall Philippines, Inc. 2015

The office within the CBD refers to good quality office buildings located at the Central Business District, for the upper range of the rental market and leading owner occupiers, such as headquarter offices for financial institutions and major companies. Offices outside CBD refer to medium quality office buildings that are built for the middle range of the rental market. Hotels Types of hotels listed are based on ‘five-star’, ‘fourstar’ and ‘three-star’ international hotel ratings. Retail – Shopping Mall Shopping malls with typical amenities and finishes in common spaces. Exclusions: Tennant equipment, shop fittings and finishes in tenancy spaces. Industrial Buildings Quality reflects a simplified type of construction suitable for light or heavy industries, Exclusions: Special and operating equipment, processing plant and proprietary systems. Residential Ratio of kitchen, laundry and bathroom areas to living areas and the quality of finishes required will affect the cost range. Range given is significantly affected by the height and configuration of the building. Exclusions: Show apartments. Loose furniture, special light fittings, household electrical appliances, kitchen equipment and building owners’ special requirements. Institutions of Higher Learning Tertiary educational schools such as universities, polytechnics, and other colleges that require full range of educational facilities and amenities. Car Park Above Grade – minimal external walling excluding mechanical ventilation. Basement – diaphragm wall or contiguous bored piles wall with standard mechanical ventilation provisions.

© Rider Levett Bucknall Philippines, Inc. 2015

8

PHILIPPINE CONSTRUCTION COST DATA building construction prices All construction prices for the Philippines are indicative only and are as at 4th Quarter 2014. Items generally excluded from the order of costs are land costs, legal and professional fees, development charges, authority fees, finance costs, loose furniture, fittings, art works, tenancy works such as but

not limited to sub-divisional partitions in office building and shop fit-out in retail spaces, private telephone systems, site infrastructure work, diversion of existing services, resident site staff cost, models and prototypes, and future cost escalation (unless otherwise stated). All prices stated below include a general allowance for foundation and external works.

Development Type

Range of Cost per Construction Floor Area Low

Office Buildings - Prestige 10 - 25 Storeys

34,000

38,200

25 - 40 Storeys

37,200

42,000

40 - 55 Storeys

41,000

46,200

HOTELS (FF&E)

Philippine Pesos per Bedroom

Five (5) Star

2,100,000

Four (4) Star

1,600,000

1,815,000

Three (3) Star

1,050,000

1,200,000

HOTELS; Multi-Storey

2,410,000

Philippine Pesos per Bedroom

Five (5) Star

3,500,000

4,000,000

Four (4) Star

3,100,000

3,600,000

Three (3) Star

2,820,000

3,200,000

RETAIL - SHOPPING MALLS

Philippine Pesos per Square Metre

Mid Class

20,000

26,000

High End

25,000

35,000

INDUSTRIAL

Philippine Pesos per Square Metre

6.00m to U/S Truss; Metal Cladding

18,200

21,000

6.00m to U/S Truss; PCC Cladding

18,600

21,500

RESIDENTIAL

Philippine Pesos per Square Metre

1 to 3 Storey Units; 85 - 120 SQM per Unit

33,500

38,500

Single and Double Storey

29,400

33,800

Condominiums (Up to 10 Storeys with Lift)

28,400

32,700

Condominiums: 10 to 20 Storeys

33,900

37,400

Condominiums: 20 to 40 Storeys

35,200

39,700

Condominiums: 40 to 80 Storeys

36,400

41,900

INSTITUTIONAL

Philippine Pesos per Square Metre

Institutions of Higher Learning

29,000

45,000

Schools

24,000

34,000

CAR PARKING

9

High

Philippine Peso per Square Metre

Philippine Peso per 35 Square Metre

Basement CBD: 35 SQM per Car

587,000

676,000

Basement Outside CBD: 35 SQM per Car

536,000

617,000

Exclusions: * Land Cost * Legal and Professional Fees * Development Charges * Local Authority Fee * Finance Cost * Loose Furniture, Fittings and Works of Art * Tenancy Work * Site Infrastructure Work * Diversion of Existing Services * Resident Site Staff Cost * Models and Prototypes * Future Cost Escalation * Goods and Services Tax

Note: As Foreign Currency exchange rates fluctuate in a daily basis, we have not converted the Philippine Peso rate to foreign currencies.

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

10

PHILIPPINE CONSTRUCTION COST DATA external works

Item

Description

Low

High

Steel with reinforced concrete casing (3000 PSI)

Low

High

30,150

32,700

UPPER FLOORS

LANDSCAPING

Philippine Peso per Square Metre

Philippine Peso per Square Metre Dense, Shrubs, Topsoil and Grassing

6,040

6,960

Grassing, Large Areas, Topsoil, Sowing, Treating

4,030

4,640

150mm reinforced concrete suspended floor slab (3000 PSI)

3,250

7,450

Concrete slab on Metal deck with structural steel supports and 2-hour fire spray

11,400

13,000

1050mm wide reinforced concrete stair with painted steel tube balustrade (average rise 3.70m)

236,800

270,000

1050mm wide reinforced concrete scissor stair with painted tube handrail (average rise 3.70m)

231,500

237,000

2,906,500

3,767,600

Price per Hectare (in Millions of Pesos) STAIRCASES Light, Large Areas, Minimal Planting

12

14 Number per Flight

CAR PARKS - ON GROUND Philippine Peso per Car Light Duty Paving

87,740

93,250

Heavy Duty Paving

93,250

98,750

ROADS (Premix finish including kerbs, channels, and drainage)

2000mm wide grand public stair with glass and brass balustrade (4.00m rise)

Philippine Peso per Metre

ROOF

Residential estate, 6.80 meters wide excluding foot-paths and nature Strips

37,800

43,500

Industrial estate 10.40 meters wide including minimal to extensive formation

53,000

61,000

construction elements The following rates are indicative only and include an allowance for profit and overheads but exclude preliminaries. The rates are not valid for tendering or pricing of variations. Item

Low

High

SUB-STRUCTURE Philippine Peso per Cubic Metre Reinforced concrete pad footing (6000 PSI)

6,500

8,900

Reinforced concrete slab on ground(3000 PSI)

4,800

6,400

RC Slab (3000 PSI) graded to fall and built-up roofing membrane

5,400

8,600

Structural steel, purlins and insulated metal deck roof

10,800

16,700

EXTERNAL WALLS Philippine Peso per Square Metre 150mm concrete hollow block walls jointed in cement mortar including reinforcement

1,150

1,200

Single glazed window unit (casement type)

13,500

16,200

Double glazed window unit (casement type)

16,200

18,300

Aluminum with 10mm tempered glass curtain wall system

26,400

34,000

COLUMNS

EXTERNAL DOORS (EXCLUDING IRONMONGERY)

Philippine Peso per Metre

Number

Reinforced Concrete (600mm x 600mm) (7000 PSI) Reinforced Concrete (900mm x 900mm) (3000 PSI)

11

Philippine Peso per Square Metre

9,300 20,000

© Rider Levett Bucknall Philippines, Inc. 2015

12,950 25,900

Single leaf solid core steel door

24,500

30,200

Double leaf glazed door

61,100

86,700

320,300

452,200

Double leaf auto operating door

© Rider Levett Bucknall Philippines, Inc. 2015

12

PHILIPPINE CONSTRUCTION COST DATA Item

Low

High

Item

INTERIOR WALLS

Low

High

FLOOR FINISHES

Philippine Peso per Square Metre 250mm reinforced concrete wall (3000 PSI)

Philippine Peso per Square Metre

6,000

7,200

Carpet tile

1,900

2,200

100mm brick or block wall

1,050

1,300

Ceramic / Homogeneous tile

2,800

4,300

Stud plasterboard wall

2,200

2,700

Granite tile

8,600

21,500

Fire rated steel stud wall

4,600

6,000

Access floors

3,800

7,000

2 hour shaft wall

6,800

8,000

SPECIALIST SERVICES

INTERNAL DOORS (EXCLUDING IRONMONGERY)

SANITARY AND PLUMBING

Number

Philippine Peso per Number

Single leaf solid core wood flush door

7,600

9,200

Single leaf half hour fire rated steel door

19,200

30,200

Single leaf one hour fire door

30,200

37,700

248,000

340,000

Double leaf auto operating door

Average cost per plumbing point including fixture, soil waste and vent

37,700

47,100

Average cost for storm water drains, industrial

550

950

VERTICAL TRANSPORTATION Number

INTERIOR SCREENS Number Laminated toilet partition with one cubicle

22,700

35,800

Stone finish toilet partition

49,500

54,700

Glass sided escalator (4m rise)

13,600,000

14,400,00

17 passenger lift

8,700,000

11,000,000

Hydraulic lift serving

2,900,000

3,500,000

WALL FINISHES OTHER ITEMS

Philippine Peso per Square Metre Cement and sand plaster and emulsion paint Cement render and vinyl fabric

760

920

1,500

2,200

Cement render and ceramic tile

2,200

3,000

Marble wall finish on rendered backing

8,600

10,800

Marble wall cladding

10,800

14,000

Philippine Peso per Cubic Metre Structural excavation

350

550

Philippine Peso per Square Metre Waterproofing Membrane / Fluid Applied

550

1,300

CEILING FINISHES Philippine Peso per Square Metre

13

Fiber cement plaster board ceiling Painted

1,500

1,750

One way exposed grid with mineral fiber board acoustic ceiling

1,750

1,900

Molded plasterboard ceiling system

4,600

6,100

Aluminium louvre ceiling system

6,700

8,600

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

14

PHILIPPINE CONSTRUCTION COST DATA construction materials wholesale price index National Capital Region, Year 2014 (2000=100) Commodity group Sand and Gravel

AVE

DEC

NOV

OCT

SEP

AUG

JUL

JUN

MAY

APR

MAR

FEB

JAN

211.0

213.3

213.2

212.8

212.4

211.9

211.8

211.6

210.4

210.1

209.2

207.9

207.4

Concrete Products

208.9

210.7

210.6

210.6

210.3

210.2

209.8

209.1

207.8

207.5

207.1

206.9

206.2

Cement

197.0

198.2

198.6

198.8

198.4

198.3

198.0

196.7

195.7

195.6

195.6

195.6

194.4

Hardware

219.1

220.8

220.4

220.3

219.8

219.7

219.8

219.8

218.7

218.6

217.7

217.4

216.6

Plywood

185.4

189.5

188.5

188.3

187.7

187.2

186.4

185.1

182.9

182.9

182.4

182.0

181.6

Lumber

241.7

246.3

246.3

246.2

245.5

244.9

243.5

242.1

238.4

238.1

237.1

237.1

235.2

G.I. Sheet

189.5

190.8

190.8

190.3

189.9

189.9

189.5

189.4

189.2

189.2

188.9

188.2

187.3

Reinforcing Steel

253.3

254.5

253.9

253.9

253.9

253.5

253.5

253.5

253.5

252.3

252.3

251.9

252.9

Structural Steel

284.4

286.0

285.8

285.5

285.0

284.6

284.2

284.2

283.8

283.6

283.4

283.2

283.8

Tileworks

187.0

187.5

187.5

187.5

187.5

187.5

187.5

187.0

187.0

186.6

186.6

185.8

185.6

Glass and Glass Products

183.4

185.2

185.2

185.2

184.6

184.3

183.7

182.9

182.4

181.9

181.9

181.9

181.9

Doors, Jambs and Steel Casement

204.2

205.3

205.3

205.2

205.1

205.1

204.7

204.1

203.3

203.0

203.0

202.8

203.1

Electrical Works

204.1

207.9

207.5

207.0

206.3

205.9

205.1

203.5

201.8

201.8

201.2

200.8

200.8

Plumbing Fixtures & Accessories / Waterworks

169.7

174.4

173.3

172.7

172.1

171.3

170.9

169.4

167.8

167.5

166.4

165.3

165.3

Painting Works

206.3

207.5

207.4

207.4

207.3

207.3

206.9

206.3

205.8

205.4

205.1

204.8

204.5

PVC Pipes

180.3

181.1

180.9

180.9

180.6

180.6

180.3

180.3

180.3

179.7

179.7

179.7

179.7

Fuels and Lubricants

329.9

288.7

310.4

320.9

330.2

333.4

339.7

338.7

339.1

340.4

339.1

339.6

338.5

Asphalt

464.0

464.0

464.0

464.0

464.0

464.0

464.0

464.0

464.0

464.0

464.0

464.0

464.0

114.6

114.6

114.6

114.6

114.6

114.6

114.6

114.6

114.6

114.6

114.6

114.6

114.6

Machinery and Equipment Rental

Source: Philippine Statistics Authority, Industry and Trade Statistics Department

15

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

16

PHILIPPINE CONSTRUCTION COST DATA SUMMARY OF CURRENT REGIONAL DAILY MINIMUM WAGE RATES Non-Agriculture, Agriculture As of December 2014, In Pesos

REGION

WAGE ORDER NO.

DATE OF EFFECTIVITY

NON AGRI

NCR

WO 18

Oct. 3, 2013

CAR

WO 16

I

WO 16

SUMMARY OF DAILY MINIMUM WAGE RATES Per Wage Order, Non - Agriculture (1989 - 2014) National Capital Region

AGRI

Amount

PLANT

NONPLANT

RA/WO

DATE

P 429.00 466.00

P 429.00

P 429.00

RA 6727

July 1, 1989

P 89.00

P 89.00

Feb. 3, 2014

263.00 280.00

247.00 268.00

247.00 268.00

WO 01

Nov. 1, 1990

106.00

106.00

WO 02

Jan. 8, 1991

118.00

118.00

Feb. 5, 2014

213.00 253.00

233.00

213.00

WO 03

Dec. 16, 1993

135.00

135.00

235.00 243.00

235.00 243.00

April 1, 1994

145.00

145.00

II

WO 16

Jan. 5, 2014

247.00 255.00

III

WO 18

Nov. 30, 2014

298.00 349.00

283.00 319.00

271.00 303.00

IV-A

WO 16

May 1, 2014

261.00 362.50

261.00 337.50

255.00 317.50

Basic

WO 04

IV-B

WO 16

Feb 1, 2013

205.00 275.00

215.00 225.00

215.00 225.00

V

WO 16

Jan. 10, 2014

236.00 260.00

236.00

236.00

VI

WO 21

Nov. 29, 2013

245.00 287.00

255.00

245.00

295.00 340.00

275.00 322.00

275.00 322.00

260.00

235.00241.00

220.50

VII

VIII

WO 17

Mar. 21, 2014

Oct. 16, 2012

IX

WO 18

June 10, 2013

280.00

255.00

235.00

X

WO 17

June 20, 2013

291.00 306.00

279.00 294.00

279.00 294.00

XI

WO 18

June 1, 2014

317.00

307.00

307.00

XII

WO 18

Aug. 1, 2014

270.00

252.00

252.00

XIII

WO 12

May 21, 2013

268.00

258.00

238.00

ARMM Note:

17

WO 18

WO 15

Feb. 1, 2014

250.00

250.00

WO - Wage Order RA - Republic Act COLA - Cost Of Living Allowance ECOLA - Emergency Cost Of Living Allowance

© Rider Levett Bucknall Philippines, Inc. 2015

WO 05

Allowance

Feb. 2, 1996

161.00

161.00

May 1, 1996

165.00

165.00

Feb. 6, 1997

180.00

180.00

May 1, 1997

185.00

185.00

WO 06

Feb. 6, 1998

198.00

WO 07

Oct. 31, 1999

198.00-223.50

WO 08

Nov. 1, 2000

213.00-250.00

WO 09

Nov. 5, 2001

213.00-250.00

15.00

Feb. 1, 2002

213.00-250.00

30.00

198.00

WO 10

Jul. 10, 2004

213.00-250.00

50.00

WO 11

Jun. 16, 2005

238.00-275.00

50.00

WO 12

Jul. 11, 2006

288.00-300.00

50.00

WO 13

Aug. 28, 2007

325.00-362.00

WO 14

June 14, 2008

340.00-377.00

5.00

Aug. 28, 2008

345.00-382.00

WO 15

Jul. 1, 2010

367.00-404.00

WO 16

May 26, 2011

367.00-404.00

22.00

WO 17

Jun. 3, 2012

389.00-426.00

20.00

Nov. 1, 2012

389.00-426.00

30.00

WO 18

Oct. 4, 2013

399.00-436.00

30.00

Jan. 1, 2014

414.00-451.00

15.00

250.00

Total

© Rider Levett Bucknall Philippines, Inc. 2015

198.00 223.50 213.00 250.00 228.00 265.00 243.00 280.00 263.00 300.00 288.00 325.00 313.00 350.00 325.00 362.00 345.00 382.00 345.00 382.00 367.00 404.00 389.00 426.00 409.00 446.00 419.00 456.00 429.00 466.00 429.00 466.00

18

PHILIPPINE CONSTRUCTION COST DATA Region VII – Metro Cebu

RA/ WO

Region XI – Davao Region

Amount DATE Basic

RA 6727 Jul. 1, 1989 WO 01

Nov. 8, 1990

WO 02

Feb. 1, 1991 Sept. 30, 1991

Total

Allowance

P 89.00

P 89.00

89.00 - 105.00

89.00 - 105.00

RA/ WO

Amount DATE Basic

RA6727 July 1, 1989 WO 01

Nov. 21, 1990

Total

Allowance

P 89.00

P 89.00

99.00 - 104.00

99.00 - 104.00

89.00 - 105.00

250/mo. or 9.55/ day

WO 02A Oct. 1, 1991

89.00 - 105.00

5.73

94.73 - 110.73

WO 03 Dec. 1, 1993

99.00 - 104.00

WO 03

Dec. 19, 1993

89.00 - 120.73

89.00 - 120.73

WO 04 Jan. 1, 1995

114.00 - 119.00

114.00 - 119.00

WO 04

Jan. 1, 1996

94.00 - 131.00

94.00 - 131.00

WO 05 Jan. 1, 1997

123.00 - 129.00

123.00 - 129.00

WO 05

99.00 - 104.00

7.92 8.32

106.92 - 112.32

25.00

124.00 - 129.00

Jul. 1, 1996

99.00 - 136.00

99.00 - 136.00

Oct. 1, 1996

104.00 - 141.00

104.00 - 141.00

WO 06 Jan. 1, 1998

126.00 - 135.00

10.00

Mar. 15,1997

115.00 - 145.00

115.00 - 145.00

WO 07

146.00 - 148.00

10.00

156.00 - 158.00

111.00 - 150.00

111.00 - 150.00

WO 08 Nov. 1, 2000

158.00 - 160.00

10.00

168.00 - 170.00

WO 05-A Jul. 1, 1997

WO 06

98.55 - 114.55

Feb. 15, 1991 WO 02 May 15, 1991

June 1, 1997

Nov. 1, 1999

123.00 - 135.00

123.00 - 135.00 136.00 - 145.00

Oct. 1, 1997

111.00 - 155.00

111.00 - 155.00

May 1, 2001

168.00 - 170.00

10.00

178.00 - 180.00

Apr. 1, 1998

116.00 - 160.00

116.00 - 160.00

WO 09 Jan. 1, 2002

168.00 - 170.00

25.00

193.00 - 195.00

Oct. 1, 1998

121.00 - 165.00

121.00 - 165.00

WO 10

Jan. 1, 2004

193.00 - 195.00

193.00 - 195.00

April 1, 1999

126.00 - 165.00

126.00 - 165.00

WO 11

Feb. 5, 2005

207.00 - 209.00

207.00 - 209.00

Oct. 1, 1999

131.00 - 165.00

131.00 - 165.00

WO 12

July 2, 2005

207.00 - 209.00

15.00

222.00 - 224.00

WO 07

Jan. 1, 2000

136.00 - 170.00

136.00 - 170.00

WO 13

July 27, 2006 222.00 - 224.00

16.00

238.00 - 240.00

WO 08

Apr. 1, 2000

140.00 - 170.00

140.00 - 170.00

WO 14

Sep. 16, 2007 222.00 - 224.00

26.00

248.00 - 250.00

WO 07

Jul. 1, 2000

145.00 - 175.00

145.00 - 175.00

WO 15

June 16, 2008

240.00

25.00

265.00

WO 08

Nov. 10, 2001

150.00 - 180.00

150.00 - 180.00

Sep. 16, 2008

250.00

15.00

265.00

WO 08

Jan. 1, 2001

155.00 - 185.00

155.00 - 185.00

WO 16

Sep. 1, 2010

271.00

15.00

286.00

WO 06

June 1, 2001

160.00 - 190.00

160.00 - 190.00

WO 17

Jan. 1, 2012

286.00

5.00

291.00

WO 08

Dec. 1, 2001

165.00 - 195.00

165.00 - 195.00

May. 1, 2012

286.00

15.00

301.00

WO 09

Jan. 6, 2002

170.00 - 200.00

170.00 - 200.00

WO 10

Aug. 8, 2004

178.00 - 208.00

178.00 - 208.00

WO 11

June 16, 2005

190.00 - 223.00

190.00 - 223.00

WO 12

Aug. 2, 2006

200.00 - 241.00

200.00 - 241.00

WO 13

Nov. 11, 2007

205.00 - 250.00

205.00 - 250.00

WO 14

June 16, 2008

222.00 - 267.00

222.00 - 267.00

WO 15

Sep. 1 , 2010

240.00 - 285.00

240.00 - 285.00

WO 16

Sep. 22 , 2011

260.00 - 305.00

260.00 - 305.00

WO 17

Dec. 7, 2012

282.00 - 327.00

WO 18

Mar. 21, 2014

282.00 - 327.00

WO 18

June 1, 2014

312.00

Dec. 1, 2014

312.00

312.00 5.00

317.00

282.00 - 327.00 13.00

295.00 - 340.00 Source: Department of Labor and Employment, National Wages and Productivity Commission

