Problem 1 Given the following activities and precedences, draw an AOA or AON diagram:
Answer
AON diagram: diagram:
Problem 2 Given the following network,
a. What What is th the e criti critica call path path? ? b. How long long will will it take take to comple complete te this this project project? ? c. Can activity activity B be delayed without delaying the completion completion of the project? project? If so, so, how many days? Answer a. Po Poss ssiible ble pa path ths s A-D-G = 8 + 7 + 5 = 20 A-C-E-G = 8 + 3 + 6 + 5 = 22 A-C-F-H = 8 + 3 + 7 + 3 = 21 B-E-G = 10 + 6 + 5 = 21 B-F-H = 10 + 7 + 3 = 20
Critical path is path with longest duration, here longest duration is of path A-C-E-G with duration 22 days. Therefore the critical path is A-C-E-G.
b. Proj Project ect dura duration tion iis s the len length gth of tthe he crit critical ical pat path h whic which h is 22 day days. s.
c. Acti Activity vity B iis s not on th the e criti critical cal and c can an be dela delayed yed wit without hout del delaying aying tthe he project. Longest path containing activity B is B-E-G with duration 21. Hence activity B can be delayed 22 - 21 days = 1 day Do give a positive rating if you think this answer helped. Problem Given the3estimated activity times below and the network in Problem 2 above Activity a
m
b
7.5 10.5 3.5 7.5 5.5
14.5 12.5 4.5 8.5 9.5
A B C D E
6.5 8.5 2.5 6.5 5.5
F G
5.5 7.5 4.5 6.5
9.5 8.5
H
2.5 3.5
3.5
What is the critical path probability that the project will be completed within: (a) 21 days? (b) 22 days? (c) 25 days? Answer Activity
a
m
b
te=(a+4m+b)/6
SD= (b-a)/6
Var= SD^2
A
6.5
7.5
14.5
8.500
1.333
1.778
B
8.5
10.5
12.5
10.500
0.667
0.444
C
2.5
3.5
4.5
3.500
0.333
0.111
D
6.5
7.5
8.5
7.500
0.333
0.111
E
5.5
5.5
9.5
6167
0.667
0.444
F
5.5
7.5
9.5
7.500
0.667
0.444
G
4.5
6.5
8.5
6.500
0.667
0.444
H
2.5
3.5
3.5
3.333
0.167
0.028
Activit te=(a+4m+b) Predecesso y /6 rs
A
8.500
B
10.500
Successo rs
ES
EF
LS
LF
Slac k
C,D
0.00
8.50
0.00
8.50
0.00
E,F
0.00
10.5
1.50
12.0
1.50
0
0
C
3.500
A
E,F
8.50
12 12.0 0
8.50
12.0 0
0.00
D
7.500
A
G
8.50
16.0 0
10.6 7
18.1 7
2.17
E
6167
B,C
G
12.0 0
18.1 7
12.0 0
18.1 7
0.00
F
7.500
B,C
H
12.0 0
19.5 0
13.8 3
21.3 3
1.83
G
6.500
D,E
H
3.333
F
18.1 7
24.6 7
18.1 7
24.6 7
0.00
19.5 0
22.8 3
21.3 3
24.6 7
1.83
Base on zero slack, the critical path is A-C-E-G a. p( p(x x