PROYEK : Pekerjaan External Pabrik Cikarang LOKASI : Cikarang NO I

JENIS PEKERJAAN

SAT

Vol

Harga Sat

LS

1.00

174,817,500

174,817,500

bln bln bln bln

2.00 2.00 2.00 2.00

7,500,000 6,000,000 5,000,000 6,000,000

15,000,000 12,000,000 10,000,000 12,000,000 49,000,000

2). Temporary work - Laveling &layout - Scafolding & Staging - Pagar terpal

m2 ls m2

3,171.00 1.00 526.50

20,000 500,000 15,000

63,420,000 500,000 7,897,500 71,817,500

3). Machine and tools -stamper -vibrator -walles -mob - demob

ls ls ls ls

1.00 1.00 1.00 1.00

5,500,000 3,500,000 20,000,000 10,000,000

5,500,000 3,500,000 20,000,000 10,000,000 39,000,000

3).Lain - Lain - Koordinasi lingkungan - Mob - demob tenaga

ls ls

1.00 1.00

10,000,000 5,000,000

10,000,000 5,000,000 15,000,000

Sub Total I II A

B

C

D

E

F

CiIVIL WORK for RENOVATION FACTORY PERBAIKAN JALAN UTAMA & SALURAN DRAINASE 1). Pekerjaan bongkaran paving block 2). Pekerjaan pemadatan 3). Pekerjaan pekerasan jalan AC WC ( hotmix asphalt), t = 30 mm 4). Pekerjaan buangan sisa galian dan puing (angkut Paving ) 5). Perbaikan saluran drainase Total II A PERBAIKAN BANGUNAN POS JAGA (SECURITY POS ) 1). Pekerjaan perbaikan rangka atap ( diganti dengan atap baja ringan ) 2). Pekerjaan Pemasangan plafond (ceiling ) 3). Pekerjaan pemasangan lisplank 2 x 20 4). Pekerjaan perbaikan toilet lengkap Total II B PERBAIKAN BANGUNAN TAX OFFICE 1). Pekerjaan perbaikan rangka atap ( diganti dengan atap baja ringan ) 2). Pekerjaan Pemasangan plafond (ceiling ) 3). Pekerjaan pemasangan lisplank 2 x 20 4). Pekerjaan perbaikan toilet lengkap 5). Perbaikan pintu &jendela ( menggunakan kaca existing ) Total II C PENAMBAHAN RUANG LOCKER MALE &FEMALE 1). Pekerjaan Partisi Gypsum + rangka (w/ Gypsum board t = 120 mm ) 2). Pekerjaan Pemasangan kusen pintu & daun pintu ( w/ alumunium , kaca )singgle Total II D RENOVASI BANGUNAN SELASAR 1).Pekerjaan Bongkar pilar dan atap 2). Pekerjaan Pemasangan rangka atap 3). Pekerjaan pemasangan atap w galvalum t =0,55m (bootles type) 4). Pekerjaan Pengurugan dan perkerasan receiving area 5). Pekerjaan beton lantai receiving area K 300 ready mix Total II E LAIN - LAIN 1 1). Pemasangan pintu penghubung (lobby - gembla) w = 2x900 H = 2400 alumunium ,kaca 2). Pemasangan pintu penghubung office - QC w = 900 H = 2400 alumunium , 3). Bangunan tiang bendera (lengkap) material from stainlish SUS -304 Total II F

174,817,500

m2 m3 m2 lot m'

1,500.00 600.00 3,171.00 1.00 34.00

15,000 35,000 80,000 10,000,000 115,000

22,500,000 21,000,000 253,680,000 10,000,000 3,910,000 311,090,000

m2 m2 m' lot

28.00 25.00 20.00 1.00

185,000 70,000 50,000 5,000,000

5,180,000 1,750,000 1,000,000 5,000,000 12,930,000

m2 m2 m' lot lot

60.00 72.00 36.00 1.00 4.00

185,000 70,000 50,000 5,000,000 500,000

11,100,000 5,040,000 1,800,000 5,000,000 2,000,000 24,940,000

m2 Lot

72.00 2.00

115,000 5,500,000

8,280,000 11,000,000 19,280,000

m2 m2 m2 m3 m3

114.00 114.00 86.00 23.00 12.10

135,000 125,000 165,000 90,000 2,700,000

15,390,000 14,250,000 14,190,000 2,070,000 32,670,000 48,930,000

unit unit lot

1.00 1.00 1.00

11,000,000 5,500,000 15,000,000

11,000,000 5,500,000 15,000,000 31,500,000

Sub Total II III A

Jumlah

PRELIMINARY for RENOVATION FACTORY Preliminary , included in : 1). Staff, Cost - Site manager 1 person ( biaya /bulan @ 7.500.000,00 ) - Supervisor 1 person( biaya /bulan @ 6.000.000,00 ) - Safety 1 person (biaya /bulan @ 5.000.000,00) - Security 2 person (biaya perbulan @ 3.000.000,00 )

MECHANICAL & ELECTRICAL MECHANICAL WORK for RENOVATION FACTORY 1).Pekerjaan penggantian AC kapasitas 20PK a). Brand daikin /FVPG20BY1, Floor Standing 2). Pekerjaan penggantian pipa collin tower a). w/ stainlish pipe SUS-305 b). Dia 2", t = 3mm 3).Termasuk pemasangan dan accesories Total III A

448,670,000 m2 m2 m2

m2

PROYEK : Pekerjaan External Pabrik Cikarang LOKASI : Cikarang NO B

JENIS PEKERJAAN

SAT

ELECTRICALWORK for RENOVATION FACTORY 1). Pekerjaan pemasangan lampu 400 watt, LED 2). Pekerjaan perbaikan lampu PJU (street light )

Vol

Harga Sat

Jumlah

unit unit m' lot

3). Pengadaan material cable NYYHY 3 x 2,5 mm (for lighting ) 4). Pekerjaan relokasi PABX & line telephone Total III B

1,476.00

35,000

Sub Total III SUB TOTAL I + SUB TOTAL II + SUB TOTAL III

623,487,500

PROFIT 10 %

62,348,750

SUB TOTAL

685,836,250

PPN 10%

68,583,625

TOTAL

754,419,875