19

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

20

21 3,100 – 3,800

3,200 - 4,300 2,600 - 2,700

Three Star

High End

© Rider Levett Bucknall Philippines, Inc. 2015 1,100 – 1,600

Condominiums (Mid Class)

750 – 1,300

Schools

120 – 240 240 – 360

Above Grade Car Park Basement Car Park

CARPARKING

1,600 – 2,100

Institutions of Higher Learning

INSTITUTIONAL

1,600 – 2,700

110 – 350

Condominiums (High End)

350 – 550

Houses (High End) Houses (Mid Class)

RESIDENTIAL

HVAC

Warehouses

Development Type

850 – 1,050

750 – 1,050

Flat Roofed Factories

INDUSTRIAL

1,100 – 1,600 1,550 – 2,100

Medium Class

RETAIL - SHOPPING MALL

4,200 - 6,000

Five Star Four Star

HOTELS

3,300 – 6,300

Prestige

HVAC

Average

OFFICE BUILDINGS

Development Type

© Rider Levett Bucknall Philippines, Inc. 2015

240 - 360

120 - 240

800 – 1,300

1,300 – 2,100

2,100 – 2,700

2,700 – 4,200

1,050 – 1,600

1,600 – 2,100

Sanitary & Plumbing

950 – 1,300

950 – 1,300

1,100 – 1,250

850 – 1,100

2,100 - 2,200

2,400 – 3,200

2,600 – 3,400

1,100 - 1,800

1,200 - 2,600

Sanitary & Plumbing

1,600 – 2,800

1,700 – 2,800

2,100 – 3,100

1,700 – 2,150

3,900 – 4,100

4,300 – 5,300

5,800 – 6,700

3,600 - 4,500

4,000 – 6,400

Electrical





850 – 1,250

750 – 1,100

1,900 – 2,100

2,200 – 3,000

2,600 – 3,600

1,100 - 2,000

1,600 – 2,600

Vertical Transport

120 – 240

120 – 240

650 – 1,100

650 – 1,100

550 – 1,500

550 – 1,500

150 – 550

150 – 550

Fire Protection

1,080 – 1,320

1,080 – 1,320

1,300 – 1,800

1,800 – 3,200

2,100 – 3,200

2,600–4,200

3,100 – 3,600

3,700 – 5,300

Electrical

360 – 460

360 – 460

350 – 550

550 – 1,050

550–1,100

750–1,600

-

-

Vertical Transport

Range of Cost per Construction floor area

650 – 950

650 – 950

1,050 – 1,600

650 – 1,100

450 – 550

500 – 1,200

650 – 1,200

530 - 1,400

500 - 1300

Fire Protection

Range of Cost per Construction floor area

-

-

-

350 – 550

600 – 1,100

550 – 1,100

-

-

B.M.S.

110 - 450

110 - 550

350 – 550

350 – 550

700 – 750

700 – 1,000

750 – 1,100

750 - 1,200

750 – 1,100

B.M.S.

2,040 – 2,740

1,800 – 2,500

3,850 – 6,050

6,250 – 10,100

7,000 – 11,200

8,750 – 15,300

4,410 – 6,100

5,800 – 8,500

Total Services

4,060 – 6,550

4,260 – 6,650

7,000 – 9,850

5,400 – 7,600

11,650 – 12,400

13,300 – 18,000

16,600 – 22,000

10,180 - 14,700

11,350 – 20,300

Total Services

PHILIPPINE CONSTRUCTION COST DATA building services as at 4th Quarter 2014 In Philippine Pesos per Square Meter

22

PHILIPPINE CONSTRUCTION COST DATA Building services Definition of Terminologies HVAC (Heating Ventilation and Air Conditioning) HVAC includes chiller plant, cooling towers, chilled water, condenser water pumps and pipework, airhandling unit systems, and fan coil systems. It also includes AC ductwork, diffusers, split type air-conditioning units and ductwork, mechanical ventilation (‘MV’) fan system, MV ductwork, diffusers and accessories, AC electrical, and automatic control works where appropriate.

Building Management Systems (BMS) BMS include Control Systems (mainly for HVAC services) where appropriate. Exclusions Security Systems, IT systems, AV systems, car parking System, compactors, chutes; special equipment such as proprietary systems, medical gases, incinerators, pneumatic refuse disposal system, façade maintenance equipment, engineered smoke control systems etc; supply of kitchen equipment.

Sanitary & Plumbing Sanitary & Plumbing works refer to water tanks and pumps, hot/cold water distribution piping, installation of water piping to sanitary ware and fittings, installation of waste piping to sanitary ware, aboveground and underground drainage piping system where appropriate. Fire Protection System

Note: The order of costs for Building Services provided herein is indicative and based on Construction Floor Area Assumptions. Detailed requirements and specification for Building Services need to be considered and provided in conceptual designs to derive cost estimates for specific project budgetary purposes.

Fire Protection system includes sprinkler, external fire hydrants, hosereels, wet and dry risers, automatic fire alarms, and fire extinguishers where appropriate. . Electrical Installation Electrical Installation refers to power transformer, sub-station, HV & LV switch gear, distribution/ sub-main cables, final sub-circuits, cable support systems and containments. Lighting protection system, earthing system, luminaries and lighting control system, standby generators, Telecommunications System, Public Address system, intercom system, and MATV/CATV system may also fall under Electrical Installation, where appropriate.   Vertical Transportation Vertical Transport spans Lifts, Escalators, Travelators, Dumbwaiters, etc, where appropriate.

23

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

24

PHILIPPINE CONSTRUCTION COST DATA Office fit ­­- out

hotel fit - out

The following costs that include workstations are an indication of those currently achievable for good quality office accommodation.

The cost of typical hotel guest room fit-out varies within its wide range and is dependent on the quality of finishes specified for different rating hotels. Scope of fit-out includes preliminaries, wall, floor and ceiling finishes, painting, timber fitments, sanitary wares and bathroom accessories, glazing at bathroom, installation of decorative lighting, curtains, blinds, etc. These costs exclude loose items, such as but not limited to furniture, room equipment and appliances, supply of decorative lighting, and bedding.

Open Planned Php/m2

Fully Partitioned Php/m2

Computer Areas

16,600 – 19,200

19,800 – 23,000

Executive Areas and Front of House

30,100 – 34,600

35,500 – 40,800

Insurance Office; Government Departments

16,600 – 19,200

19,800 – 23,000

Major Company Headquarters

25,000 – 28,800

30,400 – 35,000

Solicitors, Financiers

25,000 – 28,800

Type of Tenancy

Hotel Rating Three Star

30,400 – 35,000

workstations

Php / Room 1,070,000 - 1,230,000

Four Star

1,604,000 - 1,852,000

Five Star

2,200,000 – 2,500,000

3,500mm. average length including screens generally 1,220m high (managerial 1,620mm high), desks, storage cupboards, shelving etc. Supply of chairs is excluded. Type of Workstation Call Centre

Php / Workstation 38,800 – 44,600

Executive

120,000 – 138,800

Secretarial

55,400 – 63,750

Technical Staff

76,000 – 87,400

office refurbishment The following refurbishment costs include demolition and removal of partitions and internal finishes, provide new floor, ceiling and wall finishes but exclude fitting out. The lower end of the range indicates reuse and modification. Type of Office

25

Php / m2

Offices Typical Floor

39,200 – 45,100

Offices Core Upgrade (excluding lift Modernization)

30,000 – 35,500

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

26

Estimating Data Reinforcements Ratios Average Construction Payment Drawdown Vertical Transport Services

© Rider Levett Bucknall Philippines, Inc. 2015

28

ESTIMATING DATA Average Construction Payment Drawdown

Reinforcement Ratios The following ratios give an indication of the average weight of high tensile rod reinforcement per cubic meter of concrete (Grade 35) for the listed elements. Differing structural systems, ground conditions, height of buildings, load calculations and sizes of individual elements and grid sizes will result in considerable variation to the stated ratios. For project specific ratios, a civil & structural engineer should be consulted.

Element

Ave kg / m3

Pile caps

115 - 250

BoredPiles (compression)

30 - 60

Bored Piles (tension)

150 - 250

Raft Foundation

150 - 220

RC pad footings

70 - 100

Ground beams

200 - 300

Basement Retaining Wall

150 - 250

RC Wall

125 - 150

Slab

100 - 200

Edge Beams

The tabulation on next page is derived from the statistical average of a series of case histories, which will give an indication of the anticipated rate of expenditure when used for a specific project for preliminary budgetary purposes. All data are related to the date of submission of contractors’ claims to the client and not actual payment, which is generally one month later. No adjustment has been made for the retention money on the assumption that such money will be paid by the client into a joint account with the Contractor. The payment of the outstanding monies due to the contractors and sub-contractors after the date of practical completion takes place at irregular intervals with payments spread over an indefinite period. The average rate of claims expenditure on construction projects are from Php100,000,000 to Php 1,300,000,000 and/or greater than one year but less than two years construction period to practical completion.

220 - 300

Above Ground Columns

250 - 500

Beams

180 - 300

Slab

110 - 200

Walls (core)

130 - 320

Lift Core

125 - 200

Household Shelter

200 - 300

Stairs

29

130 - 160

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

30

ESTIMATING DATA

92.29

95

94.32

100

97.50

Contract Period

Overall Project

%

%

5

0.75

10

2.70

15

5.71

20

9.65

25

14.40

30

19.80

35

25.73

40

32.06

45

38.65

50

45.40

Note: The remaining 2.5% would be released after a period of six to twelve months after hand-over of the project

31

© Rider Levett Bucknall Philippines, Inc. 2015

Contract Period(%)

90

0%

89.07

10%

84.79

85

20%

79.60

30%

75 80

40%

67.15 73.68

50%

65 70

60%

60.15

Cumulative Project Claims Expenditure (%)

52.85

70%

55 60

80%

%

90%

Overall Project

%

Average Construction Payment Drawdown

Contract Period

5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%

Average Construction Payment Drawdown

© Rider Levett Bucknall Philippines, Inc. 2015

32

ESTIMATING DATA Vertical Transport Services

Application

$/Floor No. of $/Floor Additional Floors By Floors Served passed Served

Lift Type

Speed (M/ Sec)

Base Cost ($)

ElectrocaHydraulic passenger

0.5

$70,000 $95,000

1.0

$75,000 105,000

2

$7,000

1.65 1.75

$95,000 145,000

8

$7,000

Gearless Up to 17 Passenger

1.65 1.75

$120,000 $170,000

8

$7,000

$6,000

Gearless Up to 23 Passenger

2.0 2.5

$150,000 $270,000

15

$8,000

$6,000

Gearless

3.0 3.5

$435,000

20

$8,000

$6,000

Gearless

4.0

$575,000

20

$10,000

$8,000

Gearless

5.0

$660,000

20

$10,000

$8,000

2

$8,500

$/Floor No. of $/Floor Additional Floors By Floors Served passed Served

Lift Type

Speed (M/ Sec)

Base Cost ($)

Gearless 23 pax Bed Lift

1.75

$180,000

8

$7,000

$5,000

$5,000

Gearless Up to 40 Passenger

2.50

$680,000

10

$13,500

$8,000

$5,000

Gearless Up to 2000kg

1.0

$305,000

2

$14,000

$8,000

Gearless Up to 5000kg

0.50

$510,000

2

$16,500

$10,500

Bench Height Unit

0.50

$35,000

2

$4,500

$1,800

LargeUn

0.20

$55,000

20

$5,500

$2,300

Rise 2.5 to 5.0m

0.50

$140,000 $320,000

20

N.A.

N.A.

Distance 1.3 to 5.0m

0.50

$120,000 $340,000

N.A.

N.A.

N.A.

To 4.0m

0.15

$68,500

2

N.A.

N.A.

Above 4.0m

0.15

$88,500

3

N.A.

N.A.

Application

$6,500 Hospitals

Gearless 9 to 13 Passenger Gearless 9 to 13 Passenger

Office & Residential

Large Goods Lifts

Service Lift (DumbWaiter)

Escalators

Travellator Gearless

6.0

$920,000

30

$10,000

$8,000

Gearless

7.0

$990,000

30

$10,000

$8,000

Gearless

8.0

$1,100,000

40

$10,000

$8,000

Disabled Platform Lift

Notes: Lift types up to 17-passenger capacity serving not more than 18 floors are more commonly equipped with motor room-less systems. Costs provided above are indicative and vary depending on the brand name and technical specifications.

33

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

34

International Construction Building Costs Specific Definitions for International Construction Costs Construction Market Activity Cycle Model Sector Data

© Rider Levett Bucknall Philippines, Inc. 2015

36

INTERNATIONAL CONSTRUCTION Building Costs All costs are stated in local currency as shown below, as of Third Quarter 2014. The following data represents estimates of current building costs in the respective market. Costs may vary as a consequence of factors such as site conditions, climatic conditions, standards of specification, market conditions etc.

Rates are in national currency per square metre of Gross Floor Area except as follows: Chinese cities, Hong Kong and Macau: Rates are per square metre of Construction Floor Area, measured to outer face of external walls. Singapore, Ho Chi Minh City, Jakarta and Kuala Lumpur: Rates are per square metre of Construction Floor Area, measured to outer face of external walls and inclusive of covered basement and above ground parking areas. Chinese cities, Hong Kong, Macau and Singapore: All hotel rates are inclusive of Furniture Fittings and Equipment (FF&E).

Cost per m2 Location /City

Local Currency

Premium Offices

Low AMERICAS $USD Boston $USD Chicago $USD Denver $USD Honolulu $USD Las Vegas $USD Los Angeles $USD New York $USD Phoenix $USD Portland $USD San Francisco $USD Seattle $USD Washington D.C. ASIA Rmb Beijing Rmb Chengdu Rmb Guangzhou VND('000) Ho Chi Minh City $HKD Hong Kong Rp('000) Jakarta RINGGIT Kuala Lumpur MOP Macau KRW('000) Seoul Rmb Shanghai Rmb Shenzhen $Sgd Singapore EUROPE GBP Birmingham GBP Bristol GBP London GBP Manchester MIDDLE EAST & AFRICA AED Abu Dhabi AED Dubai SAR Saudi Arabia QAR Doha OCEANIA $AUD Adelaide $NZ Auckland $AUD Brisbane $AUD Canberra $NZ Christchurch $AUD Darwin $AUD Melbourne $AUD Perth $AUD Sydney $NZ Wellington

37

Cost per m2

Office Building High

Retail

Grade A

Mall

Low

High

Low

High

Strip Shopping Low High

Residential Multi Storey Low

High

2,155

3,015

1,885

2,635

1,290

2,260

970

1,560

1,455

3,500

2,475

3,875

1,290

1,940

1,240

2,260

860

1,400

1,290

3,500

1,505

2,420

1,075

1,615

860

1,400

700

1,345

645

3,765

2,315

4,305

1,940

3,230

1,670

4,035

1,400

3,500

1,560

6,245 4,305

1,505

3,070

1,130

2,045

1,240

5,165

700

1,560

755

1,940

3,015

1,290

2,100

1,185

2,475

860

1,505

1,400

3,120

2,205

3,765

1,940

2,905

1,505

2,690

1,240

1,720

1,505

3,765

1,345

2,475

1,075

1,670

1,130

1,775

755

1,345

860

3,765

1,775

2,260

1,240

1,720

1,185

2,370

970

1,400

1,185

2,800

2,100

3,230

1,505

2,370

1,290

2,475

1,185

1,775

1,560

3,335

1,775

2,205

1,240

1,720

1,240

2,155

1,025

1,455

1,075

2,530

1,885

2,585

1,400

1,990

1,025

2,045

805

1,455

1,075

2,690

7,250

12,000

6,750

10,300

8,050

12,300

7,000

11,000

3,800

5,850

6,900

11,200

6,350

9,400

7,300

11,050

6,600

10,500

3,500

5,400

7,050

11,200

6,500

9,800

8,050

11,500

6,950

10,400

3,700

5,550

22,061

31,731

18,815

23,549

N/P

N/P

N/P

N/P

14,131

21,425

19,000

28,200

16,800

22,800

19,800

25,200

16,900

22,000

16,800

24,200

8,755

11,530

6,053

9,458

6,106

8,052

N/P

N/P

6,161

9,839

2,400

4,500

1,600

2,900

2,100

3,500

N/P

N/P

1,700

4,100

15,300

21,900

13,500

18,800

16,600

20,500

14,000

18,000

10,900

18,200 2,080

2,210

2,830

1,660

2,040

1,480

2,150

1,250

1,900

1,440

7,350

11,850

6,750

10,250

8,050

12,450

7,050

11,200

3,700

5,700

6,750

11,050

6,350

9,600

7,350

11,050

6,450

9,850

3,550

5,400

2,700

3,850

2,050

2,950

2,150

3,350

N/P

N/P

2,000

3,150

1,650

2,330

1,450

2,330

2,530

3,550

810

1,520

1,520

2,130

1,770

2,330

1,550

2,330

2,530

3,550

810

1,520

1,520

2,130

2,150

2,800

1,800

2,800

2,910

4,090

930

1,750

1,800

2,600

1,770

2,330

1,500

2,330

2,530

3,550

810

1,520

1,520

2,130

5,800

7,000

4,700

6,600

4,200

6,500

N/P

N/P

4,500

6,500

5,600

6,900

4,600

6,400

4,200

6,300

N/P

N/P

4,300

6,300

4,883

7,597

4,988

6,825

4,725

6,195

3,360

4,725

4,358

9,188

6,500

8,500

6,100

8,200

5,300

6,500

N/P

N/P

6,500

7,800

2,600

3,850

2,100

3,450

1,550

2,950

1,300

1,825

2,100

3,500

2,750

3,500

2,100

3,200

1,100

1,800

1,200

1,400

2,100

2,900

2,450

3,800

1,900

2,900

2,150

2,950

1,050

1,550

1,900

3,050

2,990

3,880

2,420

3,060

2,050

2,880

1,100

1,810

2,480

3,520

3,570

4,590

3,060

4,080

1,530

2,040

N/P

N/P

N/P

N/P

2,900

3,980

2,250

3,600

1,550

2,400

1,050

1,900

1,940

2,560

3,000

3,750

2,325

2,900

2,025

3,000

1,060

1,550

2,200

3,500

3,150

4,770

2,575

3,740

N/P

N/P

1,025

2,565

2,230

3,830

3,000

4,150

2,250

3,100

1,650

3,400

1,300

1,600

2,200

3,650

2,800

3,200

2,200

2,500

1,300

1,800

N/P

N/P

2,500

3,200

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

38

INTERNATIONAL CONSTRUCTION Building Costs All costs are stated in local currency as shown below, as of Third Quarter 2014. The following data represents estimates of current building costs in the respective market. Costs may vary as a consequence of factors such as site conditions, climatic conditions, standards of specification, market conditions etc.

