Site Conditions Temperature (Min./ Max.) Rel. Air Humidity (Min./ Max.) Atmosphere st 1 Storey Level Earthquake zone Electrical Supply
°C % RH
Low voltage / frequency (< 185 kW) Medium voltave/frequency (>185 kW)
V / Hz V / Hz
m
Mechanical Design [ x ] ASME [ x ] IEC [ ] ……….. Electrical Design [x] [x] [ ]
IEC ISO CENELEC
Identification System [x]
KKS
QA Standard [] [x] []
Manufacturer standard ISO 9000 …..
Special requirements [ ] Duty Natural gas equipments. Natural gas scrubbing and filtering.
Pengerang Based on: 53840s01.doc - Rev. 2 - 2000-07-04
Page 1 / 6
Fuel Gas Supply System
2. Performance Data All data are given at skid limit 2.1 ESD valve Quantity × duty Total fuel flow (min. / design ) Duty per train Fuel gas inlet pressure (min. / max.) Fuel gas inlet temperature (min. / max.) Pressure drop
2.7 Pressure Reducing Station (only for HRSG) Quantity × duty Total fuel flow (min. / design ) Duty per train Fuel gas inlet pressure (min. / max.) Fuel gas outlet pressure (set point) Fuel gas inlet temperature (min. / max.) Connection (inlet / outlet) Flange rating Pressure drop
kg/s kg/s bar (a) bar (a) °C bar
< 1.5 at full aperture
3. Scope of Supply 3.1 Emergency Shut Down valve equipment [ x ] 3 × 50 % Fast acting Emergency Shut Down valve spring loaded incl. instrumentation and equalizing line, skid mounted [ x ] Internal piping including double isolation valve on drains and vents [ x ] Internal power and signal cabling [ x ] First filling of consumables [ x ] Name plates [ x ] Special tools - if required [ x ] Recommended spare parts for commissioning **
Pengerang Based on: 53840s01.doc - Rev. 2 - 2000-07-04
Page 2 / 6
Fuel Gas Supply System
[x] [x]
Spare and wear parts for 2 years ** rd th Recommended spare part for 3 & 4 year (optional) **
2 × 100 % Cyclone separator station incl. instrumentation 3 × 50 % Liquid/dust separator station incl. instrumentation Automatic condensate discharge system for separator station Drain tank incl. instrumentation Drain tank discharge
[]
… No. (2 × 100 %) Cartridge filter station(s) (one per GT), each consisting of: [] []
[x] [x] [x] [x] [x] [x] [x] [x] [x]
Cartridge filter section Internal piping, valves and instrumentation
Local motor control center - if applicable Local control cubicle - if applicable Internal power and signal cabling First filling of consumables Name plates Special tools - if required Recommended spare parts for commissioning ** Spare and wear parts for 2 years ** rd th Recommended spare part for 3 & 4 year (optional) **
Pressure reducing valve Slam shut valve(s) Pressure relief valve Noise reduction package Check valve at gas outlet Unit internal piping, valves and instrumentation
Local motor control center - if applicable Local control cubicle Internal power and signal cabling First filling of consumables Name plates Special tools - if required Recommended spare parts for commissioning Spare and wear parts for 2 years rd th Recommended spare part for 3 & 4 year (optional) **
** Please provide cost breakdown for easy accessment 3.5 Services [x] [x] [x] [x]
Equipment design Manufacturing and manufacture supervision Shop assembly Inspections, examinations and tests
Pengerang Based on: 53840s01.doc - Rev. 2 - 2000-07-04
Page 3 / 6
Fuel Gas Supply System
[x] [x] [x] [] [] [] []
Cleaning, painting and coating Documentation Protection and packing for shipment Erection Erection supervision only Commissioning Commissioning supervision only
3.3 Exclusions [x] []
Civil works .….
4. Design Features Location Equipment Design Pressure Equipemnt Design Temperature
: : :
shelter 65 bar 70 deg C
:
99.99 % of particles ≥ 5 µm
dB (A)
:
85
kg m
: :
vendor to advise vendor to advise
:
March 2014
:
seaworthy
Separation Efficiency Liquid/Dust Separator Noise Requirements Sound pressure level at 1 m distance 5. Transport Information Weight Dimensions (L × W × H)
6. Erection / Commissioning Information n.a.
7. Time Schedule Estimated order date:
8. Commercial 8.1 Delivery Conditions [x] [x]
EXW Packing
8.2 Pricing [x]
Firm price
8.3 Warranty / Guarantee
Pengerang Based on: 53840s01.doc - Rev. 2 - 2000-07-04
Page 4 / 6
Fuel Gas Supply System
[x]
[x]
Duration of material warranty after successful commissioning
9. Documents to be submitted with the Proposal [x] [x] [ ] [x] [x]
Price Technical data and descriptions Tender documents Outline drawing Schedules and comments (Please advise the delivery schedule)
10. Submittal Dates [x]
Entire proposal
:
th
7 Aug 2013
11. Enclosures [x] [x] [ ] [x] [ ] [ ] [ ] [ x]
Flow sheet Medium analysis Principle arrangement Data sheet to be filled in Client’s schedules Client’s specification Project time Schedule Sub-vendor list (Please provide equipment according to vendor list)
Pengerang Based on: 53840s01.doc - Rev. 2 - 2000-07-04