Rates are in national currency per square metre of Gross Floor Area except as follows: Chinese cities, Hong Kong and Macau: Rates are per square metre of Construction Floor Area, measured to outer face of external walls. Singapore, Ho Chi Minh City, Jakarta and Kuala Lumpur: Rates are per square metre of Construction Floor Area, measured to outer face of external walls, inclusive of covered basement and above ground parking areas. Chinese cities, Hong Kong, Macau and Singapore: All hotel rates are inclusive of Furniture Fittings and Equipment (FF&E).

Cost per m2 Location /City

Local Currency

AMERICAS $USD Boston $USD Chicago $USD Denver $USD Honolulu $USD Las Vegas $USD Los Angeles $USD New York $USD Phoenix $USD Portland $USD San Francisco $USD Seattle $USD Washington D.C. ASIA Rmb Beijing Rmb Chengdu Rmb Guangzhou VND('000) Ho Chi Minh City $HKD Hong Kong Rp('000) Jakarta RINGGIT Kuala Lumpur MOP Macau KRW('000) Seoul Rmb Shanghai Rmb Shenzhen $Sgd Singapore EUROPE GBP Birmingham GBP Bristol GBP London GBP Manchester MIDDLE EAST & AFRICA AED Abu Dhabi AED Dubai SAR Saudi Arabia QAR Doha OCEANIA $AUD Adelaide $NZ Auckland $AUD Brisbane $AUD Canberra $NZ Christchurch $AUD Darwin $AUD Melbourne $AUD Perth $AUD Sydney $NZ Wellington

39

Cost per m2

Hotels 3 Star

Car Parking 5 Star

Multi Storey Low High

Basement Low High

Industrial Warehouse

Low

High

Low

High

1,720

2,690

2,690

4,305

645

970

860

1,185

755

1,075

1,290

2,260

2,690

4,845

700

1,185

970

1,400

755

1,400

Low

High

1,130

1,775

1,990

3,015

430

755

645

1,025

700

1,185

2,635

4,415

4,200

6,080

755

1,130

1,075

2,100

1,130

1,830

1,290

2,420

3,500

5,005

540

915

645

1,615

540

1,075

1,830

2,635

2,690

4,200

805

1,025

1,025

1,505

755

1,290

1,990

2,850

3,445

5,115

700

1,130

915

1,345

970

1,400

1,185

1,720

2,260

4,090

430

700

645

1,075

590

1,075

1,400

1,830

1,885

2,850

755

970

970

1,400

805

1,185

2,045

2,800

2,850

4,415

805

1,075

1,025

1,560

860

1,400

1,505

1,940

1,990

2,960

700

915

915

1,345

805

1,185

1,615

2,475

2,475

4,035

590

860

805

1,075

755

1,075

9,100

11,800

12,400

16,400

2,100

2,900

3,450

6,150

4,100

5,200

8,550

10,900

11,550

14,300

2,050

2,800

3,300

5,400

3,490

4,300 5,050

9,350

11,500

12,500

16,100

2,050

2,900

3,600

6,250

4,050

21,566

27,899

28,687

35,131

8,042

12,017

16,539

22,598

5,513

8,345

24,600

28,300

30,100

36,700

7,550

8,800

12,800

18,300

13,000

16,400

9,539

10,999

12,483

15,944

2,997

3,917

3,917

5,458

4,107

4,972

2,500

3,800

4,300

6,500

900

1,200

1,300

2,200

1,000

1,700

19,800

23,500

24,600

30,000

N/P

N/P

7,550

10,000

N/P

N/P

1,920

2,440

2,980

4,410

620

760

800

1,020

1,110

1,390

9,250

11,750

12,450

16,350

2,200

3,000

4,000

6,550

4,100

5,250

8,900

11,200

11,900

15,500

2,000

2,800

3,450

6,050

3,850

4,850

3,300

3,650

4,250

5,600

700

1,300

1,950

2,200

1,100

1,550 610

1,215

1,790

1,925

2,635

305

610

760

1,315

330

1,215

1,620

2,100

2,800

375

750

810

1,350

330

610

1,550

2,000

2,300

3,100

375

750

975

1,600

400

725

1,215

1,620

1,925

2,635

305

610

810

1,315

330

610

7,500

9,000

8,900

10,400

1,800

3,600

2,850

4,500

1,500

2,700

7,500

9,300

9,000

11,500

1,800

3,500

2,850

4,500

1,300

2,600

5,985

7,455

8,300

10,100

908

1,208

2,258

2,835

3,308

4,043

7,500

8,500

11,500

14,500

N/P

N/P

2,750

4,500

N/P

N/P 1,100

2,500

3,400

3,500

4,400

625

1,050

1,250

1,800

625

2,800

3,200

3,450

3,800

550

750

1,000

1,500

450

700

2,500

3,600

3,200

4,300

600

800

1,100

1,700

600

1,000

2,680

3,740

3,680

4,540

680

940

910

1,300

630

980

2,856

3,264

3,570

4,080

816

1,224

1,632

2,040

714

1,020

2,800

3,500

3,500

4,300

700

1,200

1,100

1,500

700

1,325

3,050

3,400

3,750

4,250

655

1,060

1,110

1,365

555

1,100

2,645

3,635

3,600

4,430

750

1,000

1,850

3,100

625

1,020

2,650

3,300

3,750

4,850

620

950

920

1,450

620

950

2,200

2,600

3,400

4,100

500

900

1,800

2,600

900

1,400

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

40

location

41 © Rider Levett Bucknall Philippines, Inc. 2015 BEIJING CHENGDU GUANGZHOU HO CHI MINH CITY HONG KONG JAKARTA KUALA LUMPUR MACAU SEOUL SHANGHAI SHENZHEN SINGAPORE

ASIA

BOSTON CHICAGO DENVER HONOLULU LAS VEGAS LOS ANGELES NEW YORK PHOENIX PORTLAND SAN FRANCISCO SEATTLE WASHINGTON D.C.

houses

apartments

offices

industrial

retail

hotel

civil

The “Wave” chart shows the boom and bust construction cycle. Data as at Fourth Quarter 2014.

AMERICAS

CONSTRUCTION MARKET ACTIVITY CYCLE MODEL

INTERNATIONAL CONSTRUCTION Sector Data

© Rider Levett Bucknall Philippines, Inc. 2015

42

INTERNATIONAL CONSTRUCTION

Philippine Construction Information NA

hotel

civil

Sector Data

Building for Ecologically Responsive Design Excellence (B.E.R.D.E.)

retail

LEED® Green Building Rating System

ADELAIDE AUCKLAND BRISBANE CANBERRA CHRISTCHURCH DARWIN MELBOURNE PERTH SYDNEY TOWNSVILLE WELLINGTON

OCEANIA

ABU DHABI DOHA DUBAI SAUDI ARABIA

ME AND AFRICA

BIRMINGHAM BRISTOL LONDON MANCHESTER

location

43

EUROPE

houses

apartments

offices

industrial

Development Data Measurement of Building Areas Government System Implemented for Private And Public Construction

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

44

PHILIPPINE CONSTRUCTION INFORMATION Building for Ecologically Responsive Design Excellence (BERDE)

BERDE Rating Certification Structure

PHILGBC

Developing the BERDE Certification Functional Chart PHILGBC Board PHILGBC Board

ISO/ IEC 17021 Appeals Committee

Assessment BERDE Development Team

Certification

i.e. BERDE Assessor

TUV Rheinland BERDE Assessment/Certification

Building/Applicant

Industry Expert

Assessor Assessor

Customers

Assessor

Technical Assessors and Experts Pool The PHILGBC Board of Trustees is the highest policy making body in the Ecologically Responsive Design Excellence (BERDE) Rating System and owns the BERDE Certification Mark. This agency was structured and owns the BERDE Certification Seal. The BERDE Development Team provides finalization and approval of the BERDE Rating Program. They conduct periodic review on the Rating and provide technical assistance, where necessary and applicable in the interpretation of the said Program. TÜV Rheinland Philippines are envisioned to undertake the BERDE assessment activities, to include documentation review, reporting and shall appoint a technical person/ panel to independently review the Assessment Report and be responsible for the award of the BERDE Certification.

45

© Rider Levett Bucknall Philippines, Inc. 2015

TUV Rheinland Philippines will support the PHILGBC in the development of the CRITERIA for the Technical Assessors and Experts. TUV Rheinland Philippines shall maintain a list of its technical assessors and experts pool for the BERDE Rating Program. TUV Rheinland Philippines in collaboration with PHILGBC will undertake capacity building programs, such as trainings or workshops in order to qualify the technical assessors and experts and ensure that they have common understanding on the interpretation of the BERDE Rating system, thus ensure the consistent implementation and assessment of the BERDE Rating program. A regular Experience Exchange program shall be required to all qualified technical assessors and experts in order to maintain their appointment status. As part of TUV Rheinland Philippines’ compliance with ISO/IEC 17021, it shall ensure that the designated assessment team, including the technical assessors and experts, were not in any way involved in the consulting for the applicant or project.

© Rider Levett Bucknall Philippines, Inc. 2015

46

PHILIPPINE CONSTRUCTION INFORMATION Proposed Timeline for BERDE Rating Program Man-day Table and Fee Structure TUV Rheinland Philippines charges on a man-day rate basis for its assessment and certification and/ or registration activities. TUV Rheinland Philippines in collaboration with PHILGBC, will develop a manday table or matrix to determine how much time (man-days) is needed, considering the size and complexity of the project, such as location, size of lot, number of floors of the building, for the Assessment Team to spend for its assessment and certification activities, such as but not limited to documentation review, assessment and documentation/report preparation. TÜV Rheinland Philippines shall charge the current man-day rate and registration fees duly approved by PHILGBC and published accordingly.

information to assign weights to individual BERDE credits. The workbook is a decision support tool that is intended to provide a framework for credit weighting – and not definitive answers. Weighting Approach The BERDE weighting system is based on the concept that the value of credits or CRITERIA will be determined by a basic weighting equation (see below). This equation brings together information on indicators addressed, impact categories (i.e. social, economic, environmental), and the relative importance of CRITERIA indicators. This approach is implemented in a Microsoft Excel based workbook called the BERDE 1.0 Credit Weighting Tool. The tool ultimately provides a set of credit weightings such as those illustrated in the screen shot below. Basic Weighing Equation

Minimum Program Requirements Each project must meet minimum requirements in order to quality for BERDE certification. All projects much comply with applicable environmental laws, be a complete permanent building or space, have a site boundary (distinct property lines), comply with minimum occupancy rates, commit to sharing whole building energy and water usage data, and comply with a minimum building area to site-area ratio. Scoring and Rating The BERDE Rating System provides a cross-cutting measure of building performance. Weighting is a central concern when combining performance across credits and credit categories. This work is an effort for the BERDE weighting system to address the social, economic and environmental impact priorities of the Philippines. Objectives The BERDE 1.0 Credit Weighting Tool was developed to provide a transparent and reproducible system for understanding building impacts and using this

47

© Rider Levett Bucknall Philippines, Inc. 2015

UN Sustainable Development Indicators Addressed X Social, Economic and Environmental Impacts X Relative Importance of Each Impact = Credit or Criteria Weight

Definitions: Indicators Addressed: Each B.E.R.D.E. requirement or criteria addresses different U.N. Sustainable Development Indicators (SDIs). Environmental Impacts: Each U.N. Sustainable Development Indicator belongs to different impact categories (Social, Economic and Environmental). Relative Importance: Each relevant Database Indicator, that belongs to different UN SDIs, compares the Philippines’ standing against the rest of the world. The data puts the Philippines better or worse than the World average. A “worse than the world average” standing gives the indicator a relative importance. © Rider Levett Bucknall Philippines, Inc. 2015

48

PHILIPPINE CONSTRUCTION INFORMATION

Management

Energy

Points

MN-PT-1 : Berde Consultants

2

MN-PT-2 : Stakeholder Consultation

6

MN-PT-3 : Design Charrette

1

EN-PT-6 : Energy Efficient Building Envelope EN-PT-7 : Energy Efficient Equipment EN-PT-8 : Building Automation Systems

1 1 1-2

MN-PT-4 : Security

1

MN-PT-5 : Social Dimension Commitment

1

MN-PT-6 : Environmental Dimension Commitment

1

TR-PT-1 : Alternative Transportation : Bicycles

1

1-2

TR-PT-2 : Alternative Transportation : Low Emission and Energy Efficient Vehicles

1

TR-PT-3 : Parking

3

TR-PT-4 : Proximity To Key Establishments

2

TR-PT-5 : Public Access

1

MN-PT-7 : Economic Dimension Commitment

Land Use and Ecology LE-PT-1 : Land Reuse

Points 2-6

LE-PT-2 : Protection of Ecological Features and Further Improvement

2-6

LE-PT-3 : Pro-Biodiversity Open Space

2-3

LE-PT-4 : Heat Island Effect : Non-Roof

1-2

LE-PT-5 : Heat Island Effect : Building Roof

1

LE-PT-6 : Flood Risk Minimization

2

Transportation

Water WT-PT-1 : Water Metering WT-PT-2 : Water Consumption Reduction WT-PT-3 : Efficient Landscape Irrigation

Energy

Points 1-2 2-3

1-2

2-4

TR-PT-7 : Public Transportation Access

1-4

TR-PT-8 : Transportation Impact Assessment

1

EN-PT-2 : Energy Efficient Lighting

1

EN-PT-3 : Natural Ventilation EN-PT-4 : On-Site Energy Generation EN-PT-5 : Energy Efficiency Improvement

© Rider Levett Bucknall Philippines, Inc. 2015

2

Points

EQ-PT-1 : External View And Daylighting

1

EQ-PT-2 : Illumination Control

1

EQ-PT-3 : Glare Control

1

EQ-PT-4 : Thermal Control

1

EQ-PT-5 : Indoor Air Quality

1

EQ-PT-6 : Microbial Contamination Prevention

1

EQ-PT-7 : Low Voc Environment

1

Points

EN-PT-1 : Energy Metering

Points

TR-PT-6 : Contribution To Public Transport Amenities

Indoor Environment Quality

49

Points

Materials

Points

1

MT-PT-1 : Civil Works

1-2

1

MT-PT-2 : Electrical Works

1-2

MT-PT-3 : Architectural Works And Finishes

2

1

© Rider Levett Bucknall Philippines, Inc. 2015

50

PHILIPPINE CONSTRUCTION INFORMATION LEED® Green Building Rating System Emissions

Points

EM-PT-1 : Pollutant And Greenhouse Gas Inventory

2

EM-PT-2 : Ozone Protection

1

EM-PT-3 : Emission Control

1

Waste WS-PT-1 : Construction Waste Diversion WS-PT-2 : Materials Recovery Facility

Heritage Conservation

Points 2-6 5

Points

HC-PT-1 : Heritage Feature Protection

3

HC-PT-2 : Heritage Features Promotion

1

Innovation IN-PT-1 : Innovation In Design Or Process IN-PT-2 : Innovation In Performance

I. Background of LEED® Following the formation of the U.S. Green building council (USGBC) in 1993, the organization’s members quickly realized that the sustainable building industry needed a system to define and measure “green buildings.” USGBC began to research existing green building metrics and rating systems. Less than a year after formation, the members acted on the initial findings by establishing a committee to focus solely on this topic. The composition of the Committee was diverse; it included architects, real estate agents, a building owner, a lawyer, an environmentalist, and Industry representatives. This cross section of people and professions added a richness and depth both to the process and to the ultimate product.

Points 1 - 10

Features of LEED® The LEED Green Building Rating Systems are voluntary, consensus-based, and market-driven. Based on existing and proven technology, they evaluate environmental performance from a whole building perspective over a building’s life cycle, providing a definitive standard for what constitutes a green building in design, construction, and operation. The LEED Credit Weightings In LEED 2009, the allocation of points between credits is based on the potential environmental impacts and human benefits of each credit with respect to a set of impact categories. The impacts are defined as the environmental or human effect of the design, construction, operation, and maintenance of the building, such as greenhouse gas emissions, fossil fuel use, toxins and carcinogens, air and water pollutants, indoor environmental conditions. A combination of approaches, including energy modeling, life-cycle assessment, and transportation analysis, is used

51

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

52

PHILIPPINE CONSTRUCTION INFORMATION to quantify each type of impact. The resulting allocation of points among credits is called credit weighting. The LEED 2009 credit weightings process is based on the following parameters, which maintain consistency and usability across rating systems: • • •



All LEED credits are worth a minimum of 1 point. All LEED credits are positive, whole numbers; there are no fractions or negative values. All LEED credits receive a single, static weight in each rating system; there are no individualized scorecards based on project location. All LEED rating systems have 100 base points; Innovation in Design (or Operations) and Regional Priority credits provide opportunities for up to 10 bonus points.

Given the above criteria, the LEED 2009 credit weightings process involves 3 steps: 1.

2.

3.

A reference building is used to estimate the environmental impacts in 13 categories associated with a typical building pursuing LEED certification. The relative importance of building impacts in each category are set to reflect values based on the NIST weightings. Data that quantify building impacts on environmental and human health are used to assign points to individual credits.

II. Overview and Process The LEED 2009 green building rating system for new construction and major renovations is a set of performance Standards for certifying the design and construction of commercial or institutional buildings and high-rise Residential buildings of all sizes, both public and private. The intent is to promote healthful, durable, affordable, and Environmentally sound practices in building design and construction. Prerequisites and credits in the LEED 2009 for new construction and major renovations addresses 7 topics: • • • • • • •

Sustainable Sites (SS) Water Efficiency (WE) Energy And Atmosphere(EA) Materials And Resources (MR) Indoor Environmental Quality (IEQ) Innovation In Design (ID) Regional Priority (RP)

LEED 2009 for new construction and major renovations certifications are awarded according to the following Scale: • • • •

Certified 40–49 points Silver 50–59 points Gold 60–79 points Platinum 80 points and above

GBCI will recognize buildings that achieve 1 of these rating levels with a formal letter of certification. When to Use LEED 2009 for New Construction LEED for new construction was designed primarily for new commercial office buildings, but it has been applied to Many other building types by leed practitioners. All commercial buildings, as defined by standard building codes, Are eligible for certification as leed for new construction buildings. Examples of commercial occupancies include

53

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

54

PHILIPPINE CONSTRUCTION INFORMATION offices, institutional buildings (libraries, museums, churches, etc.), Hotels, and residential buildings of 4 or more Habitable stories. Registration Project teams interested in earning LEED certification for their buildings must first register the project with GBCI. Projects can be registered on the GBCI website (www.gbci.org). The website also has information on registration costs for USGBC national members as well as nonmembers. Registration is an important step that establishes contact with GBCI and provides access to software tools, errata, critical communications, and other essential information. Certification

IV. Exemplary Performance Strategies Exemplary performance strategies result in performance that greatly exceeds the performance level or expands the scope required by an existing LEED 2009 for new construction credit. To earn exemplary performance credits, teams must meet the performance level defined by the next step in the threshold progression. For credits with more than 1 compliance path, an innovation in design point can be earned by satisfying more than 1 compliance path if their benefits are additive. The credits for which exemplary performance points are available through expanded performance or scope are noted In the leed reference guide for green design & construction, 2009 edition and in LEED-online.

To earn LEED certification, the applicant project must satisfy all the prerequisites and qualify for a minimum number of points to attain the established project ratings as listed below. Having satisfied the basic prerequisites of the program, applicant projects are then rated according to their degree of compliance within the rating system. III. Minimum Program Requirements The LEED 2009 minimum program requirements (MPRS) define the minimum characteristics that a project must possess in order to be eligible for certification under LEED 2009. These requirements define the categories of buildings that the LEED rating systems were designed to evaluate, and taken together serve three goals: to give clear guidance to customers, to protect the integrity of the LEED program, and to reduce challenges that occur during the LEED certification process. It is expected that MPRS will evolve over time along with LEED rating system improvements. The requirements will apply only to those projects registering under LEED 2009. To view the mprs and the MPR supplemental guidance, visit the LEED resources and tools section at www.usgbc. org/projecttools.

55

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

56

PHILIPPINE CONSTRUCTION INFORMATION LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS PROJECT CHECKLIST Sustainable Site

26 possible points

Prerequisite 1

Construction Activity Pollution Prevention

Credit 1

Site Selection

1

Credit 2

Development Density and Community Connectivity

5

Credit 3

Brownfield Redevelopment

1

Credit 4.1

Alternative transportation: Public transportation access

6

Credit 4.2

Alternative transportation: Bicycle storage and Changing rooms

1

Credit 4.3

Alternative transportation: Low-Emitting and fuel-Efficient vehicles

3

Credit 4.4

Alternative transportation: Parking Capacity

2

Credit 5.1

Site Development: Protect or Restore Habitat

1

Credit 5.2

Site Development: Maximize open space

1

Credit 6.1

Stormwater Design: Quantity Control

1

10 possible points

Prerequisite 1

Water Use Reduction

Required

Prerequisite 2

Water Efficient Landscaping

Required

Prerequisite 3

Innovative Wastewater Technologies

Required

Credit 1

Optimize Energy performance

1-19

Credit 2

On-site Renewable Energy

1-7

Credit 3

Enhanced Commissioning

2

Credit 4

Enhanced refrigerant Management

2

Credit 5

Measurement and Verification

3

Credit 6

Green Power

2

Materials and resources

14 possible points

Prerequisite 1

storage and Collection of recyclables

Credit 1.1

Building reuse: Maintain Existing walls, floors and roof

1-3

Credit 1.2

Building reuse: Maintain Existing interior Nonstructural Elements

1

Credit 2

Construction Waste Management

1-2

Credit 3

Materials Reuse

1-2

Credit 4

Recycled Content

1-2 1-2

Required

Credit 6.2

Stormwater Design: Quality Control

1

Credit 5

Regional Materials

Credit 7.1

Heat island Effect: Nonroof

1

Credit 6

Rapidly Renewable Materials

1

Credit 7.2

Heat island Effect: Roof

1

Credit 7

Certified Wood

1

Credit 8

Light Pollution Reduction

1

Water Efficiency

57

Required

Energy and Atmosphere

10 possible points

Prerequisite 1

Water Use Reduction

Credit 1

Water Efficient Landscaping

Credit 2

Innovative Wastewater Technologies

Credit 3

Water Use Reduction

© Rider Levett Bucknall Philippines, Inc. 2015

Required

Indoor Environmental Quality Prerequisite 1

Minimum Indoor Air Quality Performance

Required

Prerequisite 2

Environmental Tobacco Smoke (ETS) Control

Required

Credit 1

Outdoor Air Delivery Monitoring

1

Credit 2

Increased Ventilation

1

Credit 3.1

Construction Indoor Air Quality Management Plan: During Construction

1

2-4 2 2-4

15 possible points

© Rider Levett Bucknall Philippines, Inc. 2015

58

PHILIPPINE CONSTRUCTION INFORMATION Development Data

Indoor Environmental Quality

15 possible points

Credit 3.2

Construction Indoor Air Quality Management Plan: Before Occupancy

1

Credit 4.1

Low-Emitting Materials: Adhesives and Sealants

1

Credit 4.2

Low-Emitting Materials: Paints and Coatings

1

Credit 4.3

Low-Emitting Materials: Flooring systems

1

Credit 4.4

Low-Emitting Materials: Composite Wood And Agrifiber Products

1

Credit 5

Indoor Chemical And Pollutant Source Control

1

Credit 6.1

Controllability Of Systems: Lighting

1

Credit 6.2

Controllability Of Systems: Thermal Comfort

1

Credit 7.1

Thermal Comfort: Design

1

Credit 7.2

Thermal Comfort: Verification

1

Credit 8.1

Daylight And Views: Daylight

1

Credit 8.2

Daylight And Views: Views

1

Innovation in Design

6 possible points

Credit 1

Innovation in Design

Credit 2

LEED accredited professional

Regional Priority Credit 1

1-5

1

Measurement of Building Areas Prior to 1989, the development intensity for residential development was measured in terms of density i.e. persons per hectare. For non-residential developments such as industrial, warehousing, institutional, commercial buildings etc., the intensity was measured in terms of plot ratio. Following the introduction of the new development charge system from 1 September 1989, the Gross Floor Area concept was adopted to determine the development intensity of a building, thereby standardizing the previous methods of calculating development intensity for different types of developments. The definition of (GFA) Gross Floor Area in this office as per Rider Levett Bucknall Philippines Operating Procedure No.2 (OP-02): All covered space fulfilling the functional requirements of the building measured to the outside face of the external walls or the external perimeter. Areas occupied by partitions, columns, internal structural or party walls, stairwells, lift shafts, plant rooms, water tanks and the like are included. Sloping surfaces such as staircases and car park ramps have been measured flat on plan. Note that;The rooms passing through two or more storey (e.g. foyer, atrium, lobby etc.) - the area is measured once only at floor level.

4 possible points Regional Priority

1-4

The rooms passing through two or more storey with a gallery or mezzanine – the area is measured once only at ground floor level and the area of the mezzanine or gallery added. Extreme care must therefore be taken to ensure that any areas quoted by the Architect or Client are understood by all parties. Gross Floor Area (G.F.A.) The sum of the “Fully Enclosed Covered Area” and “Unenclosed Covered Area” as defined.

59

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

60

PHILIPPINE CONSTRUCTION INFORMATION Fully Enclosed Covered Area (F.E.C.A) The sum of all areas at all building floor levels, including basements (except unexcavated portions), floored roof spaces and attics, garages, penthouses, enclosed porches and attached enclosed covered ways alongside buildings, equipment rooms, lift shafts, vertical ducts, staircases and any other fully enclosed spaces and usable areas of the building, computed by measuring from normal outside face of the exterior walls but ignoring any projections such as plinths, columns, piers and the like which project from the normal inside face of the exterior walls. It shall not include open courts, light wells, connecting or isolated covered ways and net open areas of upper portions of rooms, lobbies, halls, interstitial spaces and the like which extend through the storey being computed. Unenclosed Covered Area (U.C.A) The sum of all areas at all building floor levels, including roof balconies, open verandahs, porches and porticos, attached open covered ways alongside buildings, undercrofts and usable space under buildings, unenclosed access galleries (including ground floor) and any other trafficable covered areas of the building which are not totally enclosed by full height walls, computed by measuring the area between the enclosed walls or balustrade (i.e. from the inside face of the U.C.A. excluding the wall or balustrade thickness). When the covering element (i.e. roof or upper floor) is supported by columns, is cantilevered or is suspended, or any combination of these, the measurements shall be taken to the edge of the paving or to edge of the cover, whichever is lesser. U.C.A. shall not include eaves overhangs, sun shading, awnings and the like where these do not relate to clearly defined trafficable covered areas, nor shall it include connecting or isolated covered ways. Net Rentable Area (N.R.A.) The sum of rentable areas within a commercial type building, measured from the inside face of

61

© Rider Levett Bucknall Philippines, Inc. 2015

exterior walls and windows at a height of 1.5m above floor level and including the area occupied by structural columns. Deductions from N.R.A.: All stairs, toilets, cleaner’s cupboards, lift shafts, escalators and tea rooms where provided as standard facilities in the buildings. Lobbies between lifts facing other lifts serving the same floor. Areas set aside as public space or thoroughfares and not used exclusively by occupants of the building. (Note: excludes any additional common areas resulting from the sub-division of a whole floor to accommodate more than one tenant.) Areas set aside as plant and lift motor rooms or for the provision of facilities or services to the building and not for the exclusive use of the occupants of the building. Areas set aside for use by service vehicles and for delivery of goods and access ways thereto. Areas set aside for car parking and access ways thereto. Usable Floor Area (U.F.A.) The sum of the floor areas at floor level from the general inside face of walls of all interior spaces related to the primary function of the building. This will normally be computed by calculating the “Fully Enclosed Covered Area” (F.E.C.A.) and deducting all of the following areas supplementary to the primary function of the building. Deductions from U.F.A.: Common Use Areas All floored areas in the building for circulation and standard facilities provided for the common use of the occupants, tenants and/or the public such as lobbies and foyers to entrances, stairways and lifts, stairways, landings and fire escapes, verandahs © Rider Levett Bucknall Philippines, Inc. 2015

62

PHILIPPINE CONSTRUCTION INFORMATION and balconies, corridors and passages, toilets and rest room areas, cloak and locker rooms, cleaner’s rooms, including stores and cupboards, tea making and similar amenity areas. Service Areas All areas set aside for building plant supplying services and facilities common to the building for the use of occupants, tenants and/or public such as mechanical plant and equipment rooms, electrical equipment and switch rooms, tank rooms, lift motor rooms, meter cupboards, telecommunications switch rooms, refuse collection areas loading bays and all car parks including access ways thereto. Non-habitable Areas All non-habitable building space such as that occupied by internal columns and other structural supports, internal walls and permanent partitions, lift shafts, service ducts and the like.

Government System Implemented for Private and Public Construction In the Philippines, there are two distinct systems that govern the tendering and implementation of public and private construction contracts. Private Construction Contractors are usually selected on the basis of their reputations as competent builders or in consideration of their personal relationships with the project owner. Private contracts are also generally negotiated or tendered through sealed canvass bidding and some through electronic bidding (e-bidding). The contract is awarded at the price agreed upon through the negotiation process. The terms and conditions of the contract constitute the law or agreement between the contracting parties. Public Construction Presidential Decree No. 1594 and its Implementing Rules and Regulations (much like the AB 92 of Sweden) primarily governs government infrastructure contracts, particularly those funded from local appropriations, by the contract terms and conditions. However, for projects funded partly or wholly from foreign financing, the International Conditions of Contract or “FIDIC” and the bank guidelines apply. The Implementing Rules and Regulations of Presidential Decree No. 1594 and Its Objectives As an overview, Presidential Decree No.1594 has been formulated and approved by the Government of The Philippines to adopt a comprehensive, uniform and updated set of policies and guidelines, rules and regulations covering government contracts for government infrastructure and other construction projects in order to achieve a more efficient and effective implantation of these projects. It is intended to: • Bring about maximum efficiency in project implantation and minimize project cost and contract variations through sound practices in

63

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

64

PHILIPPINE CONSTRUCTION INFORMATION construction management. • Promote healthy partnership between the government and the private sector in furthering national development, and • Enhance the growth of the local construction industry and optimize the use of indigenous manpower, materials and other resources. Generally, government construction projects are undertaken by contract after competitive public bidding. Projects may be undertaken by administration or “force account” or by negotiated contract only in exceptional cases where time is of the essence, or where there is lack of qualified bidders or contractors, or where there is conclusive evidence that greater economy and efficiency would be achieved through this arrangement. Life Cycle Economy In government projects in The Philippines, a Warranty Period of one (1) year is provided and calculated from the date of final completion of the contract works as certified by the Executing Agency. Within the above prescribed period, the Contractor should maintain the facility of his own expense and is liable any failure or defect noted which is traceable to poor workmanship, use of poor quality materials or non-compliance to plans and specifications. The Contractor, at his own expense, should correct the defects and failure or refusal to do so will warrant the Executing Agency to carry out the corrective work with all the consequential expenses chargeable from any monies due to the Contractor. However, defects and failures due to ordinary wear and tear and for causes other than the fault of the Contractor shall be taken against the Contractor.

65

and or use of materials of inferior quality as provided under Article 1723 of the Civil Code of the Philippines. References : 1.) Implementing Rules and Regulations of Presidential Decree No. 1594Guidelines for Government Infrastructure Contracts 2.) Managing the Construction Process for Government Projects in the Philippines Department of Public Works and Highways (DPWH)

The Construction Industry Authority of the Philippines (CIAP) The CIAP and its four implementing boards provide various regulatory and development services for the construction industry. Generally, CIAP provides information on industry policies, industry performance and prospects, contractor’s profiles, blacklisted contractors and contractor’s performance ratings. Philippine Contractors Accreditation Board (P.C.A.B.) The group to regulate the domestic contracting sector through the issuance of licenses to contractors and the contractor’s registration classification for government projects. Philippine Overseas Construction Board (P.O.C.B.) The group to register and issues project authorization to The Philippine contractors and consultants for overseas operation. The POCB also provides market information, such as project opportunities and country profiles to register overseas contractors. Philippine Domestic Contractors Board (P.D.C.B.)

After one year, a certificate of acceptance is issued by Executing Agency the facility is now turnedover to the Government for property management and maintenance. However, the contractor, after the date of issuance of a Certificate of Final Acceptance for the project, remains criminally and administratively liable for any damages or defects discovered on the works due to faulty construction

The group to assist various government tendering agencies and other concerned entities in establishing the Contractor’s Performance Evaluation System (CPES) to ensure quality and safety in their construction projects. The PDCB likewise accredits CPES evaluators and provides information on CPES ratings and blacklisted firms.

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

66

PHILIPPINE CONSTRUCTION INFORMATION Construction Industry Arbitration Commission (C.I.A.C) The group to resolve construction contract disputes through arbitration and mediation/conciliation. It also subsidizes the costs for the resolution of small claims (P1 million and below) through Arbitration Development Fund and accredits construction arbitrators. References : Department of Trade and Industry – Bureau www.dti.gov.ph/dti/index

Infrastructure Philippine Infrastructure Information Definition of Terminologies Construction Cost Data Average Infrastructure Construction Payment Drawdown Public-Private Partnership Variants of PPP Project Agreements Infrastructure-Related Government Agencies and Offices Construction Regulations

67

© Rider Levett Bucknall Philippines, Inc. 2015

INFRASTRUCTURE PHILIPPINE INFRASTRUCTURE INFORMATION Roads and Bridges

Energy Power Consumption by Sector in GWh (2013)

Total Paved National Road (as of Nov. 2013)

3% Others

35000000

kilometers

30000000

34%

25000000

33%

Industrial

20000000

Residential

15000000 10000000 5000000 0

Road Type

National Arterial National Road Secondary Road

Total

UNPAVED

1,226,476

4,227,524

5,454,000

PAVED

14,852,241

11,920,692

26,772,933

30%

Commercial

Power Generation by Source in GWh (2013) Existing National Bridges by Type

O.4%

300000

Renewable

6%

Oil-based

250000

13% Hydro

25%

200000

Natural Gas

13%

150000

Geothermal

100000 50000 0

Concrete

BRIDGE TYPE

Steel

PERMANENT BRIDGES

Length in linear meter

284,434

63,242

43%

Timber

Bailey

Coal

TEMPORARY BRIDGES 7,057

910

Installed Generating Capacity in MW (2013) 6000

Total Paved National Road (Percentage)

Existing National Bridges by Type (Percentage)

5000 4000

17% Unpaved

2%

Temporary bridges

3000 2000 1000 0

83% Paved

69

98% Permanent Bridges

Total Length: 355, 643 m

Capacity

Oli Based

Hydro

Geothermal

Coal

Natural Gas

Renewable

3,353

3,521

1,868

5,568

2,862

153

Note: Latest data from the Department of Public Works and Highways (DPWH). Retrieved January 2015.

Note: Latest data from the Department of Energy (DOE). Retrieved January 2015.

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

70

INFRASTRUCTURE Mining

Aviation (Airports) Number of Philippine Airports (as of 2014) 50

Philippine Metallic Mineral Production (January - June 2014) 10000

40

9000

30

8000

20

7000 10

6000 0

Number

International

Domestic

Community

11

32

41

Note: Latest data from the Civil Aviation Authority of the Philippines. Retrieved January 2015.

5000

Precious Metals

Gold

Silver

8,256

9,088

Historical Metal Prices (January - December 2014)

Marine (Ports and Harbors) 2013 Cargo Throughput, Container & Shipcalls 100 80 60 40 20 0

Cargo

Container (TEU)

FOREIGN

61%

61%

Shipcalls 3%

DOMESTIC

39%

39%

97%

Note: Latest data from the Philippine Ports Authority. Retrieved January 2015.

DEFINITION Throughput

Total volume of cargo discharged and loaded at the port at any given time.

Twenty-Foot-Equivalent Unit

The unit of measurement equivalent to a container’s length of 20 feet.

Shipcalls

The number of vessels which call or arrive at a particular port. Note: Latest data from Mines and Geosciences Bureau. Retrieved January 2015.

71

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

72

INFRASTRUCTURE Irrigation

DEFINITION OF TERMINOLOGIES

Status of Irrigation Development (Dec. 2013)

44%

Remaining Area to be Developed (in hectares)

56%

Firmed-up Service Area (in hectares)

Note: Latest data from the National Irrigation Authority. Retrieved January 2015.

Railways

20

Types of Infrastructure: • Roads • Rails • Transport Intermodal • Mining • Bridges and Tunnels • Water and Waste Water

• Energy • Marine • Aviation • Land Development • Process Engineering

A type of high-capacity public transport generally found in urban areas. Rapid transit systems are electric railways that operate on an exclusive rightof-way, which cannot be accessed by pedestrians or other vehicles of any sort and which is often grade separated in tunnels or on elevated railways.

15

10

5

Transport Intermodal Involves the use of more than one mode of transport for a journey. There are two types:

0 LRT-1 (Line 1)

LRT-2 (Line 2)

MRT-1 (Line 3)

18.07

12.56

16.90

Source: LRTA and MRT3

73

The basic physical and organizational structure needed for the operation of a society or enterprise or the services and facilities necessary for an economy to function. It can be generally defined as the set of interconnected structural elements that provide a framework supporting an entire structure of development. It is an important term for judging a country or region's development.

These networks deliver essential services and support social interactions and economic development. They are society’s lifelines. Rapid Transit

Types of Rapid Transit

Kilometers

Infrastructure

© Rider Levett Bucknall Philippines, Inc. 2015

• Intermodal passenger transport’s major goal is to reduce dependence on the automobile as the major mode of ground transportation and increase use of public transport. • Intermodal freight transport reduces cargo handling, and so improves security, reduces damage and loss and allows freight to be transported faster. Reduced costs over road trucking is the key benefit for intracontinental use. © Rider Levett Bucknall Philippines, Inc. 2015

74

INFRASTRUCTURE Surface Mining

Port

Is a method of mining used to extract minerals and metals which are near the surface of the earth. Techniques of surface mining include:

A sheltered harbor where marine terminal facilities are provided, consisting of piers or wharves at which ships berth/dock while loading or unloading cargo, transit sheds and other storage areas where ships may discharge incoming cargo, and warehouses where goods may be stored for longer periods while waiting distribution or sailing. Process Engineering Focuses on the design, operation, control, and optimization of chemical, physical, and biological processes. Process engineering encompasses a vast range of industries, such as chemical, petrochemical, mineral processing, advanced material, food,  pharmaceutical, software development and biotechnological industries. Project Capital Costs

• Open-pit mining is the recovery of materials from an open pit in the ground, quarrying or gathering building materials from an open-pit mine. • Strip mining consists of stripping surface layers off to reveal ore/seams underneath. • Mountaintop removal is commonly associated with coal mining, which involves taking the top of a mountain off to reach ore deposits at depth. • Landfill mining involves sites where landfills are excavated and processed. Wastewater Treatment Plant Is a physical plant where various physical, biological or chemical processes are used to change the properties of the wastewater (e.g. by removing harmful substances) in order to turn it into a type of water (also calle effluent) that can be safely discharged into the environment or that is usable for a certain reuse purpose. Dam Is a barrier that impounds water or underground streams. Dams generally serve the primary purpose of retaining water, while other structures such as floodgates or levees (also known as dikes) are used to manage or prevent water flow into specific land regions. Purposes of dams are: 48 % for irrigation, 17% for hydropower (production of electricity), 13% for water supply, 10% for flood control, 5% for recreation and less than 1% for navigation and fish farming. Renewable Energy Is generally defined as energy that comes from resources which are naturally replenished on a human timescale such as sunlight, wind, rain, tides, waves and geothermal heat.

75

© Rider Levett Bucknall Philippines, Inc. 2015

Are normally the initial cost of the project, also referred to as the initial investment for the project. It is within this phase that the project is designed and built.

The capital cost for a construction project includes the expenses related to the initial establishment of the facility: • Land acquisition, including assembly, holding and improvement • Planning and feasibility studies • Architectural and Engineering design • Construction, including materilas, equipment and labor • Field Supervision of construction • Construction financing • Insurance and taxes during construction • Owner’s general office overhead • Equipment and furnishings not included in construction • Inspection and Testing Operations and Maintenance Costs In addition to building and owning infrastructure facilities, the concessionaire (developer) is normally © Rider Levett Bucknall Philippines, Inc. 2015

76

INFRASTRUCTURE required to operate and maintain the facility over an extended period of time. The concession period can extend for 20 to 30 years. At the end of the period that facility is then transferred back to the municipality or government agency. The staff involved with operating infrastructure facilities can include Management, Supervisors, System Controllers, Fare Collectors and Vehicle Operators. Energy Consumption can include electric power consumption for transit vehicles and fuel for buses. Consumables include tickets. Maintenance can include such things as the cost of maintaining and cleaning buildings, repairing highway pavements, cutting and watering grass, replacing bridge bearings and maintaining ticket vending machines. Maintenance can also include the labor and parts required to operate transit vehicles over the concession period. Transferring the facility back to the government includes demobilization costs such as cleanup costs, staff severance as well as audit fees required to transfer the assets. The operation and maintenance cost in subsequent years over the project life cycle includes the following expenses: • Land rent, if applicable • Operating staff • Periodic renovations • Insurance and taxes • Financing costs • Utilities • Owner’s other expenses • Labor and material for maintenance and repairs

77

CONSTRUCTION COST DATA The following rates are indicative only and based on normal site condition. It includes an allowance for profit and ovehead but exclude preliminaries. The rates are not valid for tendering or pricing of variations.

Land Development Comprised of survey works, earthworks (cut & fill, block devt), RROW (base preparation, concrete pavement, asphalt overlay, sidewalk, curb & gutter), wet utilities (water, drainage, sewer system), dry utilities (electrical & auxiliary system, streetlighting system). LAND DEVELOPMENT

Php / m2 GLA Low

High

Flat Terrain

1,030

1,260

Rolling Terrain

1,250

1,530

EARTHWORKS

Php / m3 Low

High

Cut (ordinary soil)

70

90

Cut (hard rock materials)

160

200

Fill (engineered materials)

380

Road Right-of-Way Low Subgrade Preparation

470 Php High

40

60

Subbase Material

1,050

1,290

Base Course Material

1,470

1,800

Concession

Portland Cement Concrete Pavement, 180mm thick

1,100

1,350

A concesion gives an operator the long term right to use all utility assets conferred on the operator, including responsibility for all operation and investment. Asset ownership remains with the authority. Assets revert to the authority at the end of the concession period, including assets purchased by the operator. In a concession the operator typically obtains its revenues directly from the consumer and so it has a direct relationship with the consumer. A concession covers an entire infrastructure system (so may include the operator taking over existing assets as well as building and operating new assets).

Asphalt Overlay, 50mm thick

660

810

Asphalt Overlay, 65mm thick

1,020

1,250

© Rider Levett Bucknall Philippines, Inc. 2015

Concrete Sidewalk, 100mm thick

610

750

Curb and Gutter

650

800

Wet Utilities Includes pipelaying, excavation and backfilling works, manholes, lot connections, testing and commissioning.

© Rider Levett Bucknall Philippines, Inc. 2015

78

INFRASTRUCTURE WET UTILITIES

Php / m Low

High

1,690

2,230

Blue Water System, HDPE Pipes

2,110

2,360

Gray Water System, PVC Pipes

1,010

1,390

Blue Water System, PVC Pipes

Gray Water System, HDPE Pipes

1,680

1,870

Drainage System, RC Pipes

2,890

8,480

Sewer System

3,610

6,810

250 mm diameter stainless steel casing

DRY UTILITIES

Php / m Low

High

Electrical System

7,880

15,000

Auxiliary System

4,640

10,190

Water and Waste Water Sewage Treatment Plant Does not include site devt, power and water supply during construction in excess of 5m, power and water supply during start-up and testing, power connection of main feeder line to STP MCC, dewatering equipment, tertiary treatment system, ventilation and ducting system, and unforseen site condition. Php / m per day 3

Sewage Treatment Plant

Low

High

1000 m3 / day capacity - MEP

8,700

10,640

1000 m / day capacity - Civil (above ground)

11,500

14,070

1000 m3 / day capacity - Civil (below ground)

8,520

10,420

3

Deepwell Drilling Includes drilling of pilot hole, S&I of casing, pumping test, disinfection and water analysis, S&I of submersible deepwell pump, VFD, pumphouse and all necesary fittings to complete the system.

79

© Rider Levett Bucknall Philippines, Inc. 2015

Low

High

22,870

27,960

Water Reservoir/Cistern Tank Includes earthworks, structural, plumbing (equipments, valves, pipes & fittings), electromechanical works, waterproofing, instrumentation and automation, testing and commissioning.

Dry Utilities Includes primary & secondary ductline, excavation and backfilling works, T-Pad, manhole & cover, service box, terminal cabinet, guide wire, and mandrelling test.

Php / m

DEEPWELL DRILLING

DESCRIPTION

Php / m3 capacity Low

High

Construction of Water Reservoir

39,060

47,750

Construction of Cistern Tank

46,190

56,470

Slope Protection SLOPE PROTECTION

Php / m3 Low

High

Grouted Riprap

3,250

4,170

RC Retaining Wall

14,140

15,730

Gabions & Mattress (including boulders)

2,800

3,920

Bridge / Culverts BRIDGE / CULVERTS

Php / m Low

High

Reinforced Concrete Deck Girder Bridge

690,000

840,000 63,490

Prestressed Concrete Girder (6000 psi)

51,940

RC Box Culvert, Double Barrel (2.4 x 1.8m)

68,610

83,860

RC Box Culvert, Single Barrel (2.1 x 1.8m)

40,640

49,680

6,370

7,800

RC Pipe Culvert (900mm in diameter)

Greenwall (Vertical Landscape) This item includes plastic modules, stainless steel frames, various plants with 3 months warranty. GREENWALL S&I of Greenwall Modules

Php / m2 Low

High

24,500

29,950

© Rider Levett Bucknall Philippines, Inc. 2015

80

INFRASTRUCTURE

High

Sewer Drop Manhole, 900mmØ

112,790

137,870

Drainage Manhole (Curb Inlet Manhole, 450mmØ)

104,300

127,480

Drainage Manhole (Curb Inlet Manhole, 600mmØ)

133,420

163,070

Drainage Manhole (Curb Inlet Manhole, 750mmØ)

181,680

222,060

Drainage Manhole (Curb Inlet Manhole, 900mmØ)

206,830

252,800

UPDS 2-Way Manhole

235,600

287,970

UPDS 3-Way Manhole

276,090

337,450

UPDS 4-Way Manhole

294,210

359,600

UPDS Switch Gear Manhole

456,050

557,400

UPDS Switch Gear Pump Manhole

190,400

232,720

8,430 3,290 1,330 3,290 1,330

18,260

6,890

2,030

1,660 2,680 1,080 1,080 Low

2,680

14,930

5,650

4,620 6,910

8,460

3,190

3,910 7,500

6,130 3,190

3,910

Low

High

16,570

4,440 8,450 4,440 High

1500mmø

20,370 6,390 9,520

5,220 7,780 3,630 6,910

600mmø

HDPE

100mmø 500mmø

Php / m

1,760

1,430

35,750

29,240

5,400

6,600

100mmø

FRP

78,760

64,440

66,170

80,880

uPVC

100mmø

3,630 Low

High uPVC - Unplasticised Poly Vinyl Chloride HDPE - High-density polyethylene FRP - Fibre-reinforced plastic

Low

Asphalt Pavement only

Php / unit

SUPPLY AND INSTALLATION OF MANHOLE

Concrete Pavement only

Includes earthworks, manhole frame and cover.

Concrete and Asphalt Pavement (50mm)

Manholes

REMOVAL AND RESTORATION OF PAVEMENT (after pipelaying) Consist of breaking and disposal of existing pavement, and restoration of new pavement from base preparation.

PCCP - Portland Cement Concrete Pavement

12,560

24,160

15,360

19,760

1,550

Asphalt Concrete Pavement with Curb and Gutter, and 3.50m Concrete Sidewalk

1,260

20,150

High

16,480

Low

Asphalt Concrete Pavement with Curb and Gutter, and 1.20m Concrete Sidewalk

Pipe Laying on Common Matl Bedding

15,210

7,570

12,440

36,750

Asphalt Concrete Pavement with 1.20m Shoulder

2,580

27,210

16,370

22,250

2,370

PCCP with Asphalt Overlay, Curb and Gutter, and3.50m Concrete Sidewalk

High

23,200

Pipe Laying on Hard Rock Bedding

18,970

6,190

100mmø

18,830

30,060

15,400

PCCP with Asphalt Overlay, Curb and Gutter, and 1.20m Concrete Sidewalk

600mmø

PCCP with Asphalt Overlay and 1.20m Shoulder

2,110

25,670

100mmø

21,000

13,390

PCCP with Curb & Gutter and 3.50m Concrete Sidewalk

500mmø

21,660

1,930

17,720

100mmø

PCCP with Curb & Gutter and 1.20m Concrete Sidewalk

Low

17,290

HDPE

14,140

uPVC

High

PCCP with 1.20m Shoulder

Php / m

Php / m Low

PIPE LAYING OF WATERLINES Includes excavation and disposal, sand cusion, pipe laying, metallic warning tape and backfilling works. Fittings are excluded.

ROADWORK CONSTRUCTION

FRP

Includes subgrade preparation, 250mm subbase course, 150mm base course. Carriageway considered is 6.10m (3.05m per lane).

1500mmø

Roadwork Construction

UPDS - Underground Power Distribution System

81

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

82

83 © Rider Levett Bucknall Philippines, Inc. 2015 RCP - Reinforced Concrete Pipe uPVC - Unplasticised Poly Vinyl Chloride

Asphalt Pavement only

Concrete Pavement only

Contract Period / Duration

Concrete and Asphalt Pavement (50mm)

1,890

High 1,540

4,330 5,300

Low

Low

6,030

High

High

4,940

Low

Php / m

2,470 3,030

18,980 23,210

990 1,220

4,180 5,120

2,780 3,400

11,750 14,370

3,880

3,170

13,390

1,380

1,120

3,860

3,150

4,400

3,590

110mmø

HDPE 50mmø

1500mmø

16,370

7,130

5,830

8,100

6,620

110mmø

Php / m

3,880

3,170

29,220

50mmø

23,900

uPVC (Electrical)

1500mmø

uPVC 300mmø

2,410 2,950

Low High

4,280

High

REMOVAL AND RESTORATION OF PAVEMENT (after pipelaying) Consist of breaking and disposal of existing pavement, and restoration of new pavement from base preparation.

Pipe Laying on Common Matl Bedding

Pipe Laying on Hard Rock Bedding

3,490

300mmø

RCP (Drainage)

Low

PIPE LAYING OF DRAINAGE / ELECTRICAL / SEWER LINES Includes excavation and disposal, sand cusion, pipe laying, pipe collar (for RC pipes), concrete encasement (for electrical conduits), metallic warning tape and backfilling works. Fittings and manholes are excluded.

1,700

1,380

1,700

1,380

4,330 5,300

3,710 4,540

6,030

4,930 5,170

300mmø 4,220

9,450

200mmø

7,530

FRP

8,670

7,640

8,730 10,680

7,090

6,150

300mmø

200mmø

uPVC (Sewer)

INFRASTRUCTURE AVERAGE INFRASTRUCTURE CONSTRUCTION PAYMENT DRAWDOWN

DURATION ACCOMPLISHMENT CASHFLOW

0% 0% 0%

10% 2% 2%

20% 4% 6%

30% 6% 12%

40% 10% 22%

50% 14% 36%

60% 18% 54%

70% 16% 70%

80% 12% 82%

90% 10% 92%

100% 8% 100%

Average Infrastructure Contruction Payment Drawdown

100% 80%

60%

40%

20%

0% Accomplishment

© Rider Levett Bucknall Philippines, Inc. 2015

84

INFRASTRUCTURE Terminal Project 2. Bulacan Bulk Water Supply Project 3. Operation & Maintenance of LRT Line 2 4. Laguna Lakeshore Expressway Dike Project 5. New Centennial Water Source-Kaliwa Dam Project 6. Development, Operations and Maintenance of the New Bohol (Panglao) Airport 7. Development, Operations and Maintenance of the Laguindingan Airport 8. Development, Operations & Maintenance of the Puerto Princesa Airport 9. Development, Operations & Maintenance of Davao Airport 10.Development, Operations & Maintenance of Bacolod Airport 11. Development, Operations & Maintenance of Iloilo Airport

PUBLIC-PRIVATE PARTNERSHIP (PPP) Refers to arrangements, typically medium to long term, between the public and private sectors whereby some of the services that fall under the responsibilities of the public sector are provided by the private sector, with clear agreement on shared objectives for delivery of public infrastructure and/ or public services.

Projects for Roll-out 1. Davao Sasa Port Modernization Project 2. Regional Prison Facilities through PPP

Source: ppp.gov.ph

List and Status of Philippine PPP Projects as of January 2015

For Approval of Relevant Government Bodies 1. Cavite-Laguna Expressway (CALAX) 2. NLEx-SLEx Connector Road 3. Motor Vehicle Inspection System 4. Civil Registry System-IT Project (Phase II) 5. Makati-Pasay-Taguig Mass Transit System Loop (MTSL) Project 6. North-South Railway (South Line)

A. Awarded Projects 1. DaangHari – SLEX Link Road 2. PPP for School Infrastructure Project (Phase I) 3. NAIA Expressway Project (Phase II) 4. PPP for School Infrastructure Project (Phase II) 5. Modernization of the Philippine Orthopedic Center (MPOC) 6. Automatic Fare Collection System (AFCS) 7. Mactan-Cebu International Airport Passenger Terminal Building 8. LRT Line 1 Cavite Extension and O & M 9. Integrated Transport System (ITS)-Southwest Terminal Project B. Other Projects for Implementation 1. Skyway Stage 3 2. MRT Line-7 C. PPP Pipeline Projects Under Procurement 1. Integrated Transport System (ITS)-South

85

© Rider Levett Bucknall Philippines, Inc. 2015

Projects with On-going Studies 1. San Fernando Airport Project 2. LRT 1 Extension to Dasmarinas Project 3. Batangas-Manila (BatMan) 1 Natural Gas Pipeline Project 4. Manila Bay-Pasig River-Laguna Lake Ferry System Project 5. C-5 Transport Development Project 6. Clark International Airport Project 7. Integrated Transport System-North Terminal Project 8. NAIA Development Project 9. Tri-Medical Complex Modernization Project 10. Sta. Mesa-Ortigas-Angono Rail Line 11. Joint Sludge Treatment Plant 12. Plaridel Bypass Toll Road 13. Road Transport Information Technology (IT) Infrastructure Project (Phase II) © Rider Levett Bucknall Philippines, Inc. 2015

86

INFRASTRUCTURE For Procurement of Consultants to Conduct Pre-investment Studies 1. Manila Heritage and Urban Renewal Project 2. Clark Green City Food Processing Terminal 3. Central Spine RORO 4. Manila-East Rail Transit System Project 5. R1-R10 Link Mass Transport System Development Project 6. Vicente Sotto MMC Modernization Project Projects Under Conceptualization and Development 1. Central Luzon Link Expressway – Phase II 2. Improvement and Operation & Maintenance of Kennon Road and Marcos Highway 3. Rehabilitation of National Center for Mental Health 4. Ferry Passenger Terminal Buildings Development 5. C-6 Expressway (Southeast, East and North Section) 6. Philhealth Information Technology Project 7. NLEX East Expressway 8. Freeport Area of Bataan (FAB) Barging Facility/ Port Project 9. NIA Irrigation Project 10. Camarines Sur Expressway Project 11. Construction of Classrooms for the Senior High School Through PPP 12. Sucat Gas Power Plant Source: ppp.gov.ph

VARIANTS OF PPP PROJECT AGREEMENTS

Build-and-Transfer (BT) A contractual arrangement whereby the Project Proponent undertakes the financing and Construction of a given infrastructure or development facility and after its completion turns it over to the Agency or LGU concerned, which shall pay the Project Proponent on an agreed schedule its total investment expended on the project, plus a Reasonable Rate of Return (ROR) thereon. This arrangement may be employed in the Construction of any Infrastructure or Development Projects, including critical facilities which, for security or strategic reasons, must be operated directly by the Government. Build-Lease-and-Transfer (BLT) A contractual arrangement whereby a Project Proponent is authorized to finance and construct an infrastructure or development facility and upon its completion turns it over to the Agency/ LGU concerned on a lease arrangement for a fixed period, after which ownership of the facility is automatically transferred to the Agency/LGU concerned. Build-Operate-Transfer (BOT) A contractual arrangement whereby the Project Proponent undertakes the Construction, including financing, of a given infrastructure facility, and the operation and maintenance thereof. The Project Proponent operates the facility over a fixed term during which it is allowed to charge facility users appropriate tolls, fees, rentals, and charges not exceeding those proposed in its bid or as negotiated and incorporated in the contract to enable the Project Proponent to recover its investment, and operating and maintenance expenses in the project. The Project Proponent transfers the facility to the Agency/LGU concerned at the end of the fixed term that shall not exceed fifty (50) years: Provided, that in the case of an Infrastructure or Development Facility whose operation requires

87

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

88

INFRASTRUCTURE a public utility franchise, the proponent must be Filipino or, if a corporation, must be duly registered with the Securities and Exchange Commission (SEC) and owned up to at least sixty percent (60%) by Filipinos. This build-operate and-transfer contractual arrangement shall include a supply-and-operate scheme which is a contractual arrangement whereby the supplier of equipment and machinery for a given infrastructure facility, if the interest of the Government so requires, operates the facility providing in the process technology transfer and training to Filipino nationals. Build–Own–and-Operate (BOO) A contractual arrangement whereby a Project Proponent is authorized to finance, construct, own, operate and maintain an infrastructure or development facility from which the Project Proponent is allowed to recover its total investment, operating and maintenance costs plus a reasonable return thereon by collecting tolls, fees, rentals or other charges from facility users; provided, That all such projects upon recommendation of the Investment Coordination Committee (ICC) of the National Economic and Development Authority (NEDA), shall be approved by the President o f the Philippines. Under this project, the proponent who owns the assets of the facility may assign its operation and maintenance to a Facility operator. Build-Transfer-and-Operate (BTO) A contractual arrangement whereby the Agency/ LGU contracts out the Construction of an infrastructure facility to a private entity such that the Contractor builds the facility on a turn key basis, assuming cost overruns, delays, and specified performance risks. Once the facility is commissioned satisfactorily, title is transferred to the implementing Agency/LGU. The private entity however operates the facility on behalf of the implementing Agency/LGU under an agreement. Contract-Add-and-Operate (CAO) A contractual arrangement whereby the Project Proponent adds to an existing infrastructure facility which it is renting from the Government

89

© Rider Levett Bucknall Philippines, Inc. 2015

and operates the expanded project over an agreed Franchise period. There may or may not be a transfer arrangement with regard to the added facility provided by the Project Proponent. Develop-Operate-and-Transfer (DOT) A contractual arrangement whereby favorable conditions external to a new infrastructure project which is to be built by a Project Proponent are integrated into the arrangement by giving that entity the right to develop adjoining property, and thus, enjoy some of the benefits the investment creates such as higher property or rent values. Rehabilitate-Operate-and-Transfer (ROT) A contractua l arrangement whereby an existing facility is turned over to the Project Proponent to refurbish, operate and maintain for a Franchise period, at the expiry of which the legal title to the facility is turned over to the Government. The term is also used to describe the purchase of an existing facility from abroad, importing, refurbishing, erecting and consuming it within the host country. Rehabilitate-Own-and-Operate (ROO) A contractual arrangement whereby an existing facility is turned over to the Project Proponent to refurbish and operate with no time limitation imposed on ownership. As long as the operator is not in violation of its Franchise, it can continue to operate the facility in perpetuity. Swiss Challenge Is a form of public procurement in some (ususally lesser developed) jurisdictions which requires a public authority (usually an agency of government) which has received an unsolicited bid for a public project (such as a port, road or railway) or services to be provided to government, to publish the bid and invite third parties to match or exceed it. The bids and awards committee shall compare and evaluate all the bids by the third party bidders and the original proponent. The original proponent can match or exceed the best proposal. Source: www.worldbank.org/pppirc Revised BOT Law Implementing Rules and Regulations of R.A. No. 6957

© Rider Levett Bucknall Philippines, Inc. 2015

90

INFRASTRUCTURE INFRASTRUCTURE RELATED GOVERNMENT AGENCIES AND OFFICES

ORGANIZATION

ADB -

Asian Development Bank

ATI -

Asian Terminals, Incorporated

WEB ADDRESS

www.adb.org www.asianterminals. com.ph

BCDA - Bases Conversion Development Authority

www.bcda.gov.ph

CAAP - Civil Aviation Authority of the Philippines

www.caap.gov.ph

DENR - Department of Environment and Natural Resources

www.denr.gov.ph

DOE – Department of Energy

www.doe.gov.ph

DOTC – Department of Transportation and Communications

www.dotc.gov.ph

DPWH – Department of Public Works and Highways

www.dpwh.gov.ph

DTI -

Department of Trade and Industry

www.dti.gov.ph

ERC – Energy Regulatory Commission

www.erc.gov.ph

LLDA – Laguna Lake Development Authority

www.llda.gov.ph

LRTA – Light Rail Transit Authority LWUA – Local Water Utilities Administration MICT – Manila International Container Terminal MGB - Mines and Geosciences Bureau MMDA – Metropolitan Manila Development Authority

www.lrta.gov.ph www.lwua.gov.ph www.mictweb.com www.mgb.gov.ph www.mmda.gov.ph

MWSS – Metropolitan Waterworks and Sewerage System NIA –

National Irrigation Administration

PEZA – Philippine Economic Zone Authority PNOC – Philippine National Oil Company

mwss.gov.ph www.nia.gov.ph www.peza.gov.ph www.pnoc.com.ph

PNR –

Philippine National Railways

PPA –

Philippine Ports Authority

www.ppa.com.ph

www.pnr.gov.ph

PPP –

Private-Public Partnership

ppp.gov.ph

CONSTRUCTION REGULATIONS International Federation of Consulting Engineers (FIDIC) Construction Industry Authority of the Philippines (CIAP) An organization created to promote, accelerate, and regulate the growth and development of the construction industry. It exercises jurisdiction and supervision over the following implementing boards; • Philippine Contractors Accredation Board (PCAB), which issues, suspends, and revokes licenses of contractors; • Philippine Domestic Construction Board (PDCB), assigned to formulate, recommnend and implement policies, guidelines, plans and programs for the efficient implementation of public and private construction in the country; • Philippine Overseas Constructin Board (POCB) which assigned to formulate strategies and programs for developing the country's overseas construction industry; • Construction Industry Arbitration Commission (CIAC) which takes charge of disputes arising from, or connected with government and private contract. DPWH Standard Specifications for Public Works and Highways 2004 Edition: Volume II – Highways, Bridges and Airports Presidential Decree No. 1096, National Building Code of the Philippines (NBCP) It is hereby declared to be the policy of the State of safeguard life, health, property, and public welfare, consistent with the principles of sound environmental management and control; and to this end, make it the purpose of this Code to provide for all buildings and structures, a framework of minimum standards and requirements to regulate and control their location, site, design, quality of materials, construction, use occupancy, and maintenance. Presidential Decree No. 1594 and Its Implementing Rules and Regulations Prescribing Policies, Guidelines, Rules and

91

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

92

INFRASTRUCTURE Regulations Contracts.

for

Government

Infrastructure

Implementing Rules and Regulation of R.A. 9184 The Government Procurement Reform Act An act providing for the modernization, standarization and regulation of the procurement activities of the government and for other purposes. Republic Act 7718 (Revised Implementing Rules and Regulations of R.A. 6957) Revised BOT Law An act authorizing the Financing, Construction, Operation and Maintenance of Infrastructure Projects by the Private Sector and for other purposes. Republic Act 8974 An act to facilitate the acquisition of Right-ofway, Site or Location for National Government Infrastructure Projects and for other purposes. Republic Act 7227 An act accelerating the Conversion of Military Reservations into other productive uses, creating the Bases Conversion and Development Authority for this purpose, providing funds therefore and for other purposes. Republic Act 7942 An act instituting a new system of Mineral Resources Exploration, Development, Utilization and Conservation. Republic Act 9136 Electric Power Supply Reform Act of 2001 An act ordaining reforms in the Electric Power Industry amending for the purpose certain laws and for other purposes. Republic Act 9513 The Philippine Renewable Energy Act of 2008 An act promoting the development, utilization and commercialization of Renewable Energy Resources and for other purposes. Procedural Guidelines (Department Order No. 13 Series of 1998) The Guidelines Governing Occupational Safety and Health in the Construction Industry.

93

© Rider Levett Bucknall Philippines, Inc. 2015

Professional Services Cost Consultancy Project Management Special Services

© Rider Levett Bucknall Philippines, Inc. 2015

94

PROFESSIONAL SERVICES Rider Levett Bucknall Philippines, Inc. is the biggest consultancy practice of Quantity Surveying in the Philippines. It provides a wide range of Project/Construction Cost Consultancy Services within the construction industry, commencing from the conceptualization of a project, construction administration, through its hand over upon completion, until its final account closeout. RLB Philippines is a member of Rider Levett Bucknall, an independent global property and construction practice with over 3,500 people in 120 offices in 80 countries, covering five different continents, namely Asia, Oceania, Europe, the Middle East, and the Americas. We serve major local and international clientele in the Philippines and regionally. Our global expertise in Quantity Surveying and our significant project experience provide comprehensive services and solutions to the development and construction of built environment, extending to building and civil infrastructure, commercial, residential and hospitality buildings, healthcare, industrial and civil engineering projects We offer Cost Consultancy, Quantity Surveying, Project Management, and Advisory Services from project conception to completion to ensure maximum value for money in respect of capital and asset values, whole life costs, and project delivery. Our philosophy is to provide a participative and interactive approach with the view of achieving client’s budgets, construction quality, and timely completion. The extensive range of professional consultancy provided by Rider Levett Bucknall Philippines covers the following core services: Cost Consultancy • Cost Planning • Cost Management • Contract Procurement • Tender & Contract Documentation

95

© Rider Levett Bucknall Philippines, Inc. 2015

• • • • •

Progress Valuations Financial Reporting Auditing Services Post-Contract Services Final Accounts

Project Management • Project Management Service • Contract Administration • Client Representation • Development Management • Construction Management • Value Management Special Services • Financial Audit of Construction • Physical Audit of Construction • Quality Audit of Construction • Verification of Loan Amounts • Verification of Monies Spent • Contractual Advise • Contractual Claims Preparation and Adjudication • Builders Quantities Preparation • Replacement Cost Estimates after Disasters; Fire; Typhoon; etc. • Expert Witness in Arbitration, and/or Litigation • Secondment of Staff Rider Levett Bucknall Philippines, Inc. is committed towards creating and nurturing lasting relationships. We are cognizant of our organization’s core values, bringing them to each and every project we carry out.

© Rider Levett Bucknall Philippines, Inc. 2015

96

International Offices Oceania Asia Middle East Europe Caribbean Americas/Canada

© Rider Levett Bucknall Philippines, Inc. 2015

98

INTERNATIONAL OFFICES OCEANIA ADELAIDE Rider Levett Bucknall SA Pty Ltd Level 4, 63 Pirie Street, Adelaide SA 5000 Telephone: +61 8 8100 1200 Email: [email protected] Website: www.rlb.com Contact: Stephen Knight BRISBANE Rider Levett Bucknall Qld Pty Ltd Level 13, 10 Eagle Street, Brisbane QLD 4000 Telephone: +61 7 3009 6933 Email: [email protected] Website: www.rlb.com Contact: Mark Burow CAIRNS Rider Levett Bucknall Qld Pty Ltd Suite 7, 1st Floor, Cairns Professional Centre, 92-96 Pease Street, Cairns QLD 4870 Telephone: +61 7 4032 1533 Email: [email protected] Website: www.rlb.com Contact: Bill Wilkes CANBERRA Rider Levett Bucknall ACT Pty Ltd 16 Bentham Street, Yarralumla ACT 2600 Telephone: +61 2 6281 5446 Email: [email protected] Website: www.rlb.com Contact: Mark Chappe DARWIN Rider Levett Bucknall NT Pty Ltd Level 4, 62 Cavanagh Street, Darwin NT 0800 Telephone: +61 8 8941 2262 Email: [email protected] Website: www.rlb.com Contact: Paul Lassemillante GOLD COAST Rider Levett Bucknall 45 Nerang Street, Southport Queensland 4215 Telephone: +61 7 5595 6900 Email: [email protected] Website: www.rlb.com Contact: Michael Gilligan

99

© Rider Levett Bucknall Philippines, Inc. 2015

MELBOURNE Rider Levett Bucknall Victoria Pty Ltd Level 13, 380 St. Kilda Road, Melbourne VIC 3004 Telephone: +61 3 9690 6111 Email: [email protected] Website: www.rlb.com Contact: Michael Kerr NEWCASTLE Rider Levett Bucknall NSW Pty Ltd 63 Lindsay Street, Hamilton NSW 2303 Telephone: +61 2 4940 0000 Email: [email protected] Website: www.rlb.com Contact: Mark Hocking NORTHERN NEW SOUTH WALES Rider Levett Bucknall NSW Pty Ltd Level 1, 9 Park Avenue, Coffs Harbour NSW 2450 Telephone: +61 2 6659 2060 Email: [email protected] Website: www.rlb.com Contact: Mark Hocking PERTH Rider Levett Bucknall WA Pty Level 9, 160 St George’s Tce Telephone: +61 8 9421 1230 Email: [email protected] Website: www.rlb.com Contact: Alastair McMichael SUNSHINE COAST Rider Levett Bucknall Qld Pty Ltd 63 The Esplanade, Maroochydore QLD 4558 Telephone: +61 7 5443 3622 Email: [email protected] Website: www.rlb.com Contact: Mark Brittain SYDNEY Rider Levett Bucknall NSW Pty Ltd Level 5, 41 McLaren Street, North Sydney NSW 2060 Telephone: +61 2 9922 2277 Email: [email protected] Website: www.rlb.com Contact: Bob Richardson TOWNSVILLE Rider Levett Bucknall Qld Pty Ltd Level 1, 45 Eyre Street, North Ward, Townsville QLD 4810 Telephone: +61 7 4771 5718 © Rider Levett Bucknall Philippines, Inc. 2015

100

INTERNATIONAL OFFICES Email: [email protected] Website: www.rlb.com Contact: Chris Marais WESTERN SYDNEY Rider Levett Bucknall NSW Pty Ltd Level 7, 34 Charles Street, Parramatta NSW 2150 Telephone: +61 2 9806 0044 Email: [email protected] Website: www.rlb.com Contact: Gary Train NEW ZEALAND AUCKLAND Rider Levett Bucknall Auckland Ltd Level 15, Vero Centre, 48 Shortland Street, Auckland 1141 Telephone: +64 9 309 1074 Email: [email protected] Website: www.rlb.com Contact: Brian Dackers CHRISTCHURCH Rider Levett Bucknall Christchurch Ltd Unit 18A, Cavendish Business Park, 150 Cavendish Road, Christchurch 8051 Telephone: +64 3 354 6873 Email: [email protected] Website: www.rlb.com Contact: Malcolm Timms OTAGO Rider Levett Bucknall Otago Ltd Telephone: +64 3 409 0325 Email: [email protected] Website: www.rlb.com Contact: Chris Haines PALMERSTON NORTH Rider Levett Bucknall Palmerston North Ltd Suite 1, Level 1, 219 Broadway Avenue, Palmerston North Telephone: +64 6 357 0326 Email: [email protected] Website: www.rlb.com Contact: Michael Craine TAURANGA Rider Levett Bucknall Auckland Ltd Ground Floor, 3/602 Cameron Road, Tauranga 3141 Telephone: +64 7 579 5873 Email: [email protected]

101

© Rider Levett Bucknall Philippines, Inc. 2015

Website: www.rlb.com Contact: Richard Gerrish WELLINGTON Rider Levett Bucknall Wellington Ltd Level 1, 279 Willis Street, Wellington 6011 Telephone: +64 4 384 9198 Email: [email protected] Website: www.rlb.com Contact: Tony Sutherland

ASIA CHINA BEIJING Rider Levett Bucknall Room 1803-1809, 18th Floor, East Ocean Centre, 24A Jian Guo Men Wai Avenue, Chaoyang District, Beijing 100004, China Telephone: +86 10 6515 5818 Email: [email protected] Website: www.rlb.com Contact: See-Wing Lo CHENGDU Rider Levett Bucknall Rooms 6-12, 31st Floor, Huamin Empire Plaza, 1, Fuxing Street, Chengdu 610016, Sichuan Province, China Telephone: +86 28 8670 3382 Email: [email protected] Website: www.rlb.com Contact: Stephen Liu CHONGQING Rider Levett Bucknall Room 1609A, 16th Floor, Metropolitan Tower, No. 68 Zourong Road, Central District, Chongqing 400010, China Telephone: +86 23 6380 6628 Email: [email protected] Website: www.rlb.com Contact: Danny Chow DALIAN Rider Levett Bucknall Room 1103, 11th Floor, Xiwang Tower, No. 136 Zhongshan Road, Zhongshan District, Dalian 116001, Liaoning Province, China Telephone: +86 411 3973 7778

© Rider Levett Bucknall Philippines, Inc. 2015

102

INTERNATIONAL OFFICES Email: [email protected] Website: www.rlb.com Contact: Simon Tuen GUANGZHOU Rider Levett Bucknall Room 2016, 20th Floor, Dongshan Plaza, 69 Xian Lie Road Central, Guangzhou 510095, Guangzhou Province Telephone: +86 20 8732 1801 Email: [email protected] Website: www.rlb.com Contact: Danny Chow GUIYANG Rider Levett Bucknall Room E, 12th Floor, Fuzhong International Plaza, 126 Xin Hua Road, Guiyang 550002, Guizhou Province, China Telephone: + 86 851 553 3818 Email: [email protected] Website: www.rlb.com Contact: Danny Chow HANGZHOU Rider Levett Bucknall Room 2306, 23rd Floor, Deep Blue Plaza, No. 203, Zhao Hui Road, Hangzhou, 310014 Zhejiang Province, China Telephone: + 86 571 8539 3028 Email: [email protected] Website: www.rlb.com Contact: Iris Lee HONG KONG Rider Levett Bucknall Limited 20th Floor, Eastern Central Plaza, 3 Yiu Hing Road, Shaukeiwan Telephone: +852 2823 1823 Email: [email protected] Website: www.rlb.com Contact: Philip Lo MACAU Rider Levett Bucknall Alameda Dr. Carlos D’ Assumpção, No. 398 Edificio CNAC 9° Andar,I-J Macau SAR Telephone: +853 2875 3088 Email: [email protected] Website: www.rlb.com Contact: Kenneth Kwan

103

© Rider Levett Bucknall Philippines, Inc. 2015

HAIKOU Rider Levett Bucknall 17th Floor, Fortune Center, 38 Da Tong Road, Haikou 570102, Hainan Province, China Telephone: +86 898 6672 6638 Email: [email protected] Website: www.rlb.com Contact: Stephen Lai NANJING Rider Levett Bucknall Room 1202, South Tower , NIC, 201 Zhong Yang Road, Nanjing 210009, Jiang Su Province, China Telephone: +86 25 8678 0300 Email: [email protected] Website: www.rlb.com Contact: Eric Fong SANYA Rider Levett Bucknall Room 801, 8th Floor, Bihai International House, He Dong Road, Sanya 572000, Hainan Province, China Telephone: +86 898 8898 7866 Email: [email protected] Website: www.rlb.com Contact: Stephen Lai SHANGHAI Rider Levett Bucknall 10th Floor, Shanghai Square Office Tower, 138 Huai Hai Zhong Road, Shanghai 200021, China Telephone: +86 21 6330 1999 Email: [email protected] Website: www.rlb.com Contact: Stephen Lai SHENYANG Rider Levett Bucknall 25th Floor, Tower A, President Building, No. 69 Heping North Avenue, Heping District, Shenyang 110003, Liaoning Province, China Telephone: +86 24 2396 5516 Email: [email protected] Website: www.rlb.com Contact: C. H. Chan SHENZHEN Rider Levett Bucknall Room 4510-4513, 45th Floor, Shun Hing Square Diwang Commercial Centre, © Rider Levett Bucknall Philippines, Inc. 2015

104

INTERNATIONAL OFFICES 5002 Shennan Road East,Shenzhen 518001, Guangdong Province, China Telephone: +86 755 8246 0959 Email: [email protected] Website: www.rlb.com Contact: Kenneth Kwan

No. 47 Haibinnanlu, Jida, Zhuhai 519015, Guangdong Province, China Telephone: +86 756 388 9010 Email: [email protected] Website: www.rlb.com Contact: Kenneth Kwan

TIANJIN Rider Levett Bucknall Room 1908, 19th Floor, Tianjin International Building, 75 Nanjing Road, Heping District, Tianjin 300050, China Telephone: +86 22 2339 6632 Email: [email protected] Website: www.rlb.com Contact: See Wing Lo

INDONESIA

WUHAN Rider Levett Bucknall Room 2301, 23rd Floor,New World International Trade Centre, No. 568 Jianshe Avenue, Wuhan 430022, Hubei Province, China Telephone: +86 27 6885 0986 Email: [email protected] Website: www.rlb.com Contact: Stephen Lai WUXI Rider Levett Bucknall Room 1205-1206, 12th Floor, Wealth Building, No. 220 Ren Min Zhong Road, Wuxi 214000, Jiangsu Province, China Telephone: +86 510 8274 0266 Email: [email protected] Website: www.rlb.com Contact: Stephen Lai XIAN Rider Levett Bucknall Room 2906, 29th Floor, Digital Plaza, Hi-Tech International Business Centre, 33 Keji Road, Xian 710075, Shaanxi Province, China Telephone: +86 29 8833 7433 Email: [email protected] Website: www.rlb.com Contact: Stephen Liu ZHUHAI Rider Levett Bucknall Room 3108, 31st Floor Everbright International Trade Centre,

105

© Rider Levett Bucknall Philippines, Inc. 2015

JAKARTA Rider Levett Bucknall Jl. Jend. Surdirman Kav. 45-46 Sampoerna Strategic Square South Tower, Level 18 Jakarta 12930, Indonesia Telephone: +62 21 575 0828 Email: [email protected] Website: www.rlb.com Contact: Christopher Leong SOUTH KOREA Rider Levett Bucknall Korea Ltd 8th Floor, DaHyung Building, 157-73 Samsung-Dong, Gangnam-Gu, Seoul 135-880, Korea Telephone: +82 2 582 2834 Email: [email protected] Website: www.rlb.com Contact: Stephen Lai MALAYSIA KOTA KINABALU Yong Dan Mohamed Faiz (Sabah) Lot 23, BlkC, 2nd Floor, Plaza Grand Millenium, Jalan Pintas Penampang, 89500 Penampang, Sabah, Malaysia Telephone: +60 88 733 611 Email: [email protected] Website: www.rlb.com Contact: Chin Hon Hong KUALA LUMPUR Yong Dan Mohamad Faiz Sdn Bhd No. 18-1 Jalan PJS 8/12, Dataran Mentari, 46150 Petaling Jaya, Selangor Darul Ehsan, Kuala Lumpur, Malaysia Telephone: +60 3 5632 9999 Email: [email protected] Website: www.rlb.com Contact: Kang Kian Kiat

© Rider Levett Bucknall Philippines, Inc. 2015

106

INTERNATIONAL OFFICES PHILIPPINES

Vietnam

MANILA Rider Levett Bucknall Philippines Building 3, Corazon Clemeña Compound #54 Danny Floro Street, Bagong Ilog, Pasig City, 1600, Philippines Telephone: +63 2 687 1075 / 470 0642 Email: [email protected], [email protected] Website: www.rlb.com Contact: Corazon Clemena Ballard

HO CHI MINH CITY Rider Levett Bucknall Centec Tower, 16th Floor, Unit 1603, 72-74 Nguyen Thi Minh Khai Street, Ward 6, District 3 Ho Chi Minh City, Vietnam Telephone: +84 83 823 8070 Email: [email protected] Website: www.rlb.com Contact: Ong Choon Beng

CEBU Rider Levett Bucknall Philippines Suite 602, PDI Condominium, Arch. Bishop Reyes Avenue cor. J.Panis Street, Banilad, Cebu City, 6014, Philippines Telephone: + 63 32 268 0072 Email: [email protected] Website: www.rlb.com Contact: Corazon Clemena Ballard

MIDDLE EAST

DAVAO Rider Levett Bucknall Philippines 2F Norey Building Roxas Avenue Davao City Telephone: +63 82 222 5315 / +63 917 550 7013 Email: [email protected] Website: www.rlb.com Contact: Corazon Clemena Ballard SINGAPORE Rider Levett Bucknall 150 Beach Road, #09-01 Gateway West, Singapore 189720 Telephone: +65 6339 1500 Email: [email protected] Website: www.rlb.com Contact: Winston Hauw THAILAND BANGKOK Rider Hunt Levett & Bailey (Siam) Limited Level 36, Skulthaisurawong Tower, 141/58 Surawong Road, Suriyawong, Bangrak, Bangkok 10500 Telephone: +66 2 234 4933 Email: [email protected] Website: www.rlb.com Contact: William Lo

107

© Rider Levett Bucknall Philippines, Inc. 2015

ABU DHABI Rider Levett Bucknall Mezzanine Level, Al Mazrouei Building, Muroor Road, PO Box 105766 Abu Dhabi, United Arab Emirates Telephone: + 971 2 643 3691 Email: [email protected] Website: www.rlb.com Contact: Tony Bratt DOHA Rider Levett Bucknall Al Fardan Tower, Level 8, Office 806, PO Box 31316, West Bay, Doha, Qatar Telephone: +974 4410 1724 Email: [email protected] Website: www.rlb.com Contact: Sam Graham DUBAI Rider Levett Bucknall Oasis Centre, Level 3, Suite 68, Sheikh Zayed Road, P.O.Box 115882, Dubai, United Arab Emirates Telephone: + 971 4 339 7444 Email: [email protected] Website: www.rlb.com Contact: Rob Edgecombe MUSCAT Rider Levett Bucknall Building No. 287, 18th November Road, North Azaiba, Sultanate of Oman Telephone: + 968 2 449 9676 Email: [email protected] Website: www.rlb.com Contact: Rocky Chan © Rider Levett Bucknall Philippines, Inc. 2015

108

INTERNATIONAL OFFICES RIYADH Rider Levett Bucknall PO Box 53911, Riyadh 11593, Saudi Arabia Telephone: + 966 506 633 288 Email: [email protected] Website: www.rlb.com Contact: Andy Isherwood

EUROPE UNITED KINGDOM BiRCHWOOD Rider Levett Bucknall Suite 410, Thompson House, Birchwood Park Warrington WA3 6AE Telephone: +44 0 192 585 1787 Email: [email protected] Website: www.rlb.com Contact: Deryck Barton

SHEFFIELD Rider Levett Bucknall 6th Floor Orchard Lane Wing, Fountain Precinct, Balm Green, Sheffield, S1 2JA Telephone: +44 0 114 273 3300 Email: [email protected] Website: www.rlb.com Contact: Dean Sheehy

BIRMINGHAM Rider Levett Bucknall Millennium Point, Curzon Street, Birmingham, B4 7XG Telephone: +44 0 121 503 1500 Email: [email protected] Website: www.rlb.com Contact: Nigel Mason

WELWYN GARDEN CITY Rider Levett Bucknall Weltech Centre Trust, Ridgeway, Welwyn Garden City, Hertfordshire, AL7 2AA Telephone: +44 0 170 787 1506 Email: [email protected] Website: www.rlb.com Contact: Andrew Reynolds

BRISTOL Rider Levett Bucknall Grosvenor House, 149 Whiteladies Road, Bristol, BS8 2RA Telephone: +44 0 117 974 1122 Email: [email protected] Website: www.rlb.com Contact: Mark Williamson

WOKINGHAM Rider Levett Bucknall Mulberry House, Osborne Road, Wokingham, Berkshire, RG40 1TL Telephone: +44 0 118 974 3600 Email: [email protected] Website: www.rlb.com Contact: Simon Kerton

LONDON Rider Levett Bucknall 2nd Floor, 60 New Broad Street, London, EC2M 1JJ Telephone: +44 0 207 398 8300 Email: [email protected] Website: www.rlb.com Contact: Tony Catchpole

CARIBBEAN

MANCHESTER Rider Levett Bucknall 8 Exchange Quay, Salford Quays, Manchester, M5 3EJ Telephone: +44 0 161 868 7700 Email: [email protected] Website: www.rlb.com Contact: Deryck Barton

109

NEWCASTLE Rider Levett Bucknall Evans Business Centre, Durham Way South, Aycliffe Industrial Park, Newton Aycliffe, County Durham, DL5 6XP Telephone: +44 0 121 503 1500 Email: [email protected] Website: www.rlb.com Contact: Mark Weaver

© Rider Levett Bucknall Philippines, Inc. 2015

BARBADOS AND ST. LUCIA Rider Levett Bucknall Altman Real Estate Annex, Derricks, St. James, Barbados Telephone: +1 246 435 5795 Email: [email protected] Website: www.rlb.com Contact: Robert Hoyle CAYMAN ISLANDS Rider Levett Bucknall Fourth Floor, Genesis Building, 13 Genesis Close, PO Box 1489, Grand Cayman, KY1-1110

© Rider Levett Bucknall Philippines, Inc. 2015

110

INTERNATIONAL OFFICES Telephone: +1 345 946 6063 Email: [email protected] Website: www.rlb.com Contact: Martyn Bould

AMERICAS/CANADA CANADA CALGARY Rider Levett Bucknall 200-609 14th Street NW, Calgary, Alberta T2N 2A1, Canada Telephone: +1 403 571 0505 Email: [email protected] Website: www.rlb.com Contact: Roy Baxter UNITED STATES OF AMERICA BOISE Rider Levett Bucknall 250 South Fifth Street, Second Floor, Boise, Idaho 83702 Telephone: +1 208 947 0807 Email: [email protected] Website: www.rlb.com Contact: Nick Castorina BOSTON Rider Levett Bucknall Two Financial Center, Suite 810, 60 South Street, Boston, Massachusetts 02111 Telephone: +1 617 737 9339 Email: [email protected] Website: www.rlb.com Contact: Grant Owen DENVER Rider Levett Bucknall 1621 Eighteenth Street, Suite 255, Denver, Colorado 80202 Telephone: +1 720 904 1480 Email: [email protected] Website: www.rlb.com Contact: Peter Knowles GUAM Rider Levett Bucknall GCIC Building, Suite 603, 414 West Soledad Avenue, Hagatna, Guam 96910

111

© Rider Levett Bucknall Philippines, Inc. 2015

Telephone: +1 671 473 9054 Email: [email protected] Website: www.rlb.com Contact: Emile le Roux HILO Rider Levett Bucknall 117 Keawe Street, Suite 125, Hilo, Hawaii 96720 Telephone: +1 808 883 3379 Email: [email protected] Website: www.rlb.com Contact: Kevin Mitchell HONOLULU Rider Levett Bucknall American Savings Bank Tower, Suite 1340, 1001 Bishop Street, Honolulu, Hawaii 96813 Telephone: +1 808 521 2641 Email: [email protected] Website: www.rlb.com Contact: Tony Smith/Paul Brussow/Maelyn Uyehara KENNEWICK Rider Levett Bucknall 3104 West Kennewick Avenue, Suite C, Kennewick, Washington 99336 Telephone: +1 509 735 3056 Email: [email protected] Website: www.rlb.com Contact: Nick Castorina KONA Rider Levett Bucknall Waikoloa Highlands Center, 68-1845 Waikoloa Road, Suite 202, Waikoloa 96738 Telephone: +1 808 883 3379 Email: [email protected] Website: www.rlb.com Contact: Kevin Mitchell LAS VEGAS Rider Levett Bucknall 6555 South Valley View Boulevard, Suite 510, Las Vegas, Nevada 89118 Telephone: +1 702 227 8818 Email: [email protected] Website: www.rlb.com Contact: Martin Grace

© Rider Levett Bucknall Philippines, Inc. 2015

112

INTERNATIONAL OFFICES LOS ANGELES Rider Levett Bucknall Pacific Center, 523 West Sixth Street, Suite 522, Los Angeles, California 90014 Telephone: +1 213 689 1103 Email: [email protected] Website: www.rlb.com Contact: Graham Roy NEW YORK Rider Levett Bucknall 26 Broadway, Suite 1616, New York 10004 Telephone: +1 212 952 1300 Email: [email protected] Website: www.rlb.com Contact: Grant Owen PHOENIX Rider Levett Bucknall 4343 East Camelback Road, Suite 350, Phoenix, Arizona 85018 Telephone: +1 602 443 4848 Email: [email protected] Website: www.rlb.com Contact: Julian Anderson/John Jozwick/ Scott Macpherson PORTLAND Rider Levett Bucknall Brewery Block 2, 1120 NW Couch Street, Suite 730, Portland, Oregon 97209 Telephone: +1 503 226 2730 Email: [email protected] Website: www.rlb.com Contact: Graham Roy

Website: www.rlb.com Contact: Chris Burris SEATTLE-MONROE Rider Levett Bucknall 304 West Main Street, Monroe, Washington 98272 Telephone: +1 360 805 0413 Email: [email protected] Website: www.rlb.com Contact: Nick Castorina TUCSON Rider Levett Bucknall Two East Congress, Suite 900, Tucson, Arizona 85701 Telephone: +1 520 202 7378 Email: [email protected] Website: www.rlb.com Contact: Joel Brown WASHINGTON Rider Levett Bucknall Metro Center, 1200 G Street NW, Suite 800, Washington, DC 20005 Telephone: +1 202 434 8350 Email: [email protected] Website: www.rlb.com Contact: Grant Owen

SAN FRANCISCO Rider Levett Bucknall 425 Market Street, 22nd Floor, San Francisco, California 94105 Telephone: +1 415 362 2613 Email: [email protected] Website: www.rlb.com Contact: Graham Roy SEATTLE Rider Levett Bucknall 1924 1st Avenue, Second Floor, Seattle, Washington 98101 Telephone: +1 206 223 2055 Email: [email protected]

113

© Rider Levett Bucknall Philippines, Inc. 2015

© Rider Levett Bucknall Philippines, Inc. 2015

114

Miscellaneous Conversion Factors Calculation Formulae Foreign Exchange Rate IDD Country Codes and Time Differences Philippine Regular Holidas and Special (Non-Working) Holidays Abridged Business Terms 2015 and 2016 Calendars

© Rider Levett Bucknall Philippines, Inc. 2015

116

MISCELLANEOUS CONVERSION FACTORS To convert Square inches into square millimeters Square inches into square centimeters

Multiply by

Grains into metric carats

0.323995

645.16

Grains into grams

0.064799

6.4516

Pennyweights into grams

1.555174

Square feet into square centimeters

929.0304

Grams into ounces

0.035

Square feet into meters

0.092903

Ounces into grams

28.349523

9.00

Ounces troy into grams

31.103477

0.8356127

Ounces into kilograms

0.0283495

10.764

Pounds into kilograms

0.4535924

1.196

Kilograms into pounds

2.205

Square yards into acres

0.0083613

Stones into kilograms

6.3502932

Acres into square meters

4046.8564

Hundredweight into kilograms

50.802345

Tons into kilograms

1,016.0469

Square yards into square feet Square yards into square meters Square meters into square feet Square meters into square yards

Acres into square yards

4,840

Acres into hectares

0.4046856

Hectares into acres

2.471

Hectares into square meters Square kilometers into hectares Square miles into square kilometers

Tons into metric tones Tons into pounds

1.01605 2.240

10,000

Tons into tones

1.016

100

Tones into tons

0.984

Tahills into grams

37.799

2.589988

Square miles into acres

638.0

Kati into kilograms

Square kilometers into square miles

0.386

LENGTH

VOLUME AND CAPACITY

0.6

Milli-inches into micrometers

25.4

Cubic inches into cubic centimeters

16387064

Inches into millimeters

25.4

Cubic inches into liters

0.016387

Inches into centimeters

2.54

0.0283168

Inches into meters

Cubic feet into liters

28.316847

Centimeters into inches

0.394

UK pints into liters

0.5682613

Feet into millimeters

304.8

US pints into liters

0.473

Feet into centimeters

UK liters into pints

1.760

Feet into meters

0.3048

UK liters into gallons

0.220

Yards into meters

0.9144

US liters into gallons

0.264

Fathoms into meters

1.8288

Chains into meters

20.1168

Cubic feet into cubic meters

US liters into pints UK quarts into liters

2.113 1.1365225

Furlongs into meters

0.0254

30.48

201.168

0.7645549

Miles, statute into kilometers

1.609344

UK gallons into liters

4.54609

Miles, nautical into kilometers

1.852

US gallons into liters

3.785

Cubic yards into cubic meters

UK gallons into cubic meters

0.0045461

UK fluid ounces into cubic centimeters

28.413063

POWER Foot pounds-force per second into watts Horsepower into watts Foot pounds-force per second into kilowatts Horsepower into kilowatts Kilowatts into horsepower Horsepower into metric horsepower

1.35582 745.7 0.001356

Grains into milligrams

VELOCITY Centimeters per second into feet per second Meters per second into feet per minute Meters per second into feet per second Kilometers per hour into miles per hour TEMPERATURE

0.03281 196.9 3.281 0.6214

0.7457

Degree Celsius to Degree Fahrenheit

ºF = (ºC x 9/5) + 32

1.340

Degree Fahrenheit to Degree Celsius

ºC = (ºF-32) x 5/9

1.01387

MASS

117

To convert

Multiply by

AREA

64.79891

© Rider Levett Bucknall Philippines, Inc. 2015

FORCE Newtons into pounds force

0.2248

Newtons into pounds

7.2330

© Rider Levett Bucknall Philippines, Inc. 2015

118

MISCELLANEOUS

© Rider Levett Bucknall Philippines, Inc. 2015

12438.29 12155.06 12126.19 11899.38 11712.45 11677.41 11892.62 11519.65 11435.75 11426.28 11946.63 12186.72 1 IDR

© Rider Levett Bucknall Philippines, Inc. 2015

Source: IMF

3.48 3.34 3.27 3.22 3.18 3.18 3.22 3.23 3.26 3.28 3.31 3.30 MYR

Indonesian Rupiah

1

119.31 116.02 107.48 107.24 102.96 101.70 102.05 101.78 102.56 102.27 102.16 103.94 JPY

Malaysian Ringgit

1

6.13 6.14 6.14 6.15 6.16 6.16 6.16 6.16 6.16 6.14 6.11 6.10 CNY

Japanese Yen

1

0.83 0.87 0.88 0.91 0.93 0.94 0.94 0.93 0.93 0.91 0.90 0.89 AUD

Chinese Yuan

1

1.56 1.58 1.61 1.63 1.67 1.70 1.69 1.68 1.67 1.66 1.65 1.65 GBP

Australian Dollar

1

44.69

1.32 1.30 1.27 1.26 1.25 1.24 1.25 1.25 1.26 1.27 1.27 1.27

FEB 14 JAN 14 UNIT CURRENCY

119

1

4/3 x (radius)3 x 3.1416

SGD

Volume of Sphere

U.K. Pound Sterling

(Side)2 by height by 2.598

44.96

Volume of hexagonal prism

44.80

Length by breadth by depth

44.10

Volume of cone

43.77

Area of base by height

43.42

Volume of cube or prism

43.82

(radius by slant side by 3.1416) + area of base

44.93

Volume of cylinder

44.64

4 x (radius)2 x 3.1416

44.80

Diameter x 3.1416

Surface area of cone

44.90

2/3 x base x height

Circumference of circle

44.91

Area of parabola

1

Major axis by minor axis x 0.7854

PHP

Area of ellipse

Singapore Dollar

Height x 1/2 x (sum of parallel sides)

Philippine Peso

Area of trapezium

OCT 14

(Side)2 x 0.433 SEP 14

Base x height

Area of equilateral triangle

AUG 14

Area of square, rhombus

JUL 14

Length of arc by 1/2 radius

JUN 14

Area of sector of circle

MAY 14

(radius)2 by 3.1416

APR 14

Base by 1/2 height

Area of Circle

MAR 14

Area of Triangle

NOV 14

Multiply

UNITS PER USD

To calculate

DEC 14

FOREIGN EXCHANGE RATE

CALCULATION FORMULAE

120

MISCELLANEOUS IDD COUNTRY CODES AND TIME DIFFERENCES Time Difference from Philippines (hours) Adelaide 61 (8) 1.5 Bahrain 973 -5 Brisbane 61 (7) 2 Brunei 673 0 Cambodia 855 -1 Canberra 61 (2) 2 China (Coastal Cities) 86 0 Darwin 61 (8) 1.5 France 33 -7 Germany 49 -7 Hobart 61 (3) 2 Hong Kong 853 0 India 91 -2.5 Indonesia (Jakarta) 62 -1 Italy 39 -7 Japan 81 1 Korea (North) 850 1 Korea (South) 82 1 Los Angeles 1 -16 Macau 853 0 Malaysia 60 0 Melbourne 61 (3) 2 Moscow 810 (7) (095) -5 Myanmar 95 -1.5 Netherlands 31 -7 New Zealand 64 4 New York 1 -13 Pakistan 92 -3 Perth 61 0 Philippines 63 0 Qatar 974 -5 Saudi Arabia 966 -5 Singapore 65 0 Spain 34 -7 Sweden 46 -7 Switzerland 41 -7 St Petersburg 810 (7) (812, 813) -5 Sydney 61 2 Taiwan 886 0 Thailand 66 -1 United Arab Emirates 971 -4 United Kingdom 44 -8 Vietnam 84 -1 DESTINATION

121

PHILIPPINES REGULAR HOLIDAYS AND SPECIAL (NON-WORKING) DAYS 2015

IDD Country (Area) Code

© Rider Levett Bucknall Philippines, Inc. 2015

Holidays January 1

New Year’s Day (Regular Holiday)

February 19

Chinese New Year (Special non-working day)

February 25

EDSA Revolution anniversary (Special Holiday for all schools)

April 2

Maundy Thursday (Regular Holiday)

April 3

Good Friday (Regular Holiday)

April 4

Black Saturday (Special non-working day)

April 9

Araw ng Kagitingan (Regular Holiday)

May 1

Labor Day (Regular Holiday)

June 12

Independence Day (Regular Holiday)

August 21

Ninoy Aquino Day (Special non-working day)

August 31

National Heroes Day (Regular Holiday)

November 1

All Saints Day (Special non-working day)

November 30

Bonifacio Day (Regular Holiday)

December 24

Additional special non-working day (Special non-working day)

December 25

Christmas Day (Regular Holiday)

December 30

Rizal Day (Regular Holiday)

December 31

Last day of the year (Special non-working day)

© Rider Levett Bucknall Philippines, Inc. 2015

122

MISCELLANEOUS Abridged Business Terms A.a.r. , A.r. a/c A/C

A

Against all risks Account Account Current Acceptance; Acc accepted Ad referendum – matter subject to Ad ref reference before being final. Ad valorem – Ad val according to value Afloat Vessel at sea. A.g.b. A good brand A.l.s. About like sample Cottion, etc., Charter Anglo-form (freight paid on Chamber of streamer’s Net reg. Shipping ton). A/or And, or A/o Account of. (1) A protester (to be Protested A.P. bills). (2) Additional premium (insurance). A/R. All risks. A/s Account sales American Terms A/T. (grain trade) Association Terms Aus. T Australian Terms. Av. Average @ at @p.lb. at per pound

B

Bags/Bulk Part in bags, part bulk. “Baltcon” New Baltic Coal Charter. “Baltime” Uniform Time Charter. Bar. Barrel B.B. Bill Book. B. Ch. Bristol Channel B/D. Bank Draft. Bgs. Bags. Bd. Bond Bds. Boards B/E. Bill of Exchange B.G. Birmingham Gauge B/H. Bill of Health. B.H.P. Brake horse-power. Bank; book; Bk. Backwardation Bkg. Banking. Bkge. Brokerage. Bkt. Basket Bl. Bale; barrel. Bill of lading, Receipt Given on behalf of B/L. Shipowner for goods Shipped or received for Shipment. Branch office; B.o. buyer’s Option

123

B

B.O.D. B.O.T. B/P B.P.B. b. rec. B/R

Buyer’s Option to Double Board of Trade Bill Payable Bank Post Bill. Bill Receivable Bordeaux or Rouen (grain trade)

C

C/C/A. C.A.D. Canclg. Capt. Cat. C.B. C.C. C/D C.d. C and D C.E. Cert. C&F. C/f. Cert. Inv. c.f. C.f.o. C.G.A Cge. C.H. C.H. & H. Charter Ch. Fwd. Ch. Ppd. c/i. Cie C.I.F. C&I. C.i.f.&c. C.i.f.&e. C.i.f.&i. C.i.f.c.&i. Cld. Cm.

Case; Currency; coupon. Capital Account; close Annealed; commercial Agent. Cash against Documents. Cancelling. Captain. Catalogue Cash Book. Continuation Clause. Customs Declaration Cum dividendo (with Dividend). Collection and Delivery. Civil Engineer Certificate Cost and Freight Carried forward. Certified Invoice Carried forward Coast for orders (chartering). Cargo’s proportion of G.A. Carriage. Customs House. Continent between Havre And Hamburg. Form of contract engaging A vessel on specified Terms. Charges forward. Charges Prepaid. certificate of insurance. Campagnie (French Company). Cost, insurance and freight Cost and insurance. Cost, insurance, freight and commission Cost, insurance, freight And exchange Cost, insurance, freight And interest. Cost, insurance, freight Commission and interest. Cleared (goods, shipping). Centimetre

© Rider Levett Bucknall Philippines, Inc. 2015

C

C/N C.O. C/O c/o C.O.D. Collr. Com. Con. Con. Cr. Consigne Cont. Coy. C/P. c.p.d. C.R. Cr. C/S. C/s. Csk. C/T. Ct. Cts. Ctge. C.T.L. Cub. Cum.d/ Cum. Pref. Curt. C.w.o. Cwt. Cy.

Credit Note; Consignment Note. Compte Ouvert (open a/c). Cash Order (banking) care of; carried over. Cash on Delivery Collector Commercial; Commission. Contra (against) Contra credit The party to whom goods Or vessels are consigned Contract Company Charter party; Custom of ports Charters Pay Dues. Company’s Risks Credit; creditor. Colliery Screened (coal Trade). Cases Cask Californian Terms (grain Trade). cent; current Crates Cartage. Constructive Total Loss. Cubic With dividend Cumulative Preference. Current Cash with order Hundredweight. Currency.

D

Dec. Def. Deg. Dept. D.f. Dft. Diam Dis Dist. Div. Dk. d.l.o. D/N D/O Do. Dols. Doz. D/P. d.p. D/R Dr. D/s. D/W. Ea. E&O.E. E.C.Ireland E.D. E.E. E.g. E.I. Enclo. Entd. E.o.

D.D. and Shpg.

Days after acceptance; Documents against Acceptance; Discharge Afloat (chartering); Deposit Account. Deals, battens and boards (lightwood goods). Drawback. Deviation Clause. Demad Draft Days after date. Delivered Delivered sound (grain Trade). Dock Dues and Shipping.

Deb..

Debenture

Ex-parte.

D/A.

D.B.B. Dbk. D/C. D/D. D/d. Dd. Dd/s.

E.o.h.p. Eq. Et.seq. Ex. Exch. Ex cp. Exd. Ex div. Ex. In. Ex-Mill.

D

Decrease Deferred Degree Department Dead freight Draft. Diameter Discount District Dividend; Division. Dock. Dispatch loading only. Debit Note. Delivery Order Ditto Dollars Dozen Document against Payment Direct Port. Deposit Receit Debtor; drawer. “dreding” Option General Cargo. Day’s sight Dock Warrant

E

Each. Errors and omissions excepted East Coast Ireland Ex dividen Errors excepted. Exempli gratia (for Example). East Indies Enclosure. Enetered Ex officio (by virtue of Office). Except otherwise herein Provided. Equivalent Et Sequentes (and the Following). Examined; exchange; Executed out of; without. Exchange; exchequer Ex coupon. Examined Without dividend Without interest Buyer responsible for Charges after delivery at Mill. One side only.

© Rider Levett Bucknall Philippines, Inc. 2015

124

MISCELLANEOUS E

Ex-Quay Ex-Ship. Ex-Store/ warehouse Exs. F.a.a. Fac. F.a.q.

F.a.s.

Fco. F.c.s. F.C&S. and R and C.C. F.D.D. F/D. f.d. F.C&S. and R and C.C. F.D.D. F/D. f.d. F.f.a. F.g. F.g.a. F.g.f. f.h. F.i.b. Fig. f.i.a. F.i.o. Fir. F.i.t. F.I. F.m. Fms. F/o. F.O. F.o.b. F.o.c. f.o.d. Flg. For. F.o.r. F.o.s.

125

Buyer responsible for charges after delivery at Quay. Buyer responsible for Charges after delivery at Ship. Buyer responsible for Charges after delivery at Store. Expenses.

F

Free of all average Facsimile. Fair average quality. Free alongside ship. In this form of contract the seller must deliver the goods so they can be handled by the ship. Franco abord or Franco (free). Free of capture and Seizure. Warranted free from above and damage caused by Riots and civil commotions. Francs de droit. Free docks. Free dispatch. Warranted free from above and damage caused by Riots and civil commotions. Francs de droit. Free docks. Free dispatch. Free from alongside; (free foreign agency). Fully good. Foreign General average. Fully good, fair. First half Free into bunker (coal Trade). Figure. Full interest admitted. Free in and out Firkin. Free of income tax. Floating Landing. Fair Mercantable. Fathoms For orders; full out terms (grain trade). Firm Offer Free on board. Free of charge Free of damage Following Foreign Free on rail Free on streamer

F.o.t. F.o.w. F.p. F.p.a. Fr. & c.c. Frt. Frt. fwd Frt. Ppd. f.t. Ft. F.T.W. Fur. G/a. Gall. G.B. G.b.o. G.gr. g.l. G.m. G.m.b. G.m.q. G.o.b. Govt. Gr. Gr.Wt. Grs. Grs.t. G.t.c. Grade Hewn Hhd. H.M.C. H.P. H.P.N. Hrs. I.B.

F

Free on trucks First open water. Fully paid Free from particular Average. Free of riot and civil Commotion. Freight Freight forward Freight prepaid Full terms Foot, feet. Free Trade Wharf. Furlong.

G

General average. Gallon Great Britain. Goods in bad order. Great gross (144 doz). Gill. Good merchantable Good merchantable brand Good merchantable Quality. Good ordinary brand. Government Gross. Gross weight Grains Gross tons Good till countermanded. Classified Qaulity.

H

Hewn timber per load. Hogshead. His Majesty’s Customs Horse-power. Horse-power, Nominal. Hours

I

Instn. Instns. Int. In trans

Invoice Book. ibidem-in the same place. Invoice book Inwards Invoice Book Outwards. Idem-the same. Idest-that is. Import License. Including Instant-of the present Month. Institution Institution Interest. In transitu (in transit)

Inv.

Invoice

Ib. I.B.I. I.B.O. id. i.e. I/L Incldg. Inst.

© Rider Levett Bucknall Philippines, Inc. 2015

I.O.U. I.S.W.G. J/A Jr. Kild. Kilo. Kincon.

J

Joint Account. Junior

K

Kilderkin Kilogramme United Kingdom or Continent

L

L.A.T. Lat. Lb. L/C. Ldg. And dely. Led. Leg. Wt. lh. L.I.P. Long. L.S. L.T. m. M/a. Max. M/C. M/C. M/D. M/d. Mdise Med. Memo. Michs Min. Min. B/L. Min. wt. M.I.P. Mks. M/m. M.M. M.M.A. M.O. M.O.P. Mos. M/R Ms. M.S.

M

I

I owe you Imperial Standard Wire Gauge.

Linseed Association Terms Latitude pound in weight Letter of Credit. Landing and Delivery Ledger. Legal weight Last half. Life Insurance Policy Longitude Locus siglili-place of seal. Liverpool Terms.

M

meter, mile, minute My account Maximum Marginal credit (banking) Metalling Clause (marine Insurance) Memorandum of Deposit Month’s date (i.e Months after date) Merchandise Medium Memorandum Michaelmas Minimum, minute Minimum Bill of Lading Minimum weight Marine Insurance Policy Marks Made merchantable Merchantile Marine Merchandise Marks Act. Money Order Mother-of-pearl Months Mate’s Receipt Manuscripts; mail streamer Motor ship

M/s. M.S.A. M.S.C. M.V. Mx.

Month’s sight (i.e. month’s After sight). Merchant Shipping Act. Manchester Ship Canal Motor vessel Mixed.

N

Not above-used in fixing Loading positions in River Plate. N.A. North America. N/A. No advice (banking) N.B. Take note-mark well. New Charter or New N/C. Crop. New Charter or any N/C or any direct Port. N.E. No effects. Nem. con No one contradicting Net Netto (lowest) Free of Charterer’s Net terms. Commission. N/f. No funds. N.G. No Grade N/m. No mark N/O. No orders (banking) Nom. Nominal No reduction Channel. Bristol Not otherwise pro‘N.o.p. vided. N.p. Notary Public n/p. Net proceeds Nos. Numbers N.R. No risk (insurance) No sufficient (bankN/S. ing) N.S. New Style; New Series New Terms (grain N.t. trade) Net t. Net tons Nt. Wt. Net weight. N.A.

O/a. O.C. O.c. o/c. oc. B/L. O/d. % %o O.P. O.R. O.R.B. O.R.C.

O

On account of Open Charter Off coast Overcharge Ocean Bill of Lading On demand Off Coast Vessel at port of call awaiting orders Order of; percent Per Mile-per thousand Open Policy (insurance) Owner’s Risk Owner’s risk of brekage Owner’s risk of Chafinge

© Rider Levett Bucknall Philippines, Inc. 2015

126

MISCELLANEOUS O

O.R.D. O.R.F. O.R.I. Ord. O/s. O/t. O.T. Oz.

Owner’s risk of damage Owner’s Risk of fire Owner’s risk leakage Ordinary Old style Old Term(graintrade) n track or railway Ounce.

P

P/A. P.A. Pcl. P and L. P/C Pc. P.c.r.c.a. Pcs. P.C.B. P.D. Pk. Pkg. P.L. P.m. P/N. P.O. P.O.B. P.O.D. p.p.. Per pro Ppd. P.p.i. Ppt. Pref.

Private Account (bookkeeping) Particular Average Parcel, part of a cargo Profit and Loss Price Current; Pretty Cash; Per Cent Prices Pickled cold rolled and Close annealed Pieces. Petty Cash Book Port Dues. “Pixpinus” Charter Party in use for Pitchpine Cargoes Peck Package Partial Loss (Insurance) Premium Promissory Note. Postal Order. Post Office Box. Pay on Delivery Picked ports (chartering) Per procuration (on Behalf of). Prepaid Policy proof of interest (marine insurance) Prompt loading Preference of preferred President For.

Pres. Pro. Pro. and For and against con. Pro forma As a matter of form Pro tempore for the Pro tem time being Proximo of the next Prox. month P.R. Parcel Receipt Pt. Pint P.T. Parcel Ticket P.T.O. Please Turn Over Pts. Pints P.X. Please Exchange Qlty. Qrs. Qts.

127

Q

Quality Quarters Quarts.

Q

q.v. Quid pro quo. Qy

Quod vide – which see. One exchanged for an Other an equivalent Query

R

R.A.T. R/D. R.D.C. Re. Recd. Regd. R.I. R.O. R.P. R.S.O. R.S.V.P.

Rapeseed Association Terms Refer to Drawer (banking) Running-down Clause (insurance) with reference to. Received Registered Re-insurance Receiving Office Reply Paid Railway Sub-Office Replay please.

S

Sawn s.c. Scale s/d. s.d.

S.D.

Sec. S&F.A. Seq. S.g.

S.G.

Sgd. Shipt. S.H.P. Shr. S.I. Sks. SI. S.I. S/N. S.o. S.O.D. Soc. S.p.d. S.P. S.S. & C.

Sawn Timber per standard scilicet (i.e. to wit) Freight paid for Customary Scale Ton. Sea damaged (grain trade). Sine die (indefinitely). Sea damaged. In Contracts on this basis Grain damaged by water Or consideration may be Rejected by buyers Section; secretary Shipping and Forwarding Agent The following Specific gravity Used in a loyd’s policy and signifying according to some “Ship and Goods” but probably more correctly Salutia Gratis – for the stake of safety Signed Shipment Shaft horse-power Share Short Interest (insurance) Sacks. Sailer Salvage Loss Shipping Note Seller’s Option Seller’s option to double Society. Streamer pays due Supra Protest Same Sea and Country

© Rider Levett Bucknall Philippines, Inc. 2015

St.. St. s.t. Std. Stk. Str. S. to S.

S

Stone (in weight) Stet (let in stand) Short ton (2,000 lb). Standard. Stock Streamer Station to Station Sunday excepted in Sun/ exct. Lay-days S.w. Shipper’s Weight T. TB. Tcs. T.E. Thro’B/L T.L.O.

T

Tons; tare Trial Balance Tierces Trade Expenses Through Bill of Lading Total Loss only (marine Insurance)

U

U /p. U/w.

Underwriting account (Marine insurance) United Kingdom for Orders Ultimo – of the last month Under proof (spirits) Underwriter.

V. Var. Vid. V.S. Viz. v.v

Versus – against Various Vide – see. Visible Supply Videlicet – namely Vice versa

W.A

Western Australia Warehouse Book; Way Bill Water Ballast West Coast England Warranted Wire Gauge Weight guaranteed with particular average Without prejudice (insurance) Warehouse receipts Warehouse Warrant

U/a. U.K.f.o. Olt.

W.B. w.b. W.C. W.d. W.G. w.g. w.p.a. W.P. w.r. W/W.

V

W

Y

Y/A

York Antwerp Rules (marine insurance) 10s 6d. net 10s. 6d net charter 2,158n

© Rider Levett Bucknall Philippines, Inc. 2015

128

MISCELLANEOUS 2015 CALENDAR JANUARY S

M

T

W

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

S 1 8 15 22 29

M 2 9 16 23 30

T 3 10 17 24 31

S

M

T

3 10 17 24 31

4 11 18 25

5 12 19 26

S

M

T

5 12 19 26

6 13 20 27

7 14 21 28

S

M

6 13 20 27

7 14 21 28

S 1 8 15 22 29

M 2 9 16 23 30

Th 1 8 15 22 19

2016 CALENDAR

FEBRUARY F 2 9 16 23 30

S 3 10 17 24 31

S 1 8 15 22

M 2 9 16 23

T 3 10 17 24

Th 5 12 19 26

F 6 13 20 27

S 7 14 21 28

S

M

T

5 12 19 26

6 13 20 27

7 14 21 28

W

Th 7 14 21 28

S 2 9 16 23 30

S

6 13 20 27

F 1 8 15 22 29

7 14 21 28

M 1 8 15 22 29

T 2 9 16 23 30

Th 2 9 16 23 30

F 3 10 17 24 31

S 4 11 18 25

S

M

T

W

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

F 4 11 18 25

S 5 12 19 26

S

M

T

W

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

F 6 13 20 27

S 7 14 21 28

S

M

6 13 20 27

7 14 21 28

MARCH W 4 11 18 25

Th 3 10 17 24

129

W 4 11 18 25

S

M

T

W

Th

3 10 17 24 31

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

W 1 8 15 22 29

Th 2 9 16 23 30

F 3 10 17 24

S 4 11 18 25

S

M

6 13 20 27

7 14 21 28

T 1 8 15 22 29

W 3 10 17 24

Th 4 11 18 25

F 5 12 19 26

S 6 13 20 27

S 1 8 15 22 29

M 2 9 16 23 30

T 3 10 17 24 31

Th

F

S

M

T

7 14 21 28

S 1 8 15 22 29

6 13 20 27

3 10 17 24 31

4 11 18 25

5 12 19 26

F 2 9 16 23 30

S 3 10 17 24 31

S

M

T

W

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

Th 5 12 19 26

W 2 9 16 23 30

© Rider Levett Bucknall Philippines, Inc. 2015

S 2 9 16 23 30

Th 3 10 17 24 31

F 4 11 18 25

S 5 12 19 26

Th 5 12 19 26

F 6 13 20 27

S 7 14 21 28

W

Th

6 13 20 27

7 14 21 28

F 1 8 15 22 29

S 2 9 16 23 30

F 2 9 16 23 30

S 3 10 17 24

F 4 11 18 25

S 5 12 19 26

S

M

F 4 11 18 25

S 5 12 19 26

6 13 20 27

7 14 21 28

S 7 14 21 28

M 1 8 15 22 29

T 2 9 16 23

W 2 9 16 23 30

S

M

T

Th 1 8 15 22 29

Th 3 10 17 24 31

W 4 11 18 25

W

Th

3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

S

M

T

5 12 19 26

6 13 20 27

7 14 21 28

S 7 14 21 28

M 1 8 15 22 29

T 2 9 16 23 30

F 5 12 19 26

S 6 13 20 27

F 1 8 15 22 29

S 2 9 16 23 30

S

M

T

W

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

S

M

T

W

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

W 1 8 15 22 29

F 3 10 17 24

S 4 11 18 25

F 5 12 19 26

S 6 13 20 27

Th

F

6 13 20 27

7 14 21 28

S 1 8 15 22 29

F 2 9 16 23 30

S 3 10 17 24 31

Th 2 9 16 23 30

AUGUST

Th 1 8 15 22 29

Th 4 11 18 25

DECEMBER

NOVEMBER Th 3 10 17 24

W 3 10 17 24 31

OCTOBER

SEPTEMBER

W 2 9 16 23 30

Th 4 11 18 25

JUNE

JULY

T 1 8 15 22 29

W 3 10 17 24

APRIL

MAY

DECEMBER T 1 8 15 22 29

FEBRUARY F 1 7 15 22 29

MARCH

OCTOBER

NOVEMBER T 3 10 17 24

S 7 14 21 28

AUGUST

SEPTEMBER W 2 9 16 23 30

JANUARY F 6 13 20 27

JUNE

JULY

T 1 8 15 22 29

Th 5 12 19 26

APRIL

MAY

W 1 8 15 22 29

W 4 11 18 25

© Rider Levett Bucknall Philippines, Inc. 2015

Th 1 8 15 22 29

130

For questions and further clarifications regarding the data and articles in this publication, please contact: Isabelita Briones Jasmin Mamauag Joy Calvar Main Office: Building 3, Corazon Clemena Compound, #54 Danny Floro Street, Bagong Ilog, Pasig City, 1600, Philippines T: +63 2 687 1075 / 470 0642 F: +63 2 570 4025 E: [email protected], [email protected] Cebu Office: Suite 602, PDI Condominium, Archbishop Reyes Avenue cor. J.Panis Street, Banilad, Cebu City, 6014, Philippines T: +63 32 268 0072 E: [email protected] Davao Office: 6th Floor, Units 15 & 19, Metro Lifestyle Complex, cor. F. Torres St. and E. Jacinto Extension, Davao CIty, 8000, Philippines T: +63 82 222 5315 M: +63 917 550 7013 E: [email protected] Cagayan de Oro Office 308 Sto. Thomas St., Sta. Cecilia Village, Gusa, Cagayan de Oro City, 9000, Philippines M: +63 998 573 2107 E: [email protected]